Phase 1 Environmental Site Assessment Site Name: RIDGEBACK CAMAO 12-25-54-25 Unique Well ID: 100/12-25-054-25 W4/00 Surface: 12-25-054-25 W4M Licence Number: 0030923 Project #: RB.75.03 February 2021
1900, 700 – 2ND STREET SW, CALGARY, AB, T2P 2W2 PHONE 403.991.1879 WWW.ARLETTA.CA
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
i
TABLE OF CONTENTS 1.
INTRODUCTION ........................................................................................................................................................ 1
2.
SITE DESCRIPTION .................................................................................................................................................. 2 2.1.
LOCATION & INFRASTRUCTURE....................................................................................................................... 2
2.2.
PHYSIOGRAPHIC SETTING .............................................................................................................................. 2
2.2.1
Land Use ................................................................................................................................................................... 2
2.2.2
Topography & Drainage ............................................................................................................................................ 2
2.3.
3.
HYDROGEOLOGIC SETTING ............................................................................................................................ 2
2.3.1
Surficial Deposits....................................................................................................................................................... 2
2.3.2
Bedrock ..................................................................................................................................................................... 3
2.3.3
Regional Hydrogeology & Present Groundwater Use ............................................................................................... 3
HISTORICAL & REGULATORY RECORDS REVIEW ............................................................................................... 4 3.1.
ALBERTA ENVIRONMENT AND PARKS (AEP) APPROVALS ................................................................................. 4
3.2.
ENVIRONMENTAL SITE ASSESSMENT REPOSITORY .......................................................................................... 4
3.3.
DRILLING INFORMATION ................................................................................................................................. 4
3.4.
PRODUCTION, STORAGE & ENVIRONMENTAL INFORMATION ............................................................................. 5
3.4.1
Construction and Production ..................................................................................................................................... 5
3.4.2
Current and/or Historical Infrastructure ..................................................................................................................... 5
3.4.3
Fluid Disposal ............................................................................................................................................................ 6
3.4.4
Other Facilities or Infrastructure ................................................................................................................................ 6
3.4.5
Spills and Releases ................................................................................................................................................... 6
3.5.
PREVIOUS ENVIRONMENTAL DOCUMENTATION ................................................................................................ 6
4.
AERIAL & SATELLITE IMAGERY REVIEW............................................................................................................... 9
5.
SITE VISIT ............................................................................................................................................................... 10
6.
INTERVIEWS ........................................................................................................................................................... 11
7.
CONCLUSIONS & RECOMMENDATIONS ............................................................................................................. 12 7.1.
SUMMARY OF AREAS OF POTENTIAL ENVIRONMENTAL CONCERN................................................................... 12
8.
REFERENCES ......................................................................................................................................................... 13
9.
CLOSURE ................................................................................................................................................................ 14
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
ii
LIST OF FIGURES FIGURE 1:
AERIAL PHOTOGRAPH SHOWING SITE & SURROUNDING AREA
FIGURE 2:
SITE VISIT SKETCH
FIGURE 3:
SITE PLAN WITH AREAS OF POTENTIAL ENVIRONMENTAL CONCERN (APEC)
LIST OF APPENDICES APPENDIX I:
SURVEY PLAN
APPENDIX II:
REGULATORY SEARCHES & RELEVANT HISTORICAL DOCUMENTATION
APPENDIX III:
DRILLING WASTE DISPOSAL INFORMATION
APPENDIX IV:
HISTORICAL AERIAL PHOTOGRAPHS
APPENDIX V:
SITE VISIT PHOTOGRAPHS
APPENDIX VI:
INTERVIEWS
APPENDIX VII:
GOVERNMENT OF ALBERTA PROFESSIONAL DECLARATION FOR RECLAMATION CERTIFICATE APPLICATIONS
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03 1.
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
INTRODUCTION
Arletta Environmental Consulting Corp. (Arletta) was retained by Ridgeback Resources Inc. (Ridgeback) to complete a Phase 1 Environmental Site Assessment (ESA) at the 12-25-054-25 W4M location which includes the 100/12-25-054-25 W4/00 well, herein referred to as "the Site". The objectives of the Phase 1 ESA were to identify Areas of Potential Environmental Concern (APEC) and Potential Contaminants of Concern (PCOC) resulting from historical oil and gas operations at the Site, and to identify if a Phase 2 ESA is required as per the Alberta Energy Regulator (AER) Specified Enactment Directive 002 Application Submission Requirements and Guidance for Reclamation Certificates for Well Sites and Associated Facilities (AER, 2016), according to the Alberta Environment and Parks (AEP) Alberta Environmental Site Assessment Standard (AEP, 2016) and the Canadian Standards Association (CSA) Phase I Environmental Site Assessment (CSA, 2016, as amended). The scope of the Phase 1 ESA is as follows: •
Conduct a review of company records, and any available public records, regarding the history of the Site.
•
Conduct a land title search for the Site.
•
Conduct a historical aerial photograph review of the Site and surrounding properties.
•
Conduct a site visit.
•
Conduct interviews with relevant stakeholders at the Site including the operator and landowner and/or occupant.
•
Prepare a report summarizing the results and recommendations of the Phase 1 ESA.
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
2.
SITE DESCRIPTION
2.1.
LOCATION & INFRASTRUCTURE
The Site is located within 12-25-054-25 W4M, approximately 8.1 kilometres (km) northeast of St. Albert, Alberta on Freehold Land. The Site is located within the Sturgeon County, approximately 377 meters (m) southeast from the corner of the intersection of Township Road 554B and Range Road 251. According to the survey, the lease is 106.68 m x 106.68 m and covers an area of approximately 1.14 hectares (ha). The lease was accessed via a 15 m wide, 47 m long, access road that approached the Site from the north. According to a note written on the survey plan on February 14, 2008, the access road was cut off by the County and there is no longer access to the Site (Midwest Surveys Ltd., 1986). A survey plan is included in Appendix I. The Site is an abandoned oil well site. An aerial photograph showing the Site and surrounding area is included in Figure 1. 2.2.
PHYSIOGRAPHIC SETTING
2.2.1
Land Use
The Site is currently classified as agricultural as defined by AEP (Alberta Environment and Parks, 2019), with Agricultural Land use bordering the lease to the north, and east, and Residential Land within 300m of the lease to the west, and south. The land use surrounding the Site, and future land use at the Site is classified as Agricultural and Residential (Figure 1). 2.2.2
Topography & Drainage
The surface elevation at the Site is approximately 689.2 metres above sea level (masl). The topography at the Site and surrounding area is undulating and low relief (Agriculture and Forestry, Government of Alberta (AGRASID), 2021). The closest surface waterbody is an unnamed creek located approximately 332 m southeast of the Site. The creek flows south into the Sturgeon River (Figure 1; AbaData, 2021). 2.3.
HYDROGEOLOGIC SETTING
2.3.1
Surficial Deposits
Soils at the Site are represented by the Malmo (MMO) and Ponoka (POK) soil series. MMO soil series is characterized as well-drained eluviated black chernozem, developed on fine textured clay, silty clay, and sandy clay parent material, with a second parent material consisting of fine textured water-laid sediments. POK soil series is characterized as a well-drained eluviated black chernozem, developed on medium textured loam, silt loam, and very fine sandy loam parent material, with a second parent material consisting of medium textured sediments deposited by wind and water (AGRASID, 2021).
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03 2.3.2
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Bedrock
The bedrock unit beneath the Site is the Horseshoe Canyon Formation. The Horseshoe Canyon is a nonmarine to locally marginal marine formation consisting of fine to very fined grained, pale grey, feldspathic sandstone, which is interbedded with siltstone, bentonitic mudstone, carbonaceous mudstone, concretionary sideritic layers, and laterally continuous coal seams. The top interval of this formation includes white altered sandstone and mudstone (Prior et al., 2013). 2.3.3
Regional Hydrogeology & Present Groundwater Use
The Alberta Environment and Parks (AEP) Alberta Water Wells Information Database identified ten registered groundwater users within a 1 km radius of the Site, including eight domestic wells, one industrial well, and one stock well. The closest well is also the closest domestic well and is located approximately 577 m east of the Site (Government of Alberta, 2021). The results were not field verified as part of this study. Search results and copies of the groundwater well reports are provided in Appendix II.
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
3.
HISTORICAL & REGULATORY RECORDS REVIEW
3.1.
A L B E R T A E N V I R O N M E N T A N D P A R K S (AEP) A P P R O V A L S
A search of the Alberta Environment and Parks (AEP) Authorization Viewer identified no authorizations, approvals, or certificates at the Site (AEP, 2021). 3.2.
ENVIRONMENTAL SITE ASSESSMENT REPOSITORY
A search of the Alberta Environment and Parks (AEP) Environmental Site Assessment Repository identified no reports/documents or certificates for the Site (AEP, 2017a). 3.3.
DRILLING INFORMATION
Well name or UWI:
Spud Date:
Final Drill Date:
Well Total Depth: (metres)
100/12-25-054-25 W4/00
September 7, 1966
September 17, 1966
1626.10
Is this site a re-entry?
No
Is this site re-drilled?
No
Drilling Mud Type:
Volume (m3):
Disposal Method:
Water Based
Volume not recorded in well records
Assumed Mix-Bury-Cover
Sump Type
Sump Location, if remote
Disposal Location(s)
N/A
•
•
On Lease
• • •
8118-12 Regco Petroleums Ltd. Oil well effluent line from 09-26-054-25W4 BE to 04-25-054-25W4 BE11305-18 Regco Petroleums Ltd. Oil well effluent line from 09-26-054-25W4 BE to 04-25-054-25W4 BE11305-5 Regco Petroleums Ltd. Oil well effluent line from 13-25-054-25W4 BE to 12-25-054-25W4 BE
Drilling Waste Compliance Option(s) used and attached: Has this site been used for drilling waste disposal more than once?
On Lease
☐ Option 1 ☒ Option 2 ☐ Option 3 No
A Notification of Drilling Waste Disposal document was not available for review. However, the Daily Drilling Reports and Tour Reports identify that the well was drilled with a gel chemical drilling fluid system. A mud list was available/prepared from the Tour Reports/Daily Drilling Reports/etc. Where there were discrepancies, the more conservative volumes were used. There is no information regarding the drilling waste disposal location so the drilling waste was assumed to be disposed of on site by Mix-Bury-Cover (MBC) method. The AER’s Assessing Drilling Waste for Regulatory Compliance Option 2 Checklist (AER, 2014) and associated calculations are included in Appendix III. The AEP Compliance Option 2 was used to assess drilling waste, and the following was determined: •
A water-based gel chemical drilling fluid system was used during the drilling event.
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
•
There is no information regarding the location of the drilling waste disposal, so it has been assumed to be on site.
•
The salt equivalency calculations resulted in sodium hydroxide (NaOH) equivalent sacks/m depth, which is below the allowable NaOH equivalent sacks/m depth for wells drilled prior to October 22, 1996.
•
There is no evidence that fluid returns from the three Drill Stem Tests (DSTs) were disposed of correctly.
•
The Daily Drilling Reports identified hydrocarbon mud additives being added to the drilling mud.
•
Hydrocarbon was added to the drilling fluid, a total of 50 bbl was used during the drilling event.
The drilling waste did not satisfy the AEP Compliance Option 2 requirements due to the presence of hydrocarbon mud additives and lack of evidence of proper disposal of DST fluid returns, therefore further investigation is required to determine the drilling waste management practices that were conducted on the Site. 3.4.
PRODUCTION, STORAGE & ENVIRONMENTAL INFORMATION
3.4.1
Construction and Production
The Site was spud on September 7, 1966, and produced 11,403.6 103m3 gas, 8,685.0 m3 oil and 4,397.3 m3 water from 1966 to 1981. The Site was suspended on September 1, 1981 and was subsequently abandoned on September 19, 1986. 3.4.2
Current and/or Historical Infrastructure
Current and historical infrastructure associated with the Site consists of: •
Access road
•
Aboveground Storage Tanks (AST), details below
•
Separator
•
Pump jack Storage Tank Details: Above/Below
Type of Tank
Contents
Capacity (m3)
Location
Aboveground
Unknown
Unknown
Unknown
NE corner of Site / GPS / Unknown
Aboveground
Unknown
Unknown
Unknown
SE corner of Site
Aboveground
Unknown
Unknown
Unknown
SW corner of Site
Underground Associated Structures: Type
Status
Location
NA
NA
NA
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03 3.4.3
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Fluid Disposal
How was fluid at producing wells, disposal wells, and/or battery sites shipped to/from the location? ☐ N/A
☐ Piped to the Site 3.4.4
☐ Trucked from the Site
☒ Piped from the Site ☐ Trucked to the Site
☐ Disposed of on site
Other Facilities or Infrastructure
There were no other waste storage and handling, chemical storage, buried pits and/or landfill infrastructure present on site. 3.4.5
Spills and Releases
A search of the AER field incident list (AER, 2021) and a company file review was completed to determine if any spills may have occurred on site. The records showed no spills were found to have occurred on site; however, a Mud Report by Wilson Mud Service Ltd. (Wilson) on September 8, 1966 identified that an unknown quantity of mud was washing back up from under the conductor pipe onto the lease. The additives mixed into the released mud are not considered to be potential contaminants of concern. 3.5.
PREVIOUS ENVIRONMENTAL DOCUMENTATION
Available historical environmental assessment reports were reviewed by Arletta in order to evaluate the soil and groundwater conditions at the Site based on the data collected. A summary of the available historical assessment information is summarized below. Phase 1 Environmental Site Assessments A Phase 1 Environmental Site Assessment (ESA) was completed in 2006 by Newpark Environmental Services (Newpark). The assessment was incomplete as no site visit was conducted. Newpark identified the following areas of potential environmental concern (APEC): •
Well centre and associated infrastructure.
•
Drilling waste disposal area (DWDA) assumed to be on site.
•
A separator building located south of the well centre.
•
Two AST farms in the southeast and southwest corners of the Site.
•
Pipe yard lay down area, used after abandonment of the well.
Phase 2 Environmental Site Assessments A Phase 2 ESA was completed in 2007 at the Site by Newpark; however, it was unavailable for review at the time of this assessment.
According
to
the
summary
provided
in
the
Matrix
Solutions
Inc.
(Matrix)
2008
Supplemental Phase 2 ESA (Matrix, 2008), the 2007 Phase 2 ESA included the advancement of 32 boreholes in all APEC Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
identified in the Phase 1 ESA (Newpark, 2006) and four background boreholes to a maximum depth of 3 metres below ground surface (mbgs). Arsenic and boron concentrations were above the applicable guidelines and one background sample had an EC in the “Fair” rating category. No other salinity or PHC exceedances were noted and no indicators of an on site DWDA was found. Newpark recommended that additional sampling be conducted near the well centre in search of the DWDA area and in the southeast corner of the lease where poor vegetation growth was observed. The 2008 Matrix Supplemental Phase 2 ESA further investigated all of the APEC identified in the Phase 1 ESA and investigated by Newpark in 2007 and consisted of an Electromagnetic (EM) survey of the area. A total of 17 boreholes were advanced on site including one background borehole located on the southwest corner of the Site where the soil appeared to be the least disturbed (Figure 1). The background borehole (08-B1) was drilled in the area of the former AST farm in the southwest corner of the Site as no indications of impacts were observed and established background salinity values. Eight background soil samples submitted for the analysis of salinity parameters were below the applicable guidelines with the exception of pH which had a value of 5.9 from 0 to 0.15 mbgs. No background soil samples were submitted for the analysis of PHC parameters. Six samples from five boreholes in all quadrants of the lease, as well as near the well centre, were submitted for laboratory analysis of salinity parameters and/or PHC to investigate the possibility of an on site DWDA; however, no indications of drilling waste disposal were observed and all soil samples met the applicable guidelines at the time for both salinity and PHC parameters. Several samples north and east of the well centre submitted for the laboratory analysis of trace metals did not meet the applicable guidelines at the time for boron. Four samples from two boreholes from the separator building area were submitted for the laboratory analysis of salinity parameters, PHC, and/or trace metals which all met the applicable guidelines or were within background conditions. Soil samples collected from the area of the southeast corner AST farm did not satisfy the applicable guidelines for EC, SAR and boron to a minimum depth of 7.5 mbgs. Horizontal delineation was achieved to the northwest from borehole 08-B17 which met the applicable guidelines for salinity parameters and trace metals. Matrix estimated the volume of impacted soil in this area to be 2,355 cubic metres (m3) in a 10 m circular radius. One sample was submitted for the analysis of PHC and satisfied the applicable guidelines at the time. Two soil samples collected from the well centre were submitted for the laboratory analysis of salinity parameters and satisfied the applicable guidelines at the time. Two soil samples were submitted for laboratory analysis of metals and satisfied the applicable guidelines, with the exception of boron to 0.3 mbgs. Three soil samples were submitted for the laboratory analysis of PHC parameters, all of which satisfied the applicable guidelines at the time. Matrix indicated that boron concentrations generally appeared to be associated with salinity impacts across the Site and that salinity impacts in the areas of high EM responses were likely localized to those areas. Matrix recommended conducting a Phase 1 ESA with a Site visit during non-winter conditions.
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Remedial Activities A remedial excavation program was completed by Peregrine Environmental Services (Peregrine) in 2011 to address the impacts identified in the 2008 Matrix Phase 2 ESA. However, correspondence in the well file indicates that the document available for review is an interim report, and a completed report was not identified, therefore, results could not be confirmed or compared to current guidelines. Three excavations were completed at the Site, one in the southeast corner AST farm, one in the well centre area, and one in an area identified during this investigation as a former cement pit in the northeast portion of the Site. According to the interim report, the excavations were extended horizontally and vertically until all confirmatory samples submitted for analysis met the applicable Tier 1 guidelines at the time for residential/parkland land use and fine-grained soils for salinity and/or PHC parameters. The well centre excavation reached a depth of 3 mbgs, the cement pit excavation reached a depth of 1.7 mbgs, and the southeast corner excavation reached a depth of 11 mbgs. The area of the former separator building/EM anomaly south of the well centre and the area east of the well centre/EM anomaly were not remediated during this assessment. The documentation provided was not stamped or signed, and no laboratory documentation was available for review. Data Gap Assessment A data gap analysis was completed in 2021 by Arletta Environmental Consulting Corp (Arletta). Based on a review of the available documents, a Phase 1 and Phase 2 ESA were recommended at the Site. A Phase 1 ESA is recommended, as the 2006 Phase 1 ESA was incomplete and was not professionally certified. A Phase 2 ESA is recommended at the Site as the 2008 Phase 2 ESA did not fully assess Potential Contaminants of Concern (PCOC) at the areas investigated, and the background borehole was advanced within a historical infrastructure area and therefore may not represent background conditions. A Phase 2 ESA is also recommended to assess the remedial excavations completed at the Site, as the final report for the 2011 remedial excavations could not be located, or may not have been completed, and there was no laboratory documentation available pertaining to any samples collected during remediation.
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03 4.
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
AERIAL & SATELLITE IMAGERY REVIEW
Available aerial photographs from AEP Aerial Photographic Record System (AEP, 2017b), and Google Earth Imagery and magnified versions of the original photographs reviewed during the Phase 1 ESA are included in Appendix IV. If available, photographs are reviewed from the pre-disturbance, construction, active, and post-disturbance phases of the Site. Details of the aerial imagery review are summarized below. Review Date: November 2021
Reviewed by: Jesse Macri, Arletta
Photo ID:
Year:
Scale:
Review of Imagery:
AS-817
1962
1:4,000
This photograph was taken before the construction of the 100/12-25-054-25 W4/00 well site. The Site and surrounding area primarily consist of undisturbed agricultural land.
1:4,300
This photograph was taken after the construction of the 100/12-25-054-25 W4/00 well site. Infrastructure is visible and the access road enters the Site from the north. The surrounding area is primarily agricultural. A developed area can be seen northwest of the Site.
1:4,350
This photograph was taken during the production stage of the 100/12-25-054-25 W4/00 well site. The surrounding area appears similar to the 1967 photograph with greater agricultural development to the north of the Site.
AS-978
AS-1366
1967
1974
83-311
1983
1:4,300
This photograph was taken during the production stage and pre-abandonment of the 100/12-25-054-25 W4/00 well site. Infrastructure is visible on site. The surrounding area appears to have greater agricultural activity and changes to the roadways. A new developed area can be seen to the southwest of the Site.
AS 3607150
1987
1:5,470
This photograph was taken after the abandonment of the 100/12-25-054-25 W4/00 well site. Less infrastructure is visible on Site. The surrounding area appears similar to the 1983 photograph with greater development southwest of the Site.
1:4,200
This photograph was taken after the abandonment of the 100/12-25-054-25 W4/00 well site. No infrastructure is visible on Site. Roadways surrounding the Site have been removed and modified. The surrounding area appears to consist of residential subdivisions and agricultural land.
N/A
2021
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03 5.
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
SITE VISIT
Date:
Nov. 2, 2021
Assessor(s):
Matt McGeein, Arletta
Surrounding Land Use:
N: Agricultural
S: Agricultural
E: Agricultural
Topography:
W: Agricultural
On site: Level Off site: Level
Vegetation:
On site: Agricultural - Crop Species Off site: Agricultural - Crop Species
Proximity of receptors to site (within 300 m of the Site boundary): Residence (m):
Water Well (m):
Not field verified
Not field verified
Surface Waterbody (e.g., dugout, stream, river) (m): Not field verified
Current infrastructure observed (equipment, tanks, etc.):
No
Visual signs of former facilities or activities:
No
Visual signs of open or potentially buried earthen pits:
No
Adjacent land affected by operations on the Site:
No
Vegetation stress:
Yes
Hazardous materials/wastes observed:
No
Landfilling or wastewater storage observed:
No
Information conflicts with specific file or imagery review information:
No
A site visit was conducted on November 2, 2021. At the time of the visit, the Site appeared reclaimed and was cropped over. Access to the Site was also cropped over. The Site condition was clean, and no infrastructure or containments were observed. There were no visible signs of the lease on the property, and it was noted that there was poor vegetation growth and reduced row spacing at the well centre area. Site drainage was noted to be towards the east. Photographs taken during the site visit are included in Appendix V. A site visit sketch is included as Figure 2.
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03 6.
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
INTERVIEWS
The Site operator, Terry Willoughby, was contacted by Arletta on November 29, 2021 and had no environmental concerns with the Site or the history of operations as he has not operated this Site long. Pinnacorp Investments Inc. (Pinnacorp) is the current registered landowner and was contacted for an interview over the phone. Ed Basaraba, representing Pinnacorp, noted there were no environmental concerns with the Site. He noted that the occupant had changed about 6-7 years ago and advised to contact the new occupant. The occupant, Mr. Lorne Okerman was contacted for an interview over the telephone, and he had no environmental concerns with the Site. He has leased it for approximately 7 years and noted that the Site was formerly used as a pipe and oil well equipment yard for a period after the abandonment before being regraded. About 5 years ago, a company came to do some earthworks and he still finds the odd gasket piece in the dirt while working but otherwise no concerns. Interview summaries are included in Appendix VI. Government databases were searched for relevant documentation, and the relevant results have been discussed in previous sections of this report.
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03 7.
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
CONCLUSIONS & RECOMMENDATIONS
Was sufficient information found during the Phase 1 ESA to determine the status of the Site? If insufficient information was found, a Phase 2 ESA is required.
No
Did the Phase 1 ESA show contamination was likely present, and a Phase 2 ESA is required?
Yes
7.1.
SUMMARY OF AREAS OF POTENTIAL ENVIRONMENTAL CONCERN
APEC
Location
PCOC
APEC 1: Well centre and associated production infrastructure
Well head
Petroleum hydrocarbons (PHC), salinity, metals.
APEC 2: Aboveground storage tank (AST) farms
On site in southeast, southwest, and northwest corners.
Petroleum hydrocarbons (PHC), polycyclic aromatic hydrocarbons (PAH), salinity, metals.
APEC 3: Drilling Waste Disposal Area (DWDA)
On site location unknown
Petroleum hydrocarbons (PHC), salinity, metals.
APEC 4: Separator building
South of well head
Petroleum hydrocarbons (PHC), salinity, metals.
APEC 5: Cement Pit
On site in northeast corner.
Petroleum hydrocarbons (PHC), salinity, metals.
The approximate or suspected locations of the APEC are shown in Figure 3.
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03 8.
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
REFERENCES
Abacus Datagraphics. 2021. Abadata Well and Pipeline Information Database 2.0 (Abadata 2.0). Accessed November 2021 from: http://abadata.ca/AbaData2/ Alberta Energy Regulator. 2014. Assessing Drilling Waste Disposal Areas: Compliance Options for Reclamation Certification. Alberta Energy Regulator. 2016. Specified Enactment Directive 002 Application Submission Requirements and Guidance for Reclamation Certificates. Alberta Energy Regulator. 2021. FIS Release Incident External Record Report. Accessed November 2021: https://static.aer.ca/prd/documents/data/FIS_EDD_Release_Report.pdf Alberta Environment and Parks. 2016. Alberta Environmental Site Assessment Standard. Alberta Environment and Parks. 2017a. Environmental Site Assessment Repository. Accessed November 2021: http://www.esar.alberta.ca/esarmain.aspx Alberta
Environment and Parks. 2017b. Aerial https://securexnet.env.gov.ab.ca/aprs/inquiry.jsp
Photographic
Record
System.
