Skip to main content

Sylvie Zhang Landscape Architecture Portfolio

Page 1

PORTFOLIO Landscape Architecture I Selected works 2023-2026 Sylvie Zhang 0424298306 I sylvieyuxin@gmail.com


AFL TASMANIA HIGH PERFORMANCE TRAINING FACILITY Project Type : Sport Infrastructure Contexts The AFL Tasmania High Performance Training Facility in Kingston was designed to bring local communities and visitors closer to the landscape, respond to environmental conditions and the sports precinct’s needs, and create a memorable, hands-on experience that strengthened the site’s connection to place. Challenge One challenge was balancing budget constraints with a thoughtful planting design. The client proposed using mostly grasses instead of shrubs to save costs—an approach that can work at first but often leads to more maintenance later Approach Rather than making short-term cost-saving choices, I help to develop a planting strategy based on the site’s microclimate, including shade analysis. For example, one planting zone drew inspiration from Tasmania’s Grassy Woodland, increasing habitat value by introducing a wider mix of native species that require little maintenance and are well adapted to local conditions. Responses The final design supports AFL training while also encouraging ongoing community use and creating a more engaging experience for everyone.

Landscape batter treatment options

Surface and material treaments

Working on this project sharpened my ability to collaborate across disciplines and balance elite sports needs with practical outcomes for the wider community, all while meeting tight deadlines.

Treatment 1 : Cut Batter (Geogrid installnation)

Treatment 2 : Fill Batter (Jute Mat installnation)

Treatment 3 : Hydroseeding

Treatment 4: Instant Turf and Garden bed 1


Shadow analysis

Initial planting plan

Soft Landscape Plan

2


85

2

2

642

523

2

644

2

272

2 717

2 598 2 601 2 650 622

593

696

2

2

2

604

592

2

2

097

1 2 133 990

2 554

2

2 449

603

626

2

2

617

2

2 619

749

2 601

2 499

2 429

2 679

465

2 160

2 2 196 073

566

402

2

2

2 561

2

505

271

2

2 260

2

466 2

202

2

422

2

485

2 2 128 086

2 194 222 113 116 099

2

2

608

2 581

2

255 148

2

215

2

243 2 270 2

2

2 290 2 142 295 2 2 143 204 2 206

2 408

2

570

2 2 2 451 427 441

LT AALT PPHH AASS

2

2

2

449

EE

485 529

450

NCC N

2

2

79

655

1. 4

2 455

FFEE

462

2

2 532

550

2

2

2 628

529

2

513

2 460 2 455 447 2 427 2

TC

H SSH MEE M

2

C

503

1.

2.6

2

462

FH

T

IN IN

HAA

CH C

2

67

61

2

1. 2

50 487

1.2

56

0

11

2 415

2

1. 57 5

1.

2.6

1.

657

79

12

1

2.6 02

2 567

2

2

2

594

429

706

64 6

1. 68 0

1.

2

558

1

2

62

2

701

386 2 2332

2

71

1.

1.

79

0

1. 1.60 1.6012 59 1. 2 61 4 1. 62 1. 2 62 8

64

2

2

705

653

270

1

1.

2

59

480

6

2 672

2 573

1.

2

2

651

71

1.

6

1. 72 52 3 2

1.

1. 65

6

2

1. 98

1.

6

1. 53 1.7 1. 54 1. 1. 2 571 49 1. 657459 68 1. 55 9 1. 0 73 1. 4 1.1. 3 1.76 85 1. 3 5757 49 92 1 8 76 1. 01. 1. 0 50 54 1.69 1. 807 90 1. 8 4 9 1. 0 51 89 1. 71. 1.80 52 55 4 4 2. 1.71. 2 02 5254 1. 1 2 4 77 4

1.

1.

1.

1. 1. 55 53 2 5

56 9

SS

AASS

1.

D

GGRR

487

D

2

D

LT AALT PPHH AASS

487

D

2

.

418

D

HH.

2

2

1.

679

723

E

328

458

D

. CC

330

2

E

79

CC.

D

2 416 325

1

E

2

2

D

2

63

634

756

ONN

2

E

CCO

2

D

480

133

124

2

E

2

2

0

2

D

72

2.

9

03

1

2 501

1.

976

1 2 903 050

77

0

2 354

795

467 2 328 2

2

7

9

83

71

1.

1.

5

1.

4

474

76

2

2 651

2

1.

123

1.

1.

76

2

7

9

78

78

2

548

8

252

1.

9

347

79

2

1.

08

7

9 1.82

2.

75

6

2.

04

5

8

1.

98

07

1.

81

5

1.

2

620

65

1.

4

77

1

1.

1.

2

2 727

1.

2

74

761

1. 9

1. 87

2

3

691

1.

63 1. 8 69

7

1.

65

5

1. 3

68 1.5 1. 266 765466 5

58

1.

2

802

1

2

532 2 388 2 446

2

75

67 18

715

1.

0

1.

1

65

74

3

66

1.

96

1.

1.

1

NG

98

66

1. 80 2. 00 1. 1. 9 821. 70 64 1 476 0 1 1. 11.1. 1. 57 7981 2 74 728 0 1. 3 1. 6 996 1.1.69 73 1. 58 1. 8 1.1.6117 54 8 561. 63 60 6 1 7 83 1. 63 7 1. 1. 67 63 9 4 1. 67 3 1. 56 6 1. 64 1. 5

2.

4

ROCK EDGI

2. 1. 589 1. 08 52 76 6 8 1. 4 1. 64 1. 55 4 79 2 1. 3 81 5

825

. &&

322

281

E

T

2

2

D

KK.

090

E

2

E

121

D

1 1 811 963

E

2

D

240

E

E ONN TTO

2

D

216

E

ESS

2

D

UUE

GRASS GRAS S

E

FENC FENCE E

D

BBLL

029

E

2

D

MESH MESH

E

T

107

D

T

2

E

T

181

D

T

CHAIN CHAIN

E

T

2

D

T

216

E

T

2

D

T

124

E

T

2

D

T

289

E

T

2

D

AD

E

887

D

1

E

T

1 1 762 910

73

5

2

1.

3

1. 4

79

1

377

2

2

1.

1. 70

5

2 651

2

1.

67 2 0 656

638

9

2

68

2

2 191

2

2

453 454

454

22

424

2 460

2 2 451 468

GATE

1. 82

81

1

1. 8

1 1 61 622 0 2

8

674

56

2

1.

2

627

1 73

598 2 431 2 471

2

625

2

8

1.

1. 8

4

67

72

68

672

1.

1. 1. 76 77 76 1.31. 1.1 1. 8 78 7777 85 7 5 7 1. 0 1. 1.90 89 1. 76 1 21.88 4 776 1

1.

85

1.

7

024

1 2 971 130

349

1. 58 9 1.1.1 1. 616058 1 59 5968 6 73 1. 1 51 1 50 64 6 1 1 27 1. 53 65 53 1 1.1.52 11 6 69 1. 1 5552 11812166 1 58 1. 52 2 52679 1.1 64 62 92 723 73 0 66 499 1.159 59 1 78 55 2

63

74

71

2

1.1.71 81 60 2 475

9

1.

66 1. 4 64

58

1.

454

1.

2

71

256

G

D

T

016

G

E

T

2

9

1

G

D

T

Y) NL O

972

1.

1

2

82

G

E

T

1

66 0

00 9

1

G

E

T

T

ARY RO

6

600

67

2

G

E

T

NO.

1. 79 4

1.

1

82

6

1. 81

2

70

1

431

1 1 73 58 4 2

11 8593 75 1

1.

0

2

0

1

2

693

52 1 6 63

6

96

3

92 6

8

1.

2

1.

85

2

2

2

095

529

344

2 2 040 209

2

546

0

686

79

2

2

528 2

519

494

2

CONC CONCRETE RETE

71

7

1.

87

1 91 94 7 1 1

94

1

76

1

5

1

59

3

543

2

G

E

D

E

T

838

G

A

E

D

T

X. RO PP (A

1

2

G

E

D

T

808

647

2

1. 77 1

1. 1. 75 75 1. 7 78 1. 4 77 1 6

2

1

1

716

93

527 2 84 416 2 1 426

G

E

D

T

LIGHTPOLE LIGHT POLE

2

2 628

309

1. 82

4

7

2

546

1.

4

85

1

2 08

2

2

2

07

84

9

2 732

0 1

8

89

84

1

1

2

2

1

647

71

709

90

08

4

2

6

2

5

09

2

09 62

12

1 10 9

08

2

2

2

1.

1

1

9 2 2 09 08 2 8

1

0

90

95

7

0

8

72

2

77

1

159 73 4

4

1

1

2 09 9

656

2

88 3

1

74

9

1

701

5

7

93

86

1

1

1

0

1 1 79 64 7 3

1.

2

74

8

1.

711

95

2

FENC FENCE E

291

72

2

1 62 162 1 1 754 74 9 3 2

748

2

MESH MESH

1.

