Skip to main content

Turner California Healthcare_2026

Page 1


WEST COAST HEALTHCARE

LEARN MORE ABOUT OUR SELF-PERFORM OPERATIONS TEAM

SELF PERFORM OPERATIONS

INCREASED CONTROL FOR SAFER, QUALITY OUTCOMES

At Turner, we recognize the value of self-performed work and its ability to give both us and our clients increased control over safety, quality, schedule, and budget.

OUR ADVANTAGE

Labratory & Casework

Equipment

Concrete

Drywall and Metal Stud Framing

Doors, Frames & Hardware

Rough and Finish Carpentry

We employ more than 2,500 skilled craftspeople.

Our skilled workforce, including electricians, ironworkers, carpenters, welders, and cement masons, delivers precise, high-quality construction backed by unmatched local expertise and nationwide resources.

Site & Landscape

Furnishings

Moduler Systems & Furniture

Metals and Equipment

Anchoring

Division 10

Specialists

Selective Demolition

1,169

Turner Employees in California

134

California NorCal SPO Professionals

TURNER ENGINEERING GROUP

ADDING VALUE TO THE DESIGN & CONSTRUCTION PROCESS

The Turner Engineering Group (TEG) provides design expertise and technical guidance to Turner’s projects, with a focus on both Design-Build and CM@Risk through all phases of design and construction. The group is comprised of 30 in-house experts including licensed and certified architects, engineers, designers, and building technologists (i.e. Design Specialists) with extensive design build experience.

WHAT DOES TEG PROVIDE?

TECHNICAL REVIEWS

TEG performs constructibility reviews, geotechnical reviews, mechanical/electrical system analysis, equipment review, document review, gap analysis, and more.

NATIONAL AWARENESS

TEG has the ability to gather data nationally to inform clients of material issues and system defects. Giving our clients the advantage of national information at a local level.

SMART ENGINEERING

TEG works with the design team and preconstruction team to come up with smart engineering options and opportunities that will not reduce the scope, aesthetics, or design integrity.

DETAILED SCOPE / SYSTEM ANALYSIS

TEG assists with the determination and selection of design assist and Design-Build subcontractors and creates a detailed scope/system analysis.

SCOPE

DEVELOPMENT FOR COMPLEX PROJECTS

TEG assists with scope development for complex packages such as geotechnical, structural frame, exterior facade, and mechanical,

SOURCEBLUE SUCCESS STORIES!

SourceBlue is known for adding value when is comes to procuring equipment, but did you know that SourceBlue has also successfully provided the following on many of their projects, saving upwards of 27% of total project volume? SEE

TRANSFORMING THE CONSTRUCTION SUPPLY CHAIN

WHAT

SOURCEBLUE DO FOR YOU? SOURCEBLUE

CAN

YEARS EXPERIENCE MANAGING GLOBAL SUPPLY CHAIN

STAFF SOLELY DEDICATED TO SUPPLY CHAIN SOLUTIONS

EQUIPMENT + PRODUCTS

25+

375+

$6B+

MANAGING COST CERTAINTY IN COMPLEX PROJECTS

PRECISION ESTIMATING FOR UNPARALLELED VALUE

BOTTOM UP ANALYSIS

We believe that true value is built from the ground up. Our Bottom-Up approach employs Target Value Design and Parametric Model-Based Estimating to deliver an exceptional level of cost certainty tailored precisely to every project’s specifications. By integrating detailed cost analysis with your exact programmatic needs, we ensure that every element of your project is optimized for both quality and value.

Our methodology fosters a highly collaborative, transparent process that puts your values first. We work closely with you and our design partners to create a framework where your vision leads the way. This synergy not only accelerates the project timeline but also squeezes maximum value out of every opportunity without compromising on quality.

When you partner with Turner, you’re choosing a team that doesn’t just construct buildings, we construct confidence. Our commitment to precision and collaboration ensures that your project is delivered with predictability and excellence.