Retrieved
from:
November
2021:
Alberta Environment and Parks. 2019. Alberta Tier 1 Soil and Groundwater Remediation Guidelines. Alberta
Environment and Parks. 2021. https://avw.alberta.ca/ApprovalViewer.aspx
Authorization
Viewer.
Accessed
Agriculture and Forestry, Government of Alberta. 2021. Agricultural Region of Alberta Soil Inventory Database (AGRASID). Canadian Standards Association. (2016). Phase 1 Environmental Site Assessment, Guidance Document Z768-01. Government of Alberta. 2021. Alberta Water Well Information Database (or Baseline Water Well Test Database). Accessed November 2021, from http://groundwater.alberta.ca/WaterWells/d/ Matrix Solutions Inc. 2008, Phase 2 Environmental Site Assessment 100/12-25-054-25 W4M. Prepared for Regco Petroleums Ltd. September 2008. Newpark Environmental Services, 2006. Reclamation Environmental Site Assessment Phase 1. Prepared for Canada Northwest Energy Limited. Peregrine Environmental Services. 2011. Draft Site Inspection 12-25-054-25 W4M. Prepared for Petrobaken Energy. November 2011. Prior, G.J., Hathway, B., Glombick, P.M., Pana, D.I., Banks, C.J., Hay, D.C., Schneider, C.L., Grobe, M., Elgr, R. and Weiss, J.A. 2013. Bedrock geology of Alberta. Alberta Energy Regulator, AER/AGS Map 600. PSAC. (2014). Historical Drilling Fluid Product Information. Retrieved 2014, from http://www.psac.ca/wpcontent/uploads/historical.pdf
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03 9.
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
CLOSURE
In conducting the Phase 1 Environmental Site Assessment and in providing our findings regarding the presence and level of contamination at the Site, Arletta Environmental Consulting Corp. relies on the benefit of its best judgment based on its experience and in accordance with generally accepted industry techniques for investigation. This report is our interpretation of conditions observed through a specific scope of services. As a result, no warranty, expressed or implied, is given concerning the presence or absence of contamination at the property. Our findings are based on, and limited by, the fact that only a historical investigation and a visual investigation of the Site were conducted, and all background information was provided by others. The visual observations contained in this report are only valid for the day on which the site visit was conducted, and those findings cannot be considered accurate as of any other date. This report has been prepared for the sole use of Ridgeback Resources Inc. Any third party that intends to rely on this report must obtain the prior written consent of Arletta Environmental Consulting Corp. Any use of, or reliance on, this report by a third party without the prior written consent of Arletta Environmental Consulting Corp. is the sole responsibility of any such third party. Arletta Environmental Consulting Corp. as author of this report, assumes no liability for damages whatsoever suffered by any party as a result of decisions made or actions taken based on this report. This limitation of liability includes decisions to either purchase or sell the property. A Government of Alberta Professional Declaration for Reclamation Certificate Applications is included in Appendix VII. If you require additional information, please feel free to contact the undersigned. Arletta Environmental Consulting Corp.
Andy Ma, B.Sc. Environmental Scientist
Prepared by: Arletta Environmental Consulting Corp.
Jennifer Carscallen, M.Sc., P.Biol., P.Ag. Senior Environmental Scientist
February 2022
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
FIGURES
Prepared by: Arletta Environmental Consulting Corp.
February 2022
N 670m
690m
690m
680m
670m
LEGEND
Approximate Scale 1:8,300
Approximate 100/12-25-054-25W4/00 Well Site Boundaries and Surveyed Access Road 100/12-25-054-25 W4/00 Well Centre Topographic Lines Nearby Creeks Source: Google Earth. Image Date: September 29, 2015.
Figure 1: Aerial Photograph Showing Site & Surrounding Area Surface Location: 12-25-054-25 W4M Date: November 2021 Project #: RB.75.03 Client: Ridgeback Resources Inc.
N
LEGEND Approximate 100/12-25-054-25W4/00 Compressor Station Boundaries
100/12-25-054-25W4/00 Well Centre
Figure 2: Site Visit Sketch Surface Location: 12-25-054-25 W4M Date: November 2021 Project #: RB.75.03 Client: Ridgeback Resources Inc.
N
APEC 3: Drilling Waste DIsposal Area (DWDA) Location Unknown
APEC 5: Cement Pit APEC 1: Well Centre
APEC 2: AST Farms
APEC 4: Separator Building
LEGEND
Approximate Scale 1:1,300
Approximate 100/12-25-054-25W4/00 Well Site and Access Road Boundaries
100/12-25-054-25W4/00 Well Centre
APEC
Figure 3: Site Plan With Areas Of Potential Environmental Concern (APEC) Surface Location: 12-25-054-25 W4M Date: November 2021 Project #: RB.75.03 Client: Ridgeback Resources Inc.
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
APPENDICES
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Appendix I: Survey Plan
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Appendix II: Regulatory Searches & Relevant Historical Documentation
Prepared by: Arletta Environmental Consulting Corp.
February 2022
01231245ÿ2744ÿ89
8 ÿ9
KLMN( KLO()
!ÿ#! ÿ# ÿ$%&' (!)'%ÿ*!! !+ ÿ,!-
8 . ÿ9 ÿ/0 1 2ÿ345 6 7 8 93ÿ:3 7 012312;245ÿ274;7<=ÿ89
> ÿ ÿ9 ÿ7 ÿ? 4 ÿ ÿ@ ÿ ÿ ÿ? 4 5 4711 1 1 1
AB 8 ÿ ÿ 4 ÿ ÿ . ÿ ÿ 5 5ÿ5 B ÿ5 ÿ9 C 8 ÿ Bÿ0 ÿ 8 ÿ ÿ 4 2ÿB ÿ 4 ÿ ÿ8 ÿ Bÿ ÿ Dÿ2;;0ÿ9 C 8 ÿ Bÿ0 ÿ Dÿ9 C 8 ÿ Bÿ0 ÿEÿF 42 5ÿ9 C 8 ÿ Bÿ0 ÿEÿG 5ÿHG?G5ÿ9 8 5ÿI905ÿJ3935ÿI83ÿ
1 1 1
414
View in Metric
Reconnaissance Report Please click the water Well ID to generate the Water Well Drilling Report.
Groundwater Wells GIC Well ID
LSD
M
Export to Excel
DRILLING COMPANY
DATE COMPLETED
DEPTH (ft)
SEC
TWP
RGE
TYPE OF WORK
USE
CHM
261442 11
25
54
25
4
UNKNOWN DRILLER
1936-07-14
130.00 Federal Well Survey
Domestic
261444 NH
25
54
25
4
SCHMIDT DRILLING LTD.
1969-05-10
200.00 New Well
Domestic
261499 SE
26
54
25
4
BIG INDIAN DRILLING CO. LTD.
1960-09-24
150.00 New Well
Industrial
2
261515 1
26
54
25
4
UNKNOWN DRILLER
0.00 Spring
Domestic
1
261519 7
26
54
25
4
MOBILE AUGERS AND RESEARCH LTD.
1974-05-28
120.00 New Well
Domestic
261525 9
26
54
25
4
MOBILE AUGERS AND RESEARCH LTD.
1974-05-29
100.00 New Well
Domestic
LT
PT 5 8
12
WELL OWNER
STATIC LEVEL (ft)
TEST RATE (igpm)
MCCLAY, J. GAUDIN, R. 21 AJAX (ALTA) PIPELINE LTD
SC_DIA (in) 0.00
98.00
6.00
5.00
40.00
6.75
6.63
KALLAL, CHARLES
0.00
14
MANOR ESTS
0.00
17
MANOR ESTS
0.00
261856 1
35
54
25
4
UNKNOWN DRILLER
200.00 Chemistry
Domestic
1131203 4
36
54
25
4
BIG IRON DRILLING LTD.
2014-07-30
210.00 New Well
Domestic
10
18 MARTIN, CAM & LISA
66.10
4.00
6.00
1495367 6
25
54
25
4
MAR-WAYNE WATER WELL DRILLING SERVICES LTD.
2002-10-25
170.00 New Well
Stock
22
25 GIBSON, PHIL
67.52
10.00
6.00
9676015 4
36
54
25
4
HARTL WATER WELL DRILLING & SERVICE LTD
2015-03-11
210.00 New Well
Domestic
18
Printed on 9/24/2021 2:11:31 PM
2
ISEKE, YVONNE
CHASCHIN, JOE
0.00
6.00
Page: 1 / 1
AER Spills & Complaints Report SPILLS
INCIDENT #
NOTIFIED DATE
LICENSEE (AT TIME OF INCIDENT)
SOURCE
LICENSE #
COMPLETE DATE
CURRENT LICENSEE
CAUSE
SPILL SENSITIVE OFFSITE? AREA?
PUBLIC AFFECTED
WILDLIFE AFFECTED
# OF INJURIES INCIDENT DATE
# OF DEATHS
SUBSTANCE #1 SPILLED
SUBSTANCE #2 SPILLED
PIPELINE DAMAGE PIPE OD
PRESSURE TEST FAILURE?
FAILURE TYPE
STRIKE AREA
PIPE GRADE
JURISDICTION
FIELD CENTRE
PIPE WT
AREA AFFECTED
ENVIRONMENT AFFECTED
SUBSTANCE #3 SPILLED
# OF EVACUATED
CLEANUP DATE
SUBSTANCE #4 SPILLED
11-25-054-25 W4M 20022408
AUG 21 2002
REGCO PETROLEUMS LTD.
MULTIPHASE PIPELINE
11305-6 (Pipeline Licence)
AUG 21 2002
REGCO PETROLEUMS LTD.
CONVERSION
CONVERSION FROM ENV SYSTEM
CONVERSION FROM ENV SYSTEM
AUG 21 2002 0
0
DAMAGE BY OTHERS (CONTACT DAMAGE)
HIT 60.3
3.2
CAMAO
X42
CONVERSION FROM ENV SYSTEM
ST. ALBERT AIR/LAND
0
AUG 21 2002
0.0 (0.0 RECOVERED)
12-25-054-25 W4M There are no Spill Incidents for this LSD.
13-25-054-25 W4M There are no Spill Incidents for this LSD.
14-25-054-25 W4M There are no Spill Incidents for this LSD.
COMPLAINTS
INCIDENT DATE
INCIDENT #
NOTIFIED DATE
LICENSEE (AT TIME OF INCIDENT)
SOURCE
LICENSE #
COMPLETE DATE
CURRENT LICENSEE
SOURCE IN COMPLIANCE?
CAUSE
STRIKE AREA
FIELD CENTRE
CONCERNS
11-25-054-25 W4M There are no Complaint Incidents for this LSD.
Page: 1 of 2
COMPLAINTS
INCIDENT DATE
INCIDENT #
NOTIFIED DATE
LICENSEE (AT TIME OF INCIDENT)
SOURCE
LICENSE #
COMPLETE DATE
CURRENT LICENSEE
SOURCE IN COMPLIANCE?
CAUSE
STRIKE AREA
FIELD CENTRE
CONCERNS
12-25-054-25 W4M There are no Complaint Incidents for this LSD.
13-25-054-25 W4M There are no Complaint Incidents for this LSD.
14-25-054-25 W4M There are no Complaint Incidents for this LSD.
Page: 2 of 2
Sept ember24,2021
Gener alWel lDat a Wel lSummar yRepor tf or00/ 122505425W4/ 0 Summar yI nf or mat i on Wel lI nf or mat i on
Wel lI dent i f i er
Wel lConf i dent i al Type
00/ 122505425W4/ 0
NonConf i dent i al
Dr i l l i ng Cont r act orBA Dr i l lRi g AER I d No Cl assi f i cat i on
Wel lName
RI DGEBACKCAMAO 12255425
0Z41
DeeperPool Test
002
Spud Dat e
Fi nalDr i l l Dat e Ri gRel easeDat e
07Sep 17Sep 1966 1966
Nul l
Kel l y Pl ugback Bushi ng Dept h El evat i on
Fi nalTot al MaxTr ueVer t i cal Dept h Dept h
1140
1626. 1
692. 8
Nul l
Li cenceDet ai l s Wel lI dent i f i er
Li cence Number
Li censee BAI D Li censeeBAName
00/ 122505425W4/ 0
0030923 A7G2
Li cenceI ssue Dat e Wel lLi cencePur pose
Ri dgebac kRes our c esI nc .
02Sep1966 HI STORI CALCONVENTI ONALWELL
Compl et i onI nt er val Pr odSt r i ngUWIFor mat t ed
GCITop Adj ust edI nd
GCIBase Adj ust edI nd
Gr ossCompl et i onI nt er valTop
Gr ossCompl et i onI nt er valBase
00/ 122505425W4/ 0
N
N
1128. 4
1132
Wel lCasi ng Wel lI dent i f i er
Casi ngDat e
00/ 122505425W4/ 0 Nul l
Casi ng ObsNo Casi ngType
Out si de Shoe Di amet er( mm) Dept h
1
SURFACE
219. 1
183. 8 0
PRODUCTI ON
114. 3
1161. 90
21Sep1966 2
Li nerTop Casi ng Dept h Densi t y
Cement CementTop CementBase Gr ade ObsNo Dept h( mKB) Dept h( mKB) CementType
Cement Amount
CementUni t
0
Nul l
Nul l
Nul l
Nul l
Nul l
Nul l
Nul l
0
Nul l
Nul l
Nul l
Nul l
Nul l
Nul l
Nul l
Pr oduct i onSt r i ngs&Pr odSt r i ngSt at usHi st or y Pr odSt r i ngUWI For mat t ed
OnPr oduct i on Dat e
OnI nj ect i on Dat e
00/ 122505425W4/ 0 28Sep1966
Nul l
Fi el d I d Fi el d_Name
185
Deposi t Ar eaI d Ar eaName Deposi tI D Name St at usDat e
PoolI D PoolName
BLAI RMORE CAMPBELL. .244006 Nul l Nul l F
Nul l
Nul l
19Sep1986
St at usFl ui dSt at usMode
St at us St at us Type St r uct ur e
CROI L
N/ A
ABD
N/ A
Packer Wel lLogSummar y Wel lI dent i f i er
LogRunNumber
LogRunDat e
LogTestCompanyBAI d
LogType
LogI nt er valTopDept h
LogI nt er valBaseDept h
00/ 122505425W4/ 0
1
09Sep1909
0S06
CementBond-Hi s t
15. 2
1124. 7
GammaRay-Hi s t
975. 4
1140. 3
I nduc t i onEl ec t r i c-Hi s t
183. 8
1626. 1
Mi cr ol og-Hi st
183. 8
1362. 5
Per f or at i onRecor d-Hi s t
1066. 8
1145. 7
Soni cAc ous t i c-Hi s t
183. 5
1625. 5
Per f or at i onRecor d-Hi s t
1036
1133
2
09Sep1909
0S06
Di r ect i onalDr i l l i ngDat a Per fTr eat ment Wel lI dent i f i er
Per fTr eat mentObsNo
Per fTr eat mentDat e
Per fTr eat mentType
LegacyCode
Per fTr eat mentTopDept h Per fTr eat mentBase ( m) Dept h( m)
Per fShot sPer Met r e
00/ 122505425W4/ 0
1
13Oc t1966
Bul l etPer f or at i on
01
1128. 4
1129. 6
3
2
13Oc t1966
Bul l etPer f or at i on
01
1131. 1
1132
3
3
13Oc t1966
Aci dWas h
11
1128. 4
1129. 6
0
4
13Oc t1966
Aci dWas h
11
1131. 1
1132
0
5
19Sep1986
Pack i ngDev i ceCappedw/ Ceme. .53
1107
1115
0
Pl ugback&Abandonment Wel lI dent i f i er
Pl ugbackDat ePl ugType
Legacy Cement Cement Code Pl ugbackPur pose Amount Uni t
Pl ugback Pl ugback Sur f ace Top Base Pl ugbackTop Sur f aceAbandonment Abandonment Dept h Dept h Measur edI nd Dat e Met hod
00/ 122505425W4/ 0
19Sep1986
53
1107
Pac k i ngDev i c eCapped w/ Cement
Abandon
8
Met r es
1115
Nul l
19Sept ember ,1986
CementandPl at e
Wel lTourOccur r ence Wel lI dent i f i er
Occur r ence Occur r ence ObsNo Occur r enceType Dat e
00/ 122505425W4/ 0 1
Los tc i r cul at i on 07Sep1966
Oper at i onI n Pr ogr ess
Occur r ence Dept h
Occur r ence Occur r ence MudDensi t y Cont r olDat e
Dr i l l i ng
121
9999
Occur r ence Cont r olDept h
07Sep1966 121
Cont r olMud Densi t y
Wat er f l ow Aver age I nf l ux LostCi r cul at i onTot alFl ui d
9999
0
9999. 9
St at usHi st or y Pr odSt r i ngUWIFor mat t ed
St at usDat e
St at usFl ui d St at usFl ui dDesc
St at usMode St at usModeDesc
St at usType St at usTypeDesc
St at us St r uct ur e
00/ 122505425W4/ 0
02Sep1966
00
NotAppl i cabl e
00
NotAppl i cabl e
00
NotAppl i cabl e
00
NotAppl i cabl e
17Sep1966
00
NotAppl i cabl e
07
DRI LLEDANDCASED 00
NotAppl i cabl e
00
NotAppl i cabl e
28Sep1966
01
CRUDEOI L
11
PUMPI NG
NotAppl i cabl e
00
NotAppl i cabl e
00
St at usSt r uct ur eDesc
St at usHi st or y Pr odSt r i ngUWIFor mat t ed
St at usDat e
St at usFl ui d St at usFl ui dDesc
St at usMode St at usModeDesc
St at usType St at usTypeDesc
St at us St r uct ur e
00/ 122505425W4/ 0
02Sep1966
00
NotAppl i cabl e
00
NotAppl i cabl e
00
NotAppl i cabl e
00
NotAppl i cabl e
17Sep1966
00
NotAppl i cabl e
07
DRI LLEDANDCASED 00
NotAppl i cabl e
00
NotAppl i cabl e
28Sep1966
01
CRUDEOI L
11
PUMPI NG
00
NotAppl i cabl e
00
NotAppl i cabl e
01J un1971
01
CRUDEOI L
01
SUSPENDED
00
NotAppl i cabl e
00
NotAppl i cabl e
01J un1973
01
CRUDEOI L
11
PUMPI NG
00
NotAppl i cabl e
00
NotAppl i cabl e
01Sep1981
01
CRUDEOI L
01
SUSPENDED
00
NotAppl i cabl e
00
NotAppl i cabl e
19Sep1986
01
CRUDEOI L
02
ABANDONED
00
NotAppl i cabl e
00
NotAppl i cabl e
St at usSt r uct ur eDesc
Locat i on Locat i on
Wel lI dent i f i er
Sur f aceDLS Locat i on
SHNor t h SHEastWest SHEastWest Sout h Code Di st ance Code
SHNor t h Sout h Gr ound Di st ance El evat i on
Pr oj ect ed Pr oj ect ed Ter mi nat i ng Dept h For mat i on
BHEast BHEast West WestCode Di st ance
BHNor t h BHNor t h Sout h Sout hCode Di st ance
BHLat i t ude BHLongi t ude
00/ 122505425W4/ 0
12255425W4
E
613. 3
0
E
S
53. 696144 113. 56257
200. 9
S
689. 2
Nul l
200. 9
Geol ogi calTops&Mar ker s
Wel lI dent i f i er
For mat i on
For mat i onDept h( m)
Qual i t y
00/ 122505425W4/ 0
1400LEAPARKFM
451. 1
GoodLog
TopofUni t
1600COLORADO GRP
579. 1
GoodLog
TopofUni t
1860SECONDWHI TESPECKS
758. 3
GoodLog
TopofUni t
2060BASEFI SHSCALESMARKER
852. 8
GoodLog
TopofUni t
2140VI KI NG FM
889. 4
GoodLog
TopofUni t
2180VI KI NG SANDSTONE
902. 8
GoodLog
TopofUni t
2480MANNVI LLEGRP
941. 5
GoodLog
TopofUni t
2800CLEARWATERFM
1030. 2
GoodLog
TopofUni t
3060WABI SKAW MBR
1082
GoodLog
TopofUni t
3120OSTRACODMEMBER
1098. 8
GoodLog
TopofUni t
3360ELLERSLI EMBR
1112. 5
GoodLog
TopofUni t
6580WABAMUNGRP
1177. 7
GoodLog
TopofUni t
6860CALMARFM
1287. 5
GoodLog
TopofUni t
6960NI SKUFM
1303. 3
GoodLog
TopofUni t
7100I RETONFM
1367
GoodLog
TopofUni t
7280DUVERNAYFM
1561. 2
GoodLog
TopofUni t
7320COOKI NG LAKEFM
1599. 6
GoodLog
TopofUni t
Cor e Cor eAnal ysi sLi neDet ai l Cor eHeader Cor eAnal ysi sDet ai l Cor eAnal ysi sMet hod Wel lCor eCut
Descr i pt i on
613. 3
LAND TITLE CERTIFICATE
S LINC 0029 633 352
SHORT LEGAL 4;25;54;25;NW
TITLE NUMBER 042 204 045
LEGAL DESCRIPTION ALL THAT PORTION OF THE NORTH WEST QUARTER OF SECTION TWENTY FIVE (25) TOWNSHIP FIFTY FOUR (54) RANGE TWENTY FIVE (25) WEST OF THE FOURTH MERIDIAN WHICH LIES TO THE EAST OF ST. ALBERT SETTLEMENT AS SHOWN ON A PLAN OF SURVEY OF THE SAID TOWNSHIP SIGNED AT OTTAWA ON THE 5TH DAY OF MARCH A.D. 1884 CONTAINING 32.0 HECTARES (79 ACRES) MORE OR LESS EXCEPTING THEREOUT: HECTARES (ACRES) MORE OR LESS A) PLAN 895TR - ROAD 0.817 2.02 B) PLAN 0227135 - ROAD 0.203 0.50 EXCEPTING THEREOUT ALL MINES AND MINERALS ESTATE: FEE SIMPLE MUNICIPALITY: STURGEON COUNTY REFERENCE NUMBER: 022 444 014 ----------------------------------------------------------------------------REGISTERED OWNER(S) REGISTRATION DATE(DMY) DOCUMENT TYPE CONSIDERATION VALUE ----------------------------------------------------------------------------042 204 045
21/05/2004
AFFIDAVIT OF SURVIVING JOINT TENANT
OWNERS PHILIP JOHN GIBSON AND LORNA DIANE GIBSON BOTH OF: RR2,ST.ALBERT ALBERTA T8N 1M9 AS JOINT TENANTS
( CONTINUED )
----------------------------------------------------------------------------ENCUMBRANCES, LIENS & INTERESTS PAGE 2 # 042 204 045 REGISTRATION NUMBER DATE (D/M/Y) PARTICULARS ----------------------------------------------------------------------------2538KU
23/07/1957 CAVEAT CAVEATOR - IMPERIAL OIL LIMITED. "DATA UPDATED BY CHANGE OF ADDRESS FOR SERVICE REG. 822127550"
4620NW
01/10/1964 UTILITY RIGHT OF WAY GRANTEE - ATCO GAS AND PIPELINES LTD. 10035-105 ST EDMONTON ALBERTA T5J2V6 "DISCHARGED EXCEPT PART ON PLAN 1965 N.Y. BY REG. 3170 O.L." (DATA UPDATED BY: TRANSFER OF UTILITY RIGHT OF WAY 962185393) (DATA UPDATED BY: TRANSFER OF UTILITY RIGHT OF WAY 012017362)
718RU
04/11/1969 CAVEAT CAVEATOR - PORTAL PETROLEUMS LIMITED.
752 102 704
12/08/1975 CAVEAT CAVEATOR - OAKLAND PETROLEUMS LIMITED.
752 145 142
15/10/1975 CAVEAT CAVEATOR - OAKLAND PETROLEUMS LIMITED. 2800 ONE CALGARY PLACE, 330-5 AVENUE SW, CALGARY ALBERTA "DATA UPDATED BY CHANGE OF ADDRESS FOR SERVICE REG. 832276842"
752 162 220
10/11/1975 CAVEAT CAVEATOR - OAKLAND PETROLEUMS LIMITED. 2800 ONE CALGARY PLACE, 330-5 AVENUE SW, CALGARY ALBERTA "DATA UPDATED BY CHANGE OF ADDRESS FOR SERVICE REG. 832276841"
762 116 061
30/06/1976 UTILITY RIGHT OF WAY GRANTEE - FORTISALBERTA INC. 320 - 17 AVENUE S.W. CALGARY ALBERTA T2S2Y1 (DATA UPDATED BY: TRANSFER OF UTILITY RIGHT OF WAY 002298773) (DATA UPDATED BY: CHANGE OF NAME 052010049)
762 221 220
15/12/1976 UTILITY RIGHT OF WAY GRANTEE - OAKLAND PETROLEUMS LIMITED.
