Draft Report
Pinnacle Village Outline Plan Transportation Impact Assessment Prepared for Pinnacle Investments Inc. By Arcadis
May 23, 2025
ARCADIS IBI GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Document Control Page CLIENT:
Pinnacle Investments Inc.
PROJECT NAME:
Pinnacle Village
REPORT TITLE:
Transportation Impact Assessment
ARCADIS IBI REFERENCE:
133341
VERSION:
6.0
DIGITAL MASTER: ORIGINATOR:
Nabila Haue, Ivan Dorcic, Shaun Lorincz
REVIEWER:
Ainsley Brown
AUTHORIZATION: CIRCULATION LIST:
HISTORY:
1.0 Draft report – February 13, 2023 Initial draft 2.0 Draft report – March 8, 2023 Amended for Planning comments 3.0 Draft Report – July 15, 2024 Amended for County Comments 4.0 Draft Report – November 21, 2024 Amended for County Comments 5.0 Draft Report – April 2, 2025 Amended for County Comments 6.0 Draft Report – May 23, 2025 Amended for County Comments
ARCADIS IBI GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Table of Contents 1 1
2 3
4
5
6
Executive Summary ................................................................................................. 1 Introduction and Proposed Development ............................................................. 2 1.1 Background ................................................................................................... 2 1.2 Study Scope and Proposed Development .................................................... 2 Access Management, Highway and Municipal Plans .......................................... 5 Existing Infrastructure Conditions ........................................................................ 5 3.1 Existing Roadway Network ........................................................................... 5 3.2 Existing Intersection Configurations ............................................................. 7 Traffic Conditions .................................................................................................. 10 4.1 Background Traffic ...................................................................................... 10 4.2 Traffic Generated by Other Developments ................................................. 13 4.3 Total Background Traffic ............................... Error! Bookmark not defined. 4.4 Site Generated Traffic ................................................................................. 22 4.5 Combined Traffic ......................................................................................... 28 Analysis .................................................................................................................. 34 5.1 Intersection Capacity Analysis .................................................................... 34 5.2 Intersection Treatment Warrants ................................................................ 37 5.3 Design Considerations ................................................................................ 41 5.4 Traffic Control Needs .................................................................................. 42 5.5 Illumination Warrant Analysis...................................................................... 43 5.6 Design Vehicle Accommodation ................................................................. 43 5.7 Site Access Review .................................................................................... 43 5.8 Sightlines..................................................................................................... 44 5.9 Emergency Access ..................................................................................... 44 5.10 Active Transportation Review ..................................................................... 44 Conclusions and Recommendations .................................................................. 46
Appendices Appendix A: Traffic Counts Appendix B: Intersection Analysis – Synchro Appendix C: Intersection Analysis – Sidra Appendix D: Intersection Treatment Warrants Appendix E: Signal Warrant Calculation Appendix F: Illumination Warrant
i
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
1
Executive Summary
The proposed development Pinnacle Village proposed at parcel legal description Lot 1, Block 1, Plan 182 1685 in Sturgeon County, Alberta. The proposed residential development is in the northeast quadrant of the intersection at Starkey Road & Trestle Ridge Road. The subject site is currently undeveloped and is intended for future residential development with a total area of approximately 13.88ha. The proposed development may be developed in phases, however the full development was the focus of the analysis. The traffic associated with the proposed residential development Pinnacle Village can be accommodated on the surrounding roadway network. The study intersections on Starkey Road, at East Estate Way / Trestle Ridge Road and Bellerose Drive / Pinnacle Way are able to accommodate the proposed traffic. The access to the proposed development will align with Pinnacle Way south of the subject parcel. To accommodate the additional traffic generated by the Pinnacle Village development, it is recommended that the intersection be improved to a Type IIIc intersection configuration.
1
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
1
Introduction and Proposed Development
1.1
Background
Arcadis IBI Group was retained by Pinnacle Investments Inc. to undertake a Traffic Impact Assessment (TIA) in support of the Pinnacle Village Outline Plan (OP) for a proposed residential development on the north side of Trestle Ridge Road directly east of Starkey Road. An OP is required as the proposed development area falls within the Valley Core Reserve in the Sturgeon Valley Area Structure Plan (ASP).
1.2
Study Scope and Proposed Development
1.2.1
Study Scope
The primary objectives of the TIA are to: •
Identify the transportation network relevant to the subject site;
•
Estimate the additional traffic associated with the proposed residential development; and
•
Address the potential for off-site traffic impacts.
1.2.2
Proposed Development
The proposed development is located in Sturgeon County, Alberta at parcel legal description Lot 1, Block 1, Plan 182 1685. The proposed residential development is located in the northeast quadrant of the Starkey Road & Trestle Ridge Road intersection as illustrated in Figure 1-1. The figure below also illustrates the existing roadways within the study area. Pinnacle Village outline plan location is also illustrated in Figure 1-2.
Figure 1-1: Context Plan
2
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 1-2: Pinnacle Village Outline Plan The subject site is currently undeveloped and is intended for future residential development with a total area of approximately 13.88ha. As shown in Figure 1-3, the proposed development includes proposed phases. The development will include construction of 144 lots.
3
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 1-3: Proposed Development The raised median is being proposed at the site entrance road, along with sidewalks at both side of the roadway. Conceptual design of the main entrance road is illustrated in Figure 1-4.
Figure 1-4: Proposed Development Entrance Road The area south of Pinnacle Village contains the residential subdivision of Pinnacle Ridge. The area to the west contains the residential subdivisions of Upper Manor Pointe and The Banks. The areas to the north and east of the plan area are predominantly agricultural with associated farm buildings.
4
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
2
Access Management, Highway and Municipal Plans
The access to the proposed development will align with Pinnacle Way south of the subject parcel, identified by a red triangle in Figure 1-1. The proposed development meets the intent of the Edmonton Metropolitan Regional Growth Plan (EMRGP) and the Sturgeon County Municipal Development Plan. Based on the Sturgeon County Municipal Development Plan Trestle Ridge Road may be extended in the future and turn south providing a new connection to Township Road 543A via Range Road 245. Timing for the extension is unknown. Alberta Transportation Roadside Management Classification Map identifies the future functional classification for Highway 37 as rural arterial divided (RAD).
3
Existing Infrastructure Conditions
3.1
Existing Roadway Network
The existing roadway network adjacent to the subject site includes the following roadways: Highway 37 Alberta Transportation classifies Highway 37 as a Level 2 Arterial which is intended to accommodate the movement of people, and goods and services at an intra-provincial level. Access to this level of arterial road is restricted to connections with the National Highway System and collector roads. Within the vicinity of Range Road 251, Highway 37 has a 3-lane rural crosssection with two westbound lanes and one eastbound lane. The posted speed limit is 70km/h. Two streetlights are present on the north and south sides at the intersection with Range Road 251. Starkey Road / Range Road 251 Starkey Road / Range Road 251 is a 2-lane north-south collector with a posted speed limit of 70km/h which extends for approximately 4.6km between Highway 37 and Sturgeon Road. The existing roadway cross-section is approximately 7.0m wide with 1.5m paved shoulders. Starkey Road crosses the Sturgeon River approximately 320m south of the intersection with Bellerose Drive / Pinnacle Way. There is an existing crest in the roadway between East Estate Way / Trestle Ridge Road and Bellerose Drive / Pinnacle Way, as well as north of the Sturgeon River crossing. The posted speed limit is 70km/h. A shared use path (SUP) is located on the west side of the corridor, extending approximately 125m north and 560m south of East Estates Way. A mid-block crossing of the SUP is located approximately 170m north of Bellerose Drive. A concrete median is present on Starkey Road at the intersection with Sturgeon Road. Trestle Ridge Road Directly south of the subject site, Trestle Ridge Road is an east-west 2-lane rural collector with a posted speed limit of 60km/h which extends east from Range Road 251. The existing roadway cross-section is approximately 7.0m wide with 1.0m paved shoulders. There do not appear to be any significant grade changes along the existing road profile.
5
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
There are four side street connections from the south to Trestle Ridge Road: Pinnacle Way, Riverridge Rd, Riverstone Dr W and Riverstone Drive E. At its eastern limits, Trestle Ridge Road turns north becoming the north-south Range Road 250 which dead ends at Trestle Ridge Place. Other then Pinnacle Way, there are no other through road connections. At its intersection with Range Road 251, a streetlight is present on the northeast corner, an existing Canada Post Mailbox is located on the southeast corner, and utility pedestals are located on both the northeast and southeast corners. East Estates Way Extending west of Range Road 251, opposite of Trestle Ridge Road, East Estates Way is an east-west 2-lane rural collector with a posted speed limit of 40km/hr. The existing roadway cross-section is approximately 7.0m wide and there do not appear to be any significant grade changes within close proximity to its subject intersection with Range Road 251. East Estates Way has two connections to Bellerose Drive via Villa Drive and River Lane, and two connections to Township Road 544 via Estate Way West and Estate Way Drive. Two large entrance features are located on the north and south side of the corridor west of Range Road 251. Bellerose Drive Starting at Starkey Road / Range Road 251, this existing 2-lane rural collector with a posted speed limit of 70km/h extends southwest into the City of St. Albert. The existing roadway crosssection is approximately 7.5m wide with 1.0m wide paved shoulders. The road profile falls away from the Starkey Road / Range Road 251 intersection. Streetlights are present on the northwest and southwest corners of its intersection with Starkey Road / Range Road 251. A north-south mid-block SUP crossing is located approximately 290m west of Starkey Road / Range Road 251. Pinnacle Way Extending east of Starkey Road / Range Road 251, opposite Bellerose Drive, Pinnacle Way is a 2-lane urban local subdivision roadway with a posted speed limit of 40km/h. A 30m landscaped median with street lighting is located at its intersection with Starkey Road / Range Road 251. The typical cross-section has roughly a 9.0m wide road platform. Two large entrance features are located on the north and south side of the corridor east of Starkey Road / Range Road 251. Pinnacle Way turns to the north and connects to Trestle Ridge Road. Sturgeon Road Sturgeon Road is a 2-lane east-west rural arterial roadway with a posted speed limit of 70km/h. The corridor has an approximate roadway cross-section of 7.5m with 1.2m wide paved shoulders. Partial urbanization is present at its intersection with Starkey Road, otherwise the roadway has a rural cross-section. Street lighting is present on the approaches to the intersection with Starkey Road.
6
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
3.2
Existing Intersection Configurations
Intersection configurations within proximity to the subject site are as follows are shown in Figure 3-2.
Figure 3-2: Subject Intersections
3.2.1
Range Road 251 and East Estate Way / Trestle Ridge Road
Stop Control on East Estate Way / Trestle Ridge Road. The existing intersection appears to have a Type IVc configuration as per Alberta Transportation HGDG. o
Eastbound (East Estate Way) – one shared left / through / right lane
o
Westbound (Trestle Ridge Road) – one left turn / through / right turn lane, although while there are no defined turn lanes the single approach lane widens from 3.5m to 6.6m over approximately 120m. For the purposes of analysis, a left turn bay was modeled to represent the current use.
o
Northbound (Range Road 251) – one left turn lane (130m taper, 105m storage), one shared through / right lane
7
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
o
3.2.2
Southbound (Range Road 251) – one shared left / through lane, one shared right turn lane (75m taper, 55m storage)
Range Road 251 / Starkey Road and Bellerose Drive / Pinnacle Way
Stop Control on Bellerose Drive / Pinnacle Way, located approximately 710m south of East Estate Way / Trestle Ridge Road. Sight lines are minimal for vehicles on East Estates Way approaching Range Road 251 and users of the SUP along the west side of Range Road 251. The existing intersection appears to have a Type IVb configuration as per Alberta Transportation HGDG. o
Eastbound (Bellerose Drive) – one shared left turn / through lane, one right turn lane (50m taper, 100m storage)
o
Westbound (Pinnacle Way) – one shared left turn / through / right turn lane (while there are no defined turn lanes the approach single lane widens from 4.5m to 7.0m over approximately 30m). For the purpose of the analysis, it was assumed a left turn lane with 30 m storage and a shared through and right turn lane.
o
Northbound (Starkey Road) – one left turn lane (130m taper, 105m storage), one shared through / right turn lane
o
Southbound (Range Road 251) – one shared left turn / through lane, one right turn taper (80m)
8
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
3.2.3
Trestle Ridge Road and Pinnacle Way
‘T’ intersection with stop control on Pinnacle Way, located approximately 310m east of Range Road 251. There are no existing turn lanes present and the intersection geometry appears to follow Alberta Transportation Geometric Design Guide (HGDG) Type Ia configuration.
3.2.4
Highway 37 and Range Road 251
Stop Control on Range Road 251, located approximately 2.6km north of East Estate Way / Trestle Ridge Road. The existing intersection appears to have a Type IVc configuration as per Alberta Transportation HGDG.
3.2.5
o
Eastbound (Highway 37) – one shared left turn / through lane, one right turn lane (130m taper, 95m storage)
o
Westbound (Highway 37) – one left turn lane (200m taper, 110m storage), one through lane, one shared through / right turn lane
o
Northbound (Range Road 251) – one shared left turn / through lane, one right turn lane (10 m storage)
o
Southbound (Range Road 251) – one shared left turn / through lane, one right turn lane (10 m storage)
Sturgeon Road and Starkey Road
Single lane roundabout located approximately 240m south of Bristol Way.
9
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
4
Traffic Conditions
4.1
Background Traffic
4.1.1
Existing Background Traffic
12-hour traffic counts were conducted in 2022 at the intersections of Range Road 251 and East Estate Way / Trestle Ridge Road, Range Road 251 / Starkey Road and Bellerose Drive / Pinnacle Way, and Sturgeon Road and Starkey Road. The traffic counts data were collected from 7 am to 7 pm on: •
Wednesday, October 5, 2022, at Range Road 251 and East Estate Way / Trestle Ridge Road intersection;
•
Tuesday, October 4, 2022, at Range Road 251 / Starkey Road and Bellerose Drive / Pinnacle Way intersection; and
•
Thursday, September 29, 2022, at Sturgeon Road and Starkey Road intersection.
A historical traffic count for the intersection of Highway 37 and Range Road 251 (2021) was obtained from Alberta Transportation. The traffic counts have been provided in Appendix A. Due to the low volume of site-generated traffic that is anticipated to use Highway 37, it is not expected that site-generated traffic will have a significant impact to the Highway 37 & Range Road 251 intersection. This early assumption has been reviewed as part of the intersection analysis. The existing traffic volumes have been balanced between the subject intersections and are illustrated in Figures 4-1 and 4-2.
10
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-1: Background Traffic Volumes (Daily)
11
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-2: Background Traffic Volumes (AM/PM)
12
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
4.1.2
Projected Background Traffic
It is anticipated (for the purposes of this study) that Phase 1 of the proposed development will open in 2025 and Phase 2 in 2026 or later. As such, project background traffic volumes were developed for 2025 commencement, 2035 and 2045. For the analysis conducted in Sturgeon County Transportation Master Plan (September 2023) a 2.0% linear traffic growth rate was applied to the highways, to determine forecasted traffic volumes. The analysis in this report follows a same approach. A compounding 2% growth rate was applied to regional traffic, including traffic along Starkey Road/Range Road 251, Bellerose Drive, and Sturgeon Road. In addition, as per the County’s request, the 2% growth rate was applied to Estates Way, Trestle Ridge Road, and Pinnacle Way to account for any additional growth within the developing areas. There aren’t planning documents identifying the proposed development northeast of Pinnacle Ridge. When plans are developed, additional traffic analysis, particularly for the Trestle Ridge Road corridor, will be required. Updated since the previous report, the AADT numbers are now based on Vistro traffic numbers and reflect more accurate results, which are less then the previous report. It is noted that that the AADT by the 2035 background becomes slightly over 10,000 AADT along Starkey Road and increases in the future years. The capacity for two lane collector roads is generally less then 10,000 AADT based on the Sturgeon County General Municipal Servicing Standard (GMSS). Based on the GMSS, the roads would have higher demand then capacity. Based on the Sturgeon County Master Plan, there are plans to expand Starkey Road to a four-lane arterial road between Coal Mine Road and Bellerose Drive. The expanded road should have enough capacity to account for the additional traffic.
4.2
Traffic Generated by Other Developments
Starkey Hills is a proposed development located on the south-west corner for the Range Road 251 and Township Road 544D/Township Road 545A intersection. Two accesses are proposed as part of this development as follows: •
A new access intersection will be provided on Range Road 251 approximately 490m north of the East Estates Way / Trestle Ridge Road intersection in 2025, and
•
By 2035, a second access intersection will be provided on Township Road 544D approximately 670m west of Range Road 251.
13
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figures 4-9 and 4-10 below were provided by D&A Paulichuk Consulting Ltd. and identify the anticipated daily and peak hour trip generation for the proposed development for 2025, 2035, and 2045.
Figure 4-3: Starkey Hills 2025 Trip Generation
14
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-4: Starkey Hills 2035 & 2045 Trip Generation
4.3
Total Background Traffic
The background traffic escalated from current traffic counts, and the traffic generated by the Starkey Hills development were combined to develop total background traffic volumes. The forecasted traffic data are provided in Figures 4-3 to 4-8.
15
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-5: 2025 Background Traffic Volumes (Daily)
16
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-6: 2025 Background Traffic Volumes (AM/PM)
17
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-7: 2035 Background Traffic Volumes (Daily)
18
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-8: 2035 Background Traffic Volumes (AM/PM)
19
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-9: 2045 Background Traffic Volumes (Daily)
20
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-10: 2045 Background Traffic Volumes (AM/PM)
21
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
4.4
Site Generated Traffic
The proposed development will introduce a fourth leg, Pinnacle Village, to the existing ‘T’ intersection of Trestle Ridge Road and Pinnacle Way. In accordance with 2021 ASP Traffic Review by Bunt and Associates, 9.44 two-way trips per unit were used to calculate the daily traffic generation of the proposed development. As per the County’s request, this rate was increased by 27% to 12 two-way trips per unit to account for additional site traffic. Table 4-1 summarizes the trip generation for each phase of the proposed development. Table 4-1: Trip Generation Rates
Phase
Commencement
Units
Phase 1
2025
Phase 2
2026+
Total Daily Trips 1560
14
12.00
168
144
Total 1
130
Daily Trip Generation Rate (t/du)1 12.00
1728
From 2021 Bunt and Associates ASP Traffic Review and increased by 27% as per the County’s request
Table 4-2 summarizes the projected two-way AM peak hour and PM peak hour vehicle trips generated by the proposed development, using the trip generation rates from the Institute of Transportation Engineers (ITE) Trip Generation Manual, 11th Edition (2021) publication. However, as per the County’s request, these rates were increased by 27% to account for additional site traffic. Table 4-2:Trip Generation Table Phase
Vehicle Trip Generation Rates2
Units
AM Peak
Total Generated Trips
PM Peak
AM Peak
PM Peak
AM Peak (t/du)
% IN
% OUT
PM Peak (t/du)
% IN
% OUT
In
Out
In
Out
Ph 1
130
0.89
25%
75%
1.19
63%
37%
29
87
98
57
Ph 2
14
0.89
25%
75%
1.19
63%
37%
3
9
11
6
Total
144
32
96
109
63
2
Trip Generation Rates based on the trip rates from the ITE Trip Generation Manual, 11th Edition and increased by 27% as per the County’s request Note: Any apparent discrepancies in the subtotals are due to numbers rounding
The projected traffic generated by the proposed site was distributed and assigned to the site access and the roadway network, primarily based on the directional distribution of the existing traffic volumes as well as taking account of trips as per the Starky Hills development, as illustrated in Figure 4-11. A portion of the of the traffic from the proposed development has been allocated to the future extension of Coal Mine Road to Starkey Road, as shown in the County’s Transportation Master Plan. The extension is planned as a four-lane arterial with a connection to Neil Ross Road.
22
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-11: Trip Distributions
It is anticipated that the majority of site generated traffic will travel south along Starkey Road. 43% of traffic generated from the proposed development will travel westerly towards St. Albert via Coal Mine Road (11%), Bellerose Drive (14%) and Sturgeon Road (18%). It's expected that 40% of traffic will travel to the east on Sturgeon Road to make connections to north-south Highway 28 or Anthony Henday Drive. 17% of traffic from the proposed development is anticipated to travel north towards Highway 37, where the majority will go east. Figures 4-12 to 4-15 summarize distribution of the site generated daily and peak hour traffic volumes. The County has noted there is an existing condition of additional traffic going southbound on Pinnacle Way to Bellerose Drive and an expectation the site traffic could compound the issue. The traffic was modelled to account for traffic for the most conservative route - taking Starkey Road. There is the potential that some traffic will take Pinnacle Way southbound, which will disperse traffic further than as assumed. Should there be qualitative issues experienced by residents, potential improvements could include traffic calming enhancements. Such enhancements would not be resultant from quantitative traffic concerns introduced by the development.
23
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-12: 2025 Phase 1 Site Generate Traffic Volumes (Daily)
24
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-13: 2025 Phase 1 Site Generated Traffic Volumes (AM/PM)
25
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-14: Full Build-Out Site Generated Traffic Volumes (Daily)
26
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-15: Full Build-Out/2035 Site Generated Traffic Volumes (AM/PM)
27
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
4.5
Combined Traffic
The combined volumes were obtained by superimposing the proposed site traffic volumes with the total background traffic volumes. The resulting volumes are shown in Figures 4-16 to 4-21.
Figure 4-16: 2025 Total Traffic Volumes (Daily)
28
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-17: 2025 Total Traffic Volumes (AM/PM)
29
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-18: 2035 Total Traffic Volumes (Daily)
30
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-19: 2035 Total Traffic Volumes (AM/PM)
31
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-20: 2045 Total Traffic Volumes (Daily)
32
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Figure 4-21: 2045 Total Traffic Volumes (AM/PM)
33
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
5
Analysis
5.1
Intersection Capacity Analysis
5.1.1
Intersection Analysis Assumptions
Synchro 11 was used to model. Intersection Capacity Analysis is based on the 2021 Alberta Transportation TIA Guidelines as well as the 2019 Sturgeon County Infrastructure Master Plan. The Synchro reports are included in Appendix B, and the settings are outlined in Table 5.1. Table 5.1: Synchro Settings Setting Percent Trucks Saturation Flow Rate Minimum Lane Width Grade Total Lost Time Adjustment Factor Peak hour Factor Lane Utilization Factor Link Speed
Recommended Value 2% 1,900 pcu/hr/ln 3.6 m 0% 0.5 1.0 1.0 As per posted speed
The following operational standards were used to evaluate intersection function. •
The maximum volume-to-capacity ratio shall be 0.85 for the intersection overall, and 0.90 for any individual movement as per Alberta Transportation.
•
The level of service shall be D or better for the intersection overall or each individual movement as per the Infrastructure Master Plan.
5.1.2
Starkey Road / Range Road 251 and East Estate Way / Trestle Ridge Road
The Synchro results included in Appendix B summarize the critical movements during the AM and PM Peak hour intersection assessments for the study years 2025, 2035, and 2045. With background and total traffic, the operational standards are met for 2025. In 2035, the background traffic shows an intersection performance of LOS A and the most restrictive movement is the westbound left with a v/c of 0.48 and LOS D. In 2035, the total traffic intersection performs at a LOS A and the most restrictive movement is the westbound left with a v/c of 0.74 and LOS E. In 2045, under the background condition, the intersection has a LOS A and the most restrictive movement is the westbound left with a v/c of 0.74 and LOS F. In the same year the intersection with total traffic has a LOS B and the most restrictive movement is the westbound left with a v/c of 1.06 and LOS F. By 2035 future background, there are performance concerns for this intersection It is only with the subsequent ongoing projected growth in the area for which the traffic exceeds the intersection capacity, rather than that associated with the proposed development. With a 2% compounding growth factor, the background traffic is modeled to increase by over 50% between 2025 and 2045 which exceeds the approved development in the area. As per the County’s request, mitigation was looked at to improve the conditions for 2035 and 2045. A single lane roundabout analysis was completed in Sidra and the results are included in Appendix C. The results include both 2035 and 2045 background and total conditions. Overall,
34
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
the mitigation shows improved conditions, especially for the westbound left. In the 2035 and 2045 horizon years for both the background and total traffic scenarios, the roundabout performs at a LOS A, with the most constrained movements showing a LOS B, and all within operational standards. This mitigation is to show a potential solution of improvement; ultimately, it is the county that will decide on potential mitigation strategies to this intersection based on background conditions.
5.1.3
Starkey Road/Range Road 251 and Bellerose Drive / Pinnacle Way
The 2023 TMP identifies that the Starkey Road and Bellerose Drive intersection is planned to be upgraded to a single lane roundabout in 2034 and expanded to a four-lane roundabout in 2043. which is anticipated to address the intersection operations. For the 2025 and 2035 horizon, the intersection was analysed using Synchro with the existing intersection configuration and the results are included in Appendix B. North of this intersection, the pedestrian crossing along Starkey Road was modelled as well as per the County’s request and included in the Synchro results. In the 2025 horizon year for both the background and total traffic scenarios, the existing intersection configuration performs at a LOS A, with the most constrained movements showing a LOS D and the highest v/c at 0.34. By 2035 horizon year, the background and total configuration performs at a LOS B, with the most constrained movements showing a LOS F and the highest v/c at 0.64. Roundabout analysis was completed in Sidra for the 2035 and 2045 background and total conditions and the results are included in Appendix C. For the background traffic and the proposed development, a single lane roundabout was analyzed. In the 2035 and 2045 horizon years for both the background and total traffic scenarios, the roundabout performs at a LOS A, with the most constrained movements showing a LOS B, and all within operational standards.
