



![]()




Since 1996, DeAngelis Diamond has grown rapidly from a highly successful regional construction management company, to a nationally-known, well-respected, and innovative leader in the industry. Today, DeAngelis Diamond is an award-winning national construction firm with a highly diverse project portfolio. DeAngelis Diamond was named one of America’s fastest-growing companies by Inc. 5000. We have offices located in eight cities across the country and are licensed in 38 states with a presence in the Caribbean.




















DeAngelis Diamond brings deep local healthcare construction experience to Florida, and with offices throughout the region, we have a longstanding relationship with trusted trade partners. With a strong understanding of Southwest Florida’s regulatory environment and project requirements, our team is able to mobilize quickly, navigate permitting efficiently, and deliver highquality facilities with dependable schedule and cost control. This local insight, combined with our healthcare construction expertise, helps ensure a smooth, well-coordinated process from preconstruction through project closeout.

$2B+ OF HEALTHCARE CONSTRUCTION 300+

















Lee Health Coconut Point is an extensive mixed-use development project that encompasses a vast 31-acre site and comprises a total of 164,000 sq. ft. The development transforms the area into a premier health and wellness destination and is the only medical center in southern Lee County, addressing significant service gaps in the region.
The facilities within the development are extensive and comprehensive, offering patients a full range of services that focus on health, healing, and treatment. These include a Healthy Life Center, a Free-standing Emergency Department, an Outpatient Surgery Center, a Recovery Care Center, a Laboratory, Imaging, Rehab Therapy, Cardiac Testing, and Physician Office Spaces.
One of the primary goals of the project is to provide patients with a seamless and convenient healthcare experience. To achieve this, the hospital’s system utilizes the “five ones” of healthcare connectivity, which includes one registration, one point of scheduling, one combined schedule of care, one electronic medical record, and one patient portal. This approach streamlines the healthcare process, allowing patients to receive care efficiently and effectively.
In summary, this mixed-use development project represents a significant investment in the healthcare industry, providing patients in southern Lee County with access to state-of-theart facilities and services that focus on their health and wellness needs.






Responding to Preliminarily DRB Comment:
The petitioner will pay close attention to the slope of the ADA ramps to ensure they are easily accessible.
Naples Comprehensive Health is expanding the NCH Baker Hospital Downtown Campus to include a new Heart, Vascular, and Stroke Institute (HVSI), along with a new parking structure to support both the existing hospital and the planned addition. The HVSI will be a five-story expansion directly connected to the current six-story hospital, adding approximately 186,000 square feet of space. A new four-level parking structure will also be constructed, featuring a pedestrian bridge that spans 7th Street North and connects directly to the HVSI expansion.






This project is a 105,000 sq. ft. 140-bed tertiary-care hospital that is a Center of Excellence in cardiac surgery, cardiology, and orthopedics. Health City was the first project of its size on the island and was completed with an aggressive 12-month construction schedule. Over the next decade, the hospital plans to expand to a 2,000-bed facility. The hospital consists of semi-private and private patient rooms, an ICU suite, three operating theaters, one hybrid operating theater, lab, imaging suite which includes an MRI, gamma camera, nuclear med, and CT room, dental area, full kitchen, dining area and all required support space. The goal is to provide high-quality, affordable healthcare for patients in the Caribbean region and Americas.




Phased renovations for Bayfront Health St. Petersburg for renovations in various areas of the facility. The project includes enhancements to surgical water systems, bronchoscopy and frozen sections, PACU, the roof unit, basement water treatment, and instrument air compressor systems. Further phases involve updating sterile processing, gowning rooms, work areas, repack and storage areas, managerial offices, workspace, and staff locker rooms and lounges.
ORLANDO, FL | 40,000
The Bone Marrow Transplant (BMT) Expansion Project is a 40,000 sq. ft., multi-phased renovation across multiple areas of the ORMC main campus designed to enhance both inpatient and outpatient BMT care. The initial phase includes a 12,000 sq. ft. renovation on the 8th floor of the Lewis Pavilion, focused on upgrading patient rooms and associated support and common spaces to better serve inpatient BMT patients. Subsequent phases encompass a 17,000 sq. ft. renovation on the 3rd floor of the Ambulatory Care Center to modernize outpatient infusion bays and related support areas, along with an additional 10,000 sq. ft. on the 5th floor of the Lewis Pavilion dedicated to improvements to pharmacy spaces, patient rooms.


