JOIN THE MOVEMENT www.letsmovewater.com
#letsmovewater
MAXIMIZE YOUR SUMMER POURING SEASON
At C.N. Wood, we’ve been empowering contractors with top-tier CemenTech volumetric concrete equipment. With CemenTech’s flexibility, you can move from site to site—whether it’s a residential pool or a large-scale project—without wasting time or product. CemenTech’s volumetric mixers deliver precise, on-demand concrete, so you can keep projects moving smoothly and efficiently all summer long, ensuring the job gets done right the first time.
With C.N. Wood, You're Never Alone! Woburn, MA (781) 935-1919
Avon, MA (508) 584-8484
Whately,MA (413) 665-7009
Proudly Supporting UCANE Since 1976!
Smithfield, RI (401) 942-9191
NORTHEAST
BIG. We Think
We Deliver
SOLUTIONS. flo w l e vel
PIPE RENEWAL OR REPLACEMENT, MANHOLE REHAB • Geopolymer Lining • Pipe Bursting • Manhole Rehabilitation
PIPE RELINING • CIPP Lining • UV CIPP Lining • Slip Lining
flo w l e
vel
flow l e
vel
fl o w l e
vel
INSPECTION, CLEANING & ASSESSMENT • Clean & CCTV • Multi-Sensor Inspection • Specialty Cleaning
Serving the municipal and industrial markets, you can count on Vortex Services Northeast for end-to-end trenchless rehabilitation services!
GROUTING • Leak Stoppage • Soil Stabilization • I&I Prevention
1-855-WHY-DIG1
www.vortexcompanies.com sales@vortexcompanies.com ©2025 Vortex Companies, LLC. All Rights Reserved.
Years of Excellence 1954-2025
OFFICERS President BRIAN COONEY
C. C. Construction, Inc.
President Elect CHRIS VALENTI
GVC Construction, Inc.
Treasurer QUERINO PACELLA
RJV Construction Corp.
Secretary LISA FRENCH KELLEY
W. L. French Excavating Corp.
BOARD OF DIRECTORS MARCELLA ALBANESE
Albanese Brothers, Inc.
CALVIN BRANDFORD CHB Excavating
GERRY CARNEY, JR.
C. N. Wood Company, Inc.
JULIA D’ALLESSANDRO D’Allessandro Corp.
JERRY GAGLIARDUCCI
Gagliarducci Construction, Inc.
MARCO GIOIOSO
P. Gioioso & Sons, Inc.
JUSTIN GOODHEART
J. F. White Contracting Co.
DAN HORGAN
R. H. White Const. Co., Inc.
MARK LANGEVIN
MAY, 2025 5 President’s Message:
IN THIS ISSUE
UCANE Leads 2025 Advocacy to Delay Costly Truck Mandates and Secure Infrastructure Funding
7 Legislative Update: • • • • •
Healey-Driscoll Administration Delays Enforcement of Advanced Clean Truck Rule House Passes FY26 Budget; Funding Stays Relatively Consistent Coalition Submits Letter to Congressional Delegation in Support of Water Infrastructure Funding Healey-Driscoll Administration Launches Initiative to Support Businesses Impacted by Trump’s Tariffs Healey-Driscoll Administration Awards Nearly $1 Million to Five Ipswich River Communities to Improve Water Supply and Treat PFAS
25 UCANE Interview:
Quentin Palfrey, Director of Federal Funds and Infrastructure Office
29 MassDEP Releases FINAL CY2025 Clean Water & Drinking Water SRF Lists Totaling Over $1.241 Billion 32 Legal Corner: April 16, 2025: Massachusetts Supreme Judicial Court Rules That a Contractual Indemnification Claim is Not Barred by the Massachusetts Statute of Repose Applicable to Negligence Claims
45 Save the Date: UCANE’s 45th Annual Golf Classic 47 Under the Hard Hat:
An Interview with UCANE Board Member Michael J. McCarthy, J. Derenzo Co.
51 National Trench Safety Stand Down 53 Under the Hard Hat:
An Interview with UCANE Consultant Mike Lenihan
57 Insurance Perspective:
Five Insurance Gaps That Cost Utility Contractors
MIKE McCARTHY
60 UCANE Represents New England Contractors at Water Week in Washington, D.C. 63 Understanding the ‘Competent Person’ and this Critical Role in Excavation 67 In Memoriam:
RYAN McCOURT
69 UCANE’s Safety Corner:
Phoenix Communications, Inc.
WILLIAM LEONARD
Aqua Line Utility, Inc.
KARIN MARSHALL
Boston Concrete Corp. J. Derenzo Co.
McCourt Construction Company
JOHN McGRATH
Methuen Construction Co.
MICHELE NORTON
HUB International New England
ROBBIE OUR
Robert B. Our Co., Inc.
RICHARD PACELLA, JR. R. M. Pacella, Inc.
MARK SZELA
Insituform Technologies LLC
JOSEPH NOLAN
Executive Director
Kenny Anderson, Modern Continental Construction Co.
Preventing Falls in Construction Highlighted During May National Safety Stand-Down
69 Spotlight on Cape Cod:
Protecting Public Health and Water Resources Through Testing, Monitoring, and Research
75 UCANE’s Employee Safety Manuals Editors: Joseph F. Nolan and Anne Klayman, Associate Editor: Suzanne Hatch Magazine Designer/Associate Editor: Sherri Klayman, Head Writer/Assistant Editor: Mike Lenihan Construction Outlook Chair: Brian Cooney Editorial Board: Brian Cooney, Chris Valenti, Querino Pacella, & Lisa French Kelley CONSTRUCTION OUTLOOK published monthly by the Utility Contractors’ Association of New England, Inc., 300 Congress Street, Suite 101, Quincy, MA 02169; Tel: 617.471.9955; Fax: 617.471.8939; Email: jnolan@ucane.com; Website: www.ucane.com. Statements of fact and opinion are those of the authors alone and not necessarily those of UCANE and the Construction Outlook editorial board and staff. Subscriptions are included in dues payments for UCANE members. Presorted Standard postage paid at Brockton, MA. POSTMASTER, please send form #3579 to Construction Outlook, Crown Colony Office Park, 300 Congress Street, Suite 101, Quincy, MA 02169.
JOINING FORCES TO BETTER SERVE YOU The Jack Farrelly Company, Putnam Pipe and HR Prescott have united, as part of the Core & Main family. • W. Boylston, MA 508-835-4431
• Hopkinton, MA 508-435-3090
• Norwood, MA 781-407-9133
• Bloomfield, CT 860-769-6760
• North Haven, CT 203-777-5548
• Taunton, MA 508-880-8736
• East Lyme, CT 860-739-5457
• Westbrook, ME 207-464-0585
• Worcester, MA 508-752-7473
• New Britain, CT 860-826-0517
• N. Billerica, MA 978-459-6701
• Loudon, NH 603-263-7350
• New Milford, CT 860-210-6262
• Springfield, MA 413-732-8400
• Johnston, RI 401-725-0140
We’re still the dependable experts you’ve always known, but now as one team, continuing to handle all your water, wastewater, fusible, and storm drainage material needs.
Service Work Available. Give us a call at 860-243-9714. Scan the QR Code to Learn More.
4
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
UCANE Leads 2025 Advocacy to Delay Costly Truck Mandates and Secure Infrastructure Funding As April showers turn to May flowers, the Utility Contractors’ Association of New England, Inc. (UCANE) remains fully engaged in advocating for public policies that protect and advance our industry. This year has already brought significant legislative and regulatory activity, and UCANE has responded with coordinated efforts to ensure that our contractors continue to have a strong voice on both Beacon Hill and Capitol Hill.
O
ne of our primary focuses this year has been the formation of a broad-based coalition urging the Healey Administration to postpone the implementation of both the Advanced Clean Truck (ACT) Rule and the Heavy-Duty Omnibus Regulation. While UCANE supports responsible environmental progress, we remain concerned about the limited availability of compliant vehicles, uncertain infrastructure readiness, and the significant cost burdens these rules would impose on our members. Thanks to our collective advocacy, we are pleased to report that MassDEP has exercised enforcement discretion to delay the ACT Rule’s electric vehicle quotas originally set for January 2025. The enforcement of the ACT is delayed until January 1, 2027. Additionally, the administration has pushed back the implementation of the diesel emissions standards under the Heavy-Duty Omnibus (HDO) Regulation to January 1, 2026. UCANE has also maintained consistent dialogue with MassDOT and the Registry of Motor Vehicles regarding new sideguard requirements for medium-and heavy-duty vehicles used on all state-awarded contracts after January 1, 2025. Following our engagement, the administration agreed to delay enforcement of this regulation until January 2026. We are working closely with state officials as they develop a certification portal, and UCANE will coordinate training sessions to help members prepare for compliance.
MAY, 2025
At the state level, UCANE Executive Director Joseph Nolan continues to serve on the Water Infrastructure Advisory Council. We are collaborating with agency partners and legislators to identify new funding alternatives and to ensure that clean water infrastructure is prioritized in the upcoming Environmental Bond Bill. This spring, Executive Director Nolan and Executive Board Members Querino Pacella, Chris Valenti, and Geselle Valenti traveled to Washington, D.C. for Water Week. While there, they attended the American Water Works Association conference and met with federal lawmakers to advocate for expanded investment in water, wastewater, and utility infrastructure. Back home, UCANE continues its strong partnerships with the MWRA, Boston Water & Sewer Commission, MassDEP, and the State Treasurer’s Office. As we emphasize through our InvestInWaterMA campaign: just because these projects are underground doesn’t mean they should be out of sight or out of mind.
The need is real—and urgent. UCANE remains committed to making sure our members’ priorities are front and center with decision-makers at every level. “Our mission is clear: advocate, protect, and deliver for the contractors who build New England’s future—one project at a time.” n
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
5
EFFICIENT, SAFE, RELIABLE SOLUTIONS. » HYDRO EXCAVATION » UTILITY LOCATES » POTHOLING » POLE + ANCHOR HOLES » & MORE!
MASSACHUSETTS
Maurice Anderson 617.721.1761 MASSACHUSETTS + NEW HAMPSHIRE
Joe MacEachern 508.450.7667
24 / 7 / 365 SUPPORT BADGERINC.COM 6
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
Mark Molloy, Esq.
Healey-Driscoll Administration Delays Enforcement of Advanced Clean Truck Rule
W
hile the mid-month of April brought the annual tax deadline, it also brought news that the Massachusetts Department of Environmental Protection (MassDEP) will exercise its “enforcement discretion” to enable the purchase of medium- and heavy-duty trucks under the Advanced Clean Trucks (ACT) program that was implemented on January 1, 2025. The temporary relief applies to model years 2025 and 2026 and requires that manufacturers make internal combustion engine (ICE) trucks available to distributors seeking them. According to the MassDEP, this approach gives manufacturers more flexibility and eases the challenges dealers are facing, while keeping the state on track to achieve critically important emissions reductions. The MassDEP’s action comes after UCANE, its members, and a broader of coalition of thirty-five (35+) plus associations waged a concerted effort to delay both the Heavy-Duty Omnibus (HDO) and the ACT rules since last August. While the coalition was successful in delaying the HDO rule last October, it took a little while longer for the ACT rule to be delayed. To that end, the coalition, as recently as March 31, sent a leader to Governor Maura Healey, Speaker Ron Mariano, and Senate President Karen Spilka asking them to include this delay within the fiscal year 26 budget. In doing so, over fifty (50+) associations and businesses wrote: “Unfortunately, the Commonwealth’s recent implementation of the Advanced Clean Truck (ACT) rule has adversely impacted our ability to acquire sorely needed medium and heavy trucks. While these state regulations stipulate an increasing percentage of zero-emission vehicle (ZEV) truck sales starting in Model Year 2025 and stronger NOx standards effective January 1, 2026, the necessary technology and infrastructure are not yet in place
MAY, 2025
to support these initiatives. Notwithstanding the significant shortage of the electric infrastructure necessary to charge them, medium and heavy-duty electric trucks remain prohibitively expensive even with their reduced capacity. Further, assuming enough electric trucks were somehow sold to meet the ACT standard, the fact remains that there exist few, if any, HDO compliant diesel trucks to purchase now or in the foreseeable future. In short, these regulations are simply ahead of technology advancements, the necessary infrastructure to support it, and manufacturing capacity. As local media have highlighted, the recent implementation of the ACT rule has essentially stopped the sale of new medium- and heavy-duty trucks throughout the Commonwealth. Not only does this mean that thousands of cleaner, safer trucks are not replacing older, dirtier trucks in the public and private sectors, but we are losing sales tax revenue from the same decline. Using current estimates from the decimated truck market in Massachusetts, we have already lost millions in tax revenue that could be otherwise used to fund a wide variety of important government programs during the fiscal year 2026 budget cycle.” The Healey-Driscoll Administration’s actions came as Congress begins to follow through on the Trump Administration’s efforts to revoke California’s ACT and HDO rule through Congressional action in the form of the Congressional Review Act (CRA). Under the CRA, Congress can revoke a regulation, or similar policy decision, of an agency if certain analyses were not completed. Resolutions to revoke the California waivers for the ACT and HDO waivers were passed in the United States House of Representatives (H.J. Res. 87 and H.J. Res 89) at the end continued on page 9
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
7
VIDEO PIPE INSPECTION • CCTV Live Video Feed • Large and Small Pipes
PIPE CLEANING SERVICES • High Pressure Jetting • Vactor Services
Southern New England’s
FOREMOST NAME Since 1940.
in Sewer and Drain Services
HI-RAIL VAC SERVICE • Hi-Rail Guzzler • Demo & installation
SEWER ACCEPTANCE SERVICES • Low Pressure Air Testing • Vacuum Testing of Structures
PodgurskiCorp.com
781.828.0821 Office@podgurskicorp.com 8 Springdale Ave • Canton, MA 02021 Commercial • Municipal • Residential
8
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
Legislative Update continued from page 7 of April. Again, while there is a question as to whether the Congressional Review Act (CRA) governs these types of waivers, the United States Senate, through resolutions filed in its chamber, (S.J.Res 46 and S.J. Res 47), will attempt to undo the ACT and HDO rules in the month of May. Despite this outcome, UCANE and its members will need to remain vigilant on a number of fronts. First, the Massachusetts enforcement delay is temporary – notwithstanding the fact the HDO rule was only delayed until January 1, 2026. Second, it is likely that should Congress pass the aforementioned resolutions, there will be numerous court challenges to the same. Third, emissions reduction is an issue everyone cares about. UCANE and members of the broader coalition, both public and private sector members, will need to continue to be engaged so that the voice of end-users of medium- and heavy-duty trucks remain at the forefront. With many thanks to the Healey-Driscoll Administration for their action on this issue, you may review the MassDEP’s announcement at: https://www.mass. gov/news/massachusetts-announces-flexibilities-forclean-trucks-requirements. continued on page 11
Name a better duo... we’ll wait Wrentham, MA Carver, MA Burrillville, RI
508-384-0011
We are BORING
HENNIKER DIRECTIONAL DRILLING
Over 20 years drilling in tough New England terrain HDDBORE.com | 603-428-6333 | daniellem@hddbore.com Visit us on FB and Instagram
MAY, 2025
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
9
10
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
Legislative Update continued from page 9
House Passes FY26 Budget; Funding Stays Relatively Consistent
I
n late April, the Massachusetts House of Representatives approved its fiscal year 2026 (FY26) budget proposal, totaling $61.58 billion. This figure reflects an increase of $81.9 million in spending added over three days of debate. The FY26 House budget is $3.8 billion (6.6%) more than the FY25 budget and $498 million (1%) less than Governor Healey’s proposed budget. Like the Governor’s plan, the House relies on $1.3 billion in one-time funding and new revenue sources, such as the income tax surcharge on earnings over $1 million. (Note: The surtax spending in the House’s budget proposal is divided between education ($1.85 billion)(61%) and transportation ($765 million)(39%). According to the Massachusetts Taxpayers Foundation (MTF), the House adopted seven consolidated amendments, adding $74.7 million in new spending. The consolidated amendments included 788 earmarks, which amounted to 98 more earmarks than the previous budget year. In addition, the House introduced 35 new outside policy sections and revised 5 others through 21 amendments.
Key Funding Highlights for UCANE’s Areas of Interest: • Level funding of $63.3 million for the Clean Water Trust’s contract assistance. • $1.5 million for the Commonwealth Sewer Rate Relief Fund. • $5.9 million for the underground storage tank program. • Slightly over $54 million in funding for the Massachusetts Department of Environmental Protection. • $150,000 for a study of Western Massachusetts’ drinking water infrastructure needs by the Pioneer Valley Planning Commission. The Massachusetts Senate will present its own budget in May. Following that, a Conference Committee will be formed to reconcile differences between the House and Senate versions before the July 1 deadline marking the start of FY26. For more details on the House FY26 budget, visit: https://malegislature.gov/Budget/HouseBudget
continued on page 13
DigSafe.com or Call 811 Before You Dig It’s smart. It’s free. It’s the law. Follow these steps for a safe excavation: • Pre-mark the location of intended excavation using white stakes, paint or flags. • In MA, ME, NH, RI and VT, notify Dig Safe® at least 72 hours in advance, not including weekends and holidays.