The MemorialCare Saddleback Medical Center project target budget was $103 million, and the team successfully delivered $99.7 million at GMP, saving over $3 million. This was achieved through strategic measures including early electrical equipment orders, a right-sized emergency power plan, optimized structural systems, and smart flexibility in the chiller system, demonstrating true Target Value Delivery.

LEAN IN ACTION

RESOURCES BUILDING RENOVATION

The Resources Building Renovation (RBR) project in Downtown Sacramento is on track to finish two months early, thanks to TAKT planning.

SUCCESS WITH TAKT PLANNING!

On our RBR project, we prioritized intentional close collaboration early on with our MEP and Framing trades to establish a TAKT-based schedule. The result was a crew-loaded schedule based on phases that allow each trade to flow efficiently from zone to zone without high volatility in their crew size. On a 38 month schedule, we were able to reduce 2 months after the curtainwall trade went from on-floor spider crane to tower crane. With our preexisting TAKT schedule, the schedule savings was found and validated quickly.

LOCAL BUILDER NATIONAL RESOURCES

JAMES CANCER HOSPITAL & SOLOVE RESEARCH INSTITUTE

Columbus, Ohio

DENVER HEALTH OUTPATIENT MEDICAL CENTER

Denver, Colorado

HEALTH DIAGNOSTIC TREATMENT CENTER/ ICU VERTICAL EXPANSION

Miami, Florida

JOHN R. OISHEI CHILDREN’S HOSPITAL Buffalo, New York

LE BONHEUR CHILDREN’S HOSPITAL, CRITICAL CARE EXPANSION

Memphis, Tennessee

JACKSON
AUSTIN STATE HOSPITAL Austin, Texas
BAYFRONT HEALTH WOMEN’S CENTER
St. Petersburg, Florida
PENN MEDICINE PRINCETON MEDICAL CENTER Plainsboro, New Jersey
PROMEDICA TOLEDO HOSPITAL BED TOWER Toledo, Ohio
LIONS GATE HOSPITAL POWER PLANT REPLACEMENT North Vancouver, British Columbia
UNIVERSITY OF MARYLAND ST. JOSEPH MEDICAL CENTER PERIOPERATIVE SERVICES RENOVATION Towson, Maryland
UNIVERSITY OF TEXAS AT ARLINGTON SCHOOL OF SOCIAL WORK & SMART HOSPITAL BUILDING Arlington, Texas

UC Merced, Medical Education Building

Merced, CA

CLIENT

University of California, Merced

VOLUME

$22M

SIZE

200,000 sq. ft.

COMPLETION Fall 2026

PROJECT

DESCRIPTION

The Medical Education Building (previously identified as Health and Behavioral Sciences Medical Education, HBS-ME) is a new 200,000 sq. ft. building located on the University of California Merced Campus.

UC Merced is partnering with UCSF-Fresno on the UCSF San Joaquin Valley Program in Medical Education to recruit and train a new generation of healthcare professionals. The building will provide instructional facilities, classrooms, a community sample collection and analysis laboratory, developmental psychology intake laboratories, social sciences faculty research laboratories, clinical practicum spaces, and a café. The site will include hardscape, landscape, and a parking lot.

Kaiser Permanente San Rafael Replacement Hospital

San Rafael, CA

CLIENT

Kaiser Permanente

VOLUME

$500M

SIZE

211,000 sq. ft.

PROJECT DESCRIPTION

The Kaiser Permanente San Rafael Replacement Hospital project includes 211,000 sq. ft. of ground-up construction of a 5-story, 96 bed, OSHPD-1 hospital replacement tower and site renovations. Make ready work prior to constructing the tower includes decant of the existing General Services Building (GSB); that work encompasses relocation of several back of house departments, relocation of existing utilities and infrastructure that connect to or travel through the GSB, then demolition of the GSB itself. Following demolition of this existing building, site prep and routing for the new tower will occur, followed by construction of the new tower itself. The new tower will also include a pedestrian bridge connector to an existing parking garage, as well as corridor connections to adjacent Emergency Department and an OSHPD 1 jurisdiction Medical Office Building.