434

76

2

CHAIN CHAIN

GRASS GRAS S

K. K. & & BLUE BLUEST. ST. CH. CH.

89

2

7

22 639 2 633 6572 2 654 2 643 646

509 2 417 2 432

2 514

2

E

1 70 118 6765 04 1 1 1 60856 75 4 0

808

6

1 86 91 91

5

G

1

20

97

8

1

5

77 2

1

G

90 2

G

G

1 1 98 99 9 2

2 2 16 11 5 7

E E

1 72 1 1 4 2 535 66 66 2 5

E

2

714

2

2

383 398 2 379

2

G

2

2

17

517

2

2 630

634

1 98

8

6

7

E

19 2 16

2

6

16

4

18

17

2 1 2

2

9

E

1

1 78 3

2 4

1 1 83 68 9 8

05

2

8

E

1

8

6

0

19

17

98 3

E

2

651

569 581 2 572

2

2 2 650 686

665

72

2

651

91

2

2

1

2

1 1 61 750 6

608

22 20 19 90

E

2

693 593

508 2 426 2

2

2 21 6

E

427

2

2

635

604

2

2

E

2

1

2

E

2

2

87

569

653

598

2

2

2

269

542

E

2

3

2

2

2

3

E

674

2

2 7

E

06

1 1 90 74 4 0

E

623

645

598

544

2

83

647

1

21

4

551

19

4

2 2 2 180 318

432

585

SS

DATE

G

REVISION

E

2 610

2

1

13

E

2

9

6

97

11 9

E

2

2

481 2 411 2 427

E

224 2 231 2 2 220 348 2 406

E

E

2

E

2 14 9 E

1

2

2

26

5

E

1 167 839 7

1

509

80

2

2 2 509505 2 2513 2 520 2 505 515

2372 2224 382

2 226 378

CHA CHAIN IN

E

2

501

2

2 422

2

516 2 496

488

471

2

2

438

2

462

461

2

2 2 308 2 280 444

03

E

9

2 27 6

444 2 430

2

448 2 371 2 382

2

2 493 459

2 2 307 472

463

2

10

9

37 9

1 92 5

2

28

6

1 1 95 80 6 9

2

2

2 483

2

22

0

2

2 2 362 374

2 2 2 2 526374 421 2 2 766 2526 349 527 2 395

2 2 2 375 372 352 390 2 520 2 2 380 5302 2 2390 5242394 402

2 15 9

2 42 9

2 67 9

1

2 14

98

6

4

2

2 1 01 86 5 6

16 0

2 31

2 15 6

K. K. & & BLU BLUEST EST..

512

493

FEN FENCE CE

GRASS GRA SS

MES MESH H

2

2

2

2

CON CONCRE CRETE TE

470

2

2 2 242 414

4

2

0

1

35

37

2

2

30

7

79 4

2 23

2

43

7

2

4

70

1

2 23 5

2 2 22 22 6 1

1 98 2 0 18 1

1 1682 83 5

1

GATE 22 23 26 50

CH. CH.

05

3

4

1

54

16

2

2

2

1 2 08 93 5 2

2

64

2

2

52

3

4

2

64

2

2

32

2

27

2

2 08 0

2 48 0

2

71

2

7

41 8

2

59 2 8 60

2

1

3

2

65 62

3

6

59

69

2

2

50

02 2

2

2

60

59

BY

A RA GR G

KK.. &&

09

1 2 13 99 3 0

SSSS

UU

BBLL

M

G G

G G

G G G G G G G

G

G

G G

NO.

7

TT.. EESS 2

4

2 28 9

2 12

80

2

2

55

97

4

1

2

61

2

44

3

6

60

62

2

2

7

8

4

1 1 72 877 7

1

2

9

2

61

9

74

9

2 33 0

2

60

1

2

48

7

2

49

9

2

42

9

2 01 6

2

46

2

2

48

2

67

5

9

2

46

5

H SSH MEE M

DATE

16

0

C C ENN FFE 2

ISSUE

2

6

2

56

40

2

E E 2 2 19 07 6 3

56

1

BENCHM BENCH 2

2

27

2

1

50

5

2

2

6

0

21

26

2

46

6

1

20

2

7

2

42

2

2

5

8

48

32

2

2

2 2 12 08 8 6

2 19 4 222 11 11 09 2 936

2

18

83 8

1 1 76 91 2 0

1

10

60

8

2

2

48

CHA CHAIN IN

2

2

7

BOUND

58

1

25 14 5 8

2

5

2

3

21

24

2

2

27 20

29 2

02 9

2

57

2

0

6

014 22 20 20

29 2

4

2

40

8

2

2 44 2 2 2 45 42 9 44 1 7 1

514 23

2

2

52

9

45

0

2

65

5

2

45

5

2

FEN FENCE CE

GRASS GRA SS

2

53

2

55

0

2

2

2

52

45

7

7

0

51

46 44

2

42

2 52

2

3

62

9

2

2

8

6

46

21

2.

61 1

2

2

24

2

0

2.

61

41

5

2

65

7

2

2

2 41 32 6 5

2

88

1

7

12

48

2

2.

7 1 1 81 96 1 3

1

60

2

2

56

7

2

2

6

9

59

42

70

2

4

2

70

2 3 27

1

38 2 6 23

2

2

55

8

2

09

2

0

2

70

5

ARY RO

MES MESH H

LIGHTPOLE LIGHT POLE TT AALL PPHH AASS

G G

M

TC

H..

FH

CH C

EE

TT..

NCC N

ESS

BENCH BENCH FFEE

UUE

AASS

CHH C IN AIN A

C

G

G

E

D

T

E E

GRR G

H SSH MEE M

G

E

O

E

D

T

T. T. G

E

D

T

ESS G

E

T

UUE

BBLL G

E

R

E

T

&& G

E

T

SS FF

C C ENN E G

Y

E

T

AASS H SSH MEE M

&& BBLL G

LA

E

T

BENCHM BENCH G

G

E

T

EE EETT CCRR OONN KK..

IN AIN A

KK.. VRR

G

E

T

CC R GR G G

CCV

G

E

T

SEAT SEAT G G

E

T

CHH C G G

CC EE EETT CCRR OONN G

TTEE GGAA

M T

IN IN

G

HAA

G

CC

EE EETT CCRR OONN

CH C

G

65

3

0

2

67

2

45

57

2

2

3

8

2

48

2

65

2

1

0

67

3

2

72

9

2

2

63

1

4

13

12

2

4

57

1

6

2

28

75

2

2

3

2

82

5

AD

.

G

R

HH.

SS

G

AASS

G

ST

. CC

G

SEAT SEAT

CC.

G

ONN

G

GGRR

G

LIGHTPOLE LIGHT POLE

TT AALL PPHH AASS

G

GRASS GRASS

CCO

G

C

. &&

G

RA IE

KK.

G

SA

SEAT SEAT

2

5

28 35

79

732

2

46 2

9

2

58

E

G

LIGHTPOLE LIGHT POLE

4

E ONN TTO

G

1

2

50

1

97 1 2 90 05 3 0

2

65

ESS

G

1

UUE

G

ASR G

SS

6

2

72

7

BBLL

G

G

E

T

LIGHTPOLE LIGHT POLE

2

47

4

2

76

1

2

12

3

2

2

8

2

54

25

2

62

0

2

34

7

2

69

1

2

72

8

2

80

2

5

6

2

76

53 22 382 844

2

2

71

5

2

25

6

2

LIGHTPOLE LIGHT POLE

45

D

G

GRASS GRASS

4

2

2

65

1

2

2

3

65

7

72

5

37

47

2

6

2

A

G

BENCH BENCH

2

02

4

2

9

63

34

8

1 2 97 131 0

2

19

1

22

4

2

2

45

2

4

45 45 34

42

4

2

62

2

0

2 62 7 592 843 2 147

1

2

1

67

46

5

2

2 2 45 46 8

GATE

67

2

O

G

LIGHT POLE LIGHT POLE

R

G

G

E

T

GRASS GRASS

E E

LIGHTPOLE LIGHT POLE

2

60

0

Y

G

RESERVE

2

54

3

2

43

1

2

69

3

2

52

8

2

2

54

2

09

52

4

2

34

6

2

2 2 04 20 0 9

9

5

2

4

51

49

2

68

6

2

64

7

2

9

CON CONCRE CRETE TE

LA

G

GR

522 7412 642

U

G

C

2

6

2

71

6

2

30

62

9

8

2

54

6

2

2

73

2

2

64

9

7

70

CHA CHAIN IN 2

43

4

65

2

8

2

6

74

2

70

1

MES MESH H

GRASS GRA SS

K. K. & & BLU BLUEST EST..

A

G

SEAT SEAT

SS

G

AASS

G

T

GGRR

G

MEE M

C

GRASS GRASS TT AALL PPHH AASS

G

IN AIN A CHH C E E

A

GRASS GRASS

C C ENN FFE

.

G

H SSH

29

2

71 1

2

50 2

80

8

9412 743

2

2

FEN FENCE CE

1

CH. CH.

2

M

G

G

E

SS

AASS.

GGRRH

C

T

SUB-CONSULTANTS SEAT SEAT

LIGHTPOLE LIGHT POLE

HH.

GRAVEL GRAVEL

. CC

M

CC.

G

G

E

Y) NL O

U

E

T.

TOP PIT RL. 1.552 PIT INVERT 0.942 G

A

E

LT AALT PPHH AASS

T

GRASS GRASS SEAT SEAT

MEE M G

E

ES

G

T

LIGHTPOLE LIGHT POLE

IN AIN A C C ENN FFE G

C

E

U

NEE

H SSH G

E

X. RO PP (A .

IN

T

RESERVE ON TTO

CHH C G

E

HH.

G

T

ESS E AT

E

. CC

BL

T

UE U G

A

E

CC.

&

ED

T

BBLL DF

LL G

E

ONN

SEAT SEAT

EE AAVV GGRR G

E

T

M CCO

T

BENCH BENCH

GRASS GRASS G

E

K.

CK

T

NEE

M

E

. &&

KK.

T

LIGHTPOLE LIGHT POLE

TE GA

E

E

RO

T

BENCH BENCH

PICNIC TABLE G

D

E AT

E

T

GRAVEL GRAVEL E

T

LIGHTPOLE LIGHT POLE

E

T

ON O SSTT UEE U BBLL ET

T

Y) NL O

CONFIDENTDOG AREA

MULCH R

T

CLIENT D

E ONN TTO

T

M D

ESS

T

MULCH MULCH EE

T

C LAY T O N D

NCC N

GRASS GRASS D

UUE

M SEAT SEAT G

G

D G

D G

D

ONN

G

CCO

G

. &&

G

C LAY T O N

KK.