• If a line is damaged, do not backfill. Notify the affected utility company immediately if the facility, its protective coating, or a tracer wire is damaged.
• Notify non-member facility owners.
• Call 911 in the event of a gas leak, or if a damaged facility poses a risk to public safety.
• Maintain the marks placed by underground facility owners.
• Know your state’s excavation requirements.
• Use caution and dig by hand when working within 18” of a marked facility.
• Go to digsafe.com for educational material and current laws.
DGS UCANE COM.indd 1
MAY, 2025
7/18/24 5:04 PM
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
11
For over 75 years, Shea Concrete Products has proudly served the New England construction market by providing industry leading product quality and service to our customers and industry partners. Our robust product line of precast concrete products provides solutions for all project types and our truck fleet ensures on-time delivery.
800.696.SHEA (7432) Nottingham
160 Old Turnpike Rd Nottingham, NH 03290
Wilmington
773 Salem Street Wilmington, MA 01887
Rochester
153 Cranberry Hwy Rochester, MA 02770
Amesbury
87 Haverhill Rd Amesbury, MA 01913
Legislative Update continued from page 11
I
Coalition Submits Letter to Congressional Delegation in Support of Water Infrastructure Funding
n an effort to continue raising the profile for funding water infrastructure, UCANE joined a coalition of engineers, drinking water providers, advisory boards, business organizations, and other advocacy groups in a joint letter to members of the Massachusetts Congressional delegation. All members of the Water Infrastructure Advisory Committee (WIAC), signatories sought to highlight the water infrastructure needs of the Commonwealth while also asking the Congressional delegation to take certain actions. In particular, UCANE, with its coalition members, asked the Congressional delegation to undertake the following activities: Advocating for Increased Federal Support: Reauthorize and expand the State Revolving Fund (SRF) programs to ensure equitable access to lowinterest loans and grants while maintaining flexibility
to address emerging priorities. Simplifying SRF Application Processes and Requirements: Streamline requirements to make funding more accessible, especially for smaller communities with limited resources. Look at requirements, though well-intentioned, may drive up the cost of infrastructure projects (Build America, Buy America). Creating a Dedicated Fund for Earmarks: Establish a separate fund for congressionally directed spending to address newly identified needs without compromising SRF resources. In 2020 the Drinking Water State Revolving Fund base grant federal was $25,549,000, in 2024 it was down to $10,078,000. Our SRF is losing capacity at a time when there is urgency to install PFAS treatment to comply with drinking water standards. The drop in the base grant also threatens staffing levels at MassDEP. We supcontinued on page 15
Insuring Contractors for Over 50 Years Providing tailored solutions in risk management, surety, claims and more to meet all your business needs. VISIT ACRISURE.COM/NEWENGLAND TO REQUEST A QUOTE AND FIND A SOLUTION
MAY, 2025
ACRISURE WOBURN 100 Unicorn Park Drive • Suite 201 Woburn, MA 01801 Paul Patalano — 781-569-0146 Jordan Tirone — 781-569-0134
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
13
SITECH NORTHEAST
GRADE CONTROL COMPACTION CONTROL DRILLING/PILING/SHEETING POSITIONING SURVEY/LAYOUT TOOLS PRODUCT TRAINING DRONE SERVICES SITE POSITIONING PAVING CONTROL SOFTWARE SOLUTIONS COMPONENT REPAIR TECHNOLOGY RENTAL
00
YOU DO THAT?
Offering you a complete range of services to help you save time, money and resources. Visit www.sitechnortheast.com to find your representative or call 855-748-3244.
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
OCTOBER, 2017
Legislative Update continued from page 13 port congressionally directed spending, but it should not impact funding that benefits municipalities across the Commonwealth; therefore, we are pleased to see that the recently passed Continuing Resolution returns SRF funding to pre-earmark levels. Funding Lead Service Line Replacement: Increase dedicated funding for replacing lead service lines, a critical public health priority. Supporting Compliance with Emerging Regulations: Provide targeted funding to help utilities meet PFAS standards and other regulatory requirements without overburdening ratepayers.” Organizations who signed this Congressional letter with UCANE included the American Council of Engineering Companies of Massachusetts; Boston Society of Civil Engineers; Massachusetts Coalition for Water Resources Stewardship; Massachusetts Municipal Association; MWRA Advisory Board; Massachusetts Water Environment Association; Massachusetts Water Works Association, and The 495/MetroWest Partnership. The letter was delivered to the Congressional delegation on the last day of March. A copy of the letter may be viewed at: https://tinyurl. com/526m9hjm. continued on page 17
SAND & STONE CORP. 192 Plain St. North Attleboro, MA 02760 (508) 699-1922 www.borocorp.com
We improved uptime, shop efficiency and costs with B2W Maintain. SKIP BROWNELL SEVERINO TRUCKING
Break new ground, win more work and complete it more profitably with a unified platform for heavy construction estimating, operational workflows and business insight. HEAR SKIP’S SUCCESS STORY AND MORE AT B2WSOFTWARE.COM/SKIP
MAY, 2025
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
15
CONSTRUCTION RISK SOLUTIONS
Starshep.com · 800-854-4625 16
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
Legislative Update continued from page 15
Healey-Driscoll Administration Launches Initiative to Support Businesses Impacted by Trump’s Tariffs
T
he Healey-Driscoll Administration launched the Massachusetts Tariff Response and Business Operations Support Initiative to align state resources to aid Massachusetts businesses in response to President Donald Trump’s recent tariff policies and the ongoing uncertainty they cause for consumers and businesses across the country. Specifically, the Massachusetts Tariff Response and Business Operations Support Initiative (TRBO) has been established in response to the ongoing uncertainty and rapid changes surrounding U.S. federal tariffs, which continue to impact manufacturers across industries. As businesses face rising costs, supply chain disruptions, and sourcing challenges, the TRBO aims to align state support and resources to help manufacturers navigate these dynamic conditions and adapt as necessary. Their goal is to strengthen the resilience of local manufacturers through informed planning, strategic connections, and responsive assistance.
Launched in partnership with the quasi-public economic development agency Massachusetts Technology Collaborative through its Center for Advanced Manufacturing (CAM), the TRBO will assist Massachusetts manufacturers’ response to new and changing tariffs. Initial action items include a survey for companies to share how they are impacted by the tariffs so that the state can help them develop response plans, identify their continuity needs, and connect them to alternative supply chains here in Massachusetts and across the region. The TRBO initiative follows Governor Healey’s multiple convenings and meetings with businesses and business leaders about the impact of President’s Trump’s policies, including tariffs, on the Massachusetts economy. This includes a business roundtable held April 9 with leaders of prominent organizations representing hundreds of businesses of all sizes and span-
continued on page 19
IT SOLUTIONS FOR THE CONSTRUCTION INDUSTRY Why Construction Firms Choose Rutter Networking Technologies Industry Expertise: We tackle the unique challenges of dispersed worksites, mobile workforce needs, and strict compliance. Advanced Security: Multi-layered strategies protect your sensitive project data and corporate information. Scalable Cloud Solutions: From Azure Virtual Desktops to cloud backups, our IT infrastructure grows with your business. Proactive Support: Enjoy uninterrupted operations with our proactive monitoring, maintenance, and 24/7 support.
Construction firms trust Rutter for unmatched IT expertise and comprehensive solutions.
READY TO ELEVATE YOUR IT INFRASTRUCTURE? CONTACT US TODAY!
MAY, 2025
For more information please contact: Jessica Drugan (jdrugan@rutter-net.com) www.rutter-net.com
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
17
AGGREGATES • HOT MIX ASPHALT • CONSTRUCTION SERVICES
998 RESERVOIR ROAD LUNENBURG, MA 978-582-5200
875 PHENIX AVENUE CRANSTON, RI 401-942-7300
2140 BRIDGE STREET DRACUT, MA 978-454-7878
72 SO. MAIN STREET ACUSHNET, MA 508-992-3542
WWW.PJKEATING.COM MEMBER
18
UCARI
CIRI
MAAPA
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
Legislative Update continued from page 17 ning all industries across the state, as well as representatives from the manufacturing, finance, and contracting industries. As outlined by the Healey-Driscoll Administration, TRBO is built on four critical focus areas: • T – Tariff Impact Analysis: Monitoring how tariffs are impacting Massachusetts-based manufacturers through data collection • R – Response Strategy Development: Facilitating resources from the ecosystem to support plans to mitigate risks • B – Business Continuity Support: Coordinating and aligning partners with available state or ecosystem resources • O – Operations Support for Supply Chain Resiliency: Supporting adaptability of supply chains in new tariff environments As many items used in construction are acquired from international sources, UCANE will remain vigilant on the impacts that any tariffs have on membership. Do not hesitate to let Joe Nolan, Executive Director for UCANE, and UCANE Board Members know of any impacts that recent tariffs have had. In the meantime, to complete the TRBO survey and learn more about this important initiative, please visit: https://cam.masstech.org/TRBO.
IF YOU LIVE FOR IT, WE’LL HELP YOU PLAN FOR IT.
continued on page 21
Patrick Di Cerbo
CFP®, MSFS Wealth Management Advisor 518-281-8200 pat.dicerbo@nm.com www.patdicerbo.com
07-1012 ©06-2023 The Northwestern Mutual Life Insurance Company (NM), Milwaukee, WI.
Sales • Rental • Service • Parts
Your full-line Case dealership. Sales. Rentals. Parts. Service.
With 71 years as a CASE dealer in NY, we are excited to be in New England serving Massachusetts, Rhode Island and Connecticut. And with our latest move from Worcester MA to Westborough we look forward to serving customers from our state-of-the art facility. Regardless of the brand you own, we are here to keep you doing your job.
*Westborough MA 97 Turnpike Road 508.845.4343
Woburn MA 192 New Boston Street 781.933.4217
Hartford CT 6 Sandra Drive 833.836.9800
We are a Certified Women’s Business – monroetractor.com *We’re bringing CASE back to Westborough! Stop by, we’re conveniently located for customers traveling Routes 495, 90, 30 and 20.
MAY, 2025
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
19
20
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
Legislative Update continued from page 19
Healey-Driscoll Administration Awards Nearly $1 Million to Five Ipswich River Communities to Improve Water Supply and Treat PFAS
T
he Healey-Driscoll Administration awarded $950,000 in grants at the end of April to help five communities enhance their public water supplies, improve water availability, and remove perand polyfluoroalkyl substances (PFAS) from drinking water. According to the MassDEP press release announcing the awards, PFAS, or “forever chemicals,” are persistent and harmful chemicals that can cause adverse health outcomes. The grants, administered by the MassDEP, will help maintain and improve access to clean and safe drinking water for communities in the Ipswich River Basin. This is the second year for this grant program, which aims to guide water management in the Ipswich River Basin for both the long-term water supply needs of communities and the protection of the aquatic ecosystems. The following communities and water suppliers
MAY, 2025
were awarded funds this year: Modeling and Connection to Salem Beverly Water Supply Board (SBWSB). Hamilton and Wenham - $279,775. This project consists of conducting computer simulations to identify possible limitations of wheeling a portion of SBWSB’s water supply through Wenham and up to the new connection with Hamilton, the bidding process for a new interim water supply connection between Hamilton and Wenham to obtain supply from the SBWSB, conducting a pilot study on recommended treatment strategies for removing PFAS from Wenham’s two groundwater sources, and recommending the most favorable treatment strategy for Hamilton’s School Street well. MWRA Connection. Town of Wilmington $154,208. This project consists of completing the planning and design of a booster water pump station continued on page 23
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
21
If you can… then GRANITE CITY ELECTRIC has all your underground products IN STOCK! We have it and we’ll deliver it!
No job is too BIG!
Granite City Electric has all the inventory you need and the trucks to deliver it to your job site. Our distribution centers are fully stocked with all the underground products to complete your job.
All of our New England distribution centers provide Moffett Truck daytime delivery services. For your convenience, these trucks come with a forklift that attaches directly to the back of That means no more waiting for days to get your the delivery vehicle and go with the delivery to unload your products at the job site. Our products delivered to the job site. delivery services can support any combination Count on our inventory and superior service for of conduit, pipe, and enclosures you need. Best all your Underground Utility installation needs. of all, we unload it for you at the job site at no extra cost! Call today to schedule your next Moffett delivery!
1-800-850-9400
www.GRANITECITYELECTRIC.com
Scan the code to see how Granite City Electric has you covered with over 30 branches throughout the Northeast.
Legislative Update continued from page 21 to increase the capacity of the Town’s MWRA connection so that Wilmington can supply MWRA water up to their maximum daily demand. PFAS Treatment. Town of Ipswich $370,000. This project consists of providing 30 percent design documents for a new Ipswich Water Treatment Plant (WTP), consisting of final design criteria, preliminary drawings, an outline of technical specifications, and a preliminary opinion of probable construction costs. This project also funds monitoring associated with Ipswich’s proposed Lynch wells. Construction of an Alternative Source Interconnection Lynnfield Center Water District (LCWD) - $138,160. This project consists of reimbursement of funds spent on completing the design, the bidding and award of a contract to connect the Wakefield and LCWD systems, and the funding to assist LCWD in applying for and meeting the requirements of MWRA membership, including all necessary certificates and permits. For more details on the grant projects for 2025, please visit: www.mass.gov/info-details/water-management-act-grant-programs-for-public-water-suppliers#ipswich-water-supply-and-pfas-grant- n
MAY, 2025
L. GUERINI GROUP, INC. SINCE 1917
Material Placement Specialists
CONCRETE PUMPING EQUIPMENT “TELEBELT” MOBILE CONVEYORS STONE SLINGER SERVICE Pumps Up To 200 yds/hr • Booms Up To 142’ Reach Line Pumps • Grout Pumps Material Placement To 106’
34 Topalian Street PO Box 260187 Boston, MA 02126
(617) 296-0290 www.guerini.com
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
23
CRANE RENTAL • RIGGING • SPECIALIZED TRANSPORT
THE HEAVY LIFTING SPECIALISTS
(781) 858-7777 • www.nacranes.com LIKE US: facebook.com/northamericancrane
• • • • •
MOBILE CRANES CRAWLER CRANES TOWER CRANES INDUSTRIAL CRANES BOOM TRUCKS
• LOWBED SERVICE • INDUSTRIAL RIGGING
24
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
Quentin Palfrey
Director of Federal Funds and Infrastructure Office Prior to being appointed by Governor Healey to this role in March of 2023, Quentin Palfrey served as a senior political appointee in the Administrations of President Obama and President Biden. On Day One of the Biden Administration, he served as Acting General Counsel of the U.S. Department of Commerce, managing a team of several hundred lawyers in a department with over 50,000 employees. Under President Obama, he was Senior Advisor for Jobs & Competitiveness in the White House Office of Science & Technology Policy, as well as Deputy General Counsel for Strategic Initiatives in the U.S. Department of Commerce. Prior to working in the White House, he served as the first Chief of the Health Care Division in the Massachusetts Attorney General’s office during the time when Massachusetts was implementing its landmark health reform law.
Q: A:
Please give our readers some insight into how and why the Federal Funds and Infrastructure Office was created.
When Governor Healey entered office, she made it a priority on day one to ensure that this administration would compete aggressively for federal funding for Massachusetts. Specifically, the Bipartisan Infrastructure Law, Inflation Reduction Act, and CHIPS and Science Act unleashed an unprecedented level of funding available for states to advance transportation, clean energy, and economic development projects. Our office was charged with working across all secretariats to drive the administration’s competitive efforts to secure funding for key infrastructure, climate, and economic development projects.
Q: A:
What are some of the roles, activities and functions of the Federal Funds and Infrastructure Office?
Our office works across all levels of government to advance Massachusetts infrastructure projects. We convene a biweekly interagency advisory council focused on coordinating our administration’s strategy for seeking federal funds and ensuring collaboration across agencies on key projects. We meet regularly with our terrific Congressional delegation to ensure effective advocacy at the federal level for Massachusetts priorities. We also work with municipalities, regional planning agencies, and tribes to support their local infrastructure projects. This includes convening a monthly Federal Funds Partnership meeting for
MAY, 2025
local government leaders to share information about funding opportunities and resources for their communities.
Q: A:
Please tell us some of the successes the Federal Funds and Infrastructure Office has had?
Since the beginning of the Healey-Driscoll administration, Massachusetts has successfully brought in almost $9 billion from the Bipartisan Infrastructure Law, Inflation Reduction Act, and CHIPS and Science Act. This administration secured $1.7 billion to replace the Cape Cod bridges, $156 million to help bring clean energy to low-income households statewide, $108 million to lay the groundwork for West-East Rail, $35 million to rehabilitate old mills into housing and business sites, $75 million for clean school buses, $57 million for roadway improvements across the state, and countless other projects statewide. These are state, municipal, and community-based organization-led projects that address long-standing needs and priorities across Massachusetts.
Q: A:
With a new Administration at the federal level, how does the picture look for federal infrastructure funding?
With any new administration, there are always shifts in priorities and changes in funding opportunities. This is a very dynamic time, and we’re seeing the new administration roll back opportunities continued on page 27
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
25
26
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
Interview continued from page 25 that had previously been open. The Healey-Driscoll administration is doing everything in our power to help communities navigate the uncertainty of this moment, and we remain committed to drawing down every resource available for Massachusetts infrastructure projects.