Laguna Honda Replacement Hospital

San Francisco, CA

CLIENT City and County of San Francisco

VOLUME

$460M SIZE

720,000 sq. ft.

COMPLETION 2012

PROJECT DESCRIPTION

Originally opened in the 1860’s as an alms house for the poor, the Laguna Honda Hospital is now one of 22 skilled nursing facilities in San Francisco. Turner is providing construction management at risk services for four new buildings totaling 720,000 sq. ft. and 1,200 skilled nursing facility beds, remodeling 200,000 sq. ft. and demolishing six major buildings exceeding 300,000 sq. ft. Services to be provided at the new Laguna Honda are skilled nursing care, hospice, rehabilitation, acute medical and rehabilitation, senior nutrition and adult daycare health. Work is taking place around an existing, operating facility.

UC Davis Health System North Addition Office Building

Davis, California

CLIENT

University of California, Davis

VOLUME

$64M

SIZE

133,000 sq. ft.

COMPLETION

December 2018

PROJECT DESCRIPTION

Located on an operating academic health campus, the 33,000 sq. ft. sixstory North Addition Office Building is located immediately adjacent to the main teaching Hospital tower. The building includes a 335-seat auditorium, conference center, hospital command center, and exterior courtyard. Ranked as a top teaching hospital, the executive suites offer sweeping views of Sacramento and feature high-end finishes. The building is LEED Platinum Certified with 83 LEED points, making the North Addition Office Building one of the greenest buildings on the UC Davis Health campus.

“THE TURNER TEAM ESTABLISHED A SPIRIT OF COLLABORATION FROM THE BEGINNING THAT MADE IT POSSIBLE FOR ALL OF US TO FACE CHALLENGES AND STILL HAVE A GOOD TIME WHILE WE WERE DOING IT.“
THOMAS EMME, FORMER MANAGER FACILITIES DESIGN AND CONSTRUCTION UC DAVIS HEALTH SYSTEM

UCSF Benioff Children’s Hospital Oakland Outpatient Center 2

Oakland, California

CLIENT

UCSF Benioff

Children’s Hospital

Oakland

VOLUME

$64M

SIZE

77,000 sq. ft.

COMPLETION

Feburary 2018

PROJECT DESCRIPTION

UCSF Benioff Children’s Hospital Oakland’s new Outpatient Center 2 provides care for thousands of patients. Across 77,000 sq. ft. this new transformative facility includes six floors dedicated to medical clinics, as well as one floor dedicated to building services, parking, and circulation from the parking structure. The clinical space includes exam, treatment, laboratory, support, and administrative functions. This project is OSHPD-3 and LEED Silver certified, marking a groundbreaking milestone in efficient and environmentally conscious healthcare infrastructure.

Sutter Healthcare Mills-Peninsula Health Services

Mills-Peninsula Medical Center

Burlingame, California

CLIENT

Sutter Healthcare

Mills-Peninsula Health Services

VOLUME

$494M

SIZE

300,000 sq. ft.

COMPLETION

Feburary 2011

PROJECT DESCRIPTION

The Mills-Peninsula Medical Center project is an acute care medical center serving the San Francisco / Bay Area community. Due to the near by earthquake faults, this project was built to meet stricter California earthquake safety standards. It is one of the first hospitals in Northern California to use an advanced engineering technology called base isolation that provides the highest level of seismic safety. The medical center includes a 450,000 sq. ft. 6-story hospital with 311 beds and ten operating rooms, an 180,000 sq. ft. professional (medical) office building, and a 300,000 sq. ft. 4-story parking garage, plus countless energy-saving and earth-friendly features such as energy-efficient ventilation, and architectural design to take full advantage of natural daylight to cut energy use for lighting and heating.