This ambitious project involved a significant renovation of the existing ground floor Emergency Department, covering a total area of approximately 26,000 sq. ft. In addition, approximately 1,638 sq. ft. of the existing second floor was renovated as part of the project.
The renovation project was complex and involved a variety of tasks. The existing Emergency Department’s main walk-in entry was relocated, and the entire department underwent an extensive renovation to provide all-new exam rooms and resuscitation rooms. The existing nurse stations and support spaces were also upgraded, along with the waiting room.
The project also included the construction of an impressive addition to the Emergency Department, covering a vast area of approximately 19,267 sq. ft. This addition houses new exam rooms, treatment rooms, support spaces, and storage areas. One of the most significant changes was the relocation of the existing observation unit, which was moved to the second floor of the addition and expanded to provide more space.
Overall, this renovation project was a significant undertaking that transformed the existing Emergency Department into a state-of-the-art healthcare facility. The construction team navigated a range of challenges to ensure that the project was completed successfully, including working within an operational hospital environment and managing the logistics of a complex construction project.




An epicenter of innovation, the all-new Naples Comprehensive Health Baker Judith and Marvin Herb Family Simulation Center provides space for healthcare workers to train in the latest procedures and practices. This modern training center is directly attached to the main hospital building and features 10,000 sq. ft. of futuristic classrooms, mock patient and OR rooms, and a fully integrated VR classroom. The true highlight of this project was technology and its implementation throughout the entire build to fully support and bring about the future of healthcare training and learning. Ultra-modern finishes have almost a futuristic touch that further impresses upon this project’s goal of pushing the healthcare field into the world of tomorrow.



FL | 43,000 SQ. FT.
This impressive project was a large-scale healthcare facility that included a state-of-the-art free-standing emergency department, as well as a range of outpatient medical services and offices. The building itself was an impressive 43,000 sq. ft. in size, with carefully designed spaces to ensure optimal patient care and comfort.
The emergency department was a standout feature, encompassing 16,000 sq. ft. and containing 19 beds arranged in a Lean care track, which was carefully designed to optimize the staff’s processes and ensure efficient patient care. The radiology department, meanwhile, was a well-equipped 6,000 sq. ft. space that included advanced imaging technologies such as an MRI, CT scan, X-ray, and Flouro.
The remaining 21,000 sq. ft. of the building was dedicated to a range of outpatient medical services and offices, offering patients a comprehensive suite of healthcare options all under one roof. The entire construction process took an impressive 9 months to complete, showcasing the skilled workmanship and dedication of the project team.



The all new Freestanding Inpatient Orthopedic Unit will stand three-stories tall and encompass over 80,000 sq. ft. This modern healthcare facility is designed to offer innovative healthcare procedures and treatments for incoming patients with orthopedic conditions or trauma. The build will feature space for radiology treatment, surgical services with inpatient space, physical therapy, an ambulatory surgery center, sterile processing and ancillary support space, and offices for physicians.



This 10,700 sq. ft. free-standing emergency department includes a spacious waiting area, 10 well-equipped exam rooms, a dedicated trauma room, and a CT/radiology suite. DeAngelis Diamond returned again to undertake an expansion of 2,500 sq. ft. to further improve the facility’s capabilities and meet the growing demands of the community. The expansion included additional exam rooms, support spaces, and upgrades to the existing systems and finishes. The project was completed with a focus on providing a safe and comfortable environment for patients and staff alike while ensuring the facility can accommodate emergency situations efficiently and effectively.
Ground up construction of an all-new FSED. This state-of-the-art 20,500 sq. ft. facility features (21) Exam Rooms, Resuscitation Room, Triage Room, (2) Fast Track Exam Rooms, as well as X-Ray and CT Imaging Rooms. The site presented specific logistical challenges with the overall location requiring offsite parking, limited storage, and on-time deliveries. BIM coordination is key for these facilities as there is limited space above the ceiling. Proper sequencing of activities through trade partner collaboration during pull-planning has ensured we have hit all milestones.
This new ground-up Free-Standing Emergency Department includes a 10,500 sq. ft. facility that includes 10 exam rooms, X-ray, and CT rooms. The site package includes retention ponds and clearing/grading for future healthcare development including a future medical office building. The densely wooded site required full clearing and significant import fill as part of establishing the building pad. The masonry and steel structure includes a combination of split-face block and stucco. Despite the significant sitework, the project is still being delivered in under 10 months.