Q: A:
Can you share your thoughts about some of the initiatives you and your team are excited about in the coming year or two?
In September of 2024, the Governor signed new legislation into law that dramatically expands our office’s resources to support municipalities seeking federal funds to advance infrastructure projects. That legislation made $750 million available to support Massachusetts applicants with state matching funds, $12 million of which is available for technical assistance to support applicants, and $50 million of which is for various financial support for advancing local infrastructure projects. This legislation is unique, innovative, and significantly expands our tool kit for advancing Massachusetts transportation, climate, and economic development projects. Our office looks forward to leveraging these new tools and continuing to work across all levels of government to modernize our transportation system, make progress on our climate goals, and create good-paying jobs statewide. n
The Biggest, Baddest Ditch Witch Hydrovac to ever hit the wild ... Introducing the most powerful Ditch Witch truck vac to ever hit the open road — the Warlock Series W12. With a 2,800 PSI water system, 12 cubic yard debris tank capacity, and a 5,000 CFM, 27″ Hg vac system, this beast-of-a-machine easily devours jobs of all shapes and sizes.
Green Beam Pipe Laser Compact & Powerful! • 500 ft. (150 m) operating range • High visibility Green Beam excellent for use in dark pipe conditions • Stop by for a complete demonstration on this NEW state-of-the-art Pipe Laser • From the leaders in Pipe Laser technology - Spectra Precision Model DG613G
5 Eastpoint Drive, Unit 1, Hooksett, NH 03106 Phone: 603-623-0188 • www.eastpointlasers.com
South Plainfield, NJ: Shrewsbury, MA: Lumberton, NJ: Beacon, NY: Deer Park, NY: Middletown, DE: Baltimore, MD
908-753-8080 508-719-0200 609-534-7477 845-831-1800 631-392-2605 302-376-0784 410-687-1700
CALL FOR A FREE DEMO!
Visit JESCO online at www.jescoditchwitch.us.
MAY, 2025
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
27
THE BEST CHOICE FOR PROTECTION
FROM THE GROUND UP. Keeping everyone safe on the job site isn’t simple, but choosing the insurance package that’s right for you can be. Cavallo & Signoriello knows what you need. VISIT WWW.CANDSINS.COM OR CALL 508.339.2951 TO LEARN MORE
28
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
MassDEP Releases FINAL CY2025 Clean Water & Drinking Water SRF Lists Totaling Over $1.241 Billion Charles D. Baker Governor Karyn E. Polito Lieutenant Governor
T
Over $891 Million Offered for Clean Water SRF in 2025
Matthew A. Beaton Secretary Martin Suuberg Commissioner
January 26, 2016 he Massachusetts Department of Environ-
mately $480.8 million is being offered to finance 25 mental Protection (MassDEP) is pleased to new construction projects, and $377.3 million is beTo All Interested Parties: present the Final Calendar Year 2025 Intending offered to finance 10 previously approved multied Use Plan (IUP). The IUP details the projects, proyear projects. Additionally, $3 million is allocated to ponents, total project Department costs, and amount of fundingProtection the emergency The Massachusetts of Environmental (MassDEP)set-aside is pleasedaccount, to present$4.4 the million is being offered for the Sewer Overflow Final 2016 through Intendedthe UseClean Plan Water (IUP), State whichRevolvdetails the allocated projects, borrowers and amounts thatand willStormwater be ingfinanced Fund (CWSRF) program. CWSRF is a joint Fund Reuse Municipal Grant Program, $2 million through the Clean The Water State Revolving (CWSRF) loan program. The CWSRF is a is alfederal-state financing programloan thatprogram provides subsito fund emergency or other joint federal-state financing that provideslocated subsidized interest rate loansPFAS to improve or emergdized loans and grants to improve and protect water ing contaminants projects that mitigate impacts on protect water quality in the Commonwealth. quality and public health in the Commonwealth. drinking water sources, $5 million is directed to the Community Septic Management Program The Massachusetts Clean WaterisTrust (Trust) As noted in Table 1, Massachusetts offering approximately $414 million to finance clean water (CSMP) to remediate failed septic systems in participating is projects offering across $890.8 to financeApproximately wastewater $380 million will fund 35 new construction themillion Commonwealth. projects across Commonwealth, subject the communities, and9$13 million is set aside to finance projects and anthe additional $15 million will betoallocated towards funding previously approved availability of projects. funding. As Table approxi- to the planning projects. multi-year $2 noted millioninhas been1,allocated emergency set-aside account, and $3
million will be directed to the Community Septic Management Program to remediate failed septic Table 1 million will fund 15 planning projects. systems in participating communities. An additional $13.8
Clean Water State Revolving Fund CY2025 Intended Use Plan
TABLE 1 The Water Resources Reform and Development Act of 2014 (WRRDA) amended the Clean Water CLEAN WATER STATE REVOLVING FUND Act resulting in important changes to the CWSRF Program that will affect most borrowers. The Calendar Year 2025 CWSRF Intended Use Plan NEW PROJECTS primary changes to the program are the requirements for borrowers to develop and maintain a Fiscal Sustainability Plan, which is similar to an asset management plan and a certification that the cost and 2025 NEW PROJECTS Rating Applicant SRF ID Project Project Cost andIUP Cost of the project has evaluated and that the project maximizes water efficiency Ratingeffectiveness Applicant SRFbeen ID Project Project Cost 2025 IUP Cost energy conservation. The body of the IUP discusses these new WRRDA requirements in greater 556detail. HULL #(PF) 19112 Secondary Clarifiers, Grit, and Building Upgrades $9,630,000 $9,630,000 556 FITCHBURG #(PF)(SG)
19049 CSO 045, 083 Separation/Rehabilitation The United States Environmental Protection Agency (EPA) has not yet determined$29,926,400 the exact 2016 $29,926,400 554SRF CHATHAM 18980 Chatham Sewer Phase 1Fappropriation, MassDEP $31,190,000 grant (BG) allocations to the states. Based on the Extension overall federal expects to$31,190,000 receive an estimated $44 million federal grant to subsidize the CWSRF program. Under the Fiscal $34,670,000 551 ORLEANS (H)# (SG) 19118 Lakes and Ponds Area Collection System and PS $34,670,000 Year 2016 Omnibus Appropriations Bill, Congress is requiring that at least 10% of the federal grant 549be NEW BEDFORD 19143 PhaseThe 1 Deane Street Sewer $83,810,000 $2,310,000 used to fund#(PF) “green infrastructure”. 2016 Final IUPSeparation lists 16 new “green infrastructure” projects. The exact monetary value of thePlant green portion of these projects will be 548construction ROCKLAND #(PF)(BG) 19007 Wastewater Treatment Upgrades $32,510,000 $32,510,000 determined when project applications are submitted but are expected to be well in excess of 10% of 547 NEW BEDFORD #(PF) 19146 Wamsutta Street Pumping Station Improvements $6,815,000 $6,815,000 the federal grant. 544 PROVINCETOWN (H)#
19076 Provincetown Satellite Treatment Facility
$25,000,000
$25,000,000
544 LOWELL (H)#(PF)in alternate format. Call 19108 Phase 3A Sewer System $49,500,000 $5,000,000 This information is available Michelle Waters-Ekanem, DiversitySeparation Director, at Project 617-292-5751. TTY# MassRelay Service 1-800-439-2370 MassDEP Website: www.mass.gov/dep 543 FALL RIVER #(PF)(SG)
19125 Mothers Brook Sewer Improvements
$21,020,000
$21,020,000
543 HAVERHILL #(PF)
18993 Locke Street Sewer Separation - Phase 2
$14,667,000
$14,667,000
543 FALL RIVER #(PF)(SG)
19009 Stafford Square Flood Mitigation
$29,386,600
$28,980,000
543 LOWELL (H)#(PF)
19109 Phase 2A Centralville Sewer Separation Project
continued on$4,500,000 page 31 $37,900,000
543 NEW BEDFORD #(PF)
19144 Phase I Sewer System Rehabilitation
$10,875,000
$10,875,000
19086 Phase 16 Construction - I/I & Capacity Improvement
$12,905,000
$12,905,000
19130 Downtown Area and Interceptor Sewer Improvements
$6,000,000
$6,000,000
19136 Falmouth TASA Phase 1 Collection and Recharge
$60,000,000
$50,000,000
543 REVERE (H)#(PF)
MAY, 2025
542 LOWELL (H)#(PF) 542 FALMOUTH (PF)
Printed on Recycled Paper
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
29
Built on Experience, Focused on Results. With a track record of excellence and positive outcomes, our nationally recognized Construction & Public Contracts practice is committed to delivering results for you and your business. We understand construction and our clients’ needs and businesses. Our experienced attorneys thrive on addressing complex challenges by leveraging their extensive industry knowledge, partnering with industry leaders, and participating in a vast network of professional affiliations. Our comprehensive suite of services includes contract analysis, drafting, negotiation, procurement and bid protest issues, strategic project advice, crisis management, claims preparation, prosecution and defense, and all forms of dispute resolution, such as mediation, arbitration, litigation, and appeals. We also assist with compliance and investigations, OSHA investigations, insurance recovery, and risk management. We can help you navigate any phase of your project and protect your interests through practical advice and effective legal strategies.
www.hinckleyallen.com/construction CONNECTICUT | FLORIDA | ILLINOIS | MASSACHUSETTS | NEW HAMPSHIRE | NEW YORK | RHODE ISLAND © 2025 Hinckley, Allen & Snyder LLP. All rights reserved. Attorney Advertising.
548 ROCKLAND Upgrades $32,510,000 544 #(PF)(BG) LOWELL (H)#(PF)19007 Wastewater Treatment 19108 Plant Phase 3A Sewer System Separation Project $32,510,000
$49,500
547 NEW BEDFORD #(PF)
19146 Wamsutta Street Pumping Station Improvements
$6,815,000
$6,815,000
544 PROVINCETOWN (H)#
19076 Provincetown Satellite Treatment Facility
$25,000,000
$25,000,000
$49,500,000
$5,000,000
543 FALL RIVER #(PF)(SG) Stafford Square Flood Mitigation 543 FALL RIVER #(PF)(SG) 19125 Mothers Brook 19009 Sewer Improvements $21,020,000
$21,020,000
$29,386
543 HAVERHILL Separation Phase 2 $14,667,000 2025 543 #(PF) LOWELL (H)#(PF)18993 Locke Street Sewer 19109 Phase- 2A Centralville Sewer $14,667,000 Separation Project
$37,900
543 FALL RIVER #(PF)(SG)
19125 Mothers Brook Sewer Improvements
543 HAVERHILL #(PF)
18993 Locke Street Sewer Separation - Phase 2
544 LOWELL (H)#(PF) 19108 Phase 3A Sewer System Separation Project DEP/SRF continued from page 29
NEW PROJECTS (cont.)
Rating Project Cost 543 FALL Applicant SRF RIVER #(PF)(SG) 19009 ID Project Stafford Square Flood Mitigation $29,386,600 543 NEW BEDFORD #(PF) 19144 Phase I Sewer System Rehabilitation
IUP Cost $28,980,000
543 LOWELL (H)#(PF)
19109 Phase 2A Centralville Sewer Separation Project
$37,900,000
$4,500,000
543 NEW BEDFORD #(PF)
19144 Phase I Sewer System Rehabilitation
$10,875,000
$10,875,000
543 REVERE (H)#(PF)
19086 Phase 16 Construction - I/I & Capacity Improvement
$21,020
$14,667
$10,875
$12,905
542 LOWELL (H)#(PF)19086 Phase 16 Construction 19130 -Downtown and Interceptor Sewer Improvements 543 REVERE (H)#(PF) I/I & CapacityArea Improvement $12,905,000 $12,905,000
$6,000
542 LOWELL (H)#(PF) and Interceptor Sewer Improvements $6,000,000 $6,000,000 542 FALMOUTH (PF) 19130 Downtown Area19136 Falmouth TASA Phase 1 Collection and Recharge
$60,000
542 FALMOUTH (PF)
19136 Falmouth TASA Phase 1 Collection and Recharge
$60,000,000
$50,000,000
541 HULL #(PF)
19127 Collection System Improvements Phase 2
$16,660,000
$16,660,000
540 EASTHAM (H)(PF)
18984 Eastham Wastewater Phase 1
$170,028,400
$50,000,000
541 HULL #(PF)
19127 Collection System Improvements Phase 2
540 EASTHAM (H)(PF)
18984 Eastham Wastewater Phase 1
$16,660
$170,028
540 BARNSTABLE (H)(PF) Phinney's Neighborhoods Sewer Expansion 540 BARNSTABLE (H)(PF) 19003 Phinney's Lane19003 Neighborhoods SewerLane Expansion $45,070,464 $10,000,000
$45,070
540 MASHPEE 19097 Mashpee-Wakeby Watershed Wastewater System $17,230,000 540(PF)(SG) MASHPEE (PF)(SG) 19097 Mashpee-Wakeby Watershed$17,230,000 Wastewater System
$17,230
539 HARWICH (PF)(SG)
19044 Harwich Great Sand Lakes Sewer Extension
$31,130,000
$31,130,000
539 NANTUCKET (H)#
19046 Phase 2 Surfside WWTF Improvements
$16,500,000
$16,500,000
538 BARNSTABLE (H)(PF)
19085 Centerville Village Sewer Expansion - South Phase
$15,000,000
$10,000,000
539 HARWICH (PF)(SG)
19044 Harwich Great Sand Lakes Sewer Extension
539 NANTUCKET (H)#
19046 Phase 2 Surfside WWTF Improvements
538 BARNSTABLE (H)(PF) 19085in Phase Centerville - South Phase 538 SWAMPSCOTT (H)# 18976 Sewer Rehabilitation 2B AreaVillage Sewer Expansion $3,283,000 $3,283,000 TOTAL OF NEW PROJECTS 538 SWAMPSCOTT (H)# (Count: 25)
$810,706,864 18976 Sewer Rehabilitation in Phase 2B Area (Average Rating: 544.24)
TOTAL OF NEW TOTAL OF PROJECTS NEW PROJECTS
(BG) - Base Capitalization Grant (Count: 25) (Average Rating: 544.24) (D) - Dropped by Applicant (Count: 25) (H) - Housing Choice Communities (PF) - Affordability Criteria applicable, eligible for Principal Forgiveness
$810,706,864
$480,801,400
$810,706
(RE) - Potential Renewable Energy Projects (SG) - BIL CWSRF General Supplemental Grant # - Projects contains Energy Efficiency, Renewable Energy and/or meets EPA's definition of a Green Project (https://www.epa.gov/greeningepa/energy-and-emissions-epa)
continued on page 33
GENERAL CONTRACTOR
Manufacturer and Installer of Bituminous Concrete Products
MAY, 2025
226 Nicks Rock Road Plymouth, MA 02360 Scale House: 508-732-9148 Asphalt Plant: 508-732-9140
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
$15,000
$3,283
(Average Rating: 544.24)
www.tledwards.net
$16,500
$480,801,400
(BG)Renewable - Base Capitalization (RE) - Potential Energy Projects Grant - Dropped by ApplicantGrant (SG) - BIL (D) CWSRF General Supplemental # - Projects(H) contains EnergyChoice Efficiency, Renewable Energy and/or meets EPA's definition of a - Housing Communities Green Project (https://www.epa.gov/greeningepa/energy-and-emissions-epa) (PF) - Affordability Criteria applicable, eligible for Principal Forgiveness
100 Wales Avenue-Rear Avon, MA 02322 Office: 508-583-2029 Plant: 508-587-6953
$31,130
31
&
DEWATERING | BYPASS PUMPING | ONE-PASS TRENCHING | POWER GENERATION
Mersino is the premier specialty contractor that provides solutions to meet your challenging needs nationwide. 24 HOURS | 7 DAYS A WEEK | 365 SERVICE WWW.MERSINO.COM | 866.637.7466
32
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
DEP/SRF continued from page 31 MULTI-YEAR CARRYOVER AND STATUTORY PROJECTS
MULTI-YEAR CARRYOVER AND STATUTORYSRF PROJECTS Applicant ID Project
Project Cost Project Cost
2025 IUP Cost
Applicant
SRF ID Project