“TURNER HAS EARNED THE RESPECT OF OSHPD FIELD STAFF AND OUR IOR TEAM. I COMMEND THEIR EFFORTS AND STRONGLY RECOMMEND TURNER FOR YOUR PROJECT.”
LARRY KOLLERER PROGRAM MANAGER, SUTTER HEALTH

KAISER PERMANENTE SPECIAL PROJECTS

Various Locations, California

Turner’s very first project in the Bay Area was the Kaiser Permanente Ordway building located in downtown Oakland. Since then, Turner’s Kaiser portfolio has grown to include a significant amount of renovation, expansion, and modernization projects across California. From medical office buildings to laboratories and surgery suites, Turner has performed essential improvements in active healthcare facilities and campuses.

A sampling of these projects include:

• Kaiser Antioch IR Suite

• Kaiser PTC Café

• Kaiser Richmond Decompression Lab

• Kaiser Santa Rosa BHC

• Kaiser Walnut Creek Med Surge

• Kaiser Walnut Creek RTPT

• Kaiser Irvine Med Surge & NICU

• Kaiser Patient Lift Program

• Kaiser Fire Alarm Program

Kaiser Permanente Special Projects

Various Locations, California

INTERVENTIONAL RADIOLOGY (IR) SUITE

Antioch, California

PROJECT FEATURES

Renovation

Specialized Equipment Install

Active Hospital

Technology Campus café

Pleasanton, California

PROJECT FEATURES

Renovation

High-end Finishes

Kitchen and Food Service

Active Campus

KAISER PERMANENTE SPECIAL PROJECTS

Various Locations, California

DECOMPRESSION LAB

Richmond, California

PROJECT FEATURES

Renovation

Laboratory & Office Space

SourceBlue Integration

Active Healthcare Facility

BEHAVIORAL HEALTH CENTER

Santa Rosa, California

PROJECT FEATURES

Renovation

Therapy Rooms

LEED Gold Certified

KAISER PERMANENTE SPECIAL PROJECTS

Various Locations, California

MEDICAL SURGERY EXPANSION

Walnut Creek, California

PROJECT FEATURES

Demolition & Renovation

Medical Surgery Nursing Unit

Active Healthcare Facility

RESPIRATORY THERAPY REHABILITATION RENOVATION

Walnut Creek, California

PROJECT FEATURES

Renovation

Inpatient Physical Therapy

Active Healthcare Facility

KAISER PERMANENTE SPECIAL PROJECTS

Various Locations, California

MED SURGE & NICU EXPANSION

Irvine, California

PROJECT FEATURES

Multi-floor Renovation

Central Utility Plant Expansion

Active Healthcare Facility

SPECIALTY MEDICAL OFFICE BUILDING

Santa Clarita, California

PROJECT FEATURES

Multi-floor Renovation

Multiple Floors

Urgent Care Services

Keck Medicine of USC Outpatient Facility

Pasadena, CA

CLIENT University of Southern California

VOLUME

$170M

SIZE

103,000 sq. ft.

COMPLETION June 2025

PROJECT DESCRIPTION

New 103,000 sq. ft. four-story medical office building (MOB) for Keck Medicine of USC. This multi-specialty, off-campus facility will include an ambulatory surgery center (ASU), linear accelerator, imaging center, endoscopy center, specialty clinics, oncology treatment center, and professional administrative offices. The building will also contain three levels of subterranean parking, a rooftop garden, and support spaces including a loading dock. Specific spaces including the ASU, oncology centers, and certain clinics will be licensed as outpatient services and designed and constructed in compliance OSHPD 3 standards.

Kaiser Murrieta Ambulatory Surgery Unit (ASU)

Murrieta, CA

PROJECT DESCRIPTION

Turner provided preconstruction, design assist, and construction services for this two-story, 89,500 sq. ft. Ambulatory Surgery Unit (ASU) on Kaiser Permanente’s Murrieta healthcare campus. The facility includes six operating rooms with ortho capability (two shelled), a fiveroom procedure center, a 44-bay post-anesthesia care unit (PACU), a 14-bay chemotherapy, infusion center, and a USP 800 compounding pharmacy. Additional spaces include 18 provider offices with 26 exam rooms, a breast center, ophthalmology department, and MRI unit.