This project entailed a comprehensive upgrade of an existing office space to create new, state-of-the-art office and patient amenities areas, with extensive asbestos-containing materials (ACM) abatement requirements. The project involved the addition of two ADA bathrooms and the upgrading of two existing bathrooms with high-end fixtures and finishes. Due to its proximity to the main lobby and the ICU unit above, the project required level 3 ICRA compliance, with extensive measures taken to ensure negative pressure and maximum protection for workers through the use of clean suits and masks. The project’s success hinged on precise coordination and clear communication with user groups, Moffitt facilities, and construction managers, which allowed for uninterrupted progress and timely completion of the project within an aggressive schedule.
This project includes the ground-up construction of a new three-story, 75,000 sq. ft. medical office building and the complete interior build-out of patient-focused medical spaces, including clinics, imaging, rehab/therapy, simulation, teaching, and lab areas. In addition, the scope encompasses tenant improvements across three suites within the 33,207 sq. ft. medical office building, featuring full interior build-out with architectural finishes and integrated mechanical, electrical, plumbing, fire protection, and technology systems to deliver functional, code-compliant environments tailored to tenant needs.








This project encompassed the renovation of an existing space into a modern medical facility spanning over 5,000 sq. ft. The renovation involved minor demolition to make way for the construction of three mammogram rooms, three ultrasound rooms, and a large waiting room. The facility boasts high-end finishes, COVID-friendly touch-less fixtures, and cutting-edge medical equipment. The project also included the installation of new partitions, lights, diffusers, ACT, fire alarms, bathrooms, doors, paint, tile flooring, and a revised sprinkler system. The attention to detail in both the design and construction phases resulted in a modern and welcoming medical facility for patients and staff alike.




Construction on the all-new Kamberg Wellness Center is a part of several projects aiming to expand and improve the community. Three central projects make up the whole, including the renovation of the Kiltie Café, the new construction of the Kamberg Wellness Center, and the development of the Glenridge North Community.
The all-new Kamberg Center is part of the entire Glenridge on Palmer Ranch community expansion. This 10,732 sq. ft. facility is a modern solution to the needs for a healthcare solution. The center features a diverse portfolio of spaces designed to provide care for a multitude of healthcare needs and space for public gatherings.
This project consists of a ground-up eye surgery center. The Eye Surgery Center of Elizabethtown had a 9-month contractual and DeAngelis Diamond achieved substantial completion in 7.5 months. This project broke ground in March 2020, right when COVID-19 began. The project team overcame COVID-19 obstacles while procuring materials with limited travel due to restrictions all while having a positive influence on one another and the entire community.




The project involved constructing a brand new state-of-the-art behavioral health replacement hospital spanning over 95,600 sq. ft. The facility was designed to provide a healing environment for patients with 82-86 licensed inpatient beds. The hospital was equipped with cutting-edge technology and innovative treatment methods to provide the best possible care for patients. The project required careful planning and execution to ensure that the facility was built to meet the specific needs of the patient population, with a focus on safety, comfort, and privacy.





North Tampa Behavioral Health is a 45,800 sq. ft. 50-bed behavioral health hospital and inpatient treatment center consisting of 26 psychiatric patient rooms with support space, a gymnasium, outdoor basketball court, and a full kitchen. The project was impressively completed 113 days ahead of schedule. A few years later, an additional 34,700 sq. ft. doubledecker unit was completed, expanding the hospital to 80,500 sq. ft.
TAMPA, FL | 28,000 SQ.
Gracepoint Women’s Behavioral Health Hospital is an answer to the growing need for behavioral and mental health treatment in the state of Florida. As the first treatment hospital specifically for women, Gracepoint fills a much-needed market within our community. This 2-story, 28,000 sq. ft. hospital features over 36 beds for incoming patients and allows for providers to give 24/7 care. In the initial phase of construction, the first floor will be fully outfitted as a behavioral health hospital and will be ready to receive patients upon completion. The second floor will leave shell space for a future build-out upon funding.


This project consisted of the new construction of a 65,000 sq. ft. two-story rehabilitation hospital. With a total capacity of 60 beds, this facility offers state-of-the-art care for incoming patients suffering from traumatic brain injuries, Parkinson’s disease, concussions, and other injuries. Patients’ path to rehabilitation is supported by a large therapy gym, outfitted with the latest equipment and a full-sized commercial kitchen supports both patients and staff around the clock. Both interior and exterior common spaces were designed for gatherings and down time for patients, staff, and visitors alike.
This free-standing facility is dedicated to the provision of top-quality healthcare services for patients with functional deficits resulting from debilitating illnesses or injuries. With 40 beds, Lafayette Regional Rehabilitation Hospital provides ample space to accommodate patients in need of post-acute rehabilitation services. The hospital has been designed with a focus on creating a warm and welcoming environment that is both supportive and functional.

