Skip to main content

Navvies 337

Page 1

navvies Volunteers restoring waterways

Kescrg: A year in the life of a mobile volunteer group

Cotswold Canals: The next three years on the Missing Mile…

Issue 337 JUNE - JULy 2026


Intro Training Weekend

A selection of pictures taken by Ali Bottomley on the WRG Training weekend hosted by the Lichfield Canal. See report on pages 14-15


In this issue Contents For latest news on our activities visit our website wrg.org.uk See Facebook group: WRG Follow us on @wrg_navvies Contents

Production

Intro Training Weekend pictures 2 Editor: Martin Ludgate, 35 Silvester Road, Editor’s Welcome and plastic lock gates? 4-5 East Dulwich London SE22 9PB. Chairman’s Comment 6-7 020-8693 3266 martin.ludgate@wrg.org.uk Kescrg a year in the life of a mobile group 8-11 Leadership Teams Day report 12-13 Contributions welcome, by email or post, Training Weekend report 14-15 to the address above. If sending a lot of Festivals Sites sought for waterways events large picture files, please contact the editor plus some that we’ve attended recently 16-18 first. Press date for issue 338: 15 July. WRG Wear WRG logo clothing returns 19 Diary Camps and working weekends 20-21 Subscriptions: A year's subscription (6 issues) is London WRG reporting weekend working a minimum of £5.00 (please add a donation if parties at John Robinson Lock 22-24 you can) to WRG, Hardy House, Progress a bumper-size roundup of Northbridge Road, Berkhamsted HP4 restoration from around the network 25-39 1EF. Cheques must be made out to The Inland Waterways Association (although the proceeds will be put to WRG / PLEASE NOTE: subscriptions Navvies use).

renewal cheques should be made out to The Inland Waterways Association. Note our new address (above right)

Distribution: John Hawkins, 4 Links Way, Croxley Green WD3 3RQ 01923 448559 john.hawkins@wrg.org.uk

Navvies is published by Waterway Recovery Group and is available to all interested in promoting or supporting the restoration and conservation of inland waterways by voluntary effort in Great Britain. Articles may be reproduced in allied magazines provided that the source is acknowledged. WRG may not agree with opinions expressed in this magazine, but encourages publication as a matter of interest. Nothing printed may be construed as policy or an official announcement unless so stated - otherwise WRG and IWA accept no liability for any matter in this magazine. Waterway Recovery Group is part of The Inland Waterways Association, (registered office: Hardy House, Northbridge Road, Berkhamsted HP4 1EF), a non-profit distributing company limited by guarantee, registered in England no 612245, and registered as a charity no 212342. VAT registration no 342 0715 89. Directors of WRG: Rick Barnes, George Eycott, John Hawkins, Dave Hearnden, Nigel Lee, Mike Palmer, George Rogers, Jonathan Smith, Harry Watts, Mike Wills. ISSN: 0953-6655

© 2026 WRG

Cover picture: The Kescrg mobile group’s volunteers at work on gabion channel banks on the Wey & Arun Canal at Rooks Hill. See pages 8-11 for a roundup of Kescrg’s activities over the last 12 months. Picture by Stephen Davis Back cover (top): The lock tail bridge at Pewsham Top Lock on the Wilts & Berks Canal, before the Wilts & Berks Canal Trust began restoration work a couple of years ago (picture by WBCT) Back cover (bottom) The same site today as WBCT volunteers celebrate its completion (WBCT) Page 3


Navvies welcome from the editor The relevance of our Progress pages, the usual appeal for summer Canal Camp reports, and a rather more unusual set of lock gates… Welcome A warm welcome from the editor to another issue of Navvies, the magazine named after the original navvies who built the canals 200-plus years ago, and written by and for the 21st century volunteer navvies who are restoring these historic waterways from dereliction for everyone to enjoy - and published by Waterway Recovery Group, whose mobile volunteers work around the country on whichever canals need their labour. And welcome especially to any new readers, including those who’ve received a free copy as a result of signing-up for one of WRG’s programme of summer Canal Camps which starts in just a few weeks’ time. We should have plenty of camp reports in the next couple of issues, keeping the readers informed of what our volunteers have got up to during he summer of ’26. Well, we should have - but only if some of you volunteers write them and send them to the editor. So here’s a reminder to all of you that it’s a lot easier to write a good / entertaining / accurate / stimulating / downright stroppy [delete as appropriate] camp report if you do it straight away, rather than waiting until the editor is pestering you in October to write a piece about something you did three months earlier and are struggling to remember. Seriously, we do appreciate all the reports we receive for publication - my thanks in advance to everyone who sends one in. And pictures are greatly appreciated too.

In the meantime… …as we don’t have any week-long summer Canal Camps to report on in this issue (although we do have plenty of reports of work by the regional mobile groups whose weekend digs carry on all year), I’d instead like to highlight the ‘Progress’ pages which take up a large part of this issue. These pages include a lot of information about what’s going on in the wider world of waterway restoration, mostly submitted by the local canal restoration societies and trusts and although it’s all good and (to me, and I hope to you too) interesting information I think it’s fair to say that at times there can seem to be a little bit of a ‘disconnect’ between these reports and the volunteer work that the typical Navvies reader gets involved in. For example the Chesterfield Canal report covers a £5m Government funded project involving professional engineering contractors building a new lock and new bridges - it’s a far cry from most of the volunteer work parties that I’ve been on. But actually if you look at some of the other reports on the Progress pages in this particular issue, there are several that are very much relevant (sometimes indirectly, I’ll admit) to what WRG and other mobile volunteers are working on. One of our summer Canal Camp sites is the Lichfield Canal, working on new channel construction. And in the Progress pages you can see that on a nearby site on the same canal, a longstanding obstruction to restoration - the ‘Big Pipe’ - is finally being done away with. On the Wilts & Berks Canal we’re all set for a week’s Canal Camp at Pewsham Locks. And meanwhile our Wilts & Berks Progress report covers the threat (or opportunity) for the canal restoration as a result of plans for a new reservoir, as well as the progress of a housing development in Swindon that’s providing a vital new section of canal at the developers’ expense. No, they aren’t on the same section of canal as the WRG Camp site but between them they cover three of the W&B Canal Trust’s strategic priorities for the forthcoming years (as covered in full in our Restoration Feature in Navvies issue 334): developing Pewsham as a canal centre and community hub; opening navigation from the Thames to Wantage; and linking Swindon to Royal Wootton Bassett. On the Wey & Arun, we’re looking forward to a fortnight of channel construction on a Page 4


currently filled-in length of canal, which will link up our last year’s project at Rook’s Hill Bridge and our earlier one at Birtley Bridges to create a longer length of restored canal. And in our Progress report, you can see how the Wey & Arun Canal Trust have (quite literally) built on our success at Rook’s Hill Bridge, adding the bridge deck to the abutments our Canal Camp volunteers built last year. And finally on the Cotswold Canals, as you’ll see from the Progress piece showing the task list for the remaining three years or so of the restoration of the Phase 1b (Saul to Stonehouse) section of the canal, and our report of a couple of London WRG weekends there recently, our work is right at the heart of what’s happening in the wider scheme to get ten miles of the canal open and connected up to the national network.