5.1.4
Starkey Road/Range Road 251 and Sturgeon Road
The Starkey Road/Range Road 251 and Sturgeon Road intersection is currently a three-legged roundabout. The 2023 TMP identifies that the roundabout is to remain a single lane roundabout within the timeframe of the TMP which is 25 years, although incremental improvements may be added. The single lane roundabout analysis was completed in Sidra and the results are included in Appendix C. In all horizon years for the background scenario, the roundabout performs at a LOS A, with the most constrained movements showing a LOS C. For the 2025 and 2035 horizon years and the total traffic volumes, the roundabout also performs at a LOS A, with the most constrained movements showing a LOS B. For the 2045 horizon year and with the total traffic volumes, the roundabout performs at a LOS B, with all movements performing at a LOS C or better.
5.1.5
Trestle Ridge Road and Pinnacle Way/Entrance Road (TBD)
The Synchro results for the Trestle Ridge Road and Pinnacle Way/Entrance Road (TBD) intersection included in Appendix B summarize the critical movements during the AM and PM Peak hour intersection assessments for the study years 2025, 2035, and 2045. In all study years, the Starkey Road/Range Road 251 and Bellerose Drive/Entrance Road (TBD) intersection functions within operational standards, with a LOS A for the intersection and the most constrained movement the northbound approach at a v/c of 0.13 and a LOS B.
35
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
5.1.6
Starkey Road/Range Road 251 and Highway 37
The Synchro results included in Appendix B summarize the critical movements during the AM and PM Peak hour intersection assessments for the study years 2025, 2035, and 2045. In 2025, the background traffic shows during the PM Peak an intersection performance of LOS B and the most restrictive movement is the northbound approach with a v/c of 0.47 and LOS D. In 2025, the total traffic intersection performs at a LOS B and the most restrictive movement is the northbound approach with a v/c of 0.51 and LOS D. In 2035, under the background condition, the intersection has a LOS C and the most restrictive movement is the northbound approach with a v/c of 1.11 and LOS F. In the same year, the intersection with total traffic has a LOS C and the most restrictive movement is the westbound left with a v/c of 1.20 and LOS F. The 2045 background conditions worsen. The 2025 conditions are at the threshold and 2035 and 2045 conditions become critical. It is only with the subsequent ongoing projected growth in the area for which the traffic exceeds the intersection capacity, rather than that associated with the proposed development. The existing intersection will require improvement to address the background conditions. The incremental additional traffic associated with the development will not drive the decision-making as to intersection planning. Additional guidance on the intersection configuration is included in Section 5.2.5.
36
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
5.2
Intersection Treatment Warrants
Intersection treatment warrants were reviewed in the context of the current TRANS “Highway Geometric Design Guide” (HGDG). Intersection treatment warrants are based on annual average daily traffic volume (HGDG, Figure D-7.4) and Left Turn Warrants based on hourly traffic volume (HGDG, Figure D-7.6 and D8.6C) to determine the initial intersection treatment type. The spreadsheets for the interpolation of the Harmelink curves used in Figure D-7.6. of the HGDG are included in Appendix D.
5.2.1
Starkey Road and East Estate Way / Trestle Ridge Road
A summary of the intersection warrants for the Starkey Road and East Estate Way / Trestle Ridge Road intersection for the total background and total traffic volumes are included in Table 5-1. Table 5-1 Starkey Road / Range Road 251 and East Estate Way / Trestle Ridge Road Existing Configuration
NB • • •
Dedicated left, 105m storage Through/Right Type IVb
• • •
Dedicated right, 55m storage Through/Left Type IVd
SB
Year 2025
Background NB • • • •
RT Lane Warranted Type IV Existing Storage: 105m Required Storage: None
• •
No RT Warranted Type II
• • • •
RT Lane Warranted Type IV Existing Storage: 105m Required Storage: None
• •
No RT Warranted Type II
• • • •
RT Lane Warranted Type IV Existing Storage: 105m Required Storage: 30m
• •
No RT Warranted Type II
SB
2035
• • • •
RT Lane Warranted Type IV Existing Storage: 105m Required Storage: None
• •
No RT Warranted Type II
• • • •
RT Lane Warranted Type IV Existing Storage: 105m Required Storage: 30m
• •
No RT Warranted Type IV
• • • •
RT Lane Warranted Type IV Existing Storage: 105m Required Storage: 30m
• •
No RT Warranted Type IV
SB
NB
NB
SB
2045
Total NB
SB
NB
NB
SB
SB
The requirements for the Starkey Road / Range Road 251 and East Estate Way / Trestle Ridge Road intersection for the total traffic volumes, at the 2045 horizon year are for a ‘Type IVb’, with an 30m left turn storage in the northbound direction and a “Type IVd’ configuration southbound.
37
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
The current configuration of the intersection at Starkey Road / Range Road 251 and East Estate Way / Trestle Ridge Road accommodates these requirements.
5.2.2
Starkey Road and Bellerose Drive / Pinnacle Way
A summary of the intersection warrants for the Range Road 251 / Starkey Road and Bellerose Drive / Pinnacle Way intersection for the total background and total traffic volumes are included in Table 5-2. Only the 2025 analysis is included as the intersection is planned to be upgraded to a roundabout in 2035. The results of this section are to evaluate the existing intersection configuration only. Please refer to Appendix C for the analysis results for the roundabout. Table 5-2 Range Road 251 / Starkey Road and Bellerose Drive / Pinnacle Way Existing Configuration
NB • • •
Dedicated Left, 105m storage Through/Right Type IVb
• • •
Dedicated Right, 80m storage Through/Left Type IVd
SB
Year 2025
Background NB
Total NB
• • • •
No RT Warranted Type IV Existing Storage: 105m Required Storage: 30m
• •
RT Lane Warranted Type II
SB
• • • •
No RT Warranted Type IV Existing Storage: 105m Required Storage: 40m
• •
RT Lane Warranted Type II
SB
38
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
The requirements for the Range Road 251 / Starkey Road and Bellerose Drive / Pinnacle Way intersection for the total traffic volumes, at the 2044 horizon year are for a ‘Type IVb’, with an 40m left turn storage, and right turn bay in the northbound direction and a ‘Type II’ configuration southbound. The existing intersection has the required right turn for the southbound approach and the northbound approach has an adequate left turn bay and storage.
5.2.3
Trestle Ridge Road and Pinnacle Way/Entrance Road (Name TBD)
A summary of the intersection warrants for the Trestle Ridge and Pinnacle Way/Entrance Road (TBD) intersection for the total background and total traffic volumes are included in Table 5-3. Table 5-3 Trestle Ridge Road and Pinnacle Way/Entrance Road (Name TBD) Existing Configuration
Year 2025
Type Ia ‘T’
Background
Total
EB
EB • • •
No RT Warranted No LT movement Type II ‘T’
• •
No RT Warranted Type II
• •
No RT Warranted Type II
• • •
No RT Warranted Type III* Type II @ 50 – 60 km/h
• •
No RT Warranted Type II
• •
RT lane Warranted Type III @ 50 – 60 km/h
• •
No RT Warranted Type II
WB WB
2035
• •
No RT movement Type II ‘T’
• • •
No RT Warranted No LT movement Type II ‘T’
• •
No RT movement Type II ‘T’
• • •
No RT Warranted LT movement Type II ‘T’
EB
EB
WB
WB
2045
EB
EB
WB • •
WB
No RT movement Type II ‘T’
39
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
The existing intersection configuration is currently a Type Ia T-intersection. For a design speed of 70km/h, based on the current speed limit, a full Type IIIc is recommended to accommodate the total 2045 traffic volumes. As per the 2023 TMP identifies that collector roadways in Sturgeon Valley are recommended to be planned for a 50 – 60km/h design speed, which is recommended based on the evolving context of Trestle Ridge Road, at least in the vicinity of the proposed development. For a 50 – 60km/h design speed, a Type IIIc intersection is recommended.
5.2.4
Range Road 251 / Starkey Road and Sturgeon Road
As the intersection at Range Road 251 / Starkey Road and Sturgeon Road is a roundabout and therefore it was not assessed for turn bays based on the warrants.
40
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
5.2.5
Highway 37 and Range Road 251
A summary of the intersection warrants for the Highway 37 and Range Road 251/Starkey Road intersection for the total background and total traffic volumes are included in Table 5-4. Table 5-4 Highway 37 and Range Road 251/Starkey Road Existing Configuration
EB • • •
Dedicated right, 130m storage Through/Left Type IVd
• • •
Dedicated left, 110m storage Through/Right Type IVb
WB
Year 2025
Background EB • •
RT Lane Warranted Type III, No additional storage
• • • •
No RT Warranted Type IV Existing Storage: 110m Required Storage: 30m
• •
RT Lane Warranted Type III, No additional storage
• • • •
No RT Warranted Type IV Existing Storage: 110m Required Storage: 60m
• •
RT Lane Warranted Type III, No additional storage
• • • •
No RT Warranted Type IV Existing Storage: 110m Required Storage: 90m
WB
2035
• •
RT Lane Warranted Type III, No additional storage
• • • •
No RT Warranted Type IV Existing Storage: 110m Required Storage: 30m
• •
RT Lane Warranted Type III, No additional storage
• • • •
No RT Warranted Type IV Existing Storage: 110m Required Storage: 80m
• •
RT Lane Warranted Type IV, No additional storage
• • • • •
No RT Warranted No RT Warranted Type IV Existing Storage: 110m Required Storage: 110m
WB
EB
EB
WB
2045
Total EB
WB
EB
EB
WB
WB
The requirements for the Highway 37 and Range Road 251/Starkey Road intersection for the total traffic volumes, at the 2045 horizon year are for a ‘Type IVb’, with an 110m left turn storage in the westbound direction and a “Type IVd’ configuration eastbound with a right turn lane warranted. The current configuration of the intersection at Highway 37 and Range Road 251/Starkey Road accommodates these requirements. The left turn bay storage just has enough
41
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
length to accommodate 2045 traffic; however, if there is continued growth in the future then this storage may need to be expanded to accommodate background traffic demands.
5.3
Design Considerations
Entrance Road (Name TBD) The connection to the subject site is projected to have approximately 1728 vehicles per day. The proposed cross-section has a 28m right-of-way, two 6.25m lanes, a 3m median, and separate walk on both sides. This design accommodates the anticipated traffic volumes. Trestle Ridge Road Trestle Ridge Road adjacent to the subject site will be designed as a collector road in accordance with the Sturgeon County 2024 GMSS Section 3.1.5, Volume 8, Drawing 6.1.7, which requires a 24m ROW, with a 12m carriage way, with a separate walk on one side and a 3m SUP on the opposing side. Starkey Road In accordance with the Sturgeon County 2023 Transportation Master Plan (TMP), Starkey Road between Coal Mine Road and Bellerose Drive should be upgraded to a four-lane arterial as per the development occurs in the northern section of the Sturgeon Valley Core by 2043. As per the 2023 GMSS Section 3.1.5, Volume 8, Drawing 3.1.24, the road will be designed with a 42m ROW, 20.3m roadway, and 3m SUP on either side. The current ROW adjacent to the OP area is 50m, so additional land for transportation servicing is not required, but may be required for utility servicing when the County confirms with Utility and Waste Management Services (UWMS). In addition, the Starkey Road and Bellerose Drive intersection, in reference to the 2023 TMP, is planned to be upgraded to a single lane roundabout in 2034 and expanded to a four-lane roundabout in 2043.
5.4
Traffic Control Needs
Based on the Transportation Association of Canada (TAC) signal warrant procedure, an analysis was carried out to assess the need for traffic signal control installation at the study intersections. An analysis at the Starkey Road & East Estate Way / Trestle Ridge Road and Trestle Ridge Road & Pinnacle Way / Pinnacle Village intersections, under 2045 Total conditions, concluded that the signalization is not warranted.
42
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Full signal warrant analysis calculation is presented in Appendix E.
5.5
Illumination Warrant Analysis
Based on TAC’s warrant for “Illumination of Isolated Rural Intersections”, illumination is not warranted at the intersection of Site Access & Trestle Ridge Road for the 2045 Total scenarios. For analysis purposes, a rate of at least 1.5 collisions per million entering vehicles per year was still assumed in the illumination warrant, in the absence of collision data. However, lighting is not warranted due to the projected traffic. Appendix F presents the illumination warrant calculations. All other existing study intersections have existing streetlighting.
5.6
Design Vehicle Accommodation
Standard intersection treatment types are recommended and accommodate both WB-21 and WB-23 design vehicles.
5.7
Site Access Review
Site Access Spacing Review The proposed access to the site is proposed on the Township Rd 544A/Trestle Ridge Road, which is of the lower classification between the two roads bordering the site, aligning with the requirement of County’s General Municipal Servicing Standard (GMSS) (2024). Similarly, maintain the requirement of the GMSS, the proposed access is to align with the existing Pinnacle Way south of Trestle Ridge Road. No further accesses are proposed. Table 5-4 shows the distances of the proposed site accesses, from the existing nearest intersection of Starkey Road and Trestle Ridge Road and compares it with the spacing requirements of the following: •
TAC Geometric Design Guide for Canadian Roads (2017) - Corner clearance distance is measured from the near curb of the cross roadway to the near edge of the access throat.
•
Surgeon County General Municipal Servicing Standard (GMSS) (2024) – Distance between an intersection and driveways and/or crossing accesses is measured centerline to centerline.
Table 5-4: Access Spacing Requirement Distance from the intersection at Starkey Road and Trestle Ridge Road
Site Access
~293 m
Spacing Requirements TAC (20 m)
Sturgeon County (55 m)
Yes
Yes
Based on the above, the site access meets the TAC’s and County’s access spacing requirements. Considering that this access is for the site’s general-purpose vehicles, and it aligns with the Pinnacle Way (access to the neighbourhood on the south) it is expected that this location would function adequately.
43
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
5.8
Sightlines
In order to address sightlines at Township Rd 544A/Trestle Ridge Road and Starkey Road, the cut corner in the northeast corner of the intersection will conform to Sturgeon County’s General Municipal Servicing Standard Drawing 3.1.1.
5.9
Emergency Access
Access into the community will primarily occur via Township Rd 544A/Trestle Ridge Road. There is no direct access from Starkey Road. The community will also have the southeast and southwest emergency access roads, via the proposed 6m wide asphalt surfaced walkways (as indicated in Figure 5-1), to ensure the community has more than one option for ingress/egress should the road network be compromised. As per the County’s GMSS, this access will be provided with bollards at both access points to the PUL that will not impede emergency vehicle access.
Figure 5-1: Emergency Access
5.10
Active Transportation Review
From the Sturgeon Valley Trails System – The Path Forward (2021) study, a trail and active transportation routes along the Starkey Road / Range Road 251 and East Estates Way / Trestle Ridge Road are proposed as medium and low priority projects, as depicted in Figure 5--1.
44
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Image Source: Sturgeon Valley Trails System – The Path Forward. Retrieved June 21, 2024
Figure 5--1: Prioritized Trails and Active Transportation Network In conformance with the requirements from the Path Forward study, a provision for future active transportation infrastructure should be provided in the immediate vicinity of the proposed site. A shared use path is proposed on the north side of Trestle Ridge Road as part of the proposed development. An east-west pedestrian crossing will be required at the north leg of the intersection at Starkey Road and Trestle Ridge Road to connect the proposed shared use path to the shared use path along the west side of Starkey Road.
45
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
6
Conclusions and Recommendations
The traffic associated with the proposed residential development Pinnacle Village can be accommodated on the surrounding roadway network. Traffic was reviewed for a proposed 144 units at horizon years 2025, 2035, and 2045. Five intersections were reviewed in proximity to the development, including: • • • • •
Starkey Road and East Estate Way / Trestle Ridge Road, Starkey Road and Bellerose Drive / Pinnacle Way, Starkey Road and Sturgeon Road, Pinnacle Way/Entrance Road (Name TBD) and Trestle Ridge Road, and Highway 37 and Starkey Road
Starkey Road and Trestle Ridge Road can accommodate the proposed traffic in their existing configurations through to 2035. Intersection improvements are anticipated to be required by 2045 associated with ongoing development accessing Trestle Ridge Road, rather than the proposed development. One proposed mitigation strategy is transforming the existing intersection configuration into a roundabout; however, the county can review potential mitigation strategies in the future. For Pinnacle Way/Entrance Road (Name TBD) and Trestle Ridge Road, it is recommended that the intersection be improved to a Type IIIc intersection configuration to accommodate projected traffic volumes and that the speed be reduced to 50km/h or 60 km/h adjacent to the proposed development. The improvement is recommended to be completed with the first phase of development. The Starkey Road and Bellerose Drive / Pinnacle Way intersection can accommodate the proposed development traffic in its current configuration in 2025. The intersection will require upgrades to a roundabout by 2035 to accommodate background traffic. The Starkey Road and Bellerose Drive / Pinnacle Way roundabout will accommodate the proposed development traffic as a single-lane roundabout through to 2045. The Highway 37 and Starkey Road intersection can accommodate traffic in 2025. By 2035 and 2045 intersection improvements are anticipated from growth and development in the area, rather than the proposed development. The Starkey Road and Sturgeon Road roundabout will accommodate the proposed development traffic as a single-lane roundabout through to 2045. The site access meets the TAC’s and County’s access spacing requirements. No additional illumination is required to meet operational standards.
46
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Appendix A Traffic Counts
47
Turning Movement Summary Diagram Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Reference No.: 1000691 Intersection of: STARKEY RD & BELLEROSE DR / PINNACLE WAY
2022 AADT / ASDT ESTIMATES
7:00 am - 7:00 pm
2390
A 2317 3 B 6 C 62 D 2 E
2280
A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
ASDT
4970 AADT
720
A B C D E
701 0 2 NR 17 0
150
A B C D E
148 0 0 ET 2 0
BelleroseD Vol
%
4497 0 10 51 2
98.6 0.0 0.2 1.1 0.0
% 96.9 0.1 0.3 2.6 0.1
2390
Remarks: Based on a 12 hour count period from:
Vehicle Type
Vol 4634 3 13 123 7 4780
5210 AADT
ASDT
West On
Starkey Rd
North On
D & A Paulichuk Consulting Ltd.
1410
4560 2280
TURNING MOVEMENT ABBREVIATIONS
720
1640
708 0 0 12 0
A 1582 0 B 7 C 46 D 5 E
A B C D E
NR NT NL
WL
ST
A 1397 0 B 5 SL C 7 D 1 E A 2251 WL 0 B 3 WT C 25 D 1 WR E
ER: Traffic From East Turning Right EL: Traffic From East Turning Left ET: Traffic From East Proceeding Through WR: Traffic From West Turning Right WL: Traffic From West Turning Left WT: Traffic From West Proceeding Through
WR A 1394 0 B 3 C 12 D 1 E
NT A 1591 3 B 4 C 40 D 2 E
1410
1640
ASDT: Average Summer Daily Traffic Average daily traffic expressed as vehicles per day fo period of May 1 to September 30 (153 days)
EL 255 0 0 5 0
SL ST SR A 3216 2 B 20 C 65 D 7 E
260
3310
3310 South On
TURNING MOVEMENT ABBREVIATIONS AADT: Annual Average Daily Traffic Average daily traffic expressed as vehicles per day fo period of January 1 to December 31 (365 days)
A B C D E
Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
ASDT
7210 AADT
Starkey Rd Vol
%
6456 5 27 122 10
97.5 0.1 0.4 1.8 0.2
6620
27 0 0 3 0
A B C D E ER
NR: Traffic From North Turning Right NL: Traffic From North Turning Left NT: Traffic From North Proceeding Through SR: Traffic From South Turning Right SL: Traffic From South Turning Left ST: Traffic From South Proceeding Through
30
ER A B ET C D EL E
430 0 0 10 0
A B NL C D E
25 0 0 5 0
30
A B WT C D E
149 0 0 1 0
150
A B SR C D E
237 2 8 12 1
260
440 East On Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
ASDT 440
960 AADT
PinnacleWy Vol
%
841 2 8 28 1
95.6 0.2 0.9 3.2 0.1
880
Turning Movement Summary Diagram Starkey Rd
North On
D & A Paulichuk Consulting Ltd.
Vehicle Type
Vol
%
492 3 3 14 0
96.1 0.6 0.6 2.7 0.0
A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Reference No.: 1000691 Intersection of: STARKEY RD & BELLEROSE DR / PINNACLE WAY
512
Total
2022 a.m. 100th Highest Hour ESTIMATES
286
226 61
Remarks: Based on a 12 hour count period from: 7:00 am - 7:00 pm
A B C D E
193 West On Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total
71
A B C D E
70 0 1 NR 0 0
17
A B C D E
17 0 0 ET 0 0
BelleroseD Vol
%
417 0 3 2 0
98.8 0.0 0.7 0.5 0.0
105
422 229
TURNING MOVEMENT ABBREVIATIONS
A B C D E
102 0 2 SL 1 0
A B C D E
228 WL 0 0 WT 1 0 WR
272 3 3 8 0
61 0 0 0 0
A B C D E
NR NT NL
161 A B C D E
WL
155 0 0 6 0 ST
ER: Traffic From East Turning Right EL: Traffic From East Turning Left ET: Traffic From East Proceeding Through WR: Traffic From West Turning Right WL: Traffic From West Turning Left WT: Traffic From West Proceeding Through
A B C D E
WR 147 0 0 1 0 148
A B C D E
NT 202 3 2 8 0 215
EL A B C D E
39 0 0 0 0
SL ST SR A 277 0 B 3 C 8 D 0 E
39
402
288 South On
Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total
Starkey Rd Vol
%
665 3 5 17 0
96.4 0.4 0.7 2.5 0.0
690
4 0 0 0 0
A B C D E ER
NR: Traffic From North Turning Right NL: Traffic From North Turning Left NT: Traffic From North Proceeding Through SR: Traffic From South Turning Right SL: Traffic From South Turning Left ST: Traffic From South Proceeding Through
4
ER A B ET C D EL E
60 0 0 0 0
A B NL C D E
0 0 0 0 0
0
A B WT C D E
20 0 0 0 0
20
A B SR C D E
20 0 1 1 0
22
60 East On Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total 42
PinnacleWy Vol
%
100 0 1 1 0
98.0 0.0 1.0 1.0 0.0
102
Turning Movement Summary Diagram Starkey Rd
North On
D & A Paulichuk Consulting Ltd.
Vehicle Type
Vol
%
468 0 2 11 3
96.7 0.0 0.4 2.3 0.6
A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Reference No.: 1000691 Intersection of: STARKEY RD & BELLEROSE DR / PINNACLE WAY
484
Total
2022 p.m. 100th Highest Hour ESTIMATES
226
258 72
Remarks: Based on a 12 hour count period from: 7:00 am - 7:00 pm
A B C D E
296 West On Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total
76
A B C D E
74 0 0 NR 2 0
20
A B C D E
19 0 0 ET 1 0
BelleroseD Vol
%
484 0 3 6 0
98.2 0.0 0.6 1.2 0.0
200
493 197
TURNING MOVEMENT ABBREVIATIONS
A B C D E
197 0 3 SL 0 0
A B C D E
194 WL 0 0 WT 3 0 WR
218 0 0 6 2
71 0 0 1 0
A B C D E
NR NT NL
181 A B C D E
WL
175 0 2 3 1 ST
ER: Traffic From East Turning Right EL: Traffic From East Turning Left ET: Traffic From East Proceeding Through WR: Traffic From West Turning Right WL: Traffic From West Turning Left WT: Traffic From West Proceeding Through
A B C D E
WR 112 0 0 2 0 114
A B C D E
NT 143 0 0 4 2 149
EL A B C D E
22 0 0 1 0
SL ST SR A 394 0 B 6 C 5 D 2 E
23
286
407 South On
Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total
Starkey Rd Vol
%
671 0 6 12 4
96.8 0.0 0.9 1.7 0.6
693
4 0 0 1 0
A B C D E ER
NR: Traffic From North Turning Right NL: Traffic From North Turning Left NT: Traffic From North Proceeding Through SR: Traffic From South Turning Right SL: Traffic From South Turning Left ST: Traffic From South Proceeding Through
5
ER A B ET C D EL E
45 0 0 3 0
A B NL C D E
1 0 0 0 0
1
A B WT C D E
11 0 0 0 0
11
A B SR C D E
22 0 1 2 1
26
48 East On Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total 38
PinnacleWy Vol 79 0 1 5 1 86
% 91.9 0.0 1.2 5.8 1.2
Turning Movement Summary Diagram Starkey Rd
North On
D & A Paulichuk Consulting Ltd.
Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Reference No.: 1000692 Intersection of: STARKEY RD & E ESTATES WAY
2022 AADT / ASDT ESTIMATES
1030
1030 60
Remarks: Based on a 12 hour count period from: 7:00 am - 7:00 pm
Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
ASDT
1660 AADT
60
A B C D E
56 0 1 NR 3 0
40
A B C D E
38 0 1 ET 1 0
EEstatesWy Vol
%
1490 1 9 18 2
98.0 0.1 0.6 1.2 0.1
941 0 5 43 41
A B C D E
760 West On
660
1520 760
TURNING MOVEMENT ABBREVIATIONS
% 92.5 0.0 0.4 4.5 2.5
2060
2250 AADT
ASDT
Vol 1906 0 9 93 52
A B C D E
654 0 2 SL 2 2
A B C D E
742 WL 1 5 WT 12 0 WR
57 0 1 2 0
A B C D E
NR NT NL
840 A B C D E
WL
815 0 3 14 8 ST
ER: Traffic From East Turning Right EL: Traffic From East Turning Left ET: Traffic From East Proceeding Through WR: Traffic From West Turning Right WL: Traffic From West Turning Left WT: Traffic From West Proceeding Through
A B C D E
WR 645 1 4 10 0
A B C D E
NT 793 0 2 15 30
660
840
ASDT: Average Summer Daily Traffic Average daily traffic expressed as vehicles per day fo period of May 1 to September 30 (153 days)
EL 731 0 3 25 1
SL ST SR A 2181 0 B 8 C 58 D 13 E
760
2260
2260 South On
TURNING MOVEMENT ABBREVIATIONS AADT: Annual Average Daily Traffic Average daily traffic expressed as vehicles per day fo period of January 1 to December 31 (365 days)
A B C D E
Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
ASDT
4930 AADT
Starkey Rd Vol
%
4350 1 17 108 44
96.2 0.0 0.4 2.4 1.0
4520
93 0 0 34 3
A B C D E ER
NR: Traffic From North Turning Right NL: Traffic From North Turning Left NT: Traffic From North Proceeding Through SR: Traffic From South Turning Right SL: Traffic From South Turning Left ST: Traffic From South Proceeding Through
130
ER A B ET C D EL E
862 0 4 60 4
A B NL C D E
92 0 2 25 11
130
A B WT C D E
40 0 0 0 0
40
A B SR C D E
712 0 3 42 3
760
930 East On Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
ASDT 930
2030 AADT
TwpRd 544A Vol
%
1706 0 9 127 18
91.7 0.0 0.5 6.8 1.0
1860
Turning Movement Summary Diagram Starkey Rd
North On
D & A Paulichuk Consulting Ltd.
Vehicle Type
Vol
%
222 0 5 1 3
96.1 0.0 2.2 0.4 1.3
A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Reference No.: 1000692 Intersection of: STARKEY RD & E ESTATES WAY
231
Total
2022 a.m. 100th Highest Hour ESTIMATES
104
127 8
Remarks: Based on a 12 hour count period from: 7:00 am - 7:00 pm
13 West On Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total
2
A B C D E
2 0 0 NR 0 0
2
A B C D E
2 0 0 ET 0 0
EEstatesWy Vol
%
135 0 1 1 1
97.8 0.0 0.7 0.7 0.7
99 0 3 1 1
A B C D E
9
138 125
TURNING MOVEMENT ABBREVIATIONS
A B C D E
7 0 1 SL 0 1
A B C D E
124 WL 0 0 WT 1 0 WR
8 0 0 0 0
A B C D E
NR NT NL
113 A B C D E
WL
109 0 2 0 2 ST
ER: Traffic From East Turning Right EL: Traffic From East Turning Left ET: Traffic From East Proceeding Through WR: Traffic From West Turning Right WL: Traffic From West Turning Left WT: Traffic From West Proceeding Through
A B C D E
WR 115 0 0 1 0 116
NT A B C D E
92 0 2 1 1 96
A B C D E
EL 112 0 0 1 0
SL ST SR A 140 0 B 3 C 0 D 3 E
113
325
146 South On
Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total
Starkey Rd Vol
%
459 0 5 3 4
97.5 0.0 1.1 0.6 0.8
471
6 0 0 0 0
A B C D E ER
NR: Traffic From North Turning Right NL: Traffic From North Turning Left NT: Traffic From North Proceeding Through SR: Traffic From South Turning Right SL: Traffic From South Turning Left ST: Traffic From South Proceeding Through
6
ER A B ET C D EL E
120 0 0 1 0
A B NL C D E
5 0 1 0 0
6
A B WT C D E
1 0 0 0 0
1
A B SR C D E
24 0 0 0 0
24
121 East On Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total 31
TwpRd 544A Vol
%
150 0 1 1 0
98.7 0.0 0.7 0.7 0.0
152
Turning Movement Summary Diagram Starkey Rd
North On
D & A Paulichuk Consulting Ltd.
Vehicle Type
Vol
%
214 0 0 5 5
95.5 0.0 0.0 2.2 2.2
A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Reference No.: 1000692 Intersection of: STARKEY RD & E ESTATES WAY
224
Total
2022 p.m. 100th Highest Hour ESTIMATES
108
116 3
Remarks: Based on a 12 hour count period from: 7:00 am - 7:00 pm
A B C D E
117 West On Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total
10
A B C D E
9 0 0 NR 1 0
5
A B C D E
5 0 0 ET 0 0
EEstatesWy Vol
%
184 0 0 1 0
99.5 0.0 0.0 0.5 0.0
102
185 68
TURNING MOVEMENT ABBREVIATIONS
A B C D E
102 0 0 SL 0 0
A B C D E
68 WL 0 0 WT 0 0 WR
102 0 0 1 5
3 0 0 0 0
A B C D E
NR NT NL
92 92 0 0 0 0
A B C D E
WL
ST
ER: Traffic From East Turning Right EL: Traffic From East Turning Left ET: Traffic From East Proceeding Through WR: Traffic From West Turning Right WL: Traffic From West Turning Left WT: Traffic From West Proceeding Through
A B C D E
WR 59 0 0 0 0 59
NT A B C D E
EL 86 0 0 0 5
91
A B C D E
60 0 0 0 0
SL ST SR A 263 0 B 0 C 2 D 0 E
60
210
265 South On
Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total
Starkey Rd Vol
%
468 0 0 2 5
98.5 0.0 0.0 0.4 1.1
475
17 0 0 4 0
A B C D E ER
NR: Traffic From North Turning Right NL: Traffic From North Turning Left NT: Traffic From North Proceeding Through SR: Traffic From South Turning Right SL: Traffic From South Turning Left ST: Traffic From South Proceeding Through
21
ER A B ET C D EL E
82 0 0 4 0
A B NL C D E
7 0 0 0 0
7
A B WT C D E
6 0 0 0 0
6
A B SR C D E
69 0 0 2 0
71
86 East On Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total 84
TwpRd 544A Vol
%
164 0 0 6 0
96.5 0.0 0.0 3.5 0.0
170
Turning Movement Summary Diagram Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Reference No.: 1000690 Intersection of: STARKEY RD & STURGEON RD
7280 AADT
ASDT
2022 AADT / ASDT ESTIMATES
Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
ASDT
6450 AADT
1650
A 1577 20 B 2 NR C 49 D 2 E
1310
A 1279 0 B 7 ET C 22 D 2 E
SturgeonRd Vol
%
5727 20 22 138 13
96.7 0.3 0.4 2.3 0.2
% 96.3 0.4 0.4 2.7 0.2
6680 3340
1650
7:00 am - 7:00 pm
2960
Vol 6432 29 26 180 13
3340
Remarks: Based on a 12 hour count period from:
West On
Starkey Rd
North On
D & A Paulichuk Consulting Ltd.
0
5920 2960
TURNING MOVEMENT ABBREVIATIONS
A B C D E
A 3199 29 B 6 C 99 D 7 E
A 1593 0 B 8 C 45 D 4 E
NR NT NL
WL
A B C D E
0
1690
0 0 0 0 0
A 1640 0 B 12 C 36 D 2 E
ST
ER
ER A 2919 0 B 19 ET C 58 D 4 EL E
0 0 0 SL 0 0
A 2871 WL 0 B 13 WT C 67 D 9 WR E
NR: Traffic From North Turning Right NL: Traffic From North Turning Left NT: Traffic From North Proceeding Through SR: Traffic From South Turning Right SL: Traffic From South Turning Left ST: Traffic From South Proceeding Through ER: Traffic From East Turning Right EL: Traffic From East Turning Left ET: Traffic From East Proceeding Through WR: Traffic From West Turning Right WL: Traffic From West Turning Left WT: Traffic From West Proceeding Through
WR A B C D E
NT 0 0 0 0 0
A B C D E
0
ASDT: Average Summer Daily Traffic Average daily traffic expressed as vehicles per day fo period of May 1 to September 30 (153 days)
0 0 0 0 0
A B C D E
0
SL ST SR 0 A 0 B 0 C 0 D 0 E
0
0
0 South On
TURNING MOVEMENT ABBREVIATIONS AADT: Annual Average Daily Traffic Average daily traffic expressed as vehicles per day fo period of January 1 to December 31 (365 days)
EL 0 0 0 0 0
Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
ASDT
AADT
Vol
% 0 0 0 0 0 0
0.0 0.0 0.0 0.0 0.0
3000 East On Vehicle Type
A 1622 9 B 4 NL C 50 D 5 E
1690
A 1278 0 B 5 WT C 22 D 5 E
1310
0 0 0 0 0
0
A B SR C D E
A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
ASDT 3000
6540 AADT
SturgeonRd Vol
%
5819 9 28 130 14
97.0 0.2 0.5 2.2 0.2
6000
Turning Movement Summary Diagram Starkey Rd
North On
D & A Paulichuk Consulting Ltd.
Vehicle Type
Vol
%
675 0 4 17 2
96.7 0.0 0.6 2.4 0.3
A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Reference No.: 1000690 Intersection of: STARKEY RD & STURGEON RD
698
Total
2022 a.m. 100th Highest Hour ESTIMATES
517
181 139
Remarks: Based on a 12 hour count period from: 7:00 am - 7:00 pm
A B C D E
388 West On Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total
223
A B C D E
218 0 1 NR 4 0
165
A B C D E
163 0 1 ET 1 0
SturgeonRd Vol
%
651 0 5 10 1
97.6 0.0 0.7 1.5 0.1
0
667 279
TURNING MOVEMENT ABBREVIATIONS
A B C D E
0 0 0 SL 0 0
A B C D E
270 WL 0 3 WT 5 1 WR
501 0 1 14 1
133 0 2 3 1
A B C D E
NR NT NL
0 0 0 0 0 0
A B C D E
WL
ST
ER: Traffic From East Turning Right EL: Traffic From East Turning Left ET: Traffic From East Proceeding Through WR: Traffic From West Turning Right WL: Traffic From West Turning Left WT: Traffic From West Proceeding Through
WR A B C D E
NT 0 0 0 0 0 0
A B C D E
EL 0 0 0 0 0
0 0 0 0 0
A B C D E
0
SL ST SR 0 A 0 B 0 C 0 D 0 E
0
0
0 South On
Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total
Vol
% 0 0 0 0 0 0
41 0 1 0 0
A B C D E ER
NR: Traffic From North Turning Right NL: Traffic From North Turning Left NT: Traffic From North Proceeding Through SR: Traffic From South Turning Right SL: Traffic From South Turning Left ST: Traffic From South Proceeding Through
42
0.0 0.0 0.0 0.0 0.0
ER A B ET C D EL E
204 0 2 1 0
A B NL C D E
283 0 0 10 1
294
A B WT C D E
137 0 1 2 0
140
A B SR C D E
0 0 0 0 0
0
207 East On Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total 434
SturgeonRd Vol
%
624 0 3 13 1
97.3 0.0 0.5 2.0 0.2
641
Turning Movement Summary Diagram Starkey Rd
North On
D & A Paulichuk Consulting Ltd.
Vehicle Type
Vol
%
678 2 4 14 0
97.1 0.3 0.6 2.0 0.0
A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Reference No.: 1000690 Intersection of: STARKEY RD & STURGEON RD
698
Total
2022 p.m. 100th Highest Hour ESTIMATES
270
428 259
Remarks: Based on a 12 hour count period from: 7:00 am - 7:00 pm
A B C D E
184 West On Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total
93
A B C D E
92 0 0 NR 1 0
91
A B C D E
91 0 0 ET 0 0
SturgeonRd Vol
%
581 0 2 9 0
98.1 0.0 0.3 1.5 0.0
0
592 408
TURNING MOVEMENT ABBREVIATIONS
A B C D E
0 0 0 SL 0 0
A B C D E
398 WL 0 2 WT 8 0 WR
260 2 2 6 0
250 0 1 8 0
A B C D E
NR NT NL
0 0 0 0 0 0
A B C D E
WL
ST
ER: Traffic From East Turning Right EL: Traffic From East Turning Left ET: Traffic From East Proceeding Through WR: Traffic From West Turning Right WL: Traffic From West Turning Left WT: Traffic From West Proceeding Through
WR A B C D E
NT 0 0 0 0 0 0
A B C D E
EL 0 0 0 0 0
0 0 0 0 0
A B C D E
0
SL ST SR 0 A 0 B 0 C 0 D 0 E
0
0
0 South On
Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total
Vol
% 0 0 0 0 0 0
A B C D E
168 0 1 0 0 ER
NR: Traffic From North Turning Right NL: Traffic From North Turning Left NT: Traffic From North Proceeding Through SR: Traffic From South Turning Right SL: Traffic From South Turning Left ST: Traffic From South Proceeding Through
169
0.0 0.0 0.0 0.0 0.0
ER A B ET C D EL E
259 0 1 0 0
A B NL C D E
168 2 2 5 0
177
A B WT C D E
148 0 1 0 0
149
A B SR C D E
0 0 0 0 0
0
260 East On Vehicle Type A: Passenger Vehicle B: Recreational Vehicle C: Bus D: Single Unit Truck E: Tractor Trailer Unit
Total 326
SturgeonRd Vol
%
575 2 4 5 0
98.1 0.3 0.7 0.9 0.0
586
DIRECTIONAL TRAFFIC COUNT SUMMARY HIGHWAY: Starkey Road
Starkey Road & E Estates Way-Treste Ridge Rd.
INTERSECTION OF:
REFERENCE NO.:
Sturgeon County
LEGAL DESCRIPTION:
DAY & DATE OF COUNT: Oct. 5, 2022
12 Hours
COUNT DURATION: APPROACHING INTERSECTION
FROM THE EAST ON INTERVAL VEH CLASS 7:00 - 7:30
A
LEFT B C D
E
A
THROUGH B C D
FROM THE WEST ON
Twp. Rd. 544A
E
A
RIGHT B C D
E
A
LEFT B C D
E
A
THROUGH B C D
E Estates Way
E
A
RIGHT B C D
E
TOTALS
35
0
0
1
0
0
0
0
0
0
2
0
0
0
0
3
0
0
0
0
1
0
0
0
0
41
0
0
0
0
83
7:30 - 8:00 8:00 - 8:30
70
0
0
0
0
2
0
0
0
0
4
0
0
0
0
5
0
0
0
0
0
0
0
0
0
67
0
0
1
0
56
0
2
0
1
1
0
1
0
0
0
0
0
0
0
4
0
1
1
0
0
0
0
0
0
58
0
0
1
0
149 126
8:30 - 9:00 9:00 - 9:30 9:30 -10:00 10:00-10:30 10:30 -11:00 11:00 - 11:30 pm 11:30 - 12:00 12:00 - 12:30 12:30 - 1:00 1:00 - 1:30 1:30 - 2:00
30
0
0
0
0
4
0
0
0
0
5
0
0
0
0
2
0
0
0
0
1
0
0
0
0
34
0
1
1
0
35
0
0
0
0
0
0
0
0
0
4
0
0
3
0
3
0
0
0
0
1
0
0
0
0
25
0
0
0
0
30
0
0
0
0
0
0
0
0
0
2
0
0
0
0
2
0
0
0
0
0
0
0
0
0
28
0
0
0
0
18
0
0
0
0
0
0
0
0
0
5
0
0
1
0
1
0
0
0
0
2
0
0
0
0
20
1
1
1
0
19
0
0
0
0
0
0
0
0
0
3
0
0
0
0
0
0
0
0
0
0
0
0
0
0
13
0
0
1
0
20
0
0
2
0
0
0
0
0
0
4
0
0
3
2
2
0
0
0
0
1
0
0
0
0
14
0
0
0
0
35
0
0
0
0
1
0
0
0
0
1
0
0
4
0
9
0
0
0
0
2
0
0
0
0
20
0
0
0
0
26
0
0
5
0
0
0
0
1
0
2
0
0
4
0
0
0
0
0
0
3
0
0
0
0
13
0
0
0
0
29
0
0
1
0
3
0
0
0
0
1
0
0
0
0
2
0
0
0
0
1
0
0
0
0
15
0
0
1
0
14
0
0
3
0
1
0
0
0
0
2
0
0
0
0
1
0
0
0
0
4
0
0
0
0
15
0
0
0
0
5
0
0
2
0
1
0
0
0
0
4
0
0
4
0
1
0
0
1
0
0
0
0
0
0
18
0
0
0
0
2:00 - 2:30 2:30 - 3:00 3:00 - 3:30 3:30 - 4:00 4:00 - 4:30 4:30 - 5:00 5:00 - 5:30 5:30 - 6:00 6:00 - 6:30 6:30 - 7:00 VEH CLASS TOTALS
32
0
0
3
0
1
0
0
0
0
2
0
0
3
0
3
0
0
0
0
1
0
0
0
0
12
0
0
1
0
14
0
0
0
0
3
0
0
0
0
4
0
0
1
0
1
0
0
0
0
2
0
0
0
0
14
0
0
0
0
22
0
0
1
0
0
0
0
0
0
2
0
0
1
1
2
0
0
0
0
1
0
0
0
0
23
0
0
0
0
30
0
1
3
0
4
0
0
0
0
3
0
0
1
0
2
0
0
0
0
2
0
0
0
0
30
0
2
2
0
19
0
0
0
0
0
0
0
0
0
5
0
0
1
0
4
0
0
0
0
2
0
0
0
0
20
0
0
0
0
33
0
0
1
0
0
0
0
0
0
6
0
0
0
0
3
0
0
0
0
1
0
0
0
0
34
0
0
0
0
38
0
0
0
0
2
0
0
0
0
13
0
0
2
0
2
0
0
0
0
0
0
0
0
0
35
0
0
0
0
22
0
0
0
0
3
0
0
0
0
4
0
0
2
0
1
0
0
0
0
6
0
0
0
0
24
0
0
0
0
17
0
0
1
0
1
0
0
0
0
4
0
0
1
0
1
0
0
0
0
1
0
0
0
0
13
0
0
0
0
19
0
0
0
0
0
0
0
0
0
3
0
0
0
0
2
0
0
0
0
0
0
0
0
0
10
0
0
0
0
A
B
C
D
E
A
B
C
D
E
A
B
C
D
E
A
B
C
D
E
A
B
C
D
E
A
B
C
D
E
668
0
3
23
1
27
0
1
1
0
85
0
0
31
3
56
0
1
2
0
32
0
0
0
0
596
1
4
9
0
EL
ET
ER
WL
WT
78 71 62 50 36 48 72 54 53 40 36 58 39 53 80 51 78 92 62 39 34 1544
WR
VEHICLE CLASSES
LOCATION DIAGRAM ENCLOSED (Y/N):
A: PASSENGER VEHICLES D: SINGLE UNIT TRUCKS
WEATHER CONDITIONS: RECORDER(S):
B: RECREATION VEHICLES C: BUSES E: TRACTOR TRAILER COMBINATIONS
COMMENTS:
APPROACHING INTERSECTION
FROM THE NORTH ON INTERVAL VEH CLASS 7:00 - 7:30 7:30 - 8:00 8:00 - 8:30 8:30 -9:00 9:00 - 9:30 9:30 -10:00 10:00-10:30 10:30 -11:00 11:00 - 11:30 pm 11:30 - 12:00 pm 12:00 - 12:30 12:30 - 1:00 1:00 - 1:30 1:30 - 2:00 2:00 - 2:30 2:30 - 3:00 3:00 - 3:30 3:30 - 4:00 4:00 - 4:30 4:30 - 5:00 5:00 - 5:30 5:30 - 6:00 6:00 - 6:30 6:30 - 7:00 VEH CLASS TOTALS
A
LEFT B C D
THROUGH B C D
E
A
E
3
0
0
0
0
29
0
1
1
1
2
0
1
0
0
58
0
1
0
3
0
0
0
0
43
0
0
0
0
0
0
2
50
0
0
1
0
0
0
2
20
0
1
0
0
0
0
19
3
0
0
2
0
31
2
0
0
2
0
3
0
0
3
0
0
0
0
1
0
0
0
0
0
5
0
4
FROM THE SOUTH ON
Starkey Road A
RIGHT B C D
E
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
3
2
0
0
0
0
2
0
0
0
0
0
0
0
0
0
1
0
1
23
0
0
0
4
0
18
0
0
0
1
30
0
0
0
3
0
20
0
0
3
0
13
0
0
0
0
0
27
0
0
0
1
0
15
2
0
0
1
1
1
0
0
0
0
0
0
4
0
4
THROUGH B C D
Starkey Road
GRAND
A
RIGHT B C D
TOTALS
TOTALS
E
8
0
0
0
0
1
15
0
0
0
0
0
74 164 128 133 57 60 81 76 80 98 78 65 115 83 93 109 101 124 148 213 213 160 119 80
157 313 254 211 128 122 131 112 128 170 132 118 155 119 151 148 154 204 199 291 305 222 158 114
1
0
20
0
0
0
0
1
0
25
0
0
1
1
0
0
0
10
0
0
1
0
0
0
1
0
13
0
0
0
0
0
0
0
0
20
0
0
0
0
0
0
1
0
9
0
0
0
0
E 2
2652
4196
A
LEFT B C D
E
A
E
3
0
1
0
1
22
0
1
0
1
0
4
0
0
0
0
81
0
1
0
0
0
10
0
0
0
0
50
0
0
0
0
13
0
0
0
0
35
0
0
0
0
0
7
0
0
0
0
14
0
0
0
0
0
8
0
0
0
0
18
0
0
0
0
6
0
0
0
0
17
0
0
0
0
0
16
0
0
0
1
18
1
0
0
0
0
0
11
0
0
1
0
24
0
0
1
0
15
0
0
3
0
0
1
0
0
0
0
9
0
0
0
0
33
0
0
0
0
21
0
0
3
0
0
4
1
0
0
0
0
12
0
0
0
0
18
0
0
1
0
13
0
0
4
1
0
2
0
0
0
0
0
12
0
0
0
0
17
0
0
0
0
14
0
0
4
0
0
0
0
1
0
0
0
0
18
0
0
0
0
39
0
0
2
0
22
0
0
1
0
0
0
4
2
0
0
0
0
0
15
0
0
0
0
15
0
0
2
1
23
0
0
1
0
23
0
0
4
0
1
0
0
0
0
16
0
0
0
0
26
0
0
0
0
17
0
0
2
0
0
30
0
0
2
0
0
0
0
0
0
28
0
0
0
0
22
0
0
0
0
24
0
1
1
0
0
0
21
0
0
0
0
3
0
1
0
0
30
0
1
0
0
22
0
0
0
0
22
0
0
1
0
0
0
0
29
0
0
1
3
3
0
0
0
0
28
0
0
1
0
23
0
0
1
0
26
0
1
4
0
0
0
0
0
35
0
0
0
1
2
0
0
0
0
36
0
0
0
0
35
0
0
0
0
35
0
0
0
0
4
0
0
0
0
55
0
0
1
0
11
0
0
1
0
59
0
0
0
0
45
0
1
0
1
35
0
0
0
0
5
0
0
0
0
47
0
0
0
5
5
0
0
0
0
61
0
0
0
0
51
0
0
0
0
39
0
0
0
0
2
0
0
0
0
39
0
0
0
0
4
0
0
1
0
41
0
0
0
0
41
0
0
0
0
30
0
0
2
0
3
0
0
0
0
30
0
0
0
0
1
0
0
0
0
29
0
0
0
0
25
0
0
0
3
27
0
0
1
0
2
0
0
0
0
24
0
0
0
0
0
0
0
0
0
18
0
0
0
0
20
0
0
1
0
15
0
0
0
A 55
B 0
C D 1 15 NL
E 6
A 729
B 0
C 2 NT
D 14
E 28
A 39
B 0
C 1 NR
D 2
E 0
A 490
B 0
C 2 SL
D 2
E 2
A 711
B 0
C 3 ST
D 12
E 7
A 498
B 0
C D 2 29 SR
VEHICLE CLASSES
LOCATION DIAGRAM ENCLOSED (Y/N): WEATHER CONDITIONS: RECORDER(S):
A: PASSENGER VEHICLES D: SINGLE UNIT TRUCKS
COMMENTS: Page 1 of 3
B: RECREATION VEHICLES C: BUSES E: TRACTOR TRAILER COMBINATIONS
Turning Movement Summary Diagram Oct. 5, 2022
Intersection of: Location:
Starkey Road & E Estates Way-Trestle Ridge Rd. Sturgeon County, Alberta
NORTH LEG ON
Starkey Road
Vehicle Type
Vol.