772 155 284
15/08/1977 CAVEAT ( CONTINUED )
----------------------------------------------------------------------------ENCUMBRANCES, LIENS & INTERESTS PAGE 3 # 042 204 045 REGISTRATION NUMBER DATE (D/M/Y) PARTICULARS ----------------------------------------------------------------------------RE : LEASE CAVEATOR - OAKLAND PETROLEUMS LIMITED. 2800 ONE CALGARY PLACE, 330-5 AVENUE SW, CALGARY ALBERTA "DATA UPDATED BY CHANGE OF ADDRESS FOR SERVICE REG. 832276843" 792 098 731
04/05/1979 CAVEAT CAVEATOR - OAKLAND PETROLEUMS LIMITED. 2800 ONE CALGARY PLACE, 330-5 AVENUE SW, CALGARY ALBERTA "DATA UPDATED BY CHANGE OF ADDRESS FOR SERVICE REG. 832276845"
792 161 943
11/07/1979 CAVEAT CAVEATOR - OAKLAND PETROLEUMS LIMITED. 2800 ONE CALGARY PLACE, 330-5 AVENUE SW, CALGARY ALBERTA "DATA UPDATED BY CHANGE OF ADDRESS FOR SERVICE REG. 832276840"
842 203 115
13/09/1984 SURFACE RIGHTS BOARD ORDER "ORDER NO. 2373/84"
852 199 562
17/09/1985 UTILITY RIGHT OF WAY GRANTEE - ALTAGAS UTILITIES INC. 5509-45TH ST LEDUC ALBERTA T9E6T6 (DATA UPDATED BY: CHANGE OF NAME 032497377)
872 219 450
14/09/1987 CAVEAT RE : RIGHT OF WAY AGREEMENT CAVEATOR - PEMBINA PIPELINE CORPORATION. 3800, 525-8 AVENUE SW CALGARY ALBERTA T2P1G1 (DATA UPDATED BY: TRANSFER OF CAVEAT 012207727) (DATA UPDATED BY: CHANGE OF ADDRESS 122219029)
882 211 991
09/09/1988 ORDER "AMENDING ORDER NO. 842203115"
922 085 659
01/04/1992 CAVEAT RE : SEE CAVEAT CAVEATOR - PEMBINA PIPELINE CORPORATION. 3800, 525-8 AVENUE SW CALGARY ALBERTA T2P1G1 ( CONTINUED )
----------------------------------------------------------------------------ENCUMBRANCES, LIENS & INTERESTS PAGE 4 # 042 204 045 REGISTRATION NUMBER DATE (D/M/Y) PARTICULARS ----------------------------------------------------------------------------AS TO PLAN 8722547 (DATA UPDATED BY: TRANSFER OF CAVEAT 012209298) (DATA UPDATED BY: CHANGE OF ADDRESS 122220602) 932 053 366
01/03/1993 CAVEAT RE : RIGHT OF WAY AGREEMENT CAVEATOR - CANADA NORTHWEST ENERGY LIMITED. P.O. BOX 20035 CALGARY PLACE POSTAL OUTLET CALGARY ALBERTA T2P4J2 AGENT - LARRY MUTCHESON.
002 335 430
10/11/2000 SURFACE RIGHTS BOARD AMENDING ORDER AFFECTS INSTRUMENT: 842203115 ORDER #3333/2000 AMENDING ORDER #E2373/84 PARTY NAME CHANGED TO POST ENERGY CORPORATION
042 521 992
29/11/2004 CAVEAT RE : UTILITY RIGHT OF WAY CAVEATOR - ALTAGAS UTILITIES INC. 5509-45TH ST LEDUC ALBERTA T9E6T6 AGENT - MYRNA KING
052 105 917
22/03/2005 ZONING REGULATIONS BY - HER MAJESTY THE QUEEN IN RIGHT OF CANADA C/O THE MINISTER OF NATIONAL DEFENCE 101 COLONEL BY DRIVE OTTAWA ONTARIO K1A0K2
132 018 313
17/01/2013 CAVEAT RE : UTILITY RIGHT OF WAY CAVEATOR - ALTAGAS UTILITIES INC. 5504-45 STREET LEDUC ALBERTA T9E6T6 AGENT - ALYNNE KUGLER AS TO PLAN 1225128
TOTAL INSTRUMENTS: 021
( CONTINUED )
PAGE 5 # 042 204 045
THE REGISTRAR OF TITLES CERTIFIES THIS TO BE AN ACCURATE REPRODUCTION OF THE CERTIFICATE OF TITLE REPRESENTED HEREIN THIS 24 DAY OF SEPTEMBER, 2021 AT 02:42 P.M. ORDER NUMBER:
42696724
CUSTOMER FILE NUMBER:
*END OF CERTIFICATE* THIS ELECTRONICALLY TRANSMITTED LAND TITLES PRODUCT IS INTENDED FOR THE SOLE USE OF THE ORIGINAL PURCHASER, AND NONE OTHER, SUBJECT TO WHAT IS SET OUT IN THE PARAGRAPH BELOW. THE ABOVE PROVISIONS DO NOT PROHIBIT THE ORIGINAL PURCHASER FROM INCLUDING THIS UNMODIFIED PRODUCT IN ANY REPORT, OPINION, APPRAISAL OR OTHER ADVICE PREPARED BY THE ORIGINAL PURCHASER AS PART OF THE ORIGINAL PURCHASER APPLYING PROFESSIONAL, CONSULTING OR TECHNICAL EXPERTISE FOR THE BENEFIT OF CLIENT(S).
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Appendix III: Drilling Waste Disposal Information
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Compliance Option 2 - Drilling Waste Disposal Assessment Checklist If any response to the checklist questions leads to a Phase 2 ESA requirement or there is insufficient information to complete the Compliance Option Two Checklist, a Phase 2 ESA must be conducted in accordance with Compliance Option Three. 1. General Disposal and Drilling Fluid Information: The well licensee should be able to review various sources of information pertaining to the drilling activities on-site. Many information sources, other than the Notification of Drilling Waste Disposal, Drilling Waste Management Disposal Form, or Drilling Waste Pipeline Disposal Form can be reviewed for information relating to the drilling waste disposal and drilling fluid systems. These can include Tour Reports, daily drilling records, well files, and contractor invoices. 1.0
Well Information:
Unique Identifier (UI) 100/12-25-054-25W4/00 Spud Date September 7, 1996 Well Depth 1626.10 m
1.1
Disposal Method (if known)*: Unknown * If waste was disposed at an ERCB or ESRD approved facility, list supporting documentation under Reference Documents.
1.2
Disposal Location (if known)**: Unknown ** If checklist indicates that a Phase 2 ESA (Compliance Option Three) is required, it must be undertaken at the disposal location. If the disposal location is unknown, the Phase 2 ESA must be undertaken at the wellsite. For the purpose of this form: if the disposal method and/or location remains unknown after all available information sources have been checked, the drilling waste disposal location is assumed to be on-site. Yes
No
1.3 Were there other drilling waste disposal events on the site (e.g. wellbore re-entry or another well drilled, using fluids containing drilling fluid additives)? If yes, were the disposal areas separate from one another?
July 2012
Drilling waste information must be evaluated for each disposal.
Compliance Option 2 - Drilling Waste Disposal Assessment Checklist
Drilling waste information must be evaluated by combining the drilling fluid additives and well depths. If drilling waste information is missing or incomplete for one or both wells, a Phase 2 (Compliance Option Three) is required.
1 of 7
Yes
No
In Comments section, indicate which well the remote site will be tied to for the purposes of reclamation
Single well remote disposal site must be included with reclamation certificate application, unless it already has received a Reclamation Certificate.
1.4 Was a remote site used? If, Yes, is the remote site included in this reclamation application? If not included, is the remote site a multiwell disposal location?
1.5 Has the well licensee reviewed the Daily Drilling Records and other available drilling documentation?
Phase 2 required
1.6 Can it be determined from the available records what type of drilling fluid system was used?
Phase 2 required
1.7 Were water-based drilling fluids used for all sections (i.e., gel chemical drilling fluid systems)? If No, is there evidence that demonstrates the non-water based wastes were disposed of in a manner consistent with Directive 50 (1996 version for disposals before November 1, 2012 or 2012 version for disposals on or after November 1, 2012) or Directive 58 (i.e., appropriately approved waste management facility)? 1.8 Is a mud list available? If Yes, can all the additives on the mud list be identified and described?
Phase 2 required
Phase 2 required Phase 2 required
Record the additives and their description (e.g., chrome-free lignosulfonate, aldehyde-based bactericide, etc.) on the attached form.
July 2012
Compliance Option 2 - Drilling Waste Disposal Assessment Checklist
2 of 7
Yes
No
1.9 Do the Daily Drilling Records show evidence of a flow or kick that may have resulted in the introduction of produced fluids (i.e., hydrocarbons or salts) into the drilling fluids? Phase 2 required
If Yes, is there information/documentation available to demonstrate that they were appropriately treated or disposed of as per Directive 50 or Directive 58 (i.e., approved waste management facility)? 1.10 Do the Daily Drilling Records show evidence of returned drill stem test fluids? If Yes, is there information/documentation available to demonstrate that they were appropriately treated or disposed of as per Directive 50 (1996 version for disposals before November 1, 2012 or 2012 version for disposals on or after November 1, 2012) or Directive 58 (i.e., approved waste management facility)? If treatment or disposal as per Directive 50 (1996 version for disposals before November 1, 2012 or 2012 version for disposals on or after November 1, 2012) or Directive 58 cannot be confirmed, is there sufficient information/documentation available to complete the DST calculations?
Show calculation on attached form
Phase 2 required
Yes
No
1.11 Were cement returns buried on-site or at a remote site linked to the well? 2. Hydrocarbon Management
2.1 Was hydrocarbon-based drilling fluid used? If Yes, is there evidence that wastes were disposed of in a manner consistent with Directive 50 (1996 version for disposals before November 1, 2012 or 2012 version for disposals on or after November 1, 2012) or Directive 58 (i.e., approved waste management facility)?
July 2012
Compliance Option 2 - Drilling Waste Disposal Assessment Checklist
Phase 2 required
3 of 7
Yes
No
2.2 Was the well a horizontal oil well? Phase 2 required
If Yes, is there evidence that wastes were disposed of in a manner consistent with Directive 50 (1996 version for disposals before November 1, 2012 or 2012 version for disposals on or after November 1, 2012) or Directive 58 (i.e., approved waste management facility)? 2.3 Was the well drilled using under-balanced techniques?
Phase 2 required
If Yes, is there information/documentation available to demonstrate that the drilling wastes were disposed of in a manner consistent with Directive 50 (1996 version for disposals before November 1, 2012 or 2012 version for disposals on or after November 1, 2012) or Directive 58 (i.e., approved waste management facility)? 2.4 Was hydrocarbon added to the drilling fluid?
Phase 2 required
If Yes, was the hydrocarbon contaminated drilling waste disposed of in a manner consistent with Directive 50 (1996 version for disposals before November 1, 2012 or 2012 version for disposals on or after November 1, 2012) or Directive 58 (i.e., approved waste management facility)?
3. Metals (Trace Elements) Management
3.1 Was the disposal completed before November 1, 2012?
3.2 Was barite added to the drilling fluid? If Yes, did it meet the requirements specified in the attached metal calculation table?
July 2012
Yes
No
Complete questions 3.2 to 3.5
Go to question 3.6
Show calculation on attached form
Compliance Option 2 - Drilling Waste Disposal Assessment Checklist
Phase 2 required
4 of 7
Yes
No
Show calculation on attached form
Phase 2 required
Show calculation on attached form
Phase 2 required
3.3 Was zinc carbonate added to the drilling fluid? If Yes, did it meet the requirements specified in the attached metal calculation table? 3.4 Were chrome-based thinners added to the drilling fluid? If Yes, did it meet the requirements specified in the attached metal calculation table? 3.5 Were any other additives used that would have triggered testing for metals under Section 3 or 5 of Directive 50 (1996 version)? If Yes, are waste analytical data and application rates (land treatment, landspreading) or maximum application (mix-bury-cover) available?
Phase 2 required
If above data are available, did the application rate or maximum application meet Directive 50 requirements?
Phase 2 required
3.6 Did metal concentrations in the waste trigger a requirement for post-disposal sampling? If yes, did all post-disposal samples meet the soil metal endpoints specified in Section 3 of Directive 50 (2012 version)?
July 2012
Compliance Option 2 - Drilling Waste Disposal Assessment Checklist
Phase 2 required
5 of 7
4. Salinity Management
4.1 Does the water based drilling waste meet the requirements specified in the attached Salt Calculation Table?
Yes
No
Show calculation on attached form
Phase 2 required
4.2 Was a salt zone encountered during drilling? If Yes, is there evidence that demonstrates the drilling wastes were disposed of in a manner consistent with Directive 50 (1996 version for disposals before November 1, 2012 or 2012 version for disposals on or after November 1, 2012) or Directive 58 (i.e., appropriately approved waste management facility)?
July 2012
Compliance Option 2 - Drilling Waste Disposal Assessment Checklist
Phase 2 required
6 of 7
Mud Additives (Attach additional pages if necessary.) Product Name Bicarb of soda Caustic soda Dakolite Gel Lignite Lime Oil Sawdust
Amount Used (units) 100 lbs 1050 lbs 1450 lbs 34200 lbs 200 lbs 30 lbs 50 barrels 70 sacks
Brief Description of Product Alkalinity pH control, calcium remover Calcium reducer, alkalinity control Lignite emulsifier Bentonite viscosifier Thinner, dispersant Alkalinity control Hydrocarbon lubricant Lost circulation material
Reference Documents (List all source documents used in the completion of this checklist. Attach additional pages if necessary. Documents must be supplied to Alberta Environment and Sustainable Resource Development, if requested.) Abadata 2.0 (Abacus Datagraphics). November 29, 2021. https://abadata.ca Commonwealth Drilling Co. Ltd. 1966. Daily Drilling Log Oakland Namao 12-25-54-25 W4M Petroleum Services Association of Canada. 2011. Historical Drilling Fluid Product Information. http://www.psac.ca/industry-info/mud-list
Comments (Please provide any additional comments relevant to the decision process within the checklist. Attach additional pages if necessary.) The Notification of Drilling Waste Disposal document was not available for review; however, Daily Drilling Reports and Tour Reports identify that the well was drilled with a gel chemical drilling fluid system. A mud list was prepared from the Daily Drilling Reports. Where there were discrepancies, the more conservative volumes were used. The location of the drilling waste disposal is unknown and has been assumed to be onsite by Mix-Bury-Cover. The following was determined: •
July 2012
A water-based gel chemical drilling fluid system was used during the drilling vent.
Compliance Option 2 - Drilling Waste Disposal Assessment Checklist
7 of 7
•
There is no information regarding the location of the drilling waste disposal, so it has been assumed to be onsite.
•
The salt equivalency calculations resulted in sodium hydroxide (NaOH) equivalent sacks/m depth, below the allowable NaOH equivalent sacks/m depth limit.
•
There is no evidence that fluid returns from the three Drill Stem Tests (DST)s were disposed of correctly
•
The Daily Drilling Reports identified hydrocarbon mud additives being added to the drilling mud.
•
The drilling waste did not satisfy the Compliance Option 2 Checklist requirements due to the presence of hydrocarbon mud additives and lack of evidence of proper disposal of DST fluid returns, therefore further investigation is required to determine the drilling waste management practices that were conducted on the Site.
July 2012
Compliance Option 2 - Drilling Waste Disposal Assessment Checklist
8 of 7
Professional Declaration for Reclamation Certificate Applications Submit one Declaration for each report
1
This Declaration is made in conjunction with an application for a reclamation certificate (the"Application") made by Ridgeback Resources Inc.
(Applicant)
for the following land(s): 12-25-054-25 W4M 2
(insert legal description).
I am a practicing professional member [Registration/member number] 8954 of the Alberta Institute of Agrologists which is a regulated professional organization (the "Professional Organization"). I have a minimum of five years verifiable experience in remediation or reclamation relevant to the Competencies Table contained in the Competencies for Remediation and Reclamation Advisory Committee's Recommendations Report (ESRD 2006).
3
As a member of the Professional Organization, I have the ability to sign off on work required for reclamation certificate applications as defined by the Alberta Energy Regulator and am authorized by the Applicant to prepare and submit the attached report or document, (the "Professional Report") listed below.
4
To the best of my knowledge and the best of my professional ability, recognizing the standard of care expected of a reasonable professional doing this work, it is my professional opinion that all the information contained in the Professional Report is accurate and complete, and contains all the relevant information for the purposes of this Application.
5
The results reported in the Professional Report are consistent with all current and applicable Provincial policy, criteria, standards and guidelines for the remediation or reclamation.
6
The Professional Report, including all attachments, data and supplemental information, were prepared by me, or under my direct supervision, or was prepared by a third party(ies) and has been reviewed and accepted by me; and was prepared in accordance with an appropriate quality assurance/quality control system that ensured qualified personnel properly gathered and evaluated all the information contained in and underlying the Professional Reports. All the information submitted is, to the best of my knowledge, true, accurate and complete.
7
I carry, or my employer: Arletta Environmental Consulting Corp. (insert legal name of employer)
carries professional liability insurance (errors and omissions). This insurance will be maintained for the specified liability period, subject to insurance availability. March 2014
Version 3.0
8
I am aware that it is an offence under section 227 of the Environmental Protection and Enhancement Act to provide false, misleading or inaccurate information and that there are significant fines for committing these offences, including the possibility of imprisonment. See below for the relevant sections.
Report Title:
Drilling Waste Disposal Assessment Compliance Option 2 100/12-25-054-25 W4/00 Licence Number: 0030923
Date:
Feb 23, 2022
Name:
Jennifer Carscallen Note: If you wish to sign the form with an electronic signature you are bound with the same force as though you had a fixed signature on paper.
Signature:
Registration/Member number:
8954
Section 227 of the Environmental Protection and Enhancement Act Offences
s. 227 A person who
(a) knowingly provides false or misleading information pursuant to a requirement under this Act to provide information, (b) provides false or misleading information pursuant to a requirement under this Act to provide information is guilty of an offence. Penalties is liable to
s. 228(1) A person who commits an offence referred to in section 60, 87, 108(1), 109(1) or 227(a), (d), (f) or (h)
(a) in the case of an individual, to a fine or not more than $100 000 or to imprisonment for a period of not more than 2 years or to both fine and imprisonment, or (b) in the case of a corporation, to a fine of not more than $1 000 000. (2) A person who commits an offence referred to in section 61, 67, 75, 76, 79, 88, 108(2), 109(2) 110(1) or (2), 111, 112, 137, 148, 149, 155, 157, 163, 169, 170, 173, 176, 188, 191, 192, 209, 227(b), (c), (e), (g), or (i) or 251 is liable. (a) in the case of an individual, to a fine or not more than $50 000, or (b) in the case of a corporation, to a fine of not more than $500 000.
March 2014
Version 3.0
March 2014 Salt Calculations for Option Two
1 of 2
Salt Calculations for Option 2: Alternative 1 If the volume of drilling waste is known, use the following calculator to determine the NaOH Equivalent 3 Sacks per m of waste. If this value is greater than 0.10, a Phase 2 ESA (Compliance Option 3) is required. Directions: Fill in the number of sacks and adjust for sack weight if different than 25 kg. Enter the Waste Volume in cubic metres. The spreadsheet will calculate the NaOH Equivalent Sacks per Metre. NaOH Equivalent Sacks
NaOH Equivalency Factor
Number of Sacks (25 kg/sack*)
Additive Caustic Soda Soda Ash Sodium Chloride Sodium Bicarbonate Sodium Silicate Sodium acid pyrophosphate (SAPP)
X X X X X X
1.00 0.75 0.68 0.95 1.37 0.22
= = = = = =
0 0 0 0 0 0
Calcium Chloride Calcium Nitrate Envirofloc
X X X
0.72 0.34 0.41
= = =
0 0 0
Gypsum** Lime** ** Maximum number of sacks = 0.02 x well depth (m)
X X
0.59 1.08
= =
0 0
Potassium chloride Potassium sulphate Caustic potash Potassium formate Potassium silicate Potassium nitrate
X X X X X X
0.54 0.46 0.71 0.47 0.32 0.40
= = = = = =
0 0 0 0 0 0
Diammonium phosphate Ammonium nitrate Ammonium sulphate
X X X
0.63 0.57 0.61
= = =
0 0 0
Drill Stem Test Returns
X
0.68
=
0
Total NaOH Equivalent Sacks =
0
3
Waste Volume (m ) ÷ NaOH Equivalent Sacks per m3 =
#DIV/0!
* Sack weight may be adjusted by dividing the number of sacks by 25 and multiplying by the actual sack weight in kilograms. This value should be entered as the number of sacks. ** Note: Up to 0.02 sacks of gypsum and lime per metre of well depth should be counted with other salt additives. Gypsum and lime must be calculated separately. Because of the limited solubility of gypsum and lime, sacks in excess of this value need not be counted. =
Required Field
Salt Calculations for Option Two
2 of 2
Alternative 2 If the volume of drilling waste is not known, use the following calculator to determine the NaOH Equivalent Sacks per metre of well depth. This value must be less than 0.0260 for wells drilled before October 22 1996, or 0.0350 for wells drilled on or after this date. If the value exceeds the target, a Phase 2 ESA (Compliance Option 3) must be conducted. Directions: Fill in the number of sacks and adjust for sack weight if different than 25 kg. Enter the Well Depth in metres. The spreadsheet will calculate the NaOH Equivalent Sacks per Metre.
NaOH Equivalency Factor
Number of sacks (25 kg/sack*)
Additive Caustic Soda Soda Ash Sodium Chloride Sodium Bicarbonate Sodium Silicate Sodium acid pyrophosphate (SAPP)
17.28
NaOH Equivalent Sacks
X X X X X X
1.00 0.75 0.68 0.95 1.37 0.22
= = = = = =
17.28 0 0 1.5675 0 0
Calcium Chloride Calcium Nitrate Envirofloc
X X X
0.72 0.34 0.41
= = =
0 0 0
Gypsum** Lime** ** Max = 0.02 x well depth (m)
X X
0.59 1.08
= =
0 0.4752
Potassium chloride Potassium sulphate Caustic potash Potassium formate Potassium silicate Potassium nitrate
X X X X X X
0.54 0.46 0.71 0.47 0.32 0.40
= = = = = =
0 0 0 0 0 0
Diammonium phosphate Ammonium nitrate Ammonium sulphate
X X X
0.63 0.57 0.61
= = =
0 0 0
Drill Stem Test Returns
0.0034 X
0.68
=
0.002312
Total NaOH Equivalent Sacks =
19.325012
1.65
0.44
Well Depth (m) ÷ NaOH Equivalent Sacks per Metre =
1626.1 0.01188427
* Sack weight may be adjusted by dividing the number of sacks by 25 and multiplying by the actual sack weight in kilograms. This value should be entered as the number of sacks. ** Note: Up to 0.02 sacks of gypsum and lime per metre of well depth should be counted with other salt additives. Because of the limited solubility of gypsum and lime, sacks in excess of this value need not be counted. =
Required Field
March 2014 Drill Stem Test Returns for Option 2
1 of 2
Drill Stem Test Return Calculations for Compliance Option Two Salinity: Note: Either the resistivity or the chloride calculation must be completed. It is not necessary to complete both calculations. Resistivity data should be used when available. If resistivity is not available, the chloride calculation should be used. If the volume is specified but neither chloride nor resistivity is available, use the default concentration in the chloride calculation. If no volume is available, a Phase 2 (Compliance Option 3) is required.
Alternative 1: Resistivity Directions: Enter the drill stem diameter for the drill stem test (DST) section in millimeters, the length of the DST return (including mud returns) in metres and the resistivity of the DST fluid in ohms. The spreadsheet will calculate the equivalent number of sacks. This value must be entered in the salt calculation in the cell labelled "Drill Stem Test Returns".
Length of Drill Stem Test Return (m)
Inner Diameter of Pipe (mm)
Volume of
Resistivity (Ohms)*
3
Returns (m ) 0 0 0 0 0 0
x x x x x x
0.28 0.28 0.28 0.28 0.28 0.28
÷ ÷ ÷ ÷ ÷ ÷ Total number of sacks
Number of Sacks = = = = = = =
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
* Resistivity values from formation water databases or adjacent wells are currently not acceptable.
