Sample Read


© Taxmann Price : ` 315
Law stated in this book is as updated till 15th November, 2025
Published by : Taxmann Publications (P.) Ltd.
Sales & Marketing : 59/32, New Rohtak Road, New Delhi-110 005 India
Phone : +91-11-45562222
Website : www.taxmann.com
E-mail : sales@taxmann.com
Regd. Office : 21/35, West Punjabi Bagh, New Delhi-110 026 India
Printed at :
Tan Prints (India) Pvt. Ltd.
44 Km. Mile Stone, National Highway, Rohtak Road Village Rohad, Distt. Jhajjar (Haryana) India
E-mail : sales@tanprints.com
Disclaimer
Every effort has been made to avoid errors or omissions in this publication. In spite of this, errors may creep in. Any mistake, error or discrepancy noted may be brought to our notice which shall be taken care of in the next edition. It is notified that neither the publisher nor the author or seller will be responsible for any damage or loss of action to any one, of any kind, in any manner, therefrom. It is suggested that to avoid any doubt the reader should cross-check all the facts, law and contents of the publication with original Government publication or notifications.
No part of this book may be reproduced or copied in any form or by any means [graphic, electronic or mechanical, including photocopying, recording, taping, or information retrieval systems] or reproduced on any disc, tape, perforated media or other information storage device, etc., without the written permission of the publishers. Breach of this condition is liable for legal action.
For binding mistake, misprints or for missing pages, etc., the publisher’s liability is limited to replacement within seven days of purchase by similar edition. All expenses in this connection are to be borne by the purchaser. All disputes are subject to Delhi jurisdiction only.

BUILDING AND OTHER CONSTRUCTION WORKERS’ (REGULATION
3.
4.
5.
6.
7.
8.
CHAPTER V
CHAPTER VI
42.
47.
BUILDING AND OTHER CONSTRUCTION WORKERS’ WELFARE CESS ACT, 1996
BUILDING AND OTHER CONSTRUCTION WORKERS’ (REGULATION OF EMPLOYMENT AND CONDITIONS OF SERVICE)
CENTRAL RULES, 1998
PART I
PRELIMINARY
1. Short title, application and commencement 61
2. De nitions
3. Interpretation of words not de ned
4. Savings 67
CHAPTER II
RESPONSIBILITIES AND DUTIES OF EMPLOYERS, ARCHITECTS, PROJECT ENGINEERS AND DESIGNERS, BUILDING WORKERS, ETC.
5. Duties and responsibilities of employers, employees and others 67
6. Responsibilities of architects, project engineers and designers 69
7. Responsibilities of the persons in the service of the State Government and the Board 69
8. Duties and responsibilities of workers 69
9. Exemption 69
PART II
CENTRAL ADVISORY COMMITTEE, REGISTRATION OF ESTABLISHMENTS
CHAPTER III
CENTRAL ADVISORY COMMITTEE
10. Constitution of Central Advisory Committee
12. Resignations
15. Removal from membership
16. Manner of lling vacancies
17. Staff of Central Advisory Committee
18. Allowances of members
19. Disposal of business
20. Meetings
21. Notice of meetings and list of business
22. Quorum
CHAPTER IV
REGISTRATION OF ESTABLISHMENTS
23. Manner of making application for registration of establishments
24. Grant of certi cate of registration
25. Payment of additional fees and amendment of register etc.
26. Conditions of registration
27. Fees
CHAPTER V
APPEALS, COPIES OF ORDERS, PAYMENT OF FEES, ETC.
28. Filing of appeal before the appellate of cer
29. Failure to appear on the date of hearing
30. Restoration of appeals
31. Hearing of appeal
32. Copy of Order of registration or of order in appeal
33. [Omitted by the Building and Other Construction Workers (Regulation of Employment and Conditions of Service) Central (Amendment) Rules, 2018, w.e.f. 4-9-2018]