%
A - Passenger Vehicle
1675
92.90
B - Recreational Vehicle
0 8 76 44
C - Bus D - Single Unit Truck E - Tractor Trailer Unit Total
Starkey Road
12 Hour Count: Reference No.:
0.00 0.44 4.22 2.44 1803
N
1803
Original 12 HOUR COUNT
E Estates Way 892
c d e
567 WEST LEG ON
E Estates Way
Vehicle Type
Vol.
A - Passenger Vehicle B - Recreational Vehicle C - Bus D - Single Unit Truck E - Tractor Trailer Unit Total
1240 97.792 1 0.08 9 0.71 16 1.26 2 0.16 1268
823 0 4 31 34
59
733
711 0 3 12 7
a b c d e
119 a b c d e
85 0 0 31 3
39 0 1 2 0
a b c d e
29
27 0 1 1 0
a b c d e
496
490 0 2 2 2
a b c d
a b c d
e
e
55 0 1 15 6
a b c d e
32 0 0 0 0
32
a b c d e
498 0 2 29 2
531
a b c d e
780 0 4 55 4
843 EAST LEG ON Vehicle Type
1268
A - Passenger Vehicle B - Recreational Vehicle
1483
77
C - Bus D - Single Unit Truck E - Tractor Trailer Unit Total
701
684 1 5 11 0
a b c d e
TURNING MOVEMENT ABBREVIATIONS NR: Traffic from North Turning Right NL: Traffic from North Turning Left NT: Traffic from North Proceeding Through SR: SL: ST:
Traffic from South Turning Right Traffic from South Turning Left Traffic from South Proceeding Through
ER: EL: ET:
Traffic from East Turning Right Traffic from East Turning Left Traffic from East Proceeding Through
WR: WL: WT:
Taffic from West Turning Right Traffic from West Turning Left Traffic from West Proceeding Through
TURNING MOVEMENT ABBREVIATIONS AADT: Average Annual Daily Traffic Average daily traffic expressed as vehicles per day for period of January 1 to December 31 (365 days)
a b c d e
596 1 4 9 0 610
a b c d e
729 0 2 14 28
a 668 b 0 c 3 d 23 e 1
773
695
Twp. Rd. 544A Vol.
1365 0 7 99 12
%
92.04 0.00 0.47 6.68 0.81 1483
640
a 1699 b 0 c 7 d 43
11
e
2078
1760
3838
SOUTH LEG ON Vehicle Type A - Passenger Vehicle B - Recreational Vehicle C - Bus
ASDT: Average Summer Daily Traffic Average daily traffic expressed as vehilces per day for period of May 1 to September 30 (153 days)
Trestle Ridge Rd.
S 56 0 1 2 0
a b c d e
42
%
E
Starkey Road
a b
W
911
D - Single Unit Truck E - Tractor Trailer Unit Total
Starkey Road Vol.
%
3692 96.20 1 0.03 16 0.42 89 2.32 40 1.04 3838
AADT Conversion Factor
1
Starkey Rd. & E Estates Way-Trestle Ridge Rd._Oct. 5, 2022
Hourly Traffic Fluctuations - 12 Hour Count Total Vehicles 350 313
305 291
VEHICLES PER 30 Minutes
300 254
250 222 211
204
199
200 170 157
150
155 128
131
128
122 112
151
148
154
158
132 118
100
50
0
COUNT PERIOD
119
114
DIRECTIONAL TRAFFIC COUNT SUMMARY HIGHWAY: Starkey Road
Starkey Road & Belroase Drive-Pinnacle Way
INTERSECTION OF:
REFERENCE NO.:
Sturgeon County
LEGAL DESCRIPTION:
DAY & DATE OF COUNT: Oct. 4, 2022
12 Hours
COUNT DURATION: APPROACHING INTERSECTION
FROM THE EAST ON INTERVAL VEH CLASS 7:00 - 7:30
A
LEFT B C D
E
A
THROUGH B C D
FROM THE WEST ON
Pinnacle Way
E
A
RIGHT B C D
E
A
LEFT B C D
E
A
THROUGH B C D
Belrose Drive
E
A
RIGHT B C D
E
TOTALS
9
0
0
0
0
1
0
0
0
0
2
0
0
0
0
35
0
0
0
0
8
0
0
0
0
75
0
1
1
0
132
7:30 - 8:00 8:00 - 8:30
15
0
0
0
0
3
0
0
0
0
1
0
0
0
0
40
0
0
0
0
1
0
0
0
0
73
0
0
0
0
25
0
0
0
0
10
0
0
0
0
2
0
0
0
0
38
0
0
0
0
15
0
0
0
0
85
0
0
1
0
133 176
8:30 -9:00 9:00 - 9:30 9:30 -10:00 10:00-10:30 10:30 -11:00 11:00 - 11:30 pm 11:30 - 12:00 12:00 - 12:30 12:30 - 1:00 1:00 - 1:30 1:30 - 2:00
10
0
0
0
0
5
0
0
0
0
2
0
0
0
0
16
0
0
0
0
3
0
0
0
0
46
0
0
0
0
5
0
0
0
0
2
0
0
1
0
1
0
0
0
0
10
0
0
1
0
2
0
0
0
0
42
0
0
1
0 0
2:00 - 2:30 2:30 - 3:00 3:00 - 3:30 3:30 - 4:00 4:00 - 4:30 4:30 - 5:00 5:00 - 5:30 5:30 - 6:00 6:00 - 6:30 6:30 - 7:00 VEH CLASS TOTALS
8
0
0
0
0
3
0
0
0
0
1
0
0
0
0
16
0
0
2
0
5
0
0
0
0
39
0
0
2
10
0
0
0
0
4
0
0
0
0
0
0
0
0
0
14
0
0
2
0
2
0
0
0
0
45
0
0
0
0
8
0
0
0
0
2
0
0
0
0
0
0
0
0
0
9
0
0
0
0
2
0
0
0
0
30
0
0
0
0
5
0
0
0
0
3
0
0
0
0
1
0
0
0
0
15
0
0
0
0
6
0
0
0
0
36
0
0
0
0
4
0
0
0
0
6
0
0
0
0
1
0
0
0
0
20
0
0
1
0
3
0
0
0
0
49
0
0
0
0
8
0
0
1
0
1
0
0
0
0
0
0
0
0
0
21
0
0
1
0
5
0
0
0
0
37
0
0
0
0
4
0
0
1
0
5
0
0
0
0
0
0
0
0
0
18
0
0
0
0
4
0
0
0
0
41
0
0
1
0
8
0
0
0
0
9
0
0
0
0
0
0
0
0
0
23
0
0
0
0
5
0
0
0
0
26
0
0
0
0
9
0
0
0
0
4
0
0
0
0
0
0
0
1
0
20
0
0
2
0
6
0
0
0
0
35
0
0
0
0
11
0
0
0
0
3
0
0
0
0
0
0
0
0
0
28
0
0
0
0
4
0
0
0
0
36
0
0
0
0
9
0
0
0
0
8
0
0
0
0
0
0
0
0
0
35
0
0
0
0
4
0
0
0
0
47
0
0
0
0
17
0
0
0
0
4
0
0
0
0
2
0
0
1
0
31
0
0
1
0
10
0
0
0
0
45
0
1
0
1
6
0
0
1
0
5
0
0
0
0
1
0
0
0
0
55
0
0
0
0
12
0
0
0
0
60
0
1
0
0
13
0
0
1
0
6
0
0
1
0
0
0
0
1
0
34
0
0
1
0
6
0
0
0
0
55
0
0
0
0
10
0
0
0
0
14
0
0
0
0
4
0
0
0
0
42
0
0
0
0
6
0
0
0
0
65
0
0
2
0
8
0
0
0
0
5
0
0
0
0
0
0
0
0
0
39
0
0
0
0
12
0
0
1
0
63
0
0
0
0
9
0
0
1
0
3
0
0
0
0
0
0
0
0
0
44
0
0
0
0
8
0
0
0
0
75
0
0
0
0
5
0
0
0
0
3
0
0
0
0
0
0
0
0
0
30
0
0
0
0
4
0
0
0
0
41
0
0
1
0
12
0
0
0
0
3
0
0
0
0
3
0
0
0
0
14
0
0
0
0
5
0
0
0
0
40
0
0
1
0
A
B
C
D
E
A
B
C
D
E
A
B
C
D
E
A
B
C
D
E
A
B
C
D
E
A
B
C
D
E
228
0
0
5
0
112
0
0
2
0
21
0
0
3
0
647
0
0
11
0
138
0
0
1
0
1186
0
3
10
1
EL
ET
ER
WL
WT
82 65 76 77 51 66 84 74 74 71 77 82 103 113 141 118 143 128 140 84 78 2368
WR
VEHICLE CLASSES
LOCATION DIAGRAM ENCLOSED (Y/N):
A: PASSENGER VEHICLES D: SINGLE UNIT TRUCKS
WEATHER CONDITIONS: RECORDER(S):
B: RECREATION VEHICLES C: BUSES E: TRACTOR TRAILER COMBINATIONS
COMMENTS:
APPROACHING INTERSECTION
FROM THE NORTH ON INTERVAL VEH CLASS 7:00 - 7:30 7:30 - 8:00 8:00 - 8:30 8:30 -9:00 9:00 - 9:30 9:30 -10:00 10:00-10:30 10:30 -11:00 11:00 - 11:30 pm 11:30 - 12:00 pm 12:00 - 12:30 12:30 - 1:00 1:00 - 1:30 1:30 - 2:00 2:00 - 2:30 2:30 - 3:00 3:00 - 3:30 3:30 - 4:00 4:00 - 4:30 4:30 - 5:00 5:00 - 5:30 5:30 - 6:00 6:00 - 6:30 6:30 - 7:00 VEH CLASS TOTALS
A
LEFT B C D
THROUGH B C D
E
A
E
2
0
0
0
0
100
0
1
2
0
0
0
0
0
0
109
0
0
2
0
0
0
0
0
100
3
1
0
0
0
0
0
80
0
1
0
0
0
0
0
42
0
1
0
0
0
0
34
0
1
0
0
1
0
52
1
0
0
0
0
0
0
0
0
0
0
0
1
0
0
FROM THE SOUTH ON
Starkey Road A
RIGHT B C D
A
LEFT B C D
E
14
0
0
0
0
0
29
0
0
0
2
0
45
0
0
5
0
17
0
1
1
0
0
17
0
0
2
0
19
0
0
0
1
0
22
35
0
0
2
0
0
43
0
0
1
0
0
36
0
0
0
0
0
58
0
0
0
0
0
35
2
0
0
1
0
0
0
0
1
1
0
0
0
0
0
THROUGH B C D
E
A
E
34
0
0
0
0
76
0
1
0
0
0
39
0
0
0
0
75
0
1
2
0
0
46
0
1
1
0
90
0
0
0
0
45
0
1
0
0
48
0
0
0
0
0
37
0
0
0
0
37
0
0
2
0
20
0
0
0
0
44
0
0
0
0
0
26
0
0
0
0
33
19
0
0
1
0
43
0
0
0
0
0
16
0
0
1
0
35
0
0
1
0
0
26
0
0
2
0
38
0
0
0
2
0
15
0
0
0
0
37
0
0
0
3
0
19
0
0
1
0
36
37
0
0
2
0
15
0
0
1
0
0
42
0
0
2
0
24
0
0
0
0
0
45
0
0
0
0
18
0
0
0
0
0
53
0
0
0
0
22
0
0
0
0
0
56
0
0
2
0
30
3
0
0
1
0
60
0
0
2
0
0
0
0
0
0
73
0
0
3
1
0
0
0
0
80
0
0
0
0
0
0
0
65
0
1
0
0
0
0
72
2
0
0
0
0
0
0
0
0
0
A 16
B 0
C 0 NL
D 4
E 0
RECORDER(S):
GRAND
A
RIGHT B C D
E
2
0
0
0
0
0
4
2
1
0
0
0
0
13
0
1
0
0
5
0
5
0
0
1
0
0
2
2
0
0
0
0
0
0
0
0
9
0
0
0
0
0
0
3
0
5
0
0
0
0
25
0
1
3
0
5
0
0
0
0
0
31
0
0
2
0
3
0
0
0
0
0
0
37
0
1
2
0
6
0
0
1
0
0
0
1
32
0
0
1
0
4
0
0
1
0
0
0
1
0
48
0
0
2
0
8
0
0
0
0
32
0
0
0
0
36
0
0
5
1
8
0
0
0
0
0
33
0
0
0
0
43
0
0
2
0
8
0
0
0
0
1
0
34
0
0
0
0
43
0
0
2
0
4
0
0
1
0
0
1
0
37
0
0
0
0
70
0
0
2
0
7
0
1
0
0
0
1
1
0
70
0
0
0
0
65
0
0
0
0
8
0
1
2
0
52
0
0
2
0
95
0
0
2
0
70
0
0
3
0
9
0
1
0
0
1
34
0
0
1
0
105
0
2
0
0
95
0
1
1
0
11
0
1
2
1
1
1
45
0
0
1
0
105
0
1
0
0
92
0
1
2
1
13
0
0
0
0
0
0
0
37
0
0
0
0
105
0
0
0
0
100
0
0
1
0
14
0
0
0
0
0
0
0
0
15
0
0
0
0
95
0
0
1
0
90
0
0
0
0
16
0
0
0
0
73
0
0
2
0
27
0
0
0
0
67
0
0
0
0
88
0
0
0
1
14
0
0
1
0
66
0
0
0
0
21
0
0
0
0
53
0
0
0
0
74
0
0
2
0
4
0
0
0
A 1446
B 3
C 4 NT
D 36
E 2
A 598
B 0
C D 2 15 NR
E 0
A B 1267 0
C 5 SL
D 6
E 1
A 1442
B 0
C 6 ST
D 42
E 5
A 180
B 2
C 6 SR
D 9
TOTALS
TOTALS
0
232 264 303 209 138 131 144 135 133 149 152 153 140 155 149 193 236 300 331 344 322 290 275 220
364 397 479 291 203 207 221 186 199 233 226 227 211 232 231 296 349 441 449 487 450 430 359 298
E 1
5098
7466
VEHICLE CLASSES
LOCATION DIAGRAM ENCLOSED (Y/N): WEATHER CONDITIONS:
Starkey Road
A: PASSENGER VEHICLES D: SINGLE UNIT TRUCKS
COMMENTS: Page 1 of 3
B: RECREATION VEHICLES C: BUSES E: TRACTOR TRAILER COMBINATIONS
Turning Movement Summary Diagram Oct. 4, 2022
Intersection of: Location:
Starkey Road & Belrose Drive-Pinnacle Way Sturgeon County, Alberta
NORTH LEG ON
Starkey Road
Vehicle Type
Vol.
%
A - Passenger Vehicle
4170
96.91
B - Recreational Vehicle
3 12 111 7
C - Bus D - Single Unit Truck E - Tractor Trailer Unit Total
Starkey Road
12 Hour Count: Reference No.:
0.07 0.28 2.58 0.16 4303
N
4303
Original 12 HOUR COUNT
Belrose Drive 2126 a 2060
2008 WEST LEG ON
Belrose Drive
Vehicle Type
Vol.
A - Passenger Vehicle B - Recreational Vehicle C - Bus D - Single Unit Truck E - Tractor Trailer Unit Total
598 0 2 15 0
a b c d e
114
112 0 0 2 0
a b c d e
%
3948 98.577 0 0.00 10 0.25 45 1.12 2 0.05 4005
4005
E
1495
24
S 647 0 0 11 0
a b c d e
a b c d e
1442 0 6 42 5
a b c d e
21 0 0 3 0
a b c d e
361 0 0 10 0
1267 a 0 b 1279 5 c 6 d 1 e
a b c d e
16 0 0 4 0
1971 0 3 22 1
a b c d e
138 0 0 1 0
139
a b c d e
180 2 6 9 1
198
371 EAST LEG ON
Vol.
%
695 2 6 24 1
95.47 0.27 0.82 3.30 0.14
B - Recreational Vehicle
728
20
a b c d e
TURNING MOVEMENT ABBREVIATIONS NR: Traffic from North Turning Right NL: Traffic from North Turning Left NT: Traffic from North Proceeding Through SR: SL: ST:
Traffic from South Turning Right Traffic from South Turning Left Traffic from South Proceeding Through
ER: EL: ET:
Traffic from East Turning Right Traffic from East Turning Left Traffic from East Proceeding Through
WR: WL: WT:
Taffic from West Turning Right Traffic from West Turning Left Traffic from West Proceeding Through
TURNING MOVEMENT ABBREVIATIONS AADT: Average Annual Daily Traffic Average daily traffic expressed as vehicles per day for period of January 1 to December 31 (365 days)
a 1186 0 b c 3 10 d e 1
a 1446 3 b c 4 36 d e 2
a 228 b 0 c 0 d 5 e 0
1200
1491
233
C - Bus D - Single Unit Truck E - Tractor Trailer Unit
728
357
a 2889 b 2 c 17 d 57
7
e
2924
2972
5896
SOUTH LEG ON Vehicle Type A - Passenger Vehicle B - Recreational Vehicle C - Bus
ASDT: Average Summer Daily Traffic Average daily traffic expressed as vehilces per day for period of May 1 to September 30 (153 days)
Pinnacle Way
Vehicle Type A - Passenger Vehicle
Total
1997
Pinnacle Way
Starkey Road
c d e
615
658
3 6 55 2
b
W
2177
D - Single Unit Truck E - Tractor Trailer Unit Total
Starkey Road Vol.
%
5749 97.51 5 0.08 24 0.41 108 1.83 10 0.17 5896
AADT Conversion Factor
1
Starkey Rd. & Belrose Dr.-Pinnacle Way_Oct. 4, 2022
Hourly Traffic Fluctuations - 12 Hour Count Total Vehicles 600
VEHICLES PER 30 Minutes
487
479
500
441
449
450 430
397
400
364
349 296
291
300 203
207
233
221 186
199
226
232
227 211
200
100
0
COUNT PERIOD
231
359 298
DIRECTIONAL TRAFFIC COUNT SUMMARY HIGHWAY: Starkey Road
Starkey Road & Sturgeon Road
INTERSECTION OF:
REFERENCE NO.:
Sturgeon County
LEGAL DESCRIPTION:
DAY & DATE OF COUNT: Sept. 29, 2022
12 Hours
COUNT DURATION: APPROACHING INTERSECTION
FROM THE EAST ON INTERVAL VEH CLASS 7:00 - 7:30
A
LEFT B C D
E
A
THROUGH B C D
E
FROM THE WEST ON
Sturgeon Road A
RIGHT B C D
E
A
LEFT B C D
E
A
THROUGH B C D
Sturgeon Road
E
A
RIGHT B C D
E
TOTALS
0
0
0
0
0
77
0
1
0
0
8
0
0
1
0
46
0
2
1
0
28
0
1
0
0
0
0
0
0
0
165
7:30 - 8:00 8:00 - 8:30
0
0
0
0
0
79
0
1
0
0
13
0
0
0
0
76
0
1
2
0
69
0
0
0
0
0
0
0
0
0
0
0
0
0
0
88
0
1
1
0
21
0
1
0
0
54
0
2
2
1
71
0
1
2
0
0
0
0
0
0
241 245
8:30 -9:00 9:00 - 9:30 9:30 -10:00 10:00-10:30 10:30 -11:00 11:00 - 11:30 pm 11:30 - 12:00 12:00 - 12:30 12:30 - 1:00 1:00 - 1:30 1:30 - 2:00
0
0
0
0
0
60
0
0
0
0
16
0
0
0
0
67
0
0
1
0
54
0
0
0
0
0
0
0
0
0
0
0
0
0
0
49
0
0
2
0
10
0
0
2
0
48
0
0
2
0
29
0
0
2
3
0
0
0
0
0
0
0
0
0
0
29
0
1
1
0
11
0
0
1
0
34
0
0
1
0
25
0
0
0
1
0
0
0
0
0
0
0
0
0
0
25
0
0
1
1
25
0
0
0
0
51
0
0
1
1
26
0
0
2
0
0
0
0
0
0
0
0
0
0
0
35
0
0
1
0
26
0
0
2
0
44
0
0
0
0
42
0
0
1
0
0
0
0
0
0
0
0
0
0
0
36
0
0
0
1
33
0
1
0
0
42
0
0
2
0
35
0
0
0
1
0
0
0
0
0
0
0
0
0
0
33
0
0
2
0
38
0
0
0
1
51
0
0
2
0
58
0
0
2
0
0
0
0
0
0
0
0
0
0
0
47
0
0
0
0
42
0
0
4
0
54
0
0
0
1
50
0
0
2
0
0
0
0
0
0
0
0
0
0
0
45
0
0
1
0
48
0
0
3
0
68
0
0
3
0
53
0
0
1
0
0
0
0
0
0
0
0
0
0
0
36
0
0
2
0
42
0
0
0
0
58
0
0
2
1
54
0
0
0
0
0
0
0
0
0
0
0
0
0
0
35
0
0
2
0
46
0
0
2
0
64
0
0
2
0
44
0
1
2
0
0
0
0
0
0
2:00 - 2:30 2:30 - 3:00 3:00 - 3:30 3:30 - 4:00 4:00 - 4:30 4:30 - 5:00 5:00 - 5:30 5:30 - 6:00 6:00 - 6:30 6:30 - 7:00 VEH CLASS TOTALS
0
0
0
0
0
20
0
0
0
0
39
0
1
0
0
65
0
0
4
0
39
0
0
2
0
0
0
0
0
0
0
0
0
0
0
27
0
0
0
0
54
0
2
3
0
73
0
0
2
1
40
0
0
2
0
0
0
0
0
0
0
0
0
0
0
48
0
2
1
0
73
0
1
2
0
119
0
0
3
0
56
0
0
0
0
0
0
0
0
0
0
0
0
0
0
44
0
0
0
0
100
0
1
2
0
135
0
2
4
0
80
0
1
0
0
0
0
0
0
0
0
0
0
0
0
30
0
0
0
0
100
0
1
0
0
137
0
1
4
0
95
0
0
0
0
0
0
0
0
0
0
0
0
0
0
70
0
0
0
0
85
0
0
0
0
138
0
0
5
0
68
0
1
0
0
0
0
0
0
0
0
0
0
0
0
56
0
0
1
0
94
0
0
1
0
122
0
1
3
0
94
0
0
0
0
0
0
0
0
0
0
0
0
0
0
36
0
0
0
0
49
0
0
0
0
103
0
0
2
0
56
0
0
2
0
0
0
0
0
0
0
0
0
0
0
27
0
0
3
0
48
0
0
0
0
91
0
0
2
0
42
0
0
1
0
0
0
0
0
0
0
0
0
0
0
26
0
0
0
0
40
0
0
0
0
78
0
0
2
0
34
0
0
0
0
0
0
0
0
0
A
B
C
D
E
A
B
C
D
E
A
B
C
D
E
A
B
C
D
E
A
B
C
D
E
A
B
C
D
E
0
0
0
0
0
1058
0
6
18
2
1061
0
8
23
1
1818
0
9
52
5
1242
0
5
21
5
0
0
0
0
0
EL
ET
ER
WL
WT
198 147 104 133 151 151 187 200 222 195 198 170 204 305 369 368 367 372 248 214 180 5334
WR
VEHICLE CLASSES
LOCATION DIAGRAM ENCLOSED (Y/N):
A: PASSENGER VEHICLES D: SINGLE UNIT TRUCKS
WEATHER CONDITIONS: RECORDER(S):
B: RECREATION VEHICLES C: BUSES E: TRACTOR TRAILER COMBINATIONS
COMMENTS:
APPROACHING INTERSECTION
FROM THE NORTH ON INTERVAL VEH CLASS 7:00 - 7:30 7:30 - 8:00 8:00 - 8:30 8:30 -9:00 9:00 - 9:30 9:30 -10:00 10:00-10:30 10:30 -11:00 11:00 - 11:30 pm 11:30 - 12:00 pm 12:00 - 12:30 12:30 - 1:00 1:00 - 1:30 1:30 - 2:00 2:00 - 2:30 2:30 - 3:00 3:00 - 3:30 3:30 - 4:00 4:00 - 4:30 4:30 - 5:00 5:00 - 5:30 5:30 - 6:00 6:00 - 6:30 6:30 - 7:00 VEH CLASS TOTALS
FROM THE SOUTH ON
Starkey Road
A
E
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
63
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
50
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
51
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
57
4
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
33
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
36
1
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
35
0
0
2
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
A 0
B 0
C 0 NT
D 0
E 0
A B C D 1257 16 2 39 NR
E 2
A 0
B 0
C 0 SL
D 0
E 0
A 0
B 0
C 0 ST
D 0
E 0
A 0
B 0
C 0 SR
D 0
THROUGH B C D
A
RIGHT B C D
A
E
A
E
140
0
2
1
0
0
0
0
0
0
E
54
1
0
0
0
170
0
0
2
0
0
0
0
0
0
98
0
0
0
135
0
0
5
0
0
0
0
123
0
0
4
1
0
0
0
0
0
106
0
1
0
0
92
0
0
62
1
0
1
0
0
0
53
0
0
2
0
0
0
0
0
0
50
0
0
0
0
30
1
66
0
0
2
0
0
0
0
0
0
41
65
0
0
3
1
0
0
0
0
0
69
0
0
2
0
0
0
0
0
81
0
0
4
1
0
0
0
69
0
0
3
0
0
0
86
0
0
5
0
0
85
1
0
2
0
74
2
0
3
69
3
1
74
0
78
THROUGH B C D
A
LEFT B C D
E
A
E
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
0
2
1
0
0
0
0
0
0
0
0
2
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0
0
34
2
0
2
0
0
0
0
0
0
0
35
1
0
2
0
0
0
0
0
0
0
52
0
0
2
0
0
0
0
0
0
0
43
1
0
3
0
0
0
0
0
0
0
39
0
0
2
0
0
0
0
0
0
0
62
2
0
3
0
0
0
0
0
0
0
53
3
0
2
3
0
0
0
0
0
0
43
0
0
0
3
1
0
0
0
0
0
48
0
0
0
4
2
0
0
0
0
0
52
92
0
0
3
0
0
0
0
0
0
95
0
1
3
0
0
0
0
0
90
2
1
3
0
0
0
0
111
2
0
3
0
0
0
84
1
0
1
1
0
57
0
0
1
0
0
73
0
0
1
0
A B C D 2101 12 5 64 NL
E 7
RECORDER(S):
TOTALS
TOTALS
0
198 270 249 222 117 88 110 107 109 140 119 132 155 137 121 128 138 159 149 148 179 122 97 111
363 511 494 420 264 192 243 258 260 327 319 354 350 335 291 332 443 528 517 515 551 370 311 291
E 0
3505
8839
VEHICLE CLASSES
LOCATION DIAGRAM ENCLOSED (Y/N): WEATHER CONDITIONS:
GRAND RIGHT B C D
LEFT B C D
A: PASSENGER VEHICLES D: SINGLE UNIT TRUCKS
COMMENTS: Page 1 of 3
B: RECREATION VEHICLES C: BUSES E: TRACTOR TRAILER COMBINATIONS
Turning Movement Summary Diagram Sept. 29, 2022
Intersection of: Location:
Starkey Road & Sturgeon Rd. Sturgeon County, Alberta
NORTH LEG ON
Starkey Road
Vehicle Type
Vol.
