Skip to main content

Portfolio for UCL MArch AD - Chun Rui Huang

Page 1

PORTFOLIO

Chun Rui Huang 2021-2025 University College London Architectural Design MArch Application Student Number: 26126037


Changeable Cardiff University, Welsh School of Architecture Year 3 Project Type: Academic Location: City Road, Cardiff Sector: Mixed-use residential Date: Jan - May 2024 (5 Months)

Nearby Terrace Houses

Degree of Modification Paint Reapply Finish Major Changes (e.g.: Extension, Brickwork)

Residential Category Houses Mixed Use Houses Apartment

CONTENTS CHANGEABLE

01/2025 - 05/2025 (5 Months) BSc Y3 Final Project

2

Build Height

AGAR GROVE ESTATE TECHNICAL STUDY 8 09/2023 - 01/2024 (4 Months) BSc Y3 Technical Study

REIMAGINING DE LOODSON

10

CHEPSTOW MARKET SQUARE

11

KOMOREBI

12

12/2023 - 01/2024 (2 Months) BSc Y3 Exercise

01/2023 - 05/2023 (4 Months) BSc Y2 Project

09/2022 - 01/2023 (4 Months) BSc Y2 Project

TREEHIVE

06/2024 - 11/2024 (6 Months) External Competition

CDA GROUP WORKS

09/2024 - 08/2025 (1 Year) Part 1 Work Experience 2

14 15

Residential Buildings

Seeing shops getting replaced and new buildings getting built in the area, the aspect of change around the area is explored in the design. As a further study, the majority of the surrounding terrace houses are observed to be modified or changed by their owners. The functional requirement of the brief is to provide 50 homes on the site, where there is a road dividing it and also existing buildings neighbouring it. This reminded me on Aldo Rossi’s view of a city’s form as a collective of its monuments, which represents its permanent. Thus the project hopes to create a permanent framework in which the contents can be changed and modified to accommodate future needs and change along time. 2


Massing Studies

Dimensions Study

Building Name Mirador Building

Flat

Analyzing precedents’ layouts

Schots 1+2

8‐House

Kop van Zuid Housing Complex

Development Directions

Average Average per person

1.1 1.2 2.1

Type A WoZoCos

Allowing change of sizes by merging

3.1

3 Duplex 3 Duplex 4 Flat 4 Flat 3 Flat 3 Flat 3 Flat 3.333333333

Average Average per person

Average Average per person

- Less flexible - Smaller size - Less imposing Material Study 1

- Angled unit - Circulation feels detached - Tall and imposing Lobby palette

- Challenging construction - Simple geometry too imposing

Average Average per person

Average Average per person

Bedroom

Balcony

LDK

Bathroom

type 3 Duplex 3 Duplex 4 Triplex

3.2 5 6 7 8 9

1 2

4 Flat 4 Flat

3

4 Duplex

5

4 Duplex

1 2

4 Duplex 4

1

4 Flat

2 3

4 Flat 2 Flat

4

4

4

Flat Layouts

Occupant

4 Flat 3.5

1 2 3

2 Flat 3 Flat 3.125

Double Bedroom single bedroom Kitchen Toilet LDK length area width length area width length area width length area width length area 2.7 11.88 2.5 2.5 6.25 2.5 3.2 8 2.5 1.5 3.75 3.3 11.88 3.3 2.5 8.25 2.7 3 8.1 2.2 1.6 3.52 3 15 4.2 2.2 9.24 2.4 2.2 5.28 2.4 1.5 3.6 0 4.2 2 8.4 0 2.5 1 2.5 5 2.4 12 3.7 2.4 8.88 3.4 2.3 7.82 2.2 1.6 3.52 0 0 0 1.6 1.6 2.56 3.4 3.5 11.9 5 2.4 12 2.5 3.4 8.5 1.7 1.6 2.72 3.8 3.4 12.92 4 2 8 3 2.6 7.8 2.4 1.5 3.6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4.2 3.05 12.59667 3.842857 2.285714 8.717143 2.75 2.783333 7.583333 2.1875 1.4875 3.22125 6.298333 8.717143 2.275 0.966375 4.6 2.8 12.88 4.6 2.8 12.88 2.8 2 5.6 2.6 2.6 6.76 4.2 2.9 12.18 3.6 2.9 10.44 2.8 2.1 5.88 2.7 2.6 7.02 0 4.1 2.2 9.02 0 0 4.4 2.7 11.88 2.7 2.7 7.29 3.4 2.6 8.84 2.6 2 5.2 0 3.2 2 6.4 0 0 4.8 3.4 16.32 0 4 2.6 10.4 2 1.6 3.2 4.8 2.6 12.48 0 0 1.2 1 1.2 4.56 2.88 13.148 3.64 2.52 9.206 3.25 2.325 7.68 2.22 1.96 4.676 6.574 9.206 1.92 1.169 4 2.7 10.8 0 4 1.8 7.2 2 2 4 4 3.2 12.8 0 2.1 2.2 4.62 2.2 1.4 3.08 4 3.4 13.6 0 0 0 4 3.1 12.4 0 3.05 2 5.91 2.1 1.7 3.54 6.2 0 1.4775 0.885 4 3.5 14 4 2 8 0 2.5 2 5 4.8 10.5 50.4 0 4 2.5 10 0 0 0 6 4 24 4.5 2 9 4.5 2 9 3 2 6 0 0 4 2.5 10 0 0 4.8 12 57.6 0 3.5 2.5 8.75 0 0 0 5 3.4 17 3.4 2.5 8.5 2.3 3.1 7.13 3 2 6 0 0 4.2 2.7 11.34 0 0 0 5 3.633333 18.33333 3.942857 2.385714 9.37 3.4 2.55 8.065 2.833333 2 5.666667 4.8 11.25 54 9.166667 9.37 2.304286 1.619048 15.42857 3.8 2.7 10.26 0 2.5 1.8 4.5 2.2 1.5 3.3 3.8 2.7 10.26 3.5 2 7 3.2 2 6.4 2.2 1.5 3.3 4 3.5 14 0 3.5 2 7 2.5 1.5 3.75 3.866667 2.966667 11.50667 3.5 2 7 3.066667 1.933333 5.966667 2.3 1.5 3.45 5.753333 7 1.909333 1.104

width

4.4 3.6 5

Type B

Extend

Lighting Study

Material Study 2 Effects of natural lighting in lobby

Adjustable model Brown-based interior

Balcony Modifications

Red-based interior Communal Deck

Terracotta tiles

Granite

Plaster and brick allow facade to be modified like terrace houses Alternative Scenarios

As-built

Modifying process

Modified Residential

Retail Conversion

1:250

Wheelchair Accessible Home

Retail Conversion

Office Conversion

3


Components

Lower: Public/Communal Upper: Private/Residential Facade Grid

Changeable parts Cores

City Road

4

Circulation Core

Service Cupboard

Access Deck

Type A Flats

Service Risers

Type B Flats


2/F AS-BUILT

2/F MODIFIED

Layout without input from other designers

Indicative layouts of future architect’s designs

0m 1:400

5m

10m

25m

0m 1:400

5m

10m

25m 5


SECTION With indicative future rearrangements

Key Plan

0m 6

1:400

5m

10m

25m


LIGHTING STUDY

1:50 SECTION

To decide the as-built configuration for the window and balcony opening, a model is built to study the lighting quality and material choices

Indicative user-defined facade after modifications Concrete Structure

1:10 GREEN ROOF DETAIL

As-built External Wall 105mm Bricks 120mm Rock mineral wool insulation Breather membrane, Airtightness Barrier 24mm Cementious Board 120mm Rock mineral wool insulation Vapour Barrier 2x15mm Gyproc SoundBloc Plasterboard, 10mm acoustic plaster finish Foundation Ground Floor (610mm) 50mm Tiled flooring system Screed 250mm Mineral Wool Insulation Damp-proof membrane 250mm Concrete Slab Separating Foil 50mm Lean Concrete

Roof Construction (U-value: 0.113) 315mm Bauder Green Roof System* 250mm insulation 2mm Air and vapour control layer 250mm Reinforced concrete slab Suspended 2x15mm Gyproc SoundBloc Plasterboard with 70mm air cavity

Since the flats will not extend onto the roof, a concrete slab is used to cap off the structure and also provide stronger structural support for the green roof, a thermal break is also added to prevent heat bridging through the slab to column connection.