…and there’s another point to be made that’s nothing to do with how directly relevant to WRG’s volunteer work the progress reports are. Because this particular one is extremely relevant to another discussion that has been happening in the world of canal restoration, and in particular in the pages of Navvies. Specifically, my editorial welcome in issue 333 and Steve Morley’s reply in issue 334 on the subject of whether we should allow cost and maintenance issues to justify modern materials such as concrete locks with steel gates, whether our role as custodians of heritage mean we should stick with traditional masonry and timber, or whether some compromise is possible. What might not be obvious from the Progress piece is that the gates for the new Keith Ayling Lock are made neither of metal nor of wood, but from plastic! Well, OK, fibre-reinforced polymer (FRP)’ to be precise. Made in the Netherlands (where they know a think or two about canals!) they are reckoned to last much longer than traditional wooden ones. A great idea, or a step too far? What do you think? Email the editor with your views. And finally, here’s to a successful summer Canal Camps programme. I hope to meet some of you on a worksite somewhere. Martin Ludgate

Chesterfield Canal Trust

But going back to the Chesterfield…

New Chesterfield Canal gate - but what’s it made of? Page 5


chairman’s Comment “If we believe all the suggested benefits of the waterways network are true, then the logical approach is to increase that network…” Chairman’s Comment Here I am at the end of a blisteringly hot day, when I can clearly remember that only a couple of months ago that it was rain, not sun, that filled the day. Now you may be thinking that - in an attempt to fill the pages of Navvies - I’ve descended to that great old English conversation staple: the weather. Actually, it’s a not too subtle excuse to talk about the most important waterways report – WRG’s parent body the Inland Waterways Association’s publication Waterways for Today. “Why is it important?” you ask. Well, for those not conversant with the report (and you really should be – it’s available to download on the IWA website), it puts forward 12 benefits of the UK’s waterways network. I’ll pick up on some of those benefits in a moment but first a couple of important points need to be made: • These benefits are not just benefits for a few lucky people who live or play on the network – they are benefits for the whole of the UK. • These benefits are not just idle speculation, each of them is backed up by facts, statistics, research, case studies, etc. So let’s get back to the 12 benefits, shall we? As Martin has already filled this edition of Navvies with some excellent progress reports I’ll just pick three: Benefit 6: Sustainability - Planning for resilience and climate change Benefit 8: Education and Young People Benefit 9: Jobs, training and apprenticeships Benefit 6 is why I started this Comment with chat about the weather. Whatever your thoughts about the politics of climate change, it is clear that the UK waterways Canals have vital role network has great potential to help with to play in UK’s climate resilience, says charity addressing the effects of it. Whether it’s making things cooler on hot days or providing extra capacity on the wet days the UK waterways network is a tremendous asset to the whole of the UK. That’s not just our opinion – for example The Guardian recently ran an article entitled “Canals have vital role to play in UK’s climate resilience”. Moving onto Benefit 9 is easy for me – this Navvies has pages of reports of great events such as the Leadership Teams Day and the Training Weekend. Yes, marvel at the skills, dedication and determination, but most of all appreciate the fact that all of it was enjoyable fun. Waterways are a great place for learning. The Guardian article referred to in Mike’s piece Water

This article is more than

1 year old

Waterways can protect biodiversity, help with water security and keep cities cooler, says Canal & River Trust

Priya Bharadia

Tue 7 Jan 2025 12.29

GMT

Prefer the Guardian on

Google

Protecting the UK’s canals is

crucial for improving the nation’s resilience to climate change, campaig A report by the Canal ners have said. & River Trust charity found canals could play adaptation. a “critical role” in biodive rsity, decarbonisation and climate The trust’s canal network provides the longest corridor of freshwater variety of wildlife, includin habitats in the UK, which g kingfishers, herons are a vital home within and the endangered species to thrive and cities for a water vole. Acting as move safely between a “nature highway”, cities and the country canals allow side. Richard Parry, the chief executive of the trust, said canals could also communities. During help reduce the impacts periods of heavy rainfall, of extreme weather for example, canals flooding. on urban can act as drainage routes and protect nearby building s from “They’re such an integral part of so many of our towns and cities, having purpose changing so been built more than dramatically over time,” 200 years ago, their Parry said. “They are to nature, as well as whole now this very highly water security and flood valued local space for people mitigation.” to get close As the UK faces an increase d risk of summer drought s, canals could provide trust’s canal network water security to densely currently supplies drinkin populated areas. The g water to more than Cheshire via the Llangol 5 million people each len canal, and to Bristol year, transferring water through the Glouces to parts of ter and Sharpne Waterways could also ss canal. help keep Britain’s cities cool, the report said. reduced surrounding During the 2022 heatwav temperatures by an es, the trust found urban average of 2C in Manche canals ster, Birmingham and Once used to transpo London. rt coal, canals are quickly becoming their own Liverpool is due to open renewable energy source. in early 2025, using A district heating network water from the Leeds and 4m sq ft of comme in and Liverpool canal rcial spaces. to supply heat to more than 9,000 homes Climate breakdown brings its own challeng es for the future of canals, heavy rainfall led to many of which are more a breach of the 18th-ce than 200 years old. Last ntury Bridgewater canal week, in Cheshire. In 2023, eight storms battered the canal network,

Page 6


Which leads on to Benefit 8 – Education and Young People. Picture a waterway: it doesn’t actually matter if it’s navigable or derelict, because what it will be is full of structures that represent excellent engineering. More importantly than just abstract engineering, they all represent how you successfully engineer with nature. As society worries about a lack of general engineering awareness, the waterways network represents an enormous classroom full of brilliant examples – mitre gates, stopplanks, culverts, arched bridges, embankments, channels, etc. So that’s enough of a rant from me about the value of waterways, what message have I got to conclude this? I guess it’s simple… If we believe all the suggested benefits of the waterways network are true, then the logical approach is to increase that network and therefore increase the benefits. What is needed is a Group that Recovers these Waterways. We are that group. Our job (working with the canal societies and trusts) is to do it well. It is inevitable at this time of year that the Chairman’s Comment finishes off with a few Health and Safety messages: Please remember the two biggest messages from our Health & Safety Audit 2026: • A tidy (well laid out) site is a safe site. • Never worry about asking for a banksman – if the manoeuvre (or you) requires it.

CRT

We are trialling an online Safety Reporting Tool over the summer BUT if you don’t want to use the Tool then it’s still fine to use the usual paperwork/forms/ postcards/etc. Mike Palmer “The waterways represent an enormous classroom full of brilliant examples” Page 7


Groups A year in the life of Kescrg Looking back on a year of working parties held by Kescrg, an independent mobile volunteer canal restoration group active in the south of England Our digs are advertised in Navvies, Kescrg 2025-26: on our Facebook page and website and A year in the life of a mobile volunteer canal restoration group via our email list. New volunteers are

always welcome, so if you are ever missing a cold hard village hall floor, a tasty pint in an unfamiliar pub or a bit of muddy action out of camp season, just keep an eye out and give us or one of the other groups a go! So, in no particular order, apart from that boring and much overused ‘calendar’, Ed Walker and I have pulled together a summary of a year digging with Kescrg: July 2025 - Wey & Arun, Canal Camp: Stephen, Ian and Anne ran an excellent camp on the Wey and Arun where the main work was doing a major concrete pour on Rooks Hill bridge abutments along with block work on a culvert head wall and excavating and concreting the foundations for the new canal bank. A great bunch of volunteers including 4 fab DofEers (Duke of Edinburgh’s Award scheme participants, using the Canal Camp for the residential part of the gold

Pictures by Stephen Davis

Well, it must be that last Navvies before the summer – the last edition before Martin gets inundated by a tidal wave of Summer Camp Reports; a magazine searching for some good volunteer updates with a smattering of in-jokes and references to mud and lost wellies and that kind of thing to get us in the mood for the camps… But never fear – outside of the summer camp season and in addition to all the amazing work the canal societies’ working parties do themselves, there are several ‘visiting groups’ that run weekend working parties once a month or so, moving round the country to help out different canal societies on projects requiring additional skills or just hours of labour to keep them moving forward. Kescrg is one such group – though independent of WRG we hold very much the same ethos and draw on the same wider group of volunteers.

Progress at Weymoor Bridge on the Cotswold Canals: work under way last September on on concrete and blockwork walls to create the new canal and towpath over the new culvert… Page 8


award), who all particularly enjoyed the trip to the Dunsfold Land Rover collection. They just fitted right in.