CHAPTER VI
34. Excessive noise, vibration etc.
35. Fire protection
36. Emergency action plans
CONTENTS
37. Fencing of motors, etc.
38. Lifting and carrying of excessive weight
39. Health and safety policy
40. Dangerous and harmful environment
41. Overhead Protection
42. Slipping, tripping, cutting, drowning and falling hazards
43. Dust, gases, fumes etc.
44. Corrosive Substances
45. Eye Protection
46. Head protection and other protective apparel
47. Electrical hazards
48. Vehicular Traf c
49. Stability of structures
50. Illumination of passageways, etc.
51. Stacking of materials
52. Disposal of debris
53. Numbering and marking of oors
54. Use of safety helmets and shoes
CHAPTER VII
55. Construction and maintenance of lifting appliances
56. Test and periodical examination of lifting appliances
57. Automatic safe load indicators
58. Installation
59. Winches
60. Buckets
61. Identi cation and marking of
62. Loading of lifting appliances and lifting gears
63. Operator’s cab or cabin
64. Operation of lifting appliances
65. Hoists
66. Fencing of and means of access to lifting appliances
67. Rigging of derricks 93
68. Securing of derrick foot 94
69. Construction and maintenance of lifting gear
70. Test and periodical examination of lifting gears
71. Ropes
72. Heat treatment of lifting gears
73. Certi cate to be issued after actual testing and examination, etc.
74. Register of periodical test, examination and certi cates thereof
75. Vacuum and magnetic lifting gear
76. Knotting of chains and wire ropes
77. Carrying of persons by means of lifting appliances, etc.
78. Hoists carrying persons
79. Attachment of loads
80. Tower Cranes
81. Quali cation of operator of lifting winches and of signaller, etc.
82. Use of runways and ramps by building worker
84. Slope of Ramps
85. Use by wheelbarrows, etc.
CHAPTER XI
CONCRETE WORK
96. General provisions regarding use of concrete
97. Preparation and pouring of concrete and erection of concrete structures
98. Buckets
99. Pipes and Pumps
100. Mixing and pouring of concrete
101. Concrete panels and slabs
102. Stressed and tensioned elements
103. Vibrators
104. Inspection and supervision
105. Beams, oors and roofs
106. Stripping
107. Reshoring
CHAPTER XII DEMOLITION
108. Preparation
110. Demolition of walls, partitions, etc.
111. Method of operation
112. Access to oor
Demolition of structural steel
Storage of material or article
115. Floor openings
116. Inspection
117. Warning signs, barricades, etc.
118. Mechanical method of demolition
CHAPTER XIII
EXCAVATION AND TUNNELLING WORKS
119. Noti cation of intention to carry out excavation and tunnelling work
120. Project Engineer
121. Responsible person
122. Warning signs and notices
123. Register of employment etc.
124. Illumination
125. Stability of structure
126. Piling, shoring and bracing
127.
128. Treches
129.
130. Positioning
131.
132.
133.
134.
135.
136.
150.
151.
155. Emergency generators
156. Air mains
157. Bulk head and air-locks
158. Diaphragms
159. Portable electrical hand tools
160. Circuit breaker
161. Transformer
162. Live wires
163. Welding sets
164. Quality and quantity of air
165. Working temperature
166. Man-locks and working in compressed air environment
167. Safety instruction
168. Medical lock
CHAPTER XIV
CONSTRUCTION, REPAIR AND MAINTENANCE OF STEEP ROOF
169. Work on steep roofs
170. Construction and installation or roo ng brackets
171. Crawling boards
CHAPTER XV
LADDERS AND STEP-LADDERS
172. Construction and safe use
173. Rungs
174. Materials for ladders
CHAPTER XVI
CATCH PLATFORM AND HOARDINGS, CHUTES, SAFETY BELTS AND NETS
175. Catch platforms
176. Hoardings
177. Chutes, its construction and use
178. Safety belt and its use
179. Safety net and its use
180. Storage of safety belts and nets, etc.
CHAPTER XVII
STRUCTURAL FRAME AND FRAMEWORK
181. General provision
182. Form work, false work and shoring
183. Erection or dismantling of steel and prefabricated structure
184. Form work
185. Deshoring
CHAPTER XVIII
STACKING AND UNSTACKING
186. Stacking and unstacking of materials and articles
187. Stacking of cement and other material bags
CHAPTER XIX SCAFFOLD
188. Scaffold construction
189. Supervision by a responsible person
191. Standards, ledger, putlogs
192. Working platform
193. Board, plank and decking
194. Repair of damaged scaffold
195. Opening
197. Scaffold used
198.
Trestle
203. Scaffold supported by
204. Use of winches and climbers for suspended scaffold
205. Safety devices for suspended scaffold
208.
209.
210.
211.
CHAPTER
217. Instruction to and supervision of building workers working on a
219.