*300mm BauderGREEN SUB-BM UK biodiverse substrate, 1mm BauderGREEN FV 125 100 filter fleece, 40mm BauderGREEN DSE 40 drainage board, 8mm BauderGREEN FSM 1100 protection layer, BauderGREEN PE 02 separation and slip layer, 5mm BauderPLANT E Bitumen cap sheet, 3mm BauderTEC KSA DUO underlay with adhesive

0m 0.5m 1m

2m

7




Agar Grove Estate Technical Study Cardiff University, Welsh School of Architecture Year 3 Project Type: Academic, Technical Study Location: London, England Sector: Residential Date: Sep 2023 - Jan 2024 (4 Months)



  



  





 





    

 









 



As the largest Passivhaus scheme in the country, Agar Grove Estate provides insight into how medium/large scale developments meet building regulations and standards, and their relevant sustainability strategies. While concrete is used for structural strength, the carbon footprint is offset by the shorter construction and the low operation cost of the building. The prioritization of the facade allows high airtightness and thermal insulation, which is then paired with MVHR system and PV panels on the roof to further reduce operational energy.

1:20 Balcony Detail (1:10 @A1)





  



Figure 1: Dixon, B. and White, R. (2022) ‘Project Documentation Gebäude-Dokumentation: 38 Unit apartment building at Agar Grove, Camden, London’. Passive House Institute.

  



Thermal Performance External Wall

U-value: 0.165W/m^2K Required: 0.26W/m^2K Roof

External leaf of, variously, brick or P-clad brick slip or followed inside by 150 mm cavity fully filled with mineral fibre insulation (includes height waiver for installation), 200 mm Thermalite Hi strength 7kN AAC block work with 10-15 mm parge coat to outer face as airtightness layer, internal stud lining (thickness varies). Low thermal conductivity brick wall ties fixed into the blockwork through the insulated cavity wall. Window

U-value: 0.7W/m^2K

Required: 1.6W/m^2K

U-value: 0.085W/m^2K Required: 0.16W/m^2K

   

Bauder extensive biodiverse/brown seed roof with Flora 3 seed mix (mix of sedum and plug plants suitable for an urban living roof as per planning requirements). Bauder PIR insulation under growing medium varying from 140 mm to 270 mm thickness for drainage and falls and sitting on vapour control membrane and 250 mm concrete slab.

Foundation

 

U-value: 0.252W/m^2K   

Triple low-e glazing filled with inert gas. Wooden window frames with 150mm compacted base followed above 50mm of sand binding, insulated frame made of integrated polyurethane foam shells (CO2 250mm concrete slab, RIW gas seal blue DPM, Jablite classic EPS135mm, 75mm screed, varied floor finishes. foamed, CFC-free).

   

Camden council (no date) Development plan documents - camden council, Camden Council: Local Plan Documents. Available at: https://www.camden.gov.uk/local-plan-documents (Accessed: 10 January 2024). Dixon, B. and White, R. (2022) ‘Project Documentation Gebäude-Dokumentation: 38 Unit apartment building at Agar Grove, Camden, London’. Passive House Institute.

Material & Sustainability

Clay Bricks

Mineral Fibre Insulation 8

Easy to assemble, Light density, Non-combustible, Low air permeability, High thermal and sound insulation

Up to 80% made from power station waste (pulverised ash) and fully recyclable. Low density reduces carbon footprint of transportation. Thermal insulating property and low air permeability improves building’s thermal performance.

Easy to assemble, non-combustible, High thermal and sound insulation.

up to 60% made from recycled material, and recyclable if uncontaminated. Easy assembly reduced carbon footprint of construction. Thermal insulating property improves building’s performance.



  





  

 



Up to 80% made from power station waste (pulverised ash) and fully recyclable. Low density reduces carbon footprint of transportation. Thermal insulating property and low air permeability improves building’s thermal performance.

Easy to assemble, light density, Non-combustible, Low air permeability, High thermal and sound insulation



Thermalite AAC Blockwork



Unrecyclable and Unreusable. The carbon footprint is expected to be offset by shorter construction time and low operating energy of the building. Aggregates of concrete mix is to be more environmentally friendly. Thermal break stops heat-bridging from cantilevering balconies



Reinforced concrete High flexibility, Strong, Durable, Easier installation, Faster construction time



Sustainability Considerations



Properties

 



Material











Figure 2: Architype (2015) Window Detail - 1st Floor Juliet Balcony, Camden Council: Planning: Case File: 2015/3601/P. Available   at: https://camdocs.camden.gov.uk/CMWebDrawer/PlanRec?q=recContainer:%222015/3601/P%22. 





 


Agar Grove Estate Technical Study

Acoustic

1:15 Roof/Parapet Detail EWS-802 E W S - 80 2 Glass reinforced concrete coping. Colour matched to fibre cement.

PAM to coordinate height of parapet

K11 K 11 Timber window board DPM MAC-702 M A C - 7 02 Cavity closer 52330

F30/260A F 3 0 / 2 6 0A Masonry support system with pistol brick - to specialist consultant design

Assumptions Made

The double bedroom is investigated as noise greatly affects sleep thus acoustics have more importance in it than in other rooms in apartments. The double bedroom also outnumbers single bedrooms in the apartments thus considered to be more useful to investigate it.

The room is observed to have plasterboard as its exterior wall finish and ceiling where air space is located above the ceiling plasterboard and 50mm glass fiber sound insulation is located behind the plasterboard of exterior wall. The flooring is observed to be a layer above the concrete structure. As there is a lack of information regarding the composition of interior walls, its surface is assumed to have same composition as the exterior wall's internal finish. The lack of information regarding individual flooring also lead to assumption concerning its material.

Copyright Hawkins\Brown Architects No implied licence exists. This drawing should not be used to calculate areas for the purposes of valuation. Do not scale this drawing. All dimensions to be checked on the site by the contractor and such dimensions to be their responsibility. All work must comply with relevant British Standards and Building Regulations requirements. Drawing errors and omissions to be reported to the architect. To be read in conjunction with Architect's specification and other consultant information. Rev P1

I - A - FPL

Room Studied

Room Size: Room Volume: Suitable Max Reverberation Time:

Description Issued for Coordination

Date 20/07/21

Masonary support strategy in abeyance pending confirmation by HPL

3900mm x 3400mm x 2600mm 34.476 m^3 0.6s (Metric Handbook Table XX)

EWS-591 E W S - 59 1 Weather resistant board mechanically face fixed to RC upstand RC upstand to SE specification and details

Q37/130A Q 37/ 130A Brown roof seed mix on substrate and drainage board. Refer to Landscape Consultants information Protection mat PPC aluminium cill PIR Warm Insulation

MBR-105 M B R - 1 05 Clay facing brickwork. Colour purple.

RFS-153 R F S - 15 3 Torch Applied Bitumen

Using Sabine’s Formula,

PIR Warm Roof Insulation Bauder VCL

(Not to Scale)

I - A - LRF 51357

Vegetation Barrier

Material

Thermal Break to SE specification

RC slab cast to 1:60 falls as per SE details and specification

MAC-535 M A C - 5 35 Waterproofing - DPC_Cavity Tray

RC Concrete Slab to stuctural engineer's design

F30/132A F 3 0 / 1 3 2A Non-combustible weephole

125

250

500

1000

2000

4000

Layer of rubber, cork, linoleum + underlay, or vinyl+underlay stuck to concrete

0.02

0.02

0.04

0.05

0.05

0.10

13.26

2 x 13mm plasterboard on steel frame, 50mm mineral wool in cavity, surface painted

0.15

0.01

0.06

0.04

0.04

0.05

37.96

Plasterboard on frame, 100mm airspace

0.30

0.12

0.08

0.06

0.06

0.05

13.26

Agar Grove Phase 1c Block I

Drawing

Scale @ A1

1:5

3

Drawn By

Date

06/22/21

Frequencies (Hz) Checked By

CM

Figure 3: Hawkins/Brown (2021) Typical Roof Detail - Brown Roof Parapet, Camden Council: - High at: Point Planning: LRF CaseParapet File: Available https://www.camden.gov.uk/local-plan-documents (Accessed: 2 1:5 10 January 2024).

Heat break on concrete to prevent heat-bridging Thicker concrete slab to carry dead load of soil. Opening at low end into hopper, allowing drainage (Not shown on figure 3) Plasterboard finishes for the building’s interior.

Sa Coordination

Status

1423-C

S1

Drawing No.

125

250

500

1000

2000

4000

9.9372 2.236

3.8868 2.977

2.977

3.887

0.0558 2.482

1.435

1.852

1.428

2.5 2

JW

Job Number

Purpose of Issue

Rev

P1 Reverberation Time

AGV-HBA-I-06-DR-A-270408

3400mm

Reverberation time in relationship to noise frequency

Spacer / packer

EWS-601 E W S - 60 1 15mm Parge Coat

2600mm

3900mm

Typical Roof Details - Brown Roof Parapet

MBL-121 M B L - 12 1 AAC blockwork - density to S.E specification IIWS-101 W S - 10 1 15mm Plasterboard

Project

Area (sq. m)

1.852

Seconds

155

F30/260A F 3 0 / 2 6 0A Masonry support system with pistol brick - to specialist consultant design

Frequencies (Hz)

1.5 Reverberation Time

1 0.5 0

125

250

500

1000

2000

4000

Frequency (Hz)

Result of Reverberation Time Analysis The room suits the max reverberation time when the noise frequency is at 125Hz The frequency of male and female speech are 80-155Hz and 165-255Hz level. Higher frequency noises have reverberation time higher than that of the respectively, which is most likely to be the majority of sound in the room. The requirement. This is likely to be a result of assumption for room surface materials. room might not be able to reduce the sound level as quick as the reverberation 9 time peaked at 250 Hz.