December – Wey & Arun, Christmas dig: Beginning of December saw London WRG, Kescrg and WRG Forestry joining forces for the annual Christmas dig – this September – Cotswold Canals: year on the Wey & Arun back at Rooks Hill. September, and we were at Weymoor bridge It was great to see the progress the Trust on the eastern end of the Thames & Severn work parties had made on the bridge since canal, a site we and many others have the summer – we were able to lay the last worked on in recent years, this time with couple of brick courses facing up the London WRG. A busy weekend with loads of concrete abutments we poured in the odd jobs done; block laying, brick laying, summer, with the Trust well on the way to back filing and concrete pours to make the setting up shuttering to cast the arch. site ready for winter. However, the main task for the weekend was tree felling and clearing to expose the site of October – Wilts & Berks Canal: October the lock a little south of the bridge – this will came and we were on the Wilts and Berks, eventually be Phase 3 of the overall project this time working on Double Bridge a mile or on this site [see our Progress pages …the so below Pewsham locks. This bridge was Editor], and hopefully a lock we will be able restored some years ago, but the parapets to come back and help build in years to had developed some significant cracks come. allowing rain to penetrate and damage the original arch structure – we spent a good February 2026 - Wilts & Berks: Another weekend raking out joints and repointing as joint dig with London and Forestry; possibly much as we could, and eating cake supplied the wettest and muddiest I (Ed W… we all by the amazing Fiona. know Steve has been way muddier) have got on a weekend for a long time. A large group November - Wilts & Berks, WRG of volunteers helped over a 3-day weekend Reunion: November saw the welcome with the scrub management on the North return of the WRG Reunion on the Wilts and Wilts section on the outskirts of Swindon – Berks near Wantage. Kescrg supported this many trees were felled and chipped, with the event mostly by fencing off lock chambers chippings reused to improve the path that had become exposed by the scrub surface. This was a section of canal long clearance process. overdue some TLC and provides a popular

…and the site at Weymoor Bridge on Kescrg’s return to this project in April 2026, with brick facing and other finishing woork in progress Page 9


walking route with locals, so the combined forces of the 3 groups hopefully helped to raise the profile of the canal in the north part of Swindon, as great progress is being made on other projects to the south. This weekend also saw the welcome return of cakes courtesy of Fiona… March - Wilts & Berks: Bit of a theme developing here as we were back on the Wilts and Berks again, the planned work changed quite late on but we were able to give the local group a significant hand with clearing the towpath to the West of Shrivenham – some of the worst brambles I have ever seen had taken over the path but we managed to clear a good few hundred metres. We were not allowed bonfires due to the proximity of the main road, but brash was neatly Everything stops for tea… and cake, of course! piled up alongside the towpath to make a thicket. Once again we had a plentiful supply of cakes… April – Cotswolds: Back to Weymoor again for some finishing up work – lots of brick and block laying, earth moving, more backfilling of the towpath, landscaping and a cheeky concrete pour left the site looking much better, we even replanted the gate post! Strangely enough, we had more cake. May – Cotswolds: Off to the western end this time and back to John Robinson lock for the first time in two years, the site has significantly changed! Why Kescrg? We ran a three-day weekend to help get the site ready for the Originally it Canal Camps program this stood for summer and had a good variety ‘Kent & East of work – the main task was Sussex Canal laying a roadway into the bed of Restoration the canal below the lock to give Group’, being access for the wall rebuild. a 1970s While the plant drivers got on offshoot of with that, everyone else the Kent & completed the more exacting East Sussex branch of the Inland Waterways work of laying coping stones, Association. It’s now an independent group, and brick laying, pointing and stone few of its volunteers actually live in either Kent repairs. Dave brought or East Sussex. But the group still carries on its chocolate brownies for Friday, original function of providing volunteer support and Fiona and Eli both made for waterway restoration projects mainly in the cakes for the weekend. So South of England, and it welcomes volunteers much cake in fact that almost from all over the South - and from further afield no biscuits got eaten – the Page 10


Kescrg food boxes are overflowing with spare packets of biscuits. We need help! June – Wey & Arun: Back to Rooks Hill (which now looks much more like a bridge!) where a select crowd braved the mud and rain on Saturday and spent the weekend installing gabion mattresses as bank protection on the newly created section to the South Laying coping stones at John Robinson Lock on the Cotswold Canals, of the new bridge. and (below) the finished job You know that lost welly mentioned earlier? Just ask RAF Martin next time you see him… but I think it is fair to say that this section will happily hold water once the project is complete! The future: About the time you read this we will have held another joint weekend with London WRG at Pewsham on the Wilts and Berks; work at the moment looks to be further bricklaying on the bottom lock of the three-lock flight, which will lead on well to the Kescrg summer camp in August where we will be continuing the work on that site. September (12-13th) we should be working on the Dauntsey section of the Wilts and Berks, exact details still to be determined. Depending on how the work on the summer camps goes, we hope to be going back to JR lock on the Cotswolds again in October (3-4th). We will be holding a weekend in November but this is as yet not completely nailed down (Reunion anyone?) but one

thing that is set is the usual KESCRG/LWRG/ Forestry Christmas dig in December (1213th), this year on the Chelmer & Blackwater Navigation in Essex. So, if you have a spare weekend this Autumn to fill with fresh air, rewarding work, spending time with some reasonably nice people and have space for some cake in your life, why not join our Facebook group (just search Kescrg), contact us via our website, or join our email list via IWA head office and keep up-to-date with all our activities. Happy digging and have a great summer one and all! Ed Walker & Stephen Davis Page 11


Leadership Teams Day Report …in which WRG’s leaders find out about planning excavations, learn the art of instruction, and Lowsonford Village Hall gains a dry dock… Leadership Teams Day report

sequence of excavation activities on a site. The key messages also included the need to Lowsonford Village Hall now has a dry dock! record in the Project Plan which stockpiles of material are which, because in three years’ Well, not in reality – but planning how it time it will all look the same with weeds would be constructed was just one of the growing from it. activities at this year’s Leadership Teams Next, the room split into four groups to Day. undertake a site planning activity. Each The programme for the day, which is group went for a site visit into the grounds aimed at leaders and those considering of the village hall, reviewing the access leadership of summer Canal Camps and routes and any hazards or challenges that mobile weekend working party groups, might not be evident from the plan provided. always tries to incorporate a mixture of lessons learned from previous Canal Camps; Several trees, overhead cables, manholes and a septic tank all added challenges to the key messages from the WRG Board; a site (along with a deliberately obstructive chance for experienced and new leadership ‘landowner’ - actually one of us!). teams alike to share their experiences with Once familiar with the site, each group each other; and feedback. then set about planning how to construct a As such, the day started with a dry dock on the site, laying out where presentation all about the planning of materials would be delivered, where excavations, expertly delivered by Adam ‘Digger’ Morris, following some challenges at excavation arisings would be stockpiled, the position of welfare, parking, brick-cutting, Weymoor Bridge in particular with a lack of dewatering pumps etc… Some groups even forethought in this area. Studious use of Microsoft Excel avoided offered alternatives to the landowner to make construction simpler – though not all the need for calculators – but still participants were introduced to the angle of suggestions were welcomed. Groups then returned outside to lay out repose, bulking factors and the need to the key site elements (as well as being carefully think about the beginning-to-end

‘Digger’ explains about planning an excavation Page 12


shown key changes to the trailer packing george.rogers@waterways.org.uk or arrangements - hint: no kebs, and the stephen.rice@waterways.org.uk. gazebo now stands up.) Finally – we are looking to deliver a Several participants remarked on how similar event specifically for very new leaders big the excavation was going to be – already and for volunteers who might be interested demonstrating the lessons learned from the in leading in the future. This will run shortly first part of the day. after the summer camp programme in Inside, groups also rotated through a September or October – please let us know if session on ‘the art of instruction’. Pairs first you are interested and please keep a lookout had to try and replicate each other’s for anyone you think has leadership potential drawings without looking at them and then and highlight the event to them. We promise discussed different learning styles and how that attending is no commitment to leading different instruction methods can develop in the future! volunteer skills and confidence in different George Rogers ways. Finally, the day finished with the regular ‘parish notices’, all those miscellaneous bits that don’t quite fit elsewhere into the programme. Updates on accommodation kit, a trial of the HSE reporting tool and updates on volunteer booking information were all provided. A big thanks to Jude for her excellent catering, to Digger for his presentation and to “Site visit” to the village hall grounds for the site planning activity everyone else involved in delivering a very informative and enjoyable day. Of course, a huge thanks also to Stephen ‘Ricey’ Rice for his role in planning and delivering the day alongside me. Ricey and I have some ideas for future years, but we’d really like to hear from you what you thought (if you were there) and/or what you would like to get out of future Leadership Teams Days. “The art of instruction” - trying to copy a drawing without seeing it Contact us on Page 13


