APRIL | 2025
MassDOT Bridge Project over the Saugus River Includes Tricky MWRA Water Main Replacement
“Float & Sink” Operation for 20-Inch MWRA Water Line Alongside New $87M Belden Bly Bridge at the Saugus River
![]()
APRIL | 2025
MassDOT Bridge Project over the Saugus River Includes Tricky MWRA Water Main Replacement
“Float & Sink” Operation for 20-Inch MWRA Water Line Alongside New $87M Belden Bly Bridge at the Saugus River