G

EE

G

QUIET DOG AREA

NCC N

G

E

G

FFEE

G

BBLL

LIGHTPOLE LIGHT POLE G

G

D

G

G

D

C

T

X. RO PP (A

NEE D

N

T

U U

ON TTO EESS M

O

T

LIGHTPOLE LIGHT POLE D G

D

C

T

RESERVE D

FFEE

T

NOTE D

H SSH MEE M

T

CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: ANDREW@URBANINITIATIVES.COM.AU BBLL D

IN IN

T

GRASS GRASS D

G

D

HAA

T

CLAYTON D

CH C

T

M D

TOP PIT RL. 1.650 PIT BLOCKED

LT AALT PPHH AASS

T

Existing Opportunities Analysis

GROUND FLOOR 143 FRANKLIN STREET, MELBOURNE VIC 3000 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU D

SS

D

AASS

D

TC

D

G

E ONN TTO

G

CONFIDENTDOG AREA

ESS

G

RESERVE

UUE

G

L

M

22 2 6363 6532 92 65 27 64 4 64 3 6

2

51

BBLL

G

M SEAT SEAT

H SSH MEE M

G

LIGHTPOLE LIGHT POLE IN IN

G

HAA

G

LIGHT POLE

CH C

G

GRASS GRASS

4

2

9

71

2

3

38

39 8 2 37

2

4

2

51

7

2

2

2

53

5

2

0

4

63

63

TT AALL PPHH AASS

G

EE QUU AAQ

CLAYTON

SS

PPLL

G

EE QUU AAQ

D

GGRR

PPLL

T

W: WWW.URBANINITIATIVES.COM.AU 1 1 727 877

60

8

2

2

5

1

2

65

56 58 2 1957

66

2

2 2 65 68 0 6 2 65 2 1

69

2

59

3

502 842 2 6 42

3 2

E TTE GGAA

AASS

NNTT

TAS OFFICE D

LT AALT PPHH AASS

EE M M

080

L

GGRR

U U

E TTE GGAA G

M

7

2

2

5

4

63

60

2

2

8

2

65

59

56

3

9

2

2

2

1

2

26

7

9

64

2

2

54

2

2 2 18 31 0 8

43

5

55

58

2

4

2

59

4

67

2

54

2

2

62

5

2

64

8

3

M

TC

N N

THIS WORK IS NOT TO BE COPIEDLIGHT OR POLE REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR. 2

SEAT SEAT

2

61

0

2

2

22

4

2

23 1 2 2 22 34 0 2 8 40 6

48 2 1 41 21 42

7

TT AALL PPHH AASS

O O

D

M

NNTT

M M

D

TC

GRASS GRASS

2

2 222 637

2

50

9

2 2 50 50 2 9 5 2513 2 522 50 051 5 5

23 2 7 22238 4 2 8

2

47

2

2 2 24 412 4

50

0

1

2

48

2

42

2

47

1

2

43

2 8 2 51 49 6 6

2

8

2

2

1

46

46

2

2 2 30 2 28 8 440 4

2

2

44

442

4

0 138

43 8372

2

2

2

VR

TC

TC

SEAT SEAT

TC

VR

TC

VR

EE M M

Responses The design makes the park easier to use, safer, and more enjoyable for everyone. U U

I also used sensory landscape mounds as a ‘Space Breaker’ to draw the dogs’ attention away from chasing; this feature consists of a rock scramble 600mm high with rocks and plants that promote climbing and interaction N N

Approach I created a sensory buffer to control the dogs’ behaviour and boost their engagement, using plants such as rosemary and native fuchsia to provide a rich sensory experience through scent, texture, movement, and exploration. O O

Challenge I designed a garden to help dogs manage their behaviour, as they had been digging and collecting items along the fence line, creating safety risks near Macaulay Road. FH

Contexts The project renewed Melbourne’s oldest offleash dog park. The main aim is to improve safety, increase accessibility, and create a friendly atmosphere for all park users. 2

2 49 45 3 9

2 2 30 47 7 2

46

3

T

M M

TC

BOUND

2

49

51

3

2

2

2

48

3

2

2 2 362 37 4

2 2 2 37 3537 5 39 2 52 2 22 0 0 2 53380 2 022392 52 3940 4 04 2 2 2 2 2 5237 6 42 2 2 76 41 252 34 5262 6 9 7 39 5

Project Type : Community TC

T

FH

MELB OFFICE TC

1

CLAYTON RESERVE DOG PARK UPGRADE , NORTH MELBOURNE, VICTORIA

VR

Main Interest Areas

GRASS GRASS

M

Buffer Zone Iteration 1 : Physical barrier

Buffer Zone Iteration 2 : Planting buffer

T EE Main Interest Areas

Add 3m wide 1.2m high black chain mesh gate for vechicle access

Pedestrians & Dogs Circulation

Buffer Zone Iteration 3 : Sensory landscape buffer 25036

Vechicle access

CH C H..

Existing Picnic Table

BY

DRAWN BY

SZ

CHECKED BY

TH

PLOT DATE

18/6/2026

CAD FILE NAME 260617_25036 Clayton Dog Park_Plan_ACTIVE v2026.vwx

NORTH

SCALE

1:350 1:

Minor Interest Areas

Rock Mound and Nature Play Zone

Sand Pit Play Zone

Dog Run Zone Existing Grass

Existing Granite Gravel (top up)

Proposed Granite Gravel Possible New 1.2m high fence

New 3x3m New Airlock Gate

Include tapered corners along fence

Add 3m wide 1.2m high black chain mesh gate for vechicle access Pedestrians & Dogs Circulation

H..

CH C

Vechicle access

Existing Picnic Table

Existing seats to be relocated and refurbished Existing Light Pole

Minor Interest Areas

G G G G

Rock Mound and Nature Play Zone

Sand Pit Play Zone

G G

Dog Run Zone

G G G

G G G G G G G

Existing Grass

G G G

Existing Granite Gravel (top up)

Proposed Granite Gravel Possible New 1.2m high fence

New 3x3m New Airlock Gate

Include tapered corners along fence

PROJECT

Clayton Dog Park

@A1 ADDRESS @A3 201-241 Macaulay Rd, North Melbourne VIC 3051

DRAWING NO.

SK02

DRAWING NAME

REV #

DRAFT

SITE OPPORTUNITIES PLAN

3


CLAYTON RESERVE DOG PARK

REFER TO SHELTER MANUFACTURER DETAILS FOR SHELTER'S COLUMN, BEAM AND ROOF DETAILS.

FENCED OFF-LEASH DOG AREA

4020 SHELTER

CONFIDENT DOG AREA

SHELTER

2420

BE

EXISTING GRASS AREA

RUBBISH RUBBISH BIN BIN

1 1

7 7

1000

1100

3920

1000

MAKE GOOD GRASS

GARDEN BED

CONCRETE SLAB

MAKE GOOD GRASS

LG1.1 Quite Dog Area and Confident dog area Shelter Section 2

NEW NEW 1.2M 1.2M HIGH HIGH FENCE FENCE TO TO PREVENT DOGS PREVENT DOGS JUMPING JUMPING OVER OVER

EXISTING GRASS AREA

20

PL1.2

00

BE

PL1.3 RB1.1

BB OO UU NN DD AA RRYY RR OO AA DD

2000

RB1.1

300 MIN.

3000

200

6 6

PV2.1

NC

0

SZ

CHECKED BY

TH

PLOT DATE

17/6/2026

NORTH

DRAWING NO.

PROJECT

LA400

25036 Clayton Dog Park

SCALE

2000

DRAWN BY

260202_25036 Clayton Dog Park_Plan_ACTIVE v2024 v2026.vwx

REV #

RUBBISH RUBBISH BIN BIN

SHELTER SECTION

NO.

DATE

ISSUE

100 400-500

300 MIN.

Final Design Drawing for DEECA Grant Milestone

CHECKED BY

TH

PLOT DATE

17/6/2026

CAD FILE NAME

260202_25036 Clayton Dog Park_Plan_ACTIVE v2024 v2026.vwx

200

NORTH

SCALE

1:100

DRAWING NO.

PROJECT

LA410

25036 Clayton Dog Park @A1 ADDRESS 201-241 Macaulay Rd, North Melbourne VIC 3051

300MM MIN. SAND OVER 1: GEOTEXTILE FABRIC@A3

DRAWING NAME

CONFIDENT CONFIDENT DOG AREA AREA DOG 5 5

3 3

REV #

MAINTENANCE MAINTENANCE ACCESS ACCESS GATE GATE

11

ENTRY ENTRY GATES GATES WITH WITH SIGNAGE SIGNAGE

QUIET QUIET DOG DOG AREA AREA

6 6

7 7

8 8

7 7

5 5

11

MOUND 1 - CONFIDENT DOG AREA

SANDPIT WITH DIFFERENT SIZE BOULDER EDGING DRINKING RUBBISH BIN DRINKING RUBBISH BIN FOUNTAIN FOUNTAIN

300 MIN.

PLACEPLACE ROCKROCK ON ON AL CONSOLIDATED CONSOLIDATED GROUND GROUND (TO (TO BY APPROVAL) APPROVAL)

11/12/2025

SZ

6 6

2 2

4 4

DRAWING NAME

DEECA GRANT MILESTONE - DEC 2025 DRAWN BY

-

9 9

DEECA GRANT MILESTONE - DEC 2025

6 6

3 3

4 4

1400

H

20

00

7 7

AGRICULTURAL AGRICULTURAL DRAINDRAIN CENTRALLY CENTRALLY LOCATED LOCATED CONNECTED CONNECTED TO CLOSEST TO CLOSEST DRAINAGE DRAINAGE PIT PIT

Typical Sand Pit Detail

Typical Sand Pit Detail

Scale: 1:25

MINIMUM OF 300MM TOPSOIL AND CAPPING IS REQUIRED FOR ALL EXCAVATED FOOTING MATERIALS AND FILLED MOUND AREAS AS PER BEVERIDGE WILLIAMS CONTAMINATION ASSESSMENT. ALL SOILS EXCAVATED ON SITE MUST BE TESTED AND WRAPPED IN GEOTEXTILE PRIOR TO TOPSOIL COVER. PLEASE REFER TO BEVERIDGE WILLIAMS CONTAMINATION ASSESSMENT FOR FURTHER INFORMATION.

