BANK PROJECT 03.28.2025 100% SCHEMATIC DESIGN (SD) SET 04.30.2025 60% DESIGN DRAWING (DD) COE SET 05.23.2025 90% DESIGN DEVELOPMENT (DD) SET 06.10.2025 100% DESIGN DEVELOPMENT (DD) SET 06.25.2025 90% CONSTRUCTION DRAWING (CD) SET 07.25.2025 PERMIT SET (1ST CITY SUBMITTAL) 11.14.2025 1ST SUBMITTAL RESPONSE 12.19.2025 100% CONSTRUCTION DRAWING (CD) SET
CD_F 12/19/2025