PORT CHARLOTTE, FL | 24,600 SQ. FT.
Completed multiple renovations at AdventHealth Bayfront Health (formerly CHS Bayfront Heath Port Charlotte), totaling $4.2 million, including an 18,000 sq. ft. 4th Floor Progressive Care Unit (PCU) renovation with décor upgrades, a $1 million renovation of existing shell space into a Hybrid OR Suite, and a 5,000 sq. ft. ICU, Endoscopy, and Dialysis Suite renovation.
PORT CHARLOTTE, FL | 24,000 SQ. FT.
DeAngelis Diamond has provided Construction Management (CM) services to Fawcett Memorial Hospital for several years, facilitating a range of improvements to healthcare facilities. Key projects include the CT Replacement, which enhances diagnostic imaging capabilities; the Physician Lounge, which offers upgraded amenities for medical staff; and the Grossing Station, which improves pathology operations. Additional work includes renovations to the Cath Lab and Pharmacy, contributing to enhanced patient care and clinical efficiency.





After 16 months of hard work, the Punta Gorda Terminal Expansion project reached its successful completion. With four phases in total, this project included a stunning 40,000 sq.ft. addition to the existing terminal building, a complete remodel of the terminal for a total area of 57,000 sq.ft., and updates to both the conveyor belt system and chiller plant. This impressive feat was recognized by the Lee BIA Summit Awards, which awarded the project the title of Best Commercial Contractors Project - Public Works.
DeAngelis Diamond provided comprehensive preconstruction services and is currently leading construction to expand and renovate the airport’s existing commercial terminal, adding 51,500 sq. ft. of new space for hold rooms, circulation, restrooms, and concessions, along with 30,500 sq. ft. of renovations to expand security screening, queuing, and arrival areas to improve passenger flow and operational efficiency. In addition, DeAngelis Diamond provided preconstruction services for a new single-story, 18,000 sq. ft. pre-engineered metal rental car facility that will replace the existing rental car center and position the airport for a future connection between the terminal building and rental car facility, with supporting scope across both efforts including aircraft parking relocation, drainage and rental car-ready space adjustments, apron grading, and construction of a new access road.





LEE COUNTY, FL | 30,000+ SQ. FT.
DeAngelis Diamond delivered the $6.8 million, 27,580 sq. ft. Lee Health Surfside Outpatient Clinic, a two-story design-build facility with a cath lab, advanced imaging, and 20 exam rooms. The team also provided full preconstruction services for the Lee Health Cape Coral Comprehensive Specialty Care Center, a multi-specialty clinic with infusion, imaging, procedure rooms, and recovery space. In addition, DeAngelis Diamond completed the $1.2 million, 2,500 sq. ft. Lee Health LPG OB Renovation to create a new OB/GYN clinic in an existing medical office suite.
CAPE CORAL, FL | 46,380 SQ. FT.
This project consisted of a 46,380 sq. ft. renovation of a four-story Medical Office and Outpatient Center, modernizing the facility to better support patient care and clinical operations. The renovation included updates throughout the building to enhance functionality, improve the patient experience, and create a more efficient environment for staff and providers.
MYERS, FL | 70,000 SQ. FT.
This project includes a 76-bed inpatient psychiatric hospital featuring four nursing units, delivered in 11 months with zero change orders, final AHCA approval, and a fully integrated access control/security system. LEED Silver Certified and awarded Best Healthcare Project.





DAVID DIAMOND CEO, CO-FOUNDER, & CHAIRMAN


JOHN DEANGELIS CO-FOUNDER & CHAIRMAN



REGGIE MORGAN PRESIDENT & PRINCIPAL


BRETT DIAMOND CAO & PRINCIPAL

ROBERT LEWIS EXECUTIVE VP & PRINCIPAL

9
DIVISION VICE PRESIDENTS
86
32
119
“Thank you for your leadership on this very important project. Rarely do construction projects go smoothly, but this one was the exception. The construction was flawless, the collaboration was exceptional, and the outcome phenomenal. You have made a difference for patients at SMH for today and for years to come.”
- Lorrie Liang, COO, Sarasota Memorial Hospital
55 SUPPORT STAFF