ENTRY ENTRY GATES GATES WITH WITH SIGNAGE SIGNAGE

9 9

GRACIE GRACIE STREET STREET

NORTH NORTH

Existing Existing Tree Tree

Grass Grass

Shelter Shelter

Bike Bike rack rack

Rock Rock

Agility Agility -- Bridge Bridge

Proposed Proposed Tree Tree

Granite Granite Gravel Gravel

Seating Seating

Mounds Mounds

Log Log

Agility Agility -- Weaver Weaver Pole Pole

Garden Garden Beds Beds

Concrete/asphalt Concrete/asphalt path path

Picnic Picnic table table

Sand Sand Pit Pit

Lights Lights

Agility Agility -- Tunnel Tunnel

MULCH INSTEAD OF GRASS AS A COST SAVING FOR NATURE PLAY ELEMENTS

SANDPIT WITH DIFFERENT SIZE BOULDER EDGING

DEECA GRANT MILESTONE - DEC 2025 MELB OFFICE

CLIENT

SUB-CONSULTANTS

8 8

RUBBISH RUBBISH BIN BIN

LEGEND LEGEND GEOTEXTILE FABRIC LAYER AS PER DASHED BLUE LINE. GEOTEXTILE FABRIC TO WRAPPED TO UNDER BOTTOM OF ROCK AND LOG.

5 5

PV3.1

0

1:100 @A1 ADDRESS Typical Mound Detail 201-241 Macaulay Rd, North Melbourne CAD FILE 11/12/2025 Final Design Drawing for DEECA Grant Milestone AL Logs and boulders build up mounds for sensory 1: & nature @A3 play Scale: 1:50 NAME VIC 3051 NO. DATE ISSUE BY

1

3 3

PL1.1

TIMBER LOG 450-550MM DIA., ENSURE CAN'T BE 2000 ROCKED

200

1

AD ROAD LAYYRO AULA ACAU MMAC

LOGS AND BOULDERS BUILD UP MOUNDS FOR SENSORY & NATURE PLAY

MINIMUM OF 300MM TOPSOIL AND CAPPING IS REQUIRED FOR ALL FILLED MOUND AREAS AS PER BEVERIDGE WILLIAMS CONTAMINATION ASSESSMENT.

4 4

LG1.1

Scale: 1:25

PV3.1

S S 5 5 a a rr g g

3 3

ENTRY ENTRY GATES GATES WITH SIGNAGE SIGNAGE WITH

PL1.3

NC H

CONCRETE PAD FOR SHELTER AS PER HATCHING

2 2

DRINKING DRINKING FOUNTAIN FOUNTAIN

1200

A

D D 11 p p e e ss

SHELTER ROOF OVERHANG 100MM OVER GARDEN BED TO HELP MAXIMUM STORMWATER RUNOFF INTO GARDEN BED

SHELTER ROOF LINE AS PER DOTTED LINE

QUIET DOG AREA

11

DRAWN BY

SZ

NORTH

PROJECT

DRAWING NO.

REV #

4

D D L L a a p p p p

C C O O u u tt m m rr e e

D D O O d d u u D D d d a a

T T T T d d tt m m ss u u tt

L L B B tt e e rr tt

A A E E o o e e tt ss

D D P P ii


SUNSHINE SECONDARY COLLEGE, SUNSHINE, VICTORIA KEY Existing trees retained (with tree TPZ)

Proposed Tree

Proposed Native Shurbs and G roundcovers

Project Type : Education

EXISTING BUILDING

Proposed G rass

Proposed G ravel Pavem ent (cem ent stabilised)

Contexts This project collaborates with architects in order to design an inviting outdoor area for students and improve the campus environment.

Proposed Concrete Pavem ent Proposed Exposed Aggregate Concrete Pavem ent Proposed Rock Lined Swale

Proposed Large Com m unal Tables & Chairs Proposed Bench Seat Proposed Stone Seats

Challenge The goal was to enable the students to establish a significant link with the indigenous heritage of the area as part of their everyday experience at campus.

NOTES

1 2 3

4

Approach To strengthen the connection to Wurundjeri culture, I helped design a yarning circle on the north side of the art building using large basalt rocks from the site for seating. Around the circle, I planted native species like kangaroo grass and chocolate lily in groupings that reflect the seven Wurundjeri seasons. Different sections change throughout the year. The space is positioned for morning sun and easy access, supporting gatherings, storytelling, and cultural learning. Responses The result is a school atmosphere that is more inclusive and welcoming while also promoting cultural learning and interaction. This project increased my experience in translating cultural narratives into meaningful landscape outcomes through materials, planting, and spatial design.

5 6

PEDESTRIAN ACCESS School entry point and arrival area for pedestrians from Northum berland Rd. M O UNDED PLANTING Raised garden beds with colourful native plants along eastern edge of building to create variation in the ground plane. YARNING CIRCLE Cultural gathering space / yarning circle with rock seating - subject to further discussion with W urundjeri W oi W urrung Cultural Heritage Aboriginal Corporation. CO VERED O UTDO O R LEARNING AREA New covered outdoor learning area with seating and BBQ s, and clim bers growing on pergola structure. CO URTYARD SPACE A welcom ing gathering space with seating and planting to create a sense of enclosure and provide shade. SCREEN TREES New trees planted to screen existing building and provide shade and habitat.

7

EPHEM ERAL PO ND Shallow ephem eral pond fed by rock lined swale with overflow pit in case of flood events.

8

ACCESSIBLE DECKED BRIDG E New tim ber bridge at grade over swale to provide DDA access.

Initial Concept Sketch: Proposed a yarning circle as a welcoming gathering space at the site entrance.

L-C01 Landscape Sketch Design Plan

Yarning Circle Moodboard

24041 P R O J E C T N O . SUNSHINE COLLEGE NORTH CAMPUS P R O J E C T 1:200@ A3 S C A L E IS S U E D F O R

29/11/2024 D A T E IS S U E D

Kangaroo Apple

Poa labillardierei

Kangaroo grass, Wallaby grass, Spear grass, and Tussock grasses

Mentha australis Myrnong (Yam Daisy) & Dianella (Flax Lily)

Rock correa, Grevillea rosmarinifolia Orchids

Yarning Circle planting diagram

Concept Design: Refined the yarning circle into an integrated arrival space that strengthens wayfinding, gathering, and cultural connection. 5


A

B

C

D

E

F

G

E: 309829 N: 5817086

SR

SR

800

SF

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

2 N: 5817043

NEW BUILDING

R 7340

E: 309859 N: 5817066

E: 309853

#01 N: 5817037

4

45 x Lom tan

SF

66 x Atr sem 66 x Ere gla

41 x Lom tan

SR

DP-** X 2 NO

SR SR

SF

SF

4 x Pan jas

SF

3 x Cor gla PROPOSED LOCATION OF UNDERGROUND RAIN TANKS

31 x Atr sem

NEW COVERED OUTDOOR LEARNING AREA

DP-** X 2 NO

DP-** x 2 NO

SF

SF

86 x Lom tan

CLIENT

SUB-CONSULTANTS

BM

DRAWN BY

Planting Plan TAS OFFICE

CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: ANDREW@URBANINITIATIVES.COM.AU W: WWW.URBANINITIATIVES.COM.AU

NOTE

THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR.

NO.

DATE

REVISION

BY

T1

04/9/2025

TENDER ISSUE

BM

NO.

DATE

ISSUE

BY

NORTH

CHECKED BY

BM

PLOT DATE

24/6/2026

CAD FILE NAME

250721_Sunshine Secondary College_Tender Plan_v2024 ACTIVE v2025.vwx

24041 SUNSHINE COLLEGE NORTH CAMPUS

1:100 @ A1

NEW BUILDING

SR

SR

SR

SR

SR

SF

SR

SF

SR

SR

SR

SR

SR

SR

SR

SR

3

Yarning Circle

SF

SF

SF

SF

SF

SF

SF

SF

TAP

Irrigation Plan SUB-CONSULTANTS

TAS OFFICE

CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: ANDREW@URBANINITIATIVES.COM.AU W: WWW.URBANINITIATIVES.COM.AU

DRAWN BY

BM

CHECKED BY

BM

PLOT DATE

24/6/2026

CAD FILE NAME

250721_Sunshine Secondary College_Tender Plan_v2024 ACTIVE v2025.vwx

NOTE

THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR.

NO.

DATE

REVISION

BY

T1

04/9/2025

TENDER ISSUE

BM

NO.

DATE

ISSUE

BY

Indicative location of

MELB OFFICE proposed new taps

SUITE 3, 25-31 ARGYLE STREET, FiTZROY VIC 3065 AUSTRALIA FOR TENDER T: (03) 9329 6844 REV # DRAWING NO. E: OFFICE@URBANINITIATIVES.COM.AU

NORTH

PROJECT

SCALE

24041 SUNSHINE COLLEGE NORTHTAS OFFICE CAMPUS CITY MILL, LEVEL 3 11 MORRISON STREET,

1:100 @ A1

LD4.3 DRAWING NAME

ADDRESS

Irrigation Plan7000 AUSTRALIA HOBART TASMANIA T: (03) 6223 3138 E: ANDREW@URBANINITIATIVES.COM.AU

NORTHUMBERLAND RD, SUNSHINE

Mounded Planting

3

Yarning Circle

6

Screen Trees

4 CLIENT

5

25/6/2025

7

Buffer Planting

Covered Outdoor Learning Area SUB-CONSULTANTS Covered Outdoor Learning Courtyard Space Area NO.

DATE

EXISTING SERVICES REMOVED

8

REVISION

SZ

T1

04/9/2025

NO.

DATE

ISSUE

8

Buffer Planting Opportunity For Aboriginal

A

25/6/2025

EXISTING SERVICES REMOVED

NO.

DATE

REVISION

BM

PROPOSED LOCATION OF UNDERGROUND RAIN TANKS

SR

Orchids SR

BY

SR

T1

04/9/2025

BY

NO.