Training weekend Report Waterway Recovery Group’s annual training weekend once again succeeded in improving volunteers’ skills ready for the summer Camps

The annual WRG Training Weekend was held at Fosseway Heath on the Lichfield Canal this year. Many thanks to Adrian and our friends at the Lichfield & Hatherton Canals Restoration Trust (LHCRT) who hosted us once again. We are very grateful for the use of their site, which has the perfect amount of space needed to train volunteers in a number of different areas. I am also incredibly grateful to our instructors. Every year, they kindly volunteer their time, ensuring that the foundations are laid for the safe operation of plant and equipment on our sites. The weekend is impossible to run without them, their infinite patience and their enthusiasm for passing on their wealth of experience. You are all amazing and much appreciated. This year, bookings were plentiful, with the timetable offering sessions on dumpers, excavators, ride-on rollers, surveying and brick saws, as well as an opportunity to learn to drive the minibus and manoeuvre the kit trailer. The halfday course in bricklaying was incredibly popular, with many thanks to Martin S and his professional guidance. As always, the trainees were fabulous. There were lots of new faces, all of whom we sincerely hope to see again on WRG camps, weekends or other restoration activities, as well as some familiar folk Page 14

Pictures by Ali Bottomley

WRG Training Weekend 2026 Lichfield, 16-17 May


who had come to refresh their skill set. It was great to see how quickly everyone mingled and helped to make the weekend a whole lot of fun, as well as a learning opportunity. Many have since emailed to express their thanks to the team of instructors, who were so patient and skilled at passing on their experience to others. A special thank you to Jude, whose incredible cooking kept everyone satisfied throughout the weekend. We even ate our salad at lunch this year so hopefully she will agree to feed us more tasty delights next year... (pretty please?) My genuine thanks to everyone who made the weekend happen: to all the incredible instructors for working so hard and always being so generous with their time; to the lovely Adrian for not minding giving up his time from Friday through to Monday to ensure that the materials and plant were delivered and then removed from site; to Jude, for keeping us so well-fed and looked after; to Mike Palmer, Harry and Spence for making sure vans and trailers arrived full of kit and for ensuring we had some bricks to lay on Saturday; to Bex and Spence for sorting out the station pick-ups; to Head Office for their support behind the scenes; and finally to all of the trainees who were such fantastic company, and made everything worthwhile. THANK YOU! Ali Bottomley Page 15


festivals Sites wanted! The Inland Waterways Association’s Festival of Water can help publicise the canals and campaign for them. But not without finding a site for it… Do you know of a suitable Festival of Water venue?

Pictures by Martin Ludgate unless credited

Almost every year from 2014 to 2023, WRG’s parent body the Inland Waterways Association has held an annual Festival of Water at various locations around the waterways system. It provides an enjoyable day out for local people, a get-together for boaters from all over the country, a chance for IWA and the canal groups who are there with their stalls to raise money, interest and support for the canals, to hopefully recruit new supporters, and maybe even some new WRG volunteers. IWA has also run National Campaign Rallies in the past, bringing national publicity to particular issues. And WRG volunteers have often provided support in helping to set up, run, and clear up after these events… and the Navvies editor has even been known to run the occasional boaters’ quiz in the entertainments tent on the Friday evening. But it hasn’t happened since 2023… The main reason that there has not been a Festival of Water for the last few years is a lack of suitable venue. So this is an appeal to IWA members and Navvies subscribers to see if there is a location within your local area that could host the event. You can help in the search for a new venue that could hold the Festival of Water. Any suggestion will be looked at: firstly virtually; and then if it looks like it has the main ingredients for a possible site, then a physical visit will be made to confirm all the necessary requirements for a venue would be met; before then asking the land owner for permission to hold the event on their land. There are several key main elements that are necessary, in order for us to consider a site as a possible venue. Firstly, land size available. This ideally has to be about the same as 3 full size football pitches (approx. 5 acres / 2 hectares). This is for the site for exhibitors and traders, the campsite (for many exhibitors and visitors) and car park. Ideally the campsite will need to be adjacent, or very near by the trade site, and the same for the car park. The land should be as flat as possible and be alongside a waterway. The trade site area needs to be all together, and not broken up into small pockets.

The IWA Festival of Water at Pelsall brings some colour to the northern Birmingham Canal Navigations Page 16


The waterway alongside needs to be able to accommodate up to 100 visiting boats, preferably double moored, so as not to spread the boats out too far along the Ilkeston 2017 waterway. Ideally the towpath would be on the same side as the trade / Burton 2022 exhibitor site; if not, there should be Pelsall 2016 nearby access to a bridge to cross Pelsall 2023 over to the trade site easily. If there is a section of good flat bank that Northampton 2015 can accommodate floating traders, St Neots 2018 Worcester 2021 that will be an advantage. The waterway must be connected to the main national waterways network, Saul 2014 but needn’t be on a canal: we have Waltham Abbey 2019 had events on rivers as well as canals. Access onto the land must be good enough for caravans, trailers and suppliers’ vehicles. Vehicles can be up to 7.5 tonnes for suppliers. There needs to be a water supply nearby. A fire hydrant is acceptable, as we obtain permissions IWA Festival of Water sites 2014-2023. Where next? to use this type of supply. The nearer to a town or centre of population the event is, the larger the possible attendance. Past events have been close to St Neots High Street, Northampton town centre and Ilkeston town centre. All of these had a large attendance.

It needn’t necessarily be on a canal: the 2018 festival had a fine riverside site on the Great Ouse at St Neots Page 17


In addition to being a national campaigning event raising awareness of the issues facing the waterways in general (such as the current Fund Britain’s Waterways campaign), the Festival of Water also aims to identify any local campaigning issues to help address. So if the local waterway is underused (like Pelsall on the Birmingham Canal Navigations), has navigational problems (such as the various long-term closures on Environment Agency waterways) or has a waterway restoration project nearby which can be promoted (like Ilkeston, with the Derby Canal and Cromford Canal projects both within a few miles), all the better. If you know of anywhere that might be able to hold an event, be that a Festival of Water or a National Campaign Rally, please do get in touch either via the IWA head Office or directly to the Event Logistics Chair maria.hearnden@waterways.org.uk.

Maria Hearnden

On the subject of waterways festivals and events, here are a couple of recent ones that WRG volunteers have been involved in. Above, site services volunteers transport kit and people around the IWA Canalway Cavalcade festival at London’s Little Venice, while Below our publicity team had the WRG display all set up and ready to go at the start of Crick Boat Show

Page 18


WRG Wear logo clothing is back! Remember WRG Wear? Quite possibly you don’t remember it if you’ve joined us in the last ten years or so, but those with longer memories will recall when we ran a range of ‘WRG Wear’ logo clothing including everything from rugby shirts to baseball caps. Well the good news is that WRG Wear is back just in time for the summer Canal Camps season, initially with a small selection of clothing besides the usual short-sleeved Camps T-shirt (which - unlike all the new items - is also available to buy at the summer Camps). This year there are long-sleeved T shirts, sweatshirts, hoodies and polo shirts, featuring the WRG logo as well as the ‘Navvy man’ - see illustration below. They are available in red and black only, and in sizes small / medium / large / extra large / XX large. Please order directly with Julian at Jancraft via email to mail@jancraft.com, and make payment via BACS to account number 34033368, sort code 30 98 21. Please give your surname as reference on the payment. Alternatively mark the item(s) you want (and what size and colour) on the form below and send it with a cheque made payable to Jancraft at Balaclava, High Park Avenue, Wollaston, Stourbridge DY8 3NJ. Remember to add postage of £5 for up to two items, £10 for more, to your payment. Please give your name, email address and phone number on every order. For enquires only call on 07977 491629, but all orders by email or post please. ITEM

