CASE STUDY FOUR
Micro Bubble Coolant Cleaning and Purification Unit | JCC-HM Four Times Longer Maintenance Intervals for High-Pressure Pumps. 75% Lower Costs. CUSTOMER OVERVIEW A manufacturer that cleaned and deburred cast iron components was experiencing excessive wear on high-pressure pump components. Metal chips and brush wear particles were entering the cleaning solution and circulating through the pump, accelerating wear on gaskets and plungers. The resulting maintenance requirements increased equipment downtime and operating costs.
DETAILS CLEANING DEVICE High Pressure Water Jet Parts Washing and Deburring
TARGET WORKPIECES Cast Iron Parts
KEY CHALLENGES
Premature Wear of High-Pressure Pump
Excessive Maintenance Costs and Downtime
Components
The customer was performing pump maintenance
Metal chips and debris in the cleaning solution were
approximately every three months, resulting in
accelerating wear on pump gaskets and plungers,
frequent service interruptions and high annual
reducing equipment life and reliability.
maintenance expenses.