Alternative 2: Chloride Directions: Enter the drill stem diameter for the drill stem test (DST) section in millimeters, the length of the DST return (including mud returns) in metres and the chloride concentration of the DST fluid in mg/L. The spreadsheet will calculate the equivalent number of sacks. This value must be entered in the salt calculation in the cell labelled "Drill Stem Test Returns".
Length of Drill Stem Test Return (m)
Inner Diameter of Pipe (mm)
Volume of
0 0 0 0 0 0
ID 2000
2
x
Chloride Concentration* (mg/L)
Returns (m3)*
3.14
x
L
x x x x x x
7600 ÷ 7600 ÷ 7600 ÷ 7600 ÷ 7600 ÷ 7600 ÷ Total number of sacks
dst
*If chloride concentration is not specified, use 215,000 mg/L. Chloride concentrations from formation water databases or adjacent wells are currently not acceptable.
=
Required Field
Number of Sacks = = = = = = =
0 0 0 0 0 0 0
Drill Stem Test Returns for Option 2
2 of 2
Hydrocarbons Directions: Enter the drill stem diameter for the drill stem test (DST) section in millimeters, the length of the DST return in metres, the percent oil content of the DST fluid, the well depth in metres and the mix ratio. The spreadsheet will calculate the post disposal oil concentration If this value is greater than 0.10% (dry weight) in subsoil or 0.50% (dry weight) in topsoil, a Phase 2 ESA (Compliance Option 3) is required. Inner Diameter of Pipe (mm) 97.2
Length of Drill Stem Test Return (m) 4.5
Volume of
Oil Content (%)*
3
(m3 x 100)
Returns (m ) 0.033374495 0 0 0 0 0
Vol. of Oil
x 100.00% x x x x x Total Volume of Oil
= = = = = = = ÷ Well Depth (m) ÷ Mix Ratio** ÷ Post-Disposal Oil Concentration (%) =
3.33744948 0 0 0 0 0 3.33744948 0.6 1626.1 1 0.0034207
* Actual measured oil concentration must be used if available. If only visual descriptions are available then use the following to estimate oil concentration: Flecked = 5% Emulsion = 25% Oil or oil-cut mud= 100% Do not include gas-cut mud or mud with no indication of oil. ** Enter the number of parts of soil mixed with one part of waste. For example, for a 3:1 mix ratio (3 parts soil to 1 part waste) enter “3”. If this value is not known, enter 1 for wells drilled before October 22 1996, or 3 for wells drilled on or after this date. =
Required Field
I
ISL- t o
c&k(ncA tkvo
1---F-'2
(TO BE SENT TO BOARD FIELD OFFICE)
WELL ' SERVICING REPORT mit No '
Tour
. -.
m to
m
tame of Well
'
Oakland Namao 12-25-54-25
Type of Job:
19 66
Oakland
Petroleums
Helper: Commonwealth Helper: Dowel!
No.
To
Rig Time
Hrs
Hrs.
Description of Work Performed
Limited
Drilling Company
Drilling
of Canada
Helper: Schlumberger HPInPr-
-
Hrs.
Contractor's Time
) From
Operator:
October 13
Date
--
Cementing and acidizinj
of,Canada
Lonqinq and Perforatinn
.--
-
Auxiliary Equipment:
-
Fuel Used:
Gallons:
Fuel Used:
Gallons:
Supplies Used:
Pulled ( tubing, rods, etc.)
Run ( tubing, rods, etc.) Tubing: Size: . 2.3/8
Total tally: .. 38.13,
Set at: ... 367.5..i<..F3.
Pump shoe nipple at . 3644 .. . l<,B
Perf. Joint: From
To
Other Equip.:
5335
Total Depth of Hole:
Plugged
Drilled: From
back depth:
3812
Hole size:
7 7/8
To PERFORATING
Interval shot
3702
No. of shots
30
-
3706
per
Type of Treatment
3711 -3714 Type
Shot spacing 1 shot
ACID DATA
DATA
foot
1 11/16
Uni/R
Schlumberger
Co.
15%
Max. Press. 300
Type of Job Cement Cement mixed (sx)
Production CasCo.g 334
Pressures: Feeding
Dowell
3812
Set at Maximum
K.B.
900
Feeding Rate
6 bbls in 5 mm.
Vac.
Plug No.
Cement (sx) Additives
Set with
Final Cement additives
6 bbls..
Interval
Cement displaced (sx)
Cementing tool
Feeding Press.
Vol. Acid
PLUGGING DATA
CEMENTING DATA
950 sax Litepoz
Felt at
MISCELLANEOUS DATA ( Indicate bailing or swabbing rates, recoveries, fluid levels, pump information, etc.)
fTh
Operator's Signature... . Oakl aji d. .. P.et roleums
timl t d
Approved by
Dowell
Co.
Perf's.
Interval treated Acid strength
Mud Acid
Final Press.
-
-
-
-
V
_
r
OAKLAND PETROLEUMS
LIMITED
THUND4EFBIRD PETROLEUMS LIMITED THUNDERBIRD EXPLORATION 'ILTD. 301 LANCASTER BUILDING,
TACOMA PETROLEUMS LIMITED
CALGARY, ALBERTA
P. N. R. MORRISON
October 6,
Oil and Gas Consetivation
Board,
P. 0. Box 3560, Postal Station " D", Edmonton, Alberta. Dear
Sirs: RE:
Oakland Namao 12-25-54-25 Your File: 5106
Relative to your letter of October 5, 1966, we list the following details which were missing from the tour reports submitted: 1.
K.B.
Elevation
2.
Type and interval of logs run:
—
2273'
Induction Sonic
E.
5335 5333
microcaliper Cement Bond
4470 3690
Cempletion
3759
—
—
—
—
—
603 603 603 50 3500
Yours very truly, OAKLAND PETROLEUMS LIMITED
Per:
RECVtD Ed
--
AT
n
OCT 7 1966
1966
OAKLAND PETROLEUMS
LIMITED
THUNDERBIRD PETROLEUMS LIMITED THUNDERBIRD EXPLORATION'rLTD.
902
TACOMA PETROLEUMS LIMITED
301
LANCASTER BUILDING, CALGARY, ALBERTA
P. N. R. MORRISON
October 17,
ATTENTION:
Mr.
D.
Larbalestier
Oil and Gas Conservation Board, P. 0. Box 3560, Postal Station " D", Edmonton,
Alberta.
Dear Sirs: RE:
Oakland Namao 12-25-54-25 W4 Your File No. 5158
Further to your letter of October
13,
1966
we are enclosing a summary of the work performed in completing the above noted well.
Yours very truly, OAKLAND PETROLEUMS LIMITED
D. M. Campbell Secretary- Treasurer DmC/b End.
Jn
1966
Well:' Oakland Uemao 1245-54-25 Oune'r
Oakland Petroleume Umited 902 Lancaster 0uilding, Colgery, Albert..
Contractor - Commonwealth Drilling Company Limited, Calgary, Alberta. Rig,? Spudded - September 7, 1966 - 9:00 P.M. Complete Service Rig Released - 6:30 P.M. September 26, 1966 0:00 A.N. footnao
8:00 A.M. Statue
1966 Sept. 8
458
Drilling
Sept. 9
604
W.0.C,
Ran 18 jt*. 8 5/8k casing. Landed . t 603 K.8.. Cemented with 380 sax cement plus 2% Cad,
Sept. 10
1845
Drilling
Survey. - 1129-1
Sept. 11
3405
Drilling
Surveys - 2095-3/4; 2365.4; 28683/4; 3361-3/4.
Sept. 12
3909
Chang. bit
Surveys - 3545-3/4; 3'?6O-1+.
Sept. 13
4233
Drilling
Surveys - 3909..1 3/4; 4208-1 1/3.
Sept. 14
4473
Tripping
Surveys - 4351-lI; - 50 bbls. oil taken from 13-18 to six with cud.
Sept. 15
4012
Drilling
Surveys -
Sept. 16
5120
Tripping
Surveys - 5040-1.
Sept. 17
5306
Drilling
Survey. - Nil.
Sept. 10
5335 T.D.
Logging
Surveys - 5335 - 1.
Sept. 19
5335
Testing
Sept. 20
5335
Testing
Sept. 21
5335
Run Casing
Sapp. 22
5335
Sept. 23 Sept. 24
5335 5335
)Wait on )Service Rig
Sept. 25
5335
Run tubing
Sept. 26
5335
Swabbing
Ran 3810.51' of 2 3/8" casing. Landed at 3675 K.B. Ran sucker' rode and .. t pump on base.
Sept. 27
5335
Complete
Service rig released 6:30 P.1*, Sspt.26,1966 4 c , '1 A-p
Date
Other
1695-3/4,
4020-11;
4120-1 3/4;
4470-11; 4710- 3/4.
Plugged beck from T.D. to 5070 and from 4300 to 3812. Ran 3817.62 ft. of 4k" casing. Landed at 3812 (. 8.. Released big rig at 6:00 P.M. Sept. 21, 1966,
OC
29
COMMONWEALTH - DRILLING ' CO. LTD.. DIRECTIONS TO WELL
MAILING POINT
Footage
From
N
B
Size
N
MU'
I
WEIGHT
G
VISCOSITY
JO ,/ W.C.
Type
l2mn.
Hrs. on BottoA
To
S
4' a. m.
2' a. In.
IN
UM
'
Stands
MODEL
sr.,,..
'
No.
D
"
0.0.
ID.
Length
D
2a.m.
H
1 dd
4a.m.
P
..,,
MODEL
t..
•'.'
12mn. Ju 0 S,
No.2
.1
H
4
UM
6a.m.
L,NE:
pH.
Pum
pP
'
'
C.B. Ft.
Sub. WI.
2a.m.
4a.m.
a Torque
SPM
Ft. up on Kelly
T
n
Lines
Ton 'Miles
Total Miles
Slip
Feet or
196 °
I IM E
..
START
lNTVL.
STOP
.
Py'•
.
C'
-'•.
'
E.i
5 WoIe
'
Bbk
Date Slip or Cut
At Miles
Cut
t Pi.
,
rees
At Feet
Trips
—.•
"-u,
3
Temp. Serial No.
R E MA R KS
'
lC
,.
Weather
Make
'
,_
LINER
)
Si ze
Pt
DATE
2
5P.M.
ADDITIVES
Drilling
RGE
'-
1
'
TWP.
G
B
M.T.RH.US
6a.re.
MILES MOVED
-
._
GENERAL
'.
..
Air WI.
.
F. C.
LSD.__._SEC.
LOCATION
SHIPPING POINT
.
l2mn. SURE
'
Singles
PP M
No. I
7'
RIG NO, '.
COLLARS
Wgt
6a.m.
r i.
WI. Drill Pipe A1 600 lb,,.)
.
GEL
T
DAILY DRILLING LOG
,r..
IX pt
an '
From
T
,
Footage
To
•
No
B
Se
Typo
JetsW C
Hrs. on Bottom
WI. Or, IPipe (1000 lbs.)
Serial No
Wgt
Stands
Singles
0.0.
No.
DRILL
ID.
Length
Air Wt.
C.B. Ft.
Sub. WI.
Ft. op on Kelly
..
51
>
. ,.u.
COLLARS
or Ord
R PM
HIS .
4
Reamed
HIS .
o.
UM
8a.m.
lOom.
Table orque
S.
PPump ressur o
I
G
B
T
S, MU
8a.m.
I
lOam.
12 noon
No.1
,
M
. VISCOSITY
T
GEL
•
UM
2p.m
WEIGHT
8a.m.
t
MODEL
lOam
12 noon
2p.m. No.
JEt i' E
S.P.M.
MODEL
"
LINER
SURE
P.C.
pH.
o
MOTS
2p.m.
H.US
0 ' Change
Nex -
1
..
.
5P.M.
"
2
..
LINER
SIZE
W. L.
12 noon
PRES
lze
GENERAL,
SUOV 3 At FeetDegrees 4
.
ADDITIVES,
S
,
,
-
•
P
. ,
.
Weather
'
Temp. Drilling Line Record
T
Size
Make
Serial No.
From
Lines
Total Miles
Wt. Drill Pipe (l000lbs.)
Hrs. on Bottom
Stands
No
Size
"
''
Type
.
Singles
o
B
Jets/W.C.
Slip
•
,
To
,
Ton Miles
,..
'
Footage
Trips
Wgt
.
DRILL
Cut .
No.
Hr
rCored
Bbls.
''
Date Slip or Cut
At Miles
ext
Left on Sol
N Slip
,
,
O.D.
I.D.
.5
Length
Air WI. ._
COLLARS
t
oDrilled
RPM
Pet or
Water
'
'
C.B. Pt.
Sub. Wt.
.e •
.
.
Reamed
Pump Pump o.ressure
Hrs
,•_ .
2,
Table ' Torque
M
-
Ft. UP on Kelly...t,,
..
'
I
,_
.•
90
O
p?
.
.
P
M z
T
D N G II
6p.m.
8p.m.
.
,.pGEL
No.
us'
•''
"
-'
'
P.C.
6 pin.
8p.m.
10pm.
J'
,
L
PU No. 2
4p.m.
6p.m.
suor
8p.m.
IS.P.M.
MOTOR HOURS
10p.m.
oe g i
.,),çi;
'
"
'
LINE:
-'
,
•5
,
.
,
.
2
'.. ,.
r
1 V••
IER
. .
pH."
4 p.m
SURE
1
MODEL
'
W. L.
AuII
10p.m.
"'
VISCOSITY
0 M
4 p.n.
U D
WEIGHT
-.
,
'
. ''
•.
,
S
,.,
,
.
.
.
.3
,
IZE
SURVEYS At Feet Degrees
GENERAL
ADDITIVES .
-: u
'
.,
.
DrLine i ll i ng
S z:
Make
.
Serial No
Water
Weather Tenp. -
.
'
C
,,
..
Bbls.
'
-.
1
Ton Miles
Trips
Feet
Total Miles
Slip
or
SI Date
At Miles
Cut
.
P
"
Lines
.,
Ft. Left o Spoo l
Ne x titt
Record Tested'
B.O.P.
.'El ,PS:d
Hydril
is" e' Seal P
Cros.. Chk' dTali
,
Blind Rams.
-
-
TOTCO RING ON BIT #
'
S
.
pu
Boiler Operated
Kelly Cock Chkd. •
.
Hrs
'C
gal
re E thkadu P
CASING REPORT
RAN
:
EQUIPME NT CHANGES .
.
-
.
TOTAL
Fuel on Hand 11.59 p.m. ( deduct) ..
FUEL USED
gals
.
gals. gals
TO
KB. USED
u
.
.
,
PLUS
,
-
SAX
A. M. P.M.
, t 4
TONS
-
TOTAL
#
.,
-,
4...
,,
.
"
.
. CONTRACTOR'S
HRS.
O .,
S
Approved by
,,
TOTAL
-,
A
TIME
B
.
perator's Representative
-'
CONSERVATION , BOARD
-
P
,,.
COPY
TIME '
HRS.1
m
--
'
,,5
-
-
'
-
0000000000000
q
ER
0
..•',
.-,
-.
COAL ON HAND
'
,
-
"
5.,
. 5
',.
-
GENERAL:
CEMENT RETURNS ( YES, NO)
•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••s•••Ø•••s•• •
•' q
CEM
'
PLUG DOWN
•S•I•••••••S•••••SS•••••••••••••I•••••••S••••S•••S••I••••••••S••••••e••••S•••••S•••••S•S•• • ••• ••••••••••••••••••••••••••••••••••••••••••••••••••••,••••••••••••••••••••••••••••••••••••• • •••••••••••••••••••••••••••••••••••••••••••••••,•••••••••••••••••••••••••••••••••••••••••••• • ............................................•••••••••••••••..............•.•••••.•.......••• • 0000000000
B
URVU
"CSG ,,
.5
,4.
LLE
,
'
JTS
.
,
S
-
gals.
Fuel Rec'd Today ( add)
Rig Savers
'
C
Pipe Rams.
Fuel an.Harsd 12.01 o:m.
.
4
1çç
-
Approved bv/ TooIpvsher,
COMMONWEALTH DRILLING CO LTD.
,
DAILY DRILLING LOG
DIRECTIONS TO WELL
MAILING POINT
From
T
Size
/"
M
Type
'i"
Wit. Drill Pipe (100 lbs.)
Hrs on Botf' om
f..
/
No.
B
Jo
Footogg.°
Singles
/
R.P.M.'
Jets/W.C.
3
C
Stands
.
No.
DRILL
C OLLARS
Car 4 Drilled
med
I.D.Length
O.D.
Hrs
Pum
MILES MOVED
Air Wt.
5PM:
Pump preswr e
.
,fC,/'(t4 OiAi
i
LOCATION
SHIPPING POINT
.
<i9
/ o
,'
7
RIG NO
Torque
6/
.3o
C.B. Ft.
Sub. WI.
DATE
Ft. upon Kelly
196
I IM E
REM A R KS
START
STOP
/J '3 1
/°-
INTVL.
,c
.
/frzç.
/ 2!L1
'
' MU
N G
l2mn.
I
2a.m.
4a.m.
UM
6a.m.
l2mn.
2a.m.
4a.m.
UM
óo.m.
WEIGHT
PRESNo . 2 SUR r.
VISCOSITY
MODEL S.P.M.
MOEEL:.P.
WI.
P.C.
ADD Ill V0 i-- -.-.
*
PH. .
.
—/
•
GENERAL
.—,-
PI-illing tine
..i
-, .
.a
Size
Make
No.. Lines
Serial No. .
Trips .
.
Ton Miles
Total Miles
Footage
To
/
72 ' o.
H s. on Bottom
Slip
At Miles.
Jb.
H . US
/
a'
/2
'
4 e
O
s..
,/nlç
5 13&
t.
o.
E22
'J4 55
R.P.M.
'1'
iJq
Weather
Dote
Temp.
i.
Water
L)"k
Bbls. Neot Slip
Hrs .
,
-
O
F
T.
&'M.
In
B.
TIE
'2'
//'-'
G
517 ii
''-'5'
-
Ft. urs Spoo l
lea
Reamed
*c
1,ftw"c "
' MU'
8a.m.
12 noon
lOom.
'UM
2p.m.
VISCO SIT Y
T
GEL
:. .
WI.
P.C.
8a.m.
lOa.m.
MODEL
12 noon
2p.m.
Nex Oil Change
M.T.RH.U'S
LINE:
SIZE
SIZE
GENERAL
PH .
.
LIN E.
3
.
IVYçi•9p 5/ 3'// JJ
ADDITIVES
S/9
M
UM
2p.m.
PRES-
WEIGHT
M
10a.m. 12 noon
8a.m.
jc
SURVEYS Al Feet Degrees
-,E4" /
Si ze
Se '&No
Make
Lines
T
T n M tes
rps
F
Total M I s
Cur
Weothe
5 P
on
Footage
To
27 No.
•
MU
CO' Size
Type
4p.m.
'
Bot ,
Stands
t om
Jets/W.C.
cr1
Sp.m.
10 p.m.
6p.m.
WI. Dri IPipe
His, on
Wgt.
UM •
R.P.M.
4p.m.
6p.m.
rilled
8p.m.
No.
DRILL
COLLARS
•
/
No.
-.
Singles
0. D.
ID.
Length
Air Wt.
Pump Pre ssu r e
S.P.M .
Sub. WI.
C. B. Ft.
Reamed
Nm.
Plo ! u
Table orque
T.
10 p.m.
PUMP
4p.m.
6p.m.
8p.m.
10 p.m.
MODEL
vy
: G.
B.
1/
Oil
MOTOR HOURS
GEL
U
IZE
N::
F.C.
PH.
1
ADDITIVES :
GENERAL: .
-
(J*
)i
J 1
-
'-'i
'-
0
Y1 4 J
Trips
Ton Miles
9
53J) //jf
Waler
Weather
0
CO
Lq
5
'
e9 -r
.
SURVEYS Degrees 4 Al Feet
1v'
1/A/
'-
WI. •
-
')
'i
MODEL
CA
LINER
2
2
z •7• ,
SURE
T
:
Ft. upon
'
His.
2'
/
: To
pool
Record From
,iy L
/ Sa
BbIs.
Date si p or Cut
Al M Ins
,' 4?/ 4 2 /
Water
Temp. Dri ll i ng Line
.1,
—
'' G
.
Ft. up on C.B. Ft. O.D. I. D.Length Air Wt. Sub. Wt. 4No. ILKelly COLLARS
Singles
ha
07
Is
Slip or Cut
42
Stands
Wt. Dii IPipe (1000 lbs.)
Sc
1'4
.
Fee or
.
.
.
From
U
6a.m.
SRVEY Degrees 4 At Feet ' 3 .5
.f.,, /,
A
/
Record
T
4a.m.
2
A
I
S ,.
—7
r'/
M
2a.m.
ex N Change Oil
LINE:
GEL
T
12mn.
PRES. No. I SURE
MT.
Temp.
H
D'tr' Drilli ng Size
Make
Serial No.
Elapsed Time
Fressore
Lines
Total Miles
Slip
Peel or
Cut
Dote Slip or Cut
At Miles
iA
Ft. Let on Spool
Next Slip
Record B. 0. P. Hydril
Tested
Packing & Seal Inspected Date
-
c
.
.
t'
Chk'd.
Kelly Cock Chk'd.
.
TOTCO RING ON BIT
Boiler Operated
Hrs.
Fire Equip Chk'd.
.
-
CASING REPORT
Fuel Recd Today ( add)
P pjRoms Blind Rams.
gal
'/' CSG iTS
RAN
Rig Savers
-
Fuel on Hand 12.01 am.
TOTAL Fuel on Hand 11.59 p.m. ( deduct)
FUEL USED
TO
gal gal
.
gal .
PLUS
// 3 KB USED _' Z
r
0J
CEMENT RETURNS
SAx
PLUG DOWN
/
EQUIPMENT CHANGES
ç-5
-
'
0000000000000000000000000000000000000
00
,
P- AM. —
COAL ON HAND
TONS
(YES, NO)
0
000400000000000000000000
000
0
:4 0
CONSERVATION
-
TOTAL COMPANY TIME
A O
HRS.
pproved by perator ' s S Representative
-
0000000000000000000000000000000000000:
TRANSFER
•
/
0000000
0000000 ::00
SIGNAT URg
-.
- riT'.
•.............................................s.....s.........•............•................ '
DRILLER 'S
4
BOARD
-
COPY
Approved b Toolpusher/.. .,
TOTAC CONTRACTR'S. TIME tc, r.i.
-
HRS.
'-
-
-
..
OM
1464
-
COMMONWEALTH DRILLING CO. LTD.
DAILY DRILLING LOG
nIP FcrINS To — WELL
T
el
11
B
am
No.
Size
Type
V(t. Drill Pipe f1000 lbs.)
Mrs. I" BotIom
To
Footage
Jets/W.C.
Serial No.
Stands
Singles
/
RIG NO
MAILING POINT
O4
oDrilled
R.F,M.
Hrs.
rCored
LSD../ -2
SHIPPING POINT No.
DR ILL
O.D.
I.D.
Length
Reamed
Mrs.
Pump
P Pu
p ressur e
o.
, t4
LOCATION/k' L4) MILES MOVED
I
Air WI.
Sub. Wt.
C.B. Ft.
Ft. up on Kelly .
COLLA RS
Wgt.
IAd
Table orque
5M
T.
B.
.
Z-1 1
WP.kGE
7
DATE
196 T IM E
REM A R KS
'
INTVL.
STOP
START
0
0
M
MU •
N I G H T T
SEC.
l2mn.
2a.m.
4a.m.
UM P
6a.m.
l2mn.
2a.m.
4a.m.
UM
6a.m.
l2mn.
2a.In.
4a.m.
WEIGHT
No. 1
SUR E
No. 2
SURE
1
VISCOSITY
MODEL
Spa.
MODEL S.P.M.
2
LINER
LINER
SIZE
SIZE
GEL W I
FC
5 Water
1
Temp
Line Record
S e
Make
From
T
.
p
Weather
M
.
3
ADDITIVES:
Dtl ng
'
,
SURVEYS Degrees At Feet
GENERAL
pH
4
Ne x Oil an
M.Ts' H.U5
6a.m.
No Lnes
Serial No
Footage
To
•
No.
Size
Type
Wt. DrI IPipe (1000 lbs.)
Mrs. on Bottom
Jets/W.C.
Serial No.
Total
les Ton M i
Tr ps
Stands
es
M
Singles
Feet gr
p
DRILL
-4No.
O.D.
I.D.
SlipoCut
Length
Air WI.
BbI s. Ft. Left an Spool
Next SIP
Date
At M les
Cut.
C. B. Ft.
Sub. Wt.
;4zz x
Ft. up on Kelly
bRILL
v
'
SIGNATURE
COLLARS
Wgt.