BARNSTABLE (H)(PF)
16683 Route 28 West Sewer Expansion Project
$56,600,000
$10,000,000
BARNSTABLE (PF)(SG)
16677 Nitrogen Removal Improv. & New Headworks Facility
$109,330,000
$20,000,000
BOSTON WATER AND SEWER COMMISSION (H)#
16690 East Boston Sewer Separation Phase IV
$143,936,993
$50,000,000
DENNIS (PF)
16676 Phase 1 - WRRF and Collection System
$196,315,000
$50,000,000
GLOUCESTER (H)(PF)(SG)
16775 WPCF Secondary Treatment and Facility Upgrades
$205,972,280
$50,000,000
LOWELL
16760 Centralville Sewer Separation Program – Phase 1
$57,500,000
$34,500,000
MASHPEE (PF)(BG)
16791 Phase 2 Mashpee Treatment and Collection System
$96,100,000
$32,770,000
MASSACHUSETTS WATER RESOURCES AUTHORITY
6822 DITP Clarifier #2
$289,359,690
$50,000,000
NEW BEDFORD (PF)#
16873 Wastewater Collection System Improvements
$74,965,000
$30,000,000
YARMOUTH (PF)
8349 Phase I - WRRF and Collection System
$205,841,464
$50,000,000
TOTAL OF MULTI-YEAR CARRYOVER AND STATUTORY PROJECTS
$1,435,920,427
$377,270,000
(Count: 10) TOTAL OF MULTI-YEAR CARRYOVER AND STATUTORY PROJECTS
$1,435,920,427
$377,270,000
(Count: 10)
continued on page 34
MassDEP PRIORITY PROJECTS Applicant
2025 IUP Cost
SRF ID Project
Project Cost
2025 IUP Cost
COMMUNITY SEPTIC MANAGEMENT
3850 Community Septic Management Program
$5,000,000
$5,000,000
EMERGENCY PFAS REMEDIATION SET-ASIDE
18911
$2,000,000
$2,000,000
EMERGENCY SRF SET-ASIDE
2977
$3,000,000
$3,000,000
PLANNING SRF SET-ASIDE
13575
$13,000,000
$13,000,000
SEWER OVERFLOW AND STORMWATER REUSE SETASIDE
18972
$4,400,000
$4,400,000
$27,400,000
$27,400,000
TOTAL OF MassDEP PRIORITY PROJECTS (Count: 5) PLANNING PROJECTS
Products and Services
Applicant
SRF ID Project
BARNSTABLE COUNTY
19149 Barnstable County: MFTF PFAS Remediation
Project Cost
Hot Mix Asphalt $1,140,489 TOTAL OF PLANNING PROJECTS Paving $1,140,489 (Count: 1) Fine Grading 25 Concord Street Cold Planning TOTAL OF INTENDED USE PLAN $2,275,167,780 Pawtucket, RI 02860 Reclaiming Tel: (401) 722-4488 Fax: (401) 312-0992 RI & MA DOT Approved pawtuckethotmixasphalt.com MAY, 2025
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
2025 IUP Cost $1,140,489 $1,140,489
$886,611,889
33
YARMOUTH (PF) YARMOUTH (PF)
8349 Phase I - WRRF and Collection System 8349 Phase I - WRRF and Collection System
TOTAL OF MULTI-YEAR CARRYOVER AND STATUTORY PROJECTS TOTAL OF MULTI-YEAR CARRYOVER AND STATUTORY PROJECTS
$205,841,464 $205,841,464
$50,000,000 $50,000,000
$1,435,920,427 $1,435,920,427
$377,270,000 $377,270,000
Project Cost Project Cost Project Cost
2025 IUPIUP Cost Cost 2025
(Count: 10) (Count: 10)
DEP/SRF continued from page 33
MassDEP PRIORITY PROJECTS MassDEP PRIORITY PROJECTS Applicant Applicant Applicant
MassDEP PRIORITY PROJECTS
SRF ID Project SRF SRFID ID Project
2025 IUP Cost
COMMUNITY SEPTIC COMMUNITY SEPTIC MANAGEMENT MANAGEMENT EMERGENCY PFAS EMERGENCY PFAS REMEDIATION SET-ASIDE REMEDIATION SET-ASIDE EMERGENCY SRF SET-ASIDE EMERGENCY SRF SET-ASIDE
3850 Community Septic Management Program 3850 Community Septic Management Program
$5,000,000 $5,000,000
$5,000,000 $5,000,000
18911 18911
$2,000,000 $2,000,000
$2,000,000 $2,000,000
2977 2977
$3,000,000 $3,000,000
$3,000,000 $3,000,000
PLANNING SRF SET-ASIDE PLANNING SRF SET-ASIDE
13575 13575
$13,000,000 $13,000,000
$13,000,000 $13,000,000
SEWER OVERFLOW AND 18972 18972 SEWER OVERFLOW AND STORMWATER REUSE SETSTORMWATER REUSE SETASIDE ASIDE TOTAL OF MassDEP PRIORITY PROJECTS TOTAL OFTOTAL MassDEP PRIORITY PRIORITY PROJECTSPROJECTS OF MassDEP
$4,400,000 $4,400,000
$4,400,000 $4,400,000
$27,400,000
$27,400,000
$27,400,000 $27,400,000
$27,400,000 $27,400,000
Project Cost Project Cost Project Cost
2025 IUP Cost IUP Cost 2025
$1,140,489 $1,140,489
$1,140,489 $1,140,489
$1,140,489 $1,140,489 $1,140,489
$1,140,489 $1,140,489
(Count: 5) (Count: 5) (Count: 5)
PLANNING PROJECTS
PLANNING PROJECTS PLANNING PROJECTS Applicant Applicant Applicant
SRF SRF ID ID Project
SRF ID Project
BARNSTABLE COUNTY BARNSTABLE COUNTY
19149 Barnstable County: MFTF PFAS Remediation 19149 Barnstable County: MFTF PFAS Remediation
TOTAL OF PLANNING PROJECTS OF PLANNING TOTAL OFTOTAL PLANNING PROJECTSPROJECTS (Count: 1) (Count: 1) (Count: 1)
TOTAL OF FINAL INTENDED USE PLAN
TOTAL OF INTENDED USE PLAN TOTAL OF INTENDED USE PLAN
34
$2,275,167,780
2025 IUP Cost
$886,611,889
$2,275,167,780 continued$886,611,889 on page 37 $2,275,167,780 $886,611,889
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
DEP/SRF continued from page 34
Over $348 Million Offered for Drinking Water SRF in 2025
T
he Massachusetts Department of Environmental Protection (MassDEP) is pleased to present the Final Calendar Year 2025 Intended Use Plan (IUP). The IUP details the projects, proponents, total project costs, and amount of funding being offered through the Drinking Water State Revolving Fund (DWSRF) program. The DWSRF is a joint federal-state financing program that provides subsidized loans and grants to protect public health, safeguard the drinking water supply, and improve the infrastructure systems in the Commonwealth. The Massachusetts Clean Water Trust (Trust) is offering $349.5 million to finance drinking water projects across the Commonwealth (Table 1), with an addition-
al $1.3 million offered in grants for Asset Management Planning (AMP) (Table 2), subject to the availability of funding. As noted in Table 1, approximately $123.8 million is being offered to finance 13 new construction projects and approximately $169.9 million will finance 19 previously approved multi-year projects. Additionally, set-asides include $5 million for emergency projects, $39.5 million to finance new Lead Service Line (LSL) Replacement construction and planning loans, and $10 million to finance other planning projects and PFAS design costs. To encourage communities and Public Water Suppliers to engage in planning activities, MassDEP is accepting planning loan applications on a rolling basis while funding is available.
Table 1 Drinking Water State Revolving Fund CY2025 Intended Use Plan TABLE 1 DRINKING WATER STATE REVOLVING FUND Calendar Year 2025 DWSRF Final Intended Use Plan NEW PROJECTS
NEW PROJECTS Rating
Applicant
SRF ID
Project
Project Cost
Rating Applicant
SRF ID Project
530
YARMOUTH (EC)(PF)(BG)
19119 Yarmouth Wells 10 & 11 PFAS Treatment
$4,996,475
$4,996,475
530
MASSACHUSETTS WATER RESOURCES AUTHORITY
19059 Cp-2 NEH Improvements
$21,045,949
$2,000,000
530
IPSWICH (SG)
19012 Ipswich Water Treatment Plant
$33,803,000
$10,000,000
529
NEWBURYPORT (H)(EC)(SG)
19054 Newburyport PFAS Treatment System
$20,495,200
$10,000,000
526
FOXBOROUGH (EC)
19121 Oak Street PFAS Water Treatment Upgrades
$16,500,000
$10,000,000
526
HANOVER (EC)(SG)
19091 Hanover PFAS Treatment
$17,330,000
$10,000,000
524
DRACUT WATER SUPPLY DISTRICT (EC)(PF)
19115 PFAS Water Treatment Plant Expansion
$19,400,000
$15,000,000
523
BRIDGEWATER (H)(PF)
19102 Plymouth St. Wells Upgrades and Raw Water Main
$6,190,103
$6,190,103
521 * PEPPERELL (EC)(PF)(SG)
19132 Jersey Street Well Water Treatment Plant
$13,000,000
$13,000,000
520 * GROVELAND (EC)(PF)(SG)
18991 Wells 1, 3 & 4 Water Treatment Plant
$44,531,076
$15,000,000
518 * WEST BROOKFIELD (PF)(BG)
19048 Leland Road Pump Station Upgrade
$6,240,000
$6,240,000
515 * DUDLEY (PF)
19148 Eagle Drive Neighborhood Water Main Extension
$10,085,000
$10,085,000
430 * HADLEY (PF)(BG)
19075 Mount Warner Well Rehabilitation
$11,350,000
$11,350,000
$224,966,803
$123,861,578 $123,861,578
TOTAL OF NEW PROJECTS
TOTAL OF NEW PROJECTS (Count: 13) 13) (Average Rating: 517.08) (Count: (Average Rating: 517.08)
Project Cost
2025 IUP Cost
$224,966,803
2025 IUP Cost
continued on page 37
* - Small System (BG) - Base Capitalization Grant (D) - Dropped by Applicant (EC) MAY, - BIL DWSRF GrantFROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK” 2025 Emerging Contaminants “BUY (H) - Housing Choice Communities (LR) - BIL DWSRF Lead Service Line Replacement Grant (PF) - Disadvantaged Community, eligible for Principal Forgiveness
35
P.A. Landers, Inc.
The Smart Choice For All Your Site Development Needs “WE DELIVER QUALITY BY THE TRUCKLOAD”
NEW LOCATION 608 Main St. Mashpee, MA 02649 800.660.6404
36
351 Winter St. Hanover, MA 02339 800.660.6404 781.826.8818 F: 781.826.6377
152 Route 130 Forestdale, MA 02644 800.834.4333 508.477.8818 F: 508.477.9692
228 Cherry St. Plymouth, MA 02360 508.747.1800 F: 508.747.6017
www.palanders.com
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
DEP/SRF continued from page 35 MassDEP PRIORITY PROJECTS MassDEP PRIORITY PROJECTS Applicant Applicant Applicant
MassDEP PRIORITY PROJECTS SRF SRFIDIDProjectProject SRF ID Project
Project Cost Project Cost Project Cost
EMERGENCY SRF SET-ASIDE 2978 EMERGENCY SRF SET-ASIDE 2978 LEAD SERVICE LINE 16595 LEAD SERVICE LINE 16595 REPLACEMENT SRF SETREPLACEMENT SRF SETASIDE ASIDE PLANNING SRF SET-ASIDE 13574 PLANNING SRF SET-ASIDE 13574 TOTAL OFTOTAL MassDEP PRIORITY PROJECTS OF MassDEP PRIORITY PROJECTS TOTAL OF MassDEP PRIORITY PROJECTS (Count: 3) (Count: 3) (Count: 3)
$5,000,000 $5,000,000 $39,500,000 $39,500,000
$5,000,000 $5,000,000 $39,500,000 $39,500,000
$10,000,000 $10,000,000 $54,500,000 $54,500,000 $54,500,000
$10,000,000 $10,000,000 $54,500,000 $54,500,000 $54,500,000
MULTI-YEAR CARRYOVER AND STATUTORY PROJECTS MULTI-YEAR CARRYOVER AND STATUTORY PROJECTS MULTI-YEAR CARRYOVER AND STATUTORY PROJECTS Applicant SRFIDIDProjectProject Project Cost Applicant SRF Project Cost Applicant SRF ID Project Project Cost ATTLEBORO (PF)(EC)(BG) ATTLEBORO (PF)(EC)(BG) BARNSTABLE (H)(PF)(EC)(SG) BARNSTABLE (H)(PF)(EC)(SG) BELLINGHAM (H)(PF)(EC)(SG) BELLINGHAM (H)(PF)(EC)(SG) BRAINTREE #(RE)(PF)(EC) BRAINTREE #(RE)(PF)(EC) CHELMSFORD WATER CHELMSFORD WATER DISTRICT (H)(EC) DISTRICT (H)(EC) FRANKLIN (H)(RE)(EC) FRANKLIN (H)(RE)(EC) GRAFTON WATER DISTRICT GRAFTON (H)(EC)(BG)WATER DISTRICT (H)(EC)(BG) HOLBROOK #(RE)(PF)(EC) HOLBROOK #(RE)(PF)(EC) MASSACHUSETTS WATER MASSACHUSETTS WATER RESOURCES AUTHORITY RESOURCES AUTHORITY MASSACHUSETTS WATER MASSACHUSETTS WATER RESOURCES AUTHORITY RESOURCES AUTHORITY MIDDLEBOROUGH (H)(PF)(EC) MIDDLEBOROUGH (H)(PF)(EC) PLAINVILLE (H)(EC)(BG) PLAINVILLE (H)(EC)(BG) RANDOLPH #(RE)(PF)(EC) RANDOLPH #(RE)(PF)(EC) SCITUATE (H) SCITUATE (H) SHARON (RE) SHARON (RE) SHREWSBURY (H)(EC) SHREWSBURY (H)(EC) UXBRIDGE (PF)(EC) UXBRIDGE (PF)(EC) WEBSTER (PF)(EC) WEBSTER (PF)(EC) WESTFORD (H)(EC)(SG) WESTFORD (H)(EC)(SG)
2025 IUP Cost
20252025 IUPIUP Cost Cost 2025 IUP Cost
16764 Wading River Water Treatment Plant 16764 Wading River Water Treatment Plant 16849 Straightway & Hyannisport PFAS Treatment Facility 16849 Straightway & Hyannisport PFAS Treatment Facility 16813 PFAS Treatment at Hartford Avenue WTP 16813 PFAS Treatment at Hartford Avenue WTP 7258 Tri-Town Regional Water Treatment Plant 7258 Tri-Town Regional Water Treatment Plant 16698 Chelmsford WD PFAS Treatment 16698 Chelmsford WD PFAS Treatment
$35,181,000 $35,181,000 $45,295,767 $45,295,767 $36,500,000 $36,500,000 $55,212,683 $55,212,683 $43,000,000 $43,000,000
$15,000,000 $15,000,000 $7,500,000 $7,500,000 $15,000,000 $15,000,000 $10,000,000 $10,000,000 $15,000,000 $15,000,000
16730 Franklin Hayward St. WTP Improvements 16730 Franklin Hayward St. WTP Improvements 16765 East St. and Worcester St. PFAS Treatment Upgrades 16765 East St. and Worcester St. PFAS Treatment Upgrades
$25,696,000 $25,696,000 $23,000,000 $23,000,000
$10,696,000 $10,696,000 $8,000,000 $8,000,000
7259 Tri-Town Regional Water Treatment Plant 7259 Tri-Town Regional Water Treatment Plant 6691 Northern Intermediate High Section 89 Replacement 6691 Northern Intermediate High Section 89 Replacement
$19,904,296 $19,904,296 $32,680,976 $32,680,976
$3,200,000 $3,200,000 $11,344,056 $11,344,056
7218 Section 23, 24, 47 Water Mains Rehab 7218 Section 23, 24, 47 Water Mains Rehab
$28,963,060 $28,963,060
$1,655,944 $1,655,944
$34,153,700 $34,153,700 $25,600,000 $25,600,000 $39,780,862 $39,780,862 $67,213,348 $67,213,348 $31,444,944 $31,444,944 $18,500,000 $18,500,000 $19,500,000 $19,500,000 $35,120,000 $35,120,000 $23,000,000 $23,000,000
$7,500,000 $7,500,000 $10,600,000 $10,600,000 $6,800,000 $6,800,000 $15,000,000 $15,000,000 $6,444,944 $6,444,944 $3,500,000 $3,500,000 $4,600,000 $4,600,000 $10,120,000 $10,120,000 $8,000,000 $8,000,000
$639,746,636 $639,746,636
$169,960,944 $169,960,944
16735 East Grove Street Water Treatment Plant 16735 East Grove Street Water Treatment Plant 16848 Turnpike Lake PFAS Water Treatment Plant 16848 Turnpike Lake PFAS Water Treatment Plant 7260 Tri-Town Regional Water Treatment Plant 7260 Tri-Town Regional Water Treatment Plant 7348 Surface Water Treatment Plant 7348 Surface Water Treatment Plant 12443 Wells 2 & 4 Water Treatment Plant 12443 Wells 2 & 4 Water Treatment Plant 16836 Home Farm WTP PFAS Treatment Upgrades 16836 Home Farm WTP PFAS Treatment Upgrades 16738 Blackstone Water Treatment Plant 16738 Blackstone Water Treatment Plant 10380 PFAS Water Treatment Plants 10380 PFAS Water Treatment Plants 16749 Forge Village&Nutting Road PFAS Treatment 16749 Upgrades Forge Village&Nutting Road PFAS Treatment Upgrades TOTAL OF MULTI-YEAR CARRYOVER AND STATUTORY PROJECTS TOTAL OF MULTI-YEAR CARRYOVER AND STATUTORY PROJECTS (Count: 19)TOTAL OF MULTI-YEAR CARRYOVER AND STATUTORY PROJECTS (Count: 19)(Count: 19)
TOTAL OF FINAL INTENDED USE PLAN TOTAL OF FINAL INTENDED USE PLAN TOTAL OF FINAL INTENDED USE PLAN
MAY, 2025
Cost 20252025 IUPIUP Cost
$639,746,636
$169,960,944
$919,213,439 $348,322,522 $919,213,439 $348,322,522 $919,213,439
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
$348,322,522
37
Water Works? We’ve Got New England Covered F.W. WEBB WATER WORKS
Providing contractors & municipalities innovative solutions for new construction and aging infrastructure Full-Service Approach
PRODUCT • SERVICES • EXPERTISE Our end-to-end project support saves you time, money, & effort
Pre-project material assessment
Trusted partners & personalized service
Rapid support with extensive supply chain
Equipment training & repairs
In-House Fabrication Shop
Custom fabrication
FAST, PRECISION PIPE RETROFITS & CUSTOM FABRICATION Machining, welding, and painting—custom parts in days, not months To speak with someone today, contact the Water Works Malden location at 781-322-1238
fwwebb.com/waterworks
Construction & Public Contracts Group, Hinckley Allen, LLP
Christopher Morog Partner
Robert T. Ferguson Partner
April 16, 2025: Massachusetts Supreme Judicial Court Rules That a Contractual Indemnification Claim is Not Barred by the Massachusetts Statute of Repose Applicable to Negligence Claims More than 12 years ago, in June of 2012, a local university executed a design contract with an architect to design a new synthetic turf athletic field on top of a parking structure. The architect prepared the design, the field was constructed, and the university hosted its first sporting event at the field in August of 2013.