CLIENT Kaiser Permanente

VOLUME

$121M

SIZE

89,500 sq. ft.

COMPLETION

January 2023

Saddleback MemorialCare Women’s Health Pavilion

Laguna Hills, CA

CLIENT

Saddleback Medical Center

PROJECT DESCRIPTION

The Women’s Health Pavilion at MemorialCare Saddleback Medical Center (SMC) is a modern, 42,000 sq. ft. three-story facility that replaces a 40-year-old structure and advances women’s healthcare in Southern California. Designed to streamline a full spectrum of services, the Pavilion includes the Sarah & Taylor Nederlander Breast Center, Orange County’s only fully integrated breast center, featuring 3D mammography, breast ultrasound, and MRI, along with oncology, obstetrics, women’s health, and mental health services.

42,000 sq. ft.

COMPLETION

April 2024

Built on a constrained, active campus, the project required carefully phased construction to maintain uninterrupted care, including partial demolition, enclosure of the existing structure, new construction, and service transitions.

Turner partnered with c|a architects to deliver the project through a progressive design-build approach, addressing complex utility re-routing and site challenges while creating a patient-centered facility for the Laguna Hills community.

University of California, Riverside Student Health and Counseling Center

Riverside, CA

CLIENT

University of California, Riverside VOLUME

$28M SIZE

39,450 sq. ft.

COMPLETION

August 2023

PROJECT DESCRIPTION

Design-build services for a new two-story health center that includes exam rooms, an urgent care center, full service laboratory, pharmacy, radiology office and counseling spaces. The building also includes a conference room, offices, and gathering spaces for workshops and classes. The conference room opens into a courtyard that overlooks the interior of the campus while the building provides views of the Box Springs Mountains in the background. It’s part of a design that emphasizes connections to nature and a heavy use of natural lighting. The University’s goal for the project was to create a central hub for all things related to student health and wellness with a focus on multidisciplinary services, health education, and prevention.

LEED Silver certified.

Miller Children’s Hospital Cherese Mari Laulhere Children’s Village

Long Beach, CA

CLIENT Memorial Health Services/Miller Children’s & Women’s Hospital

VOLUME

$53M

SIZE

80,000 sq. ft.

COMPLETION December 2020

PROJECT DESCRIPTION

The Cherese Mari Laulhere Children’s Village is an innovative, 80,000 sq. ft. four-story LEED-Certified building that brings together 36 different pediatric specialties, allowing children and their families to receive all of their healthcare needs in one location. In addition to pediatric care, families also have access to a pharmacy, laboratory, imaging services, indoor and outdoor gyms for various age groups, a daycare, and a family resource and education center.

The entire project was developed with lean concepts, using pull planning across the entire Design-Build team; Conditions of Satisfaction; big room team coordination meetings; and the crafting of full-sized mock-ups of nearly all treatment spaces, all within a 30,000 square foot outdoor tent.

Emanate Health Queen of the Valley

West Covina, CA

CLIENT

Emanate Health

VOLUME

$88M

SIZE

60,000 sq. ft.

COMPLETION

April 2026

PROJECT DESCRIPTION

Turner provided preconstruction and construction services for a new 60,000 sq. ft. two-story OSHPD-certified Emergency Department and Intensive Care Unit at Queen of the Valley Hospital. The expansion increases the hospital’s capacity from 325 to 349 beds and supports 24/7 emergency and critical care services. The first floor includes a full-service Emergency Department with 60 treatment bays, MRI and CT scanner, two X-ray rooms, and a pneumatic tube system, while the second floor houses a 24-bed Intensive Care Unit.