WRG logo on front

Navvy only on front

WRG logo front / navvy Logo back

Camps 2026 WRG logo front / Camps logo back

T-shirt short sleeve

£7.50

£7.50

£10.50

£8.50

T-shirt long sleeve

£9.50

£9.50

£12.50

£10.50

Sweatshirt

£14.00

£14.00

£17.00

Hoodie

£17.00

£17.00

£20.00

Polo shirt

small chest logo £11.50

Navvy back Small WRG front print only £11.50 Navvy back £14.50

Left: the ‘navvyman’ logo Right: the WRG logo (modelled by the editor)

Page 19


navvies

diary

Week-long Canal Camps cost £90 or as stated. Booking for events labelled ‘WR Road, Berkhamsted, HP4 1EF. Tel: 01494 783453, enquiries@wrg.org.uk. Diary Jul 4 Sat

MBBCS

Manchester, Bolton & Bury Canal: event at Middlewood Locks

Jul 4-5

KESCRG

Wilts & Berks Canal: Camp preparation at Pewsham Locks. Joint dig with London WR

Jul 4-5

London WRG

Wilts & Berks Canal: Camp preparation at Pewsham Locks. Joint dig with KESCRG

Jul 5 Sun

MBBCS

Manchester, Bolton & Bury Canal: event at Nob End Locks

Jul 11-18

WRG Canal Camp

Wey & Arun Canal Camp: Channel construction at Rooks Hill. Led by the NWPG regio

Jul 18-19

wrgBITM

To be arranged

Jul 18-25

WRG Canal Camp

Wey & Arun Canal Camp: Channel construction at Rooks Hill.

Jul 18-25

WRG Canal Camp

Lichfield Canal Camp: Channel construction in Lichfield. Leaders Colin Hobbs and Wil

Jul 25-Aug 1

WRG Canal Camp

Lichfield Canal Camp: Channel construction in Lichfield. Leaders Colin Hobbs and Wil

Jul 25-Aug 1

WRG Canal Camp

Grand Union Canal: Hanwell Locks sidepond restoration Rescheduled from April. Le

Aug 1-8

WRG Canal Camp

Grand Union Canal: Hanwell Locks sidepond restoration Rescheduled from April. Le

Aug 1-8

WRG Canal Camp

Wilts & Berks Canal Camp: Pewsham Locks Led by the KESCRG regional mobile gro

Aug 8-15

WRG Canal Camp

Cotswold Canal Camp: John Robinson Lock. Rebuilding wing walls. Leaders: Mike Pa

Aug 15-22

WRG Canal Camp

Cotswold Canal Camp: John Robinson Lock. Rebuilding wing walls. Leaders: Stephen

Aug 22-29

WRG Canal Camp

Cotswold Canal Camp: John Robinson Lock. Rebuilding wing walls.

Sep 12-13

KESCRG

Wilts & Berks Canal: Channel profiling at Dauntsey

Sep 19-20

London WRG

Cotswold Canals: John Robinson Lock

Sep 19-20

MBBCS

Manchester, Bolton & Bury Canal: Nob End Locks

Sep 20 Sun

WRG

WRG Committee/Board Meeting: Rowington Village Hall

Sep 25-27

wrg Forestry Team

Wilts & Berks Canal: Swindon Branch, accommodation at Watchfield

Sep 26-27

wrgBITM

Maidenhead Waterways: Bray Cut

Oct 10-11

London WRG

Shrewsbury & Newport Canals

Oct 17-18

MBBCS

Manchester, Bolton & Bury Canal: Nob End Locks

Oct 17-18

wrgBITM

Basingstoke Canal: To be confirmed

Oct 24-31 Nov 21 Sat

wrg Forestry Team WRG

Wilts & Berks Canal: East Vale & Abingdon branch. Return to Grove Locks. Accom at Kemp WRG Committee/Board Meeting: Location & date TBC

Nov 21-22

wrgBITM

To be arranged

Nov 21-22

MBBCS

Manchester, Bolton & Bury Canal: Nob End Locks

Dec 12-13

London WRG

Joint Christmas dig with KESCRG and WRG Forestry on the Chelmer & Blackwater N

Dec 12-13

KESCRG

Joint Christmas dig with WRG Forestry and London WRG on the Chelmer & Blackwat

Dec 12-13

wrg Forestry Team Joint Christmas dig with London WRG and KESCRG on the Chelmer & Blackwater Na

Dec 12-13

wrgBITM

Maidenhead Waterways: Bray Cut

Dec 19-20

MBBCS

Manchester, Bolton & Bury Canal: Nob End Locks

Dec 26-Jan 1

WRG Canal Camp

Christmas / New Year camp: venue to be confirmed in future issues of Navvies

Page 20


WRG and mobile groups

RG Canal Camp’ should go to: WRG Canal Camps, Hardy House, Northbridge y contributions to Dave Wedd, Tel 07816 175454, dave.wedd@wrgbitm.org.uk

RG

Sam Kennion

07843-394161

samklancs@yahoo.com

Ed Walker

07887-568029

ed@edwalker.org.uk

Tim Lewis

07802-518094

london@wrg.org.uk

Sam Kennion

07843-394161

samklancs@yahoo.com

onal mobile group Dave Wedd

01494 783453

enquiries@wrg.org.uk

07816-175454

dave.wedd@wrgbitm.org.uk

01494 783453

enquiries@wrg.org.uk

ll Mathew

01494 783453

enquiries@wrg.org.uk

ll Mathew

01494 783453

enquiries@wrg.org.uk

eader Dave ‘Evvo’ Evans

01494 783453

enquiries@wrg.org.uk

eader Dave ‘Evvo’ Evans

01494 783453

enquiries@wrg.org.uk

oup

01494 783453

enquiries@wrg.org.uk

almer & Becky Parr

01494 783453

enquiries@wrg.org.uk

n ‘Ricey’ Rice & Sandra Horner

01494 783453

enquiries@wrg.org.uk

01494 783453

enquiries@wrg.org.uk

07887-568029

ed@edwalker.org.uk

Tim Lewis

07802-518094

london@wrg.org.uk

Sam Kennion

07843-394161

samklancs@yahoo.com

Mike Palmer

01494 783453

enquiries@wrg.org.uk

Ed Walker

Nigel Lee

07802-854694

nigel.lee@wrg.org.uk

Dave Wedd

07816-175454

dave.wedd@wrgbitm.org.uk

Tim Lewis

07802-518094

london@wrg.org.uk

Sam Kennion

07843-394161

samklancs@yahoo.com

Dave Wedd

07816-175454

dave.wedd@wrgbitm.org.uk

Mike Palmer

01494 783453

enquiries@wrg.org.uk

Dave Wedd

07816-175454

dave.wedd@wrgbitm.org.uk

Sam Kennion

07843-394161

samklancs@yahoo.com

Navigation

Tim Lewis

07802-518094

london@wrg.org.uk

ter Navigation

Ed Walker

07887-568029

ed@edwalker.org.uk

avigation

Clive Alderman Dave Wedd

07816-175454

dave.wedd@wrgbitm.org.uk

Sam Kennion

07843-394161

samklancs@yahoo.com

01494 783453

enquiries@wrg.org.uk

psford

Clive Alderman

Page 21


Dig report LWRG on the Cotswold London WRG turn up mob-handed at the Cotswold Canals project at John Robinson Lock. Fortunately there’s lots of work for them to do… bad, and we got used to rearranging kit Cotswold Canals dig report: London WRG at John Robinson Lock boxes every time we needed to eat.

