MEASUREMENT Sr. No.
SHEET
Description
Quantity PLine Area / Perimeter
MEASUREMENT Sr. No.
Height / Width
No.
Total
Units
SHEET
Description
Quantity
PLine Area / Perimeter Height / Width No. Total Units For all Items in all Sections : Rate shall include transportation, loading/unloading,providing/supplying/laying/fixing/installing/ fabricating/testing/ commissioning etc on site. Rate shall also include all taxes such as VAT, excise, sales tax, octroi, etc.
SECTION - I : Site Preparation & Cleaning a1
Cleaning and clearing the site of all rocks, boulders, brick-bats, stone, bushes, shrubs, etc complete, as directed by the architect for start of construction activity.
SECTION - II : CIVIL WORK A
EARTHWORK AND METAL PACKING Note : 1) The items given below shall be as per Section A " "Earthwork, Metal Packing & Subsurface Drainage" of the specifications. 2) Rate for excavation shall include dewatering during the excavation including shoring, strutting etc and keeping it dry during excavation and construction. 3) All earthwork shall be carried out as per Conservation Architect's instructions and safety norms as per relevant IS code. The rate shall include all scaffolding and measures for cordoning off areas during dismantling, providing sign boards etc. 4) All debris and scrap materials from earthwork shall be contractors property other than that which is reused for back-filling etc. and this debris and scrap materials shall be removed away from site immediately on his own. The contractor to give rebate in rates against materials and scrap / debris from such dismantled work which shall be contractor's property. 5) For all earthwork items, the contractor should carefully stack all excavated material at site as per the instructions of the Conservation Architect. All debris associated with the earthwork should however be disposed off by the Contractor. 6) The measurement of excavation shall be taken in cu.m. as per rectangular trench of bottom width of concrete multiplied by vertical depth of foundation from ground even though contractor might have excavated with sloping side/ full length trench for his conviency.
a1
a2
a3
a4
a7
B
Surface excavation and excavation for retaining walls, basement, water tanks, effluent treatment tanks, etc. including backfilling of approved excavated materials in foundations, & behind retaining walls after completion of waterproofing etc. watering and consolidating, carting away surplus earth, including preparing the surface. (Note: All backfilling & spreading of earth shall be carried out in layers not exceeding 200mm and compacted to 90% ordinary proctor dry density.)
583.19
3.50
-- 2041.1615
CU.M
Filling in plinth and in other places with approved murum brought from outside, including watering consolidating in layers not exceeding 200mm by 8-10 tonnes road roller or other approved mechanical equipment etc. complete as directed.
480.96
3.50
--
1683.36
CU.M
Anti-termite Preconstruction Treatment : (As per IS: 6313 Part-III) (Note : Anti-termite treatment shall be carried out through specialised agency reputed in Pest Control treatment and approved by the Architect. The contractor to give 10 years guarantee on a suitable bond)
81.74
3.00
--
245.22
SQ. M
Providing post-constructional anti-termite treatment by drilling in holes at the junctions of walls and flooring and injecting chemical emulsion, wall spray and door frames to be drilled and sprayed complete using approved chemicals at the rate of 5 liters of emulsion concentrate of one percent concentration of CHLORPYRIFOC 2.0% EC, ISI approved conforming (IS 8944), Including treatment of wood for termites, borers, wet rots and dry rots. Covered floor area shall be measured for payment. (TOTAL)
834.13
--
--
834.13
SQ. M
Providing, chasing, inserting/ laying Damp proof course 50 mm thick M-20 cement concrete layer and bitumen using cement with approved water proofing compound at the rate of 1Kg per 50 kg of cement etc. complete.
247.91
--
--
247.91
SQ. M
CONCRETE-PLAIN & REINFORCED Note : 1) The items given below shall be as per Section B" Concrete-Plain & Reinforced" of the specifications. 2) For small concrete on approval of Conservation Architect, weigh batched concrete as per design mix, in manually or mechanical type operated weigh batcher dial type or mechanical type of minimum capacity 650 Kgs shall be used. Weigh batcher shall be calibrated regularly.
1