ENGR - EXPO 2023 - (CE) - Kapolei Hawaii

Page 1

NEW OFFICE BUILDING PROJECT MEN OF STEEL DESIGN TEAM: AUSTIN EMERICK, JOHN TAYLOR, DEVIN STEED, PARKER WATSON SPONSOR: GARRETT DAVIS AND DEREK PECK, TAMARACK GROVE ENGINEERING ACADEMIC ADVISORS: DR. RICHARD NIELSEN AND DR. AHMED IBRAHIM, UNIVERSITY OF IDAHO

BACKGROUND

GRAVITY MEMBER SIZES

• Tristate General Contractors were wanting to expand their operations to Kapolei, Hawaii, with the addition of a new office building.

• Warehouse Section Roof Joists: 22K5

• Office Building Layout

• Warehouse Section Columns: HSS6x6x1/2

• 23,815 Square Ft. • Finished Office Space • Storage Mezzanine • Large Open Warehouse Area

• Warehouse Section Joist Girders: 32G8N9K

• Mezzanine Roof Joists: 14K1 • Mezzanine Roof Girders: W14x61, W14x43 • 2nd Floor Joists: 20K4 • 2nd Floor Joist Girder: 24G8N9K • Office Section Columns: HSS6x6x1/2

• Warehouse Footing: 10’x10’x2’

• In Accordance with ASCE 7 – 10 and IBC 2012

• Rebar: #5 @ 12in spacing, top and bottom

• Roof

• Office Footing :7’-6”x7’-6”x2’

• Live Load: 20 PSF

• Rebar: #5 @ 12in spacing, top and bottom

• Dead Load: 15 PSF

• Continuous Footing

• Floor

• Interior Wall: 1’

• Live Load: 125 PSF (Light Storage) • Misc. Dead Load: 10 PSF • Lateral

• Seismic Load: Top Story Force of 63 Kips • Wind Load: 20.1 PSF

FOUNDATION DESIGN • Column Sizing

DESIGN PARAMETERS

• Mezzanine Dead Load: 30 PSF

ROOF FRAMING PLAN

• Rebar: #5 @ 12in spacing Graphic Provided by Tamarack Grove Engineering

SHEAR WALL DESIGN

• Exterior Wall: 2’ • Rebar: #5 @ 12in spacing

• 8 in thick grouted CMU blocks • Rebar: #4 bars 24in O.C in both vertical and horizontal directions

2023 Capstone Project