DATE

ISSUE

SR

SR

SR

SR

8

24041 SUNSHINE COLLEGE NORTH CAMPUS NEW BUILDING

BM

PLOT DATE

21/4/2026

CAD FILE NAME

PROPOSED LOCATION OF 250721_Sunshine Secondary UNDERGROUND RAIN College_Tender Plan_v2024-Project TANKS Sheets.vwx

SCALE

ADDRESS

NORTHUMBERLAND RD, SUNSHINE DRAWN BY

BM

CHECKED BY

BM

NEW COVERED PLOT DATE OUTDOOR LEARNING AREA BM BY

CAD FILE

4NAME

LD2.1

4 Plan 01 Materials & Surfaces

8

250721_Sunshine Secondary College_Tender Plan_v2024-Project Sheets v2025.vwx

SCALE

A

NEW COVERED OUTDOOR LEARNING AREA

DRAWING NAME

NORTH

1/7/2026

NEW BUILDING

REV #

DRAWING NO.

PROJECT

NEWTENDER BUILDING ISSUE

SZ

SR

SR

8

5 NORTH

CHECKED BY

Courtyard Space 5 It5 creates an inclusive and welcoming school environment that also support 6 cultural learning and connection. Screen Trees 7

SR

SR

SF

SF

SF

BM SF

1:100 @ A1

TENDER ISSUE

Opportunity For Aboriginal 6 Artwork / Mural BY

SR

SF

SF

SF

THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR.

A

SF

2

8 SF

SR

Rock correa, Grevillea rosmarinifolia

SR

SF

SR

SF

SF

SF

W: WWW.URBANINITIATIVES.COM.AU

NOTE

SF

SF

W: WWW.URBANINITIATIVES.COM.AU Garden bed irrigated with dripline NOTE THIS WORK IS NOT TO BE COPIED OR Grass irrigated with spray REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF Indicative location of THE AUTHOR. irrigation conduits

Awards: Awards here CLIENT

TAS OFFICE

SF

DRAWN BY

CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138

SR

FOR TENDER

SUB-CONSULTANTS

SF

E: ANDREW@URBANINITIATIVES.COM.AU KEY - IRRIGATION

IRRIGATED GRASS

Courtyard Space

SR

5

SF

SF SF

Budget: $xxK or million

5

Pedestrian Access

SF

SF

IRRIGATED GRASS

CLIENT

6

SF

MELB OFFICE SUITE 3, 25-31 ARGYLE STREET, FiTZROY VIC 3065 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU

TAP

MELB OFFICE

1

#03

Client: Client

SUITE 3, 25-31 ARGYLE STREET, FiTZROY VIC 3065 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU

5

#01

Role: Lead Consultant NEW COVERED OUTDOOR LEARNING AREA

PROPOSED LOCATION OF UNDERGROUND RAIN TANKS

Covered NEW Outdoor Learning ENTRY Area Covered Outdoor Learning SF Courtyard Space Area

SR SR

SF

EXISTING TREES RETAINED

SR

SR

3

SR

3

SF

4 NEW BUILDING

SR

SF

#02

NEW BUILDING

SR

SR

SR

SF

SF

SF

SF

SR

SR

Mounded Planting

SR

8 SF

SF

SF

SF

SF

2

SR

SR SF

SR

SFSF

SF

SF

SF SF

SR

SR

SR

SR

SF

SF

SR

SR

SR

5

SR

Pedestrian Access

SR

SR

TAP

SF

SF

SF

SR

SR

SR

SR

SR

SR

#03

Mentha australis

Myrnong (Yam Daisy) & Dianella (Flax 3 Lily) SR SR SR

SR SF

SF SR

SF

SF

SR

SR

SF

SR

SR

SR

SF

SF

SF TAP

ENTRY

PROPOSED DRINKING FOUNTAIN REFER TO HYDRAULIC ENGINEER

SR

SF

SF

7

PROPOSED LOCATION FOR NEW PORTABLE BBQ

SR

SF

SF

PROPOSED DRINKING FOUNTAIN REFER TO HYDRAULIC ENGINEER

SF

TAP

SR

SF

SF SF

PROPOSED LOCATION FOR PORTABLE BBQ

SF SF

SF

SR

EXISTING BUILDING

1

Kangaroo SR grass, Wallaby grass, Spear grass, and Tussock grasses

SR

Poa labillardierei

SR

3

SR

SR

SR

SR

SR

SR

Planting Plan

SR

SR

SR

SR

#03

SR

SR SR

7

4

1000

SR

SR

Kangaroo Apple

SR

SR

SR

1 #01

SR

SR

SR

SR

#01

SF

SR

SR

SR

1

SF

SR

SR

SR

SF

SR

SR

SR

NEW BUILDING 1

NEW BUILDING

SF

SR

SR

SR

SR

4

SF

SR

SR

SR

SR

SR

SR

SR

8

DRAWING NAME

ADDRESS

NORTHUMBERLAND RD, SUNSHINE

SR

SR

NEW COVERED OUTDOOR LEARNING AREA

SF

SR

SR

2

SF

SR

SR

SR

SR

UNDERGROUND RAIN TANKS

1000

SR

SR

SR

EXISTING BUILDING

PROPOSED LOCATION OF UNDERGROUND RAIN PROPOSED LOCATION OF TANKS

Boreium rate nus, od quatem quatecu ptatatempere nusciae. Epudanda dolutas diciis sitiam, solupta ssinven iscitis audae esci aut quis et aboreperum fugitist arum

EXISTING BUILDING

SR

REV #

DRAWING NO.

PROJECT

SCALE

SR

#02

NEW BUILDING

FOR TENDER

MELB OFFICE

SUITE 3, 25-31 ARGYLE STREET, FiTZROY VIC 3065 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU

SR

2

NEW COVERED OUTDOOR LEARNING AREA

3 x Ind aus

2 x Hym den

SR

#02

5

5

1 x Cor gla

180 x Lom tan 1 x Cor gla

SR

SF

1 x Aca bai

3 x Ind aus

SR

SF

SF

16 x Ere gla 16 x Cal cit

100 x Kun amb pro 100 x Lon lon

SF

SF

SR

8

2 x Ind aus

3 x All ver

SR

SF

#03

4 x Dis cra 4 x Cal cit 4 x Ery ovi

3 x Hym den 42 x Ken pro 42 x Men aus

6

4 x Dis cra 4 x Cal cit 4 x Ery ovi

UNDERGROUND SERVICES CULVERT

SR

SR SR

1 x Aca bai

2 x Aph res

3 x Aph res

3 x Gre ros

6

GARDEN BED TO BE SUPPLEMENTED WITH NEW PLANTS

#01

6 x Dia rev 6 x Sca aem

4 x Pan jas

8 SF

SF

SF

EXISTING TREES AND GARDEN BED RETAINED.

4 x Dis cra 4 x Cal cit 4 x Ery ovi

4 x Wes fru 'flat n fruity' 4 x Dis cra

4 x Pan jas

1 x Aca pyc

1 x Aca bai

2 x Aph res

SR

#02

NEW BUILDING

2 x Aph res

SF

SR

SF

30 x Dia rev 30 x Con eru

18 x Ere gla 18 x Cal cit

1 x Gre ros

2 x Dia rev 2 x Sca aem

4 x Pan jas

SR

41 x Wes fru 'flat n fruity' 41 x Dis cra

8 x Dia rev 8 x Sca aem

4 x Pan jas

SR

2 x Gre ros 'Nana' 2 x Cor gla

5 x Diu fra 5 x Pim hum

SF

NEW BUILDING

SR

16 x Atr sem

6 x Men aus

SF

SF

26 x Dia rev 26 x Dia SS

SF

SR

3 x Gre ros

SR

8SF

SR

8

SF

SF

DP-** x 2 NO

SF

SF

2 x Gre ros

SF

SF

DP-** X 2 NO

SF

SR

SF

SR

SF

24 x Dia rev 24 x Dia SS

2 x Gre ros

SR

SF

SF

3 x All ver 79 x Aus mol 79 x Poa lab 79 x Wes fru 'flat n fruity'

SR

SR

5

SR

SR

SF

SF

SF

SF

3 x Kun amb pro

SR

SR

1 x Cor fic 'W'

SF

SF

SF

SF

59 x Ken pro 59 x Men aus

SR

SR

EX 43.31

SF

ACCESSIBLE BUILDING ENTRY RETAINED

SR

SF

SR

SF

SF

SR

SF

SF

1 x Euc LS

14 x Dia rev 14 x Con eru

EX 43.31

29 x Dia rev 29 x Con eru

SF

SF

SR

SF

SF

SR

SR

SR

SF

SF

SR

SR

SR

SR

SR

SR

3

8

SR

SR

SR

SR

SF

SR

SR

SF

SR

40 x Dia rev 40 x Dia SS

SR

SF

SR

SR

SF

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

Subject to further discussion with Wurundjeri Woi Wurrung Cultural Heritage Aboriginal Corporation.

SR

SR

SR

SR

SR

SF

SR

SR

Ebit lam, ex est unte niatur, quia corum 1 Pedestrian Access dolorem lantium aut et omnia dolorem erovide Mounded Planting lestem facessint quia 2alibus cor seritibus 3 Yarning nest Circle lacearum adipid ut velendam eaquiam, quunt aut lam, quid que dipid eaquia si dit 4 Covered Outdoor Learning Area es sin rature eosti aliquam utemporeheni Covered Outdoor Learningad Courtyard Space Area quaes ant id escipsa 5solluptatem fugit, nos 5 Courtyard Space elenimus nonsendae nosanihic te plabo. Nem 6 eos quidel ipsandae odi optatest, Screen Trees aditatemped maxim sed et rest, que poreped molorro ma Buffer Planting 7 poratatio qui dent laborem perferibus elitatem Opportunity For Aboriginal 8 intibus, optatem velibus rempore pratem Artwork / Mural qui alis dolorundae quae rerumquae paris LD4.1 maximus essus. SF

SR

SF

SR

SR

SR

40 x Dia rev 40 x Dia SS 1 x Sol avi 6 x Car ros 3 x Poa lab 3 x Wah com 2 x The tri 2 x Aua ten 2 x Aus sca 2 x Poa lab SR 6 x Dia rev

31 x Atr sem 31 x Ere gla

SR

SF

SR

SR

SR

SR

SR

SR

SR

SR

SF

SF

1 x Euc LS

1 x Lep lan

NEW ENTRY

SF

SF

5

SF

43 x Lon lon

SF

59 x Dia rev 59 x Con eru

SR

SR

33 x Lom tan 15 x Atr sem 15 x Ere gla

SR

SR

17 x Lom tan 11 x Atr sem 11 x Ere gla

SF

SR

SF

11 x Atr sem 11 x Ere gla

SF

SR

3

SF

SR

NEW ENTRY

SF

25 x Lom tan

10 x Atr sem 10 x Ere gla

ADDRESS

SR

SR

250721_Sunshine Secondary College_Tender Plan_v2024 ACTIVE v2025.vwx

SF

34 x Lom tan

15 x Atr sem 15 x Ere gla

CAD FILE NAME

SR

SF

BY

SF

BM

SR

SF

ISSUE

SF

TENDER ISSUE

DATE

SF

04/9/2025

NO.