U
nfortunately, the university allegedly experienced issues with the field almost immediately. The university attributed these issues to the architect’s allegedly defective/negligent design of the field. In particular, the university asserted that the architect had failed to account for seasonal expansion of the parking structure underneath the field, which resulted in “depressions” in the field that made it “unsafe” and unusable for athletic events. The university incurred costs to address the alleged design defects and make the field usable. Then, more than six years after it first started using the field, the university filed a court action against the architect to recover its damages caused by the allegedly defective/ negligent design. The architect raised the Massachusetts statute of repose as a defense, arguing that the university filed its court action too late. In this regard, the statute of repose provides that “in no event” shall “[a] ction[s] of tort for damages arising out of any deficiency or neglect in the design, planning, construction, or general administration of an improvement to real property . . . be commenced more than six years after the earlier of the dates of: (1) the opening of the improvement to use; or (2) substantial completion of
MAY, 2025
the improvement and the taking of possession for occupancy by the owner.” According to the architect, the university contended that the architect had negligently prepared a defective design. Therefore, the university was required to file its court action within six years after first using the field under the statute of repose applicable to negligence claims. The architect lost. In an April 16, 2025 decision, the Massachusetts highest court – the Supreme Judicial Court (“SJC”) – ruled that the statute of repose did not bar the unicontinued on page 41
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
39
Your Trusted Partner Since 1964, C.N. Wood has been the steadfast partner of road builders like you. We deliver top-quality equipment from Bomag, a brand continuously advancing its expertise for the road ahead.
Need Support? Call or Text... Parts: 800-557-0704 Service: 800-561-4939
Sales: 800-539-8905 Rentals: 800-560-3819
www.cn-wood.com Proudly Supporting UCANE Since 1976!
Legal Corner continued from page 39 versity’s claim. The reason is because the university asserted a contract claim, not a negligence or “tort” claim. As is common in construction and design contracts, the parties had negotiated an express indemnification provision in their contract in which the architect explicitly agreed to indemnify the university for “any and all” expenses – including “reasonable attorney’s fees” – to the extent caused by the architect’s “negligence.” When the university demanded that the architect perform its contractual indemnification obligations, the architect declined. This was the alleged breach of the contractual indemnification provision that gave rise to the university’s breach of contract claim. The fact that the indemnification provision explicitly used the term “negligence” did not mean that the university’s claim was actually a “negligence” claim within the scope of the statute of repose. As the SJC noted, the elements of a negligence claim are different from the elements of a contract claim. To prevail on a negligence claim, the university would have had to establish a legal duty, breach of that duty, causation, and damages. However, with respect to its claim for breach of the indemnification provision, the university would need to prove
MAY, 2025
the following elements: (1) the existence of a valid and enforceable indemnification clause; (2) the occurrence of an event triggering the duty to indemnify; (3) adequate notice to the architect; and (4) the architect’s failure to fulfill its obligation specification in the indemnification clause. Thus, the SJC stated: “[a]ccordingly, the university’s claim is contractual in nature, and the tort statute of repose does not bar it.” The decision reflects the fact that Massachusetts courts will often embrace a “freedom of contracting” approach. That is, where – as here – sophisticated parties “specifically negotiated” and “freely and intelligently entered into a contract of indemnification” the SJC ruled that “[t]hey should be held to it.” Massachusetts courts aim to enforce the terms of a contract in accordance with its plain meaning, and typically will not step in to protect a party that may have made a poor deal for itself. Highlighting the differences between a negligence claim and a contract claim, the SJC noted that the architect had actually agreed by contract to take on more liability than would have been imposed on it by law had it faced a negligence claim. That is, under the “American Rule,” litigants typically cannot recover attorneys’ fees absent statutory or contractual aucontinued on page 43
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
41
DO IT ONCE. DO IT WITH STONE. Granite Curbing Since 1883. Seamless Supply: From Quarry to Quality – Our Granite, Our Commitment.
WHY CHOOSE GRANITE CURBING? Our products are 100% natural and created by us from what Mother Nature provides! Why use products that cannot hold up against harsh New England weather? Servicing New England and beyond. Find A Store!
42
A Guide To Granite Curbing
Contact Leslie Shea at curbsales@swensongranite.com (603) 224-1637 | swensongranite.com
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
Legal Corner continued from page 41 thority. As a result, if the university had attempted to litigate a negligence claim, the university could not have reasonably expected to recover its attorneys’ fees. But here, the architect explicitly agreed to take on liability for and cover the university’s “‘reasonable attorney’s fees’ in addition to the university’s expenses incurred to fix the field” by agreeing to the indemnification provision of the contract. As a result, the architect’s “duty to indemnify the university” for negligence was “not one imposed by law” but “rather, [was] a promise to which [the architect] freely and intelligently chose to be bound.” In other words, it was the duty under the contract that gave rise to the university’s claim against the architect. If the architect had not agreed to the indemnification provision, the outcome in this case might have been different and its statute of repose defense may have been successful. The case illustrates just one of the multitude of issues that can arise in the context of indemnification. Indemnification provisions are among the most hotly negotiated provisions in design and construction contracts. Indemnification obligations can take many forms, ranging from extremely broad in some cases, to very narrow in others. Sometimes, indemnification obligations are cou-
pled with defense and hold harmless provisions. Regardless, contractors need to carefully examine proposed indemnification obligations, consider and understand the potential ramifications, and revise them appropriately to suit the risks of a given project. Contractors are well advised to make sure that their insurance broker reviews proposed indemnification provisions and provide appropriate insurance coverage. In addition, contractors/suppliers/vendors at any tier need to be sure that they are appropriately flowing down indemnification obligations to others at lower tiers to ensure that there are no “scope gaps” when it comes to indemnification. Failure to do so could lead to the untenable position of having to indemnify up-the-chain without the benefit of receiving indemnification from down-the-chain. In addition, light of the SJC’s decision in this case, parties will likely consider adding proposed time limitations on contractual indemnification obligations. Otherwise, open ended indemnification provisions could arguably give rise to contract-based indemnity actions asserted years after project completion. We suggest that you review your contracts, subcontracts, and purchase orders with a careful eye towards identifying potential long-term and costly obligations. n
WHATEVER IT TAKES.
WE’VE GOT YOU COVERED. The Right Equipment, Right When and Where You Need It Reliable and Ready To Work 24/7/365. ELEVATE OPERATIONS WITH TOP-TIER EQUIPMENT RENTALS MA: Chicopee • Plymouth • Randolph • Shrewsbury • Uxbridge NH: Chichester • Gorham • Lebanon • Plaistow ME: Portland NY: Auburn • Dansville • Ithaca • Rochester
` Rent by the Day/Week/Month
` Caterpillar and Leading Brands
` Low Hour/Late Model Machines
` Independently Owned and Locally Operated
877-DIG-LIFT • MILTONRENTS.COM
Milton Rents Magazine Ad 5.5 x 4.25 LANDSCAPE.indd 1
MAY, 2025
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
4/5/24 9:09 AM
43
IF YOU KNOW WHAT THIS IS YOU NEED TO KNOW WHO WE ARE RENTALS SALES ENGINEERING TRAINING
“THE TRENCH & TRAFFIC SAFETY SPECIALISTS”
SERVICE
BOSTON BRANCH 49 SILVA LANE DRACUT, MASSACHUSETTS 01826 PHONE (978) 475-0420 FAX (978) 475-4022
44
FOR MORE INFORMATION CALL (888) 234-9244 WITH A NATIONWIDE BRANCH NETWORK, WE’RE WHERE YOU NEED US TO BE
www.ntsafety.com
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
MONDAY, JULY 14, 2025 BROOKMEADOW COUNTRY CLUB CANTON, MA
TAYLOR OIL NORTHEAST E. J. PRESCOTT, INC. $25,000 “Hole-in-One” McCOURT CONSTRUCTION CO. $10,000 Putting Contest DAGLE ELECTRICAL CONSTRUCTION CORP. Beat the Sports Celebrity CORE & MAIN
Photos with Sports Celebrity RITCHIE BROTHERS AUCTIONEERS/ IRON PLANET Golf Ball Cannon J. F. WHITE CONTRACTING CO. All Signage ROADSAFE TRAFFIC SYSTEMS
For sponsorships or reservations call the UCANE office at 617.471.9955 (Reserve your spots today! This will sell out quickly.)
MARCH, 2024 MAY, 2025
“BUY “BUY FROM FROM THE THE ADVERTISERS ADVERTISERS IN IN CONSTRUCTION CONSTRUCTION OUTLOOK” OUTLOOK”
00 45
with UCANE’s Officers and Board Members
Will you please give us some information on your background and tell us how you got started in the construction business? I knew I loved this business from the age of 12, when I started running equipment for my uncle’s development company that was based in Franklin, MA. Every weekend I would ride my bike to the train station in Canton, jump on the train to Franklin, and then drive my bike again to my uncle’s jobsite where I worked every Saturday and Sunday for years. I grew up in Canton, MA, and graduated from Canton High in 1987. I attended MassBay Community College for horticultural design where I graduated in 1989. Fresh out of school, I started my own landscape design company where I designed and installed landscapes for residential and commercial clients for eight years.
UCANE Board Member Michael J. McCarthy Executive Vice President J. Derenzo Company
In 1997, I answered an ad from J. Derenzo Company who was looking for a Supervisor. They made me an offer, I accepted it, and I am now in my 28th year with the company and have never looked back. What attracted you to J. Derenzo Company and what positions have you held since joining the company? When I first decided to leave my small landscaping business I interviewed with a few other well-known heavy contractors. After interviewing with Derenzo, I felt that the company was growing and might ofMAY, 2025
fer more potential for me, but I also felt a more comfortable sense of a family business operation, which was what I was looking for. I was correct on all counts. As the company continued to grow and branch out into several divisions, it has still been able to hold on to its family business roots. I began with Derenzo as continued on page 49
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
47
48
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
Under the Hard Hat continued from page 47 a Field Supervisor, then advanced to a Project Manager, to Estimator, and then to Chief Estimator. In 2010, I was given the new title of Executive Vice President for J. Derenzo Co. My roles in the company are to oversee and manage the project management and estimating departments, review all bids and change orders, buyout all materials and subs on every job, sign and approve all change orders and purchase orders, and work with the supervisors and foremen to make sure they understand all aspect of the jobs that they are running. If we have any field or job issues, I will attend the meetings onsite with the GC to make sure nothing gets out of hand. What types of construction does J. Derenzo specialize in, and in what areas of New England do you pursue this work?
primarily for large private developers or General Contractors, and we pride ourselves in being experts in every type of earth support system, tiebacks, and methods of dewatering. Over the years J. Derenzo (David Howe), has expanded our in-house capabilities further to include total demolition capabilities (JDC Demolition), asbestos and contaminated soils permitting and handling (New Roads Asbestos and Boston Environmental), and complete sheet pile and H-Pile operations (Allied Pile Driving). These divisions are all under the Derenzo umbrella making us more of a onestop source for all deep excavation and site development needs. We are currently working in MA, RI, NH, CT, VA, and ME, and we are looking to expand our bidding area and our capabilities to support the continued growth of the company. J. Derenzo Company has built a great reputation along with remarkable growth over the past 20 years.
J. Derenzo Co. specializes in all aspects of site work, from deep hole excavations for major buildings, to utility work, and to complete site finishes. We work
continued on page 50
BUILD WITH US After serving major contractors for more than 60 years, the Driscoll Agency truly understands the unique risks, insurance requirements, and surety demands of the construction industry.
781. 681. 6686 781. 681. 6656 141 LONGWATER DRIVE, SUITE 203, NORWELL, MA 02061
www.DriscollAgency.com MAY, 2025
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
49
Under the Hard Hat continued from page 49 To what do you attribute the company’s success? The sense of being a family business, where the owner is always available to support employees, or to discuss issues, has developed a camaraderie amongst our employees that makes Derenzo an attractive company to work for. We have some of the best talent in the heavy construction industry and they enable us to perform high quality and safe work, a cut above the competition. I love what I do and enjoy working with everyone in this company. From the office staff, to field employees, we all work together and help each other out to make all the companies successful. Looking ahead into 2025 and beyond, what aspects of the heavy construction business do you see today that could be a challenge to your company’s growth or bottom line? We are always looking to grow as a company. The economy needs to level out, interest rates need to come down, and the City of Boston needs to open up again for construction. In the past two years the city has been basically at a standstill with regards to new commercial development. We have had to look outside the box and go after work outside the city which, as a company, we are adapting to and making positive strides. Why did you accept our offer to serve on the UCANE Board of Directors? I have a few friends who are currently on the board and others who have previously served on the board. I have seen the respect that UCANE has earned in the construction industry and have heard great things about the board and what they do to better and protect our industry, and I want to be a part of that. I have been in this business for a long time and hope to offer my experience to advance a mutual agenda for our industry. I’m looking forward to working alongside other leaders and competitors who I respect in our industry. n 50
Est. 1926
PROTECTING YOUR ASSETS WHILE YOU BUILD YOUR FUTURE. Insurance & Bonding Professionals Lou Tonry | Commercial Insurance Kris Bibbo | Personal Insurance Kristin Erickson | Bonds
BRAINTREE 150 Grossman Drive Suite 200 Braintree, MA 02184
(617) 773-9200 LEXINGTON 238 Bedford Street Lexington, MA 02420
(781) 861-1800
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
Proud UCANE Member since 1954
TONRY.COM
MAY, 2025
JUNE 2025 IS TRENCH SAFETY MONTH! JUNE 2025 IS TRENCH SAFETY MONTH!
JUNE JUNE 2025 2025 IS IS TRENCH TRENCH SAFETY SAFETY MONTH! MONTH!
NATIONAL TRENCH SAFETY STAND DOWN NATIONAL TRENCH SAFETY STAND DOWN NATIONAL TRENCH SAFETY STAND DOWN June 16-20, 2025 June16-20, 16-20, 2025 June 2025
What is a Safety Stand Down? What is aa Safety Stand Down? What is a Safety Stand Down? What isfor Safety Stand Down? A Safety Stand Down presents the opportunity employers to talk directly to employees and others about safety. A Safety Stand Down presents the opportunity for employers to talk directly to employees and others about safety. A Safety Stand Down presents the opportunity for employers to talk directly toimportance employees and others about safety. A Safety Stand Down presents the opportunity for employers to and talk reinforce directly tothe employees and of others about safety. These Stand Downs will focus on trench & excavation hazards using trench protective These Stand Downs will focus on trench and excavation hazards and will reinforce the importance of using trench These Stand Downs will focus on trench & excavation hazards and reinforce the importance of using trench protective These Stand Downs workers from trench and excavation systems and protecting trenching hazards.hazards and will reinforce the importance of using trench protective systems and workers from hazards. protectiveand systems and protecting protecting workers from trenching trenching hazards. systems protecting workers from trenching hazards.
HowtotoConduct Conduct a Safety Stand Down How aa Safety Stand Down How toto Conduct Safety Stand Down How Conduct a Safety Stand Down Companies will conduct a Trench Safety Stand Down by taking a break to have a toolbox talk or another safety Companies will conduct a Trench Safety Stand Down by taking a break to have aa toolbox talk another safety Companies will conduct a Trench Safety Stand Down by taking a break to have toolbox talk or ortalk another safetysafety Companies will conduct a Trench Safety Stand Down by taking a break to have a toolbox or another activity to draw attention to thespecific specifichazards hazardsrelated related to working in and around trenches/excavations. We ask activity attention to to in around trenches/excavations. We activity to to draw draw totothe the hazards related to working working in and and around trenches/excavations. We ask ask activity to draw attention attention thespecific specific hazards related to working inasand around trenches/excavations. We ask that companies provide feedback about their Stand Down, such when it was held, how many workers that companies feedback about their Stand Down, such as itit was held, how workers that companies companies provide provide feedback about their Stand Down, such as when when was held,held, how many manymany workers that provide feedback about their Stand Down, such as when it was how workers participated, youyou shared information UCANEwill willcollect collect information, publicize participated, and how shared information with employees. UCANE the information, publicize the participated, how and how you shared informationwith withemployees. employees. UCANE will collect thethe information, publicize the the participated, how you shared information with employees. UCANE will collect the information, publicize the overall total number of participants, and publish the names of the companies that held a Trench Safety overall overall total total number number of participants, participants, and and publish publish the the names names of of the the companies companies that that held held aa Trench Trench Safety Safety Stand StandStand overall total number of participants, and publish the names ofyour the companies that held a Trench Safety Stand Down. made availableto submit information about your Stand Down. Down. Forms will information about Stand Down. Down.Forms Forms will will be be made made available available totosubmit submit information about your Stand Down. Down. Forms will be made available to submit information about your Stand Down.