Reimaging De Loodsen

Private - Apartment

Cardiff University, Welsh School of Architecture Year 3 Project Type: Academic Location: Amsterdam, Netherlands Sector: Residential Date: Dec 2023 - Jan 2024 (2 Months)

The apartment spaces are arranged with consideration to their degree of privacy and cleanliness. The spaces are designed to allow direct connection to each other. The circulation to bedrooms are integrated with bookshelves to create a side function of a reading area. The strip of outdoor space removed windows from the building facade to allow user more freedom in their expression to the public.

Part of a larger group study of residence typology in Amsterdam, the study first looks into the structure and organisation strategies of 4 different buildings with simplified diagrams and photography of their appearance.

Degree of privacy

The diagrams of different buildings are then swapped between groups to be redesigned individually. Focusing on a new lobby, and a repeatable apartment layout surrounding a theme, in which I’ve chosen “user expression”. Degree of cleanliness

De Loodsen photograph (Not by me)

1:100 Apartment plan (1:50@A1)

1:1000 De Loodsen diagram (Not by me)

Common - Lobby Thought diagram

2D render of lift lobby space

Flexible plan

Lighting

Self-organized

Able to make decisions of your own

A space of your own Dim

Home-like

Lighting

Cozy

Sense of Warmth

Warm colour

Materials

Red Glazed Bricks

Dark Timber

Red Bricks

10

Slab

Change of space

Soft lighting

Warm coloured lights Seating

Close connection to each other

Change in roughness

Indirect lighting

User interact while waiting

Put bags Place decorations Free interpretation

Qualities

Extruded in different magnitude from the wall

Lobby

Furniture

Polished

Mailbox Blackboard

Colour

Cleanliness Red

De Loodsen

Avoid blocking main circulation path User participation

Paint

Spaciousness

Brick laying patterns

Optional user activity

White

Limestone

Mirror

Spaciousness Fire break of De Loodsen Narrow lift lobby breaks up Dutch Aesthetic vertical space Simplistic, Clean

Connecting to a bigger space


Chepstow Market Square

Concept Sketch

Exploring Foldable Stalls

Cardiff University, Welsh School of Architecture Year 2 Project Type: Academic Location: Chepstow, Wales Sector: Retail Date: Jan 2023 - May 2023 (4 Months) The project aims to revitalize the town’s high street by turning it into a destination for the surrounding area and creating more opportunities for local craftspeople and small businesses. The design reshapes the existing town square to include a sheltered walkway along the street, open spaces for community events, and foldable on-site stalls that make it easier for vendors to take part in local activities, particularly the weekly Sunday market. While much of the town’s historic heritage site lies elsewhere, the materials used in the market square reference its medieval and industrial past. Together with the existing 1960s building on the site, the project reflects the different periods of the town’s development and reconnects the square with its layered history.

Interaction Diagram

Handdrawn Perspective

1:400 Plan

11


Komorebi (Dappled Sunlight)

Development process

Cardiff University, Welsh School of Architecture Year 2 Project Type: Academic Location: Chepstow, Wales Sector: Mixed-use residential Date: Sep 2022 - Jan 2023 (4 Months)

Initial atrium sketch

Central atrium The design of this carpentry apprentices’ residence surrounds the theme of “connection”, where it physically connects the greenery on the two sides of the site, connects the users of the building, and connects the local community with its public spaces. To encourage interaction between users, communal facilities are spread across levels and openings are also placed along corridors to allow interactions across levels. The public space on the ground floor also serves as a space for locals and crafts fair for the local artists and craftsmen. The building being constructed from sustainably sourced timber and CLT also allows the residing carpenters to do small repairs by themselves, reducing the cost for maintenance and reduces its carbon footprint.

12

Communal space

Precedent study

1:500 Model

Initial appearance sketch

Shared library space


The flats layouts are first explored on a piece of paper with cut-outs of rooms, then the 3 typologies of flats are introduced to make the construction more standardized and also ensure the quality of the flats. The openings in the flats are oriented to not face directly into other’s flat, introduce sunlight, and also open up to the view to River Wye.

Function Diagram Vertical Circulation Bridge Workshop Library/ Self-study Space Vending Machines Community Hall Multipurpose Room Bin Storage Boiler Room Management Office Bike Storage Toilets 0m 2nd Floor Plan

1:400

5m

10m

Studio Flats 13


Treehive Buildner’s Unbuilt Competition Project Type: Personal Location: Unspecified Sector: Mixed-use, Residential Date: Jun 2024 - Nov 2024 (6 Months) Contributer: Cyril Kwok, Chun Rui Huang

COMMUNAL UNIT

RESIDENTIAL HOUSE

As city land becomes more expensive, many young people are forced to move away from the communities they grew up in. This project explores a different way to add homes to dense urban areas without displacing existing families. A central structure provides shared platforms where residents can build and expand their homes over time, allowing families to grow while staying in the same neighbourhood. These platforms also create outdoor spaces, bringing qualities of traditional housing into a denser setting. The lower levels of the building include shops and shared facilities that support everyday life and reduce pressure on nearby streets and services. As housing demand increases, the structure can grow upward to add new homes gradually, allowing density to increase while maintaining strong community connections.

Levels starts building from the base.

A new level starts when the level reaches 80% capacity.

The remaining 20% of a level allows users to expand and extend their plots.

Communal floors will be added when population milestones are reached.

BUILDING SLAB JOINT

PROTECTIVE SHELL STRUCTURAL TRUSS

Surrounding environment generated by A.I. 14


Sears Retail Park Refurbishment

109 Princess Street

CDA Group Project Type: Location: Sector: RIBA Stage: Date:

CDA Group Project Type: Location: Sector: RIBA Stage: Date:

project

job no

SEARS RETAIL PARK

Existing Unit 4 - Render 1

client

Rev

Date

Description

drwn chkd

status

aberdeen Investments DRAFT

dwg no

M CL AT AD T B D RO IN N G Z E M ET A ST L C EP L P E AD D TE RO SU RR OF + SP AC EN E D CA E D N S O IG PY N AG

E

Professional Edinburgh, Scotland Hospitality 2,4 Sep 2024 - Aug 2025 I have assisted in preparing planning drawings during stage 2 and also taken on small tasks on the project over the year.

L LI IF T G O H V T ER G R RE U Y N SM CL IN O AD KE D VE IN G N CU T W R T AL A LI IN N G

Professional Solihull, England Retail 1-2 I have set up initial files, drafted up drawings and 3D models and also prepared Jul 2025 - Aug 2025 presentations for many of the options to the client.

The project converts an Category-B Listed department store and neighbouring building into a hotel with a new rooftop bar extension. The project have to work with its many public fronts especially towards Princes Street, part of a UNESCO world heritage site.

ER

RN

N E W W IN D D OR O M W E S R

I have worked on the re-cladding of the shopfront and modifications to the service yard on the retail park. Many variations for the facade have been explored as options to the row of building as well as construction phasing.

O

D

ZE

C

LA

G

revision

25023

01-0034

scale

date

drawn

checked

N.A.

28.07.25

TH

AC

P1

SIXTH FLOOR +90773 FULL OUTLINE OF CONSENTED SCHEME

FIFTH FLOOR +86306

FOURTH FLOOR +82206

FO +

THIRD FLOOR +78106

project

job no

SEARS RETAIL PARK

Proposed Unit 4 Option 1 - Render 1

client

Rev

Date

Description

drwn chkd

status

aberdeen Investments DRAFT

dwg no

T +

revision

25023

01-0030

scale

date

drawn

checked

N.A.

28.07.25

TH

AC

P1

SECOND FLOOR +74006

SE +

FIRST MEZZANINE +70846

FI +

FIRST FLOOR +67686

LO +

zedwell

GROUND FLOOR +62056

project

client

status

aberdeen Investments DRAFT

dwg no

revision

25023

01-0032

scale

date

drawn

checked

N.A.

