Field House Experience_VLK

Page 1


We guide clients through process, collaboration and imagination to realize exceptional environments to work, live, learn and play.

Pecos-Barstow-Toyah ISD Pecos High School Athletic Facilities

Project Information

Year Built:

Eagle Stadium: 2021

Natatorium/Arena: Est. 2027

Field House: Est. 2027

Athletic Improvements: 2024

Cost:

Eagle Stadium: $15,463,006;

Natatorium/Arena: $83,416,577; Field House: $36,681,439; Athletic Improvements: $15,702,454

Size:

Varies by Project

VLK has worked with PBT ISD on a number of projects for their athletic facilities. Recent work includes the following projects:

• Stadium Modernization: Modernization of Eagle Stadium to include a new press box, home grandstands, visitor bleachers, concession stands, and restrooms.

• Natatorium/Arena Replacement: The replacement of aging athletic facilities and natatorium at Pecos High School. Designed to serve a wide range of student programs, the facility features spaces for weight training, a competition gym, and an Olympic-sized aquatics center.

• Fieldhouse Addition: A new two-story Field House will include football, soccer, and track and field locker rooms. Other spaces include coaches’ offices, three classrooms, a weight room, and a state-of-the-art athletic training room.

• Athletic Improvements: New fields and grandstands for baseball and softball, new six-court tennis complex with a patio overlooking the courts, renovated locker rooms and coaches offices for tennis, baseball, and softball.

Learn more about Eagle Stadium

Eagle Mountain-Saginaw ISD Eagle Mountain High School Athletic Facilities

Year Built: Project Information

2024

Project Size

639,141 sf

Cost

$80,000,000

Eagle Mountain High School, EMSISD's fourth comprehensive high school included the following:

• Stadium: The complex is a 7,500-seat stadium featuring a bowl design with two tiers, ensuring tremendous sight lines for all attendees and a concourse that ensures spectators are connected to the action even if they are away from their seat.

• Fieldhouse: The multisport field house is integrated with the 100-yard indoor practice facility, providing athletes with a versatile space for training and practice. The field house contains locker rooms for all outdoor sports, coaches offices, training facilities, wrestling room, and a large weight room.

• Baseball/Softball: The baseball and softball complex is designed to take advantage of the site's natural contours, allowing spectators to enter at the top level of the seating area. Each field within this complex accommodates 500 seats, as well as standing room areas for larger capacity events.

• Tennis Complex: The eight-court tennis facility is another highlight, with two courts sunken to create a stadium feel, complete with 100 seats for spectators.

• Arena: Inside, the high school boasts five gyms, two for athletic practice, one for gymnastics, one for dance, and a 1700-seat competition gym. Locker rooms for indoor athletics, dance, and cheer flank each of their gyms, along with coaches’ offices, training facilities, and a large weight room.

Royse City ISD Worthy Fate High School Athletic Facilities

Project Information

Year Built:

Est. 2027

Project Size

606,486 sf

Cost

$309,618,828

Worthy Fate High School will be the second high school in Royse City ISD, opening in the fall of 2026. The three-story, state-of-the-art facility is designed around a central student courtyard that will encourage connection to the outdoors across a multitude of programs. Athletic facilities at the campus include:

• Competition Arena: The competition arena is designed with bowl-style seating for 2,200 spectators and includes direct views to the outside from the seats, as well as a weightroom that overlooks the arena from the north end.

• Multi-Sport Fieldhouse: A two-story multisport fieldhouse will be constructed in the south endzone that includes coaches’ offices, classrooms, a weight room, and athletic training facilities.

• Athletic Facilities: The project includes dedicated gymnasiums for Dance and Cheer as well as locker room facilities for all indoor sports.

• Tennis Complex: Eight-Court Tennis Complex

Katy ISD Katy High School Athletic Renovations

Project Information

2019 Year Built:

Project Size

33,123 sf

Cost

$6,983,677

Katy High School, a Texas powerhouse in football and 6A athletics with multiple state and national titles, needed an athletics facility that could match the legacy and trajectory of its programs. VLK was engaged by Katy ISD to expand and modernize the existing undersized Athletics Wing, transforming it into a flagship facility that celebrates performance, honors tradition, and meets the evolving demands of a nationally ranked 6A athletics program. The project was a comprehensive renovation and vertical expansion of the existing single-story building into a dynamic two-story athletics complex, seamlessly integrated into the existing campus. Designed in close collaboration with Principal Dr. Rick Hull and Head Coach Gary Joseph, the new facility supports student-athletes through every phase of their development: training, education, competition, and recruitment.

Crowley ISD Indoor | Outdoor Track and Field Complex

Project Information

Year Built:

Est. 2027

Project Size

232,079 sf

Cost

$150,000,000

Crowley ISD’s new Indoor | Outdoor Track and Field Complex is an elite, multi-functional athletic facility that will serve as a cornerstone for student development and athletic excellence.