Trench Trench Safety Safety Stand Stand Down Down (TSSD) (TSSD) Goals Goals
Trench Safety StandThe Down (TSSD) Goals UCANE Event since goal of is UCANE has has been been aa leader leader in in this this National National Event since 2017. 2017. goal(TSSD) of the the event event is to to reach reach out out to to the the many many workers workers Trench Safety StandThe Down Goals who work in and around trenches and excavations to provide them with information about current excavation who work andaaround trenches and excavations provide them with about out current excavation UCANE hasinbeen leader in this National Event sinceto2017.The goal of theinformation event is to reach to the many workers requirements and procedures for working in By reaching as workers possible we can reduce UCANE a leader in this National Event since to 2017.The goal of many the is toas reach out to the workers requirements safety procedures forand working in trenches. trenches. By reaching as many workers as possible we canmany reduce who workhas in been and safety around trenches excavations provide them withevent information about current excavation the number of fatalities and serious injuries that occur each year in our industry, and make others, such as municipal who work in and around trenches and excavations to provide them with information about current excavation the number ofand fatalities serious injuries that occur each year our industry, and make others, such as we municipal requirements safetyand procedures for working in trenches. Byinreaching as many workers as possible can reduce and industry who are also aware these serious hazards.as many workers as possible we can reduce requirements and safety procedures for working inof By reaching and industryofworkers workers who are also exposed, exposed, aware oftrenches. these the number fatalities and serious injuries that occur eachserious year inhazards. our industry, and make others, such as municipal
the industry number of fatalities and injuries that occur each serious year in our industry, and make others, such as municipal and workers who areserious also exposed, of these hazards. UCANE CONTRACTORS ARE THE PROFESSIONAL IN THE BUSINESS! UCANE AREaware THE MOST MOST PROFESSIONAL and industry workersCONTRACTORS who are also exposed, aware of these serious hazards. IN THE BUSINESS!
UCANE CONTRACTORS ARE THE MOST PROFESSIONAL IN THE BUSINESS! UCANE CONTRACTORS ARE THE MOST PROFESSIONAL IN THE BUSINESS!
MAY, 2025
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
51
®
®
rainforrent.com
BUILD WITH CONFIDENCE
28 Trolley Crossing Charlton, MA 01507 (508) 248-4607
52
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
An Interview with Mike Lenihan, UCANE Consultant, Former Utility Contractor, and Active UCANE Member Will you please tell us a little bit about your background and how you got started in the utility construction business? I grew up in Franklin, MA. where I graduated from high school. I commuted to Wentworth Institute for two years where I received an Associate’s degree in Civil and Highway Engineering. I eventually (15 years later) attended night classes for four years where I received my bachelor’s degree in Civil Engineering from Northeastern University. My first full time job out of Wentworth was with Metcalf & Eddy Engineers who, along with Camp, Dresser & McKee, were the two largest Civil Engineering firms in Boston at the time. I started out with M&E as a surveyor and draftsman before being moved to the construction division as a field inspector. At that time M&E was the prime consultant for water and sewer projects for many towns on the South Shore. I was an inspector for multiple projects in various South Shore towns for a few years and that was my first exposure to UCANE contractors. I actually attended several UCANE banquets during that time, and some of the contractors I worked with are still UCANE members today. After four years with M&E, I advanced to Resident Engineer and was about to start a new sewer project in Rockland with a contractor named MAY, 2025
UCANE Consultant Mike Lenihan
J. D'Amico, Inc., from Randolph, MA. After the pre-construction conference at the Statler Building in Boston, Joe D'Amico invited me for a cup of coffee. After two hours of coffee, Joe offered me a job and I accepted it. You had a long and successful career at J. D'Amico, Inc. Please tell us a little about the company and what your roles were over the years? J. D'Amico, Inc. was a small familyowned business concentrating on water and sewer projects in Eastern Massachusetts. Brothers Joe, Neno, and Paul were the second-generation owners, and though the company only ran two pipe crews, they had a large inventory of heavy iron and were known to tackle difficult projects involving deep and wet excavations, river crossings, selfperformed steel sheet piling, and rock blasting. continued on page 54
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
53
Under the Hard Hat continued from page 53 The company did many challenging projects involving large diameter pipes and valves for the MWRA and the Boston Water & Sewer Commission. The company did almost exclusively public work including Federal work on several military bases. Joe D'Amico was well known in the industry as a very personable and honest man whose word was his bond. I started out with Joe D'Amico as a field engineer laying out the work, setting grades with batter boards, and then with the pipe lasers. Joe was a hands-on owner running a crew and present on the site full-time. He and I were very
close, and having lost my father to an auto accident when I was 16, Joe was like a father to me. He took me under his wing and taught me everything about the utility contracting business. A few years after starting with D'Amico we went to three, and sometimes a fourth crew, and that size operation proved very profitable for us over the years. I eventually was doing project management and handling the bulk of the estimating duties. In 1990, I was made Vice President of the company, as Joe was trying to step back a bit due to health concerns. Unfortunately, in 1991 Joe suffered a fatal heart attack at the age of 61 in the middle of one our most difficult jobs in Gloucester, MA. At that time, I took over the role of Vice President/ General Manager where I ran all aspects of the business for the next 23 years. After successfully transitioning the family business into the third generation of D’Amico’s, and after putting my successor in place, I retired in 2014 after 41 great years with the company. You have also had a long affiliation with UCANE. Please tell us some history about that relationship?
1200 Worcester Road 625 Pleasant Street Watertown, Framingham, MA . 617 (508) 532-3200 MA. - 924 - 3673 MATel: Ask for: Chris Uhl
watertownford.com mcgovernfordofframingham.com 3 Locations to– Serve You& TRUCK in Eastern SALES – SERVICE PARTS – CAR RENTAL MA
54
Joe D’Amico had been an active member of UCANE since the mid 1960s. He was President of the Association in 1977 and 1978, and was the recipient of the prestigious Contractor of the Year Award in 1978. Joe was also instrumental in hiring staff for UCANE including a young woman named Anne Klayman to assist the UCANE Executive Director. With my boss being so active in UCANE it was natural for me to get involved early in my
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
continued on page 55
MAY, 2025
Under the Hard Hat continued from page 54 career by attending meetings and volunteering for various committees. In the early 1980s, I was asked to be on the Board of Directors and was the youngest member of the board at the time. That was the beginning of a long relationship with UCANE, where I served on every board and officer position including President in 1993 and 1994 (UCANE’s 40th Anniversary) and again in 2004 (UCANE’s 50th Anniversary). One of my proudest career moments came in 1994 when I was voted UCANE’s Contractor of the Year by my peers and was presented the award at the Annual Banquet. I continued my active involvement in UCANE, including watching the Association prosper under the leadership of our Executive Director, Anne Klayman, until I retired from J. D’Amico, Inc. in 2014. Ahead of my retirement date, I was flattered when asked by Anne and the UCANE Board of Directors if I wanted to be a part-time consultant to UCANE. I wasn’t sure at first, but after considering the oth-
er option of going from working 50 hours a week to zero hours, I decided (or more accurately—my wife insisted) that I take the position. What has been your role as a consultant at UCANE over the last 10 years? Coming from a small business where I wore a lot of hats, I knew the same would be true at UCANE where everyone on the small staff wears multiple hats. I have assisted the UCANE Board in transitioning to new leadership over the last multiple years. I also work closely with our lobbyist, Mark Molloy, to identify pieces of legislation that are detrimental to contractors and for small businesses, and when requested, accompany him on visits to Beacon Hill when a contractor’s perspective on an issue might be needed. Because of my knowledge of the utility contracting business, I assist with membership recruitment and member services, such as when a continued on page 56
“Fueling America’s Progress” Your Complete On-Site Fuel & Petroleum Service • Ultra Low Sulfur Diesel • Gasoline • Kerosene Boston, MA
• Biodiesel • Lubricants • Storage Tanks and Equipment
LOCATIONS
Baltimore, MD Hartford, CT New York, NY Philadelphia, PA Pleasantville, NJ Providence, RI Somerville, NJ Washington, DC
1-800-894-FUEL (3835) • www.tayloroilco.com MAY, 2025
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
55
Under the Hard Hat continued from page 55 contractor has a construction question or an industry concern. I also coordinate and run the UCANE Safety Committee meetings, maintain our relationship with OSHA, and provide safety updates to the general membership. I assist with meeting agendas and attend all Board of Director’s meetings and UCANE events. I have been working with the editors of Construction Outlook magazine to find and produce interesting content for our readership. This includes interviews with our Board Members, with Municipal DPW Directors, and with Safety Professionals from within our member firms. Other articles include introductions to our Associate Members and articles on current industry issues. The most satisfying articles are the cover stories that highlight the history and successes of our members, or maybe an unusual project being performed by one of our contractors. To what do you attribute your successful career?
It is a rare person that can credit only himself for his success. Obviously, I was lucky to bump into Joe D’Amico at a time when he needed help, and even more fortunate that we clicked so well and he poured his business knowledge into my brain. I owe a lot to the talented and loyal employees at D’Amico that actually built the projects that I was low bidder on and made me look good. But, without a doubt, I owe my success to my wife Susan who has been my biggest booster since day one. She is my high school sweetheart and we were both 18 years old when we married. My future was very much in doubt at that time, but with her constant support we managed to create a future for ourselves. While she took care of the homefront and raised three kids, I was able to put all of my energy into my career and even into my UCANE activities. She put up with my long hours, late nights, my moodiness prior to bids, and when work was slow and layoffs needed to be done. It has been the perfect team effort and, looking back, I wouldn’t change a thing. n
www.unitedconcrete.com
Your single source for precast concrete solutions
Pump Stations, Prefabricated Buildings
˚ Bridge Structures ˚ Pump Stations, Buildings ˚ Underground Tunneling ˚ Culverts/Arches ˚ Retaining Walls ˚ Prestress/NEXT Beams ˚ Custom Structures
Prestress (PCI (PCI Certified) Certified) Prestress
RCP
Box Culverts
56
Toll Free: (800) 234-3119 Fax: (203) 265-4941 Jason Lindsey jlindsey@unitedconcrete.com Cell 203-464-7667
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
Christopher Clark
World Insurance Associates, Inc.
Five Insurance Gaps That Cost Utility Contractors Utility construction projects have a unique blend of complexity, coordination, and risk. From underground work to public-facing infrastructure, these jobs demand a robust insurance strategy. Yet, even seasoned contractors often find themselves exposed due to a few common gaps in their insurance programs.
H
ere are five critical areas where we frequently see utility contractors leave money—and protection—on the table. 1. Relying on Blanket Policies for Specialized Projects: Many contractors assume their general Commercial General Liability (CGL), Builder's Risk, and Workers' Comp policies will cover most scenarios. That's a dangerous assumption. Large-scale or specialized utility projects—like tunneling, bridgework, or water infrastructure—often require unique endorsements or higher limits that blanket policies don't address. What to do: Tailor your coverage to each project. Ensure specialized risks are accounted for and that endorsements reflect the true nature of the work. 2. Underestimating Builder's Risk Needs: Builder's Risk policies are often written to cover physical damage, but do they cover soft costs like labor escalation, administrative expenses, and financing delays? They are frequently left out. If your project faces delays, due to materials, permitting, or weather—and your Delay in Start-Up (DSU) coverage isn't dialed in—you could be stuck footing a hefty bill. What to do: Properly value your project, including soft costs. Confirm that DSU is included and aligned with your contract structure and timeline.
MAY, 2025
3. Poor Risk Transfer from Subcontractors: On multi-party utility jobs, it's not uncommon to see vague or missing indemnity clauses. If a subcontractor makes a costly mistake and you're not properly listed as an Additional Insured on their policy, guess who's left holding the liability? What to do: Tighten your contracts. Require all subs to name you as an Additional Insured and ensure their policies meet minimum standards—then verify it's done. 4. Mismanaged Wrap-Up Programs (OCIPs/ CCIPs): Wrap-up programs can be great tools for centralized coverage—but only if they're managed tightly. We often see subcontractors improperly enrolled, confused about what's covered, or unaware of how the wrap interacts with their policies. What to do: Ensure enrollment is mandatory, clear, and monitored. Provide guidance on coverage overlaps and responsibilities. A well-run wrap-up avoids costly finger-pointing when claims arise. 5. Overlooking Emerging Risks: Utility contractors increasingly rely on technology—from project management software to drones and IoT sensors. This creates cyber risk many standard policies don't cover. Meanwhile, environmental exposures—from fuel spills to soil contamination—are another blind spot, continued on page 59
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
57
Highest Level of Quality, Greatest Level of Skill
Dagle Electrical Construction Corp.
Construction: • • • • • • •
Other Services:
Heavy Industrial Commercial Multi-Unit Residential Design Build Ground Up Renovation Pumping Stations
• • • • • • •
Tel/Data Fiber Optic Fire Alarm Stand By Power Systems Sports Lighting Marine Power Installations Special Event Lighting & Power
Transportation: • • • • •
Traffic Signal Systems Highway & Street Lighting Systems Intelligent Transportation Systems Parking & Snow Melt Systems Rail Transit Installation
Alternative Energy: • Wind Turbine • Photo Voltaic • Green Technology
WBE Certified
68 Industrial Way • Wilmington, MA 01887-3434 T: 800.379.1459 • F: 781.937.7678 • Email: dec@deccorp.com
www.deccorp.com
Insurance Perspective continued from page 57 often excluded from traditional policies. What to do: Review whether you need Cyber Liability, Contractor's Pollution Liability, or Professional Liability based on your scope of work and tech usage. Bonus Tip: Consider Captive Insurance: If your company spends $1 million or more annually on insurance, it might be time to look at a captive structure. Captives can reduce volatility, provide more control over claims handling, and potentially return underwriting profits to you—if set up and managed properly. Final Thought:
In an industry where the margin for error is tight, and every delay or misstep can carry significant financial consequences, your insurance strategy shouldn't just check a box—it should protect your operation at every level. Spotting and fixing these gaps don’t just reduce risk—it can unlock real savings and give you more control when it matters most. n
LARGE RESOURCES. LOCAL RELATIONSHIPS.
IS YOUR INSURANCE PROGRAM KEEPING PACE IN TODAY’S MARKET? Let us review your programs and recommend improvements to ensure you are fully protected should the unexpected happen. COMMERCIAL INSURANCE & BONDS • All forms of liability and property coverages • Bonds including Express Bond Program • Competitive terms • Personalized service • Highly experienced with Construction programs
RISK MANAGEMENT SOLUTIONS • Employee and executive benefits • Retirement planning services • Investment advisory services • Private wealth management • Personal and high-net-worth portfolios
CHRISTOPHER CLARK, PRINCIPAL, CLIENT ADVISOR World Insurance Associates LLC, 50 Prospect Street, Waltham, MA 02453 O 781-642-9000 | D 781-398-9318 | M 508-400-4010 | christopherclark@worldinsurance.com
MAY, 2025
worldinsurance.com
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
59
UCANE Represents New England Contractors at Water Week in Washington, D.C.
D N ST A D IN T
T
WATERWEEK2025|ELEVATECLEANWATERASANATIONALPRIORITY
(L-R): UCANE Treasurer Querino Pacella, Congressman Stephen Lynch, Executive Director Joe Nolan, Geselle Valenti, and UCANE President Elect Chris Valenti
UCANE Leaders with our Partners from Banner Media and the Clean Water Construction Coalition CWCC in Washington DC on April 9 During Water Week
60
IS RW O D D E CS R D KI
E OT
DES
S
DO
R
SA VI ES
ST WTHO AV r IES 10
ED DR
totheeconomy.
L
$524billion
DO
Overthenext10years,the
watersectorwillcontribute
04
During the week of April 7–10, UCANE Executive Director Joseph Nolan was joined in Washington, D.C. by UCANE President Elect Chris Valenti and his wife Geselle of GVC Construction, Inc., along with Treasurer Querino Pacella of RJV Construction Corp. Their mission: to represent the interests of UCANE’s members at the 2025 Water Week Conference and reinforce the organization’s role as a national leader in utility infrastructure advocacy.