28.07.25

TH

AC

P1 BAR

WCs

WCs

STORE

STAIR

FF LOBBY

SIXTH FLOOR +90773

E

EN

LO

BI

TO

STAIR BEDROOM

N

C

N FE

BEDROOM

BEDROOM

BEDROOM

FF LOBBY

BEDROOM

FIFTH FLOOR +86306

S

D

drwn chkd

C

M

N

Description

SU

AR

LA

EW

EW

N

N

Date

RE

IN

G N AP I SC D N LA EW N

REMOVAL OF PLANTING BED, KERB AND SERVICE ROAD MADE GOOD

SC AP IN C G O TE BA RR SL RC ID O IE R IN M G G G AT SE OO C D E U S EN RI D TR T O IN Y C O Y TE O R RC MP WI O TH O U M N D

Rev

NOTE: SECURITY LINE SET BACK FROM ADOPTED ROAD TO ALLOW 1 NO. TRUCK TO STACK FROM THE ROAD

job no

SEARS RETAIL PARK

Proposed Unit 4 Option 3A - Render 1

G +

0

1m

2m

112 PRINCES STREET

5m

BEDROOM

111 PRINCES STREET

BEDROOM

109 - 110 PRINCES STREET STAIR

BEDROOM

FF LOBBY

BEDROOM

BEDROOM

FOURTH FLOOR +82206

STAIR

BEDROOM

BEDROOM

BEDROOM

FF LOBBY

BEDROOM

BEDROOM

THIRD FLOOR +78106

STAIR

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

FF LOBBY

BEDROOM

SECOND FLOOR +74006

STAIR

PLANT

BEDROOM

BEDROOM

FF LOBBY

BEDROOM

FIRST MEZZANINE +70846 job no

STAIR BEDROOM

project BEDROOM

PROPOSED ELEVATION A - PRINCES STREET ROSE STREET

1

ROSE STREET SOUTH LANE

STAIR

Date

FF LOBBY

109 PRINCES STREET, EDINBURGH client

STAIR

Rev

Description

LOBBY

STORE

drwn chkdSTAIR PCL RISER

FIRST24017 FLOOR +67686

status FF LIFT

FF LOBBY

CHECK-IN

PLANNING

STAIR

PRINCES STREET

2

LINEN

DORM

PLANT

FF LOBBY

dwg no

109PS

scale

date

1:250@A3

18.10.

GROUND FLOOR +62056

STAIR

5000

OAKENSHAW ROAD (ADOPTED)

5000

KEY PLAN

SPRINKLERS

BASEMENT +57956

15


internal job no

25002 dwg no

revision

P1

419-30 Notes

WL3

D01

B

AR2

550

133

20

30

0 R9

ROOM 420

D05

D04

ROOM 419

L1

30

380

PANEL

50

ACCESSIBLE PANEL

ART5 50

CL 16 Moray Place STEP

Edinburgh EH3 6DT T: 0131 225 1111 www.cda-group.co.uk

M-LP-01, F-ST-01

client

EL05A

THE ROCCO FORTE COLELCTION

131

BROWNS HOTEL - BATHROOMS

SMOKE DETECTOR

title

STONE SKIRTING (M-SK-03, F-ST-04)

M-SK-04, F-TJ-01

FRONT VIEW

BROWNS HOTEL - BATHROOMS

ROOM 419 VANITY & BATH DETAILS

Room entrance electric plan

title

PROPOSED ROOM 419 420 PLAN 420-EX-01 420-01 420-03 420-04 420-05 -

ROOM 420 EXISTING PLAN WITH DOWNTAKINGS ROOM 420 PROPOSED PLAN ROOM 420 FLOOR FINISHES PLAN ROOM 420 ELECTRICS PLAN ROOM 420 REFLECTED CEILING PLAN

420-06 420-07 420-08 -

BEDROOM ELEVATION A BEDROOM ELEVATION B, B1, D1 BEDROOM ELEVATION C, D

420-09 420-10 -

BATHROOM ELEVATION E, F BATHROOM ELEVATION G, H, J

drwn chkd

276 175

EL05A WL6

50 ACCESSIBLE PANEL

F-ST-04

SECTION D

project

TH

Description

project

THE ROCCO FORTE COLELCTION

Vanity

50 50

130

client

659

50

WL1

50

550

16 Moray Place Edinburgh EH3 6DT T: 0131 225 1111 www.cda-group.co.uk 121 100

A B

LIVING ROOM EXISTING PLAN WITH DOWNTAKINGS LIVING ROOM PROPOSED PLAN LIVING ROOM FLOOR ELECTRICS PLAN LIVING ROOM SCRIBED SIDESFLOOR FINISHES PLAN 659 LIVING ROOM REFLECTED141 CEILING PLAN LIVING ROOM ELEVATIONS A,B LIVING ROOM ELEVATIONS C,D SECTION C

EL01

540

280 30

A B ACCESSIBLE

Ø63

419-EX-03 419-03 419-04 419-05 419-06 419-07 419-08 -

D

FIRST ISSUE

Date

EL05A 174

93 (Site dim)

A D

276

EL01

B C

35

276

141

A

CL DOOR CM

28.05.25

EL05A EL05A

50

659

141

EL01 C1 Rev

M-DR-02, F-ST-01 CL DOOR

30

659

B A

EL05A EL05A

280

Description

105 108 ENTRANCE L1 LOBBY

409

FIRST CONSTRUCTION ISSUE

D

25

Date

B

EL01

97

16.04.25

1025 20

340

R1

C1 Rev

SECTION B

BEDROOM

C

35

25

ENSURE CEILING REINFORCEMENT FOR TH FL PREPARATION OF drwn CHANDELIER chkd INSTALLATION

ENTRANCE

L1

CO1

97

SITTING AREA

B1

CL2

R1

STEP +30mm

1680

1206

A

93 (Site dim)

D1 A

340

SD

ENTRANCE EXISTING PLAN WITH DOWNTAKINGS ENTRANCE PROPOSED PLANS ENTRANCE ELEVATIONS

J C

EMERGENCY LIGHT ELECTRICAL SUBCONTRACTOR TO CONFIRM REQUIREMENT

EL05A

1652

PLAN VIEW

175 30

WL3

WL3

The majority of my tasks is communicating with the contractor, interior designer, suppliers and other parties to adjust interior designer’s drawings to fit, including room layouts, services, construction and furniture details, and building control documents.

E G

CL FITTED WARDROBE, FF&E BY RFH/OTHERS STEP

WL1

L1

20

80

419-EX-02 419-01 419-02 -

B C

141 BATHROOM

EL01

L1

D

H G

EL07

A

D03

D07

F-TJ-01

D02

ENTRANCE

D06

F

F-TJ-01

REMOVABLE SHELF FOR ACCESS

ROOM 420

E

EL07

A

90

A B

FITTED WARDROBE BY OTHERS

EL07

I-CP-01

419-EX-04 BEDROOM EXISTING PLAN WITH DOWNTAKINGS 419-09 BEDROOM PROPOSED PLAN 419-10 BEDROOM ELECTRICS PLAN 419-11 - 60 BEDROOM FLOOR FINISHES PLAN 470 419-12 BEDROOM REFLECTED CEILING PLAN 419-13 BEDROOM ELEVATIONS A,B SECTION A FRONT 419-14 BEDROOM ELEVATIONS C,D ELEVATION

D C

C

EL01

NOTE: CDA DRAWING BASED ON ORIGINAL PAOLO MOSCHINO DWG REF: 250211_Room 419

EL05A

D

1946 STONE TOP WIDTH 1927 SPLASHBACK WIDTH

EL07

90 R3

Half of my year in CDA have been working on this refurbishment along a number of other hospitality projects. This refurbishment covers 14 Bathrooms across the 1st and 4th floor and 3 suites in the 1830s building, where my company’s role is to primarily prepare drawings for construction. The project have been completed in July 2025.

L1

EL05A WL6

STONE SPLASHBACK (M-AR-04, F-ST-01) M-LP-01, F-ST-01

100

BEDROOM

DRAWING DWG REF: 30 250211_Room 419 & 250211_Room 420

THE INFORMATION ON THIS DRAWING IS SUBJECT TO BUILDING CONTROL APPROVAL

ART5

A B

106 (Site dim) NOTE: 368 CDA DRAWING BASED ON PAOLO MOSCHINO

400

850

LOOSE FF&E PROVIDED BY RFH/OTHER. SHOWN FOR REFERENCE ONLY

(M-LP-01, M-LP-02, F-ST-01)

ENTRANCE EXISTING PLAN WITH 368DOWNTAKINGS 400 WALK-IN WARDROBE30PROPOSED PLAN WALK-IN WARDROBE ELEVATIONS R WALK-IN WARDROBE JOINERY90DETAILS 175

B 830 STRUCTURAL OPENING

Works to be carried out in accordance with the Construction Phase plan prepared by the Principal Contractor.

THE INFORMATION ON THIS DRAWING IS SUBJECT TO BUILDING CONTROL STONE SHELF APPROVAL

106 (Site dim)

419-EX-05 419-15 419-16 419-17 -

This drawing is to be read in conjunction with CDA's Standard Hazard and Risk Assessment of architectural matters (CDM) series drawings.