Scope included demolition of an existing imaging building and extensive upgrades to site utility infrastructure, including fire water, domestic water, sewer, storm drain, underground tanks, and a storm retention system.

Mechanical and electrical systems included a new emergency generator, four air handling units, a chiller, and rooftop mechanical and electrical equipment.

Kaiser Bellflower Radiation Oncology Center

Bellflower, CA

PROJECT DESCRIPTION

Turner provided preconstruction and construction services for a new 32,000 sq. ft Radiation, Oncology and Imaging

MOB, making it the second project for Turner on the Kaiser Permanente Bellflower Medical Center Campus. The Radiation Oncology Center (RadOnc) building, a rectilinear structure with Porcelanosa tiles, contains three linear accelerators and a Halcyon unit.

Additional facilities include a CT scan room, eight provider offices and ten exam rooms. Connected to the RadOnc via a structural slip joint, the Imaging building is a progressive radius structure clad in curtain wall. The facility hosts three MRI machines and associated support spaces.

CLIENT Kaiser Permanente

VOLUME

$45M

SIZE

32,000 sq. ft.

COMPLETION November 2023

Kaiser Intuit Dome Sports Medicine Clinic

Inglewood, CA

CLIENT Kaiser Permanente

VOLUME

$11.5M

SIZE

17,000 sq. ft.

COMPLETION

August 2025

PROJECT

DESCRIPTION

Turner provided design-build services for a 17,000 sq. ft. physical therapy and rehabilitation clinic located within the Administrative Building at Intuit Dome. The facility is designed to serve both public and athlete clientele, integrating clinical treatment spaces with supporting program areas to deliver outpatient care services.

The project included interior buildout of clinical space within a larger mixed-use facility, requiring coordination of building systems and layouts to support rehabilitation and therapy functions. The design balances clinical functionality with a high-quality environment tailored to patient experience.

Temecula Valley Hospital

Temecula, CA

CLIENT Universal Health Services

VOLUME

$150M

SIZE

178,000 sq. ft.

COMPLETION

July 2013

PROJECT DESCRIPTION

Turner provided preconstruction and construction services on The Temecula Valley Hospital. The new 140 bed, five-story, 178,000 sq. ft. hospital was built on a 37-acre site. The hospital features all private rooms, a 20-bed intensive care unit (ICU), high-tech surgical suites, emergency services, and an advanced electronic clinical information system.

The delivery method was a highly collaborative, Integrated Project Delivery (IPD). The IPD delivery method promoted and facilitated strategic planning, design, construction, start up and turnover of the project through the principles of collaboration and lean project delivery. The collaborative effort resulted in a 25% decrease in design time from concept to permit, and a 20% reduction in cost from the historical market average.

Kaiser Irvine Medical Center

Irvine, CA

CLIENT

Kaiser Permanente

VOLUME

$65M

COMPLETION

August 2019

PROJECT DESCRIPTION

The OSPHD project included build-out of shelled space on the fifth and sixth floor for 96 medical surgical beds. NICU was a 13,000 sq. ft. expansion for 20, Level 2 bassinets. Scope included expanding the central utility plant chiller and condenser capacity by 1500 tons. Tie-ins were done during the off-peak season to mitigate impacts. The plant was also recommissioned.

SACRAMENTO

2500 Venture Oaks Way, Suite 200

Sacramento, CA 95833

WALNUT CREEK

100 Pringle, Suite 340

Walnut Creek, CA 94596

SAN FRANCISCO

100 Bush Street, Suite 510

San Francisco, CA 94104

SILICON VALLEY

691 S Milpitas Boulevard, Suite 202 Milpitas, CA 95035

FRESNO

8050 N Palm Avenue, Suite 108 Fresno, CA 93711

@turnerconstructioncompany

@turner_talk

@turner_california

turnerconstruction.com

Turn static files into dynamic content formats.

Create a flipbook
Turner California Healthcare_2026 by TurnerWestCoast - Issuu