W19P325

Page 7

Site Co n tex t SWOT

Strength

Weakness

• A mix of transport infrastructure

• Severance caused by railway • Poor west-eastnorth-south connectivity

• The key role of A4 in maintaining the performance of strategic highway network

• Poor quality pedestrian footway

• Integrated network of sewers traversethe OA

• Underground lines serving are some of the most congestedin London

• Green spaceaccess forall

• Main roads impacts on the easeand attractiveness of pedestrian and cyclist movement

• Street hierarchy to encourage walking and cycling

• Limited spare capacityof parking

• Housing mix to include socially affordable housing and intermediate housing

• Shortage of waste management infrastructure

• Enhance existing businesses andcreatejob opportunities

• Air, noise pollution and vibrant

• Existing town centres for retail such as Fulham town centre provide ‘comparative retail

• Fragmented open greenspace

offer’as well as everyday retail offer

• Affordable housing is not assured • Poor consultation • The closureand demolition of the exhibition centres 5


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.