81 (Site Dim)

© Comprehensive Design Architects Ltd. All rights reserved

1085

A

© Comprehensive Design Architects Ltd. All rights reserved

CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2015

Registered Office : Comprehensive Design Architects Limited 16 Moray Place EDINBURGH EH3 6DT Registered in Scotland : SC311114

F-ST-01

M-LP-01

D C

175

WALK-IN WARDROBE

4.

Do not scale off this drawing Drawing to be read in conjunction with the specification and all relevant drawing information Contractor to check all dimensions on site Comprehensive Design Architects to be advised of any discrepancies between this drawing and site conditions immediately Dimensions are in millimetres unless otherwise stated

Registered Office : Comprehensive Design Architects Limited 16 Moray Place EDINBURGH EH3 6DT Registered in Scotland : SC311114

CL DOOR

Do not scale off this drawing Drawing to be read in conjunction with the specification and all relevant drawing information Contractor to check all dimensions on site Comprehensive Design Architects to be advised of any discrepancies between this drawing and site conditions immediately Dimensions are in millimetres unless otherwise stated

3.

M-LP-02

40

FITTED WARDROBE BY OTHERS

660

265

40

1. 2.

475

C D

4.

Notes

BATHROOM EXISTING PLAN WITH DOWNTAKINGS BATHROOM PROPOSED PLAN 660 BATHROOM ELECTRICS PLAN BATHROOM FLOOR FINISHES PLAN BATHROOM REFLECTED CEILING PLAN BATHROOM ELEVATIONS A, B, C, D 1765 BATHROOM ELEVATIONS E, F, G 81 (Site Dim) BATHROOM LOW LEVEL PLAN BATHROOM SETTINGPLAN OUT PLAN VIEW

177 30

Professional London, England Hospitality 4-6 Dec 2024 - Jul 2025

A

3.

P1

680

B WL3

revision

940 SPLASHBACK

WL3

25002 419-00

80

F

BATHROOMG

1. 2.

dwg no 564 (Site dim)

400

400

80

419-EX-01 419-18 419-19 419-20 419-21 419-22 419-23 419-24 419-25 -

ART3

E

564 (Site dim)

553

CDA Group Project Type: Location: Sector: RIBA Stage: Date:

FINAL CLIENT SIGN OFF TBC

ROOM 419

Browns Hotel Refurbishment

internal job no

date

scale

drawn by

26.05.25

1:25@A3

TH

date

scale

drawn by

checked by

1:100@A3

TH

CM

CONSTRUCTION

Bathroom plan and elevations

CONSTRUCTION

A5

internal job no

25002

status code

status

CM status code

status

07.04.25

checked by

dwg no

revision

419-30

A5

internal job no

P1 Notes

25002 dwg no

revision

419-00

C1

1. Do not scale off this drawing 2. Drawing to be read in conjunction with the specification and all relevant drawing information 3. Contractor to check all dimensions on site Comprehensive Design Architects to be advised of any discrepancies between this drawing and site conditions immediately 4. Dimensions are in millimetres unless otherwise stated Registered Office : Comprehensive Design Architects Limited 16 Moray Place EDINBURGH EH3 6DT Registered in Scotland : SC311114 © Comprehensive Design Architects Ltd. All rights reserved

2990 Site Dimension

897 Site Dimension

CL of basin & tap

595

620

Eq

600

103

800

80

5

900

5

250

Timber stud framing with MR plasterboard or Wedi board (where in shower) to both sides

240

Timber stud wall with MR plasterboard or Wedi board (where in shower) to one side

240

20

155

856 Removable top

Where door moved, wall to be infilled with metal stud/timber framing to match existing wall with plasterboard to both sides

600

220

4111 Site Dimension

550 vanity

750

860

Where existing quilt insulation is exposed to walls or ceiling, to be made good and replace with new insulation to match existing.

420

700

860

420

10

Yellow line indicates 30min fire rating for wall between bathroom and corridor. Where existing linings are disturbed or removed by the works, replacement board to be least match existing to be used. Where wedi board used, plasterboard of appropriate thickness to be installed behind to maintain the fire rating.

200

140

225

1758

150

80

Existing walls unaltered.

10 50 860

1100

90 750

860 1100

200

1800

240

50

20

Key: TEL

200 50

450 shelf

225

580 20

Artwork

CL of Bidet

155

210 290

Eq Eq

1100 870

1800 x 800 Bath

Bathroom Wall Construction Note The existing walls surrounding the bathrooms and forming nibs are generally metal stud or timber framing, lined with plasterboard. In some cases these linings need to be removed, and the general consideration is new will be MR plasterboard and/or wedi board. Construction shown on plan and noted below.

FF&E Mirror (client supply)

EQ

SH

2240

20

400

2427 Site Dimension

EQ

NOTE: CDA DRAWING BASED ON ORIGINAL DODESIGN DWG REF: 2407-3-108

1358 Site Dimension

150

2240

Artwork

Open to WC & Bidet

555

155 150

5

85

Eq

Artwork

CL of basin & tap

1200 Mirror

80

CL of HTR & Bath

100

700

Magenta line indicates new thermal insulation to external walls. These are only upgraded where existing wall linings are removed and opportunity exists to upgrade. Min 75mm quilt insulation used, 100mm where space exists. 100mm quilt achieces circa 0.3 U-value based on existing external wall construction.

60

60 5

5

1210 MARBLE TO MARBLE EQ EQ

EQ

Existing soil stack (position unchanged)

800 Niche

2395 EQ

C4

EQ

600

600

950

1110

1085

16.04.25 FINAL CONSTRUCTION ISSUE

1000

140

150

150 20

1010 Sloped section

200

20

140

1000

20

20

200

1009 Sloped section

FL

07.03.25 NOTES FOR BUILDING CONTROL ADDED RELATING TO WALL CONSTRUCTIONS, INSULATION AND DRAINAGE. HOOK POSITIONS UPDATED

TH

CM

26.02.25 UPDATED TO CORRECT BATH SETTING OUT AND ADDITIONAL SITE SIZES

TH

CM

C1

24.02.25 UPDATED TO REFLECTED LATEST CLIENT COMMENTS

TH

CM

P1

22.01.25 ISSUED FOR INFORMATION

TH

CM

Date

150

20

TH

C3

C2

Rev

150

750 860 1100

New drainage pipework. all to be laid to min 2.5 degrees. Pipework increased to 40mm to all basins, showers and bidet. 100mm pipe connection from WC to stack

2280

2110

2395

2010

120 120

CL of WC

950

200

300

500

420 to pan

580

2110

2240

2010

290

500

20

Eq Eq

2395 Site Dimension

1160

400

110

100

550 vanity

Do not scale off this drawing Drawing to be read in conjunction with the specification and all relevant drawing information 80 103 20 3. 80Contractor to check all dimensions on801 site Comprehensive Design Architects to be advised of any discrepancies between this drawing and site conditions immediately 4. Dimensions are in millimetres unless otherwise stated

EQ

856 Removable top

1800

20 210

1800 x 800 Bath

1. 2.

200

870 Window Sill height

150

C3

290

1800

20

Notes 450 shelf

revision

EQ

Artwork

70

PAINTED TIMBER CORNICE (M-CO-02, F-PT-03)

Existing door in existing position, redecorated

420-08

1100

649

200

JIB DOOR (F-PT-03)

CL OF PANEL

25002 dwg no

240

CL OF PANEL

Eq Eq

1904

PAINTED TIMBER (F-PT-03)

155

CL OF PANEL

50

643

CL OF WALL

1160

80

65

EQ

580

600

internal job no

225

171 29

EQ

EQ

FINAL CLIENT SIGN OFF TBC

WALLPAPER (F-WP-03) PAINTED PLASTER CORNICE (M-CO-01, F-PP-06)

CL OF PANEL

300

EQ

Existing window

1100 860

Bedroom Elevation

EQ

CL of window, bath & vanity opposite

65

100

Completion photos (not by me)

740 max. (700mm door leaf)

5

710 65

2990 Site Dimension

internal job no

20

25002

Description

drwn chkd

dwg no

revision

25002-CDA-ZZ-ZZ-DR-A-001005

C4

CL of door & lined opening

220

200

700

602

150

© Comprehensive Design Architects Ltd. All rights reserved

Consolidated Access panels to suit new layout.Gyproc Profilex bead frame ceiling access panel (or similar approved), sealed and fire rated as necessary. Max size 450x450mm. Contractor to confirm access requirements

855 Site Dimension

857 Site Dimension

330

200

2690 Site DimensionDesign Architects Limited Registered Office : Comprehensive 16 Moray Place EDINBURGH EH3 6DT Registered in Scotland : SC311114

