POST FALLS APARTMENT COMPLEX TEAM COMPLEX DESIGNERS MEMBERS: ALIYANA AVALOS, NOAH GEORGE, PARKER SCHWERS PROJECT SPONSOR: ARDURRA GROUP, INC. SPONSOR CONTACT: JOANNA LITALIEN
BACKGROUND
OBJECTIVES
•
Located in Post Falls, Idaho
• Design building and parking layout
•
Developing area
• Design stormwater storage
•
16-acre plot
•
Proposed new housing between Wal-Mart and Cabela’s
• Create Grading Plan • Design utilities to align with existing main line connections
COST ESTIMATE Design
Total Cost
Utilities
$ 362,016
Site Layout
$ 733,584
Grading/Storm
$ 195,965
Total
$1,291,565
DESIGN • • • •
UTILITIES
STORMWATER & GRADING
Water and Sewer mains Water and Sewer services Fire-Riser and Hydrant connection and location Municipal Network Connection
• Site divided into four stormwater basins • Seven double depth drywells • Designed to 20 year 2 hour storm event • Grading designed to meet Post Falls and ADA standards
SITE LAYOUT • •
16 Buildings • 384 Units Pedestrian ramps • Parallel and perpendicular
2023 Capstone Project