Drilled
R.P.M.
Mrs.
o r Co
Reomed
Hrs.
PP
P'a
Table , Torque
S.P.M.
T.
G.
B.
/iSu4
j,
/'
(4'/1S
(j42
/12 MU
A M
VISCOSITY
T
GEL
I
8a.m.
'
10am.
12 noon
UM
2p.m.
8a.m.
10a.m. 12 noon
UM
2p.m.
Na. 1 SURE
WEIGHT
MODEL S.P..
-
P.C.
10a.m.
12 noon
M.T
2p.m.
.
H.US
2
LINER
1
3
SURV EYS grees 4 At Feet
GENERAL:
pH.
'
8a.m.
SURE
MODEL S.e.C.
.
LINER
,
WI.
No. 2
ADDITIVES:
5
At
.
Water
Weather
M
Temp.
'
Drilling Line
Size
Make
Serial No.
Ton Miles
Trips
Li nes
At Mile s
Cut
Slip
Bbls. Next Slip
Ft. Left on Spool
•3•5 __
.
From
To
Footage
No.
Size
Type
1(
MU • M
WEIGHT
1
VIS COSITY
4p.m.
6p.m.
Serial No.
2/(
8p.m.
10p.m.
Singles
Wgl.
R.P.M.
Drilled orCo
/)
/Vt)
///
57//
/
Stands
Wt. Or, IPipe (1000 lbs.)
Mrs. on Bottom
Jets/W.C.
/
UM
4p.m.
6p.m.
8p.m.
DRIL L COLLAS Mrs.
J.
0.0.
Length
1.0.
Air Wt.
Sub. Wt.
Ft. up an
C. B. Ft.
25;:G
Kelly
Reamed
Nrs.
Pum Pressje
' I ''
5
Table Toe
P- M.
T.
G.
B.
flIp.
,
UMP
10 P.m.
No. 2
No. I SURE
No.
4p.m.
6p.m.
8p.m.
M.T.
10p.m.
H'U S
Ne 01 Change
SURE
MODEL LINUR SIZE
GEL P.C. •
Date Slip or Cut
F:et
Total Mi les
Record
T
Next Oil
PM.
Z
I-,
.LiNt:
SURVEYS At Fee t Degrees 4
GENERAL:
t
ADDITIVES:
N
Water
Weather
T
Drilling Line
Si ze
Tested
Make
Serial No
Li Nnes o.
Trips
Se
Ela psed
Hy dril
Total Miles
Crown-o.matic Rig Savers Chk'd.
Pipe Rams.
.
Kelly Cock chk'd
Blind Rams. TOTCO RING ON BIT #
Ton Miles
Boiler Operated ,
Hrs.
F eE Chkd. 9
Sli p
Feel or
Cut
Date
j
gal .
Fuel Recd Today ( add)
gals.
TOTAL Fuel on Hand 11.59 p.m. ( deduct)
FUEL USED
000
0
on Spool
At Miles
Fuel on Hand 12.01 am,
so
N Slip ext
6000000000
gals.
CASING REPORT
---
-
//r9
'
,
ANVT TUR
EQUIPMENT CHANGES
.
RAN
iTS
•
KB. USED
SAX PLUG DOWN
gals.
PLUS
gals.
CEMENT RETURNS - ( YES! NO)
-
A. M. P.M.
COAL ON HAND
GENERAL:
TONS
TOTAL COMPANY TIME
TOTAL CONTRACTORS
. HIS. TIME
Approved by O perator's Representative
000000000064110
Approved by I
000000000
'
'-
CONSERVATION
TRANSFER
CEM
00 )) US
O
'
C50 .
TO
.-
& bls
H
2" ,ô& '4 /1 / /C'. // / X
C
BOARD
COPY
HIS.
7 -' ,
•cm )
CcM-
N IAI ,-
14 E6 5
-
COMMONWEALTH DRILLING CO. LTD.
DAILY DRILLING LOG
DIRECTIONS TO WELL From
Footage
Sze
Mrs
To
on
Wt. Drill Pipe
I
No.
DRILL
ordle9
or
Efct(
LOCATION
:s
I.D .
O.D.
Length
Air WI.
pSPM ressure
Reamed
ored
C.B .Ft.
Sub. WI.
I IM E ;EMARKs
/
N
MU'
l2mn.
2a.m.
4a.m.
UM
6a.m. No.
WEIGHT
12
n. 2a.m.
4a.m.
cj 1Lusr:
GEL
:
UM
6a.m.
: -o,i
SURE
1
I2mn.
2a.m.
T
F. C.
M
Drllirig
T
From
-
A 4
egees r
-
Sz
Make
Serial No
'V
Size
/
t
Hrs. on Bottom
To
Type
Jets/W.C.
77e' D5c.-JJ
MU'
80.m.
7211/
12 noon
lOam.
T
SI
-
At Miles
Cut
i2
Temp
00te
,
Wgt.
R.P.M.
.2
No.1
.MODEL PH.
0. D.
No.
DRILL
1. D.
Length
Pu P No
pump Pre sso
Air WI.
Drilled
8a.m.
Mrs.
Reamed
Mrs.
/7f I ,/
10a.m.
12 noon
/
UM
2p.m.
8a.m.
10a.m.
Y&00
12noon
M.T.
2p.m.
No. 2
ruse st
1
s.e.c.
MODEL s.e.c.
2
y
SU
I.
B.
Z
2-
At Feet
/$,6/4
NChange xOd
H.US
//,/
T
.
From
Footage I
No.
B
Size
To
92
4
3,070
Type
1' Xit
k'
Hrs. on Bottom
Jets/W.C.
Trips
Serial No.
Total Miles
Ton Miles
Wt. Del IPipe (1000 lbs.)
Stands
p
Singles
Feet
i
No.
DRILL
0r r Car illed 4
R.P.M.
Hrs.
ç
O.D.
/f Bbls.
Next Slip
C/ ,l/
ft. Left Spoo l
1. D.
Length
Air WI.
Sub. Wt.
C.B. Ft.
Hrs.
Pump
mpr Pse
S.P.M.
Table orque
T.
o.
B.
—
'7/
G.
-
'/ 1/
(..'
•; ,i119C:A•l I
D
-
2,
3•
i'c1(
/ it.'
)
Reamed
ç,eC 7L'
,,çjf
Ft. UP 015 Kelly
/,
/ 4
, )
Z —
3 /S
E.
.z. ' i•a
4?
./
...t
,/C
43O i•u
/
5ifl.
7Jgwi7.L
.1
Date Sli p 0 ,Cut
At Miles
Cut
COLLARS
Wilt.
fte4'i1J
Water
Temp. L es
2"
£8
j
61 At
Weather
M Serial No
'
.t::
Degrees
14
Make
..5T/
41
95 -
Size
/424
G.
IZE
• ,
5,14 ,t/,
.
Li5O
GENERAL,
ADDITIVES
Ft. up an
C. B. Ft.
Sub. Wt.
Table Torqu e
S.P.M.
PRI ES.
SIE
F. C.
Singles
o r Cored
/'e
Li: R
GEL WI.
Drilling Line Record
L/
Ft. Left on Spool
Next Slip
p or Cut
(
'&
COLLARS
/
UM
2p.m.
VISCOSITY
Stands
Wt. Dri IPipe (1000 tbs.)
Serial No.
WEIGHT
M
Ft
Total Mites
Water
—
P9A,1 Footage
No.
B
Ton Miles
Trips
No. L i nes
Line Record
P.
W eat her
/
7
•
SIjeeRtV Ar F
ADDITIVES 1'r
.
.
s
IZE
.
E ERAL,12E
PH.
H.US
NER
LI
T W. L.
M.T'
6a.m.
4a.m.
INTVL
STOP
—
41
T
START
B
T
Torque
DATE
Ft. up on Kelly
C.
M
LSDJ2SEC.A1cWP.GE emW.
MILES MOVED
SHIPPING POINT
Stands
Seri al
Type
7
RIG NO
MAILING POINT
.
.
.
•
MU
M
WEIGHT
4p.m.
T
VISCOSITY
10 p.m.
6p.m.
8p.m.
4f,4
74 )
UM
MODEL
8p.m.
/WO,,od
10 p. m. jti
1
S.C.M.
WI.
•
ADDITIVES
P.C.
C
1L
PH.
(#
PU M
4p.m.
No. 2 su
-
MODEL
s.c.M.
.'.
L isca
M
IZE
GENERAL,
6p.m.
8p.m.
10p.m.
M.T.
0t)
H.US
2
.
Si ze
Make
Serial No.
Elapsed Time
Pressure
N Lis
Trips
/
5 Water
Weather
Ton Miles
Total Miles
Slip
Feet or
Cut
s
SURVE YS 4.,•.. Degrees At Feet
Temp Drilling Line Record
N Slip
DI Sli p or
At Miles
-
Bbls on
/
Spool .
em
d
Packing & Seal Inspected Date
Hydril
Crown.o.matic . Chk 4. Rig Savers Chk'd.
Pipe Rams.
Fuel on Hand 12.01 a.m.
gal .
Fuel Rec'd Today ( add)
gal TOTAL
Kelly Cock
Blind Rams.
Fuel on Hand 11.59 p.m. ( deduct) TOTCO RING ON BIT #
Boiler Operated,
Mrs.
Fi re Equ ip. Chkd.
FUEL USED
-...
I' &O
1
(2/V $11 /1/iS
/ ./,4 , yLcii,7, +- c
G H
6p.m.
SIZE
GEL
T
4p.m.
No. I SURE /4
CASING REPORT
gal . TO gal . PLUS gal
.
EQUIPMENT CHANGES RAN
iTS
KB. USED
TURE
TRANSFER
CEM
PLUG
A. M.
DOWN
P.M. GENE
CEMENT RETURNS . (YES! NO)
-
• CSG
SAX
%
" LER 1RK VI
AL
COAL ON HAND —
TONS
CO M P L ANY TIME
MRS.
TOTAL CONTRACTOR ' S' TIME
Approved by O perator's Representative
10111111* 1111111114111141MUMMI111111111 1 90:00000 40
Approved b TooIpushe<J.,
Mqf s
CONSERVATION
BOARD COPY
COM..
14666
MRS.
COMMONWEALTH DRILLING CO. LTD.
DAILY DRILLING LOG
DIECTIONS TO WELL From
B
MAILING POINT
-
Footage
on Bottom
To
No.
Size
peJW
2
7
14 2 1-//
WI. Drill Pipe (1000 lb s.)
S
Hr1
Seri MNo.
Stands
SHIPPING POINT
Singles
No.
DRILL
TO
I0 a
Table T
Pump
T.
I
•
12 mn.
4a.m.
6a.m.
12 mc.
UM
WEIGHT
No. 1
SURE
VISCOSITY
MODEL
S.P.M.
•
GEL
T
2a.m.
LINER IZE
P.C.
PH.
ADDITIVES
11,4
•
r
Drilling
Sine
2a.m.
6a.m.
4a.m.
9'7
q52J t7 j..
2a.m.
4a.m.
i6
B.
MODEL
..
s.e.c.
,,c-
Serial No.
Line s
Line
Trips
/
/ Fo ot age
Fr om
Mr s. on Bottom
To
Size
Type
Jets/W.C.
Serial No.
Wgt.
.
-
Water
Date
At Miles
Cut
Slip or Cut
Singles
O .D.I D
No
DRILL
AirWt.
Length
COLLARS
d
R.P.M.
Hrs.
Sub. Wt.
-
Reamed
Hrs.
Tab l e
S.P.M.
Pe
Bbls. Ft.
C.B. Pt
.
.
B.
,
.
8a.m.
lOam.
12 noon
UMP
2p.m.
I
WEIGHT
M
VISCOSITY
T
GEL
•
.PL}/
.
•
WI.
// y
5
3//
• Serial No.
Make
No. Lines
12noon
2p.m.
At Feel
Degrees
M.T.
.
.
.
Ton Miles
Trips
./
/ /
/ Total Miles
Slip
Singles
- DRILL
/
3 Fee or
,'
Bbls.
Date Slip or Cut
Pt. Left on Spool
Next Slip
'
To
Bottom Hrs. on
WI. Dri IPipe
Stands
334 No.
Size
9
77 /s XC
MU
•
Type
4p.m.
Jets/W.C.
O.D...
No.
COLLARS/
Serial No.
Wgt.
R.P.M.
Hrs.
DrIed r Core d
6p.m.
8p.m.
WEIGHT
UM
10 p.m.
M
6p.m.
9i)
No. I
VISCOSITY
4p.m.
5.e.M
ff)
/)
8p.m.
Reamed
Hrs.
q5) 4?≤
UM
4p.m.
Air WI.
Table 5P.M.T orqu e
...s—
1
•...,,/
8p.m.
10p.m.
e No. 2 SU RE
MOTS
C.B. Ft.
'Y
Ft. up on Kelly
/c1
( N.
H.U5
Oil
/
4
1 2
/ 1"' /
) LI
F.C.
PH.
SURVEYS Degrees At Feet
.cENERAL
J(J
ADDITIVES:
.
4
i',iTf.
G
j
Bbls. Driling Line
Si ze
. Serial No.
Make
Lines
Trips
Ton Miles
Total Miles
Slip
B.O.P.
r
Cut
Tested
Elapsed Time
Pressure
Packing & Seal Inspected Date
Hydril Pipe Rams.
Cr own.o.d. mati Chk •
Fuel on Hand 12.01 a.m.
Rig Savers Chk d.
Fuel Recd Today ( add)
Blind Rams.
# Hrs. 00006 096004000000000016109690044900
TOTCO RING ON BIT
Pre E i Chkd.
V
1 5
••
gals.
CASING REPORT
EQUIPMENT CHANGES JTS
RAN
gals.
e0*96
TO
KB. USED
- / gals. PLUS
0
•'.\
FUEL USED
000000000400000000000000e00000
000000000 000000000
...........................................•••• 0
LL
TRANSFER
CSG
Dais.
SAX
%
CEMENT RETURNS
600000000 wwww ---
CEM
PLUG
AM.
DOWN
P.M.
.(YES! NO)
GENE
AL:
COAL ON HAND
—
eo
000000000000000000000000000 0
•••••
000000000
•••
0
•• —
•
00
•••
••••
0 0000000000
•••
CONSERVATION
TONS
TOTAL COMPANY TIME
TOTAL CONTRACTOR'S
HRS.
TIME
HRS.
Approved by 0 pera t or • s Representative
................................................••••••••••••••••••••••••••••••••••••••••••••••••• •• ,....,...,.................................uI.S •...............s...II..•••••••••S••••SØ 00000000000
. f'SISIGNATURE A.'V
gals.
Fuel on Hand 11.59 p.m. ( deduct) Boiler Operated:
on Spool
Slip or Cut
Ins
t
TOTAL
Kelly Cock
Is
At
•
Record
Nex t
Date
Feet
S
.
Waler
Weather
/Q No.
'
9'
1/
'SIZE
WI.
H
-
T.
Ci)
7si
6p.m.
Sub. WI.
02 el, 340 P' ress se Pup
/
10 P.m.
(#()
Length
I.D.
. 2 7 18
3)
GEL
It
/
DRICCRS SIGNJ-R Footage
From
T
/k
00
.3 .
.
U
I
Temp.
.
/
ecord
M
/c7
k
Water
WeaIhr
At Miles
Cut
.
2
RLine
•
./o
?
5
H.USChan Next ge 1
)
L SIZE
SIZE
.-
Size
lOam.
.'
SUR
LR
M
8a.m.
/1/MODEL
ADDITIVES
Drilling
UM
2p.m.
see
I.
GENERAL:
PH.
P.C.
10a.m. 12noon
Ba.m.
SURE
J,,
MD
'
/
G.
W
-
MU
ATURE
151 T 1V1ee
,1(
Pt Kelly upon
T.
e
Left
on Spoo l
Sli p
T/ 1
•s
-
4
Temp. Fe et
Slip
(1000 lbs.)
No.
I
-
W eat her
Dr
r
4
7W/c
/1
Total Miles
Sta nds
Wt . DiIPipe
c€sc r,a.4'
.
Record
T
ci',4A'
s
. SURVEYS At Feet Degrees
4:
Tan Miles
-
-
2
.
Make
N ex
/2
CHC/
ck
INTVIL.
STOP
START
USER
GENERAL:
7•f/f
H.US
1964 T IM E
I/IlL L M.T.
6a.m.
2
xE: No. 2 PSUE
/y
,y
l2mn.
UM
IRGE.
& WP.
R EM A R K S
V MU
ZSEC
DATE
Ft. upon Kelly
I
/
/
40" 0
C.B. Pt.
Sub. Wt.
1-2
oDrilled Core d
R
MILES MOVED
Mr WI.
Length
ID.
0. D.
COLLARS
W.
I
LOCATION
RIG NO.
Approved
•
oo put .eV,
BOARD
COPY
.
C6M-
—.-°
4''c'
i-s-
146 ?
COMMONWEALTH DRILLING CO. LTD. DI'RECTIONS TO WELL Footage
To
74/
•: Jf3D No.
Size
Type
Hr on I, Bot am
q
Jets/W.C.
WI. Drill Pipe (1000 lb•
Serial No.
Stands
7
RIG NO.
MAILING POINT
I
From
B
DAILY DRILLING LOG
Singles
No.
DRILL
-
I.D.
0. D.
Length
MILES MOVED
Air WI.
C. B. Ft.
Sub. WI.
Ft. up on Kelly
COLLARS
R.P.M.
Wgt.
or Cored
Reamed
Hrs.
Hrs.
No.
5PM
Pressu r e
440
V
, r4/M9
J72
f41/27
LOCATION
SHIPPING POINT
T T ble o °r
T.
B.
Z
LSD
SEC.
105,
DATE
/Z
. c,,1T,
I IM E START
IA I
G
196
•
REMARKS
..
Zrwp. 6'1'RGE. 26W ' 1
STOP
INTVL
z.
/i'€; MU'
12 mg.
I
WEIGHT
G
VISCOSITY
2a.m.
4a.m.
UM
6a.m.
M
1
SURE
DEL
S.P.M. LINRR
GEL WI.
T
P.C.
PH.
4a.m.
6a.m.
PUM
12mg.
2a.m.
4a.m.
Nex
H.US
M.T.
6a.m.
Oil
Change
t2
.
.,
#68 9ç1 q'i 0 60 It7
IRES.
No.
2a.m.
12mn.
PRES. 2
SURE
I
MODEL
s.g.s.
2
No.
•-1--•;:. I
-
pi,
LINE SIZER
.
(3
8
3 FV kYS Degrees Al Feet
GENERALS
ADDITIVES
5 Water
Weather
Temp.Bbls eXt Drilling
Size
Make
Serial No.
Line
Trips
Lines
Ton Miles
Total Miles
Feet
Slip
Date
At Miles
Cut
N
Slip or Cut
Ft.
Left
on Spool
Slip
Record From
footage
To
Hrs. on
WI. Dri IPi
Bo
Stands
Singles
No.
DRILL
O.D.
I.D.
Length
Air WI.
Sub. Wg
C.B. Ft.
A;tten< 1 GThRE
Ft. upon Kelly
(1000 lb, '
52
COLLARS
No.
i Size
, Type
Jets/W.C.
Serial No.
wgt
O
bY
Drilled
R. P. M.
'i
Hrs.
or Cored
/J"
Hrs
Reamed
Pump
Pump
Table
a.
Pressure
Torque
of 3
B
T.
/ ,
G.
,1,
/4)
S
,,
-
•
•
MU
8a.m.
lOam.
12 noon
2p.m.
UM
10a.m. 12 noon
2p.m.
UM
8a.m.
WEIGHT
j7y
No .
1
PREs. SURE
No.2
SURE
VISCOSITY
2
MODL
are.
MODEL
spa.
GEL
•
8a.m.
., ,')
f,.
LINER
F.C.
WL
CLINER
.
lOam.
12 noon
2p.m.
M.TsRHsUS
2
0
7.
4
siz6.7
SURVYS At Feet IDeg rees
ADDITIV ES:
Weather
Water
Temp. 0
Size
ifl8
. Serial No.
Make
No. Lines
Line
Trips
f
NCehxOI
Ton Miles
Total Miles
Slip
Feet or
Bbls.
Date Slip or Cut
At Miles
Cut
Next Slip
Ft. Left on Spool
Record
1
Footage
From
To
Wt. Di: IPipe (10005.)
Hrs. on Botto
Stands
Singles
Size
Type
Serial No.
Jets/W.C.
Wgt.
O.D.
Length
1. D.
Air WI.
Sub. WI.
C.B. Ft.
Ft. up on K:I
Hrs,
Reamed
P
His.
F Pre.ssu're
o.
Tbl 5orgs7e
S.P.M.
T.
B.
- R
R'S SIGNM.URE -
/J
G.
/
I
/0-50
•
MU
M
WEIGHT
10 o6
T
VISCOSITY
7
4p.m.
I
6p.m.,
10 p.m.
8p.m.
UM No.1 MODEL
4p.m.
I ' SUR
/
SIZE
.
WI.
F. C.
I
Line
10 p.m.
p
UM,
4p.m.
No.2
SURE
MODEL
5 -
6 p.m.
—
8p.m.
10 p.m.
Make
Seriat
Tested
Elapsed
Pre:-
Ne
SURVEYS
At Feet
Degrees
9f:IO
Size
MOTOR H.US
QEP
s
I
Water
Weather Temp
c
/ó
2
aq/
'
izE
Cl
CA (jr-r/C — /)A ) c/ /1F
G H Drilling
S p.m.
GENERAL:
PH.
G-FL
ADDITIVES:
6p.m.
E
a
GELLI NER
M
Dri ll ed
R.P.M.
-
.
No.
DRILL
coLLARs/
0 No.
B
-
91
Bbls
o
a.
Trips
Ton Miles
& Seal
Crown-o.motic
Total Miles
Fe e t
Slip
Cut
At Miles
Next
SlipDe Cut
Ft.
Slip
Left
on Spool
i
Rec ord .
B.
o. P.
Hydril
Tim•
sure
Pack i ng
Inspected
Date
•1
Rig Savers Chk'd.
Pipe Rams. Blind Rams.
Kelly Cock Chk'd.
..,
TOTCO RING ON BIT #
,
" f/
Boiler Operated:
His.
Fuel on Hand 12.01 am,
Chk'd.
F'
E Chk 'd.
y e, / 7
1 -
.
foeI Rec'd Today ( add)
..
TOTAL
.
Fuel on Hand 11.59 p.m. ( deduct)
gal .
EQUIPMENT CHANGES
CASING REPORT RAN
TRANSFER
CSG
gal gals
TO
KB. USED
gals.
PLUS
gals.
CEMENT RETURNS
SAX PLUG
%
DOW N
.
FUEL USED
JTS
CEM A. M. P.M.
. COAL
ON
.,
-
(YES/NO)
-
GENERAL: —
HAND
IONS
-
TOTAL COMPANY TIME
HRS.
TOTAL CONTRACTOR'S TIME
-
HRS.
Approved by Operator 's Representative -, Approved by
•••••••••••••••••••••••••••••••••••••••••••••••••••••••••......................................
Toolpusher
-4000000
CONSERVATION
BOARD
COPY
,v: ./
,
COM-
-'--3
14669
g.%
I
COMMONWEALTH DRILLING CO. LTD. lr(TiCsN
WELL
TO
Footage
No.
Size
Hrs. on Botim
To
Jets/W.C.
Type
Vt. Drill Pipe l0 00 lb,.)
/
R.P.M.
M'rlifrl
LOCATION
T
SHIPPING POINT
Singles
No.
DR ILL
ID.
O.D
Drilled or Coredrs. H
L'1
Hrs.
1
'
o. ''
B.
G.
"
/
T.
DATE
196
R EM A R K S
START
J,"6'
.Lhui/ A ó
S
I
WEIGHT
G
VISCOSITY
T
l2mn.
2o.m.
4a.m.
/
,
UM
6a.m. No
jL 3
1
MODEL
uu S.C.M. LINER
GEL
—/
P.C.
T
12mn.
/ .r
pH.
/L7
2a.m.
9
4a.m.
UMIREI
6a.m.
f0C /o4 103';0 Na
4
2
l2mn?
2a.m.
4a.m.
6a.m.
SUR
/}/'
2
H . US
,ç
Ne xO,l Cho ge
1
MODEL s.e.c.
,5'z ('7
M I T.
R'1TVL.
STOP
17
.
MU'
2W. 4'
TWP....,(4IRGE
T IM E
ç
O
/ 0
/
Table
SEC.
25
Ft. up on Kelly
yc
5P.M.
P' ress Je
C.B. Ft.
Sub. Wt.
,z z
Reamed
LSD MILES MOVED
Air Wt.
Length
COLLARS
Wgt.
Serial No.
I 21
I
Stands
7
RIG NO.
MAILING POINT
From
• s
DAILY DRILLING LOG'
2
'.