30mm Marble border

220

CONSTRUCTION (DESIGN AND MANAGEMENT) Marble Floor REGULATIONS 2015 200 20

Marble outfill

CL of lined opening

16 Moray Place Edinburgh EH3 6DT T: 0131 225 1111 www.cda-group.co.uk

100

client

THE ROCCO FORTE COLLECTION

16

310 EQ 300

1323

20

CH:2427

CH 2427

CL of shower door

EQ 710

200

300

Marble outfill

200

200

310

4126 Site Dimension

620 740 opening

AFFL +150mm

105 100

1210 Shower 20

1000 Shower

key plan

250

EXT

30mm Marble border

Marble Floor

140

project

EQ

BROWNS HOTEL - BATHROOMS 2 x single way switches for 2 bathroom circuits, relocated adjacent to bathroom door

title

70mm Step

CL of door & lined opening

UP Existing + 70mm CL of door & lined opening

220

T

220

220

D D D

220

PANEL/MOULDINGS SETTING OUT AND SIZES TBC

650

130 130

100 80 160

T

20

950

50

640

1100

1100

640 130 130

100

CARD READER

400

20

PAINTED TIMBER SKIRTING (M-SK-01, F-PT-03)

800

PAINTED TIMBER MOULDING (M-MO-01, F-PT-03) PAINTED PLASTER (F-PP-06)

CR

Existing speaker (connected to TV sound) reused and repositioned

200 140 200

100 TV

520

545

885

30mm Marble border

110

PAINTED TIMBER DADO RAIL (M-DR-01, F-PT-03)

CL of window, bath & vanity

THE INFORMATION ON THIS DRAWING IS SUBJECT TO BUILDING CONTROL APPROVAL NOTE: CDA DRAWING BASED Marble outfill ON ORIGINAL PAOLO MOSCHINO DWG 550 Vanity 700mm Door Sloped marble DWG: 250211_Room 420

20

2105 TV

1806

1810

Works to be carried out in accordance with the Construction Phase plan prepared by the Principal Contractor.

ANTIQUE BRASS HANDLE, ESCUTCHEON AND HINGES (I-HA-01, I-ES-01, I-HI-02, F-ME-03)

CEILING ACCESS PANEL

EQ

885

576

20

220

30

100

100

This drawing is to be read in conjunction with CDA's Standard 900 Hazard and Risk Assessment of architectural matters (CDM) 200 450 shelf series drawings. 200 Marble Floor

ROOM 416 BATHROOM DETAIL (TYPE 3A) date

scale

20.01.25

1:25@A1

drawn by

SL

status

320 ELEVATION C

320

FINAL CONSTRUCTION ISSUE

PAINTED TIMBER SKIRTING (M-SK-01, F-PT-03)

324

324

PAINTED TIMBER ARCHITRAVE (M-AR-02, F-PT-03)

checked by

CM status code

A5

internal job no

AC CONTROL

CL OF PANEL

PAINTED TIMBER SKIRTING (M-SK-02, F-PT-03)

PAINTED TIMBER AND OIL RUBBED BROZE PEDIMENT (M-PE-01, F-ME-01, F-PT-03)

100

862

CL OF PANEL

100

662

PAINTED PLASTER CORNICE (M-CO-01, F-PP-06)

25002 dwg no

25002-CDA-ZZ-ZZ-DR-A-001005

C3

02.05.25

C2

29.04.25

TV SWITCHES ADDED

C1

28.04.25

FIRST CONSTRUCTION ISSUE

Rev

Date

Description

drwn chkd

CARD READER ADDED

TH

FL

FL

CM

TH

FL

revision

C4


Clear safety fire glass panel - Door D04 only

internal job no

WL-000

Wall Light

Treatment room elevation

LED-000

LED Light

LED-101 Recessed Directional Downlight

20

45

Low level LED Wall light (see Small Power plan for references)

70

2

FCL +2100 E1 FCL +2500

Extract to M&E Engineer Detail

SA

Supply to M&E Engineer Detail

E2

FCL +3160

E1

S HN

E2

Air Grille- sizes TBC

MANI/PEDI/HAIR TREATMENT ROOM

LED FEATURE SPOTLIGHT

600x900

FCL +2500 AUDIO

E2

BA-101

E2

ACCESS HATCH 600x600

160

A

TREATMENT ROOM 3 FCL +2500

600x900

AUDIO

SP

SP

FCL +2100

SN

ACCESS HATCH

ACCESS HATCH

600x600

EM

E2

600x600

70

PT-109

ACCESS HATCH

TH CM 22.10.24 - ACCESS HATCH TO TREATMENT ROOM 5 AMENDED EQ 300 - PAINT FEATURE ON CEILING TO TREATMENT C2 09.04.25 EQISSUED FOR FINAL CONSTRUCTION ROOMS OMITTED - PLANK ROUNDED CURVES OMITTED C1 CEILING 05.11.24 FIRST CONSTRUCTION ISSUE. - FIRE ESCAPE SIGNS AND EMERGENCY LIGHTS FF&E ADDED Mirror - MANIPEDI ROOM HEAD AMENDED Rev DateWINDOW Description - SETTING OUT OF GRILLES, SPEAKERS, ETC AMENDED - BASE GA PLAN UPDATED

600x600

600x600

EMFCL +2250

E3 FCL +2300

FCL +2300

EM

FCL +2300

EM

E2

S

E2

E3

AUDIO SP

FCL +2150

E2

E2

ACCESS HATCH

S

FCL +2186

SN

400x400

AUDIO

E2

E3

SN

FCL +2186

AUDIO SP

E2

FCL +2300

FCL +2300

FCL +2350

CM

FL

CM

FL

CM

29.08.24 ACCESS HATCH ADDED SA GRILLE REMOVED

Date

Description

SS

CM

TH

CM

RETAIL

RETAIL

PT-104 Painted wall

revision

23053-CDA-ZZ-00-DR-A-350001 EQ EQ

C6

WL-103 Wall light

LED-106 Concealed LED strip

1650

Open

ST-105 Stone plinth

Open

Open

CT-109 Cut tile kick plinth

WD-104 Slatted teak bench

E2

MIRROR STONE SKIRTING

SCHLUTER JOLLY TRIM IN BRUSHED ANTIQUE STAIRS BRONZE ANODISED ALUMINIUM EDGE TO NICHE EDGES

client PT-109

client

1:50 TREATMENT ROOM 1 PLAN LIFT

PT-104

PT-104

Painted architrave and door Painted wall Painted wall ROCCO FORTE HOTELS THE ROCCO FORTE COLLECTION 200 200 COLLECTION 1058

RECEPTION

CHANGING

LED-106 Concealed LED strip

EQ EQ

FCL +2300 key plan

EQ EQ

150

110

PT-104 Painted wall

PT-101 Painted architrave and door

2122 structural opening

475 865

150 200

50

70 110

350

475

2100 door leaf

2150 structural opening

475

EQ

EQ

LED-106 Concealed LED strip

PT-104 Painted wall

PT-105 Painted joinery

EQ EQ

Open To Corridor EQ

1375

CT-106 Tiled wall ST-103 Stone upstand ST-101 Stone top

PT-106 Painted wall

EQ

CT-111 Skirting tile

WD-107 Profiled timber stained to match teak Refer to drawing 23053-CDA-ZZ-00-DR-A-000208

EQ

LED-106 Concealed LED strip

LM-104 Laminate locker front faces

350

Open To Corridor

Artwork

WD-104 Slatted teak bench

CT-111 Skirting tile

EQ

EQ

WL-103 Wall light

Open To Corridor

Works to be carried out in accordance with the Construction Phase plan prepared by the Principal Contractor.

PT-104 Painted wall EQ

Access hatch

Refer to drawing 23053-CDA-ZZ-00-DR-A-000210

WL-108 Wall light

© Comprehensive Design Architects Ltd. All rights reserved

CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2015

NOTE: CDA DRAWING BASED ON ORIGINAL DODESIGN DWG REF: 2303-2-301

Refer to drawing 23053-CDA-ZZ-00-DR-A-000207

600

Open

350

PT-104 Painted wall

PT-104 Painted wall

WL-103 Wall light

250

FF&E Mirror

Registered Office : Comprehensive Design Architects Limited 16 Moray Place EDINBURGH EH3 6DT Registered in Scotland : SC311114

