byrnerental.com
Issue:
Buildings that are connected to District Cooling network experience delays with connections to network on District Cooling Plants (DCPs).
Solution:
District Cooling Rental SolutioNS
Install a temporary chiller to building’s heat exchange for testing & commissioning or to provide cooling to building.
Result:
Temporary solution can help the main contractor’s hand over building to owner and allow landlords & tenants to move into the building thus reducing delays.
Enabling operational efficiency through equipment rental and lease solutions
UAE
KSA
Kuwait
Oman
Bahrain