EA ONE Offshore Wind Farm •
Wind farm
•
Onshore substation
4.
General engineering approach to SUDS
5.
General environmental approach to SUDS
6.
Current Wildlife interest at Burstall in relation to SUDS
7.
Questions
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
2
Introductions
Michael Hotze East Anglia ONE Offshore Wind Farm Transmission Asset Package Manager
Emma Browning East Anglia One Offshore Windfarm Environmental Manager
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
3
Objective of the presentation
The objective of this presentation is to reach out and communicate to interested parties about our project. Specifically for today to:
1. Develop an awareness of the EA ONE project generally; 2. Inform about the design and construction of the SUDS pond at the onshore substation; and 3. Inform about the wildlife at the SUDS pond.
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
4
East Anglia ONE – Project Overview
East Anglia ONE offshore windfarm will provide 714 MW of new cleaner capacity with an important investment commitment of £2.5Bn Key Facts
• • • •
First Round 3 Project awarded with a CfD 102 7-MW Siemens turbines Powering up to 600,000 homes every year 3,000 jobs during the construction period followed by 30-year O&M works in the region
East Anglia ONE
Timeline 45km from the coast Great Yarmouth & Lowestoft ports Grid Connection at Bramford
scottishpowerrenewables.com
• • • •
FID and satisfied CfD requirements 2016 Engineering work and supplier activities ongoing Construction has begun First power achieved during 2019
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
5
EA ONE Offshore Windfarm
Offshore Substation
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
6
EA ONE Offshore Windfarm
WTG- Turbine installation continues
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
7
EA ONE Offshore Windfarm 1. Substation
CCSB CCSE
(JB2/3)
CCSC (gas) HDD4 (River & Network rail)
(JB1/2)
JB10/11, (Gas crossings, Near Archaeology Site 23, HDD8 &HDD10) CCSD & Main Archaeology Compound) HDD11 (Martlesham creek & Network rail)
CCSA
Ipswich
CCSF
HDD14 (Kirton Creek)
River Deben
Landfall (CCSI, HDD18, Archaeology Site 50)
CCSG (JB17/18 HDD16 (River Deben)
Cable Route scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
8
Engineering of SuDS
Statcom Buildings
Space for Harmonic Filters
Control Building GIS Building
Transformers
Shunt Reactors National Grid Cable Route
400kV AIS
Welfare Compound
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
9
Engineering of SuDS
Legislative / planning background The proposed surface water drainage scheme will be designed to meet the requirements of the National Planning Policy Framework (NPPF) by limiting the post development site run-off to the existing greenfield rate and providing sufficient on site attenuation for rainfall events up to the 1 in 100 year rainfall event, plus allowance for climate change over the lifetime of the development. A Sustainable Drainage System (SuDS) is utilised that employs the following key principles to ensure the drainage system mimics natural drainage by: • • • • •
Storing runoff and releasing it slowly (attenuation); Allowing water to soak into the ground (infiltration); Slowly transporting (conveying) water on the surface; Filtering out pollutants; and Allowing sediments to settle out by controlling the flow of the water.
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
10
Engineering of SuDS
Design basis All surface water runoff from the operational Substation (platform, facilities and roads) will be collected and will receive at least two consecutive stages of treatment in its conveyance across the site, including attenuation within basins, before its controlled release. The SuDS basin, with a controlled outlet, provides a second stage of treatment and full attenuation limiting the rate of discharge to the equivalent of the pre-existing greenfield rates. The Wet Woodland SuDS is a modified detention basin, with shallow sloping sides (between 1 in 10 and 1 in 20) featuring a permanently retained pool of water at the outlet end, giving it a more natural appearance. The area will be landscaped, with planting of suitable tree and plant species, which can tolerate the occasional inundation and to provide a habitat for bird life. There are actually two SuDS basins, however the outlet from the secondary SuDS basin is pumped back to the access road drainage towards the wet woodland SuDS pond. This was a late design change due to UKPN cables blocking the original discharge route. The Wet Woodland SuDS has therefore become the primary discharge route for surface water run-off from the Substation.