54 x Lom tan

14 x Ban GC

86 x Lom tan

EXISTING BUILDING

T1

SF

BY

SR

SF

REVISION

SR

SR

SF

DATE

SF

SF

SR

SR

SR

SF

SR

DRAWING NAME

SCALE

SF

NO.

24/6/2026

SR

SF

THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR.

BM

PLOT DATE

CAMPUS BUFFER PLANTING Setout Plan 1:100 @ A1 NORTHUMBERLAND New garden bed with treesRD,/ SUNSHINE shrubs to create a buffer between the road and the new building surrounds.

SR

SR

W: WWW.URBANINITIATIVES.COM.AU

NOTE

CHECKED BY

S

SF

LD3.1

24041 SUNSHINE COLLEGE NORTH

Ur, conem quo odis eum sit, con eatquosam 7 quia ducia volum untempo riscium volorro tessitatiae pernam, alit debitat inullorepre OPPORTUNITY FOR ABORIGINAL ARTWORK / 8 MURALtusdame pro dolupta cusam fugitat ea volupta Possible location for artwork such as sculpture, mural, sandblasted concrete. non nonse maio dolorecatat.

TAS OFFICE

CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: ANDREW@URBANINITIATIVES.COM.AU

SR

SR SR

SRF

SR

SR

SR

SR

SR

SR

REV #

SR

SR

DRAWING NO.

PROJECT

SR

SR

DRAWN BY

NORTH

SR

SR

BM

SF

SF

SR

FOR TENDER

SUB-CONSULTANTS

SR

SR

SR

M

L

K

J

H

G

SR

7 SF

7

F

E

D

SR

SR

E: 309856 N: 5817054

SR

SR

SR

R 2490

R 3200

C

EXISTING BUILDING

6

SR

E: 309845 N: 5817054

R 5680

R 815

SF

Setout Plan

R 1560

R 2910

B

A

R 3460

SF

7

R 2640

R 1415

SR

SR

R 1500

R 2395

E: 309863 N: 5817057

R 670

E: 309828 N: 5817056

E: 309822 N: 5817055

R 880

SR

SF

R 2730

SR

SR

SR

SR

SF

E: 309820 N: 5817057

R 3445

R 1080

SR

SR

E: 309859 N: 5817062

E: 309859 N: 5817058

5

E: 309859 N: 5817054

R 3685

7

E: 309856

#03N: 5817033

R 770

SR

1500

R 1095

R 1000

R 4840

R 1500

EXISTING BUILDING

EXISTING TREES RETAINED

R 770

R 940

SR

SF

SF

#02E: 309859

R 1050

Veraecti busandam3 si dit estinit est, consecae sum ab ium, sant pre simagni beaqui ne lanis apidipsa et omnia prerore perrum re nitatur COVERED OUTDOOR LEARNING AREA covered outdoor learning area with secus et vendebis 4eosNew consequ ossitaspel seating and BBQs, and climbers growing on pergola structure. et hic te dolendam, officiis as elis moluptate SPACE est eumquas alicti ad COURTYARD eos anda vollamusdant A welcoming gathering space with seating and 5 volore nusdae vercid etur ut eum vel ma plantingad to create a sense ofes enclosure and provide shade. Opportunity for outdoor learning. quia veliqui del ma quidi culpa inciae nonest SCREEN TREES New trees planted to screen existing building 6 voluptatia volecti onesciis aut laboratus. and provide shade and habitat. R 530

6

SR

SR

YARNING CIRCLE Cultural gathering space / yarning circle with rock seating - subject to further discussion 3 with Wurundjeri Woi Wurrung Cultural Heritage Aboriginal Corporation.

R 975

NEW COVERED OUTDOOR LEARNING AREA

SUITE 3, 25-31 ARGYLE STREET, FiTZROY VIC 3065 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU

SR

SF

SF

R 1150

E: 309816 N: 5817065

CLIENT

SR

R 800

E: 309859 N: 5817073

610

SF

R 1415

1575

SF

695

765

SF

1110

SF

NEW BUILDING

E: 309813 N: 5817058

R 2000

2000

SR

SF

SF

R 2980

4

MELB OFFICE

R 2000

SR

R 1670

R 1920

5

8

SR

SR

SR

800

800

SR

SR

2000 SF

SF

2

SR

SR

E: 309832 N: 5817080

0

SR

SR

SF

SR

SR

SR

MOUNDED PLANTING Raised garden beds with colourful native plants 1 along eastern edge of building to create variation in the ground plane. R 7420

E: 309820 N: 5817074

85

R 3405

9

R 5110

SF

SF

SF SF

R 2755

47

SR

SR

SR

R 4305

2025

SR

SR

R 1525

7610

SR

SR

SF

SF

SF

R 2055

SR

SR

R 1240

SR

80

E: 309835 N: 5817079

SF

SF

R 3050

SF

R 1855

SF

E: 309815 N: 5817070

M

SR

SF

R 1065

SR

SR

SF

SF

SF

3

L

SR

R 410 R 1000

SR

1 00

R 1115

SR

SR

24

SR

SR

SR

SR

SR

R 3800

2000

R 2035

R 1300

R 1315

E: 309859 N: 5817078

8

R 1875

R 2885

R 3400

E: 309815 N: 5817075

K

SUNSHINE SECONDARY COLLEGE, SUNSHINE, VIC

EXISTING BUILDING

2

J

PEDESTRIAN ACCESS School entry point and arrival area for pedestrians from Northumberland Rd.

1

9

H

NOTES

1:100 @ A1

PROJECT

24041 NEW BUILDING SUNSHINE COLLEGE NORTH CAMPUS

PROPOSED LOCATION FOR PORTABLE BBQ

PROPOSED DRINKING FOUNTAIN REFER TO ADDRESS HYDRAULIC ENGINEER

NORTHUMBERLAND RD, SUNSHINE

FOR TE REV #

DRAWING NO.

LD2.1

1

A

#01 DRAWING NAME

Materials & Surfaces Plan 01

6


D D

D

20MM CHAMFERED CORNER

1 LA702

800

2 LA702

L

L

L

L

L

D

L

L

L

18 D

3 LA702

D

D

400

500

D

D

D

D

D

D

D

L

L

D

D

F

400

L

F

D

D

REINFORCING REFER TO ENGINEERING DETAILS

L

D

17

D

D

NORTH RICHMOND HOUSING ESTATE BASKETBALL COURT UPGRADE , NORTH RICHMOND, VIC 17

.4

3

.5

1

9

17 LW1.1 - DOUBLE CONCRETE RETAINING SEATING WALL 7

Scale: 1:10

17

17

.6

.6

3 17

.7

0

D D

18

D

SIDELINE .3

0

CENTRE CIRCLE

1750

.5

16

0

JUNIOR FREE THROW LINE 5800

NEUTRAL ZONE

.9

7 L

L

L

L

L

L

L

16

.9

L

L

L

L

L

L

L

L

L

18

6 17

.1

6

17

.8

.0

4

6

.5

1

CENTRE LINE R 6750

.8

4

.5

.4

7

16

.4

6

800

2

16 16

0 .6 EXISTING CONCRETE 16 BASKET BALL COURT 16

16

.4

.4

1

3

.7

.7

8

7

16 16

16

1

6.7

2

.7

.7

.9

17

7

7 16

.9

16

16

.7

6 16

.9

16

D D

5000

SCORER'S TABLE

16

.5

7

9

.3

16

4 D

.3

5 16

2000

TEAM BENCH AREA

16

.4

16

16

5

16

TEAM BENCH AREA

.4 16

6

.4

9 1

6.5

.4

5 16

.6

5 16 16

1

F

16

.5

1 16

[Drawing Title] 1

7.0

.6

9

16

.6

.7

.9

.9

16

.9

.9

Scale: 1:10

6

.9

5 16

.9

300

8

STAIR NOSING TGSI

1

17

3

.0

5

17

.0

4 D

D

17

D

.8

6

.1

8

D

16

.7

2

16

.9

0

16

.8

16

7

.8

5

17

.2

Concrete Terrace steps with TGSI LW1.1 - CONCRETE RETAINING SEATING WALL WITH STEPS

5

3

D

16

.5

8

17

D

1

4

7.1

16

6

.9

1

16

.9

3

.2

8

Scale: 1:10

D

.7

8

D

17

.1

0

FOR CONSTRUCTION

L

16

L

DRAFT

TAS OFFICE

CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: ANDREW@URBANINITIATIVES.COM.AU W: WWW.URBANINITIATIVES.COM.AU

NOTE

THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR.

CLIENT

HOMES VICTORIA

SUB-CONSULTANTS

MELB OFFICE

SUITE 3/25-31 ARGYLE ST, FITZROY VIC 3065 T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU

CLIENT

DATE

DW

TH

PLOT DATE

9/9/2026

CAD FILE NAME

25037_NR Basket Ball Court_Concept 3D 250925 copy v2026.vwx

NORTH

REVISION

BY

NO.

