Biodiversity Net Gain Update Nick White

Page 1

Biodiversity Net Gain Update for the East Anglian Planning and Biodiversity Webinar Dr Nick White – Principal Advisor, Net Gain

www.gov.uk/natural-england


Biodiversity Net Gain Now

• National Planning Policy Framework (NPPF) • Planning Practice Guidance (PPG) • National Design Guide • National Policy Statements


Mandatory Biodiversity Net Gain – Key Components The Environment Bill • England only • Amends the Town & Country Planning Act (TCPA) • Minimum 10% gain required calculated using Biodiversity Metric & approval of net gain plan • Habitat secured at least 30 years • Delivered, on-site, off-site or via statutory biodiversity credits • National register for net gain sites • Likely to become law – second-half 2023 • Does not change existing legal protections • Does not apply to Nationally Significant Infrastructure Projects (NSIPs) or Marine


Environment Bill – Secondary Legislation

Secondary Legislation – To Come Net Gain Plan

Section 141 or 177

Percentage

Amendments to Planning Register

Approval of Plan

Metric

Exemptions

Degradation

Irreplaceable Habitat

Modified Planning Permission

Phased Development

Limitations on Planning Authorities

Section 73a & 102


Additional Related Components of the Environment Bill Local Nature Recovery Strategies • Locally developed, spatial strategies for nature working within a national framework. • Identify opportunities and priorities for enhancing the natural environment • Inform and underpin the national Nature Recovery Network (NRN) • Can be used to target net gain delivery Conservation Covenants • Legally binding private voluntary agreements between landowners & responsible bodies • Can be used as alternative to planning obligations to secure BNG outcomes


Mechanisms for Biodiversity Net Gain Delivery Onsite (units)

Offsite (units)

Potentially in full or combination

Delivered via habitat creation/enhancement via landscaping/green infrastructure

Delivered through new habitat creation/enhancement on land holdings or via habitat banks

Statutory Credits

Only if units not available

Delivered through landscape-scale strategic habitat creation delivering nature-based solutions


Environment Bill – Envisaged Biodiversity Net Gain Process


Mandatory Biodiversity Net Gain Key Themes • Measurable net gain • Spatial delivery hierarchy (on-site, local + strategic) • Benefits for nature, people, LPA + developer

• Does not replace existing protections/legislation


Mandatory BNG - Indicative Timetable*

Spring 2021

Metric 3.0 Released

Summer 2021

Secondary Legislation Consultation

* All dates subject to potential change

Autumn 2021

Environment Bill Royal Assent

Winter 2022

Register + Credits Sales Platforms go live

Autumn 2023

BNG becomes legal requirement for TCPA Developments


Biodiversity Metric 2.0 • • • • •

Uses habitat features as a ‘proxy’ measure Translates into biodiversity units All intertidal and terrestrial habitat features Area and linear habitat types Calculations based upon: – – – – –

Habitat size Habitat condition Habitat distinctiveness Spatial location Ecological connectivity

• GIS data import facility

3.0


Biodiversity Metric 3.0 - Timetable • July 2019 – February 2020: Metric 2.0 Consultation – 7,000+ downloads & 130 formal responses

• March 2020 – October 2020: Metric edits – c1.3m calculations run to test numbers + stress tested

• August 2020 – Formal Consultation response published • Spring 2021: Metric 3.0 Published – Metric calculation tool – Summary & detailed guidance + case studies – Revised condition assessment methodologies

• Early 2021: Consultation on small sites metric


BNG Considerations for Planning Authorities • LPA role is key • Net gain opportunities now e.g. embed into local plans/SPDs • Refer to guidance/standards – CIRIA/CIEEM/IEMA, BS8683* or Government Advice • Agree and map your local priorities in conjunction with Local Nature Partnerships, eNGOs etc e.g. LNRS, GI strategy, biodiversity opportunity areas • Consider links to other plans and strategies e.g. Health & Well Being • Consider you own land holdings and raise awareness amongst local landowners • Gain familiarity with the biodiversity metric 3.0 • Establish your reporting/monitoring requirements

* to be published Spring 2021


BNG Considerations for Developers • Consider early! – site selection + outline design • Net gain what? e.g. % gain, metric type, duration etc – Environment Bill standardises for TCPA only • Refer to guidance/standards – CIRIA/CIEEM/IEMA, BS8683* or Government Advice • What are the local priorities? e.g. LNRS, GI strategy, biodiversity opportunity areas etc • Undertake baseline metric calculations • Determine your delivery strategy – onsite/off-site or combinations of + how relates to other obligations If offsite component – is unit supply available? If not, purchase credits • If delivering onsite how will this be maintained? • Submit net gain plan + completed metric to LPA * to be published Spring 2021


BNG Considerations for Landowners? • Identify land parcels suitable for habitat enhancement/creation • Habitat bank vs non-habitat bank • Refer to guidance/standards – CIRIA/CIEEM/IEMA, BS8683* or Government Advice • Undertake indicative metric calculations • Register land availability on net gain register • Calculate likely unit sales prices (incl habitat creation + management costs, any survey costs + overheads) • Undertake full metric calculations to inform final sale • Enter into minimum 30 year legal agreement (planning obligation or conservation covenant) • Undertake periodic monitoring/reporting * to be published Spring 2021


Other Landowner Considerations •

Additionality “Achieve nature conservation outcomes that demonstrably exceed existing obligations (i.e. do not deliver something that would occur anyway)” – CIRIA/CIEEM/IEMA (2016) Guidance coming

•

Is Land Within a Local Strategic Area? Influences unit values that can be generated from land

•

ELM Pricing + Taxation


Poll Question

Q. How prepared do you feel you are for when mandatory Biodiversity Net Gain becomes a legal requirement? A. Very prepared, not prepared, not sure


Other Developments

• Marine Net Gain • Nationally Significant Infrastructure Projects (NSIPS) • Environmental Net Gain • Planning White Paper


Thanks