NU STA SED IP
O EN AW LATJP
EH
N
O
N
B 98
7 47
6 .22
LB
104VEN TIC R
SE
RE
he UCANE delegation attended the American Water Works Association’s (AWWA) Annual Water Policy Forum, held at the Hill Harbor Inn. The Forum featured presentations from top federal leaders, including Arizona Senator Mark Kelly, who emphasized the need for continued investment in water systems across the nation. In addition, there were sessions also focused on water equity, funding innovation, and regulatory clarity, providing UCANE leaders with timely insights to bring back to Massachusetts. UCANE also attended panel discussions on Infrastructure Investment and Jobs Act (IIJA) implementation and upcoming Clean Water Act priorities. These conversations highlighted both the opportunities and challenges facing utility contractors as regulatory and funding landscapes evolve. On Wednesday morning, UCANE took part in a key Clean Water Construction Coalition (CWCC) strategy session. UCANE has proudly been a member of the CWCC for nearly a decade. This year’s gathering was hosted by Banner Public Affairs in their D.C. office and brought together construction
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
continued on page 61
MAY, 2025
Water Week continued from page 60 associations from across the country, including representatives from New Jersey, Colorado, and Illinois. The breakfast forum allowed members to discuss pressing policy issues, share legislative strategies, and hear directly from U.S. EPA officials. UCANE leaders also participated in a series of Congressional meetings to advocate for increased funding through the State Revolving Fund (SRF) and to emphasize the importance of long-term investment in water and sewer infrastructure. These discussions were critical in building continued support from our federal delegation and aligning UCANE’s priorities with national infrastructure goals.
UCANE Leadership attended AMWA (Association of Metropolitan Water Agencies) conference on Tuesday April 8 in Washington DC
UCANE’s participation in Water Week 2025 reaffirmed our unwavering commitment to national advocacy and collaboration. As federal infrastructure funding becomes increasingly competitive, UCANE remains focused on ensuring that the voices of New England’s utility contractors are heard loud and clear in Washington. We are grateful to our Board members for dedicating their time and resources to represent our industry’s interests on Capitol Hill. Their efforts continue to strengthen UCANE’s presence as a leading advocate for clean water and utility infrastructure across the region. n
A trusted partner in construction...
now as The Baldwin Group For over a decade, RogersGray has been a proud UCANE member, and that commitment continues as we transition to The Baldwin Group. While our name is evolving, our dedication to protecting what matters most remains unwavering—now with even greater resources and expertise. We’re here to support owners, developers, general contractors, designers, and subcontractors, helping them navigate risk, strengthen their businesses, and achieve their next level of growth. At The Baldwin Group, we’re not just protecting your projects—we’re Protecting the Possible.
Strategic differentiators: Dedicated Construction Practice Group Captive and standard market relationships Our people
RogersGray is becoming The Baldwin Group
Service strategy Trust & transparency
MAY, 2025
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
61
978.658.5300
900 Salem Street - Wilmington, Ma. www.beneventocompanies.com
Asphalt
62
Concrete
Aggregates
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
Recycling
MAY, 2025
Understanding the ‘Competent Person’ and this Critical Role in Excavation The Competent Person: Excavations are integral to underground infrastructure construction, but they pose significant dangers for workers when improperly planned or managed. On average, more than 20 workers die from trench cave-ins each year, according to the Bureau of Labor Statistics.
T
o mitigate the risk of injuries and death, OSHA requires companies to designate a “Competent Person” to oversee trenching and excavation activities. Too often, employers fail to comply with this regulation. In a survey of industry stakeholders, only 39 percent reported there was always a properly trained Competent Person on the jobsite; 31 percent said there was occasionally a Competent Person present; and 3 percent said they never had a Competent Person during a project. Many facility owners and their contractors lack clarity about what a Competent Person should be expected to know and do. Almost 34 percent of the survey respondents failed to understand the rules and responsibilities of this role.
Who Can Serve in this Role?: OSHA defines a Competent Person as “one who is capable of identifying existing and predictable hazards in the surroundings or working conditions which are unsanitary, hazardous or dangerous to employees, and who MAY, 2025
has authorization to take prompt corrective measures to eliminate them.” Examples of existing and predictable hazards are cave-ins, hazardous atmospheres, and lack of entry and exit. OSHA requires that a Competent Person be trained in and knowledgeable about soil evaluation, the proper selection and use of protective systems, and the requirements of the standard. It is up to the employer to see that a Competent Person has had the appropriate training – but checking the training box is not enough. The employer must ensure, on an ongoing basis, that the person still possesses the necessary knowledge and is able to execute what he or she has been trained to do. The Competent Person bears a great deal of responsibility. In trench and excavation work, this person is required to perform the duties below, among others: 1. Follow all relevant OSHA standards. OSHA 1926 Subpart P Standard outlines the legal recontinued on page 64
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
63
Competent Person continued from page 63 quirements for protecting workers involved in excavation and trenching activities. It specifies when a protective system is required and calls for designating a Competent Person to ensure that the system selected is designed for the application and used properly. Six appendices present guidelines related to soil classification, sloping and benching, timber shoring, aluminum hydraulic shoring, alternatives to timber shoring and the selection of protective systems. 2. Classify the soil. Too often, a solution is determined before the problem is understood. In excavation safety, accurate soil classification is necessary prior to selection of a protective system. OSHA requires that the chosen system be designed to resist, without failure, all actual and reasonably expected loads, including soil loads. 3. Follow tabulated data. Manufacturers of trench protection systems provide tables and charts developed by professional engineers that dictate the maximum allowable depth for safe use, load limits and installation requirements. The Competent Person must follow the manufacturer’s tabulated data when choosing and using a prefabricated system. The tab data must be kept onsite during construction in the event conditions change. For
64
instance, heavy rainfall may alter the soil classification. The Competent Person will need to refer to the data to ensure that use of the protective system still falls within the limits of safe operation. 4. Enlist site-specific engineering as needed. The Competent Person must know when a shoring or shielding design from a registered professional engineer is required. A site-specific plan is needed at any depth, any time there is deviation from the OSHA charts or any tabulated data. When the desired protective system has no tabulated data, a site-specific plan must be developed. Examples of protective systems that do not have tabulated data include beam and lagging, beam and plate, soil nailing and cantilevered sheeting. 5. Determine the best type of protective system. One of the main responsibilities of the Competent Person is determining the best type of protective system for the excavation, accounting for factors such as width, depth and length; soil type; and any adjacent structures or surface encumbrances. Excavating protective systems include: • Sloping or benching: Removing additional soil away from the excavation in order to eliminate the risk of collapse • Shoring: Installing supports, such as a hydraulic strut system
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
continued on page 65
MAY, 2025
Competent Person continued from page 64 • Shielding: Installing a trench box or similar structure 6. Identify the location of underground utilities. Before the excavation begins, the Competent Person is responsible for locating any and all underground installations in the area, including gas, water or electrical lines. Skipping this step could result in gas leaks, flooding or electric shock. 7. Conduct tests for hazardous atmospheres. When workers are in a confined space or an excavation deeper than 4 feet and it is reasonable to think that a hazardous atmosphere could exist, the Competent Person must test that atmosphere prior to entry. Monitoring the atmosphere and taking appropriate corrective action, when necessary, protects workers from injuries due to hazardous gases and oxygen deficiencies. 8. Watch out for water accumulation. Water accumulation in a trench, regardless of the source, can undermine the performance of a protective system. The Competent Person should monitor water levels and re-evaluate the soil classification and the safety of the excavation, as necessary. 9. Perform inspections. Conditions on a jobsite can change unexpectedly; a leak can develop, for example, or a section of sloped earth could shift. Before any worker goes into an excavation at the start of a shift, and after each hazard-increasing event throughout the day, the Competent Person
MAY, 2025
is required to inspect the site to ensure that integrity of the protective system has not been compromised, and the workspace remains safe.
Role of Training: Companies may become complacent if their projects frequently require excavations, and they’ve never had an incident. They may neglect to designate a Competent Person because they assume that crews know what they’re doing. But the reality is that everyone in a job involving excavations is required to be trained in the hazards of the work, and at least one person must be designated as the decision-maker. Formal training can fill knowledge gaps, correct any long-held misunderstandings, and provide a refresher course on critical details and protocols. Training on an ongoing basis ensures that the Competent Person stays up to date with the most recent advances in protective systems and any changes in the OSHA standard. Designating and training a Competent Person does more than meet a legal requirement. It helps companies in the underground infrastructure space create safer worksites, improve their safety culture, protect their bottom line, and safeguard their most valuable asset: their people. About the Author – Bruce Magee is the regional product development manager for United Rentals. With 30 years of experience specializing in trenching and underground safety solutions, he has delivered over 400 Competent Person Training Classes to the construction industry. Article reprinted with permission of United Rentals and Underground Infrastructure magazine, March 2025. n
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
65
WE’RE BREAKING NEW GROUND! ATS EQUIPMENT IS YOUR SOURCE FOR EPIROC HYDRAULIC BREAKERS ATS EQUIPMENT HAS FOUR CONVENIENT LOCATIONS BOSTON, MA, 33 Locust St. Tel: (617) 825-3600 AUBURN, MA, 487 Washington St. Tel: (508) 832-8500 REHOBOTH, MA, 51 Fall River Ave. Tel: (508) 379-6200 CANDIA, NH, 133 Raymond Rd. Tel: (603) 483-2100
www.atsequipment.com
PREMIUM HYDRAULIC BREAKERS Our range of Epiroc premium hydraulic breakers give you everything you want from a hydraulic breaker: efficient and highly adaptable products, that combine superior efficiency and performance with high durability and low impact on the environment. SBU breakers are used for road work, trenching and demolition as well as in primary and secondary rock breaking. It has an air injection porting for under water breaking. A solid body breaker is manufactured from a single block of cast metal.
The Connolly family and all the professional staff ATS Equipment look forward to serving you – our friends!
I n M emoriam
W
K enny A nderson
Modern Continental Construction Co.
e are deeply saddened to announce the unexpected passing of long time UCANE member and friend, Kenny Anderson on April 8, 2025 at the age of 83. Ken was the beloved husband of Rosanne (DiCarlo) Anderson for almost 44 years. He was also the loving father of Michelle Patenaude and Kenneth P. Anderson, and cherished grandfather of four. Kenny was also the best friend and business partner of the late Les Marino. In 1967 the two young ambitious men took a giant gamble, quit their jobs, and founded Modern Continental Construction Company (Modern). Over the decades that followed, under their capable leadership, Modern grew quickly and matured into a giant construction company that employed over 2,000 people and became a major
player in the New England utility, transit, and highway construction markets. At its peak, Modern built significant sections of the “Big Dig” and the O’Neill and Ted Williams Tunnels, valued at over $3 Billion. Modern also took on other large construction projects both in the United States and abroad. Their ventures also expanded into other areas of interest beyond construction like Restorante Marino in Cambridge and Lookout Farm in Natick. The Officers, Board of Directors, Members, and Staff of UCANE extend their deepest sympathies and condolences to the entire Anderson family. Kenny’s years of experience and knowledge of our industry brought him the unequaled respect of his peers who feel a deep and personal sadness at his passing. n
NOW AVAILABLE: BOSTON GRAVEL PLANT LOCATION:
200 LEGACY BLVD. DEDHAM, MA 02026 Plant: 617-590-0024
MATERIALS AVAILABLE FOR PURCHASE: • 1” MINUS PROCESSED GRAVEL • ¾” & 1½” CRUSHED STONE • SCREENED LOAM • SCREENED SAND MATERIALS ACCEPTED: • BROKEN ASPHALT • NON & REINFORCED CONCRETE • CONCRETE WITH WIRE MESH • ROCK • BLASTED LEDGE
MAY, 2025
OFFICE:
1039 EAST STREET DEDHAM, MA 02026 Office: 781-329-4111 Fax: 781-329-1039
HOURS OF OPERATION: MONDAY-FRIDAY: 6:30 A.M. – 4:00 P.M. SATURDAY: 7:00 A.M. – 12:00 P.M.
DELIVERIES AVAILABLE ON LARGE ORDERS. PLEASE CALL FOR PRICING.
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
67
We improve the lives of our partners, and our family by going beneath the surface to build America’s essential infrastructure. While we’re capable of taking on any trenchless construction project across the U.S., we’re bestsuited for the hard jobs no one else wants to touch.
Bettering lives from the ground up
We are proud to offer an array of trenchless construction methods to choose from to perfectly fit every job. Partner with us on your next project.
. Jack and Bore . Hand Mining . Micro-tunneling . Conventional Tunneling . Horizontal Directional Drilling . Rehabilitation Learn more at miswestmole.com
6814 W 350 N Greenfield, IN 46140 317.545.1335
1101 Princess St Alexandria, VA 22314 317.545.1335
Ferguson offers a complete line of products to cover all your water, sewer and storm water management needs, and our relationships with the waterworks industry’s top vendors give our customers peace of mind through unmatched customer service, on-time delivery, and industry leading fill rates.
DI PIPE & FITTINGS | PVC PIPE & FITTINGS | VALVES & HYDRANTS HDPE PIPE & FITTINGS | GEOTEXTILES | BRASS CASTINGS | STORM WATER CHAMBERS | SAFETY & TOOLS WATER MAIN TAPS | HYDROSTATIC TESTING | HYDRANT REPAIR
FERGUSON.COM
68
Canton (781) 828-1350
North Harwich (508) 430-1696
Worcester (508) 754- 2027
©2014 Ferguson Enterprises, Inc.
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
Patrick W.Underhill Saltmarsh Blake Corporate Safety Director President Industrial Safety & Rescue J. Derenzo Companies
Preventing Falls in Construction Highlighted During May National Safety Stand-Down
Falls continue to be the number one cause of fatalities in construction work, while new fall protection and prevention technologies are constantly coming out that are better, safer, lighter, and more cost-effective. According to the U.S. Bureau of Labor Statistics (BLS), in 2023, there were 421 fatalities in the construction industry due to falls, slips, and trips, accounting for 39.2% of all construction-related deaths. Falls are OSHA’s #1 source of violations with 6,307 citations in 2024. This underscores the persistent risk that falls pose to construction workers.
D
espite decades of awareness campaigns, regulatory efforts, and technological advancements, falls remain the leading cause of fatalities in the construction industry. According to the U.S. Bureau of Labor Statistics (BLS), in 2022, falls, slips, and trips accounted for 423 out of 1,069 total construction fatalities nationwide—almost 40% of all deaths in the sector. In Massachusetts alone, 22 construction workers lost their lives in 2023 due to workplace injuries—a figure that is four times higher than any other industry in the state. This alarming statistic underscores the urgent need for the construction sector to adopt and implement the latest fall protection technologies and best practices.
The Persistent Threat of Falls in Construction: Falls from heights continue to be a significant hazard on construction sites. A fatal construction accident occurred at Massachusetts General Hospital (MGH) on January 9, 2023, when a contractor fell from the roof of the Gray/Bigelow Building. The worker fell approximately eight stories and landed on a lower roof, resulting in a fatal injury. Similarly, in August 2024, a 43-year-old man from Taunton fell from scaffolding at the Emerson Cutler Majestic Theatre in Boston, resulting in a fatality. On January 24, 2025, a 66-year-old worker tragically died after falling into a sand silo at Chicopee Concrete Service in Green-
MAY, 2025
field. These incidents highlight the ongoing risks associated with working at heights, or near unprotected edges, and the critical importance of effective fall protection measures.
Embracing Advanced Fall Protection Technologies: The good news is that the industry is witnessing a surge in innovative fall protection solutions designed to enhance worker safety while being more user-friendly and cost-effective. Some of the latest advancements include: Improved harnesses with better padding, lighter hardware and horizontal leg straps which offer more continued on page 70
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
69
Safety Corner continued from page 69 comfort and freedom of movement compared to vertical leg straps, especially for tasks requiring movement. Advanced Self-Retracting Lifelines (SRLs): Modern SRLs offer improved mobility, lighter weight materials, and faster locking speeds, significantly reducing fall distances. AI-Powered Fall Prevention Systems: Artificial intelligence is being embedded into construction safety platforms to predict high-risk activities and conditions before incidents occur, enabling proactive interventions. Lightweight Horizontal Lifeline Systems: New deBoston Area signs for temporary horizontal lifelines make it easier Locations
to deploy fall protection in unconventional areas, including leading edges and trench work zones. These technologies not only enhance safety but also improve compliance with OSHA regulations and can lead to reductions in insurance premiums, workers’ compensation claims, and potential legal liabilities. Horizontal lifeline (HLL) sys2 Dexter Street tems have become an increasingly Everett, MA 02149 valuable fall protection solution Boston Area Boston Area on construction sites, particularLocations Locations 431 Second Street ly in situations where traditional Everett, MA 02149 guardrails or anchor points are not 2 Dexter Street 2 Dexter Street feasible. Unlike fixed anchor sysEverett, MA 02149 Everett, MA 02149 tems that require structural tie-off points, HLLs provide a flexible an431 Second Street 431 Second Street chorage path that can span long Everett, MA 02149 Everett, MA 02149 distances—ideal for open edges, BOSTON AREA LOCATIONS leading edge work, or over exca100 Fremont Street 2 Dexter Street 431 Second Street Worcester, MA 01603 vations and trenches. They allow Everett, MA 02149 Everett, MA 02149 workers to remain connected while moving laterally along a work surface without needing to disconnect and reconnect frequently, reducing the risk of falls caused by interrupted tie-offs. Some of the most practical applications of horizontal lifelines is in roof work, bridgework, scaffolding, or steel erection, where perimMinichiello Bros./Scrap-It, Inc., eter protection is limited or absent. Minichiello Bros./Scrap-It, Inc. HLL systems can be rigged overServes over 2500 customers a week and is one of New England’s largest Serves over 2500 customers a week and is one New England's largest buyers, buyers, sellers, and processors of scrap metal. Forour overgoal 60 years goal head or at foot level depending on sellers and processors of scrap metal. For over 60 years has our remained remained the same - to in provide the best along prices in thetop industry along with the same - tohas provide the best prices the industry with notch the hazard assessment and availtop notch service! Fred Rogers at 617-595-5505 customer service! Callcustomer Fred Rogers at Call 617-595-5505 able structure. Newer lifeline techMinichiello Bros./Scrap-It, Inc., nologies feature energy-absorbing Minichiello Bros./Scrap-It, Inc., components, lightweight synthetic Serves over 2500 customers a week and is one New England's largest buyers, cables, and user-friendly connecsellers and processors of scrap metal. For overa60week years ourisgoal Serves over 2500 customers and onehas Newremained England's largest buyers, tion mechanisms that enhance the same - to provide the best in theof industry along with notch sellers and prices processors scrap metal. Fortop over 60 years our goal has remained mobility and worker comfort withcustomer service! the Callsame Fred -Rogers at 617-595-5505 to provide the best prices in the industry along with top notch out compromising safety. Many customer service! Call Fred Rogers at 617-595-5505 systems are modular and portable, making them adaptable to evolving site conditions and reusable Turn your metal into money today! across multiple jobsites. Turn your metal into money today!