DATE

ISSUE

BY

SCALE

1:100 1:200

REV #

DRAWING NO.

PROJECT

L100

25037 NRHE - BASKET BALL COURT UPGRADE D

HOMES VICTORIA

TAS OFFICE

CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA NO. T: (03) 6223 3138 E: ANDREW@URBANINITIATIVES.COM.AU

DRAWN BY

CHECKED BY

SUB-CONSULTANTS L

MELB OFFICE

GROUND FLOOR 143 FRANKLIN STREET, MELBOURNE VIC 3000 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU

Approach I assessed how the new court would affect existing slopes and pathways. The northeast path conflicted with the required two-metre run-off zone and was only 1.5 metres wide, below the 1.8-metre standard for wheelchair passing. The ground also sloped sharply away from the path, creating a safety risk for mobility-impaired users. To resolve this, the concrete path was demolished and regraded, widened to 2 metres, and fitted with a handrail, stairs, and a ramp to ensure safe, accessible entry to the basketball court for everyone.

300

2

8

D

16

5

1

1

9

Conflict with 2 metre run off zone and existing path

.5

.5 16 LW1.1 - SINGLE CONCRETE RETAINING WALL

L

Scale: 1:175

16

.8

17

2

L

16

0

4

1

16

9

16

L

.8

.7

0

F

L

16

8

D

D

D

.8

L

The Basketball Field Of Play

.6

D

D

D

L

TEAM BENCH AREA

5000

.3

400

L

TEAM BENCH AREA

16

L

2000

800

3

20MM CHAMFER EDGE

3

FSL

.2

7

16

Challenge A key challenge was integrating the required twometer run-off zone surrounding the court within the constrained existing site conditions, particularly due to the existing slope and conflicts with adjacent concrete pathways.

L

L

D

300 16

16

16

1

16

1800

375

.6

L

L

D

16

1000

3 POINT LINE

16

L

L

L

L

L

L

L

L

L

L

D

850 850 400850

R 1250

3600

1575

3

ENDLINE

JUNIOR 3 POINT LINE 5800

1200

.1

400

17

17

15000

900

8325 THROW IN LINE

BOUNDARY CLEARANCE

Contexts The project upgraded the basketball court between Buildings 108 and 110 to meet Basketball Australia guidelines and improve safety and accessibility for the local community.

D

8325

4900

Project Type : Community

28000

130

BOUNDARY CLEARANCE

DRAWING NAME

Existing Conditions

@A1 ADDRESS @A3 106-112 Elizabeth Street North Richmond VIC 3121

W: WWW.URBANINITIATIVES.COM.AU

DRAWN BY

SZ

CHECKED BY

TH

PLOT DATE

20/6/2026

CAD FILE NAME

260312_25037_NRH E Basket Ball Court_IFC v2024 v2026.vwx

NOTE

THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR.

NO.

DATE

REVISION

BY

-

12/03/26

CONSTRUCTION ISSUE

SZ

NO.

DATE

ISSUE

BY

NORTH

SCALE

AS PER 1: PER AS

PROJECT

25037 NRHE - BASKETBALL COURT UPGRADE

@A1 ADDRESS @A3 106-112 Elizabeth Street North Richmond VIC 3121

DRAWING NO.

LA702

REV #

DRAWING NAME

Detail Sheet 2

Responses The upgraded community facility complies with Basketball Australia’s standards and provides the local community with a safer, more functional space.

Introduced a concrete terrace around the basketball court to incorporate the required 2 m run-off zone in accordance with Basketball Australia guidelines 7


Environmental Significance Overlay

Areas of Cultural Heritage Sensitivity

NT

RR

PE

ME

COBURG HIGH SCHOOL

E

EK RE

DG

IC

RI

EVC 851 Streambank Shrubland HO268

VD BL

EVC 55 Plains Grassy Woodland EVC 68 Creekline Grassy Woodland

PROJECT SITE

OR TE

DE CHENE RESERVE URQUHART

MCDONALD RESERVE

ST

URQUHART STREET CARPARK DOCUMENTATION C/A , COBURG, VIC

48

ALL SIGNAGE LOCATIONS ARE TO BE REVIEWED

Heritage Overlay

COBURG SPECIAL Ecological Vegetation Classes Pre-1750 DEVELOPMENTAL SCHOOL NOT IN SCOPE

Solutions,

Inc. All

reserved.

/

/

/

/

/

/

/

48

/

/

1:40

2

/

AD

47 1:40

/

47

47

/

/

RO

1:22

47

/

/

/ .6

/

HANDRAIL MAKE-GOOD

42.

B

46

5

60.

45

61.

LP

RETAIN AND PROTECT EXISTING RAMP & TGSI

/

45.98

CL

59.

LP

G4 C

12.

13.

14.

18.

17.

16.

15.

21.

20.

19.

22.

23.

B

SSV OFFICE

24.

(PREVIOUSLY REFERRED TO AS BLOCK 'A')

/

//

EX SP EE D HU MP

/ /

45.70

45.75

/ /

/

/

/

/

EXISTING GATE & FOOTPATH

7

EVC 937 Swampy Woodland

/

G2 B

41.

39.

40.

38.

36.

37.

35.

32.

33.

34.

28.

29.

30.

31.

27.

25.

26.

/

GATE

45.97

/

//

/

/

/

SUB-CONSULTANTS

WKT / SZ

CHECKED BY

TH

PLOT DATE

20/9/2026

CAD FILE NAME

26028 Urquhart Street Carpark Design Development 06 v2026.vwx

NORTH

NOTE

A

28/8/2026

UPDATE TO MATCH ARCHITECT'S DRAWINGS

WKT

1

21/8/2026

PRELIMINARY D&C TENDER ISSUE

WKT

NO.

DATE

REVISION

BY

NO.

DATE

ISSUE

BY

/

/

PROJECT

26028 Urquhart Street Carpark 1 & 2 Landscape

Department of Education

THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR.

/

/

DRAWN BY

/

CLIENT

W: WWW.URBANINITIATIVES.COM.AU

SCALE

@A1 ADDRESS @A3 2/189 Urquhart St, Coburg VIC 3058

1:125 1: 1:250

PRELIMINARY - SUBJECT TO DOCUMENTATION

/

DRAWING NO.

LD200

/

/

REV #

A

DRAWING NAME

Material & Surface Plan

KICKRAIL TBC

FINISH LEVEL TO BE BELOW THE MOSITURE BARRIER OF THE BUILDING

EXISTING LEVELS AS PER PINK LINE

TGSI INDICATORS (AS1428.1)

HANDRAIL (AS1428.1)

STAIR NOSING (AS1428.1)

47.40 47.20 47.00 46.80

PRELIMINARY DRAWING NO.

L01 DRAWING NAME

Site Context

REV #

EDGE THICKENING TO ENGINEER'S SPEC.

1

Special Building Overlay

25030 Urquhart Street Coburg Feasibility Study

3 3

62.

PL05

PL02

46

CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: OFFICE@URBANINITIATIVES.COM.AU

PROJECT NAME

3

LP

43.

58.

EVC 55 Plains Grassy Woodland

HANDRAIL TBC

+45.80

1:42

+46.41

10.

Ecological Vegetation Classes Pre-1750

PRELIMINARY DRAWING NO.

EXISTING LEVELS

1:40

REV #

L01

46.60 46.40 46.20 46.00

19/9/2026

2

E AT W R K N TA

PLOT DATE

1:5000 @A3

PROJECT NO.

PL02-D

HOBART OFFICE

Site Context

NORTH

/

CHECKED BY

SCALE

46.44

/

LB

4

SCALE BAR

3

DRAWN BY

LB

(c) 2026 Transoft Solutions, Inc. All rights reserved.

SUITE 3, 25-31 ARGYLE STREET, FITZROY, VICTORIA 3064 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU

DRAWING NAME

45.60

1:56

BL01

BL01

/ 46

/

3

PROJECT NAME

46.47 +46.54

46

BL01

LB

PD02 A-401

5

HOBART OFFICE City Mill, Level 3, 11 Morrison Street Hobart TAS 7000 T: (03) 6223 3138 E: andrew@urbaninitiatives.com.au

PROJECT NO.

25030 Urquhart Street Coburg Feasibility Study

9.

+46.49

BL01

LB

+46.55

8

MELBOURNE OFFICE Suite 3, 25-31 Argyle Street Fitzroy VIC 3065 T: (03) 9329 6844 E: office@urbaninitiatives.com.au

NORTH

+46.49

5

1:5000 @A3

STEPS +46.61 0 146.50 2 6

HANDRAIL MAKE-GOOD

STANDARDS 2018 (AU)

MELBOURNE OFFICE

mental Significance Overlay. This signifies that the Merri Creek and Environs otes: tives of the ESO are to restore natural systems, provide waterway function, is located in Coburg. Its land use has been predominantly for educational institutions since 1959. It is in close proximity to the Merri Creek original and natural hertiage. ch Merri-bek Council has designated the area with an Environmental Significance Overlay. This signifies that the Merri Creek and Environs ous environmental, heritage, and recreation corridor. The objectives of the ESO are to restore natural systems, provide waterway function, y. ion use, enhance landscape character and protect areas of aboriginal and natural hertiage.

SCALE

LB+47.30 +47.31 47.28

Material and Surface Plan

1750

Heritage Overlay

2

DE/VCAA BUILDING (PREVIOUSLY REFERRED TO AS BLOCK 'J') TWO WATER TANKS TO BE REMOVED (TBC)

PROTECT & RETAIN DISCONTINUED NATURAL GAS PIPE & THE SURROUNDING ROCK WORKS

SEAT

2

Ecological Vegetation Classes Pre-1750 Ecological Vegetation Class Pre

/

RETAIN EXISTING CONCRETE LANDING

47.28

MRV

/

TRAM 1 STOP

SCALE BAR

44.

6

/ EXISTING LEVELS

BUS STOP

46.40 46.20 46.00 45.80

57.