We tore through the mortar materials and kept the local Jon very busy trying to keep us supplied with work. We benefited from having several pro or regular bricklayers on site and that meant we made a very good start on several bits of brickwork. Andy and newcomer Danny laid a lot of very precise courses for the towpath under the lock tail bridge. Rob and Phil also got well underway with a tricky bit of brickwork on the other side of the lock tail between the lower gate recess and the tail bridge. We had a lot of people cleaning out for re-pointing and a smaller number doing the actual pointing. Meanwhile David and some assistants managed to Tirfor winch out the rotten wood of the old sill. We also managed to complete an excavation job on The pointing team at work the old brick built overflow bywash culvert which had caved in. Our two brand new volunteers on site were introduced to the mixer and started the weekend by laying a bed of mortar. They smoothed this out beautifully and covered it with a tarpaulin but when we came onsite the next Bricklaying lessons on the towpath wall under the tail bridge Pictures by Martin Ludgate

It’s not all that long ago I remember only four of us turning up for a London WRG weekend dig so it was quite a shock to have 27 volunteers on our April dig on the Cotswold Canals. I was part pleased with the turnout and part kicking myself for not having the sense to limit the numbers. Luckily everyone was very good-natured about having to squeeze past each other to get ready in the mornings. The queues for toilets weren’t too

Page 22


morning we found a large set of pawprints stamped into the surface through the tarpaulin. We hadn’t thought to barricade it off! Although it was hard work to get enough materials for all the brickwork we wanted to do, we had enough numbers to get the bricks on site so we set the place up for the next few months of activity. There were due to be weekend digs Dealing with the collapsed section of the bywash culvert here every weekend in May, plus the locals’ own work midweek, followed by three weeks of summer Canal Camps. I expect the place to be unrecognisable by the autumn. The site at John Robinson is very popular with walkers, runners, and cyclists so we had a lot of public curiosity about what we were up to. We spent a good amount of Rebuilding begins on the towpath side wing wall beyond the tail bridge time explaining the next phase of work to people, and trying Cotswolds site and accommodation so I will to direct them through the maze of barriers be interested to see if we get similar to the footpath route. numbers again in five weeks time [see over Cooking for 27 people in the tiny …Ed]. I might encourage camping if the kitchen at Saul was a challenge. I was really numbers get much about 20 again but it grateful to Martin Danks and Lynda for doesn’t really help at mealtimes when it’s the making breakfast and helping with the oven space that really matters. catering. We also had a few bits of London WRG has got very used to administrative running around to do which being highly active in the Cotswolds so this everyone pitched in on. seems like a return to form for us. We were I’m not sure that I would cap the also pleased to have new volunteers with us numbers so long as we could provide work and I hope we see them again. for this number of people again. The difficulty with such a large dig tends to come Top tips for huge weekend digs: from the number of moving parts you have to manage. People needing station lifts and • Warn the local canal society beforehand various other requirements. It just so that there will be lots of you so they can happens that our next dig is at the same prepare the work. Page 23


Postscript: London WRG returned to the same site five weeks later in late May. It was another wellsupported weekend, and once again the work centred around the bottom end of John Robinson Lock, which visiting teams from KESCRG and NWPG had visited in the meantime. We continued cleaning out and re-pointing the otherwise sound brickwork on the main chamber walls, completing most of this work. Phil and Rob Rebuilding the offside wall between lock and tail bridge… continued their bricklaying on the offside tail wall between the lock and the tail bridge, which advanced to the point where coping stones would be ready to go on. Meanwhile on the towpath side, where the tail wall slopes down alongside the towpath, Jon was busy putting together something of a threedimensional jigsaw puzzle of coping stones of different shapes and sizes. And on the other side of the tailbridge, the two wing walls were given rather different treatment… On the towpath side, the …and the same wall on the May dig, with much progress made existing wall was carefully built up with bricks, then a course of stones, and then some more brickwork. While on the offside, where the old wall is damaged and is to be completely rebuilt, the machinery operators did their best to reduce it to rubble and take it away. We also continued the repair to the collapsed section of the bywash culvert, and throughout Demolishing the offside wing wall ready for rebuilding this summer the weekend we fetched large quantities of bricks and mixed • Find out ahead of time what the kitchen copious quantities of mortar. facilities are. Oven capacity is particularly By the time you read this, the start of important. three consecutive week-long Canal Camps on • Plan your menu carefully as you this site (concentrating on rebuilding the wing probably can’t fit everything in the oven. walls on the far side of the tail bridge) will be • Everything cooks slower if there are just weeks away, we’ll have reports from large volumes of food. them in the forthcoming issues of Navvies • Delegate tasks and responsibilities both (please!) and London WRG will be back there onsite and at the accommodation. in September to finish off whatever’s left to • Your job is to lead, not to do the work. do. You’ll be welcome to join us. Sophie Smith Martin Ludgate Page 24


progress Wey & Arun Canal Our roundup of progress on restoration projects around the country begins in the deep south with WACT continuing from last year’s work at Rooks Hill Wey & Arun Canal The Wey & Arun Canal Trust’s current major restoration project is at Rooks Hill, south of Bramley. Phase 1 is on schedule to complete this summer, and Phase 2 will also kick-off this summer with two WRG Canal Camps booked. Phase 1 – Nearing completion • Rooks Hill Bridge • Banks and canal cut to the south of the bridge, alongside Fanesbridge Cottage • Repairs and extension to stream culvert under the canal

Pictures by WACT

Phase 2 – Starting this summer • New canal cut and banking work replacing infilled length between Rooks Hill and Birtley • Construction of towpath linking Greensand Way long distance walking trail at Rook’s Hill to Birtley section

Rooks Hill Bridge: aerial view of the concrete pour for the bridge deck… Page 25


Phase 3 – 2027+ • A new lock to be constructed to replace the original Fanesbridge Lock

River Wey to the Thames Shalford Bramley Birtley Canal Camps site: Rooks Hill to Birtley

Godalming Members open morning and bricklaying ceremony: Saturday Birtley lift 18th April was a special day at Rooks Hill, where we were able to bridges section say thank you to our members and Rowly Rooks Hill site supporters who have made this restoration project possible and to our volunteers who have carried out Fanesbridge Lock all the design and construction work. Dunsfold We also welcomed Sir Jeremy Restored Hunt MP and Bramley Councillor Summit length Jane Austin, who kindly joined us to lay special bricks to recognise the contribution of two individuals who Locks 8-16 Loxwood made this project possible: John Compton who kindly sold the Trust the land, and Martin Foster who left us a generous legacy. Restored Loxwood Our members were able to Link section follow the route the canal will take from the restored canal in Birtley Newbridge southward to the site of the new Rooks Hill bridge and have an escorted tour to see the progress on Orfold the bridge and canal channel. Our Appeal total has now Pallingham passed £233,000 leaving us just under £20,000 to fully fund phase 1 River Arun to of this project which we expect to the South Coast complete this summer.

…and a close-up of the brick arch of the bridge Page 26


progress Lichfield Canal Meanwhile on the Lichfield Canal, the Lichfield & Hatherton Canals Restoration Trust are dealing with a longstanding obstruction to restoration Lichfield Canal

LHCRT

Our first picture shows Lichfield & Hatherton Canals Restoration Trust removing sections of “The Big Pipe”. This is a concrete stormwater drain pipe that was laid along a length of the canal bed running through the outskirts of Lichfield after the canal closed, cutting through the canal lining and damaging the inverts and cills forming the base of the locks. It’s been an obstruction to restoration, made more awkward by the need to maintain its function of carrying away rainwater runoff until such time as the restored canal can take over this role. But as pictured, a section at Gallows Wharf is finally being removed - good riddance!

Court Above the Cut

Our second picture is a drone shot of the canal channel above the restored locks 25 and 26 at Borrowcop Locks Canal Park, by Tamworth Road in Lichfield. The channel has been reinstated at several feet below the original level, so that there will be enough headroom to get under Cricket Lane (the road crossing in the distance) without needing a lift bridge or a humpback bridge. To cater for the changes of level the original Lock 24 (behind the camera) has been abolished, and a new one will be built on the far side of Cricket Lane. This section will then be linked to the Gallows Wharf length via the new lift bridge pictured in our last issue.

Page 27


progress Cotswold Canals Looking forward to three years’ progress on the Saul to Stonehouse length as the Cotswold Canals Trust lists the work to complete the Phase 1b length

To read more about the Missing Mile and Phase 1b restoration see our feature in Navvies 335 Page 28


Cotswold Canals: the Phase 1b restoration and the Missing Mile As covered elsewhere in this issue volunteers are currently completing John Robinson Lock and rebuilding the tail walls. These will lead into a new length of canal being built to replace the ‘Missing Mile’ destroyed when the M5 motorway was built. This in turn forms an important part of the Lottery-supported four mile Phase 1b restoration (the Cotswold Canals Connected project), aiming to complete the Saul to Stonehouse section in 2029, connecting to the already-restored length from Stonehouse through Stroud and almost to Brimscombe. The maps and task list on these pages were created by Jon Pontefract of Cotswold Canals Connected for The Trow magazine and are reproduced courtesy of Cotswold Canals Trust.

