








20th January 2026
Aligned to the May 2021 National Sales Specification
Approved by Gareth Jacob

![]()









20th January 2026
Aligned to the May 2021 National Sales Specification
Approved by Gareth Jacob

Housetype GIA (ft²) NIA (ft²)
2 Beds
3 Beds
4 Beds
Plot Numbers
NOTE : These are the general minimum requirements. Please also refer to working drawings, Electrical Layouts and Plumbing & Heating layouts




4


Date
Revision No.
10.8.23 First Issue
Master Specification Revision Tracker
Section Details of Changes Made
4.12.23 A Appendix B Appliances
Appendix D Ironmongery
Appendix C Sanitaryware
27.06.24 B Plot Schedule
Appendix B Appliances
Appendix E Kitchens
8.1 Plumbing
14/01/2025 C Various Various
05/06/2025 D 6 Floor Finishes
Appendix E Kitchens
Appendix F Colours
2/7/25 E 7.11 Electrical
6/11/25 F Appendix B Appliances
Appendix B Appliances
4/12/25 G Various
First Issue based upon Current Site Layout and Master Specification Template Rev W
Integrated WD/DW/FF models revised as discontinued from January 2024 (in Red)
Group deal Specification confirmed - to be implemented in early 2024
Maisonette Sanitaryware Spec added
Maisonettes removed as these are HA Plots
Updated to latest Group Spec (April 2024)
Updated to latest Group Spec (April 2024)
Heating revised to ASHP throughout
Reference to Dulux removed, Showers & Trays revised, Appliances Revised (all to new Group Specifications)
Carpets and Vinyl removed as a standard item
Kithcen Colours choices revised
Appendix added
Car Charger revised
Integrated WM reference revised as previous model discontinued by Hoover (6/10/25)
4 Bed oven revised to double under counter
Plot Schedule corrected due to replan
Updates to bring in line with latest Master Spec - Kitchens, Appliances, Utility Sinks, Sanitaryware corrected and appendix removed