Fortress Hurricane Mesh Spec Sheets August 2025_Construction

Page 1


Hurricane Construction Mesh: 663L

HURRICANE CONSTRUCTION MESH

C:\Users\mikko.anzano\Downloads\Hurricane-LogoLockup-White.png

Construction Mesh: 663L

Design of Reinforced Concrete Structures: NZS 3101-1 clause 8.7.6(a) is considered the primary clause to determine the overlap from a mesh point of view. The concrete knowledge of the wider design requirements, be able to adjust the overlap, or to review

C:\Users\mikko.anzano\Downloads\Hurricane-LogoLockup-White.png

Hurricane Construction Mesh: 665L

HURRICANE CONSTRUCTION MESH

C:\Users\mikko.anzano\Downloads\Hurricane-LogoLockup-White.png

Hurricane Construction Mesh: 665L

C:\Users\mikko.anzano\Downloads\Hurricane-LogoLockup-White.png

DESIGN OF REINFORCED CONCRETE STRUCTURES

NZS 3101.1 clause 8.7.6(a) is considered the primary clause to determine the overlap from a mesh point of view. The concrete Designer may, with knowledge of the wider design requirements, be able to adjust the overlap, or to review it under 8.7.6(b)

Hurricane Construction Mesh: 665M

Hurricane Construction Mesh: 665M

HURRICANE CONSTRUCTION MESH

Design of Reinforced Concrete Structures:

NZS 3101-1 clause 8.7.6(a) is considered the primary clause to determine the overlap from a mesh point of view. The concrete Designer may, with knowledge of the wider design requirements, be able to adjust the overlap, or to review it under 8.76.6(b)

DESIGN OF REINFORCED CONCRETE STRUCTURES

C:\Users\mikko.anzano\Downloads\Hurricane-LogoLockup-White.png

NZS 3101.1 clause 8.7.6(a) is considered the primary clause to determine the overlap from a mesh point of view. The concrete Designer may, with knowledge of the wider design requirements, be able to adjust the overlap, or to review it under 8.7.6(b)

Hurricane Construction Mesh: 668L

HURRICANE CONSTRUCTION MESH

C:\Users\mikko.anzano\Downloads\Hurricane-LogoLockup-White.png

Hurricane Construction Mesh: 668L

Made to Steel & Tube internal standard to achieve the nominal mass per square metre for non-seismic applications.

DESIGN OF REINFORCED CONCRETE STRUCTURES

NZS 3101.1 clause 8.7.6(a) is considered the primary clause to determine the overlap from a mesh point of view. The concrete Designer may, with knowledge of the wider design requirements, be able to adjust the overlap, or to review it under 8.7.6(b)

Hurricane Construction Mesh: 84XP10

Design of Reinforced Concrete Structures: NZS 3101-1 clause 8.7.6(a) is considered the primary clause to determine the overlap from a mesh point of view. The concrete knowledge of the wider design requirements, be able to adjust the overlap, or to review it under 8.76.6(b)

Made to Steel & Tube internal standard to achieve the nominal mass per square

C:\Users\mikko.anzano\Downloads\Hurricane-LogoLockup-White.png

DESIGN OF REINFORCED CONCRETE STRUCTURES

NZS 3101.1 clause 8.7.6(a) is considered the primary clause to determine the overlap from a mesh point of view. The concrete Designer may, with knowledge of the wider design requirements, be able to adjust the overlap, or to review it under 8.7.6(b)

Hurricane Construction Mesh: 147ST

HURRICANE CONSTRUCTION MESH

Hurricane Construction Mesh: 147ST

Design of Reinforced Concrete Structures: NZS 3101-1 clause 8.7.6(a) is considered the

Made to Steel & Tube internal standard to achieve the nominal mass per square metre for non-seismic applications.

knowledge of the wider design requirements, be

DESIGN OF REINFORCED CONCRETE STRUCTURES

NZS 3101.1 clause 8.7.6(a) is considered the primary clause to determine the overlap from a mesh point of view. The concrete Designer may, with knowledge of the wider design requirements, be able to adjust the overlap, or to review it under 8.7.6(b)

C:\Users\mikko.anzano\Downloads\Hurricane-LogoLockup-White.png

Hurricane Construction Mesh: 147XP10

HURRICANE CONSTRUCTION MESH

Design of Reinforced Concrete Structures: NZS 3101-1 clause 8.7.6(a) is considered the primary clause to determine the overlap from a

knowledge of the wider design requirements, be able to

Made to Steel & Tube internal standard to achieve the nominal mass per square metre for non-seismic applications.

DESIGN OF REINFORCED CONCRETE STRUCTURES

NZS 3101.1 clause 8.7.6(a) is considered the primary clause to determine the overlap from a mesh point of view. The concrete Designer may, with knowledge of the wider design requirements, be able to adjust the overlap, or to review it under 8.7.6(b)

Hurricane Construction Mesh: 333L

Hurricane Construction Mesh: 333L

HURRICANE CONSTRUCTION MESH

Hurricane Construction Mesh: 335L

Hurricane Construction Mesh: 335L

HURRICANE CONSTRUCTION MESH

Hurricane Construction Mesh: 338GMW

Hurricane Construction Mesh: 338GMW

HURRICANE CONSTRUCTION MESH

Made to

Design of Reinforced Concrete Structures: NZS 3101-1 clause 8.7.6(a) is considered the primary clause to determine the overlap from a mesh point of view. The concrete Designer may, with knowledge of the wider design requirements, be able to adjust the overlap, or to review it under 8.76.6(b)

DESIGN OF REINFORCED CONCRETE STRUCTURES

C:\Users\mikko.anzano\Downloads\Hurricane-LogoLockup-White.png

NZS 3101.1 clause 8.7.6(a) is considered the primary clause to determine the overlap from a mesh point of view. The concrete Designer may, with knowledge of the wider design requirements, be able to adjust the overlap, or to review it under 8.7.6(b) Galvanising will have a minimum of 300g/m2 surface area

Hurricane Construction Mesh: 338L

Hurricane Construction Mesh: 338L

HURRICANE CONSTRUCTION MESH

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Fortress Hurricane Mesh Spec Sheets August 2025_Construction by Steel & Tube - Issuu