H4fr
L
GENERAL,
At Feet
V44/
4,1a
' j 1WE . 57/J
5"'
Degrees 4
ADDITIVES, Water
Weather Temp.
/ Drilling Line
Size
Make
No. Lines
Serial No.
Trips
.
Total Mules
Ton Miles
Slip
-
/ Feet or
Cut
At
Bbls.
Date Slip or Cut
M iles
Next Slip
Ft. Left on Spool
T
r
Si ze
MU
•
/
To
Footage
From
Son,.
X Hrs. an Butte
Wt. Drill Pipe )1000 lbs.)
12 noon
100 rn
Singles
8a.m.
DRILL
Hrs
T
GEL
•
/
10a.m. 12 noon
F.C.
ADDITIVES
.
pH.
C'
M
UM
2p.m.
/
-
8a.m.
f
B
MiT.
2p.m.
Ne Change xt Oi l
-
H.US
C/1t'
-r z y (
0A
MODEL LINE:
3 SURV At Feet
e
9''
'/' s
•
M
WEIGHT
-
h
t/
3 5
1 Lj
T
VISCOSITY
Serial No.
To
Trips
Lines
Feet
Total Miles
Ton Mñes
Slip
Wt. Dri IPipe
Hrs. on
.
Stands
Singles
Wgt.
Type
Jets/W.C.
Serial No.
7f
7
3 -/$
?€ ("
R.P.M.
f
$_O
Dril led
4p.m.
6p.m.
/
24
'
/
8p.m.
10 p.m.
/
U M
4p.m.
N,.1
3$
SURE
MODEL
S.C.M.
6p.m.
, 4ó
it
40
LINER
.
size
/
W.L.
,
ADDITIVES:
F. C.
Sti
Dote
No.
DRILL
O.D.
4
Ft. Left
Next
Cut
Air WI.
Length
ID.
C.B. Ft.
Sub. WI.
Reamed
Hrs.
Pssre
Kelly
T.
5P.M.
RIL ER
Fl. upon
/
,
—
G.
B.
?V
'
,)'.
Ott.
8p.rn.
J
Ne.
2
MODEL
t/'
4p.m.
UM
10 p.m.
/ ,
6p.m.
8p.m.
10 p.m.
M.T'
H.U5
-.
3
SIZE
B.O.P.
Tested
No. Lines
Trips
Ton Miles
SEP
Slip
Feet or
Cut
Date . Slip or Cut
At Miles
5.4
Water
Temp. Total Miles
Bbl s. Next Slip
Ft. Lett on Spool
I Elapsed Time
Pressore
Packing & Seal nspected Date
Hydril
Rig Sayers Chk'd.
Pipe Rams. p
Blind Rams.
TOTCO RING ON BIT
Crown-o-malic Chk'd
Boiler Operated;
Hrs.
Fuel on Hand 12.01 am,
gals.
Fuel Recd Today ( odd)
gals.
TOTAL
Kel Chk' lY Cock ct
gals. •
Fuel on Hand 11.59 p.m. ) deduct) Fire Equip. Chk'd.
.
.
SURVEYS Degrees 4 At Feel
GENERAL,
.
Serial No.
O
2
LINER
( f7
Make
'c-
p1.
,
Weather
Size
,/
I5lnge I
su' ' S.C.M.
N G H DrtinR illing T Record
_&
Water
I
Hrt.
,/
At Miles
Cut
COLLAR
Size
GEL
M
1/
.
Bbls. ke
U •
cø
0
/6
M
ki
YS Degrees
Weather
.
No.
Ft. upon Kelly
5
Footage
. v
12 noon
10a.m.
GENERAL,
Bottorn
B
C.B. Ft.
-'
Size
From
Sub. Wt.
I t
(/
•
T
I
sCM LINER
W. L.
Drilling Li ne Record
MODEL
Air WE.
R' . SIGNATURE
/? sURE
VISCOSITY
Length
ReaY
PRES
M
0. I. D.
O. D.
4 10i
COLLARS
or 11-d ore d
PU M
2p.m.
Stands
'f fri)!
Seria lNo.
Typ e
.
1
Record
FUEL USED
gals. gals.
CASING REPORT
TO
SAX PLUG DOWN
pius .
)YES/ NO)
TRANSFER
CSG
iTS
KB. USED
CEMENT RETURNS
-
EQUIPMENT CHANGES RAN
CEM A.M . P.M.
COAL ON HAND
TONS
GENERA L:—
..................................................•••••••••...•••••••••••••••••••••••••••••••••••
TIME
. ,.
•...........,.,.......,..,.....,....I..I.....II...,••••••••,...S••S•••I•••I•••I•••••••••••••••••S
TOTAL COMPANY
-
HRS.
TOTAL CONTRACTOR'S TIME
Approved by O perator 's Representative
Approved Approved b Too I pus er
04-10-30000000000000000000000000onto go 3 , so
CONSERVATION
BOARD COPY
COM-
14669
HRS.
COMMONWEALTH DRILLING CO. LTD.
DAILY DRILLING LOG
From
T
Footage
U
Size
'TyIse
N
MU'
I
WEIGHT
G
GEL
UMP
6am
4am
/./'3
'9 /
VISCOSITY
J/
Drilled orCored
12
n.
2am
4am
No.
DRILL
Hrs .
0. D. ,
Reamed
Hrs.
UM
l2nsn
6am
MODEL
4q9
s. 1.
0
1.0.
Length
Air WI.
Pum
Pump p. preSM
2am
4am
/ GENERAL
T.
M.Ts
HeU 'S
6am
1
MODEL
2
S. P.M.
Ft. up on Kelly
C. B. Ft.
Sub. Wt.
Table Torque
No. 2 PEE:;
5Y,.
Ize
M
No Lines
Trips
Ton Miles
DATE
s
cal
2,w
_-
-
I M E
REM A R KS
I
-
3
'/i
Serial No
3 -#R
cge
Wate r
Temp. Make
/
SURV EYS egrees AtFeet
.'
S ze
ISO
Ne
Weather
ng
,' fi'7 MILES MOVED
Va 12
8'ç 3j'O
J '
pH
FC
ADDITIVES
R PM.
No. 1 PRESSURE
L
9 ,5L.
W L
2am
12mn
WgL
7/ Jf) 440
74 7 1-/
'
Singles
Stands
WI. Drill Pipe (1000 lbs.)
,
Serial No.
iets/W.C.
,'
M
T
Hrs on Boflom
To
24KL4A'fl
LOCATION
SHIPPING POINT
MAILING POINT
DIRECTIONS TO WELL
7
RIG NO.
Total Miles
Feor et
Slip
Ebls. Ft. SIt1 Le ft
Date
At Miles
Cut
°
,_.14
ecord From
T
Footage
No.
Size
Hrs. on m
To
Ty?e
Jets/W.C.
Wt. Dri IPipe fl000lb
(
1
Singles
q'i
Wgt.
R.P.M.
410
O
Serial No.
77 XI
Stands
O.D.
No.
DRILL
I.D.
Air Wt.
Length
SDr r illedd
i
Hrs.
Reamed
Hrs.
Press u pr e
le
5PM.
Ft.'upon
C.B. Ft.
Sub. Wt.
COL
2
i-
T.
B.
tc
C j!Jhi.
0.
70
C
57 1"1
/ .4/
/ /
/
' V
/1)
t /
S MU •
A M
VISCOSITY
T
GEL
I
8a.m.
10am.
WEIGHT Al
.2 u..
W L
12 noon
z q2 3 5/
'UM
2p.m.
N..1
C
SURE
MODEL SF55.
UM
8a.m.
10a.m. 12 noon
2p.m.
'f
/
,i112)
(()
''
7()
No.
8a.m.
10a.m.
MOT*
2p.m.
ON 15,41
2
.L
ZC
Next Oil
H.US
1
MODEL S.P.e.
')
size
2 3
Z E:5.._>.
.
SURVEYS At Feel Degrees
GENERAL
F. C.pH
12 noon
5
ADDITIVES,
7
M
Water
Weather ,
Temp. Drilling Line Record
T
Size
Make
Footage
From
No.
Siz/
,
I
.
To
6.
EbIs.
I Xj Left Fe -NoFt. 0t Cut Trips Ton Miles Total Miles Slip on Spoo l Li ne , SliCut Al Miles
Serial No.
Hr on Bottom
WI. Dni IPipe (1000lbs)
pe
sØiio.
t
7';
Wet.
Stands
Singles
No.
DRILL
R.P.M.
Drilled
Hrs.
O.D.
ID.
Air WI.
Sub. Wt.
C. B. Ft.
5P.M.
Table orque
T.
Length
Ft. up on Kelly
,
COLLARS
•/'
__•,
Reamed
Hrs.
LIMP
4p.m.
"'
P'e
.
ii i! LL
-
SIGNAtURE
,JpS
C.
B.
5 MU'
M
WEIGHT
T
VISCOSITY
4p.m.
6p.m.
Sp.m.
G
Cj
l...m.
o
3
•
4 )
/ W L I' W. '' '' ADDITIVES
FC
''
//
'
.C'7'
H
4p.m.
6p.m.
SURE
1
8p.m.
10 P.m. _
—
,'
.
../.
6p.m.
8p.m.
M
10p.m.
sn og e i'
2
S.P.M.
—
.
SURVEY S Degrees At Feet
°
t'7
.
Size
Make
Serial No.
Tested
Elapsed Time
Pressure
No. Lines
Trips
Ton Miles
Total Miles
Slip
Feet or
Cut
/
Bbls Next SUP
Ft. Left on Spool
Packing & Seal Inspected Dote
Hydril
Rig Savers Chkd.
a
Pipe Rams.
Kelly Cock Chk'd
Blind Rams. TOTCO RING ON BIT #
Crown .o -mo ti c Chk'a .
Boiler Operated,
Hrs.
Fire Equi p Chkd.
'
. CASING REPORT
Fuel on Hand 12.01 ann.
gal
Fuel Rec'd Today ( add)
gols.
TOTAL
gal .
Fuel on Hood 11.59 p.m. ( deduct)
FUEL USED
.TO
EQUIPMENT CHANGES RAN
.PLUS % CEMENT RETURNS .(YES/NO) gal . gal
,'
SAX PLUG DOWN
00000000 0000:0
TRANSFER
CEM A.M. F.M.
GENERAL:
• 000000000000 0000000000 09000000009*:0090000000 go 9000060!6
DRILLERS SIGNATURE
CSG
iTS
KB. USED
I
,
Record B 0 P
/
Water
Weather
Dote Sli p or Cut
At Miles
I'
49
°"
Temp Diliiefl9
s.,
.
fF,i,4
SIZE
I
G H
OT* ' H.U'S
1
2 PREs. SURE
isce
LINER SIZE
GENERAL
No
MODEL
MOD EL 5P.M.
GEL
M
- UM No.
COAL ON HAND
TONS
TOTAL COMPANY TIME
HRS.
TOTAL CONTRACTOR'S TIME
-
•
0 09 : 46164000090 0.0 000::::2*04,
CONSERVATION BOARD COPY
Approved by O pera t or ' s Representative
/
Approved by fr T00 I PU) h
.
CÔM-
el
14670
HRS.
-A
COMMONWEALTH DRILLING CO. LTD.
WELL
RIG NO
POINT From
T
Footage
No.
1
l2mn.
2a.m.
W. L.
6a.m.
No. I
2a.m.
l2mn.
GENERAL:
PH.
ç.
[
Hrs.
Pump No.
'
Length
Air WI.
Pump Pressure
.o Table Torque
PM .
//1
o"
UM
MODEL
.ct. 5 i/
l2mn.
2a.m.
4a.m.
M.T.'
6a.m.
Drilling Line Record
M
Size
j I
Make
T.
B.
ñ
'
f
,'i7
4iJ/
-'
Footage
/4
No.
Size
I '7
Type
Wt. Dri IPipe (1000 lbs.)
SURVEYS Degrees 4 At Feet
Total Miles
2 Ser,al
Jets/W.C.
Stands
Feet or
Slip
Singles
Cut
No.
DRILL
coLLARs
/
) f\'itZ
'
S-
-
A Water
Ft. Left Spool on
Next Slip
'
3 -0
'
Bbl,.
Dote Slip or Cut
At Miles
•1"
.
14
A// 7-/ Hrs. on Bottom
To
7J9000
T
Ton Miles
Dr
2
I
From
B
.
c ,q
SIZE
Temp. Trips
lNTVL.
LINER
Weather
No. Lines
STOP
JO
Nex Oil Change
H.US
I IM E START
J2,f/J'A
0,
'i
196
DATE
SURE 5P.M.
nor
Serial No.
2
7.2 SEC. 2TWP. (4 RG E.,7 v w.
REMARKS
ADDITIVES
MOO
MILES MOVED
LSD.
Ft. upon Kelly-
C.B. Ft.
Sub. Wt.
'
6a.m.
0
SIZE
I.D.
2? /Z
& 14' '1/'' /
LOCATION
zr
Reamed
/O/ji4No. 2
SURE
LINER
0::/,,
4
O.D.
?4-
7Y
MODEL
GEL
P.C.
c
Hrs.
7
UM
'/.
.i
9N9
Drilled on Cored
f'
No.
DRILL
7
SHIPPING POINT
COLLARS
/
R.P.M.
7j'
4a.m.
Singles
Stands
q
7.
WEIGHT VISCOSITY
/
Wgt.
/
z— f
Pt'i
MU
I G
Serial No.
Jets/W.C.
7,' 4//ft /
7
N
Wt. Drill Pipe (1000 lbs.)
%ottom
Type
Size
I
M
Hrs. sn
To
qo
1 z7/6 B
H
, qy
DAILY DRILLING LOG MAIL IN4 I 2JI
-DIRECTIONS TO
O.D.
ID.
Length
Hrs.
Pum No.p
Pump Pressure
8a.m.
10a.m.
C.B. Ft.
Sub. VJ
Air Wt.
Ft. upon Kelly
/
A
Wgt.
R.P.M.
f2
/O
or Cored
Hrs.
Reamed
Table Torque
S.P.M.
--
ll 1
.
B.
T.
.7T3
S MU
a
8a.m.
WEIGHT
ç' i
12 noon
IUM
2p.m.
i'oo
0/1
4
No.2 /)
f(
.
12
noon
MIT.
2p.m.
/ 1
URE
/
C •,
2
R
SIZE
pH.
F. C. /.j
W. L. '
( ADDITIVES
SURVEYS Degrees At Feet
GENERAL:
Z'/,
5
,. .7;
Water
Weather
• M
D Drilling Line Record
T
'I/A
Si ze
1.
71 Temp.
M a ke
U
Wt. Dni IPipe (1000 lbs.)
Stands
Total Mites
Singles
Feet or
Slip
DRILL
No.
Cut
Size
Type
Jets/W.C.
7
7
O.D.1.0.
Length
Air Wt.
Wot.
R.P.M.
Drilled or Cored
Pump No.
Pump Pressure
S.P.MM.
6p.m.
8p.m.
Bbls. Next Slip
Ft. Left on Spool.
.,
Hrt.
Reamed
Hrs.
10 p.m.
PUMP
4p.m.
Table
T.
orque
4p.m.
M U D WEIGHT
T
VISCOSITY
9 , 2 9'
6p.m.
8p.m.
10 p.m.
PUMP
W. L.
6p.m.
8p.m.
No. 1 SURE
Na.
4/
MODEL 5P.M.
LINER
LINER
SIZE
SIZE
PH.
q.
2
10 p.m.
Oil ge
suae
2
.
3
°S' '7ç7 A) D w
6:.
G Size
Make
Sertal N °
Tested
Elapsed Time
Pres. sure
No. Lines
. Trips
P'.
.ii ' 57'
Ton Miles
Total Miles
Slip
Feel or
Cut
Temp. Date Slip or Cut
At Miles
e 10
Water Ebis. Pt. Left on Spool
Next Slip
,
Record
B. 0. P.
Packing & Seal Inspected Date
.ok52ril
Crown.o.matic Chkd.
Fuel on Hand 12.01 am,
gals.
Rig Savers
Fuel Recd Today ( add)
gals.
Pipe Rams.
Chk'd
Blind Rams.
Kelly Cock Chk'd.
.
TOTCO RING ON BIT #
Boiler Operated:
Hrs.
i7
SURVEYS Degrees 4 At Feet
GENERAL
Weather
Drilling Line
eo
N Cho
MOTOR HOURS
PRES.
MODEL N.R.C.
P.C.
ADDITIVES:
4p.m.
9'
GEL
T
G.
8.
//Z.
M
H
Ft. up on
C.B. Ft.
Sub. WI.
7C2+9
S
P
Serial No.
Date Slip or Cut
At Miles
COLLARS
43 No.
M
Ton Miles
Trips
Hrs. on Bottom
To
Footage
From
No. Lines
-Serial No.
.0
4
Next Oil Change
H.US
P 5 OES
MODEL s.r.n.
/ 1)
LINER
GEL T
•
•U
2p.m.
/j
MODEL s. P.
I
r 6
10a.m. 12 noon
8a.m.
PSoUEoSE
No.1
''1
9
dt/fl
VISCOSITY
M
lOam.
Fire Equip. Chkd.
TOTAL Fuel on Hand 11.39 p.ni, ( deduct)
gals. gals. gals.
FUEL USED
•
CASING REPORT
TO
RAN
iTS
KB. USED
PLUS
EQUIPMENT CHANGES
.
%
CEMENT RETURNS . ( YES/NO)
SIGNATURE
TRANSFER
CSG
SAX PLUG DOWN
9RILLERS
CEM A. M. P.M.
COAL ON HAND'
GENES AL..-.....
TONS
TOTAL COMPANY TIME
HRS.
TOTAL CONTRACTORS TIME
HRS.
Approved by Operators
I•
Representative
•.....................................I...........S......................••S•••••••••••• 0 o il:
....................................................................................sq. :
CONSERVATION
Approved by Topushe',, 1
.
BOARD
COPY
-
co
14671
I
A
COMMONWEALTH DRILLING CO. LTD.
DAILY DRILLING LOG
DIRECTIONS TO WELL
MAILING POINT
From
T o
Footage
ó. 5
0)
U
No
B
OU
7
I
Wt. Drill Pipe (1000 lbs.)
Stands
5/. f1b..1
Singles
No.
DRILL
i2 t ./7f O.D.
-
1
Jets/W.C.Serial No
R. P. M.
Wgt
Drilled
or Co re d
.
I. D.
Pump
Hrs
JI2
/ 7
Length
Air Wt.
SPM
Pres sur e
C.B. Ft.
Sub. Wt.
B
T
iJ 0r
MUD
12mn.
4a.m.
A
6a.m.
o5/
vy
T
12 ron.
•
2a.m.
4a.m.
PUMP
6a.m.
% ';
PRES.
I
SURE
:EM.
GEL
2a.m.
12 mn.
4a.m.
M
Drilling Line
Size
ñ'4
G
514 '- C,'/.
No. Ls
Serial Na.
From
Footage
Sac
To
Hrs. on Bottom
peetC
Wt Oni IPipe (,I 000 lbs.)
Tot alMiles
Ser i al No.
W
Stands
.
8a.m.
WEIGHT
A M
lOam.
.,-
VISCOSITY
T
Al
.4)1
32
MODEL s.e.c. LINER
GEL
'
Singles
/..
Cut
No.
DRILL
4/
/
7
Fe et
Slip
Hs
oC ore d
ed
.
7
8b1s. Ft. Left on Spool
.
-',:--'
•._,
1k` ID.
Length
Air WI.
Y
Water
Next Sp
e
si.pD otr Cut
At M iles
0. D.
NJ
Reamed
10a.n
1 'nuon
PUMP
2p.m.
PRES.
No. I
/3
,
8a.m.
/7
Sub. WE.
C.B. Ft.
Pt. up on Kelly
_184•TU RE
'. .'
.-
COLLARS
RPM
PUMP
2p.m.
12 noon
Nivi.
STOP
/2
C/(
o.
Pu Po
Table
M
T
,
t/
B
—7
,Li MUD
START
INER L SIZE
/
Record
T
Ton Miles
196
)1q,yj ,,,,,,.
RVYS At Feet Degrees
Trips/
4'
I IM E
No.
Temp.
Make
/( 9
REM A RKS
5 c, n t1 ge
Weather
A
) L.P'/.
W.
;-
MOTOR HOURS
Sam.
-
c
DATE
'RGE
r ,
PRES.
GENERAL
8
SEC. ,
que
/ /i9
2a.m.
WEIGHT
,' _3 TWP.
l
,
1
Ft. up on Kelly
C'74A/ N
LSD.
Z C
MILES MOVED
1(4
Reamed
Hrs.
d1
LOCATION
SHIPPING POINT
COLLARS
ç,,7
Type
Size
tlrs.,on Bottom
To
7
RIG NO
4,
-
No. 2
/
MODEL
8a.m.
10a.m.
12 noon
SURE
1
urn.
2
LSIN::
AI
O il
MOTOR HOURS
2p.m.
PRES.
,
j
,
/
'
/
,
/1. / /
/
'"
1
1/
/3.0 /j
/I
01/
z2''
d
2
-
3
-
0
W L
4
ADDITIVES : ,
FC
P M
Ej..
PH
Size
Make
From
flI1J-
To
No.
Size
Jets/W.C.
(J'C
Trips
Ton Miles
Serial No.
Wgt.
4p.m.
De Y Sgrees 5 Water
Weather
Singles
or Dr il l ed
— 5i;
Cut
—
51 1Dat p ore
6p.m.
8p.m.
PU M
10p.m.
4p.m.
At Miles
.
Hrs.
O.D.
No.
DRILL COLLARS
Reamed
Hrs.
1. D.
Length
Pum o.p
p'essrre
a
Air WI.
C.B. Ft.
Sub. Wt.
Table Toe
S.P.M.
-
Ft. Lft oS °ool
I.
. DRILLER'S SIGNAWRk
Ft. upon Kelly
12,F/,''
G.
B.
8p.m.
10p.m.
UM
4.
. 6pm
8p.m.
10p.m.
MIT.
6"
•i,/afJ)O//v,;A/o//
/
Ri'i 6p.m.
... Bbts.
t
0
i-'°'
14LIA)V
MU'
At Feet
Peet
Total Miles
R.P.M.
1
Temp.
//iI
Stands
71U '/f
4 5
I
Type
&/)
Wt. Dri IPipe (1000 Us(
Hrs. on Bottom
/ á?-/ r5 B
No. Ls
4
z10
_t 7 -
.. -uJ,'
Serial No.
Footage
4/
7
tu77s
1 /,/ç0
— Drilling Line Record
7
O''
—
/),q/j(1
GENERAL
-
9/c:'
c-
,#i/ Oil onge
H.U'S
1
T
VIS COSITY
M W. L.
MODEL
7, j.
MODEL s
SM
/
GEL
,
LINER SIZE
pH.
P.C.
ADDITIVES
q. '
/ ./ f/' / /
,.
N H
.
Drilling Line
Si ze
M a ke
Tested cue
Elapsed Time
Record
B0 P
'..
Serial No.
3 SURV E Degrees At Feet
GEN ERA L,
rt0s
Trips
Ton Miles
Total Mil's
Slip
Feet
AT
.
4 u zonOfaCQ
.
S
.
Water
Weather Temp. Cut
At Miles
51.Date p or
Bbls.
.
Next Slip
1
oS
..,
Pressure
ocking & Seal Inspected Dote
Hydnil
Crown-o.matiz Chk'd . Rig Savers Chk'd.
Pipe Rams.
Fuel on Hand 12.01 am.
TOTAL Fuel on Hand 11.59 p.m. ( deduct)
TOTCO RING ON BIT #
Boiler Operated:
Hrs.
. . p. .Chkd.
FUEL USED
EQUIPMENT CHANGES
CASING REPORT
RAN
iTS
gals.
TO
KB. USED
gals.
PLUS
gals.
CEMENT RETURNS
%
-
TRANSFER
::::0000000000000006000000000
-
CEM A.M. P.M.
GENE
( YES/NO)
000:0000000000000000000000000000000000::O00000000000eo:::*::000::oo000000000000000000000 00
DRILLERS SIGNATURE
CSG
SAX PLUG DOWN
COAL ON HAND
.1:—
.
...I . lsto
:02
w,
CONSERVATION
TONS
TOTAL COMPANY TIME
HRS.
Approved by Op perator's Representativ
.S
•..................................I..........I..................s.............. 0000000000000000000000000000000000000000 s......... 0000
k
—
gals.
Fuel Rec'd Today ( add)
Kelly Cock
Blind Rams.
gal .
SEI' 1919
...
.
Left ool
Approved
BOARD
COPY
HRS.
e
by q
,
TOTAL CONTRACTOR'S TIME
/
COM-
14 672..