%
A - Passenger Vehicle
6237
96.22
B - Recreational Vehicle
28 24 178 15
C - Bus D - Single Unit Truck E - Tractor Trailer Unit Total
Starkey Road
12 Hour Count: Reference No.:
0.43 0.37 2.75 0.23 6482
N
6482
Original 12 HOUR COUNT
Sturgeon Road 3505 a 3358
c d e
1316
2400 WEST LEG ON
Sturgeon Road
Vehicle Type
Vol.
A - Passenger Vehicle B - Recreational Vehicle C - Bus D - Single Unit Truck E - Tractor Trailer Unit Total
%
5375 96.725 16 0.29 22 0.40 130 2.34 14 0.25 5557
1884
28 7 103 9
b
E
W
0
1093
0 0 0 0 0
a 1061 b 0 c 8 d 23 1 e
S
1818 0 9 52 5
a b c d e
a b c d e
1257 a 16 b 2 c 39 d 2 e
1058 a 0 b 1084 6 c 18 d 2 e
a 2119 b 0 c 14 d 41 e 3
2177 EAST LEG ON Vehicle Type
5557
0
0 0 0 0 0
2101 12 5 64 7 e
a b c d
a b c d
e
A - Passenger Vehicle B - Recreational Vehicle
5639
2189
C - Bus D - Single Unit Truck E - Tractor Trailer Unit Total
3157
3060 0 14 73 10
a b c d e
TURNING MOVEMENT ABBREVIATIONS NR: Traffic from North Turning Right NL: Traffic from North Turning Left NT: Traffic from North Proceeding Through SR: SL: ST:
Traffic from South Turning Right Traffic from South Turning Left Traffic from South Proceeding Through
ER: EL: ET:
Traffic from East Turning Right Traffic from East Turning Left Traffic from East Proceeding Through
WR: WL: WT:
Taffic from West Turning Right Traffic from West Turning Left Traffic from West Proceeding Through
Sturgeon Road
2977
TURNING MOVEMENT ABBREVIATIONS AADT: Average Annual Daily Traffic Average daily traffic expressed as vehicles per day for period of January 1 to December 31 (365 days)
a b c d e
0 0 0 0 0 0
a b c d e
0 0 0 0 0 0
1242 0 5 21 5
1273
a b c d e
0 0 0 0 0
0
%
96.86 0.21 0.43 2.23 0.27 5639
3462
0 0 0 0 0
a b c d
0
e
0
0
0
SOUTH LEG ON Vehicle Type
Vol.
%
A - Passenger Vehicle
0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0
B - Recreational Vehicle C - Bus
ASDT: Average Summer Daily Traffic Average daily traffic expressed as vehilces per day for period of May 1 to September 30 (153 days)
0 0 0 0 0
a b c d e
a b c d e
Sturgeon Road Vol.
5462 12 24 126 15
D - Single Unit Truck E - Tractor Trailer Unit Total
AADT Conversion Factor
1
Starkey Rd. & Sturgeon Rd. Sept. 29, 2022
Hourly Traffic Fluctuations - 12 Hour Count Total Vehicles 600 551 528 511
517
515
494
VEHICLES PER 30 Minutes
500 443 420
400
370
363
354 327
350
335
332
319
311 291
300
264 243
258
260
192
200
100
0
COUNT PERIOD
291
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Appendix B Intersection Analysis - Synchro
48
Lanes, Volumes, Timings 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
8 8 1900 0.3 0.0 0 0.0 1.00
1 1 1900 3.7
119 119 1900 0.3 0.0 0
2 2 1900 3.7
6 6 1900 0.3 0.0 0
37 37 1900 0.3 0.0 0
3 3 1900 3.7 0.0 0
1.00 0.887
1.00
1.00 0.974
1.00
7 7 1900 3.7 0.0 0 0.0 0.95
122 122 1900 3.7
1.00
14 14 1900 3.7 105.0 1 0.0 1.00
175 175 1900 3.7
1.00 0.874 0.997 1641 0.997 1641 40 160.1 14.4 1.00 1
113 113 1900 3.7 15.0 1 0.0 1.00
0.95
1671
0
1834
0
0
1671 60 308.8 18.5 1.00 2
0
0.950 1789 0.950 1789
0
0
1.00 6
1.00 14
1834 70 536.6 27.6 1.00 175
1.00 37
1.00 7
0.95 0.997 0.997 3557 0.997 3557 70 477.5 24.6 1.00 122
0 No Left
1.75 26
0 0
1.00 8
0
0.950 1789 0.950 1789
1.00 119
1.00 113
128 No Left 3.7 0.0 2.4
0 No Right
113 No Left
8 No Left 3.7 0.0 2.4
0 No Right
14 No Left
212 No Left 3.7 0.0 2.4
0 No Right
0 No Left
132 No Left 3.7 0.0 2.4
0 No Right
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
Stop
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 32.8% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2022 Existing.syn
0
Stop
Free
0 0
1.00 3
Free
ICU Level of Service A
Synchro 11 Report Page 1
HCM Unsignalized Intersection Capacity Analysis 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
8 8
1 1 Stop 0% 1.00 1
119 119
113 113
6 6
14 14
7 7
1.00 6
1.00 14
1.00 37
1.00 7
122 122 Free 0% 1.00 122
3 3
1.00 113
175 175 Free 0% 1.00 175
37 37
1.00 119
2 2 Stop 0% 1.00 2
1.00 8
None
None
348
378
62
416
360
194
125
212
348 7.5
378 6.5
62 6.9
416 7.5
360 6.5
194 6.9
125 4.1
212 4.1
3.5 99 570
4.0 100 545
3.3 88 989
3.5 75 452
4.0 100 557
3.3 99 815
2.2 99 1459
2.2 99 1356
EB 1 128 8 119 940 0.14 3.6 9.4 A 9.4 A
WB 1 113 113 0 452 0.25 7.4 15.6 C 15.2 C
WB 2 8 0 6 731 0.01 0.3 10.0 A
NB 1 14 14 0 1459 0.01 0.2 7.5 A 0.5
NB 2 212 0 37 1700 0.12 0.0 0.0
SB 1 68 7 0 1356 0.01 0.1 0.8 A 0.4
SB 2 64 0 3 1700 0.04 0.0 0.0
Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2022 Existing.syn
5.3 32.8% 15
ICU Level of Service
1.00 3
A
Synchro 11 Report Page 2
Lanes, Volumes, Timings 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 0.3 1.00
34 34 1900 3.7 1.00 0.965
11 11 1900 3.7 1.00
7 7 1900 3.7 1.00
89 89 1900 3.7 1.00
0 0 1900 0.3 1.00
32 32 1900 3.7 1.00
5 5 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 0.3 1.00
0
1818
0
0
0
0
0
0
1883
0
0
1818 60 308.8 18.5 1.00 2% 34
0
0
0
0
0
0
0.90 2% 8
1.00 0% 0
0.90 2% 36
0.90 2% 6
1.00 0% 0
1883 40 69.7 6.3 0.90 2% 0
0
0.90 2% 12
0 0 1900 3.7 1.00 0.981 0.959 1772 0.959 1772 40 78.4 7.1 0.90 2% 0
1.00 0% 0
0.996 1876 0.996 1876 60 150.6 9.0 1.00 2% 89
1.00 0% 0
0 No Left
46 No Left 3.7 0.0 2.4
0 No Right
0 No Left
97 No Left 3.7 0.0 2.4
0 No Right
0 No Left
42 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 2.4
0 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0.99 26
0.99
1.75 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 20.5% Analysis Period (min) 15
PinnacleVillage-1-AM_v0.4 - 2022 Existing.syn
Free
Stop
Stop
ICU Level of Service A
Synchro 11 Report Page 3
HCM Unsignalized Intersection Capacity Analysis 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0
34 34 Free 0% 1.00 34
11 11
7 7
0 0
32 32
0 0
1.00 0
0.90 36
0.90 6
1.00 0
0 0 Stop 0% 0.90 0
0 0
0.90 8
0 0 Stop 0% 0.90 0
5 5
0.90 12
89 89 Free 0% 1.00 89
1.00 0
1.00 0
None
None
89
46
145
145
40
151
151
89
89 4.1
46 4.1
145 7.1
145 6.5
40 6.2
151 7.1
151 6.5
89 6.2
2.2 100 1519
2.2 99 1562
3.5 96 821
4.0 100 742
3.3 99 1031
3.5 100 813
4.0 100 737
3.3 100 975
EB 1 46 0 12 1519 0.00 0.0 0.0 0.0
WB 1 97 8 0 1562 0.01 0.1 0.6 A 0.6
Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min)
PinnacleVillage-1-AM_v0.4 - 2022 Existing.syn
NB 1 42 36 6 845 0.05 1.2 9.5 A 9.5 A 2.5 20.5% 15
SB 1 0 0 0 1700 0.00 0.0 0.0 A 0.0 A
ICU Level of Service
A
Synchro 11 Report Page 4
Lanes, Volumes, Timings 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
3 3 1900 0.3 0.0 0 0.0 1.00
365 365 1900 3.7
96 96 1900 3.7 130.0 1
251 251 1900 3.7
2 2 1900 0.3 0.0 0
52 52 1900 3.7 10.0 1
16 16 1900 3.7 10.0 1
1.00 0.999
1.00
1.00
1.00 0.850
5 5 1900 0.3 0.0 0 0.0 1.00
22 22 1900 3.7
1.00 0.850
129 129 1900 0.3 0.0 0 0.0 1.00
8 8 1900 3.7
1.00
14 14 1900 3.7 110.0 1 0.0 1.00
1.00
1.00 0.850
0
1883
1601
1882
0
0
1883 70 263.2 13.5 1.00 365
1601
0.950 1789 0.950 1789
0
1.00 96
1.00 14
1882 70 245.1 12.6 1.00 251
0 No Left
368 No Left 3.7 0.0 2.4
96 No Right
14 No Left
1.75 26
0.99
0.99 14
0.99 26
1.00 3
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 42.5% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2022 Existing.syn
1.00 2
0.955 1799 0.955 0 1799 70 1595.3 82.0 1.00 1.00 129 8
253 No Left 3.7 0.0 2.4
0 No Right
0 No Left
137 No Left 0.0 0.0 2.4
52 No Right
0 No Left
27 No Left 0.0 0.0 2.4
16 No Right
0.99
1.75 14
1.75 26
0.99
0.99 14
1.75 26
0.99
0.99 14
Free
0
Stop
1601
0
1601
0
1.00 52
1.00 5
0.991 1866 0.991 1866 70 138.7 7.1 1.00 22
1601 1601
1.00 16
Stop
ICU Level of Service A
Synchro 11 Report Page 5
HCM Unsignalized Intersection Capacity Analysis 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
3 3
365 365 Free 0% 1.00 365
96 96
14 14
2 2
129 129
5 5
1.00 2
1.00 129
1.00 52
1.00 5
22 22 Stop 0% 1.00 22
16 16
1.00 14
8 8 Stop 0% 1.00 8
52 52
1.00 96
251 251 Free 0% 1.00 251
1.00 3
1 None
1.00 16
1
None
253
461
669
652
365
681
747
252
253 4.1
461 4.1
669 7.1
652 6.5
365 6.2
681 7.1
747 6.5
252 6.2
2.2 100 1312
2.2 99 1100
3.5 62 342
4.0 98 381
3.3 92 680
3.5 98 327
4.0 93 336
3.3 98 787
EB 1 368 3 0 1312 0.00 0.1 0.1 A 0.1
EB 2 96 0 96 1700 0.06 0.0 0.0
Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2022 Existing.syn
WB 1 14 14 0 1100 0.01 0.3 8.3 A 0.4
4.6 42.5% 15
WB 2 253 0 2 1700 0.15 0.0 0.0
NB 1 189 129 52 436 0.43 16.3 19.4 C 19.4 C
SB 1 43 5 16 533 0.08 2.0 14.1 B 14.1 B
ICU Level of Service
A
Synchro 11 Report Page 6
Lanes, Volumes, Timings 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
61 61 1900 0.3
20 20 1900 3.7 0.0 1 0.0 1.00
152 152 1900 3.7 50.0 1
105 105 1900 3.7 105.0 1 0.0 1.00
161 161 1900 3.7
22 22 1900 0.3 0.0 0
267 267 1900 3.7
86 86 1900 3.7 35.0 1
4 4 1900 0.3
1.00
1.00
1.00 0.850
39 39 1900 3.7 30.0 1 0.0 1.00
17 17 1900 3.7 0.0 1
1.00 0.982
1 1 1900 0.3 0.0 0 0.0 1.00
1.00 0.850
1.00
1850
0
0
1883
1601
1601
0
1850 70 675.7 34.8 1.00 161
0
0
1601
1601
0
1.00 22
1.00 1
1883 70 171.1 8.8 1.00 267
1.00 17
1.00 4
1.00
0 0
1.00 61
0.950 1789 0.950 1789 70 288.3 14.8 1.00 20
1.00 0.850
1601
0.950 1789 0.950 1789
1.00 152
1.00 105
1601
1.00 86
0.950 1789 0.950 1789 40 207.9 18.7 1.00 39
0 No Left
81 No Left 3.7 0.0 2.4
152 No Right
105 No Left
183 No Left 3.7 0.0 2.4
0 No Right
0 No Left
268 No Left 3.7 0.0 2.4
86 No Right
39 No Left 3.7 0.0 2.4
21 No Right
0 No Right
1.75 26
0.99 26 Stop
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
0.99 26 Stop
0.99 14
1.75 14
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 45.1% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2022 Existing.syn
Free
Free
ICU Level of Service A
Synchro 11 Report Page 7
HCM Unsignalized Intersection Capacity Analysis 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h)
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
61 61
20 20 Stop 0% 1.00 20
152 152
105 105
22 22
1 1
4 4
1.00 22
1.00 1
39 39 Stop 0% 1.00 39
17 17
1.00 105
267 267 Free 0% 1.00 267
86 86
1.00 152
161 161 Free 0% 1.00 161
1.00 17
1.00 4
Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS
1.00 61
1.00 86
7 None
None
652
662
267
353
183
737
737
172
652 7.1
662 6.5
267 6.2
353 4.1
183 4.1
737 7.1
737 6.5
172 6.2
3.5 82 339
4.0 94 349
3.3 80 772
2.2 91 1206
2.2 100 1392
3.5 84 240
4.0 95 316
3.3 100 872
EB 1 233 61 152 983 0.24 7.0 13.6 B 13.6 B
NB 1 105 105 0 1206 0.09 2.2 8.3 A 3.0
NB 2 183 0 22 1700 0.11 0.0 0.0
SB 1 268 1 0 1392 0.00 0.0 0.0 A 0.0
Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2022 Existing.syn
5.6 45.1% 15
SB 2 86 0 86 1700 0.05 0.0 0.0
SW 1 39 39 0 240 0.16 4.3 22.9 C 20.4 C
ICU Level of Service
SW 2 21 0 4 359 0.06 1.4 15.6 C
A
Synchro 11 Report Page 8
Lanes, Volumes, Timings 26: Starkey Rd / Range Rd 251 & Ped Crossing
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
223 223 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
354 354 1900 1.00
0 0 1900 1.00
0
0
0
0
0
0
0
1883
0
0
1883
0
0
0 50 17.9 1.3
0
0
0 50 34.9 2.5
0
0
1883 70 171.1 8.8
0
0
1883 70 536.6 27.6
0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
5 0.90 0
5 0.90 0
5 0.90 0
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
248 No Left 3.7 0.0 4.8
0 No Right
0 No Left
393 No Left 3.7 0.0 4.8
0 No Right
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 22.0% Analysis Period (min) 15
PinnacleVillage-1-AM_v0.4 - 2022 Existing.syn
Free
0.90 248
Free
0.90 393
5 0.90 0
Free
ICU Level of Service A
Synchro 11 Report Page 9
HCM Unsignalized Intersection Capacity Analysis 26: Starkey Rd / Range Rd 251 & Ped Crossing
04-01-2025
Intersection Sign configuration not allowed in HCM analysis.
PinnacleVillage-1-AM_v0.4 - 2022 Existing.syn
Synchro 11 Report Page 10
Lanes, Volumes, Timings 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
8 8 1900 0.3 0.0 0 0.0 1.00
1 1 1900 3.7
126 126 1900 0.3 0.0 0
2 2 1900 3.7
6 6 1900 0.3 0.0 0
37 37 1900 0.3 0.0 0
3 3 1900 3.7 0.0 0
1.00 0.887
1.00
1.00 0.977
1.00
7 7 1900 3.7 0.0 0 0.0 0.95
165 165 1900 3.7
1.00
14 14 1900 3.7 105.0 1 0.0 1.00
201 201 1900 3.7
1.00 0.874 0.997 1641 0.997 1641 40 160.1 14.4 1.00 1
120 120 1900 3.7 15.0 1 0.0 1.00
0.95
1671
0
1840
0
0
1671 60 308.8 18.5 1.00 2
0
0.950 1789 0.950 1789
0
0
1.00 6
1.00 14
1840 70 537.9 27.7 1.00 201
1.00 37
1.00 7
0.95 0.997 0.998 3561 0.998 3561 70 477.5 24.6 1.00 165
0 No Left
1.75 26
0 0
1.00 8
0
0.950 1789 0.950 1789
1.00 126
1.00 120
135 No Left 3.7 0.0 2.4
0 No Right
120 No Left
8 No Left 3.7 0.0 2.4
0 No Right
14 No Left
238 No Left 3.7 0.0 2.4
0 No Right
0 No Left
175 No Left 3.7 0.0 2.4
0 No Right
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0
Stop
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 37.8% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2025 Future BG (Adj).syn
Stop
Free
0 0
1.00 3
Free
ICU Level of Service A
Synchro 11 Report Page 1
HCM Unsignalized Intersection Capacity Analysis 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
8 8
1 1 Stop 0% 1.00 1
126 126
120 120
6 6
14 14
7 7
1.00 6
1.00 14
1.00 37
1.00 7
165 165 Free 0% 1.00 165
3 3
1.00 120
201 201 Free 0% 1.00 201
37 37
1.00 126
2 2 Stop 0% 1.00 2
1.00 8
None
None
416
446
84
470
430
220
168
238
416 7.5
446 6.5
84 6.9
470 7.5
430 6.5
220 6.9
168 4.1
238 4.1
3.5 98 509
4.0 100 498
3.3 87 958
3.5 71 408
4.0 100 509
3.3 99 785
2.2 99 1407
2.2 99 1326
EB 1 135 8 126 905 0.15 4.0 9.7 A 9.7 A
WB 1 120 120 0 408 0.29 9.2 17.4 C 17.0 C
WB 2 8 0 6 691 0.01 0.3 10.3 B
NB 1 14 14 0 1407 0.01 0.2 7.6 A 0.4
NB 2 238 0 37 1700 0.14 0.0 0.0
SB 1 90 7 0 1326 0.01 0.1 0.6 A 0.3
SB 2 86 0 3 1700 0.05 0.0 0.0
5.3 37.8% 15
PinnacleVillage-1-AM_v0.4 - 2025 Future BG (Adj).syn
ICU Level of Service
1.00 3
A
Synchro 11 Report Page 2
Lanes, Volumes, Timings 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 0.3 1.00
36 36 1900 3.7 1.00 0.964
12 12 1900 3.7 1.00
7 7 1900 3.7 1.00
94 94 1900 3.7 1.00
0 0 1900 0.3 1.00
34 34 1900 3.7 1.00
5 5 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 0.3 1.00
0
1816
0
0
0
0
0
0
1883
0
0
1816 60 308.8 18.5 1.00 2% 36
0
0
0
0
0
0
0.90 2% 8
1.00 0% 0
0.90 2% 38
0.90 2% 6
1.00 0% 0
1883 40 69.7 6.3 0.90 2% 0
0
0.90 2% 13
0 0 1900 3.7 1.00 0.982 0.959 1774 0.959 1774 40 78.4 7.1 0.90 2% 0
1.00 0% 0
0.996 1876 0.996 1876 60 150.6 9.0 1.00 2% 94
1.00 0% 0
0 No Left
49 No Left 3.7 0.0 2.4
0 No Right
0 No Left
102 No Left 3.7 0.0 2.4
0 No Right
0 No Left
44 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 2.4
0 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0.99 26
0.99
1.75 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 20.7% Analysis Period (min) 15
PinnacleVillage-1-AM_v0.4 - 2025 Future BG (Adj).syn
Free
Stop
Stop
ICU Level of Service A
Synchro 11 Report Page 3
HCM Unsignalized Intersection Capacity Analysis 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min)
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0
36 36 Free 0% 1.00 36
12 12
7 7
0 0
34 34
0 0
1.00 0
0.90 38
0.90 6
1.00 0
0 0 Stop 0% 0.90 0
0 0
0.90 8
0 0 Stop 0% 0.90 0
5 5
0.90 13
94 94 Free 0% 1.00 94
1.00 0
1.00 0
None
None
94
49
152
152
42
158
159
94
94 4.1
49 4.1
152 7.1
152 6.5
42 6.2
158 7.1
159 6.5
94 6.2
2.2 100 1513
2.2 99 1558
3.5 95 811
4.0 100 735
3.3 99 1028
3.5 100 804
4.0 100 729
3.3 100 968
EB 1 49 0 13 1513 0.00 0.0 0.0 0.0
WB 1 102 8 0 1558 0.01 0.1 0.6 A 0.6
NB 1 44 38 6 835 0.05 1.3 9.5 A 9.5 A 2.5 20.7% 15
PinnacleVillage-1-AM_v0.4 - 2025 Future BG (Adj).syn
SB 1 0 0 0 1700 0.00 0.0 0.0 A 0.0 A
ICU Level of Service
A
Synchro 11 Report Page 4
Lanes, Volumes, Timings 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
3 3 1900 0.3 0.0 0 0.0 1.00
387 387 1900 3.7
106 106 1900 3.7 130.0 1
266 266 1900 3.7
2 2 1900 0.3 0.0 0
66 66 1900 3.7 10.0 1
17 17 1900 3.7 10.0 1
1.00 0.999
1.00
1.00
1.00 0.850
5 5 1900 0.3 0.0 0 0.0 1.00
23 23 1900 3.7
1.00 0.850
148 148 1900 0.3 0.0 0 0.0 1.00
8 8 1900 3.7
1.00
19 19 1900 3.7 110.0 1 0.0 1.00
1.00
1.00 0.850
0
1883
1601
1882
0
0
1883 70 263.2 13.5 1.00 387
1601
0.950 1789 0.950 1789
0
1.00 106
1.00 19
1882 70 245.1 12.6 1.00 266
0 No Left
390 No Left 3.7 0.0 2.4
106 No Right
19 No Left
1.75 26
0.99
0.99 14
0.99 26
1.00 3
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 44.7% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2025 Future BG (Adj).syn
1.00 2
0.955 1799 0.955 0 1799 70 1595.3 82.0 1.00 1.00 148 8
268 No Left 3.7 0.0 2.4
0 No Right
0 No Left
156 No Left 0.0 0.0 2.4
66 No Right
0 No Left
28 No Left 0.0 0.0 2.4
17 No Right
0.99
1.75 14
1.75 26
0.99
0.99 14
1.75 26
0.99
0.99 14
Free
0
Stop
1601
0
1601
0
1.00 66
1.00 5
0.991 1866 0.991 1866 70 138.7 7.1 1.00 23
1601 1601
1.00 17
Stop
ICU Level of Service A
Synchro 11 Report Page 5
HCM Unsignalized Intersection Capacity Analysis 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
3 3
387 387 Free 0% 1.00 387
106 106
19 19
2 2
148 148
5 5
1.00 2
1.00 148
1.00 66
1.00 5
23 23 Stop 0% 1.00 23
17 17
1.00 19
8 8 Stop 0% 1.00 8
66 66
1.00 106
266 266 Free 0% 1.00 266
1.00 3
1 None
1.00 17
1
None
268
493
717
699
387
735
804
267
268 4.1
493 4.1
717 7.1
699 6.5
387 6.2
735 7.1
804 6.5
267 6.2
2.2 100 1296
2.2 98 1071
3.5 53 313
4.0 98 357
3.3 90 661
3.5 98 292
4.0 93 310
3.3 98 772
EB 1 390 3 0 1296 0.00 0.1 0.1 A 0.1
EB 2 106 0 106 1700 0.06 0.0 0.0
WB 1 19 19 0 1071 0.02 0.4 8.4 A 0.6
5.8 44.7% 15
PinnacleVillage-1-AM_v0.4 - 2025 Future BG (Adj).syn
WB 2 268 0 2 1700 0.16 0.0 0.0
NB 1 222 148 66 411 0.54 23.7 23.6 C 23.6 C
SB 1 45 5 17 493 0.09 2.3 14.8 B 14.8 B
ICU Level of Service
A
Synchro 11 Report Page 6
Lanes, Volumes, Timings 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
69 69 1900 0.3
20 20 1900 3.7 0.0 1 0.0 1.00
161 161 1900 3.7 50.0 1
111 111 1900 3.7 105.0 1 0.0 1.00
182 182 1900 3.7
22 22 1900 0.3 0.0 0
309 309 1900 3.7
101 101 1900 3.7 35.0 1
4 4 1900 0.3
1.00
1.00
1.00 0.850
39 39 1900 3.7 30.0 1 0.0 1.00
17 17 1900 3.7 0.0 1
1.00 0.984
1 1 1900 0.3 0.0 0 0.0 1.00
1.00 0.850
1.00
1853
0
0
1883
1601
1601
0
1853 70 675.7 34.8 1.00 182
0
0
1601
1601
0
1.00 22
1.00 1
1883 70 169.8 8.7 1.00 309
1.00 17
1.00 4
1.00
0 0
1.00 69
0.950 1789 0.950 1789 70 288.3 14.8 1.00 20
1.00 0.850
1601
0.950 1789 0.950 1789
1.00 161
1.00 111
1601
1.00 101
0.950 1789 0.950 1789 40 207.9 18.7 1.00 39
0 No Left
89 No Left 3.7 0.0 2.4
161 No Right
111 No Left
204 No Left 3.7 0.0 2.4
0 No Right
0 No Left
310 No Left 3.7 0.0 2.4
101 No Right
39 No Left 3.7 0.0 2.4
21 No Right
0 No Right
1.75 26
0.99 26 Stop
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
0.99 26 Stop
0.99 14
1.75 14
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 48.8% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2025 Future BG (Adj).syn
Free
Free
ICU Level of Service A
Synchro 11 Report Page 7
HCM Unsignalized Intersection Capacity Analysis 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h)
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
69 69
20 20 Stop 0% 1.00 20
161 161
111 111
22 22
1 1
4 4
1.00 22
1.00 1
39 39 Stop 0% 1.00 39
17 17
1.00 111
309 309 Free 0% 1.00 309
101 101
1.00 161
182 182 Free 0% 1.00 182
1.00 17
1.00 4
Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
1.00 69
1.00 101
7 None
None
728
737
309
410
204
816
827
193
728 7.1
737 6.5
309 6.2
410 4.1
204 4.1
816 7.1
827 6.5
193 6.2
3.5 77 298
4.0 94 312
3.3 78 731
2.2 90 1149
2.2 100 1368
3.5 81 203
4.0 94 277
3.3 100 849
EB 1 250 69 161 846 0.30 9.4 15.1 C 15.1 C
NB 1 111 111 0 1149 0.10 2.4 8.5 A 3.0
NB 2 204 0 22 1700 0.12 0.0 0.0
SB 1 310 1 0 1368 0.00 0.0 0.0 A 0.0
5.9 48.8% 15
PinnacleVillage-1-AM_v0.4 - 2025 Future BG (Adj).syn
SB 2 101 0 101 1700 0.06 0.0 0.0
SW 1 39 39 0 203 0.19 5.2 26.9 D 23.5 C
ICU Level of Service
SW 2 21 0 4 318 0.07 1.6 17.1 C
A
Synchro 11 Report Page 8
Lanes, Volumes, Timings 26: Starkey Rd / Range Rd 251 & Ped Crossing
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
255 255 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
411 411 1900 1.00
0 0 1900 1.00
0
0
0
0
0
0
0
1883
0
0
1883
0
0
0 50 19.3 1.4
0
0
0 50 73.8 5.3
0
0
1883 70 169.8 8.7
0
0
1883 70 537.9 27.7
0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
5 0.90 0
5 0.90 0
5 0.90 0
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
283 No Left 3.7 0.0 4.8
0 No Right
0 No Left
457 No Left 3.7 0.0 4.8
0 No Right
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 25.0% Analysis Period (min) 15
PinnacleVillage-1-AM_v0.4 - 2025 Future BG (Adj).syn
Free
0.90 283
Free
0.90 457
5 0.90 0
Free
ICU Level of Service A
Synchro 11 Report Page 9
HCM Unsignalized Intersection Capacity Analysis 26: Starkey Rd / Range Rd 251 & Ped Crossing
04-01-2025
Intersection Sign configuration not allowed in HCM analysis.
