General Estimation & Abstract Sheet of Royal City Shaikh Ajim1, Raut Vishwajit2, Shah Tajmmul3, Pawar Ganesh4, Pathan Alim5, Shejwal Yogesh6 1Guide.
Department Of Civil Engineering, Ashok Polytechnic, Maharashtra, India Department Of Civil Engineering, Ashok Polytechnic, Maharashtra, India
2,3,4,5,6Student.
---------------------------------------------------------------------***--------------------------------------------------------------------Abstract – The estimating and costing means technique of the calculating the various quantities of executed work and then determining their cost known as costing The costing is mainly done by abstract sheet which is seen as follows Also it is use to determine the cost and labors for the work and in this rates of DSR is use the rates given in the DSR are revised every year, also the rates given in DSR includes 10% contractor’s profit (Key words : estimating, costing, cost, abstract sheet, labors, 10% contractor’s profit) 1. INTRODUCTION This project is under guidance of prof. shaikh A. S of General estimation of the city which has name as royal city, in which includes hospital (G+1), hostel (G), school (G+2), collage (G+2), 3bhk row houses, 3bhk apartments, 1bhk apartments and mall. And also abstract sheet is done after calculating the quantities of each building 2. APPROXIMATE ESTIMATE Approximate estimate means the preliminary estimate , because it is also use full for getting administrative approval .also for it site plans and layout plans are required Purposes of approximate estimate 1.
It gives rough idea about the cost which is required for the project or work which will be executed
2.
Easy to check feasibility of project
3.
It is also helpful to administrative approval and technical sanction
Comes here Conclusion content comes here Conclusion content comes here Conclusion content comes here 4. sample calculations Measurement sheet SR.NO
DESCRIPTION
NOS
LENGTH
BREADH
HEIGTH
QUANTITY
1.
EXCAVATION
17
1.2
1.2
1.5
17.13
17
1.2
1.2
0.2
4.89
Excavation in soft murum in foundation with lead & lift etc. complete. 2.
PCC Pcc bed below the foundation in proportion with providing & laying , compacting , curing etc. complete.