Minichiello Bros. Inc./Scrap-It Inc. Minichiello Bros. Inc.,/Scrap-It Inc.
70
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
Turn your metal into money today!
continued on page 71
MAY, 2025
Safety Corner continued from page 70 Horizontal lifelines also offer a smart solution where trenching or excavation is underway. Fall hazards from trench edges are often overlooked, yet they pose serious risk. Where guardrails or barriers may obstruct operations or be impractical due to site layout, HLLs can be installed along trench edges to offer continuous fall protection.
The Path Forward: To combat the persistent issue of falls in construction, it is imperative that industry stakeholders: • Conduct Regular Training: Ensure that all workers are trained in the proper use of fall protection equipment and are aware of the latest safety protocols. Knowledge is the first line of protection. • Invest in Modern Fall Protection Equipment: Adopt the latest technologies that offer enhanced safety features and ease of use. • Perform Routine Safety Audits: Regularly assess jobsites for potential fall hazards and implement corrective measures promptly. • Foster a Culture of Safety: Encourage open communication about safety concerns and involve workers in developing safety solutions.
MAY, 2025
•
Incorporate Safety by Design: During the project planning phase, identify fall hazards and integrate engineering controls to eliminate or minimize exposure. May's National Safety Stand-Down is an ideal time for contractors, supervisors, and tradespeople to recommit to fall protection. Whether it’s taking 15 minutes for a toolbox talk or investing in upgraded gear, these actions can save lives. By embracing modern solutions and fostering a culture of accountability, we can significantly reduce fall-related incidents and help ensure every worker goes home safely at the end of the day. n
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
71
Make Your Project Stand Out:
Expert Construction Signage Solutions
JOHN HOADLEY AND SONS, INC. WATERWORKS SPECIALIST
TEL:781-878-8098
Water-Sewer-Drain Supplies Vactor Service/Hydro Excavation
• Indoor/Outdoor Signage • Flyers/Brochures • Target Marketing • Direct Mail • Banners
Contact Ernie@websterprinting.com 781.447.5484
72
● 24/7 Emergency Service ● Plant Maintenance ● Catch Basin Cleaning ● Filter Media Removed from Tanks ● Lift Stations and Pump Chamber Cleaning ● High Velocity Water Jetting ● Clean Sewer and Drain Lines
T.V INSPECTION & SEWER MANHOLE AIR / VACUUM TESTING
www.hoadleyandsons.com
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
Protecting Public Health and Water Resources Through Testing, Monitoring, and Research Our water quality and wastewater programs provide testing, monitoring, and research in every stage of water use; from recreation, to drinking, to wastewater disposal. Drinking, Surface, and Ground Water
The Barnstable County Water Quality Laboratory
provides high quality analytical services to our region’s private residents and municipalities alike. Barnstable County Complex Accordingly, the Laboratory assists water depart3196 Main Street Barnstable, MA. 02630 ments on Cape Cod in meeting the monitoring reTel: 508-375-6600 quirements necessary for adherence to state and TESTING RESOURCES FOR CAPE COD RESIDENTS & BUSINESSES federal water quality standards. Water departProtecting Public Health and Water Resources through ments benefit from the flexibility of the Laboratory bathing beach water Cape-wide from Memorial Testing, Monitoring and Research to assist when periodic problems arise, such as Our water quality and wastewater programs provide testing, monitoring and research in every Day through Labor Day, annually. stage of water use; from recreation, to drinking, to wastewater disposal. the seasonal and transient occurrences of bacteWSurface astewater rial contamination in the water systems. Drinking, and Ground Water 15Water of Quality Barnstable County’s towns rely on to our The BarnstableAll County Laboratory provides high quality analytical services The Laboratory also provides analytical serregion’s private residents and municipalities alike. Accordingly, the Laboratory assists water a single source aquifer–the Cape Cod Aquifer– vices to owners of private drinking water wells. departments on Cape Cod in meeting the monitoring requirements necessary for adherence to state andfor federal water quality standards. Water departments from the flexibility of the 100% of their drinking waterbenefit needs, making Sample pick-up is provided in the towns of WellLaboratory to assist when periodic problems arise, such as the seasonal and transient effective wastewater management essential to occurrences of bacterial contamination in the water systems. fleet, Truro, Eastham, Brewster, Falmouth, and public health environmental inwater our wells. The Laboratory also provides and analytical services to owners protection of private drinking Mashpee. In 2021, the Barnstable County LaboSample pick-up is provided in the towns of Wellfleet, Truro, Eastham, Brewster, Falmouth and region. The Department does this through three ratory received over 16,000 samples and perMashpee. In 2021, the Barnstable County Laboratory received over 16,000 samples and performed over sustaining 87,000 analyses. programs: self formed over 87,000 analyses.
The Innovative/Alternative (I/A) Finally, the Laboratory supports Barnstable initiatives, including the Landfill Monitoring Program which providesSeptic surveillance of groundwater plumes beneath Cape Cod’s landfills and the Bathing Beaches Monitoring System Tracking Program assists towns County’s groundwater and recreational monitorProgram, which conducts collection, analysis and reporting of bathing beach water Cape-wide from Memorial Day through Labor Day annually. with monitoring their I/A septic systems at no ing initiatives, including the Landfill Monitoring cost. An internet database collects inspection reProgram, which provides surveillance of groundports and effluent monitoring results, and it also water plumes beneath Cape Cod’s landfills and allows regulators the ability to track compliance the Bathing Beaches Monitoring Program, which conducts collection, analysis, and reporting of continued on page 74 Finally, the Laboratory supports Barnstable County’s groundwater and recreational monitoring
MAY, 2025
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
73
Spotlight on Cape Cod continued from page 73 for 3,600 I/A systems across the Cape, Islands, and Southeastern Massachusetts.
Cape Cod AquiFund provides
an effective and efficient means of financially assisting area residents with often cost-prohibitive yet essential septic system requirements.
The Massachusetts Alternative Septic System Test Center is the nation’s premier
test-bed for academic institutions and private industry alike, diverting untreated wastewater from Joint Base Cape Cod where it is used to simulate residential wastewater influent. This allows for the active investigation and development of products that focus on nitrogen reduction to protect sensitive marine resources. n
Asphalt Paving • Excavating • Site Development Hot Mix Asphalt Lawrence-Lynch Corp.
White Bros. – Lynch Corp.
P.O. Box 913 • Falmouth, MA 02541
P.O. Box 155 • Oak Bluffs, MA 02557
396 Gifford Street • Falmouth, MA 02540
20 Vineyard Ave. • Oak Bluffs, MA 02557
PH 508-548-1800 • FX 508-457-1825
PH 508-693-0845 • FX 509-693-0312
Visit our website @ www.lawrencelynch.com
74
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
UCANE’S Employee Safety Manuals Your Company Must Have a Comprehensive Safety Program! This year’s Safety Manual includes information on: • Updated DOL Drug Testing information and Updated CDL information • Massachusetts Safety Standards - COVID-19 • OSHA’s Final Rule on Silica Exposure Limits • OSHA’s Final Rule on Improved Tracking of Workplace Injuries and Illnesses • OSHA’s Final Rule on Confined Space in Construction • OSHA’s New Requirements for Reporting Severe Injuries
EMPLOYEE SAFETY EMPLOYEE MANUAL SAFETY MANUAL
Promote a Safe Working Environment
It should be your company’s policy to provide a safe place to work, with the prevention of accidents being your ultimate goal. Your Insurance/Bonding carrier requires a Safety Program. State and Federal Agencies require a Safety Program.
OSHA Inspectors Will Be Enforcing:
• Overall Construction Safety (29 CFR 1926) • Excavating Standards • Written Safety and Health Plans
• Hazard Communications Programs • Drug Free Workplace • OSHA 10-Hour Training Requirements
Examine the UCANE Pocket Directory
When ordering Company Safety Manuals, the Safety Manual section only, in the back of UCANE’s Pocket Directory, will be made up into an individual Employee Pocket Safety Manual with Your Company Name and Logo printed on the cover. Employee signature cards verifying compliance with safety manual procedures are included. When signed, these cards should be placed in each employee’s file.
-----------------------------------------------------------------------------------------------------Employee Pocket Safety Manual Order Form
Company Name:___________________________________ Authorized By:________________________ Pocket Manuals w/Signature Cards: Qty.:____________ x $4.75 Ea. = $_________________________ 65.00 Printing and Set Up Charge for Personalized Covers: $_________________________ TBD Postage and Handling: $_________________________ Date:________________ Total: $_________________________ Company Logo enclosed
Company Logo to be mailed
My check is enclosed
Employee Pocket Safety Manuals are available to UCANE members only. PAYMENT MUST ACCOMPANY ORDER. Utility Contractor’s Association of New England, Inc. • 300 Congress Street, Suite 101 • Quincy, MA 02169
MAY, 2025
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
75
Advertisers’ Index 21st Century Concrete, Inc.................................................................... 76 Acrisure..................................................................................................... 13 ATS Equipment, Inc. .............................................................................. 66 Badger Daylighting................................................................................... 6 The Baldwin Group................................................................................. 61 Benevento Companies............................................................................ 62 B2W, A Trimble Company..................................................................... 15 Blue Collar Customs............................................................................... 20 Boro Sand & Stone Corp........................................................................ 15 Brennan Consulting................................................................................ 72 Dennis K. Burke, Inc............................................................................... 21 C&S Insurance Agency........................................................................... 28 Concrete Systems, Inc....................................................Inside Back Cvr. Core & Main............................................................................................... 4 Cumberland Quarry Corp..................................................................... 41 Dagle Electrical Construction Corp.................................................... 58 Darmody, Merlino & Co., LLP.............................................................. 62 Dedham Recycled Gravel....................................................................... 67 Dig Safe System, Inc................................................................................ 11 The Driscoll Agency................................................................................ 49 Eastpoint Lasers, LLC............................................................................. 27 T. L. Edwards, Inc.................................................................................... 31 Ferguson Waterworks............................................................................. 68 Genalco, Inc.............................................................................................. 34 Granite City Electric............................................................................... 22 L. Guerini Group, Inc............................................................................. 23 Henniker Directional Drilling, LLC...................................................... 9 Hinckley Allen LLP................................................................................. 30 John Hoadley & Sons, Inc...................................................................... 72 Industrial Safety & Rescue..................................................................... 71 JESCO........................................................................................................ 27 P. J. Keating Company............................................................................ 18 P. A. Landers, Inc..................................................................................... 36 Lawrence-Lynch Corp............................................................................ 74 Lorusso Corp............................................................................................ 48 Lorusso Heavy Equipment, LLC........................................................... 10 McGovern Ford of Framingham.......................................................... 54 Mersino Dewatering............................................................................... 32 Midwest Mole........................................................................................... 68 Milton CAT..............................................................................Back Cover Milton Rents............................................................................................. 43 Monroe Tractor........................................................................................ 19 National Trench Safety........................................................................... 44 Norfolk Power Equipment, Inc............................................................... 9 North American Crane & Rigging LLC.............................................. 24 North East Shoring Equipment, LLC................................................... 26 Northwestern Mutual............................................................................. 19 Ocean State Oil........................................................................................ 62 Pawtucket Hot Mix Asphalt.................................................................. 33 Podgurski Corp.......................................................................................... 8 E. J. Prescott, Inc................................................................ Ins. Front Cvr. Rain For Rent-New England.................................................................. 52 Read Custom Soils................................................................................... 59 Rutter Networking Technologies.......................................................... 17 Scituate Concrete Products Corp......................................................... 46 Scrap It, Inc............................................................................................... 70 Shea Concrete Products, Inc. ................................................................ 12 SITECH New England............................................................................ 14 Starkweather & Shepley Ins. Brokerage, Inc....................................... 16 Swenson Granite Company LLC.......................................................... 42 Taylor Oil Northeast............................................................................... 55 Tonry Insurance Group, Inc.................................................................. 50 TransCor................................................................................................... 23 United Concrete Products..................................................................... 56 Vortex Services........................................................................................... 2 F. W. Webb................................................................................................ 38 Webster Printing & Packaging.............................................................. 72 C. N. Wood Co., Inc. .......................................................................1 & 40 World Insurance Associates LLC......................................................... 59
76
“BUY FROM THE ADVERTISERS IN CONSTRUCTION OUTLOOK”
MAY, 2025
Concrete Systems, Inc.: Manholes & Catch Basins, Box Culverts, Utility Structures, Special Box Structures, Containment Vaults, Fire Cisterns, CSI Arc-Span™ Bridges, Rigid Bridge ™ Systems, Bridge Deck Slabs, Permanent & Temporary Median Barrier, Uwall™ Retaining Wall Systems, Stablewall™ Retaining Wall, Headwalls & Wingwalls. Clampcrete Construction Systems: TL-4 Anchored Barrier for Roadway Structures. Tunnel Systems: Precision Segmental Tunnel Lining Rings. Cleco Manufacturing: Precision Fabricated Forms & Forming Systems, Complete Plant Design, Batch Plant Computer Automation, Countercurrent Mixers & Concrete Delivery Systems.
CAT’S NEXT-GEN COMPACT TRACK LOADERS
RE-IMAGINED. FROM THE GROUND UP. +7.5 in
22%
MORE LIFT HEIGHT
OVERALL VOLUME
59%
LARGER REAR WINDOW
3,500 psi
22%
INCREASED HYDRAULIC SYSTEM PRESSURE
HIGHER LIFT BREAKOUT FORCE
19%
MORE TILT
+43%
15%
MORE TORQUE than 289D3 Cat C2.8TA engine
26%
ADDITIONAL FOOT SPACE
30 gal/min
INCREASED HYDRAULIC FLOW
24%
74.3 hp
265
ACROSS A WIDER RPM RANGE
INCREASE IN RATED OPERATING CAPACITY (ROC)
THIS IS THE CTL THAT CHECKS ALL THE BOXES. With more torque, giving you the power you need to get things done. Completely re-imagined, it delivers enhanced grading, ride and stability. And its new cab layout simply redefines operator comfort. This is the complete package of power, performance and comfort.
SEE FOR YOURSELF. CALL YOUR REP OR VISIT YOUR NEAREST LOCATION TODAY. MILFORD
BREWER
NORTH READING
RICHMOND
WAREHAM
LONDONDERRY
STOUGHTON
CRANSTON
100 Quarry Drive | (508) 634-3400 84 Concord Street | (978) 276-2400 14 Kendrick Road | (508) 291-1200 207 Page Street | (781) 399-8580
SCARBOROUGH
16 Pleasant Hill Road | (207) 885-8000
79 Robertson Boulevard | (207) 991-3100
0%
FINANCING AVAILABLE
*
INCLUDES A 2 YR./ 1,000 HR. MAINTENANCE PARTS KIT. INCLUDES A 2-YEAR/ 2,000 HR. STANDARD WARRANTY.
150 Cat Lane | (802) 434-7800 30 Industrial Drive | (603) 665-4500 2158 Plainfield Pike | (401) 946-6350
www.miltoncat.com
*CAT® machines sold by participating CAT dealers to customers in the USA or Canada. Purchase and delivery must occur during offer period. Offer subject to machine availability and credit approval by CAT Financial. Not all customers will qualify. Payments based on 36-month loan. Payments do not include taxes, freight, set-up, delivery, document fees, inspections, additional options, or attachments. The credit of up to $500 USD can only be applied towards the purchase of a qualifying CAT Customer Value Agreement (CVA) or qualifying Equipment Protection Plan (EPP). Amount of the credit cannot exceed the price of qualifying CVA or EPP. CVA must include 1-year preventative maintenance parts kit, TA1 annual inspection, signed CVA contract and Product Link®. Amount of credit towards CVA or EPP is the same for all models. In some areas, EPP might be sold separately from the CVA. Offer may change without prior notice and cannot be combined with any other offers. Additional terms and conditions may apply. Contact your CAT dealer for details.