PinnacleVillage-1-AM_v0.4 - 2025 Future BG (Adj).syn
Synchro 11 Report Page 10
Lanes, Volumes, Timings 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
8 8 1900 0.3 0.0 0 0.0 1.00
1 1 1900 3.7
126 126 1900 0.3 0.0 0
2 2 1900 3.7
29 29 1900 0.3 0.0 0
55 55 1900 0.3 0.0 0
3 3 1900 3.7 0.0 0
1.00 0.860
1.00
1.00 0.968
1.00
14 14 1900 3.7 0.0 0 0.0 0.95
165 165 1900 3.7
1.00
14 14 1900 3.7 105.0 1 0.0 1.00
201 201 1900 3.7
1.00 0.874 0.997 1641 0.997 1641 40 160.1 14.4 1.00 1
178 178 1900 3.7 15.0 1 0.0 1.00
0.95
1620
0
1823
0
0
1620 60 308.8 18.5 1.00 2
0
0.950 1789 0.950 1789
0
0
1.00 29
1.00 14
1823 70 533.0 27.4 1.00 201
1.00 55
1.00 14
0.95 0.998 0.996 3557 0.996 3557 70 477.5 24.6 1.00 165
0 No Left
1.75 26
0 0
1.00 8
0
0.950 1789 0.950 1789
1.00 126
1.00 178
135 No Left 3.7 0.0 2.4
0 No Right
178 No Left
31 No Left 3.7 0.0 2.4
0 No Right
14 No Left
256 No Left 3.7 0.0 2.4
0 No Right
0 No Left
182 No Left 3.7 0.0 2.4
0 No Right
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0
Stop
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 43.5% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2025 Future Total (Adj).syn
Stop
Free
0 0
1.00 3
Free
ICU Level of Service A
Synchro 11 Report Page 1
HCM Unsignalized Intersection Capacity Analysis 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
8 8
1 1 Stop 0% 1.00 1
126 126
178 178
29 29
14 14
14 14
1.00 29
1.00 14
1.00 55
1.00 14
165 165 Free 0% 1.00 165
3 3
1.00 178
201 201 Free 0% 1.00 201
55 55
1.00 126
2 2 Stop 0% 1.00 2
1.00 8
None
None
454
478
84
494
452
228
168
256
454 7.5
478 6.5
84 6.9
494 7.5
452 6.5
228 6.9
168 4.1
256 4.1
3.5 98 463
4.0 100 475
3.3 87 958
3.5 55 391
4.0 100 491
3.3 96 774
2.2 99 1407
2.2 99 1306
EB 1 135 8 126 895 0.15 4.0 9.7 A 9.7 A
WB 1 178 178 0 391 0.45 17.5 21.6 C 19.9 C
WB 2 31 0 29 746 0.04 1.0 10.0 B
NB 1 14 14 0 1407 0.01 0.2 7.6 A 0.4
NB 2 256 0 55 1700 0.15 0.0 0.0
SB 1 96 14 0 1306 0.01 0.2 1.2 A 0.6
SB 2 86 0 3 1700 0.05 0.0 0.0
7.2 43.5% 15
PinnacleVillage-1-AM_v0.4 - 2025 Future Total (Adj).syn
ICU Level of Service
1.00 3
A
Synchro 11 Report Page 2
Lanes, Volumes, Timings 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
25 25 1900 0.3 1.00
36 36 1900 3.7 1.00 0.976 0.983 1807 0.983 1807 60 308.8 18.5 1.00 2% 36
12 12 1900 3.7 1.00
7 7 1900 3.7 1.00
94 94 1900 3.7 1.00
0 0 1900 0.3 1.00
34 34 1900 3.7 1.00
5 5 1900 3.7 1.00
0 0 1900 3.7 1.00
5 5 1900 3.7 1.00 0.874
81 81 1900 0.3 1.00
0
0
0
0
0
0
1646
0
0
0
0
0
0
0
0.90 2% 8
1.00 0% 0
0.90 2% 38
0.90 2% 6
1.00 0% 0
1646 40 68.2 6.1 0.90 2% 6
0
0.90 2% 13
3 3 1900 3.7 1.00 0.983 0.961 1779 0.961 1779 40 74.1 6.7 0.90 2% 3
0 No Left
74 No Left 3.7 0.0 2.4
0 No Right
0 No Left
102 No Left 3.7 0.0 2.4
0 No Right
0 No Left
47 No Left 0.0 0.0 4.8
0 No Right
0 No Left
87 No Left 0.0 0.0 2.4
0 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0 0
1.00 2% 25
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 26.4% Analysis Period (min) 15
PinnacleVillage-1-AM_v0.4 - 2025 Future Total (Adj).syn
0.996 1876 0.996 1876 60 150.6 9.0 1.00 2% 94
Free
Stop
1.00 2% 81
Stop
ICU Level of Service A
Synchro 11 Report Page 3
HCM Unsignalized Intersection Capacity Analysis 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min)
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
25 25
36 36 Free 0% 1.00 36
12 12
7 7
0 0
34 34
0 0
1.00 0
0.90 38
0.90 6
1.00 0
5 5 Stop 0% 0.90 6
81 81
0.90 8
3 3 Stop 0% 0.90 3
5 5
0.90 13
94 94 Free 0% 1.00 94
1.00 81
1.00 25
None
None
94
49
286
202
42
210
209
94
94 4.1
49 4.1
286 7.1
202 6.5
42 6.2
210 7.1
209 6.5
94 6.2
2.2 98 1500
2.2 99 1558
3.5 94 596
4.0 100 679
3.3 99 1028
3.5 100 732
4.0 99 673
3.3 92 963
EB 1 74 25 13 1500 0.02 0.4 2.6 A 2.6
WB 1 102 8 0 1558 0.01 0.1 0.6 A 0.6
NB 1 47 38 6 635 0.07 1.8 11.1 B 11.1 B 5.1 26.4% 15
PinnacleVillage-1-AM_v0.4 - 2025 Future Total (Adj).syn
SB 1 87 0 81 935 0.09 2.3 9.2 A 9.2 A
ICU Level of Service
A
Synchro 11 Report Page 4
Lanes, Volumes, Timings 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
3 3 1900 0.3 0.0 0 0.0 1.00
387 387 1900 3.7
107 107 1900 3.7 130.0 1
266 266 1900 3.7
2 2 1900 0.3 0.0 0
76 76 1900 3.7 10.0 1
17 17 1900 3.7 10.0 1
1.00 0.999
1.00
1.00
1.00 0.850
5 5 1900 0.3 0.0 0 0.0 1.00
23 23 1900 3.7
1.00 0.850
152 152 1900 0.3 0.0 0 0.0 1.00
8 8 1900 3.7
1.00
22 22 1900 3.7 110.0 1 0.0 1.00
1.00
1.00 0.850
0
1883
1601
1882
0
0
1883 70 263.2 13.5 1.00 387
1601
0.950 1789 0.950 1789
0
1.00 107
1.00 22
1882 70 245.1 12.6 1.00 266
0 No Left
390 No Left 3.7 0.0 2.4
107 No Right
22 No Left
1.75 26
0.99
0.99 14
0.99 26
1.00 3
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 44.9% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2025 Future Total (Adj).syn
1.00 2
0.955 1799 0.955 0 1799 70 1595.3 82.0 1.00 1.00 152 8
268 No Left 3.7 0.0 2.4
0 No Right
0 No Left
160 No Left 0.0 0.0 2.4
76 No Right
0 No Left
28 No Left 0.0 0.0 2.4
17 No Right
0.99
1.75 14
1.75 26
0.99
0.99 14
1.75 26
0.99
0.99 14
Free
0
Stop
1601
0
1601
0
1.00 76
1.00 5
0.991 1866 0.991 1866 70 138.7 7.1 1.00 23
1601 1601
1.00 17
Stop
ICU Level of Service A
Synchro 11 Report Page 5
HCM Unsignalized Intersection Capacity Analysis 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
3 3
387 387 Free 0% 1.00 387
107 107
22 22
2 2
152 152
5 5
1.00 2
1.00 152
1.00 76
1.00 5
23 23 Stop 0% 1.00 23
17 17
1.00 22
8 8 Stop 0% 1.00 8
76 76
1.00 107
266 266 Free 0% 1.00 266
1.00 3
1 None
1.00 17
1
None
268
494
723
705
387
746
811
267
268 4.1
494 4.1
723 7.1
705 6.5
387 6.2
746 7.1
811 6.5
267 6.2
2.2 100 1296
2.2 98 1070
3.5 51 309
4.0 98 353
3.3 89 661
3.5 98 282
4.0 92 306
3.3 98 772
EB 1 390 3 0 1296 0.00 0.1 0.1 A 0.1
EB 2 107 0 107 1700 0.06 0.0 0.0
WB 1 22 22 0 1070 0.02 0.5 8.4 A 0.6
6.2 44.9% 15
PinnacleVillage-1-AM_v0.4 - 2025 Future Total (Adj).syn
WB 2 268 0 2 1700 0.16 0.0 0.0
NB 1 236 152 76 417 0.57 25.8 24.3 C 24.3 C
SB 1 45 5 17 485 0.09 2.3 15.0 B 15.0 B
ICU Level of Service
A
Synchro 11 Report Page 6
Lanes, Volumes, Timings 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
73 73 1900 0.3
20 20 1900 3.7 0.0 1 0.0 1.00
161 161 1900 3.7 50.0 1
111 111 1900 3.7 105.0 1 0.0 1.00
196 196 1900 3.7
25 25 1900 0.3 0.0 0
355 355 1900 3.7
113 113 1900 3.7 35.0 1
4 4 1900 0.3
1.00
1.00
1.00 0.850
44 44 1900 3.7 30.0 1 0.0 1.00
17 17 1900 3.7 0.0 1
1.00 0.983
1 1 1900 0.3 0.0 0 0.0 1.00
1.00 0.850
1.00
1851
0
0
1883
1601
1601
0
1851 70 675.7 34.8 1.00 196
0
0
1601
1601
0
1.00 25
1.00 1
1883 70 174.7 9.0 1.00 355
1.00 17
1.00 4
1.00
0 0
1.00 73
0.950 1789 0.950 1789 70 288.3 14.8 1.00 20
1.00 0.850
1601
0.950 1789 0.950 1789
1.00 161
1.00 111
1601
1.00 113
0.950 1789 0.950 1789 40 208.5 18.8 1.00 44
0 No Left
93 No Left 3.7 0.0 2.4
161 No Right
111 No Left
221 No Left 3.7 0.0 2.4
0 No Right
0 No Left
356 No Left 3.7 0.0 2.4
113 No Right
44 No Left 3.7 0.0 2.4
21 No Right
0 No Right
1.75 26
0.99 26 Stop
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
0.99 26 Stop
0.99 14
1.75 14
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 52.4% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2025 Future Total (Adj).syn
Free
Free
ICU Level of Service A
Synchro 11 Report Page 7
HCM Unsignalized Intersection Capacity Analysis 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h)
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
73 73
20 20 Stop 0% 1.00 20
161 161
111 111
25 25
1 1
4 4
1.00 25
1.00 1
44 44 Stop 0% 1.00 44
17 17
1.00 111
355 355 Free 0% 1.00 355
113 113
1.00 161
196 196 Free 0% 1.00 196
1.00 17
1.00 4
Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
1.00 73
1.00 113
7 None
None
788
800
355
468
221
878
900
208
788 7.1
800 6.5
355 6.2
468 4.1
221 4.1
878 7.1
900 6.5
208 6.2
3.5 73 269
4.0 93 286
3.3 77 689
2.2 90 1094
2.2 100 1348
3.5 76 180
4.0 93 250
3.3 100 832
EB 1 254 73 161 744 0.34 11.5 16.6 C 16.6 C
NB 1 111 111 0 1094 0.10 2.6 8.7 A 2.9
NB 2 221 0 25 1700 0.13 0.0 0.0
SB 1 356 1 0 1348 0.00 0.0 0.0 A 0.0
6.2 52.4% 15
PinnacleVillage-1-AM_v0.4 - 2025 Future Total (Adj).syn
SB 2 113 0 113 1700 0.07 0.0 0.0
SW 1 44 44 0 180 0.24 7.0 31.4 D 27.2 D
ICU Level of Service
SW 2 21 0 4 288 0.07 1.8 18.5 C
A
Synchro 11 Report Page 8
Lanes, Volumes, Timings 26: Starkey Rd / Range Rd 251 & Ped Crossing
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
273 273 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
469 469 1900 1.00
0 0 1900 1.00
0
0
0
0
0
0
0
1883
0
0
1883
0
0
0 50 20.2 1.5
0
0
0 50 56.0 4.0
0
0
1883 70 174.7 9.0
0
0
1883 70 533.0 27.4
0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
5 0.90 0
5 0.90 0
5 0.90 0
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
303 No Left 3.7 0.0 4.8
0 No Right
0 No Left
521 No Left 3.7 0.0 4.8
0 No Right
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 28.0% Analysis Period (min) 15
PinnacleVillage-1-AM_v0.4 - 2025 Future Total (Adj).syn
Free
0.90 303
Free
0.90 521
5 0.90 0
Free
ICU Level of Service A
Synchro 11 Report Page 9
HCM Unsignalized Intersection Capacity Analysis 26: Starkey Rd / Range Rd 251 & Ped Crossing
04-01-2025
Intersection Sign configuration not allowed in HCM analysis.