University of Louisiana at Monroe Bachelor of Science in Building Construction
years of Construction Experience
OSHA 30
Certified General Contractor –
State of Louisiana #57774
With more than 25 years of construction experience, Reggie serves as President of DeAngelis Diamond, providing leadership across all projects and overseeing day-to-day operations. A Louisiana Certified General Contractor with a Bachelor’s degree in Building Science from the University of Louisiana at Monroe, he has delivered complex work throughout the United States and the Caribbean. Known for building high-performing teams and driving operational excellence, Reggie ensures efficient resource management and reliable project delivery, combining strong construction expertise with a client-focused approach to maximize project value.
Sarasota Memorial Hospital Behavioral Health
Sarasota, FL | $64 million
95,600 sq. ft., 3-story ground up construction of a behavioral health treatment hospital. The facility was built to offer an array of both outpatient and inpatient care, including counseling services, 24hour assessment center, and an ECT suite. Private patient rooms for pediatric, adult, and acute care were key features of this project.
NCH Heart, Vascular, and Stroke Institute (HVSI) Naples, FL | $230 million
This project features a 199,000 sq. ft. expansion on the existing HVSI facility and the addition of an all-new, 4-level parking structure. The work includes a 5-story, vertical expansion to the existing 6-story hospital and a bridge that will connect the new parking structure to the new expansion.
HSS/NCH Freestanding Inpatient Orthopedic Unit Naples, FL | $93 million
This project features the new construction of a 3-story, 104,000 sq. ft. orthopedic surgery center with both inpatient and outpatient suites. The work includes building over 22 exam rooms, 2 radiography room, a rehab gym, cafe, and ambulatory surgical center, as well as patient support spaces and administration offices for staff and medical providers.
Lee Health Village at Coconut Point Estero, FL | $86 million
This project consists of a mixed-used development on a 31-acre site. Altogether, the project totals 164,000 sq. ft. The new health and wellness destination is the only medical center in southern Lee County addressing the service gaps around the area. Facilities include a Healthy Life Center, Free-standing Emergency Department, Outpatient Surgery Center, Recovery Care Center, Laboratory, Imaging, Rehab Therapy, Cardiac Testing, and Physician Office Spaces. Services focus on health, healing, and treatment.


Palm Point Behavioral Health Hospital
Titusville, FL | $22 million
This project featured the construction of an all-new, nearly 50,000 sq. ft. behavioral health hospital.
NCH Baker ED
Naples, FL | $30 million
This project consists of renovating approximately 26,000 sq. ft. of the existing ground floor Emergency Department and approximately 1,638 sq. ft. of the existing second floor. The project entails relocating the Emergency Department's main walk-in entry, renovating the department to provide all new exam rooms and Resuscitation rooms, renovating existing nurse stations, renovating existing support spaces, and renovating the existing waiting room. The project also includes the construction of an addition to the Emergency Department that is approximately 19,267 sq. ft. of additional exam rooms, treatment rooms, support spaces, and storage. The renovation includes relocating the existing observation unit to the second floor of the addition and expanding the observation unit.
North Tampa Behavioral Health Expansion
Wesley Chapel, FL | $12.3 million
A 34,700 sq. ft. double-decker unit expands the hospital to 80,500 sq. ft. Additional features include a state-of-the-art training area and the doubling of North Tampa’s outpatient and partial hospitalization sections.
AdventHealth Bayfront Health Hybrid OR
Port Charlotte, FL | $1 million
Renovation of existing shell space to a Hybrid OR Suite.
AdventHealth NSB CT Replacement
New Smyrna, FL | $730,000
Renovation of 775 sq. ft. existing CT suite and installation of upgraded equipment.