LP

+47.29

46.67 46.4 4 8. 46.4 46.61 4 46.5 5 8 46.5146.37

5

45.

FL.47 EXISTING DOORWAY .31

2

7.

46.53

56.

+47.30 +FL 47.31

PL04

46.80

16

BUS STOP

Responses The landscape design transforms the site into a space thatPrison. supports delivers ocal bluestone used in the construction of Pentridge The Special staff wellbeing, 47.40 is also within an Area of Aboriginal Cultural Heritage Sensitivity. at part of the project site has historically been, and may still be, low-lying and 47.20and manages compliant and inclusive access s a heritage-listed former quarry (HO268), which supplied the local bluestone used in the construction of Pentridge Prison. The Special 47.00 stormwater sustainably using the existing y and the Ecological Vegetation Classes Pre-1750 suggest that part of the project site has 46.80 historically been, and maycar still be, low-lying and Special Building Overlay ng. 46.60 park landscape.

46.

5

BUS STOP

TRAM 1 STOP

55.

EXISTING DOORWAY

47.28 LB

47

73.

/

BUS STOP

(AU)

VD BL

EVC 68 Creekline Grassy Woodland

EVC 937 Swampy Woodland

47.

46

E

72.

EVC 55 Plains Grassy Woodland

54.

RAMP 47.04 47.01

6.

11. EVC 851 Streambank Shrubland

HO268

EK RE

DG

IC

RI

Scale: 1:20

S 2018

71.

EVC 68 Creekline Grassy Woodland

Indicative Section CC

DARD

70.

LP PL01

+47.12

PD01 A-401

5. 8 46.80 47.0 46.8746.70

48.

6

65. EXCAVATION IN THE NRZ AND SRZ MUST BE DONE UNDER THE PROJECT ARBORIST SUPERVISION, 64. BY HAND DIGGING OR WITH LINEA CURVED SEAT NDD-EXCAVATION TECHNIQUES. AND BENCH COMBO ( 63. SURFACE MOUNTED)

Areas of Cultural Heritage Sensitivity

LP

53.

5

5

6

69.

46

EVC 55 Plains Grassy Woodland

RR

EK RE

ME

IC

NT

1

N

rights

RR

PE

BUS STOP

1

47.12

47.26 46.98

4.

LP

REV #

RELOCATED SIGNAGE 3 66.

68.

5

HO268

BUS STOP

3.

49.

PL01

67.

OR ITE

BUS STOP

I TA

Transoft

DRAWING NO.

L01

EVC 851 Streambank Shrubland

EVC 55 TO EDGE THICKENING Plains Grassy Woodland ENGINEER'S SPEC.

51.

47.51 47

PRELIMINARY

DRAWING NAME

Approach PROJECT SITE I used an Ecological Vegetation 46.60 Class (EVC) DE CHENE RESERVE Pre-1750 overlay to prioritise 46.40 indigenous and 46.20 DE CHENE URQUHART 46.00 ST native species over a purely low-maintenance RESERVE 45.80 URG palette and drew on theURQUcharacter of the HART ST HALL MCDONALD adjacent Merri RESERVE Creek corridor to ground the Heritage Overlay design in its local surroundings. BELL ST I worked with the project engineer to resolve the DDA access issue, thickening the path edge and elevating the surface to achieve compliant 1:40 grade educational institutions sincea 1959. It is in close proximity to the Merri Creek under AS 1428.

48

4

2

LB

1

47.52

PL02

19/9/2026

PROJECT SITE

2.

50.

CHECKED BY

47.20 47.00 46.80

UN

(c) 2026

PROJECT NAME

52.

4

PROJECT NO.

3

47.14

HU MP

NORTH

47.37 47.2

BL02

48

47.34 47.14

G1 A

ME

COBURG HIGH SCHOOL

SCALE

6

/ /

47.37

EX SP EE D

DGE NG E& RISON

SCALE BAR

LB

47.39

BL02

1.

Special Building Overlay

PLOT DATE

G3 C

48

Special Building Overlay Challenge MURRAY RD • The plants in the understory near the NW Region building were senescent, in poor health, and largely non-indigenous. It 25030 Urquhart Street Coburg Feasibility Study 1:5000 @A3 Site Context offered no amenity for staff and reduced natural light in the ground-floor offices. • The DDA access was non-compliant — the Significance Overlay Areas of Cultural Heritage Sensitivity northeast asphalt pathEnvironmental was narrow, steep, LEVEL TO ALLOW EX ACCESS TO SUBFLOOR S ACCESS HATCH and failed to COBURG meet AS 1428. Environmental Significant overlayEEP Environmental Significance Overlay D LINEA CURVED SEAT HIGH HU • The car park upgrade required removing a AND BENCH COMBO MP ( SCHOOL SURFACE MOUNTED) significant number of mature 47.40 canopy trees. DRAWN BY

MRV

LB

y and the Ecological Vegetation Classes Pre-1750 suggest that part of the project site has historically been, and may still be, low-lying and g.

HOBART OFFICE City Mill, Level 3, 11 Morrison Street Hobart TAS 7000 T: (03) 6223 3138 E: andrew@urbaninitiatives.com.au

STAN

Contexts The project involves upgrading the existing s also within an Area of Aboriginal Heritage Sensitivity. car Cultural parking spaces for the Department of s a heritage-listed former quarry (HO268), which supplied the localUrquhart bluestone used in the construction Coburg. of Pentridge Prison. The Special Education at 189 Street,

MELBOURNE OFFICE Suite 3, 25-31 Argyle Street Fitzroy VIC 3065 T: (03) 9329 6844 E: office@urbaninitiatives.com.au

FO

Project Type : Community

otes: is located in Coburg. Its land use has been predominantly for educational institutions since 1959. It is in close proximity to the Merri Creek h Merri-bek Council has designated the area with an Environmental Significance Overlay. This signifies that the Merri Creek and Environs us environmental, heritage, and recreation corridor. The objectives of the ESO are to restore natural systems, provide waterway function, on use, enhance landscape character and protect areas of aboriginal and natural hertiage.

48

PROTECT & RETAIN EXISTING DRAINAGE PIT

PL03

/

47.70

/

RELOCATED SIGNAGE 1

48

TRAM 1 STOP

48

BUS STOP

/

BUS STOP

/

BUS STOP

/

BELL ST

EVC 55 Plains Grassy Woodland

BUS STOP

/

URG HALL

EVC 937 Swampy Woodland

1:9.9

Indicative Section DD Scale: 1:20

MELBOURNE OFFICE

SUITE 3, 25-31 ARGYLE STREET, FITZROY, VICTORIA 3064 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU

PRELIMINARY - SUBJECT TO DOCUMENTATION CLIENT

3

SUB-CONSULTANTS

Indicative Section BB Scale: 1:20

Department of Education

MELBOURNE OFFICE

SUITE 3, 25-31 ARGYLE STREET, FITZROY, VICTORIA 3064 AUSTRALIA T: (03) 9329 6844 E: OFFICE@URBANINITIATIVES.COM.AU

HOBART OFFICE

CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138 E: OFFICE@URBANINITIATIVES.COM.AU

CITY MILL, LEVEL 3 11 MORRISON STREET, HOBART TASMANIA 7000 AUSTRALIA T: (03) 6223 3138

NOTE

THIS WORK IS NOT TO BE COPIED OR REPRODUCED IN ANY FORM WITHOUT THE PRIOR WRITTEN PERMISSION OF THE AUTHOR.

CLIENT

1 NO.

DATE

REVISION

BY

NO.

21/8/2026 DATE

E: OFFICE@URBANINITIATIVES.COM.AU PRELIMINARY D&C TENDER ISSUE

ISSUE

W: WWW.URBANINITIATIVES.COM.AU

NORTH

SUB-CONSULTANTS TH

CHECKED BY

Department of Education

HOBART OFFICE

W: WWW.URBANINITIATIVES.COM.AU

WKT / SZ

DRAWN BY

WKT BY

PLOT DATE

20/9/2026

CAD FILE NAME

26028 Urquhart Street Carpark Design Development 06 v2026.vwx

SCALE

1:20 1: 1:40

PROJECT

26028 Urquhart Street Carpark 1 & 2 Landscape

@A1 ADDRESS @A3 2/189 Urquhart St, Coburg VIC 3058

DRAWING NO.

LD701 DRAWING NAME

Landscape Sections

PRELIMINARY - SUBJ DOCUMEN

REV #

DRAWN BY

WKT / SZ

CHECKED BY

TH

PLOT DATE

20/9/2026

NORTH

SCALE

PROJECT

26028 Urquhart Street Carpark 1 & 2 Landscape

DRAWING NO.

LD702

8

DRAWING NAME

REV #


THE MYCELIA PARADISE, DAREBIN PARKLAND, VICTORIA University Project

Project Type : Design Research Contexts It offers an alternative way of ecological regeneration by deconstructing the existing ecological pyramid. It considers how the human body (walking) can be used as an agent of change. Challenge Darebin Parkland is facing many contemporary landscape challenges. For example, the high salinity (Leachate treatment) within the current wetland system and irregular stormwater have significantly threatened local biodiversity. Approach It uses human walking as a tool to redesign this very human centre parkland into a habitat for mycelium (the root of mushrooms). It reshapes the walking environment to trigger the existing mycelium network through controlled foot traffic, preserving and enhancing biodiversity.

Use Human walking as a tool

Responses It explores how the landscape can be performed for other-than-human species. Ultimately, it urges us to be aware of the non-human actors within the landscape, learning and collaborating with them in order to co-exist in this age of environmental crisis.

Controlling human movement through creating water catchment areas

Binding soil particles, stabilise containments, filter pollutants and form symbolic relationship with trees.

Existing brackish soil

Permeable pavement

A casual walking style that encourage roaming in summer

Moss (nature buffer for foot traffic)

A curated ritualistic style of walking experience in Autumn

Increase humidity that leads to growth of Wooddecompose fungi 9


Turn static files into dynamic content formats.

Create a flipbook
Sylvie Zhang Landscape Architecture Portfolio by Sylvie ZHANG - Issuu