PinnacleVillage-1-AM_v0.4 - 2025 Future Total (Adj).syn
Synchro 11 Report Page 10
Lanes, Volumes, Timings 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 0.3 0.0 0 0.0 1.00
1 1 1900 3.7
154 154 1900 0.3 0.0 0
3 3 1900 3.7
8 8 1900 0.3 0.0 0
37 37 1900 0.3 0.0 0
3 3 1900 3.7 0.0 0
1.00 0.891
1.00
1.00 0.982
1.00
7 7 1900 3.7 0.0 0 0.0 0.95
277 277 1900 3.7
1.00
14 14 1900 3.7 105.0 1 0.0 1.00
269 269 1900 3.7
1.00 0.874 0.997 1641 0.997 1641 40 160.1 14.4 1.00 1
146 146 1900 3.7 15.0 1 0.0 1.00
0.95
1678
0
1850
0
0
1678 60 308.8 18.5 1.00 3
0
0.950 1789 0.950 1789
0
0
1.00 8
1.00 14
1850 70 535.2 27.5 1.00 269
1.00 37
1.00 7
0.95 0.998 0.999 3568 0.999 3568 70 477.5 24.6 1.00 277
0 No Left
1.75 26
0 0
1.00 10
0
0.950 1789 0.950 1789
1.00 154
1.00 146
165 No Left 3.7 0.0 2.4
0 No Right
146 No Left
11 No Left 3.7 0.0 2.4
0 No Right
14 No Left
306 No Left 3.7 0.0 2.4
0 No Right
0 No Left
287 No Left 3.7 0.0 2.4
0 No Right
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0
Stop
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 44.6% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2035 Future BG (Adj).syn
Stop
Free
0 0
1.00 3
Free
ICU Level of Service A
Synchro 11 Report Page 1
HCM Unsignalized Intersection Capacity Analysis 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10
1 1 Stop 0% 1.00 1
154 154
146 146
8 8
14 14
7 7
1.00 8
1.00 14
1.00 37
1.00 7
277 277 Free 0% 1.00 277
3 3
1.00 146
269 269 Free 0% 1.00 269
37 37
1.00 154
3 3 Stop 0% 1.00 3
1.00 10
None
None
599
626
140
622
610
288
280
306
599 7.5
626 6.5
140 6.9
622 7.5
610 6.5
288 6.9
280 4.1
306 4.1
3.5 97 374
4.0 100 392
3.3 83 882
3.5 52 302
4.0 99 401
3.3 99 709
2.2 99 1280
2.2 99 1252
EB 1 165 10 154 810 0.20 5.8 10.6 B 10.6 B
WB 1 146 146 0 302 0.48 19.0 27.6 D 26.5 D
WB 2 11 0 8 586 0.02 0.4 11.3 B
NB 1 14 14 0 1280 0.01 0.3 7.8 A 0.3
NB 2 306 0 37 1700 0.18 0.0 0.0
SB 1 146 7 0 1252 0.01 0.1 0.4 A 0.2
SB 2 142 0 3 1700 0.08 0.0 0.0
6.5 44.6% 15
PinnacleVillage-1-AM_v0.4 - 2035 Future BG (Adj).syn
ICU Level of Service
1.00 3
A
Synchro 11 Report Page 2
Lanes, Volumes, Timings 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 0.3 1.00
44 44 1900 3.7 1.00 0.964
14 14 1900 3.7 1.00
9 9 1900 3.7 1.00
115 115 1900 3.7 1.00
0 0 1900 0.3 1.00
41 41 1900 3.7 1.00
6 6 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 0.3 1.00
0
1816
0
0
0
0
0
0
1883
0
0
1816 60 308.8 18.5 1.00 2% 44
0
0
0
0
0
0
0.90 2% 10
1.00 0% 0
0.90 2% 46
0.90 2% 7
1.00 0% 0
1883 40 68.2 6.1 0.90 2% 0
0
0.90 2% 16
0 0 1900 3.7 1.00 0.982 0.958 1772 0.958 1772 40 70.4 6.3 0.90 2% 0
1.00 0% 0
0.996 1876 0.996 1876 60 150.6 9.0 1.00 2% 115
1.00 0% 0
0 No Left
60 No Left 3.7 0.0 2.4
0 No Right
0 No Left
125 No Left 3.7 0.0 2.4
0 No Right
0 No Left
53 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 2.4
0 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0.99 26
0.99
1.75 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 23.2% Analysis Period (min) 15
PinnacleVillage-1-AM_v0.4 - 2035 Future BG (Adj).syn
Free
Stop
Stop
ICU Level of Service A
Synchro 11 Report Page 3
HCM Unsignalized Intersection Capacity Analysis 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min)
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0
44 44 Free 0% 1.00 44
14 14
9 9
0 0
41 41
0 0
1.00 0
0.90 46
0.90 7
1.00 0
0 0 Stop 0% 0.90 0
0 0
0.90 10
0 0 Stop 0% 0.90 0
6 6
0.90 16
115 115 Free 0% 1.00 115
1.00 0
1.00 0
None
None
115
60
187
187
52
194
195
115
115 4.1
60 4.1
187 7.1
187 6.5
52 6.2
194 7.1
195 6.5
115 6.2
2.2 100 1487
2.2 99 1544
3.5 94 770
4.0 100 703
3.3 99 1016
3.5 100 761
4.0 100 696
3.3 100 943
EB 1 60 0 16 1487 0.00 0.0 0.0 0.0
WB 1 125 10 0 1544 0.01 0.1 0.6 A 0.6
NB 1 53 46 7 795 0.07 1.6 9.9 A 9.9 A 2.5 23.2% 15
PinnacleVillage-1-AM_v0.4 - 2035 Future BG (Adj).syn
SB 1 0 0 0 1700 0.00 0.0 0.0 A 0.0 A
ICU Level of Service
A
Synchro 11 Report Page 4
Lanes, Volumes, Timings 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
4 4 1900 0.3 0.0 0 0.0 1.00
472 472 1900 3.7
140 140 1900 3.7 130.0 1
325 325 1900 3.7
3 3 1900 0.3 0.0 0
111 111 1900 3.7 10.0 1
21 21 1900 3.7 10.0 1
1.00 0.999
1.00
1.00
1.00 0.850
6 6 1900 0.3 0.0 0 0.0 1.00
28 28 1900 3.7
1.00 0.850
211 211 1900 0.3 0.0 0 0.0 1.00
10 10 1900 3.7
1.00
34 34 1900 3.7 110.0 1 0.0 1.00
1.00
1.00 0.850
0
1883
1601
1882
0
0
1883 70 263.2 13.5 1.00 472
1601
0.950 1789 0.950 1789
0
1.00 140
1.00 34
1882 70 245.1 12.6 1.00 325
0 No Left
476 No Left 3.7 0.0 2.4
140 No Right
34 No Left
1.75 26
0.99
0.99 14
0.99 26
1.00 4
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 53.8% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2035 Future BG (Adj).syn
1.00 3
0.954 1797 0.954 0 1797 70 1595.3 82.0 1.00 1.00 211 10
328 No Left 3.7 0.0 2.4
0 No Right
0 No Left
221 No Left 0.0 0.0 2.4
111 No Right
0 No Left
34 No Left 0.0 0.0 2.4
21 No Right
0.99
1.75 14
1.75 26
0.99
0.99 14
1.75 26
0.99
0.99 14
Free
0
Stop
1601
0
1601
0
1.00 111
1.00 6
0.991 1866 0.991 1866 70 138.7 7.1 1.00 28
1601 1601
1.00 21
Stop
ICU Level of Service A
Synchro 11 Report Page 5
HCM Unsignalized Intersection Capacity Analysis 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
4 4
472 472 Free 0% 1.00 472
140 140
34 34
3 3
211 211
6 6
1.00 3
1.00 211
1.00 111
1.00 6
28 28 Stop 0% 1.00 28
21 21
1.00 34
10 10 Stop 0% 1.00 10
111 111
1.00 140
325 325 Free 0% 1.00 325
1.00 4
1 None
1.00 21
1
None
328
612
898
876
472
935
1014
326
328 4.1
612 4.1
898 7.1
876 6.5
472 6.2
935 7.1
1014 6.5
326 6.2
2.2 100 1232
2.2 96 967
3.5 5 223
4.0 96 276
3.3 81 592
3.5 97 188
4.0 88 229
3.3 97 715
EB 1 476 4 0 1232 0.00 0.1 0.1 A 0.1
EB 2 140 0 140 1700 0.08 0.0 0.0
WB 1 34 34 0 967 0.04 0.8 8.9 A 0.8
33.8 53.8% 15
PinnacleVillage-1-AM_v0.4 - 2035 Future BG (Adj).syn
WB 2 328 0 3 1700 0.19 0.0 0.0
NB 1 332 211 111 291 1.14 106.4 134.6 F 134.6 F
SB 1 55 6 21 359 0.15 4.1 18.8 C 18.8 C
ICU Level of Service
A
Synchro 11 Report Page 6
Lanes, Volumes, Timings 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
91 91 1900 0.3
20 20 1900 3.7 0.0 1 0.0 1.00
197 197 1900 3.7 50.0 1
136 136 1900 3.7 105.0 1 0.0 1.00
239 239 1900 3.7
22 22 1900 0.3 0.0 0
432 432 1900 3.7
143 143 1900 3.7 35.0 1
4 4 1900 0.3
1.00
1.00
1.00 0.850
39 39 1900 3.7 30.0 1 0.0 1.00
17 17 1900 3.7 0.0 1
1.00 0.987
1 1 1900 0.3 0.0 0 0.0 1.00
1.00 0.850
1.00
1859
0
0
1883
1601
1601
0
1859 70 675.7 34.8 1.00 239
0
0
1601
1601
0
1.00 22
1.00 1
1883 70 172.5 8.9 1.00 432
1.00 17
1.00 4
1.00
0 0
1.00 91
0.950 1789 0.950 1789 70 288.3 14.8 1.00 20
1.00 0.850
1601
0.950 1789 0.950 1789
1.00 197
1.00 136
1601
1.00 143
0.950 1789 0.950 1789 40 191.0 17.2 1.00 39
0 No Left
111 No Left 3.7 0.0 2.4
197 No Right
136 No Left
261 No Left 3.7 0.0 2.4
0 No Right
0 No Left
433 No Left 3.7 0.0 2.4
143 No Right
39 No Left 3.7 0.0 2.4
21 No Right
0 No Right
1.75 26
0.99 26 Stop
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
0.99 26 Stop
0.99 14
1.75 14
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 59.5% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2035 Future BG (Adj).syn
Free
Free
ICU Level of Service B
Synchro 11 Report Page 7
HCM Unsignalized Intersection Capacity Analysis 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h)
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
91 91
20 20 Stop 0% 1.00 20
197 197
136 136
22 22
1 1
4 4
1.00 22
1.00 1
39 39 Stop 0% 1.00 39
17 17
1.00 136
432 432 Free 0% 1.00 432
143 143
1.00 197
239 239 Free 0% 1.00 239
1.00 17
1.00 4
Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
1.00 91
1.00 143
7 None
None
958
967
432
575
261
1064
1099
250
958 7.1
967 6.5
432 6.2
575 4.1
261 4.1
1064 7.1
1099 6.5
250 6.2
3.5 54 197
4.0 91 219
3.3 68 624
2.2 86 998
2.2 100 1303
3.5 66 114
4.0 91 183
3.3 99 789
EB 1 308 91 197 557 0.55 25.5 24.1 C 24.1 C
NB 1 136 136 0 998 0.14 3.6 9.2 A 3.1
NB 2 261 0 22 1700 0.15 0.0 0.0
SB 1 433 1 0 1303 0.00 0.0 0.0 A 0.0
8.4 59.5% 15
PinnacleVillage-1-AM_v0.4 - 2035 Future BG (Adj).syn
SB 2 143 0 143 1700 0.08 0.0 0.0
SW 1 39 39 0 114 0.34 10.3 51.9 F 42.0 E
ICU Level of Service
SW 2 21 0 4 215 0.10 2.4 23.6 C
B
Synchro 11 Report Page 8
Lanes, Volumes, Timings 26: Starkey Rd / Range Rd 251 & Ped Crossing
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
334 334 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
576 576 1900 1.00
0 0 1900 1.00
0
0
0
0
0
0
0
1883
0
0
1883
0
0
0 50 19.7 1.4
0
0
0 50 79.5 5.7
0
0
1883 70 172.5 8.9
0
0
1883 70 535.2 27.5
0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
5 0.90 0
5 0.90 0
5 0.90 0
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
371 No Left 3.7 0.0 4.8
0 No Right
0 No Left
640 No Left 3.7 0.0 4.8
0 No Right
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 33.6% Analysis Period (min) 15
PinnacleVillage-1-AM_v0.4 - 2035 Future BG (Adj).syn
Free
0.90 371
Free
0.90 640
5 0.90 0
Free
ICU Level of Service A
Synchro 11 Report Page 9
HCM Unsignalized Intersection Capacity Analysis 26: Starkey Rd / Range Rd 251 & Ped Crossing
04-01-2025
Intersection Sign configuration not allowed in HCM analysis.
PinnacleVillage-1-AM_v0.4 - 2035 Future BG (Adj).syn
Synchro 11 Report Page 10
Lanes, Volumes, Timings 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 0.3 0.0 0 0.0 1.00
1 1 1900 3.7
154 154 1900 0.3 0.0 0
3 3 1900 3.7
36 36 1900 0.3 0.0 0
57 57 1900 0.3 0.0 0
3 3 1900 3.7 0.0 0
1.00 0.862
1.00
1.00 0.974
1.00
17 17 1900 3.7 0.0 0 0.0 0.95
277 277 1900 3.7
1.00
14 14 1900 3.7 105.0 1 0.0 1.00
269 269 1900 3.7
1.00 0.874 0.997 1641 0.997 1641 40 160.1 14.4 1.00 1
210 210 1900 3.7 15.0 1 0.0 1.00
0.95
1624
0
1834
0
0
1624 60 308.8 18.5 1.00 3
0
0.950 1789 0.950 1789
0
0
1.00 36
1.00 14
1834 70 536.5 27.6 1.00 269
1.00 57
1.00 17
0.95 0.998 0.997 3561 0.997 3561 70 477.5 24.6 1.00 277
0 No Left
1.75 26
0 0
1.00 10
0
0.950 1789 0.950 1789
1.00 154
1.00 210
165 No Left 3.7 0.0 2.4
0 No Right
210 No Left
39 No Left 3.7 0.0 2.4
0 No Right
14 No Left
326 No Left 3.7 0.0 2.4
0 No Right
0 No Left
297 No Left 3.7 0.0 2.4
0 No Right
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0
Stop
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 52.3% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2035 Future Total (Adj).syn
Stop
Free
0 0
1.00 3
Free
ICU Level of Service A
Synchro 11 Report Page 1
HCM Unsignalized Intersection Capacity Analysis 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10
1 1 Stop 0% 1.00 1
154 154
210 210
36 36
14 14
17 17
1.00 36
1.00 14
1.00 57
1.00 17
277 277 Free 0% 1.00 277
3 3
1.00 210
269 269 Free 0% 1.00 269
57 57
1.00 154
3 3 Stop 0% 1.00 3
1.00 10
None
None
647
666
140
652
640
298
280
326
647 7.5
666 6.5
140 6.9
652 7.5
640 6.5
298 6.9
280 4.1
326 4.1
3.5 97 329
4.0 100 369
3.3 83 882
3.5 26 285
4.0 99 382
3.3 95 699
2.2 99 1280
2.2 99 1230
EB 1 165 10 154 795 0.21 5.9 10.7 B 10.7 B
WB 1 210 210 0 285 0.74 40.6 46.1 E 40.6 E
WB 2 39 0 36 657 0.06 1.4 10.8 B
NB 1 14 14 0 1280 0.01 0.3 7.8 A 0.3
NB 2 326 0 57 1700 0.19 0.0 0.0
SB 1 156 17 0 1230 0.01 0.3 1.0 A 0.5
SB 2 142 0 3 1700 0.08 0.0 0.0
11.5 52.3% 15
PinnacleVillage-1-AM_v0.4 - 2035 Future Total (Adj).syn
ICU Level of Service
1.00 3
A
Synchro 11 Report Page 2
Lanes, Volumes, Timings 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
30 30 1900 0.3 1.00
44 44 1900 3.7 1.00 0.976 0.984 1809 0.984 1809 60 308.8 18.5 1.00 2% 44
14 14 1900 3.7 1.00
9 9 1900 3.7 1.00
115 115 1900 3.7 1.00
0 0 1900 0.3 1.00
41 41 1900 3.7 1.00
6 6 1900 3.7 1.00
0 0 1900 3.7 1.00
6 6 1900 3.7 1.00 0.875
92 92 1900 0.3 1.00
0
0
0
0
0
0
1648
0
0
0
0
0
0
0
0.90 2% 10
1.00 0% 0
0.90 2% 46
0.90 2% 7
1.00 0% 0
1648 40 68.2 6.1 0.90 2% 7
0
0.90 2% 16
3 3 1900 3.7 1.00 0.983 0.961 1779 0.961 1779 40 97.7 8.8 0.90 2% 3
0 No Left
90 No Left 3.7 0.0 2.4
0 No Right
0 No Left
125 No Left 3.7 0.0 2.4
0 No Right
0 No Left
56 No Left 0.0 0.0 4.8
0 No Right
0 No Left
99 No Left 0.0 0.0 2.4
0 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0 0
1.00 2% 30
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 27.6% Analysis Period (min) 15
PinnacleVillage-1-AM_v0.4 - 2035 Future Total (Adj).syn
0.996 1876 0.996 1876 60 150.6 9.0 1.00 2% 115
Free
Stop
1.00 2% 92
Stop
ICU Level of Service A
Synchro 11 Report Page 3
HCM Unsignalized Intersection Capacity Analysis 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min)
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
30 30
44 44 Free 0% 1.00 44
14 14
9 9
0 0
41 41
0 0
1.00 0
0.90 46
0.90 7
1.00 0
6 6 Stop 0% 0.90 7
92 92
0.90 10
3 3 Stop 0% 0.90 3
6 6
0.90 16
115 115 Free 0% 1.00 115
1.00 92
1.00 30
None
None
115
60
342
247
52
256
255
115
115 4.1
60 4.1
342 7.1
247 6.5
52 6.2
256 7.1
255 6.5
115 6.2
2.2 98 1474
2.2 99 1544
3.5 91 536
4.0 100 638
3.3 99 1016
3.5 100 680
4.0 99 631
3.3 90 937
EB 1 90 30 16 1474 0.02 0.5 2.6 A 2.6
WB 1 125 10 0 1544 0.01 0.1 0.6 A 0.6
NB 1 56 46 7 575 0.10 2.4 11.9 B 11.9 B 5.2 27.6% 15
PinnacleVillage-1-AM_v0.4 - 2035 Future Total (Adj).syn
SB 1 99 0 92 906 0.11 2.8 9.5 A 9.5 A
ICU Level of Service
A
Synchro 11 Report Page 4
Lanes, Volumes, Timings 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
4 4 1900 0.3 0.0 0 0.0 1.00
472 472 1900 3.7
142 142 1900 3.7 130.0 1
325 325 1900 3.7
3 3 1900 0.3 0.0 0
123 123 1900 3.7 10.0 1
21 21 1900 3.7 10.0 1
1.00 0.999
1.00
1.00
1.00 0.850
6 6 1900 0.3 0.0 0 0.0 1.00
28 28 1900 3.7
1.00 0.850
216 216 1900 0.3 0.0 0 0.0 1.00
10 10 1900 3.7
1.00
38 38 1900 3.7 110.0 1 0.0 1.00
1.00
1.00 0.850
0
1883
1601
1882
0
0
1883 70 263.2 13.5 1.00 472
1601
0.950 1789 0.950 1789
0
1.00 142
1.00 38
1882 70 245.1 12.6 1.00 325
0 No Left
476 No Left 3.7 0.0 2.4
142 No Right
38 No Left
1.75 26
0.99
0.99 14
0.99 26
1.00 4
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 57.4% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2035 Future Total (Adj).syn
1.00 3
0.954 1797 0.954 0 1797 70 1595.3 82.0 1.00 1.00 216 10
328 No Left 3.7 0.0 2.4
0 No Right
0 No Left
226 No Left 0.0 0.0 2.4
123 No Right
0 No Left
34 No Left 0.0 0.0 2.4
21 No Right
0.99
1.75 14
1.75 26
0.99
0.99 14
1.75 26
0.99
0.99 14
Free
0
Stop
1601
0
1601
0
1.00 123
1.00 6
0.991 1866 0.991 1866 70 138.7 7.1 1.00 28
1601 1601
1.00 21
Stop
ICU Level of Service B
Synchro 11 Report Page 5
HCM Unsignalized Intersection Capacity Analysis 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
4 4
472 472 Free 0% 1.00 472
142 142
38 38
3 3
216 216
6 6
1.00 3
1.00 216
1.00 123
1.00 6
28 28 Stop 0% 1.00 28
21 21
1.00 38
10 10 Stop 0% 1.00 10
123 123
1.00 142
325 325 Free 0% 1.00 325
1.00 4
1 None
1.00 21
1
None
328
614
906
884
472
949
1024
326
328 4.1
614 4.1
906 7.1
884 6.5
472 6.2
949 7.1
1024 6.5
326 6.2
2.2 100 1232
2.2 96 965
3.5 1 219
4.0 96 272
3.3 79 592
3.5 97 179
4.0 88 225
3.3 97 715
EB 1 476 4 0 1232 0.00 0.1 0.1 A 0.1
EB 2 142 0 142 1700 0.08 0.0 0.0
WB 1 38 38 0 965 0.04 0.9 8.9 A 0.9
40.3 57.4% 15
PinnacleVillage-1-AM_v0.4 - 2035 Future Total (Adj).syn
WB 2 328 0 3 1700 0.19 0.0 0.0
NB 1 349 216 123 291 1.20 119.1 156.3 F 156.3 F
SB 1 55 6 21 351 0.16 4.2 19.1 C 19.1 C
ICU Level of Service
B
Synchro 11 Report Page 6
Lanes, Volumes, Timings 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
95 95 1900 0.3
20 20 1900 3.7 0.0 1 0.0 1.00
197 197 1900 3.7 50.0 1
136 136 1900 3.7 105.0 1 0.0 1.00
255 255 1900 3.7
25 25 1900 0.3 0.0 0
482 482 1900 3.7
157 157 1900 3.7 35.0 1
4 4 1900 0.3
1.00
1.00
1.00 0.850
45 45 1900 3.7 30.0 1 0.0 1.00
17 17 1900 3.7 0.0 1
1.00 0.987
1 1 1900 0.3 0.0 0 0.0 1.00
1.00 0.850
1.00
1859
0
0
1883
1601
1601
0
1859 70 675.7 34.8 1.00 255
0
0
1601
1601
0
1.00 25
1.00 1
1883 70 171.2 8.8 1.00 482
1.00 17
1.00 4
1.00
0 0
1.00 95
0.950 1789 0.950 1789 70 288.3 14.8 1.00 20
1.00 0.850
1601
0.950 1789 0.950 1789
1.00 197
1.00 136
1601
1.00 157
0.950 1789 0.950 1789 40 160.5 14.4 1.00 45
0 No Left
115 No Left 3.7 0.0 2.4
197 No Right
136 No Left
280 No Left 3.7 0.0 2.4
0 No Right
0 No Left
483 No Left 3.7 0.0 2.4
157 No Right
45 No Left 3.7 0.0 2.4
21 No Right
0 No Right
1.75 26
0.99 26 Stop
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
0.99 26 Stop
0.99 14
1.75 14
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 63.4% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2035 Future Total (Adj).syn
Free
Free
ICU Level of Service B
Synchro 11 Report Page 7
HCM Unsignalized Intersection Capacity Analysis 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h)
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
95 95
20 20 Stop 0% 1.00 20
197 197
136 136
25 25
1 1
4 4
1.00 25
1.00 1
45 45 Stop 0% 1.00 45
17 17
1.00 136
482 482 Free 0% 1.00 482
157 157
1.00 197
255 255 Free 0% 1.00 255
1.00 17
1.00 4
Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
1.00 95
1.00 157
7 None
None
1024
1036
482
639
280
1132
1180
268
1024 7.1
1036 6.5
482 6.2
639 4.1
280 4.1
1132 7.1
1180 6.5
268 6.2
3.5 46 174
4.0 90 198
3.3 66 584
2.2 86 945
2.2 100 1283
3.5 54 98
4.0 90 163
3.3 99 771
EB 1 312 95 197 484 0.64 34.2 29.6 D 29.6 D
NB 1 136 136 0 945 0.14 3.8 9.4 A 3.1
NB 2 280 0 25 1700 0.16 0.0 0.0
SB 1 483 1 0 1283 0.00 0.0 0.0 A 0.0
9.9 63.4% 15
PinnacleVillage-1-AM_v0.4 - 2035 Future Total (Adj).syn
SB 2 157 0 157 1700 0.09 0.0 0.0
SW 1 45 45 0 98 0.46 14.9 69.5 F 55.7 F
ICU Level of Service
SW 2 21 0 4 191 0.11 2.8 26.1 D
B
Synchro 11 Report Page 8
Lanes, Volumes, Timings 26: Starkey Rd / Range Rd 251 & Ped Crossing
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
354 354 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
640 640 1900 1.00
0 0 1900 1.00
0
0
0
0
0
0
0
1883
0
0
1883
0
0
0 50 24.6 1.8
0
0
0 50 79.8 5.7
0
0
1883 70 171.2 8.8
0
0
1883 70 536.5 27.6
0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
5 0.90 0
5 0.90 0
5 0.90 0
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
393 No Left 3.7 0.0 4.8
0 No Right
0 No Left
711 No Left 3.7 0.0 4.8
0 No Right
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 37.0% Analysis Period (min) 15
PinnacleVillage-1-AM_v0.4 - 2035 Future Total (Adj).syn
Free
0.90 393
Free
0.90 711
5 0.90 0
Free
ICU Level of Service A
Synchro 11 Report Page 9
HCM Unsignalized Intersection Capacity Analysis 26: Starkey Rd / Range Rd 251 & Ped Crossing
04-01-2025
Intersection Sign configuration not allowed in HCM analysis.
