MARCH 2023
More transparency, more value. With MWM Remote Asset Monitoring. Remote Asset Monitoring (RAM) is the new digital application from MWM that enables you to continuously monitor your plant. The system displays the status of your MWM fleet in a wellstructured, transparent manner, allowing you to act with foresight and more effectively. www.mwm.net/ram CES20001_Anzeigen_MWM_RAM_235x55mm_EN_1_0_RZ_sm.indd 1
GAS-FIRED ALFHAUSEN PROJECT MWM is behind an innovative gas-fired cogeneration project being rolled out in Alfhausen in Germany. Page 14 The New Children’s Hospital (NCH) project in Dublin, Ireland, comprises a main hospital on the shared campus at St James’s and two paediatric Outpatient and Urgent Care Centres CHI at Connolly, Blanchardstown, and CHI at Tallaght. The NCH Project will have a significant impact on 25% of the population and is a Government priority, it is the most significant capital investment project in the healthcare system ever undertaken in Ireland. Anglo Nordic - part of the Flowmax Group of companies - has partnered with Inpro Research & Development to supply and install gas oil pumping technology for the NCH’s prime/standby gensets. Anglo Nordic installed two different fuel supply systems for the burners and the gensets, both controlled by a master PLC. The whole installation has two main storage tanks. Both the burner ring pipeline and the genset ring pipeline suck fuel from these two main storage units. The burner’s supply installation comprises a double pump unit and five burners., plus inlet stablisers. The genset’s supply
07.03.23 10:13
BESS SYSTEM FOR THE NETHERLANDS Zwart Techniek Battery is supplying an a 1 MW/2 MWh BESS to BE Fresh Produce BV of the Netherlands. Page 15
LIDL-SPAIN BUYS NEW GENSET ELECTRA The MOLINS Group has supplied a 2,250 kVA genset with Baudouin engine & Mecc Alte alternator Page 18
The New Children’s Hospital (NCH) Project in Dublin features new genset tech installation is composed of a double-pump unit and five generators with their corresponding daily tanks , safety devices and their return single pump units. The master control will be redundant with two separate PLC programmed to control the installation. There will be two different communication lines for each PLC, one via Modbus and the other via TCP IP as well: there will be four redundancy communication channels.
The NCH project provides a key hospital at St James’s campus, delivering the best care and treatments for Ireland’s sickest children and young people. It will play play a central role in the provision of acute paediatric healthcare services across Ireland. We designed and built your genset – and we know it like no other. Entrust the service to the one who knows best: the manufacturer. www.mwm.net/en/services
1
EURO POWER NEWS MARCH 2023 CES22027-Anzeigen_MWM_Service_V1_95x145mm_EN_1_0_RZ_sm.indd 1
08.03.23 09:23