Skip to main content

FL Currents, Florida Keys Electric Cooperative, September 2025

Page 1

Florida Currents FLORIDA KEYS ELECTRIC COOPERATIVE

SEPTEMBER 2024

Waterway

Work

With approximately 11 miles of power lines spanning water in Florida Keys Electric Cooperative’s service territory, lineworkers are sometimes called out to sea. Pictured, FKEC’s Extra-High-Voltage crew makes preventive repairs to transmission conductor at the Long Key Bridge water crossing. Read more on page 4. PHOTO BY NIKKI DUNN CULLEN

ALSO INSIDE >> Proactive Prevention | Heat Stress Program | Generator Loan


Turn static files into dynamic content formats.

Create a flipbook
FL Currents, Florida Keys Electric Cooperative, September 2025 by utilitypioneers - Issuu