Refer to drawing 23053-CDA-ZZ-00-DR-A-000210

CT-111 Skirting tile

C2 C1

14.03.25 SVP ACCESS HATCH ADDED. SOCKET OMITTED 14.02.25 ISSUED FOR CONSTRUCTION

P1

09.01.25 ISSUED FOR TENDER

Rev

Date

Description

SS TH

CM SS

TH

CM

drwn chkd

U

D

F

Refer to drawing 23053-CDA-ZZ-00-DR-A-000209

CT-111 Skirting tile

CT-111 Skirting tile

23053

LM-104 Laminate locker front faces

LED-106 Concealed LED strip

1

PT-104 Painted wall

PT-101 Painted architrave and door

WL-103 Wall light

PT-104 Painted wall

dwg no

revision

23053-CDA-ZZ-00-DR-A-000133

C2

4

E3

CT-111 PRINCES STREET Skirting tile

internal job no

2

PT-104 PAINTED WALL

P

10 to 15

PRINCES STREET

18

Open

B

FF&E Mirror

ST-101 Stone top

WD-104 Slatted teak bench

Open

CT-111 Skirting tile

Refer to drawing 23053-CDA-ZZ-00-DR-A-000210

B

ST-103 Stone upstand

ST-105 Stone plinth

CT-111 Skirting tile

Refer to drawing 2303-3-307

WAVERLY STATION

project

C

C

400

1650

TOURIST INFORMATION CENTRE

A

1800 Hooks

1800 Hooks

16

1 to 5

THE BALMORAL HOTEL

NORTH BRIDGE

10

400

A

Refer to drawing

THE BALMORAL HOTEL SPA 2303-3-302 REFURBISHMENT - PHASE 1

16 Moray Place Edinburgh EH3 6DT T: 0131 225 1111 www.cda-group.co.uk client

THE ROCCO FORTE COLLECTION

key plan

Hotel

16

20 Hotel

21

17

18

20

title

10 to 15

G

2

1

1:25/50@A1

TH

CM

10 16

1 to 5

25.10.24

D80 P

checked by

D81 N

drawn by

D78 P

scale

D79 P

D77 P

date

UP

D

F

status code

CR

internal job no

23053 dwg no

revision

18

CHANGING ROOM ELEVATIONS

date

scale

drawn by

20.12.24

1:50@A1

TH

checked by

CM status code

status

CONSTRUCTION

S4

internal job no

23053 dwg no

status

FINAL CONSTRUCTION

NORTH BRIDGE

D64 T

FEMALE CHANGING

Treatment room

C7

WAVERLY STATION

project

BALMORAL HOTEL SPA REFURBISHMENT PHASE 2 title

revision

LIFT MOTOR ROOM

Changing Room

D75 P

TREATMENT ROOM 1

dwg no

THE BALMORAL HOTEL

TOURIST INFORMATION CENTRE

D62 N

23053

D63 T

title

UP

D71 P

internal job no

D65 N

status code

23053-CDA-ZZ-00-DR-A-350001 SPECIFICATIONS

D06 A

D67 P

D72 N

E

MD

MALE CHANGING

LK

D68 P

D69 P

1:50@A1

checked by

BALMORAL HOTEL SPA COMMENT REFURBISHMENT DRAFT FOR A5 PHASE 1 status

D73 N

E

project

D70 P

03.07.24

drawn by

D76 P

scale

4

WAVERLY MARKET (SHOPPING CENTRE)

D66 P

date

TREATMENT ROOM 1

PRINCES STREET

PRINCES STREET

D74 N

REFLECTED CEILING PLAN

UP

G

2110 Overall Door Frame Height

350 2100 door leaf 1375

900

200

70 350

300

CT-111 CT-109 WD-104 Refer to drawing Skirting tile 23053-CDA-ZZ-00-DR-A-000208 Slatted teak Cut tile kick bench plinth

CT-111 Refer to drawing Skirting tile 23053-CDA-ZZ-00-DR-A-000208

WL-103 Wall light

300

Open

WD-107 Profiled timber stained to match teak

PT-105 Painted joinery

PT-106 Painted wall

Refer to drawing 23053-CDA-ZZ-00-DR-A-320031 for all changing room door details

key plan

SN

70

70

350

2100 door leaf

2150 structural opening

1375

900

Towel drop

WL-108 Wall light

EQ

1. Do not scale off this drawing 2. Drawing to be read in conjunction with the specification and all relevant drawing information 3. Contractor to check all dimensions on site Comprehensive Design Architects to be advised of any discrepancies between this drawing and site conditions immediately 4. Dimensions are in millimetres unless otherwise stated

This drawing is to be read in conjunction with CDA's Standard Hazard and Risk Assessment of architectural matters (CDM) series drawings.

PT-101 Painted architrave and door

WL-103 Wall light 250

CT-105 Tiled wall

EQ

555

FF&E Mirror

WD-104 Slatted teak bench

PT-104 Painted wall

PT-104 Painted wall

EQ

1000

C1

WL-103 Wall light

Open

CT-111 Skirting tile

PT-109 Painted architrave and door

1650

ST-101 STUDIO

ST-105 CT-109 Stone plinth Cut tile

To match existing pool area finishes

PT-104 Painted wall

EQ

1800 Hooks

600x600

PT-104 Painted wall

C2 LM-102 Laminate locker front faces

PT-104 Painted wall

1000

EQ

Open

PT-112 Refer to drawing 23053-CDA-ZZ-00-DR-A-000207 revision Painted wall

1650

ACCESS

LM-104 Laminate locker front faces

Open To Pool Corridor

drwn chkd

16 Moray Place Edinburgh EH3 6DT 16 Moray Place Edinburgh EH3 6DT T: 0131 225 1111 www.cda-group.co.uk T: 0131 225 1111 www.cda-group.co.uk

NG HATCH DR-0000015-SHOWER SEAT DETAIL

EQ

LED-106 Concealed LED strip

PT-101 Painted architrave and door

Artwork

To match existing pool area finishes

FCL +2350

WL-108 Wall light

drwn chkd

450

600x600

300

23053-CDA-ZZ-00-DR-A-220003

27.08.24 FIRST ISSUE

Notes

revision

23053-CDA-ZZ-00-DR-A-000211 PT-111 Painted joinery

Open To Corridor

E3

00

FL

23053

DRINKS PREP / STORE

600x600

OOM

19.09.24 TREATMENT ROOM COVE CEILING DETAIL

Door elevations

S4

Bentleys

internal job no

dwg no

FCL +2150

RETAIL

ACCESS HATCH

U P

ACCESS HATCH

CT-111 UPDATED, AUDIO SPEAKERS ST-105+ CCTV ADDED Refer to drawing Skirting Stone plinthUPDATED dwg no 23053-CDA-ZZ-00-DR-A-320031 29.08.24tileSHOWER COVE CEILING DETAIL FL CM

dwg no

STORE 600x600

C4

23053

FCL +2350

FCL +2150

ACCESS HATCH

FL

Rev

E3

600x600

TH

internal job no

FCL +2350

Reflected Ceiling Plan

09.10.24 CORRIDOR AUDIO SPEAKERS LOCATION UPDATED

C1

E3

SN

AUDIO SP

SP

FCL +2350

ACCESS HATCH

C5

C3 C2

FCL +2300 SN

internal job no

46

EM

Wall light TH FL

CM status code

23053

PT-104 Painted wall

C6

FCL +2550 ACCESS HATCH

WL-103

PaintedPREP architrave 28.11.24 MANIPEDI ROOM UPDATE, ROOM GRILL REMOVED, RA ADDED TOdoor CORRIDOR and

TH

CONSTRUCTION Timber architraves by

Doors to be flush with adjacent painted plasterboard wall

Therapist task lighting only, single switch

C7

1010 Structural Opening drawn by checked by

1:2@A3

status

Heat Detector, with beacon and sounder

4 lighting scenes switch

H

600x900

E2

SN

E2 WD-103 EM

ACCESS HATCH

AUDIO

FCL +2100

SN

WD-103

TREATMENT ROOM 5 FCL +2400 SP

SN

600x600

SN

TEAK SHELF

AUDIO

SP

E2

FCL +2100

ACCESS HATCH

plasterboard lining oversailing end of scale shaftwall to give seamless finish

18.12.24

Changing room elevations

ACCESS HATCH

TREATMENT ROOM 4 FCL +2500

926 Door leaf

date

All on/off switch

4

T

1800 Hooks

HOOK

600x900

AUDIO

FCL +2100

SP

TREATMENT ROOM 2 FCL +2500

HN

Casambi Switches

600x900

2400

TREATMENT ROOM 1

Smoke Detector, optical with beacon and sounder Heat Detector

800 Single clear opening width

Door and Architrave Detail (not by me)

ACCESS HATCH AUDIO SP

ACCESS HATCH

SN

H

Access Hatch, 500mm x 500mm

E1

ACCESS HATCH

Smoke Detector

title

30 min shaftwall built SKIRTING AND 873 Clear opening width ARCHITRAVE, DOOR against existing DETAILS plasterboard arch.

1602 Clear opening width

450

LED-104

LED-106 LED STRIP LIGHT

S

Door type omitted

Timber architraves by

Painted plasterboard BALMORAL HOTEL flush skirting to base SPA REFURBISHMENT PHASE 2

1650

ST-101 STONE LINING

E2

FCL +2500

600x900

Ceiling Mounted Illuminated fire Exit Sign Audio Speaker

FD30S Door

1650

E2

LED-106

ACCESS HATCH

Dedicated Emergency Light - Non-maintained

E3 AUDIO SP

E2

Painted 70 x 25mm Timber architrave

2

Combined Emergency Light (Remote Battery) - Maintained

E2

E2

Scale 1:20

Emergency Indicator Light

EM

Type H Elevation

Door D01 THE ROCCO FORTE COLLECTION Scale 1:20

Door D11

FD30S Door D11 Hold open door

Return to M&E Engineer Detail

RA

Lorient LAS8014 SI acoustic drop seal

Type G Elevation

client

1650

E1

E1

EXT

Kick plinth as required

project Bentleys

1650

FCL +2500

Pendant (Contractor to allow for suitable fixing in ceiling for weight of pendant.)