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
11
Engineering of SuDS
General layout EA1 Onshore substation
EA3 Future onshore substation
Temp SuDS pond Secondary SuDS pond
Wet Woodland SuDS pond
Access from public road
Approx water shed line
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
12
Engineering of SuDS
General layout Size / Depth / surface area relationship • Permanent pool circa 20m x 15m • 100 year storm event size circa 100m x 50m • Minimum surface area 2532m2 (no run-off) • Maximum surface area 5506m2
Original greenfield run off rate
Peak discharge rate into the basins from
Peak volume in basin
Peak discharge rate from the basin
1 year return
8.3 litres/second
287 litres/second
>700m3
6.0 litres/second
30 year return
23 litres/second
555 litres/second
>1400m3
7.9 litres/second
100 year return
34.1 l/s
622 litres/second
>1800m3
9.3 litres/second
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
13
Engineering of SuDS
General layout
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
14
Engineering of SuDS Headwalls and outfalls
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
15
Environmental – Pre-construction Land Use
Environmental Statement identified the area of the substation and SUDS area to be that predominantly agricultural fields
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
16
Environmental – Pre-Construction - Ecology
The Environmental Statement and pre-construction surveys identified the following species, these were managed via a qualified ecologist and the relevant licences were in place prior to works taking place • Badgers – setts within woodland to the north (Fore Grove Wood) – under Disturbance licence • Great Crested Newts – single pond with low population within woodland to the north (Fore Grove Wood) – Exclusion fencing installed under EPS mitigation licence • Bats – trees throughout woodland and hedgerows with roosting potential. Activity surveys confirmed foraging activity by common & soprano pipistrelle, myotis species, barbastelle
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
17
Environmental – During Construction
The project is still under construction, the SUDS pond area below:
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
18
Environmental – During Construction
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
19
Environmental – Ecology during construction
Species noted throughout construction: Birds:
Invertebrates: Mammals:
Amphibians:
Little grebe (2) Mallard (10) Reed bunting Linnet (30) Dunnock Goldfinch (15) Meadow pipit (20) Skylark Kestrel Raven Wood pigeon
Small copper butterfly Painted lady butterfly Common blue damselfly Thick legged flower beetle Buffish mining bee Broad bodied chaser Common darter (7 incl. breeding pair) Honey bee Bumblebee species
Common toad Common frog Great crested newt (confirmed to north)
Badger (2 setts covered by disturbance licence) Brown hare Deer species (various) Rabbit Fox Common pipistrelle Soprano pipistrelle Noctule Serotine
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
Notable plants: Common broomrape Hedge woundwort
20
Environmental – Ecology during construction
Little Grebe
Common Darter scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
21
Environmental – Ecology during construction
Small Copper
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
22
Environmental – Ecology During Construction
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
23
Environmental – Landscape Management Plan The Onshore Substation Landscape Management Plan defines the variety and arrangement of species to be planted: • 30,305 Woodland Trees • 1580 metres of hedge • 12 hectares of grassland • 1 permanent SUDs and 1 drainage basin • 4 Woodland mixes: Core, Edge, Screening and Wet Woodland (mixing both broadleaved & coniferous species) • Wet Woodland includes species such as Alder, Birch, willow and Ash • 5 grassland mixes including aquatic species such as fool’s watercress, brooklime, pond sedge, purple loostrife • Additional ecological enhancements to be installed in and around the landscaped areas include 8 log piles and hibernacula, 1 Barn Owl box, 15 bird nest boxes and 12 bat roost boxes scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
24
Environmental – Bio-Diversity Net Gain
Ecological Enhancement & Bio-Diversity Net Gain Integrated into the permanent design
After
Before
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
25
Environmental – Post Construction – Ecological Gains Anticipated
1. Increase in invertebrate assemblage (both aquatic and terrestrial) within grassland and wetlands, as well as new woodland (particularly as the woodland ages and leaf debris/mulch accumulates naturally) 2. Bat populations further supported by increased optimal foraging habitats and subsequent increase in invertebrate life – particular habitats including woodland edges, wetland and open species rich grasslands 3. Increase in foraging habitat for badgers and other larger mammals such as foxes, hare and deer (although hopefully not too much deer grazing!) as well as smaller mammals such as mice and voles which provide prey for larger mammals and birds 4. Increase in floral diversity due to introduction of aquatic and marginal plants which are somewhat uncommon within the landscape at this location as largely arable with hedge boundaries scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
26
Environmental – Post Construction – Ecological Gains Anticipated 5.
Increase in bird number and species due to various habitats available – already seeing waterfowl such as grebes and ducks present, ground nesting birds expected such as skylarks, woodland species such as finches, thrushes, open grassland and increase in small mammals will attract owls and other birds of prey
6.
Potential for GCN to utilise SUDs provided small volume of water is retained. Other amphibian life expected to be maintained including common toad, common newts – palmate/smooth, common frogs.
7.
Potential for reptiles due to range of habitats and features available including south facing banks, woodland edges, taller grass and open spaces
8.
Direct Gain in Suffolk BAP Habitats including wet woodland, mixed deciduous woodland and hedgerows, and ongoing potential gain for Suffolk BAP Species including bats, hedgehogs, brown hare, reptiles and amphibians and multiple bird species. scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
27
Questions
scottishpowerrenewables.com
Level of confidentiality: INTERNAL USE
ONSS SuDS Presentation November 2019
28