CHAPTER XXIV
MEDICAL FACILITIES
223. Medical examination of building workers, etc. 149
224. Duties of construction medical of cers 150
225. Occupational health centres 150
226. Ambulance Room 150
227. Ambulance van 151
228. Stretchers 151
229. Occupational health services for the building workers 151
230. Notice of poisoning or occupational diseases 152
231. First-aid boxes 152
232. Emergency care services or emergency treatment 153
CHAPTER XXV
INFORMATION TO BUREAU OF INDIAN STANDARDS
233. Furnishing of information to Bureau of Indian Standards. 154
PART IV
HOURS OF WORK, WELFARE, PAYMENT OF WAGES, REGISTERS AND RECORDS, ETC.
CHAPTER XXVI
HOURS OF WORK, REST INTERVALS AND WEEKLY OFF, ETC.
234. Hours of work, intervals of rest and spread over etc. 154
235. Weekly rest, payment for work done on the day of rest at overtime rate, etc. 155
236. Night Shifts 155
237. Application of provisions of this Chapter to certain classes of building workers 156
CHAPTER XXVII
NOTICES, REGISTERS, RECORDS AND COLLECTION OF STATISTICS
238. Notice of wage periods, etc. 156
239. Notice of commencement and completion 156
CONTENTS
PAGE
240. Register of persons employed as building workers 157
241. Muster-roll, wages register, deduction register, overtime register and issue of wage books and service certi cates 157
242. Returns 159
CHAPTER XXVIII WELFARE OF BUILDING WORKERS
243. Latrine and urinal accommodation 160
244. Canteens 160
245. Foodstuff to be served in the Canteen 161
246. Serving of tea and snacks at the work places 161
247. Charges of foodstuff 161
CHAPTER XXIX WAGES
248. Payment of wages 161
249. Display of notices of wage regarding date of payment of wages 162
PART V
MISCELLANEOUS PROVISIONS
CHAPTER XXX
POWERS OF DIRECTOR GENERAL AND INSPECTORS
250. Power to engage experts, agencies 162
251. Powers of Inspectors 163
252. Prohibition Order 164
SCHEDULE I: Manner of test and examination before taking lifting appliance, lifting gear and wire rope into use for the rst time 164
SCHEDULE II: Noti able Occupational Diseases in Building and other Construction Work 167
SCHEDULE III: Contents of a First-Aid Box 168
SCHEDULE IV: Articles for Ambulance Room 169
SCHEDULE V: Contents of Ambulance Van or Carriage 170
SCHEDULE VI: Permissible Exposure in cases of Continuous Noise 171
SCHEDULE VII: Periodicity of Medical Examination of Building Workers 171
SCHEDULE VIII: Number of Safety Of cers, Quali cation, Duties, etc. 172
SCHEDULE IX: Hazardous Process 174
SCHEDULE X: Services and Facilities to be Provided in Occupational Health Centres 174
SCHEDULE XI: Quali cation of Construction Medical Of cer 174
SCHEDULE XII: Permissible Levels of Certain Chemical Substances in the Work Environment 175
BUILDING AND OTHER CONSTRUCTION WORKERS’ WELFARE CESS RULES, 1998
1. Short title and commencement
2. Definitions
3. Levy of cess
4. Time and manner of collection
5. Transfer of the proceeds of the cess to the Board
6. Information to be furnished by the employer
7. Assessment
8. Return of overpaid cess
9. Exemption
10. Powers of Assessing Officer and other officers
11. Date of payment
12. Penalty for non-payment
13.
14.
15.
EASE OF COMPLIANCE TO MAINTAIN REGISTERS UNDER VARIOUS LABOUR LAWS RULES, 2017
1. Short title and commencement
2. Maintenance of registers under certain labour related laws
3. Amendment of certain rules
SCHEDULE
FORM A: Format of Employee Register
FORM B: Format for Wage Register
FORM C: Format of Register of Loan/Recoveries 206
FORM D: Format of Attendance Register 206
FORM E: Format of Register of Rest/Leave/Leave Wages under The Mines Act, 1952, The Sales Promotion Employees (Conditions of Service) Act, 1976 and The Working Journalists (Conditions of Service) and Miscellaneous Provisions Act, 1957
RATIONALISATION OF FORMS AND REPORTS UNDER CERTAIN LABOUR LAWS RULES, 2017
1. Short title and commencement 209
2. Maintenance of Forms under certain labour related laws 209
3. Amendment of certain rules 209 SCHEDULE 213