• Hydraulic Track: Purposefully designed to meet the highest standards of performance and versatility, the complex will feature one of only 18 hydraulic banked tracks in the nation, making it a rare and highly advanced asset in the world of track and field.

• Indoor | Outdoor Track: The facility includes a 200-meter indoor track and a 400-meter outdoor track, as well as dedicated areas for all major field events.

• National Level Spectator Venue: With seating for 3,500 spectators indoors and 5,000 outdoors, the venue will not only support district athletes but also position CISD as a host for regional and national competitions, concerts, and other events.

This dynamic space reflects Crowley ISD’s commitment to providing world-class opportunities for its students—both on and off the field.

Learn more about the new Crowley ISD Indoor Track

Eagle-Mountain Saginaw ISD Boswell High School Athletic Additions and Renovations

Project Information

Year Built:

2022

Project Size

52,053 sf

Cost

$35,679,043

The Boswell High School Athletic Additions and Renovations include a new addition to provide football and gymnastics locker rooms, a training room, weight room, and an indoor practice field. The renovations include a pressbox replacement, as well as the addition of a home side parking lot, and new landscaping, a home side grandstand expansion, visitor grandstand replacement, new visitor bus parking, new perimeter fencing for safety and security, and the replacement of visitors’ restrooms to serve the auxiliary field.

Brazosport ISD Brazoswood High School Fieldhouse

Project Information

Year Built:

2020

Project Size

60,200 sf

Cost

$17,807,926

In May 2019, voters passed a $267 million bond program which included the replacement of the 50-year old Brazoswood High School Main Campus, Fine Arts, CTE and Field House. The District has engaged VLK and the design development for a new multi-sport field house has been completed.

The new Brazoswood High School Multi-Sport facility was phase one of a fourphase, $150 million project. This facility opened Summer 2020 at which time the old field house was demolished, making room on the existing site to begin construction of the new Brazoswood High School main campus.

The new two-story facility is located on the east side of Slade Field offering direct student access during and after school hours. Students and visitors can access the facility from an expanded parking lot off of Brazoswood Drive. The facility serves over 1,000 high school students participating in athletics with locker rooms for football, softball, soccer, track, cross country, wrestling, and powerlifting. State of the art amenities include a 9,000 square foot strength and conditioning weight room, prevention and rehabilitation athletic training and rehabilitation room, wrestling practice mat room, and a multi-use meeting room with direct access to a second-floor covered observation deck overlooking Slade Field.

Denton ISD Bill Carrico Fieldhouse

Project Information

Year Built:

2016

Project Size

Football: 30,555 sf

Track/Soccer/Golf/CC: 23,870 sf

BB/SB/Tennis: 14,225 sf

Cost

$14,348,070

Braswell High School’s athletic program demanded a safe space for athletes. The district’s design called for new field houses that were both adjacent to the fields/facilities where there athletes were training while providing separation of the male and female locker rooms. The common spaces were also designed to provide ease of access for all athletes including the indoor training facility with large windows to provide as much natural light as possible and creating coaches office and locker room spaces while maintaining proper coaching supervision among the athletes.

Braswell High School has three field houses, one dedicated for football, one for soccer, track, and golf, and another for baseball, softball, and tennis. The football field house has dedicated locker rooms and meeting spaces for the varsity and sub-varsity teams, a state-of-the-art weight room, and a coach’s suite with locker rooms, offices, and conference space. The soccer, track, and golf field house includes locker rooms for each sport accessed from separate areas of the building for men and women. A centralized weight room and team meeting room work to both separate the locker room suites and provide access to any athlete. The training room for all athletes is located in this field house with access directly from the exterior. The baseball, softball, and tennis field house is separated into two buildings, one for the male athletes and one for the female athletes. The separation of the buildings creates a entry portal into the baseball/softball complex.

Sherman ISD Sherman High School Fieldhouse

Project Information

Year Built:

2020

Project Size

35,860 sf

Cost

$8,893,280

As part of the new Sherman High School, VLK designed new athletic facilities for the school. Athletic facilities included a new weightroom attached to the indoor practice facility.

Keller ISD Indoor Practice Facilities

Project Information

Year Built:

2022

Project Size

68,745 sf each

Cost

$46,137,800 total

VLK worked with Keller ISD to build four indoor extra-curricular facilities for the district. Each high school now has its own facility that provides a sheltered indoor practice space for multiple sports and fine arts programs.

Crowley

ISD

Crowley HS/North Crowley HS Indoor Practice Facility

Project Information

2021 Year Built:

Project Size

43,460 sf

Cost

$10,788,744

New indoor practice facilities at CHS and NCHS to serve the band and all athletic programs that need a safe, dry place to train when the weather is cold and wet.

Sherman ISD Sherman High School Indoor Practice Facility

Project Information

2021 Year Built:

Project Size

49,959 sf

Cost

$8,143,317

New indoor practice facility to allow for a protected environment in inclement weather. This facility was part of the new Sherman High School completed in 2021

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.