11 COMMONWEALTH DRILLING CO. LTD.
DAILY DRILLING LOG MAILtNG POINT
DIECTIONS TO WELL Footage
From
B
No
Size
'ljt. Drill Pipe (1000 Ibs.(
Hrs on Bottom
To
Singles
SHIPPING POINT
,q
O. D.
No.
DRILL
MILES MOVED
ID.
Length
Air WI.
Sub. WI.
C.B. Ft.
Ft. upon Kelly
COLLARS
7 R.P.M.
Wgt
jets/W.C.Serial No
Type
Stands
,4(
LSD
LOCATION
RIG NO.
Hr
orCore d
Reamed
Hrs.
t-
i&c
o.
p'Je
Table orque
S. F M
T
MU'
l2mn.
WEIGHT
G
VISCOSITY
2a.m.
/
4a.m.
6a.m.
C
('
—
L
UM
ç
No.1
(
T
LINER
\
GEL
T
SURE
MODEL 5P.M.
4am;
0 5 1
'/jJ // 0 &0 5// ;
UM
6o.m.
No.2
l2nsn.
2a.m.
4a.m.
MODEL
I IM E START
STOP
INTVL.
j
G
B
,,1Jt'
l e llel
H.US
2
::
3 SURVEYS AtFeet
Degrees 4
ADDITlVES Water
Weather
Size
Temp.
'0
*
Drilling
Make
Serial No.
Trips
Ton Miles
TO
Wt .Dri
P ipe
Feet
Total Miles
Slip
Singles
DRILL
Lin Stands
is
No.
MU
Type
Size
8a.m.
0
WEIGHT
M
VISCOSITY
T
GEL WI.
Wgt.
Serial No.
Jets/W . C.
.
lOom.
( 9.. 7 (.
'
12 noon
PU M
2p.m.
Drilled or Cored
R.P.M.
o.
q /i)()
MODEL S.P.M ./
PnE:;
Hrs.
F.C.
pH.
'/. s
, j ,,
lOan. 12 noon
Footage
To
No.
Size
Type
S.P.M.
U5E
9
Hrs.
Pu No
'
Table Torque
B.
G.
8a.m.
10a.m.
12 noon
M.T.
2p.m.
Next Oil Chan ge
H.US
2
LINER 4, SIZE
3
....1
/
-
.
w9i.
.
Total Miles
Ton Miles
.
Singles
Stands
eet or
Slip
.
At Miles
Cut
No.
DRILL
2r
r
O.D.
Temp.
Length
ID.
Air WI.
O
Hrs
rl ed d
Reamed
Hrs.
' I' urn
Pump Pressu r e
-/
CE. Ft.
Sub. WI.
UM
4p.m.
6p.m.
8p.m.
Table Torque
S. P.M.
7
Ft. Left on Spool /.1 pRlLtERS'SIt
Ft. up n Kelly
ç' iicJc
COLLARS
JR.P.M.
__i '
/ 1)
Bbls. Ne t Slip
Dole Slip or Cut
/ 1
Water
Weather
.
I
S'lJP
SURVEYS At Feet Degrees
Trips
/
P:z:
MODEL s.c.M.
C
T.
) 5
Serial No.
Jets/W.C.
Ump Presse
R'41S1'44,
Sub. WI.
/,'
UM No.2
/
WI. Dri IPipe (1000 lbs.)
Hrs. on Bottom
• 5 rB
2p.m.
, ,
Record Line From
Air
. No. Lines
Serial No.
Len gth
ID.
/
SIZE
M Make
0. D.
GENERAL,
/.
Size
I A,••Vji
/7
Na.
Reamed
LINER
M
7i
Drilling
8a.m.
N
ADDITIVES,
T
BbIs. Ft. Left on Spool
ext
N Slip
COLLARS
W
•
Date
At Miles
Cut
I Fo ot age
From
T
•
196
DATE
1
5.P... L
M.T.
6o.m.
SURF
"SIZE GENERAL
PH
FC9//.
W.
R
/ "o
2o.m.
12mn.
TWP
R E M A R KS
Ne
I
10- SEC.
G.
B.
T.
e
kT,URE
/'o9
gei'
oO
,
rT
•
MU
•
M
WEIGHT
T
VISCOSITY
4p.m.
6p.m.
8p.m.
UM
10 P.m.
6p.m.
10 p.m.
SURE
Na. 2 MODEL
No. 1
LINER SIZE F.C.
W. L.
PH.
10p.m.
L/.Y#
GENERAL
-. ,
LLd4—c
M.T.
Nex t
H.US
1
SURE S.P.M.
2
LNER
3
IZE
ADDITIVES
G H
8p.m.
MODEL s.e.c.
GEL
M
4p.m.
9' ,...
,
J
u.
URVEYS Degrees At Feel
.
Wat er
Weather Temp.
Drilling
T
Si ze
M a ke
Ser i a lNa .
es ed
Elapsed Time
Pressure
LNi n o. e,
Trips
Ton Miles
Total Miles
Feet Slip
Cut
SIip oreCUl
Al Miles
Bbls. t
Ft. Left on Spo ol
j X p
Line Record
4•R IE Packing & Seal Inspected Date
Hydril
chkd Rig Savers Chkd.
Pipe Rams.
Kelly Cock Chk'd
Blind Rams.
TOTCO RING ON BIT #
Crown- o -ma ti c
Bailer Operated:
Hrs.
Fire Equip chkd.
Fuel on Hand 12.01 am,
gals.
Fuel Recd Today ( odd)
gals.
.
TOTAL
Fuel an Hand 11.59 p.m. ( deduct)
gal .
CASING REPORT
TO
RAN
iTS
KB. USED
CSG
SAX PLUG DOWN
gal . PLUS
CEM AM. P.M.
.____________________ eI1I1:iI
,/Je/5.r COAL ON HAND
YES/ NO) gal - CEMENT RETURNS - [
FUEL USED
......•...•...•........................•.••..•••••S••••••••S••S••SIS•S•••••••••••••I 00000
•..................s...........................•••
TRANSFER
EQUIPMENT CHANGES
0
TONS
TOTAL COMPANY . TIME
IRS.
TOTAL CONTRACTOR'S TIME
-
Approved by
Operator 's
Representative 11
Wo Approved T.00lpusher,j
CONSERVATION BOARD COPY
21
,
COM-
14673
HRS.
COMMOMEATHDRJU NG CO. LTD. DIETIONS TO (
WELL
'..
From
T
To
Hrs. on Botfzm
RIG No.
MAILING POINT
______
Footage
4
DAILY DRILLING LOG
'ft. Drill Pipe 11000 lbs.)
Stands
7itY'
LOCATION
S7 SFIPPING POINT
Singles
0. D.
No.
DRILL
ID.
Length
Air Wt.
Sob. Wt.
C.B. Pt.
1
SEC
DATE
.
Pt. up on Kelly
COLLARS
/
TWP
/
_ 114GE.
'- I.y4
196
I IM E
R EM A R K S
START
STOP
INTVL.
-O
U
Si ze
B
Type
Serial No
Jet / W C
Wgt
Drdied or 4
R.P.M.
Hrs
Reamed
lIrs
No.
s
p ump j
M
or. ablee
MT__
MU'
N
12mn.
2a.m.
4a.m.
LJM
6a.m.
o.t
VISCOSITY
G
12mn.
2a.m.
4a.m.
:s0URE .
ODEL
___
EL
C
GEL FC
T
.1
pH. * (—
:
UMP
6a.m.
-
l2mn.
2a.m.
0
SURVEYS Dc ree At Feet
GENERAL
5 Water
Temp Size
Line
Make
Serial
Record From
T
No.
.
Footage
To
B
Lines
Hrs. on Bottom
•.$$3
Trips
Ton Miles
WI. Dri IPipe (1000 lbs.)
Size
Type
.lets/W.C.
Total Miles
Stands
Serial No.
Feet
Slip
or
DRILL
Sing les
Cut
0.0.
No.
Wgt.
R.P.M.
Hrs.
or Core d
—
Reamed
8a.m.
WEIGHT
M
UM
10a.m.
12 noon
0
MM No. 1
VISCOSITY
2p.m.
4
W.L.
F.C.
ADDITIVES, •
G
p or Cut
Pu
Sub. WI.
Pressue
J&O
.
12 noon
2p.m.
-
10a.m.
12 noon
-
2p.m.
.UM•
8a.m.
Table orque
S.P.M .
on Spool
C.B. pt.
T.
MeT.
NONE No. 2 PRESu
I
MODEL s.e.c
2
LINER
usE:
GENERAL,
At Feet
B.
H.US
Line
Size
Li noe' s
Fro m
Footage
No.
B
Total Miles
eet
Slip
or
.-.
Record
T
Ton Miles
Trips
Size
To
Type
Hrs. on Bottom
Jets/W.C.
WI. Or, IPipe (1000 lbs.)
Serial No.
Wgt.
Singles
Hrs,
Reamed
OO
I.D.
Pump o.
Hrs.
I
1t.
Next
:C te
SIi
Length
Air WI.
r es'J e
/
3.
1
'j/
8b1s.
Table
T.
Torque
/
,
€
(1
9'
Ft. UP 051 Kelly
/_?'
/.
nSpool
Sub. Wt.
5P.M.
p pu
1)
7 'f
/
'
O.D.
—
ç
Water
COLLARS R.P.M.C ore dd
:
C i(
No.
D
,
A
"
'
/
/
1 Stands
S1URE
/
Degrees
At Miles
Cot
P
I
Weather
Serial No.
c::s / I/.1
C.
,/f/y
/ -
Make
I
.
1ex n' ge
M Drilling
R11. E
t. up on Kelly
-
--
-
10a.m.
u
PH.
S
Air WI.
Length
MODEL sr.e
GEL
T
8a.m.
o.p
Hrs.
-
MU'
ID.
Bbl s.
Ft. Left
tx0t
51 . Dote
At Miles
COLLARS
J
/
No.
/
LINER
Weather
M
-,
(7
r
N Change
M.TsRH.US
6a.m.
ADDITIVES
Drilling
Az'
-- 6 f/2
4a.m.
B
T
I=
•
LSD.
MILES MOVED
*
'
•cL'lt?zu RE
/'
7
C.
B.
lb -
MU
M
WEIG
T
'
HT
4p.m.
6p.m.
8p.m.
UM
10p.m.
OMEN
VISCOSITY
No. 1
,
G H
Drilling
Line
Make
Serial No
GENERAL,
.
4p.m.
LINER
)57
—
Sire
UM
10 p.m.
MODEL s.e.c.
ADDITIVE S ; ,— ,
N
8p.m.
E R
LIN
pH.
6p.m.
No. Lines
6p.m.
8p.m.
--
10p.m.
/ ,-
9
Tog Miles
'trMiles
0/'
i / C'
Oil
ange
-
3 At Feet
-5
'egrees
O'
4
.
Temp.
,
te
1s
Cut
Sli p°or Cut
.
Water
Weather
SE, ,
Bbls. N
Ft. Left
ext
/
onSp ool
) Tested
Tim.
Elops:d
P5
sure
Inspected Date
Hydril
Rig Savers Chk d.
Pipe Rams.
Kelly Cock Chk'd.
Blind Rams. , TOTCO RING ON BIT #
Crown-o.motic Chk d.
Boiler Operated:
Hrs.
Fire Equip. Chkd.
Fuel art Hand 12.01
a.m. 4i'
11
gal
. CASING REPORT
. gal .TO
tLtE
EQUIPMENT CHANGES RAN
iTS
f
S IG
$ URE
•
TRANSFER
CSG
gal
Fuel Recd Today ( add)
TOTAL Fuel on Hand 11.59 p.m. ( deduct)
FUEL USED
41
f
Id
SURVEYS
/
-
Slip
e. H.US
2
, Trips
M 1
Record
B.O.P.
-
PRES. IRIS-NONE No. 2 SURE SURE
MODEL s.e.c.
GEL
P.C.
4p.m.
-
KB. USED
SAX
gal
.pius
gal
. CEMENT RETURNS .(YES, NO)
.
CEM
PLUG DOWN
A. M. P.M. GENE
COAL ON HAND
.L: —
TONS
TOTAL COMPANY TIME
HRS.
TOTAL CONTRACTOR'S TIME
Approved by perotor's Representative Approved b Tool pusher ,, us er,,,, 1
o —
CONSERVATION
BOARD COPY
,.
CdM-
/.
1
14674
HRS.
COMMONWEALTH
DRILLING
CO.
DkRECTIONS TO WELL
T 0 U
Footage
No
R
Y1t. Drill Pipe cioOo lbs.)
Mrs. on, BoPlom
/
I
4
To
Stands
Type
Singles
No.
DRILL
I.D.
O.D.
COLLARS
I o
RPM
Wgt
0t lied or Cored
Mrs
Reamed
Pump No.
Mrs
P mp Pros s C
S.P. M.
!Ykr
a
STOP
6 IN
2O
.a MUD
I G H T
12
2a.m.
n.
4a.m.
PUMP
6a.m.
WEIGHT
2a.m.
l2mn.
No. 1
VISCOSITY
4a.m.
6a.m.
MODEL
n.
2a.m.
4a.m.
LINER
SIZE
1 2
SIZE
GENERAL
pH
4
ADDITIVES
5 Water
Weather
8
Temp.
A
Drillin g ri Lineng
M
Size
.
Make
No. Lines
Serial No.
From
Footage
To
Mrs. on Bottom
.
.
.
Trips
Tan Miles
..
Record
T
Total Miles
SIt.
..
Wt. On IPipe (1000 lbs.)
Stands
M
Type
8a.m.
U D
M
8
Size "
Jets/W.C.Serial No
10 m.
12 noon
VIS COSITY
1
M P
MODEL
GEL
o
W. L.
P.C.
4
A..ITIVES.
PH.
-
Cut
Singles
No.
O.D.
I.D.
Length
Air Wt.
M
R
8 am.
or Dr ill ed
10a.m. 12 noon
Hrs.
Reamed
2p.m.
PUMP
Hrs.
a.
ressure
.
10 G.m
12 noon
8 am.
______MODEL S
LINER
SIZE
SIZE
.1
T .0 U
No.
Size
Type
WI. Dri IPipe (1000 lbs.)
Mrs. on Bottom
Jets/W.C.
Serial No.
Wgt.
Stands
Sli
Singles
M
DRILL
Feet or
v
0.0.
1. D.
Bbls.
Date stl p or cut
At Miles
Cot
No.
R. P.M.
Hrs,
Reamed
Length
l •ut p
Air WI.
Sub. Wt.
Hrs.
To
S.P.M.
P re' sj're s
o.
t ee
U D
WEIGHT VISCOSITY
0
4p.m.
6p.m.
8p.m.
10 p. m.
PUMP
4p.m.
6 p.m.
8 p.ri.
10 p. m.
-
PUMP
4p.m.
6p.m.
10 p. m. MOTOR HOURS
8p.m.
No. 2 S.
==M= MODEL s.p.sr
MODEL s.r.u. ==M= 2
LIEU
LS INER IZE
_________________
SIZE
WI.
pH.
F.C.
t Cho
ge
ac y 4—
____
I
le
.-
W ea th er
.
Make
-
Serial No.
Line
Trips
Ton Miles
Total Miles
Sli
Feet or
.
-
Elapsed Time
Test ed
Pressure
Packing & Seat Inspected Date
Hydril
Cro w n . omat i c Chkd Rig Savers Chkd.
Pipe Rams.
Kelly Cock Chkd.
__________
Blind Rams. TOTCO RING ON BIT #
Bolter Operated:
Mrs.
Fire Equip Chk'd.
sli Do 0
At Miles
Cut
Fuel on Hand 12.01 a.m.
p or Cut
Bbls. Ft. Left on Spool
Next Slip
.
. gal
Fuel Recd Today ( add)
PR
Water
Temp. Size
.
3
5 -
B.O.P.
≤ /
G.
B.
GENERAL
_
ADDITIVES:
Drilling Line Record
Ft. up on Kelly
C.B. Fl.
___' •___p
-
Mmmm No. I
GEL
on Ft. 5Left1
T.
-
M
-
Water
Temp.
COLLARS __________________________________________
n wIl P
0
_________
-
-
Ton Miles
Trips
To
Footage
From
JOI
Serial No.
/
-
-.-... Make
—
-
RE
Next Oil
MOTOR HOURS
2p.m.
Weather
M Size
B
I N S SIG N
D
Ft. op on Kelly —
T
S PM
-
Drilling Lin: Record
C.B. Ft.
4
.r 4
-
Sub. WI.
EMM
LINER
-
It. left an Spool
_______
tei42I41i........I'
-
Nest Slip
..
DRILL COLLARS
S.M.
-
Bbls.
Dote Slip or Cut
.
At Miles
.
Wgt
P
2 p.m.
Feet or
-
o
No
f
l Nex Change
MOTOR HOURS
6a.m.
s.r.n.
LiNER
E FC
12
PUMP
MMMM No. 2 SU R
MODEL S.P.n.
W I
H T
START
________________________
T
196
/9
I IM E'
REM A R K S
T
N
D N
able
Torque
Y/RGE. _2 .4: w
J2IAlIlI
M I D
M
UV!I
TWP.
dir lt
DATE
Ft. UP Ort Kelly
C.B. Ft.
Sub. Wt.
.,
LSD.4.,.LSEC.
MILES MOVED
Air Wt.
Length
/
Serial No
Jets/W.C. C
/5
( QCL4 f?f4IL" '//(.. 4i..tA.'
LOCATION
SHIPPING POINT
.
Size
/
RLGNO.
MAILING POINT
From
.
F
DAILY DRILLING LOG
LTD.
. CASING REPORT
EQUIPMENT CHANGES RAN
iTS
DRILLERS SIGNATURE
.
TRANSFER
CSG
gal TOTAL
gal
Fuel on Hand 11.59 p.m. ( deduct) FUEL USED
TO
KB. USED
SAX PLUG DOWN
gal .
PLUS
gals.
CEMENT RETURNS - ) YES/ NO)
•••••• ••• •••••••••••••••••••• ,••• ••••• •••••••• ••••••• ••••••••• ••••••••••• •••• S.Si•i 0
J
CEM
A.M. P.M.
COAL ON HAND
GENERAL:—
TONS
TOTAL COMPANY TIME
MRS.
TOTAL CONTRACTOR'S TIME
MRS.
Approved by
00000
O perator ' s Representative
Approved by/
a........
•... ø•..*
....
••••••••••• ø•••_liøS••øiø_S•
S..a
'
Too1pusher
•* øss
0
CONSERVATION
BOARD
COPY
14675;
COMMONWEALTH DRILLING CO. LTD.
DAILY DRILLING LOG
DtIECTIONS TO WELL From
Footage
Hrs
To
T
on..
Vt. Drill Pipe (1000 lbs.)
Bottom
•á33i ,)
Stands
No.
Size
Type
Jets/W.C.
Serial No.
LOCATION
LSD.
-
SHIPPING POINT
Singles
Na.
DRILL
ID.
O.D.
Air WI.
Length
Sob. WI.
Ft. op on Kelly
C.B. Ft.
Wgt.
Dr il led
R.P.M.
Hrs.
Reamed
Pump
Hrs.
S.P.M.
Poe
T.
T Ree
1.t
'7 It..
T IM E
REM A R K S
START
STOP
INTVL
G
B.
,,jt / 2( 3 ?
1,c
-
S
N I G H T
MU
12mn.
2a.m.
6a.m.
4a.m.
PU M Na. 1
SURE
VISCOSITY
MODEL
Ste.
WI.
P.C.
2a.m.
12mn.
WEIGHT
GEL
.
4a.m.
UM
6a.m.
l2mn.
2a.m.
1 SURE
1
MODEL
s.p..s.
2
LINER
LINER
SIZE
SIZE
5,9reeI
At Feet
5 Water
Weather Temp. Si ze
Drilling Li
40 41
Ne
H.US
M.T.
6a.m.
No. 2
GENERAL
PH.
4a.m.
ADDITIVES,
M
J 'TWP.AGE (
I.,
DATE
-
MT
T
SEC.
'
MILES MOVED
COLLARS
-
B
7
RIG NO.
MAILING POINT
Serial No.
Make
.
No. Lines
.
.
Tr i ps
les Ton M i
Total M i les
Record From
Footage
To
Hrs. on
Wt. Dri
Bottom
(1000
Stands
Singles
Feel or
Slip
.
Bbls.
Date Slip or Cot
At M i le s
Cut
Next Slip
Ft. Left on Spool
0. D.
No ,
DRILL
lbs.)
I.D.
Length
Air Wt.
Sob. Wt.
C.B. Ft.
DREUERS SIGNA1UR.E
Ft. up on
COLLARS 6
No
B
Size
Type
Jets/W C
SerIal Na
Wgt
or Dr illed
RPM
Hr.
Reamed
H 5. Hrs
' No. ''
pesI''
T
Table T or qu e
5, P-M-
tr fib oO
B
I I
•
MU
M
8a.m.
10
In.
12 noon
PU M
2p.m.
WEIGHT
No. 1
VISCOSITY
MODEL
8a.m.
10a.m.
12 noon
2p.m.
ADDITIVES
M.T.
2p.m.
Na. 2SURE
1
MODEL
2
F.C.
GENERAL:
PH.
LINER -.
1J(
U
Sloe
. i
M a ke
Ser al
Line
Na.
.
TrIps
Ton MIles
WI. Dri IPipe (1000 lbs.)
Hr.. on Bottom
• No.
Size
Type
4p.m.
Jets/W.C.
6p.m.
Bp.m.
10 p.m.
Stands
Slip
or
R.P.M.
6p.In.
",...
Water
Drilled
Hrs,
or Core d
1.0.
Length
p. In.
Pum Na p
Pump Pressure
UM
4p.m.
6p.m.
8p.m.
10p.In. No.
T
VISCOSITY
MODEL
ste.
MODEL
2
Air
WI.
5
Sob. WI.
Table
P-M.
C.B. Ft.
10 p.m.
MOT. I
s.p.n.
2
LINER
LINER
SIZE
SIZE
T.
orque
JR5
t
H.US
Line
Ls
Record
. 4este.Eled
B.O.P.
Time
ju*,,
Jnspected
Trips
Ton Miles
SCOt
Crown-o-motic
Date
Hydril
Kelly Cock Chkd.
-
BIT #
Operated:
•
B ,
Boiler TOTCO RING ON
V'
Cf
.
4' £
•___ . r_,.
-
/ LE4JRE
G.
B.
7
Cehanog ei'
/. 4'ó
..
0
ç
I
Wales
Hrs.
Total Miles
Feel
Cut
Date
At Miles
<
Bbls. Next
Slip or Cut
'
Ft.
SUP
OC
Left
Spool t '91 5 •K•41E
Rig Savers Chk'd.
Pipe Rams. Blind Rams.
,&
&
Ft. up on Kelly
Temp.
T
4.
/a I
Degrees
G
Serial No.
'
.-,
-
Al Feet
Weather
Make
'
3'
5
Size
•
3
ADDITIVES
Drilling
.
SURVEYS
GENERAL: --
H
td;'
//o1S/
,,42
Ft. Let on Spool
#t Hrs.
PREs. SURE
PH.
O.D.
Reamed
No. 1
P.C.
Nest Slip
COLLARS
MU
WI.
ds
,
..
-
,.
WEIGHT
M
Date Slip or Cot
Al MIles
Cut
Na.
DRILL
•
GEL
4p.In.
\,.Singles
M
I
UM
'.,.j
3
Wgt.
Serial No.
—
.
SO
5
To
Footage
--
.
r
,,
Feet
Total MIles
Record From
, i-,.,
1/
f
Temp. No. Lines
7
eC.
76" F u eet
J
M
B
,
1ZI
Weather
T
s
1
nge
3
sic
-
•
Drilling
Next
H.US
_7?llc
SIZE
4
12 noon
'SURE
LINER
WI.
10a.m.
PRES.
S.P.R
GEL •
8a.m.
'UM
'
Chk
.
.
Fuel on Hand 12.01 a.m.
gal
Fuel Recd Today ( add)
gals. TOTAL
gals -
Fuel on Hand 11.59 p.m. ( deduct) FUEL USED
-
CASING REPORT
10
RAN
iTS
KB. USED
SAX
CSGEQUIPMENT
-
CHANGES
TRANSFER
CEM
-
PLUG DOWN
gals.
PLUS
gals.
CEMENT RETURNS
.(YES, NO)
A.M. P.M. GENE
COAL ON HAND
TONS
TOTAL
TIME
AL: —
CONTRACTORS TIME
HRS.
Approved by O perator's
-
Representative Approved by I
Too pusher
CONSERVATION
BOARD
COPY
7
-
-.
/9
COM-
14676
HRS.
COMMQNWEALTH DRILLING ' CO. LTD. UI N t.L IIONS IU WELL
DAILY DRILLING LOG ..
-
"r
lvi P.lI
RIG NO.
