MODERN TOILET SYSTEM FOR RAILWAYS Phapale K.S.1, Maniyar M.Y.2, Kakad P.H.3, Bhosale P.M.4 , Prof. Shinde R.S.5 1Student,
Dept. Of Mechanical engineering,S.N.D. C.O.E. & RC.,Maharashtra,India Dept. Of Mechanical engineering,S.N.D. C.O.E. & RC.,Maharashtra,India 3Student, Dept. Of Mechanical engineering,S.N.D. C.O.E. & RC.,Maharashtra,India 4Student, Dept. Of Mechanical engineering,S.N.D. C.O.E. & RC.,Maharashtra,India 5Professor, Dept. Of Mechanical engineering,S.N.D. C.O.E. & RC.,Maharashtra,India ---------------------------------------------------------------------***--------------------------------------------------------------------1.2 Objectives Abstract – In recent decades railways are used normally 2Student,
the conventional toilets systems. Due to this major problems are produced because of human wastes are discharged on railway platform. By using modern toilet system all this problems are totally eliminated. Also overcome the drawbacks of bio toilet system. In this system the discharge of railway Toilet is control by using the speed of railway and it is operated fully automatically. Key Words: Railway, toilet, wheel, shaft, speed, governer, main reservoir, chlorine reservoir, control unit, followers, rpm, railway track, platform etc.
1. INTRODUCTION The aim of this project is to control the problems which are produced due to human wastes which are discharge on railway platform. Not only human but also protect the life of railway track due to corrosive losses. Now a day, the requirement of water as well as man power for washing and cleaning the railway platform are the major issues. Hence by using this system we overcome all this types of problems. In this system, when railway engine is coming at platform, the reservoirs of modern toilet system are coming under working by using the speed of railway shaft. and the human wastes are store in main reservoir till the train are stand on platform. When train leaves the railway platform at a certain distance from end of platform the human wastes are discharge with chlorine action.
I. II. III. IV.
Minimize the air pollution at railway platforms. Increase the life of railway track. Reduce the cost required for cleaning of platform. Eliminate the illness problems of passengers, railway workers, railway staff, track man etc.
1.3 Scope I. II. III. IV. V. VI.
It provides comfort to passengers, track mans, staff member etc. Eliminate the effort required for cleaning. Easily install in conventional toilet system with minimum changes in their design aspect. The whole system is operated fully automatically. Required Maintenance for this system is neglected. Installation cost per toilet as compare to bio toilet system is 1.11%.
1.4 Methodology Initial study Design of components Collection of material
1.1 Problem Statement Due to conventional toilet system various problems are produced like, I. Environmental impact. II. Platform cleaning and Corrosion of railway track.
Manufacturing of components Assembly of components Analysis & testing of result Conclusion Fig-1.4.1 : Flow Of Methodology