KOOTENAI COUNTY INTEGRATED CLINIC Anna Young, Clinton Ponozzo, Philip Lohman, Xinyi Li Sponsors: Chaney Wood, Lucas Coutinho | Faculty: Dr. Richard Nielsen, Dr. Ahmed Ibrahim

P ROJ E CT OB J E CTIVES • Design gravity and lateral systems for

LOA D S

Location

Load Type

Magnitude (psf)

Live

65 125 (Storage)

Dead

26.67

scenarios of loading were used for

Live

20

design of typical members. All

Dead

52.2

Wind

-17.92

method. All wood elements

Snow

93.44

utilized the ASD method.

Seismic

5.44

Loads were determined using the IBC 2018, the ASCE 7-16, and

2nd Floor

ASCE Hazards Report. Worst case

steel elements used the LRFD

DE S I GN

Roof

• Develop drawings for gravity and lateral systems.

• Create a project budget and time/task management schedule. Partition and Office Area (65 psf)

Storage Area (125 psf)

Design work was split into a gravity system (resisting live, dead, and snow loads) and a lateral system (resisting wind and seismic loads). A top-down approach was utilized to size members starting with the roof TJI joists down to the foundation footing sizes.

G R AV I T Y SY ST E M Location

the medical clinic in Post Falls, ID.

2 ND F LO O R L I V E LO A D M A P

L AT E R A L S Y S T E M

Element

Size

TJI Joist Transverse Glulam Girder Longitudinal Glulam Girder nd 2 Floor Steel Girder Elevator Hoist Beam Floor Sheathing TJI Joist Roof Transverse Glulam Girder Longitudinal Glulam Girder Multiple Floors Steel Column

16” TJI 360 @ 12” OC 12” x 5.5” 15” x 10.75” W 6” x 8.5” W 8” x 15” 40/20 – 4 Ply Plywood 14” TJI 110 @ 14” OC 16” x 5.5” 15” x 8.75” W 8” x 31”

The lateral system comprises of the shear wall design and headers, trimmers, and king studs. • Header: 1.75” x 5.5” • Trimmer: 4 x 12 DF No.2 @ 7” OC • King Stud: 9.5” x 11.5”

C OST Members tracked hours spent on each item and estimated rates for professional consultation ($175/hr), sponsor consultation ($150/hr), and personnel time ($100/hr) to develop an estimated cost for the design work completed.

F O U N D AT I O N

Shear Wall Schedule Fastener Spacings Stud or Blocking Type Mark Size at Adjoining Wall Boundaries Intermediate Panel Edges and Panel Edges Studs

SW-4

3x

3"

12" OC

SW-3

3x

4"

12" OC

SW-2

3x

2"

12" OC

SW-1

3x

3"

12" OC

2SW-4

3x

4"

12" OC

2SW-3

3x

2"

12" OC

2SW-1

3x

4"

12" OC

Time (hrs)

Total Cost ($)

25

$2,500

40

$4,000

140 50 225

$140,000 $8,250 $154,750

Codes Load Calculations Design Consulting Total

• Factor of Safety: 1.2 • Soil Bearing Capacity: 3500 psf • Foundation Bearing Pressure: 2917 psf • Height: 24” • Width: 72”

2023 Capstone Project