20

1650

FCL +2500

Lorient DS Door seals

Type F Elevation

12 5 8

25

LED 106 IP Rated Concealed LED Strip

ELEVATION A

2100 door leaf

150mm High Stone Plinth Block

5

LED-105 Concealed LED Strip High Level LED

LL

Lorient DS Door seals Pull handle with push plate to rear. Ironmongery TBC.

16 Moray Place Edinburgh EH3 6DT LAS8014 SI T: Lorient 0131 225 acoustic drop seal 1111 www.cda-group.co.uk

ST-105

LED-107 Track Lighting

HH

Indicative pull handle with push plate to rear. Ironmongery TBA

PT-101

Painted single inset panel door

Kick plinth as required

To be read in conjunction with CDA Elevations and Lighting Schedule

LED-102 Recessed IP Rated Downlight LED-103 Recessed RAL-coloured Directional Downlight WL-105 Low Level Plastered In Light

Perko or similar approved door closer

865

Switch Plates

Door frame & stop

200

SWT-000

Lighting & Electrical Legend

LED-104 Small LED Feature Spot Light

E1

2150 structural opening

This drawing is to be read in conjunction with CDA's Standard Hazard and Risk Assessment of architectural matters (CDM) series drawings.Please refer to DoDesign Lighting schedule

Painted Architrave & Lining (TR Corridor side)

SS CM

1650

+2300 AFFL

drwn chkd

door closers Description Date Clear safety fire glass panel PT-101

1900 Hooks

PT-113

2303-4-103-C forwith thethefollowing Works to be carried out in accordance Constructiontags Phase plan prepared by the Principal Contractor.

PT-101

FCL +2500 E1

110

110 Plasterboard ceiling perimeter

Rev

Glass

1200

SWT-101

Qic Trims E50 trim painted to match ceiling colour

PT-113

Qic Trims E25 Flexi trim painted to match ceiling colour

CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2015 Stone ST-000

PT-101

110

TH TH

180

70

Laminate

LM-000

+2350 AFFL Prestige SL2 Edge Ceiling Plank

926 door leaf 110

C1 14.02.25 ISSUED FOR CONSTRUCTION P1 Concealed 09.01.25 overhead ISSUED FOR TENDER

865

PT-113

15 Axiom Transition BPT3271G

100 Plasterboard perimeter

110

Glass

1800 Hooks

55

Wood

© Comprehensive Design Architects Ltd. All rights reserved PT-113

PT-101

110 110

1650

PT-113

WD-000

20

1010 Structural Opening

Dotted line denotes painted architrave & lined to opening

1375

LM-103

50

65

I’ve participated in preparing planning and warrant packages, detailing and adjusting drawings, measuring site sizes, snagging and more. Base drawings provided by interior designer to work from.

Registered Office : Comprehensive Design Architects Limited CT-000 Ceramic TileEH3 6DT 16 Moray Place EDINBURGH Registered in Scotland : SC311114

Axiom transition BPT3271G with 300mm radius curves at ends of bays

LED-105

110

70 x 25mm Painted Architrave

826 door leaf

Face of skirting

Zentia System Z & T-bar

926 Door leaf

15

1650

Adhered to inner face to follow curve LED-106

Door D

Scale 1:20 FD30S Doo

873 Clear opening width

44

910 Structural Opening

826 door leaf

2100 door leaf

LED-105

CT-102

Type

Doors D04,D15

Scale 1:20 D04 Free open, NFR, Vision panel D15 Access control, FD60S

Overpanel / frame

Stone Plinth

933 approx. Dim between existing built archways TBC

BW-106

55

10mm Underdoor Clearance

Type C Elevation

PT-101

1. Do not scale off this drawingSanitaryware SW-000 2. Drawing to be read in conjunction with the specification and all relevant drawing information 3. Contractor to check all dimensions on site Comprehensive Design Architects to be advised of any schedule 2303-4-102-C Please refer to DoDesign finish discrepancies between this drawing and site conditions for the following tags immediately 4. Dimensions are in millimetresPaint unless otherwise stated PT-000

1900 Hooks

CT-102 Tiled wall

100

Key to Corridor Side, Thumbturn to Treatment Room Side

Lorient LAS8014 SI acoustic drop seal

Electro-magnetic fire door hold open to hold doors open in pockets.

2150 Soffit (TBC with door construction)

30

Pull handle with push plate to rear. Ironmongery TBC Kick plinth as required

44

Brassware

450

70

Lorient DS Door seals

826 Door leaf 773 Clear opening width

44

937 Structural Opening

BW-000

Glass

12

44

1800 Hooks

10

853 Door leaf 800 Clear opening width

1650

70

CT-101 TILED WALL

Scale 1:20

FD60S Door

Extended stop

Please refer to DoDesign Sanitaryware schedule 2303-4-101-C for the following tags Bathroom Accessories BA-000

Notes

Scale 1:20

FD30S Door D03 Not fire rated D17 826mm leaf

Perko or similar approved door closer PT-101

CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2015

12

KEY

R6

Registered Office : Comprehensive Design Architects Limited 16 Moray Place EDINBURGH EH3 6DT Registered in Scotland : SC311114

EQ

200

Painted single inset panel door

This drawing is to be read in conjunction with CDA's Standard Hazard and Risk Assessment of architectural matters (CDM) series drawings.

Staff bead profile to solid panel

450

70

Painted MDF skirting

CT-102 TILED WALL

Painted Architrave & Lining

Inset painted panel to suit fire rating

required

2

70

PT-119

150

60

To suit partition thickness

BW-102

EQ

Works to be carried out in accordance with the Construction Type B Principal Elevation Phase plan prepared by the Contractor. Doors D02-D03, D05-D07, D09-D10, D12, D17 Door D08

Works to be carried out in accordance with the Construction Acoustic seal where Phase plan prepared by the Principal Contractor.

SHOWER

4.

PT-101

110

PT-101

Do not scale off this drawing Drawing to be read in conjunction with the specification and all relevant drawing information Contractor to check all dimensions on site Comprehensive Design Architects to be advised of any discrepancies between this drawing and site conditions immediately Dimensions are in millimetres unless otherwise stated

3.

Type A Elevation

This drawing is to be read in conjunction with CDA's Standard Hazard and Risk Assessment of architectural matters (CDM) 32 12 series drawings.

150

03

15

CONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 2015

CL curtain track

50

HOOK

© Comprehensive Design Architects Ltd. All rights reserved

I have primarily worked on the spa refurbishment in my first quarter. The project covers the spa in the basement of a Category-B listed building, including treatment rooms, changing rooms, reception and toilets. The project have been completed on June 2025.

BW-103

BA-101

C1

© Comprehensive Design Architects Ltd. All rights reserved

110

Registered Office : Comprehensive Design Architects Limited 16 Moray Place EDINBURGH EH3 6DT Registered in Scotland : SC311114

CL

16

LED-106 LED STRIP LIGHT CONCEALED IN COFFER

3

1. 2.

PT-101

44

WL-103 WALL LIGHT

5

Staff bead

200

10

PT-104 PAINTED WALL

SWT-101

25

ELEVATION B

110

revision

Notes

10

LED-106 CONCEALED LED LIGHTS LED-103 LED DOWNLIGHT

Professional Edinburgh, Scotland Hospitality, Leisure 4-6 Sep 2024 - Jun 2025

926 door leaf

PT-101

Eq 110

350

23053-CDA-ZZ-00-DR-A-000211

Notes

70 x 25mm Painted Architrave 1. Do not scale off this drawing 2. Drawing to be read in conjunction with the specification and Face of skirting Stone Plinth all relevant drawing information 70all dimensions on site 3. Contractor to check Comprehensive Design Architects to be advised of any Smoke seal where discrepancies between this drawing and site conditions required immediately 4. Dimensions are in millimetres unless otherwise stated

200

CDA Group Project Type: ELEVATION E Location: Sector: RIBA Stage: Date:

826 door leaf 110 Eq

dwg no

70

Balmoral Hotel Spa Refurbishment

23053

PT-101

110

2150 structural opening

853 door leaf 110

23053-CDA-ZZ-00-DR-A-000133

revision

C2

17


Turn static files into dynamic content formats.

Create a flipbook
Portfolio for UCL MArch AD - Chun Rui Huang by Toby Huang - Issuu