Page 29


progress Montgomery Canal Shropshire Union Canal Society volunteers make excellent progress on lining the next length of the Montgomery Canal to Schoolhouse Bridge Thursday, work to extend the welfare facilities with extra benching and a gazebo An eventful Shropshire Union Canal Society work party - and records tumbled… was completed along with a number of other preparatory jobs. We had a very productive This party was always going to be a site meeting with Canal & River Trust senior busy one for several reasons. Nine engineer Ian Draycott to discuss detailing for volunteers attended on Thursday for a the wash wall (canal bank wall) that will be variety of preparatory tasks, thereby extending the April work party to four days. constructed through Schoolhouse Bridge On arrival, we were greeted by a tree which later this year. A start was made clearing spoil in the channel through this area. had fallen onto the welfare container On Friday, we were visited by CRT chief courtesy of Storm Dave, a few days earlier. Thankfully, no damage and by Saturday, this executive Campbell Robb making his first tour of the Montogomery Canal since his had been consigned to the bonfire. recent appointment. With the work party in Large numbers were expected for the full swing, he appeared very impressed by main work party with a group from OutdoorLads attending Friday to Sunday, an what he saw. In addition to the Society’s restoration work, Campbell also visited event that had been in planning for several Llanymynech Wharf Visitor Centre and the months. With high numbers, there was a prospect of making great progress with lining Carreghofa Bridge construction site nearby, before moving on to Welshpool. (installiing a waterproof liner in the And so to the main restoration works notoriously leaky canal bed) and blocking (covering the liner with a protective layer of themselves. As anticipated, numbers were concrete blocks) in the Phase 2 section (from high – in fact an all-time record of 37 on the end of the rewatered length south of the Saturday and a Sunday record of 28. A limit of navigation at Crickheath Wharf to the somewhat less welcome feature was the new Schoolhouse Bridge 86) of the ‘Crickheath South’ project to restore and rewater the canal towards Llanymynech. Delivery of blocks in Phase 2 is only possible along the channel bed, so profiling the channel ready for lining and blocking (which requires diggers to operate in the channel) cannot be undertaken at the same time. So Thursday was spent profiling as much of the channel as Lining and blocking in progress on the Phase 2 section of canal Page 30

Pictures by SUCS

Montgomery Canal: April work party possible ready for the following day. Also on


weather with some sharp, but thankfully from as far afield as Kent, Southampton and short-lived, showers and gusty winds. These Kosovo and hugely enjoyed supporting the are never the best when laying large Society‘s restoration efforts as well as the sections of liner which at times billowed like friendly environment on site. Their leader, sails which would not look out of place in Rob, said “Our members found the weekend Cowes Week! very rewarding and were really happy to see Nevertheless, by Sunday afternoon, 60 the impact on the restoration that their hard metres of channel had been lined and work had”. Once again, a big thank you is blocked – another record. This required an due to all those who helped out over the incredible 5,000 blocks to have been work party. individually handled and each lovingly placed. With so many volunteers available, many other tasks were also undertaken. Over four days, substantial progress was made removing spoil from the channel either side of and through Schoolhouse Bridge. Environmental works stretched from winter into spring – whereas in February, a major snowdrop salvage operation had been undertaken relocating barrowSchoolhouse Bridge with spoil to be cleared from underneath and each loads of snowdrops side of the bridge, and (below) with the channel completely cleared from the future work site at Waen Wen (some distance beyond Schoolhouse Bridge), this time it was the turn of daffodils which were replanted out of harm’s way along the hedgerow in the Phase 2 section. Given the mild and wet winter, weeding was also necessary around newly planted hedging whips. To have guest volunteers for three whole days was a new experience. The group of nine from OutdoorLads came Page 31


Montgomery Canal: May work party party was cooler, but with little wind. A few The Phase 2 section is taking shape. Over 5 days a great deal was achieved The normal work party pattern is three days over Friday to Sunday, but on this occasion, both Wednesday and Thursday were included to provide two days of preparation. The primary activities were to finish profiling a sufficient length of channel for lining and blocking during the main work party and to prepare sufficient liners cut to length for a prompt start on Friday. In glorious sunshine, both objectives were achieved. The weather during the main work

spots of dampness at times, but we dodged the worst which was overnight. So, near ideal conditions for laying large lengths of liner. By close of play on Saturday, another 60 metres of channel had been lined. An excellent turn out of volunteers on Sunday enabled the blocking to catch up with the liner. Placing ‘riprap’ stone aggregate on the off side bank above the blocks was completed. As previously explained, there is no plant access to the offside bank so all material must be barrowed along the newly blocked channel and placed by hand. The riprap is covered with soil. Most of that was also completed and then reseeded. A really

Pictures by SNCT unless credited

Pictures taken on the Thursday afternoon and Sunday afternoon show how much progress was made with lining and blocking during the May working party

Kingspan installation being installed in the larger warehouse’s roof Page 32


tidy result. The towpath side is much more accessible and will be completed next month using power barrows. Over the coming months, another big task will be to build the towpath wash wall through Schoolhouse Bridge and much preparation work was undertaken this time including a very productive site meeting on method and sequencing with CRT senior engineer Ian Draycott. The first job was to divert the towpath and make the site secure. The remains of a redundant, concrete-encased drain and inspection chamber were then removed using a pecker attached to the 8-tonne excavator. Then, through to Sunday

afternoon, countless dumper-loads of spoil were removed from the channel. One more very productive and tidy output from this month’s work party.

Montgomery Canal: June work party A very busy work party. 5 days, record volunteer numbers (again), multiple different activities. June was the second successive work party with two days of preparation before the main work party started on Friday. And once again, two full days of profiling the channel was required to keep one step ahead of the rapid progress by the lining and

On the towpath side of the canal, the riprap stone can be delivered by tracked power barrow (above), but on the offside (below) it has to be done with buckets and wheelbarrows

Page 33


blocking team, enabled by such healthy volunteer numbers. On Thursday, the opportunity was also taken to add riprap and soil over the liners above the level where the blocks finish (blocks finish below water level). This continued through the rest of the work party and is a fairly lengthy and laborious job, not least due to the distance travelled to deliver materials. On the offside bank, buckets of riprap must be barrowed over the laid blocks and this work had progressed more or less in sync with the channel being lined and blocked. At least on the towpath bank, materials can be delivered by power barrow along the towpath, though none of this had been done so far this year. By Sunday afternoon, 150 metres of towpath bank had been completed and reseeded. With deliveries of these materials completed, it was finally possible to apply the wear course (very fine chippings/quarry dust) to the surface of the towpath. The main work party started on Friday. A new attendance record was set with 42(!) attending that day – that’s an awful lot of tea and cake, and a lot of progress too. Over Friday to Sunday lining and blocking continued with a further 45 metres completed. The seemingly endless task of excavating material though Schoolhouse Bridge progressed so well that the end does actually seem to be in sight, despite the 7.5 tonne excavator breaking down at lunchtime on Friday. Thanks to those who fixed it and returned it to operation 24 hours later.

“Monty’s Mountain” continues to grow

However, we lost count of the number of dumper loads removed. For the time being, this is being removed to the spoil heap in the compound, now affectionately referred to as “Monty’s Mountain”, which continues to grow. Although nothing is yet confirmed, potential “homes” for this material have been identified which do not involve waste disposal costs. With a substantial quantity of material removed, it was possible to start setting out the position of the wash wall that will be constructed through the bridge. This will be a significant task occupying many of the forthcoming work parties. With warmer weather following the mild but very damp winter and early spring, vegetation is now growing rampant. A further task for the work party was strimming and weed bashing at both the Schoolhouse and Crickheath compounds as well as around newly planted and laid hedging. As channel restoration on Phase 2 (north of Schoolhouse Bridge) is progressing rapidly and coming towards a conclusion, attention is now turning towards the channel in Phase 3 (Bridge 86 Schoolhouse Bridge to Bridge 87 Malthouse Bridge). Some initial clearance took place there last autumn and, now that the channel is just about dry after the wet winter, will resume in earnest over forthcoming work parties. A start Keeping the rampant vegetation under control was made on the Friday.

