Skip to main content

Construction Outlook April 2025

Page 1

APRIL | 2025

MassDOT Bridge Project over the Saugus River Includes Tricky MWRA Water Main Replacement

“Float & Sink” Operation for 20-Inch MWRA Water Line Alongside New $87M Belden Bly Bridge at the Saugus River


Turn static files into dynamic content formats.

Create a flipbook
Construction Outlook April 2025 by UCANE - Issuu