University of Florida Bachelor of Science in Building Construction
15 years of Construction Experience OSHA 30 LEED AP
TJ serves as the Vice President of our Orlando Office. He is responsible for project oversight of all assigned projects from the initial concept to each project’s completion.
TJ will provide leadership and direction to all involved in his projects, while creating and maintaining great relationships with the Client(s).
James A Haley Veteran’s Hospital New Bed Tower
Tampa, FL | $150 million
This Design / Build project included a new 5-story, 140-bed tower on the existing VA campus in Tampa, FL. The project includes integration with the existing hospital campus systems, meets all blast requirements, and complies with all Army Corps and VA guidelines. The structural steel building is supported on auger-cast piles with precast and curtain wall exteriors.
Orlando Health Bone Marrow Transplant Projects
Orlando, FL | $24 million
This expansion project consisted of multiple smaller projects each aiming to renovate, improve, and expand on the bone marrow transplant at Orlando Health's downtown Orlando campus. The entire project totals up to 40,000 sq. ft. and was completed while the hospital remained open and active.
Halifax North Daytona FSED
Daytona Beach, FL | $14.2 million
Built a new 20,500-sq.-ft. freestanding emergency department with 21 exam rooms, triage, resuscitation, fast-track rooms, and on-site X-ray and CT imaging, delivered through tight logistics planning, BIM coordination, and pull-planning collaboration to meet all milestones.
Orlando Health Eustis FSED
Eustis, FL | $14 million
New construction of a 12,000 sq. ft. Free Standing Emergency Department.
Orlando Health BMT 3ACC Renovation
Orlando, FL | $8.8 million
Demolition, Construction, and renovation of the existing Orlando Health Cancer Center Institute to expand its Bone Marrow Transplant Program.
Orlando Health BMT 5LP Pharmacy Renovation
Halifax Port Orange FSED
Port Orange, FL | $9.5 million
Ground up construction of an all-new FSED.


Orlando Health Nuc Med CT Changeout
Sarasota, FL | $1.6 million
This project features 2,500 sq. ft. of equipment change out for Orlando Health.
Orlando Health BMT Expansion
Orlando, FL | $530,000
1,500 sq. ft. of renovation work on the existing hospital wing focusing on converting positive pressure patient rooms into bone marrow transplant patient rooms.
AdventHealth NSB CT Replacement
New Smyrna, FL | $730,000
Renovation of 775 sq. ft. existing CT suite and installation of upgraded equipment.
The Teale Melbourne Melbourne, FL | $10 million
Conversion of a motel into studio-style affordable housing units.
Thornton Place Apartments
Orlando, FL | $23 million
100-Unit 4-Story CFMF Affordable Senior Housing
Apartment Building with Integral Clubhouse and ~1000 SF Mixed Use Tenant Space. Total Square Footage: 116,540 sq. ft.
PUPR Orlando Campus Aerospace Lab
Orlando | $2.4 million
Design / Build project. The new laboratory consists of a test jet engine, autonomous vehicle research studio, supersonic and subsonic wind tunnel. The building structure consists of CMU and steel joist, with an exterior stucco and storefront exterior façade.
Lakeside at Waterman Village
Mount Dora, FL| $52 million
This project consist of new construction a 344,846 sq. ft. senior living community. Build includes 88 living units, 40 cottage units, 32 lakehouse units, 24 assisted living support units, and 20,000 sq. ft. of common area/amenities and enclosed parking.




University of Tennessee Bachelor of Science in Building Construction
QUALIFICATIONS EDUCATION
21 years of Construction Experience OSHA 30 LEED AP
CERTIFICATIONS
Scott serves as the Vice President of our Sarasota Office. He is responsible for project oversight of all assigned projects from the initial concept to each project’s completion.
Scott will provide leadership and direction to all involved in his projects, while creating and maintaining great relationships with the Client(s).
PROJECT HIGHLIGHTS
Sarasota Memorial Hospital Behavioral Health
Sarasota, FL | $64 million
95,600 sq. ft., 3-story ground up construction of a behavioral health treatment hospital. The facility was built to offer an array of both outpatient and inpatient care, including counseling services, 24hour assessment center, and an ECT suite. Private patient rooms for pediatric, adult, and acute care were key features of this project.
Cleveland Clinic Weston Expansion 2
Weston, FL | $180 million
Cleveland Clinic expanded its emergency and intensive care services with a six-story, 195,800 sq. ft. addition featuring a 40-room Emergency Department, 12 observation rooms, 48 ICU beds, and a 24-bed acute care floor, plus a central utility plant, 400 parking spaces, a connector bridge, and 66,000 sq. ft. of renovations to the main hospital.
Jackson Health Rehabilitation Center
Miami, FL | $130 million
Nine-story, 270,000 sq.ft. facility containing 72 inpatient beds, clinics, designated research space, diagnostic and treatment areas, outpatient therapy, aquatic therapy rooms, and offices. The hospital delivers inpatient and outpatient care for spinal cord and brain injuries, and a broad spectrum of other medical conditions.
UHS Manatee Memorial Hospital Emergency
Department Expansion
Bradenton, FL | $33 million
Project included a 37,000 sq.ft. horizontal expansion as well as 5,000 sq.ft. of interior renovations of the original hospital.
Brandon Regional Hospital MOB
Brandon, FL | $27 million
Ground-up construction of an all-new, 3-story, 75,000 sq. ft. medical office building. The project will include the full build-out of the space, including patient care clinics, imaging suites, rehab/therapy suites, simulation, teaching, and lab space.