Page 34


progress Chesterfield Canal On the Staveley Town Deal project, the newly built Keith Ayling Lock gets its gates installed, while the rebuilt Bellhouse Basin takes shape Chesterfield Canal

Pictures by CCT

beams and paddle gear added; the Bellhouse Basin is taking shape, the narrow channel making provision for the future Work continues on the £5m Staveley Town reinstatement of Bellhouse Bridge has been Deal funded project to extend the existing built; and work is under way on building a isolated restored six-mile Chesterfield to new concrete channel wall on the section Staveley length. Although short, the new section includes some significant structures. below the lock where a former railway bridge crossed the canal. The Trans-Pennine Trail bridge was Meanwhile the Chesterfield Canal Trust completed first; the new Keith Ayling Lock is now complete and has had its gates, balance is very grateful for two grants recently

Keith Ayling Lock gets gates, while (below) Bellhouse Lane Bridge narrows and Bellhouse Basin take shape

Page 35


received to help with its activities elsewhere on the canal. Cllr Bert Bingham, Nottinghamshire County Council councillor for Worksop West, made a major donation from his Councillor’s Divisional Fund. It will go towards the maintenance of trip-boat Hugh Henshall and also Dawn Rose, which is the Trust’s replica ‘Cuckoo Boat’ (the Chesterfield Canal’s

distinctive style of historic working narrow boat, none of which survive), built entirely by hand by Trust volunteers. Both of these boats are moored in Shireoaks Marina which lies within Cllr Bingham’s division. Cllr Bingham said “I have long admired the work of the Chesterfield Canal Trust. On behalf of Nottinghamshire County Council, I

Constructing the new concrete channel walls at the old railway bridge site below the new Keith Ayling Lock To the Humber

Chesterfield Canal

West Stockwith

Length: 46 miles Locks: originally 65 Closed: in stages from 1907 Staveley to Chesterfield restored: 6 miles 6 locks (including new Staveley Town Lock)

Worksop to Kiveton restored and reopened in 2002: 6 miles 31 locks (including 1 extra added)

Killamarsh

Chesterfield

To Nottingham

Kiveton

13

Staveley Town Basin and Lock

Drakeholes Tunnel

River Trent

Norwood Tunnel Renishaw

Staveley Town Deal project

20

Retford Worksop Kiveton to Staveley unnavigable ‘missing link’ including current restoration sites: 8 miles 14 locks (originally)

West Stockwith to Worksop saved from closure in 1960s: 26 miles 16 locks

The Staveley Town Deal project, supported by £5m from the Towns Fund, is rebuilding the length northeast of Staveley Town Lock (which was added in 2012 to get the canal under a railway) including the new Keith Ayling Lock (to return the canal to its original level) and Trans Pennine Trail Bridge

Page 36


wanted to demonstrate this by supporting the maintenance of these two boats which bring people from near and far to Shireoaks to enjoy the waterway. Long may this continue.” Peter Hardy, Chair of the Trust, is pictured (right) receiving a ceremonial cheque from Cllr Bingham at the Stret Lock Open Day. He said “We are very grateful to Cllr Bingham for this grant. Hugh Henshall carries hundreds of passengers every year and Dawn Rose demonstrates horse boating during the summer months to sizeable crowds. It costs a surprising amount of money to maintain boats, so this donation is very welcome.” The Mansfield

Building Society has also given the Trust a grant. This was from its Community Support Scheme and is to purchase a new bench at the Hollingwood Hub, the canal visitor centre and coffee shop developed as an extension of the Hollingwood Lock keeper’s cottage.

Next job: the concrete canal bed under the Trans Pennine Trail bridge. The initail blinding layer has been laid Page 37


progress Wilts & Berks Canal A new reservoir scheme could represent a major boost for the prospects for canal restoration - or it could be a lost opportunity… Wilts & Berks Canal

Trust are calling for urgent public backing to ensure that the reservoir does include the The Wilts & Berks Canal Trust has launched full navigable reinstatement of the historic Wilts & Berks Canal around the reservoir and a campaign to secure restoration of the to the River Thames. The Trust says: “A canal through the site of a planned major once-in-a-generation opportunity could be drinking water supply reservoir - where the lost unless canal restoration is fully Trust believes that a once-in-a-generation incorporated into the reservoir’s final opportunity could otherwise be lost. Development Consent Order (DCO) plans.” The South East Strategic Reservoir WBCT has been working with Thames Option (SESRO), otherwise known as the Water and SESRO representatives to White Horse Reservoir, is being planned by demonstrate the substantial environmental, Thames Water. It will be the second largest reservoir in the country, and will store water social and economic benefits that full canal in winter which can then be released into the restoration could deliver alongside the reservoir project. Thames to supply South East England at These benefits include: drier times. Its situation just southwest of Abingdon puts it directly on the line of the • New wildlife habitats and biodiversity Wilts & Berks Canal’s Swindon to Abingdon gains line - not far from where the WRG 2025 • Walking, cycling and recreation routes Reunion working party took place. Improved health and wellbeing This might sound like a disaster for the • canal’s complete restoration and reopening, outcomes • Economic growth and tourism which is WBCT’s long term aim. But • Protection of more than 200 years of alternatively it could be very helpful for the heritage canal. An alternative route has been reserved for the canal, skirting the reservoir Figures presented by the Trust indicate the on the north and west sides, but the Trust believes it would make more sense to extend restored canal corridor could contribute the this to include complete reinstatement of the following real benefits each year to the local communities and residents: canal on this new route, and continuing eastward to reach the River Thames (this part would double-up as the channel carrying water from the reservoir to the river - rather than constructing the channel as an underground culvert, as currently proposed). All this could be incorporated into the reservoir construction works - where it would form just a small fraction of the multi billion pound total cost of the project. So campaigners and supporters of the Wilts & Berks Canal The reservoir plans: canal diversion shown by thick blue line around top and left Page 38


• £7.7 million annually in economic activity • £5.4 million annual NHS savings through increased physical activity • £14.4 million annual wellbeing benefits • Thousands of acres of enhanced habitats and biodiversity improvements • Tens of thousands of volunteer hours every year

consultation stages. Supporters are being encouraged to:

Henry Sullivan, WBCT

• Follow and share campaign updates on social media • Respond to public consultations • Contact local councillors and MPs • Join or support the Wilts & Berks Canal Trust • Help spread awareness of the issue The Trust believes the reservoir project presents locally a unique opportunity to create a connected green and blue infrastructure corridor that For further information, interviews or would benefit communities across Oxfordshire, campaign involvement, contact: Wiltshire and beyond for generations. Email:Info@WBCT.ORG.UK However, campaigners say time is Check WWW.WBCT.ORG.UK running out. Become a member from just £1.50 a month The current SESRO (White Horse and pledge your support: WWW.WBCT.ORG. Reservoir) planning programme means key UK/JOIN-PAGE/ design and consultation decisions will soon See Facebook group: Wilts & Berks Canal Trust be finalised before submission of the Development Consent Order application. A spokesperson for the campaign said: “This is about making sure the biggest infrastructure project in the region also delivers the biggest possible public benefit. “If the reservoir proceeds without full canal reinstatement being secured now, the opportunity may never come again. “We are asking local residents, businesses, councillors, environmental groups and supporters of active travel and heritage to stand with the Trust and help ensure the full Wilts & Berks Canal restoration is included within the final plans.” The campaign will now focus on raising Meanwhile elsewhere on the Wilts & Berks, here’s an example of a public awareness, major development helping the canal restoration, as the new reservoir engaging decisioncould do. The Wichelstowe major residential southern extension of Swindon makers and has already resulted in the restoration of one length of canal and the encouraging construction of part of a canal diversion around lengths that have been community support lost under the town. Here. These two lengths are being connected together ahead of forthcoming by the new Badgers Bridge as part of the latest phase of Wichelstowe Page 39


From this… …to this

Page 40


Turn static files into dynamic content formats.

Create a flipbook
Navvies 337 by The Inland Waterways Association - Issuu