IIN a'
LOCATION anirril,
POINT
LSD..L...._ 11
/
Ll
'a
ill-
s
POINT
MOVED
1
1 f( /
DATE
I
From
Footage
Drill Pipe (1000 tbs.) ,
Hrg. ms I Bottom
To
Singles
Stands
1 Wt.
DRILL
-
1.0.
0. D.
No.
Sub. wt.I7 C.B. Ft. IAir WI. j
Length
Ft. upon Kelly
-
.-."/ -.
I IME
START
STOP
'
R E MA R KS
196
INTVL.
. COLLARS!
—
J
irrTmn•
1n
r—
i,
f/()
G
B
T
'l7I
Y'
19e
/ LI IJ
A!
ell
II
'T..
• -
N
N
LI 'oocL !
GEL W. L.
F.C.
t,)
'
PH.
ADDITIVES
T
GEN ERAL.
Size
Line
. Serial No.
Make
Record Footage.
MODEL
Sr
P
'
'-
N
7
Nex Ch a
[1hI.1
mN
N
At Feet
''
I I
".
nge
t-,, IL S ,
3'
ce
Degrees
Water
4eher
1
.
Temp Total Miles
Feet or
Slip
Dole Slip or Cut
.
At Miles
Cut
,,J
.
To
.
0.0.
No.
DRILL
I.D.
Length
Air WI.
Sub. Wt.
C.B. Ft.
Ft. UP on Kelly
COLLARS
,,
• No
B
Size '
Type
Jets/W.C.
Wgt
Serial No
i
.
Singles
Stands
WI. On IPipe (1000 tbs.)
H s. on Bottom
Drdore led 4
R PM
Mrs
Reamed
— P.
Mrs
P
Table
Pup
pT,e
5
PM
's Zoe
--
Bbls Ft. Left on Spool
Next Slip
•
. -
/ Al
3
P
,'
,-
,/ , ( Ton Miles
Trips
/
From
T
No. Lives
SURE
LINER SIZE
1/
/ .c Fr
D
N
SURVEYS
/i,/
/ 2
2
—'
IiPN
N
'
I
B
r
..
.
DRILLE'S - SI ,
Ill E -
/
0
7 %cr rylr Ii cV 7
,.zre
t2,
I
31,
.
Born,
MU'
A
WEIGHT
M
VISCOSITY
12 noon
UM'
2p.m.
8a.m.
•
No. 1
SURE
'-
MODEL
sr.,,-.-
.
LINER
T •
lOam.
GEL
10a.m. 12 noon
8a.m.
lOam.
12 noon
M.T.RH.U'S
2p.m.
No. 2
N
'
-
"
.
.
.
-SIZE
-
74
4
AtFeelegrees
5
,
M M a ke
N- Serial No,
Lines No
Tr
Ips
Ton Miles
Total
Miles
Slip
Recotd Line .
T .0 R
Footage
From
No
B
S ze
To
Type
'.
WI. Drill Pipe (1000 tbs.)
Hrs. on Bottom
Jets/W.C. C
Wgt
Serial No
Water
Ne t Slip "
-,
Singles
No.
DRILL
0.0.
1.0.
Length
Air Wt.
Sub. Wt.
M
WEIGHT
T
VISCOSITY
0
GEL
4p.m.
6p.m.
8p.m.
10 p.m.
PUMP No
1
RPM
OD
, d
on Spool,i7 •Uf!: . . II•ER S SIGNATURE C. B. Ft. Ft. up on • Kelly -'
l
Reamed
Mrs
Mrs
Io. '
pesTm Pup e
Table orque
S PM
I
I
Q
B
,-
4p.m.
6p.m.
8p.m.
10p.m.
"
PRE S-
PUMP No
nose
6p.m.
8p.m.
10 p.m.
/
/ /7
SURE
.
LINER
2
LINER S
/f_.•
3
IZE
SUR Fee t
GE NaALI ,
EYS Degrees
ADDITIVES
'''':-
:
.
.
Temp.
.
B 0
P
Hydril
Size
Serial Na
Make
Trips
Lin es
on
feet
Total Mil
Slip
Tested
-,
Pipe Rams.
e 0
Pres. sure
EIT OPS:d
:c?e
Rig Savers Chk d.
,
,.
"
Crown: mat,
Kelly Cock Chk'd
Blind Rams, TOTCO RING ON BIT #
Bailer Operated,
,
Mrs.
Fre Equip chk'd.
•
Fuel on Hand 12 01 a m
gal
I
•
••
-
.
-
'
,.
,
KB. USED
gals.
PLUS
gals.
CEMENT RETURNS . ( YES/NO)
.- -
SAX
-
009
I
PLUG DOWN
14
GENE
COAL ON HAND
1:— -
-
''
-
I
CONSERVATION
4,
TRANSFER #
CEM
A.M. P.M. U
* 000
__________
.
RE
CSG
-'
UUMM 9069
SSGN
-
iTS
-
1110
, 4;
EQUIPMENT CHANGES,/
TO
-
Fuel on Hand 11.59 p.m. ( deduct) FUEL USED
__
RAN
gals
-
P It
it.,,
,
Left on Spool
S lip
CASING REPORT
gals.
"
TOTAL
'
"8'i
r
Bbls.
u
-i
-
Fuel Rec'd Today ( add)
SIl0ot7Cut
At Mile
Cut
..
Water
Weather -
DrmIiI ,.g Line Record
Nex Oil Ch onge
MOTOR HOURS
(
/Z
PRES.
2
SIZE '
4p.m.
9-
1ii--•
r
MODEL S 0.
MODEL NrC ,.
,
,,
P
-
5
Left
5 MUD
T
Ft
COLLARS
.
P
H
I •
Bbts
Date Slip or Cut
At Miles
Cut
.
Stands
I
4
or
•eet
t
.
Temp Size
.
3
Weather
Drilling
,
2
'
GENERAL,
ADDITIVES,
r
L.
mm
-'
1
MODEL Spe. 'I LINER
1
Dxc
•.C.pH. F.
W. L.
'UM'
2p.m.
Next Oil Chan ge
-
BOARD
,
-
..
,
-
TOTAL COMPANY TIME
TOTAL CONTRACTOR'S TIME
'.
-
HRS.
•
I MRS.
Approved by O
perator's
Representative
-
--
-
.
-
TONS
,-
-
-
Approved b .
COPY
'
-
00
US
7
er
'-/
,,,
/
-
-, -
f
,
com114677
TOUR
REPORTS
Prepared
CAJtdD
/
WR 9 80.01
rqmao
By
ABANDONMENT REPORT CNW CAMAO
Sept.
Sept.
18,
19.
1986
1986
MIRU. rods. SIFN. D.C.
12-25-54-25 W4M
Hot oil with 150 bbls. POOH with pump and Displace hole with inhibited fresh water.
$ 1.125
Install BOPts. Pressure test to 14 MPa. POOH with tubing and set bridge plug at 1115.0 m K.B. Pressure test to 14 MPa. Held 15 mins. O.K. Dump 8 in cement. Cut casing, dump S sacks cement and weld on plate.
See instructions on reverse side.
*V
Energy Resources Conservation Board 640 Fifth Avenue SW Calgar% Alberta T2P 3G4
LI APPLICATION TO:
BABANDONAWELL
APPROVALTO:
El ABANDON A ZONE
Unicue Well Identifier Sc LS LIE
Well Name
CNW CAHAO 12-25-54-25 Log Markers
BSL.
QUARTZ
Depth (m) /
0 io Perf. Intervals (m)
1128.3-1132.0
TWP
RG
Casing Size (mm)
E
184
219.1
Inter Prod
Total Depth
1161.8
1199
114.3
PBTD
Program of Operations Set a bridge plug at
Pressure test to 14 MPa for 10 rnins.
3
Cap w18 m cement.
May Be Staged and -
-
Cement Plug
Interval (m)
1
To
2
To
3
To
4
To
5
To
6
To
8
Phone
J.
KNELLER
260-2900
Stage Felt Feel After 8 hours
Bottom of Pipe Set at (m)
Volume of Cement and Additives
Plug Felt— ( If logged, attach ogs) Depth (m)
Mass (daN)
=
Conditions for this program as described orf the reverse side are as follows:
3
In Yes
Was either condition 2 or 3 (described on reverse side) completea?
LI No
Reason for Abandonment It is no longer commercially productive of oil or gas.
and 8.
LI Testing and logging failed to disclose evidence of commercially recoverable
Abandon at surface as per
hydrocarbons.
Condition 3.
El It was necessary to abandon for safety or mechanical reasons.
Program Authorization YR
By
MO
DY
6O9l
On
T.
E.
Certification
COOK Nam e a ppL•
,,,••S
DEV.
nure
DEPT.
-
CALGARY
Office
Program Approval
rThe Licensee (Agent) hereby certifies that the abandonment was carried out for the reason ( s) indicated and in accordance with the program authorized by the ERCB as shown in the summary report.
LI The Licensee (Agent) hereby ceftifies that the program of operations will be carried out for the rson(s indicated. \J i
•'
• Drilling & Prod,iiction Superintendent
/ On By
Signature
Title
8— l0- 0l
CANADA NORTHWEST ENERGY LTD. ARY, AB.
- -
Da'e
t
ED-21 83-06
Time
Date
To
No(s)l
4
LI
ry Report of Abandbnrnent Program Followed
To 2
ERCB CODE USE
LI TEMPORARILY ABANDON A ZONE Company Representative
EDMONTON
0i0i0i9i2i
Plug No
Casing SFC
LISUSPEND DRILLING ERCB Area Office
Hole Size ( mm
KB
1
M
LI RESUME DRILLING
LIRE- ENTER AWELL Licence Number
112 2,5 0151 42i5 W4
Depth (m)
Data
LI PLUG BACK AWELL
See instructions on reverse side. Energy Resources Conservation Board 640 Fifth Avenue SW Calgary, Alberta T2P 3G4
Well Name
C1
El APPLICATION TO: Eli APPROVALTO:
UABANDON AZONE
Unique Well Identifier LE LS Sc
CAMO 12--25-54-25
Log Markers
$SL. OArTz
Depth ( m)
Licence Number TWP
1 pruor Perf. Intervals ( m)
1128.3-4132.0
ES
Size (mm)
Depth (m)
Hole
Size (mm
ERCB Authorized Abandonment Program Plug No
Casing SFC
184
Inter Prod
Total Depth
114.3
1161.8
1199
PBTD
Program of Operations 1
Set a bridge plug at
2
Pressure test to 14 MN for 10 tins. Cap v/8 M cercnt.
May Be Staged and
Cement Plug
Interval (m)
1
To
2
To
3
To
4
To
5
To
6
To
7
To
8
To
Company Representative
1,
3.
3.
Phone
Feel After 8 hours
KELLEI.
Volume of Cement and Additives
Bottom of Pipe Set at ( m)
Plug Felt— ( If logged, attach logs) Depth (m)
Mass (daN)
Was either condition 2 0r3 (described on reverse side) completed?
Abandon at surface as per
Time
Elves
No
Reason for Abandonment
hydrocarbons.
.
El It was necessary to abandon for safety or mechanical reasons.
Program Authorization M0,I
DY
I
I
I
E.
COO!(
YR
On By
T.
,.
Certification
Name (Typed)
Signature
DEV. DEPT.
--
Office
C&LGARY
El The Licensee (Agent) hereby certifies that the abandonment was carried out for the reason(s) indicated and in accordance with the program authorized by the ERCB as shown in the summary report.
El The Licensee (Agent) hereby certifies that the program of operations will be carried out for the reason ( s) indicated.
Program Approval
ED-21 83-06
Date
El It is no longer commercially productive of oil or gas. El Testing and logging failed to disclose evidence of commercially recoverable
and 3.
Condition J
\
EDGE CODE USE
Summary Report of Abandonment Program Followed
Stage Felt
Conditions for this program as described on the reverse side are as follows:
No.(s)
4
ERCB Area Office
El TEMPORARILYABANDON AZONE El
E..
EDMONTON
KB
3
M
LI RESUME DRILLING El SUSPEND DRILLING
UI Casing
Data
LI PLUG BACK AWELL LII RE-ENTER AWELL
ABANDON AWELL
On By
YR
MO
I
I
DY Signature
CANADA CqT.pBnyT'f
Title
O.TiVrT ENEIY LTE. AJ3.
Date
$EP
2
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Appendix IV: Historical Aerial Photographs
Prepared by: Arletta Environmental Consulting Corp.
February 2022
N
Approximate 100/12-25-054-25W4/00 lease location
Scale 1:4,000 DESCRIPTION Aerial Photograph ID: AS-817 This photograph was taken before the construction of the Image Date: 18-May-1962 100/12-25-054-25 W4/00 well site. The Site and surrounding area Source: Aerial Photo Record System primarily consist of undisturbed, and agricultural land. Surface Location: 12-25-054-25 W4M Project #: RB.75.03 Date: September 2021 Client: Ridgeback Resources Inc.
N
Approximate 100/12-25-054-25W4/00 lease location
Scale 1:4.300 DESCRIPTION Aerial Photograph ID: AS 978 This photograph was taken after the construction of the Image Date: 22-Jul-1967 100/12-25-054-25 W4/00 well site. Infrastructure is visible and Source: Aerial Photo Record System the access road enters the Site from the north. The surrounding Surface Location: 12-25-054-25 W4M area is primarily agriucultural. A developed area can be seen Project #: RB.75.03 Date: September 2021 northwest of the Site. Client: Ridgeback Resources Inc.
N
Approximate 100/12-25-054-25W4/00 lease location
Scale 1:4,350 DESCRIPTION Aerial Photograph ID: AS-1366 This photograph was taken during the production stage of Image Date: 09-Oct-1974 the 100/12-25-054-25 W4/00 well site. The surrounding area appears Source: Aerial Photo Record System similar to the 1967 photograph with greater agricultural development Surface Location: 12-25-054-25 W4M to the north of the Site Project #: RB.75.03 Date: September 2021 Client: Ridgeback Resources Inc.
N
Approximate 100/12-25-054-25W4/00 lease location
Scale 1:4,300 DESCRIPTION Aerial Photograph ID: 83-311 This photograph was taken during the production stage and Image Date: 30-Sep-1983 pre-abandonment of the 100/12-25-054-25 W4/00 well site. Source: Aerial Photo Record System Infrastructure is visible on site. The surrounding area appears to have Surface Location: 12-25-054-25 W4M greater agricultural activity and changes to the roadways. A new Project #: RB.75.03 Date: September 2021 Client: Ridgeback Resources Inc. developed area can be seen to the southwest of the Site.
N
Approximate 100/12-25-054-25W4/00 lease location
Scale 1:5,470 DESCRIPTION Aerial Photograph ID: AS 3607-150 This photograph was taken after the abandonment of Image Date: 24-Jul-1987 the 100/12-25-054-25 W4/00 well site. Less infrastructure is Source: Aerial Photo Record System visible on Site. The surrounding area appears similar to the 1983 Surface Location: 12-25-054-25 W4M photograph with greater development southwest of the Site. Project #: RB.75.03 Date: September 2021 Client: Ridgeback Resources Inc.
N
Approximate 100/12-25-054-25W4/00 lease location
Scale 1:4,200 DESCRIPTION Aerial Photograph ID: N/A This photograph was taken after the abandonment of the Image Date: 24-May-2021 100/12-25-054-25 W4/00 well site. No infrastructure is visible on Site. Source: Google Earth Roadways surrounding the Site have been removed and modified. Surface Location: 12-25-054-25 W4M The surrounding area appears to consist of residential subdivisions Project #: RB.75.03 Date: September 2021 Client: Ridgeback Resources Inc. and agricultural land.
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Appendix V: Site Visit Photographs
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Photograph 1: November 2, 2021; Looking east from the well centre.
Photograph 2: November 2, 2021; Looking north from the well centre.
Prepared by: Arletta Environmental Consulting Corp.
November 2021
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Photograph 3: November 2, 2021; View of the row spacing at well centre.
Photograph 4: November 2, 2021; View of the row spacing off site.
Prepared by: Arletta Environmental Consulting Corp.
November 2021
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Photograph 5: November 2, 2021; Looking south from the well centre.
Photograph 6: November 2, 2021; Looking south towards the well centre from the access road.
Prepared by: Arletta Environmental Consulting Corp.
November 2021
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Photograph 7: November 2, 2021; View of the vegetation stress at the well centre.
Photograph 8: November 2, 2021; Looking west from the well centre.
Prepared by: Arletta Environmental Consulting Corp.
November 2021
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Photograph 9: November 2, 2021; Looking west down the access road.
Prepared by: Arletta Environmental Consulting Corp.
November 2021
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Appendix VI: Interviews
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Phase 1 Environmental Site Assessment Landowner Interview Well/Facility Name: 100/12-25-054-25 W4/00
Surface Location: 12-25-054-25 W4M
Landowner: Ed Basaraba (Pinnacorp Investments Inc.) (780-448-4000) Interviewed by: Arletta
Date: 2011/11/30 Called, line was busy
•
How long have you lived on or near this property? 19 years as the realtor for it.
•
Did you live at your current residence when the lease and well/battery/facility/etc in question were constructed and drilled? Drilled before their ownership o
•
If so, do you know of any pits that were used for fluid storage when the site was drilled? None
What do you remember about the history/layout/ownership of the site? Does not know
•
Do you remember/know of tanks or pits present or formerly present on site? Yes, there were many but does not remember specifics.
•
Do you remember/know of any spills that have occurred as a result of production operations? Do not know.
•
Do you have any environmental concerns related to past or present operations on your property, relating to the specific well/battery/facility/etc in question? No
•
Have you noticed poor crop or other poor vegetation growth on your property? Ask farmer
•
Are you aware of any environmental remediation work performed work on the site in question?
PHONE 403.991.1879
o
If so what year did this happen? About 8 years ago
o
What type of work was done? Reclaimed the site.
o
Do you know who may have performed the work (company/consultant)? Does not remember.
1900, 700 – 2ND STREET SW CALGARY, AB T2P 2W2
WWW.ARLETTA.CA
•
Are there any other comments/concerns you have about the property?
New occupant is: Lorne Okerman (780-719-9990)
PHONE 403.991.1879
1900, 700 – 2ND STREET SW CALGARY, AB T2P 2W2
WWW.ARLETTA.CA
Phase 1 Environmental Site Assessment Landowner Interview Well/Facility Name: 100/12-25-054-25 W4/00
Surface Location: 12-25-054-25 W4M
Landowner: Lorne Okerman (Occupant; 780-719-9990) Interviewed by: Arletta
Date: 2021/12/01 CALL AT 10:15
•
How long have you lived on or near this property? 6 years – 7 years.
•
Did you live at your current residence when the lease and well/battery/facility/etc in question were constructed and drilled? Do not live on the lease, farm it but live north and east of it about ¾ of a mile. o
•
If so, do you know of any pits that were used for fluid storage when the site was drilled?
What do you remember about the history/layout/ownership of the site? Canada northwest (original), Oakland Petroleum (Drill), Regco Petroleum.
•
Do you remember/know of tanks or pits present or formerly present on site? No tanks, just wellhead and pumpjack. Pipelines running to a southern battery.
•
Do you remember/know of any spills that have occurred as a result of production operations? None that he knows of.
•
Do you have any environmental concerns related to past or present operations on your property, relating to the specific well/battery/facility/etc in question? Did some work 5-6 years ago, reclamation, moved dirt and filled back in. Sometimes he gets bits and pieces of a gasket coming up occasionally.
•
Have you noticed poor crop or other poor vegetation growth on your property? Not noticed. Varied just based on low ground, high ground.
•
•
Are you aware of any environmental remediation work performed work on the site in question? o
If so what year did this happen? About 10 years ago
o
What type of work was done? Regraded and removed all the oil well infrastructure.
o
Do you know who may have performed the work (company/consultant)? Unknown
Are there any other comments/concerns you have about the property?
Access has changed from original surveyed access about 30 years ago.
PHONE 403.991.1879
1900, 700 – 2ND STREET SW CALGARY, AB T2P 2W2
WWW.ARLETTA.CA
Phase 1 Environmental Site Assessment Operator Interview Well/Facility Name: 100/12-25-054-25W4/00
Surface Location: 12-25-054-25 W4M
Operator: Terry Willoughby Interviewed by: Arletta
Date: November 29, 2021
•
How long have you been the operator of this well/facility? Recent
•
Were you the operator when the lease and well/battery/facility/etc in question were constructed and drilled? No o
•
If so, do you know of any pits that were used for fluid storage when the site was drilled?
What do you remember about the history/layout/ownership of the site? Do not know
•
Do you remember/know of tanks or pits present or formerly present on site? Do not know
•
Do you remember/know of any spills that have occurred as a result of production operations? Do not know
•
Do you have any environmental concerns related to past or present operations on this site, relating to the specific well/battery/facility/etc in question? Do not know
•
Have you noticed poor crop or other poor vegetation growth on this site? Do not know
•
•
Are you aware of any environmental remediation work performed work on the site in question? o
If so what year did this happen? N/A
o
What type of work was done? N/a
o
Do you know who may have performed the work (company/consultant)? N/A
Are there any other comments/concerns you have about the site?
PHONE 403.991.1879
1900, 700 – 2ND STREET SW CALGARY, AB T2P 2W2
WWW.ARLETTA.CA
Ridgeback Resources Inc. RB.75.03
Phase 1 Environmental Site Assessment 12-25-054-25 W4 (100)
Appendix VII: Government of Alberta Professional Declaration for Reclamation Certificate Applications
Prepared by: Arletta Environmental Consulting Corp.
February 2022
Professional Declaration for Reclamation Certificate Applications Submit one Declaration for each report
1
This Declaration is made in conjunction with an application for a reclamation certificate (the"Application") made by Ridgeback Resources Inc.
(Applicant)
for the following land(s): 12-25-054-25 W4M 2
(insert legal description).
I am a practicing professional member [Registration/member number] 8954 of the Alberta Institute of Agrologists which is a regulated professional organization (the "Professional Organization"). I have a minimum of five years verifiable experience in remediation or reclamation relevant to the Competencies Table contained in the Competencies for Remediation and Reclamation Advisory Committee's Recommendations Report (ESRD 2006).
3
As a member of the Professional Organization, I have the ability to sign off on work required for reclamation certificate applications as defined by the Alberta Energy Regulator and am authorized by the Applicant to prepare and submit the attached report or document, (the "Professional Report") listed below.
4
To the best of my knowledge and the best of my professional ability, recognizing the standard of care expected of a reasonable professional doing this work, it is my professional opinion that all the information contained in the Professional Report is accurate and complete, and contains all the relevant information for the purposes of this Application.
5
The results reported in the Professional Report are consistent with all current and applicable Provincial policy, criteria, standards and guidelines for the remediation or reclamation.
6
The Professional Report, including all attachments, data and supplemental information, were prepared by me, or under my direct supervision, or was prepared by a third party(ies) and has been reviewed and accepted by me; and was prepared in accordance with an appropriate quality assurance/quality control system that ensured qualified personnel properly gathered and evaluated all the information contained in and underlying the Professional Reports. All the information submitted is, to the best of my knowledge, true, accurate and complete.
7
I carry, or my employer: Arletta Environmental Consulting Corp. (insert legal name of employer)
carries professional liability insurance (errors and omissions). This insurance will be maintained for the specified liability period, subject to insurance availability. March 2014
Version 3.0
8
I am aware that it is an offence under section 227 of the Environmental Protection and Enhancement Act to provide false, misleading or inaccurate information and that there are significant fines for committing these offences, including the possibility of imprisonment. See below for the relevant sections.
Report Title:
Phase 1 Environmental Site Assessment 100/12-25-054-25 W4/00 Licence Number: 0030923
Date:
Feb 23, 2022
Name:
Jennifer Carscallen Note: If you wish to sign the form with an electronic signature you are bound with the same force as though you had a fixed signature on paper.
Signature:
Registration/Member number:
8954
Section 227 of the Environmental Protection and Enhancement Act Offences
s. 227 A person who
(a) knowingly provides false or misleading information pursuant to a requirement under this Act to provide information, (b) provides false or misleading information pursuant to a requirement under this Act to provide information is guilty of an offence. Penalties is liable to
s. 228(1) A person who commits an offence referred to in section 60, 87, 108(1), 109(1) or 227(a), (d), (f) or (h)
(a) in the case of an individual, to a fine or not more than $100 000 or to imprisonment for a period of not more than 2 years or to both fine and imprisonment, or (b) in the case of a corporation, to a fine of not more than $1 000 000. (2) A person who commits an offence referred to in section 61, 67, 75, 76, 79, 88, 108(2), 109(2) 110(1) or (2), 111, 112, 137, 148, 149, 155, 157, 163, 169, 170, 173, 176, 188, 191, 192, 209, 227(b), (c), (e), (g), or (i) or 251 is liable. (a) in the case of an individual, to a fine or not more than $50 000, or (b) in the case of a corporation, to a fine of not more than $500 000.