Gracepoint Women's Behavioral Health Hospital
Tampa, FL | $12 million
Ground-up construction of a 2-story, 15,000 sq. ft. women's behavioral health hospital. The first floor provides space for 36 beds and 24/7 care. The second floor will provide a shell-space for a future build-out. This project will be the first women's behavioral health hospital in the state of Florida.
Boca Grande Health Clinic
Boca Grande, FL | $12 million
This project features demolishing an existing 3,600 sq. ft. health clinic and the construction of an allnew 2-story, 11,200 sq. ft. replacement.
Coastal Commons MOB
Nokomis, FL | $8.4 million
The project consists of a two-story, 46,000 sq. ft. core and shell medical office building. The scope includes landscaping, sidewalks, handicap-accessible parking, and impact-resistant storefront windows. The total project duration is approximately 8.5 months, and the project is currently in the Core & Shell phase.
BayCare Carrollwood Health Hub
Tampa, FL | $9.7 million
Conversion of an existing Barnes & Noble into a HealthHub, including Urgent Care, Imaging, and Lab.
Orlando Health Bayfront Health Sterile Processing Department Renovation
St. Petersburg, FL | $7.5 million
Bayfront Health St. Petersburg completed phased renovations across the facility, upgrading surgical water systems, bronchoscopy and frozen sections, PACU, roof units, basement water treatment, and instrument air systems, with additional phases modernizing sterile processing, staff/work areas, offices, storage, and locker rooms and lounges.
Tampa General Hospital - Healthpeak
Tampa, FL | Under Construction
Continuing services for TGH Outpatient with Healthpeak.




As Director of Operations, Brant’s commitment to excellence provides every project with a capable and proven team. He will monitor project performance to ensure the project is delivered according to the client’s expectations. Brant will take a leadership role in managing the client relationship together with the project resources. Bill will oversee the GMP budgets, project operations, scheduling and financial reviews and offer guidance and leadership to problem solving during the preconstruction and construction.
Orlando Health BMT Expansion
Orlando, FL | $530,000
Orlando Health BMT Expansion
Orlando, FL | $530,000
1,500 sq. ft. of renovation work on the existing hospital wing focusing on converting positive pressure patient rooms into bone marrow transplant patient rooms.
1,500 sq. ft. of renovation work on the existing hospital wing focusing on converting positive pressure patient rooms into bone marrow transplant patient rooms.
24 years of Construction Experience
OSHA 30 ASHE
ICRA 2.0 Improving Patient Protections
Certified Healthcare Environment Worker
Safe Day One Certification
USF H. Lee Moffitt Cancer Research Center
Tampa, FL | $175 million
New 360,000 sq. ft. concrete framed cancer research facility with a detached 600 vehicle parking garage and a 2,000 ton Central Energy Plant. Also included a 160,000 sq. ft., five level Clinic for outpatient services. In the 200,000 sq. ft. Research Building, the basement level houses a 26,000 sq. ft. Vivarium, the 1st floor contains an auditorium, administration, conference facilities and related functions and the 2nd through 4th floors are laboratory space. The new buildings augment the existing facilities with research laboratories, outpatient clinics, administration, related support functions and conference facilities.
Orlando Health Bone Marrow Transplant Projects
Orlando, FL | $24 million
This expansion project consisted of multiple smaller projects each aiming to renovate, improve, and expand on the bone marrow transplant at Orlando Health’s downtown Orlando campus. The entire project totals up to 40,000 sq. ft. and was completed while the hospital remained open and active.
Orlando Health BMT 3ACC Renovation
Orlando, FL | $8.8 million
Demolition, Construction, and renovation of the existing Orlando Health Cancer Center Institute to expand its Bone Marrow Transplant Program.
Orlando Health BMT 5LP Pharmacy Renovation
Halifax Port Orange FSED
Port Orange, FL | $9.5 million
Ground up construction of an all-new FSED.


