Skip to main content

Delivering Green Infrastructure 3

Page 1

Masterplanning     

 

2003 Green Paper Outline planning applications to be phased out Masterplans could fill the gap – English Nature, CABE Green paper abandoned, but masterplans introduced in 2006 Local Plan 2008 Concept Statement process wins RTPI award 2010 Core Strategy adopted – requires masterplans for strategic growth of Bury St Edmunds and Haverhill 2012 NPPF – Pre-application engagement and front loading


And finally ď‚› Ensure

these principles are carried through to the detailed planning applications

ď‚› Design

the development to fit the landscape, don’t try and fit the landscape around the development.


Turn static files into dynamic content formats.

Create a flipbook
Delivering Green Infrastructure 3 by Suffolk Biodiversity Information Service - Issuu