PUPR Orlando Campus Aerospace Lab
Orlando | $2.4 million
Design / Build project. The new laboratory consists of a test jet engine, autonomous vehicle research studio, supersonic and subsonic wind tunnel. The building structure consists of CMU and steel joist, with an exterior stucco and storefront exterior façade.
The Maxwell at Xentury City
Kissimmee, FL | $60.5 million
This project features the all-new construction of a 407,796 sq. ft., 311-unit multifamily development. The build includes 5 buildings, surface parking, retaining pond, pool, and amenities.
Cordova Apartments
New Smyrna, FL | $69.3 million
New construction of a 450,818 sq. ft. 5-building, 322-unit multifamily complex with amenities: pool, trash compactor with enclosure, and maintenance building.
Novel Nona
Orlando, FL | $47 million
This project consists of construction of (2) 4-story multifamily apartment buildings with 260 apartment units and amenities totaling 315,093 sq. ft.
Lake Wire Mixed-Use
Lakeland, FL | $64 million
This project features new construction of a mixedused development featuring four main resident buildings, an amenities building, 2-retail shells, a pool, a maintenance building, and site furnishings.




EDUCATION
University of Florida Bachelor of Science in Building Construction
QUALIFICATIONS
30+ years of Construction Experience
CERTIFICATIONS
OSHA 30
ICRA 2.0 Improving Patient Protections
Healthcare Physical Environment Worker Safe Day One Certification
As Director of Operations, Bill will monitor project performance to ensure the project is delivered according to the client’s expectations. He will take a leadership role in managing the client relationship together with the project resources. Bill will oversee the GMP budgets, project operations, scheduling and financial reviews and offer guidance and leadership to problem solving during the preconstruction and construction.
PROJECT HIGHLIGHTS
Carilion Roanoke Regional Medical Center
Roanoke, VA | $500 million
Construction of a 600,000 sq. ft. 14-story, 180bed, level 1 trauma center. This build included the all-new emergency department and a trauma and cardiac health teaching institute.
Gracepoint Women's Behavioral Health Hospital
Tampa, FL | $12 million
Ground-up construction of a 2-story, 15,000 sq. ft. women's behavioral health hospital. The first floor provides space for 36 beds and 24/7 care. The second floor will provide a shell-space for a future build-out. This project will be the first women's behavioral health hospital in the state of Florida.
Halifax North Daytona FSED
Daytona Beach, FL | $14.2 million
Built a new 20,500-sq.-ft. freestanding emergency department with 21 exam rooms, triage, resuscitation, fast-track rooms, and on-site X-ray and CT imaging, delivered through tight logistics planning, BIM coordination, and pull-planning collaboration to meet all milestones.
Orlando Health Eustis FSED
Eustis, FL | $14 million
New construction of a 12,000 sq. ft. Free Standing Emergency Department.
Orlando Health BMT 3ACC Renovation
Orlando, FL | $8.8 million
Demolition, Construction, and renovation of the existing Orlando Health Cancer Center Institute to expand its Bone Marrow Transplant Program.
Medical University of South Carolina
Charleston, SC | $350 million
This project featured the construction of a 650,000 sq. ft. 15-story, 200-bed, level 1 trauma center with replacement women’s and children’s center.


The Roux Institute at Northeastern University
Portland, ME | $350 million
This project featured the construction of a 7-story, 325,000 sq. ft. New Life Science and University project with both wet and dry labs.
MaineGeneral Medical Center
Augusta, ME | $300 million
This project featured the construction of a 4-story, 250-bed, 640,000 sq. ft., level 1 trauma center, new acute care hospital.
Baylor Scott & White Medical Center
Waco, TX | $200 million
This project featured the construction of an all-new 7-story, 200-bed, 525,000 sq. ft., level 1 trauma center and new acute care hospital with a connected 2-story 50-bed 100,000 sq. ft. women and children’s center.
New River Valley Medical Center
Radford, VA | $115 million
This project featured the ground up construction of a 350,000 sq. ft. 3-story, 100-bed new acute care hospital for the Carilion Clinic.
Gerald Champion Regional Medical Center
Almogordo, NM | $100 million
This project featured the gound up construction of a 300,000 sq. ft. 2-story, 75-be new acute care hospital.
Orlando Health BMT Expansion
Orlando, FL | $530,000
1,500 sq. ft. of renovation work on the existing hospital wing focusing on converting positive pressure patient rooms into bone marrow transplant patient rooms.
Halifax Port Orange FSED
Port Orange, FL | $9.5 million
Ground up construction of an all-new FSED