PinnacleVillage-1-AM_v0.4 - 2035 Future Total (Adj).syn
Synchro 11 Report Page 10
Lanes, Volumes, Timings 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
13 13 1900 0.3 0.0 0 0.0 1.00
2 2 1900 3.7
188 188 1900 0.3 0.0 0
3 3 1900 3.7
9 9 1900 0.3 0.0 0
37 37 1900 0.3 0.0 0
3 3 1900 3.7 0.0 0
1.00 0.887
1.00
1.00 0.984
1.00
7 7 1900 3.7 0.0 0 0.0 0.95
311 311 1900 3.7
1.00
14 14 1900 3.7 105.0 1 0.0 1.00
319 319 1900 3.7
1.00 0.875 0.997 1643 0.997 1643 40 160.1 14.4 1.00 2
178 178 1900 3.7 15.0 1 0.0 1.00
0.95
1671
0
1853
0
0
1671 60 308.8 18.5 1.00 3
0
0.950 1789 0.950 1789
0
0
1.00 9
1.00 14
1853 70 535.5 27.5 1.00 319
1.00 37
1.00 7
0.95 0.999 0.999 3571 0.999 3571 70 477.5 24.6 1.00 311
0 No Left
1.75 26
0 0
1.00 13
0
0.950 1789 0.950 1789
1.00 188
1.00 178
203 No Left 3.7 0.0 2.4
0 No Right
178 No Left
12 No Left 3.7 0.0 2.4
0 No Right
14 No Left
356 No Left 3.7 0.0 2.4
0 No Right
0 No Left
321 No Left 3.7 0.0 2.4
0 No Right
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0
Stop
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 51.3% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2045 Future BG (Adj).syn
Stop
Free
0 0
1.00 3
Free
ICU Level of Service A
Synchro 11 Report Page 1
HCM Unsignalized Intersection Capacity Analysis 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
13 13
2 2 Stop 0% 1.00 2
188 188
178 178
9 9
14 14
7 7
1.00 9
1.00 14
1.00 37
1.00 7
311 311 Free 0% 1.00 311
3 3
1.00 178
319 319 Free 0% 1.00 319
37 37
1.00 188
3 3 Stop 0% 1.00 3
1.00 13
None
None
684
710
157
724
694
338
314
356
684 7.5
710 6.5
157 6.9
724 7.5
694 6.5
338 6.9
314 4.1
356 4.1
3.5 96 324
4.0 99 351
3.3 78 861
3.5 26 241
4.0 99 359
3.3 99 658
2.2 99 1243
2.2 99 1199
EB 1 203 13 188 768 0.26 8.1 11.4 B 11.4 B
WB 1 178 178 0 241 0.74 39.1 53.1 F 50.5 F
WB 2 12 0 9 545 0.02 0.5 11.8 B
NB 1 14 14 0 1243 0.01 0.3 7.9 A 0.3
NB 2 356 0 37 1700 0.21 0.0 0.0
SB 1 162 7 0 1199 0.01 0.1 0.4 A 0.2
SB 2 158 0 3 1700 0.09 0.0 0.0
11.1 51.3% 15
PinnacleVillage-1-AM_v0.4 - 2045 Future BG (Adj).syn
ICU Level of Service
1.00 3
A
Synchro 11 Report Page 2
Lanes, Volumes, Timings 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 0.3 1.00
54 54 1900 3.7 1.00 0.965
17 17 1900 3.7 1.00
11 11 1900 3.7 1.00
140 140 1900 3.7 1.00
0 0 1900 0.3 1.00
50 50 1900 3.7 1.00
8 8 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 0.3 1.00
0
1818
0
0
0
0
0
0
1883
0
0
1818 60 308.8 18.5 1.00 2% 54
0
0
0
0
0
0
0.90 2% 12
1.00 0% 0
0.90 2% 56
0.90 2% 9
1.00 0% 0
1883 40 68.2 6.1 0.90 2% 0
0
0.90 2% 19
0 0 1900 3.7 1.00 0.981 0.959 1772 0.959 1772 40 88.3 7.9 0.90 2% 0
1.00 0% 0
0.996 1876 0.996 1876 60 150.6 9.0 1.00 2% 140
1.00 0% 0
0 No Left
73 No Left 3.7 0.0 2.4
0 No Right
0 No Left
152 No Left 3.7 0.0 2.4
0 No Right
0 No Left
65 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 2.4
0 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0.99 26
0.99
1.75 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 24.6% Analysis Period (min) 15
PinnacleVillage-1-AM_v0.4 - 2045 Future BG (Adj).syn
Free
Stop
Stop
ICU Level of Service A
Synchro 11 Report Page 3
HCM Unsignalized Intersection Capacity Analysis 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min)
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0
54 54 Free 0% 1.00 54
17 17
11 11
0 0
50 50
0 0
1.00 0
0.90 56
0.90 9
1.00 0
0 0 Stop 0% 0.90 0
0 0
0.90 12
0 0 Stop 0% 0.90 0
8 8
0.90 19
140 140 Free 0% 1.00 140
1.00 0
1.00 0
None
None
140
73
228
228
64
236
237
140
140 4.1
73 4.1
228 7.1
228 6.5
64 6.2
236 7.1
237 6.5
140 6.2
2.2 100 1456
2.2 99 1527
3.5 92 723
4.0 100 667
3.3 99 1001
3.5 100 711
4.0 100 659
3.3 100 913
EB 1 73 0 19 1456 0.00 0.0 0.0 0.0
WB 1 152 12 0 1527 0.01 0.2 0.6 A 0.6
NB 1 65 56 9 752 0.09 2.1 10.2 B 10.2 B 2.6 24.6% 15
PinnacleVillage-1-AM_v0.4 - 2045 Future BG (Adj).syn
SB 1 0 0 0 1700 0.00 0.0 0.0 A 0.0 A
ICU Level of Service
A
Synchro 11 Report Page 4
Lanes, Volumes, Timings 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
5 5 1900 0.3 0.0 0 0.0 1.00
576 576 1900 3.7
167 167 1900 3.7 130.0 1
396 396 1900 3.7
3 3 1900 0.3 0.0 0
126 126 1900 3.7 10.0 1
25 25 1900 3.7 10.0 1
1.00 0.999
1.00
1.00
1.00 0.850
8 8 1900 0.3 0.0 0 0.0 1.00
35 35 1900 3.7
1.00 0.850
247 247 1900 0.3 0.0 0 0.0 1.00
13 13 1900 3.7
1.00
38 38 1900 3.7 110.0 1 0.0 1.00
1.00
1.00 0.850
0
1883
1601
1882
0
0
1883 70 263.2 13.5 1.00 576
1601
0.950 1789 0.950 1789
0
1.00 167
1.00 38
1882 70 245.1 12.6 1.00 396
0 No Left
581 No Left 3.7 0.0 2.4
167 No Right
38 No Left
1.75 26
0.99
0.99 14
0.99 26
1.00 5
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 62.0% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2045 Future BG (Adj).syn
1.00 3
0.955 1799 0.955 0 1799 70 1595.3 82.0 1.00 1.00 247 13
399 No Left 3.7 0.0 2.4
0 No Right
0 No Left
260 No Left 0.0 0.0 2.4
126 No Right
0 No Left
43 No Left 0.0 0.0 2.4
25 No Right
0.99
1.75 14
1.75 26
0.99
0.99 14
1.75 26
0.99
0.99 14
Free
0
Stop
1601
0
1601
0
1.00 126
1.00 8
0.991 1866 0.991 1866 70 138.7 7.1 1.00 35
1601 1601
1.00 25
Stop
ICU Level of Service B
Synchro 11 Report Page 5
HCM Unsignalized Intersection Capacity Analysis 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
5 5
576 576 Free 0% 1.00 576
167 167
38 38
3 3
247 247
8 8
1.00 3
1.00 247
1.00 126
1.00 8
35 35 Stop 0% 1.00 35
25 25
1.00 38
13 13 Stop 0% 1.00 13
126 126
1.00 167
396 396 Free 0% 1.00 396
1.00 5
1 None
1.00 25
1
None
399
743
1088
1061
576
1129
1226
398
399 4.1
743 4.1
1088 7.1
1061 6.5
576 6.2
1129 7.1
1226 6.5
398 6.2
2.2 100 1160
2.2 96 864
3.5 0 151
4.0 94 213
3.3 76 517
3.5 94 126
4.0 79 170
3.3 96 652
EB 1 581 5 0 1160 0.00 0.1 0.1 A 0.1
EB 2 167 0 167 1700 0.10 0.0 0.0
WB 1 38 38 0 864 0.04 1.0 9.4 A 0.8
113.7 62.0% 15
PinnacleVillage-1-AM_v0.4 - 2045 Future BG (Adj).syn
WB 2 399 0 3 1700 0.23 0.0 0.0
NB 1 386 247 126 200 1.93 215.7 477.2 F 477.2 F
SB 1 68 8 25 256 0.27 7.9 26.2 D 26.2 D
ICU Level of Service
B
Synchro 11 Report Page 6
Lanes, Volumes, Timings 26: Starkey Rd / Range Rd 251 & Ped Crossing
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
397 397 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
677 677 1900 1.00
0 0 1900 1.00
0
0
0
0
0
0
0
1883
0
0
1883
0
0
0 50 23.8 1.7
0
0
0 50 80.1 5.8
0
0
1883 70 172.2 8.9
0
0
1883 70 535.5 27.5
0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
5 0.90 0
5 0.90 0
5 0.90 0
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
441 No Left 3.7 0.0 4.8
0 No Right
0 No Left
752 No Left 3.7 0.0 4.8
0 No Right
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 39.0% Analysis Period (min) 15
PinnacleVillage-1-AM_v0.4 - 2045 Future BG (Adj).syn
Free
0.90 441
Free
0.90 752
5 0.90 0
Free
ICU Level of Service A
Synchro 11 Report Page 7
HCM Unsignalized Intersection Capacity Analysis 26: Starkey Rd / Range Rd 251 & Ped Crossing
04-01-2025
Intersection Sign configuration not allowed in HCM analysis.
PinnacleVillage-1-AM_v0.4 - 2045 Future BG (Adj).syn
Synchro 11 Report Page 8
Lanes, Volumes, Timings 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
13 13 1900 0.3 0.0 0 0.0 1.00
2 2 1900 3.7
188 188 1900 0.3 0.0 0
3 3 1900 3.7
37 37 1900 0.3 0.0 0
57 57 1900 0.3 0.0 0
3 3 1900 3.7 0.0 0
1.00 0.861
1.00
1.00 0.977
1.00
17 17 1900 3.7 0.0 0 0.0 0.95
311 311 1900 3.7
1.00
14 14 1900 3.7 105.0 1 0.0 1.00
319 319 1900 3.7
1.00 0.875 0.997 1643 0.997 1643 40 160.1 14.4 1.00 2
242 242 1900 3.7 15.0 1 0.0 1.00
0.95
1622
0
1840
0
0
1622 60 308.8 18.5 1.00 3
0
0.950 1789 0.950 1789
0
0
1.00 37
1.00 14
1840 70 535.6 27.5 1.00 319
1.00 57
1.00 17
0.95 0.999 0.997 3564 0.997 3564 70 477.5 24.6 1.00 311
0 No Left
1.75 26
0 0
1.00 13
0
0.950 1789 0.950 1789
1.00 188
1.00 242
203 No Left 3.7 0.0 2.4
0 No Right
242 No Left
40 No Left 3.7 0.0 2.4
0 No Right
14 No Left
376 No Left 3.7 0.0 2.4
0 No Right
0 No Left
331 No Left 3.7 0.0 2.4
0 No Right
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0
Stop
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 57.2% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2045 Future Total (Adj).syn
Stop
Free
0 0
1.00 3
Free
ICU Level of Service B
Synchro 11 Report Page 1
HCM Unsignalized Intersection Capacity Analysis 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
13 13
2 2 Stop 0% 1.00 2
188 188
242 242
37 37
14 14
17 17
1.00 37
1.00 14
1.00 57
1.00 17
311 311 Free 0% 1.00 311
3 3
1.00 242
319 319 Free 0% 1.00 319
57 57
1.00 188
3 3 Stop 0% 1.00 3
1.00 13
None
None
732
750
157
754
724
348
314
376
732 7.5
750 6.5
157 6.9
754 7.5
724 6.5
348 6.9
314 4.1
376 4.1
3.5 95 284
4.0 99 330
3.3 78 861
3.5 0 227
4.0 99 342
3.3 94 649
2.2 99 1243
2.2 99 1179
EB 1 203 13 188 751 0.27 8.3 11.6 B 11.6 B
WB 1 242 242 0 227 1.06 79.7 123.7 F 107.8 F
WB 2 40 0 37 608 0.07 1.6 11.3 B
NB 1 14 14 0 1243 0.01 0.3 7.9 A 0.3
NB 2 376 0 57 1700 0.22 0.0 0.0
SB 1 172 17 0 1179 0.01 0.3 0.9 A 0.5
SB 2 158 0 3 1700 0.09 0.0 0.0
27.4 57.2% 15
PinnacleVillage-1-AM_v0.4 - 2045 Future Total (Adj).syn
ICU Level of Service
1.00 3
B
Synchro 11 Report Page 2
Lanes, Volumes, Timings 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
30 30 1900 0.3 1.00
54 54 1900 3.7 1.00 0.975 0.986 1811 0.986 1811 60 308.8 18.5 1.00 2% 54
17 17 1900 3.7 1.00
11 11 1900 3.7 1.00
140 140 1900 3.7 1.00
0 0 1900 0.3 1.00
50 50 1900 3.7 1.00
8 8 1900 3.7 1.00
0 0 1900 3.7 1.00
6 6 1900 3.7 1.00 0.875
92 92 1900 0.3 1.00
0
0
0
0
0
0
1648
0
0
0
0
0
0
0
0.90 2% 12
1.00 0% 0
0.90 2% 56
0.90 2% 9
1.00 0% 0
1648 40 68.2 6.1 0.90 2% 7
0
0.90 2% 19
3 3 1900 3.7 1.00 0.982 0.960 1776 0.960 1776 40 98.9 8.9 0.90 2% 3
0 No Left
103 No Left 3.7 0.0 2.4
0 No Right
0 No Left
152 No Left 3.7 0.0 2.4
0 No Right
0 No Left
0 No Right
0 No Left
99 No Left 0.0 0.0 2.4
0 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0.99 26
68 No Left 0.0 0.0 4.8 Yes 0.99
0.99 14
0.99 26
0.99
1.75 14
0 0
1.00 2% 30
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 30.7% Analysis Period (min) 15
PinnacleVillage-1-AM_v0.4 - 2045 Future Total (Adj).syn
0.996 1876 0.996 1876 60 150.6 9.0 1.00 2% 140
Free
Stop
1.00 2% 92
Stop
ICU Level of Service A
Synchro 11 Report Page 3
HCM Unsignalized Intersection Capacity Analysis 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min)
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
30 30
54 54 Free 0% 1.00 54
17 17
11 11
0 0
50 50
0 0
1.00 0
0.90 56
0.90 9
1.00 0
6 6 Stop 0% 0.90 7
92 92
0.90 12
3 3 Stop 0% 0.90 3
8 8
0.90 19
140 140 Free 0% 1.00 140
1.00 92
1.00 30
None
None
140
73
383
288
64
298
297
140
140 4.1
73 4.1
383 7.1
288 6.5
64 6.2
298 7.1
297 6.5
140 6.2
2.2 98 1443
2.2 99 1527
3.5 89 501
4.0 100 605
3.3 99 1001
3.5 100 636
4.0 99 597
3.3 90 908
EB 1 103 30 19 1443 0.02 0.5 2.3 A 2.3
WB 1 152 12 0 1527 0.01 0.2 0.6 A 0.6
NB 1 68 56 9 541 0.13 3.3 12.6 B 12.6 B 5.1 30.7% 15
PinnacleVillage-1-AM_v0.4 - 2045 Future Total (Adj).syn
SB 1 99 0 92 876 0.11 2.9 9.6 A 9.6 A
ICU Level of Service
A
Synchro 11 Report Page 4
Lanes, Volumes, Timings 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
5 5 1900 0.3 0.0 0 0.0 1.00
576 576 1900 3.7
169 169 1900 3.7 130.0 1
396 396 1900 3.7
3 3 1900 0.3 0.0 0
138 138 1900 3.7 10.0 1
25 25 1900 3.7 10.0 1
1.00 0.999
1.00
1.00
1.00 0.850
8 8 1900 0.3 0.0 0 0.0 1.00
35 35 1900 3.7
1.00 0.850
252 252 1900 0.3 0.0 0 0.0 1.00
13 13 1900 3.7
1.00
42 42 1900 3.7 110.0 1 0.0 1.00
1.00
1.00 0.850
0
1883
1601
1882
0
0
1883 70 263.2 13.5 1.00 576
1601
0.950 1789 0.950 1789
0
1.00 169
1.00 42
1882 70 245.1 12.6 1.00 396
0 No Left
581 No Left 3.7 0.0 2.4
169 No Right
42 No Left
1.75 26
0.99
0.99 14
0.99 26
1.00 5
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 62.9% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-AM_v0.4 - 2045 Future Total (Adj).syn
1.00 3
0.955 1799 0.955 0 1799 70 1595.3 82.0 1.00 1.00 252 13
399 No Left 3.7 0.0 2.4
0 No Right
0 No Left
265 No Left 0.0 0.0 2.4
138 No Right
0 No Left
43 No Left 0.0 0.0 2.4
25 No Right
0.99
1.75 14
1.75 26
0.99
0.99 14
1.75 26
0.99
0.99 14
Free
0
Stop
1601
0
1601
0
1.00 138
1.00 8
0.991 1866 0.991 1866 70 138.7 7.1 1.00 35
1601 1601
1.00 25
Stop
ICU Level of Service B
Synchro 11 Report Page 5
HCM Unsignalized Intersection Capacity Analysis 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
5 5
576 576 Free 0% 1.00 576
169 169
42 42
3 3
252 252
8 8
1.00 3
1.00 252
1.00 138
1.00 8
35 35 Stop 0% 1.00 35
25 25
1.00 42
13 13 Stop 0% 1.00 13
138 138
1.00 169
396 396 Free 0% 1.00 396
1.00 5
1 None
1.00 25
1
None
399
745
1096
1069
576
1143
1236
398
399 4.1
745 4.1
1096 7.1
1069 6.5
576 6.2
1143 7.1
1236 6.5
398 6.2
2.2 100 1160
2.2 95 863
3.5 0 148
4.0 94 210
3.3 73 517
3.5 93 119
4.0 79 167
3.3 96 652
EB 1 581 5 0 1160 0.00 0.1 0.1 A 0.1
EB 2 169 0 169 1700 0.10 0.0 0.0
WB 1 42 42 0 863 0.05 1.2 9.4 A 0.9
126.7 62.9% 15
PinnacleVillage-1-AM_v0.4 - 2045 Future Total (Adj).syn
WB 2 399 0 3 1700 0.23 0.0 0.0
NB 1 403 252 138 199 2.02 231.4 516.8 F 516.8 F
SB 1 68 8 25 250 0.27 8.2 26.8 D 26.8 D
ICU Level of Service
B
Synchro 11 Report Page 6
Lanes, Volumes, Timings 26: Starkey Rd / Range Rd 251 & Ped Crossing
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
417 417 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
741 741 1900 1.00
0 0 1900 1.00
0
0
0
0
0
0
0
1883
0
0
1883
0
0
0 50 18.6 1.3
0
0
0 50 82.9 6.0
0
0
1883 70 172.1 8.9
0
0
1883 70 535.6 27.5
0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
5 0.90 0
5 0.90 0
5 0.90 0
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
463 No Left 3.7 0.0 4.8
0 No Right
0 No Left
823 No Left 3.7 0.0 4.8
0 No Right
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 42.3% Analysis Period (min) 15
PinnacleVillage-1-AM_v0.4 - 2045 Future Total (Adj).syn
Free
0.90 463
Free
0.90 823
5 0.90 0
Free
ICU Level of Service A
Synchro 11 Report Page 7
HCM Unsignalized Intersection Capacity Analysis 26: Starkey Rd / Range Rd 251 & Ped Crossing
04-01-2025
Intersection Sign configuration not allowed in HCM analysis.
PinnacleVillage-1-AM_v0.4 - 2045 Future Total (Adj).syn
Synchro 11 Report Page 8
Lanes, Volumes, Timings 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
3 3 1900 0.3 0.0 0 0.0 1.00
6 6 1900 3.7
64 64 1900 0.3 0.0 0
5 5 1900 3.7
23 23 1900 0.3 0.0 0
71 71 1900 0.3 0.0 0
11 11 1900 3.7 0.0 0
1.00 0.877
1.00
1.00 0.937
1.00
8 8 1900 3.7 0.0 0 0.0 0.95
106 106 1900 3.7
1.00
102 102 1900 3.7 105.0 1 0.0 1.00
97 97 1900 3.7
1.00 0.882 0.998 1658 0.998 1658 40 160.1 14.4 1.00 6
64 64 1900 3.7 15.0 1 0.0 1.00
0.95
1652
0
1765
0
0
1652 60 308.8 18.5 1.00 5
0
0.950 1789 0.950 1789
0
0
1.00 23
1.00 102
1765 70 534.3 27.5 1.00 97
1.00 71
1.00 8
0.95 0.987 0.997 3521 0.997 3521 70 477.5 24.6 1.00 106
0 No Left
1.75 26
0 0
1.00 3
0
0.950 1789 0.950 1789
1.00 64
1.00 64
73 No Left 3.7 0.0 2.4
0 No Right
64 No Left
28 No Left 3.7 0.0 2.4
0 No Right
102 No Left
168 No Left 3.7 0.0 2.4
0 No Right
0 No Left
125 No Left 3.7 0.0 2.4
0 No Right
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
Stop
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 29.2% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2022 Existing.syn
0
Stop
Free
0 0
1.00 11
Free
ICU Level of Service A
Synchro 11 Report Page 1
HCM Unsignalized Intersection Capacity Analysis 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
3 3
6 6 Stop 0% 1.00 6
64 64
64 64
23 23
102 102
8 8
1.00 23
1.00 102
1.00 71
1.00 8
106 106 Free 0% 1.00 106
11 11
1.00 64
97 97 Free 0% 1.00 97
71 71
1.00 64
5 5 Stop 0% 1.00 5
1.00 3
None
None
454
500
58
472
470
132
117
168
454 7.5
500 6.5
58 6.9
472 7.5
470 6.5
132 6.9
117 4.1
168 4.1
3.5 99 446
4.0 99 436
3.3 94 995
3.5 85 414
4.0 99 454
3.3 97 892
2.2 93 1469
2.2 99 1407
EB 1 73 3 64 861 0.08 2.1 9.6 A 9.6 A
WB 1 64 64 0 414 0.15 4.1 15.3 C 13.6 B
WB 2 28 0 23 761 0.04 0.9 9.9 A
NB 1 102 102 0 1469 0.07 1.7 7.6 A 2.9
NB 2 168 0 71 1700 0.10 0.0 0.0
SB 1 61 8 0 1407 0.01 0.1 1.0 A 0.5
SB 2 64 0 11 1700 0.04 0.0 0.0
Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2022 Existing.syn
5.0 29.2% 15
ICU Level of Service
1.00 11
A
Synchro 11 Report Page 2
Lanes, Volumes, Timings 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 0.3 1.00
64 64 1900 3.7 1.00 0.964
21 21 1900 3.7 1.00
5 5 1900 3.7 1.00
68 68 1900 3.7 1.00
0 0 1900 0.3 1.00
24 24 1900 3.7 1.00
7 7 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 0.3 1.00
0
1816
0
0
0
0
0
0
1883
0
0
1816 60 308.8 18.5 1.00 2% 64
0
0
0
0
0
0
0.90 2% 6
1.00 0% 0
0.90 2% 27
0.90 2% 8
1.00 0% 0
1883 40 68.2 6.1 0.90 2% 0
0
0.90 2% 23
0 0 1900 3.7 1.00 0.969 0.963 1758 0.963 1758 40 69.4 6.2 0.90 2% 0
1.00 0% 0
0.996 1876 0.996 1876 60 150.6 9.0 1.00 2% 68
1.00 0% 0
0 No Left
87 No Left 3.7 0.0 2.4
0 No Right
0 No Left
74 No Left 3.7 0.0 2.4
0 No Right
0 No Left
35 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 2.4
0 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0.99 26
0.99
1.75 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 17.7% Analysis Period (min) 15
PinnacleVillage-1-PM_v0.4 - 2022 Existing.syn
Free
Stop
Stop
ICU Level of Service A
Synchro 11 Report Page 3
HCM Unsignalized Intersection Capacity Analysis 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0
64 64 Free 0% 1.00 64
21 21
5 5
0 0
24 24
0 0
1.00 0
0.90 27
0.90 8
1.00 0
0 0 Stop 0% 0.90 0
0 0
0.90 6
0 0 Stop 0% 0.90 0
7 7
0.90 23
68 68 Free 0% 1.00 68
1.00 0
1.00 0
None
None
68
87
156
156
76
164
167
68
68 4.1
87 4.1
156 7.1
156 6.5
76 6.2
164 7.1
167 6.5
68 6.2
2.2 100 1546
2.2 100 1509
3.5 97 809
4.0 100 733
3.3 99 986
3.5 100 797
4.0 100 723
3.3 100 1001
EB 1 87 0 23 1546 0.00 0.0 0.0 0.0
WB 1 74 6 0 1509 0.00 0.1 0.6 A 0.6
Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min)
PinnacleVillage-1-PM_v0.4 - 2022 Existing.syn
NB 1 35 27 8 843 0.04 1.0 9.5 A 9.5 A 1.9 17.7% 15
SB 1 0 0 0 1700 0.00 0.0 0.0 A 0.0 A
ICU Level of Service
A
Synchro 11 Report Page 4
Lanes, Volumes, Timings 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
8 8 1900 0.3 0.0 0 0.0 1.00
292 292 1900 3.7
53 53 1900 3.7 130.0 1
364 364 1900 3.7
6 6 1900 0.3 0.0 0
26 26 1900 3.7 10.0 1
2 2 1900 3.7 10.0 1
1.00 0.998
1.00
1.00
1.00 0.850
4 4 1900 0.3 0.0 0 0.0 1.00
4 4 1900 3.7
1.00 0.850
83 83 1900 0.3 0.0 0 0.0 1.00
14 14 1900 3.7
1.00
68 68 1900 3.7 110.0 1 0.0 1.00
1.00
1.00 0.850
1880
0
1880 70 245.1 12.6 1.00 364
0
0 0
1.00 8
0.999 1882 0.999 1882 70 263.2 13.5 1.00 292
1601
0.950 1789 0.950 1789
1.00 53
1.00 68
1601
1.00 6
0.959 1806 0.959 0 1806 70 1595.3 82.0 1.00 1.00 83 14 0
1601
0
1601
0
1.00 26
1.00 4
0.976 1838 0.976 1838 70 138.7 7.1 1.00 4
1601 1601
1.00 2
0 No Left
300 No Left 3.7 0.0 2.4
53 No Right
68 No Left
370 No Left 3.7 0.0 2.4
0 No Right
0 No Left
97 No Left 0.0 0.0 2.4
26 No Right
0 No Left
8 No Left 0.0 0.0 2.4
2 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
1.75 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 57.3% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2022 Existing.syn
Free
Stop
Stop
ICU Level of Service B
Synchro 11 Report Page 5
HCM Unsignalized Intersection Capacity Analysis 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
8 8
292 292 Free 0% 1.00 292
53 53
68 68
6 6
83 83
4 4
1.00 6
1.00 83
1.00 26
1.00 4
4 4 Stop 0% 1.00 4
2 2
1.00 68
14 14 Stop 0% 1.00 14
26 26
1.00 53
364 364 Free 0% 1.00 364
1.00 8
1 None
1.00 2
1
None
370
345
811
814
292
831
864
367
370 4.1
345 4.1
811 7.1
814 6.5
292 6.2
831 7.1
864 6.5
367 6.2
2.2 99 1189
2.2 94 1214
3.5 70 280
4.0 95 293
3.3 97 747
3.5 98 256
4.0 99 274
3.3 100 678
EB 1 300 8 0 1189 0.01 0.2 0.3 A 0.2
EB 2 53 0 53 1700 0.03 0.0 0.0
Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2022 Existing.syn
WB 1 68 68 0 1214 0.06 1.4 8.1 A 1.3
3.7 57.3% 15
WB 2 370 0 6 1700 0.22 0.0 0.0
NB 1 123 83 26 341 0.36 12.2 21.4 C 21.4 C
SB 1 10 4 2 331 0.03 0.7 17.3 C 17.3 C
ICU Level of Service
B
Synchro 11 Report Page 6
Lanes, Volumes, Timings 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
77 77 1900 0.3
11 11 1900 3.7 0.0 1 0.0 1.00
114 114 1900 3.7 50.0 1
200 200 1900 3.7 105.0 1 0.0 1.00
188 188 1900 3.7
26 26 1900 0.3 0.0 0
154 154 1900 3.7
79 79 1900 3.7 35.0 1
5 5 1900 0.3
1.00
1.00
1.00 0.850
23 23 1900 3.7 30.0 1 0.0 1.00
20 20 1900 3.7 0.0 1
1.00 0.982
1 1 1900 0.3 0.0 0 0.0 1.00
1.00 0.850
1.00
1850
0
0
1883
1601
1601
0
1850 70 675.7 34.8 1.00 188
0
0
1601
1601
0
1.00 26
1.00 1
1883 70 173.4 8.9 1.00 154
1.00 20
1.00 5
1.00
0 0
1.00 77
0.950 1789 0.950 1789 70 288.3 14.8 1.00 11
1.00 0.850
1601
0.950 1789 0.950 1789
1.00 114
1.00 200
1601
1.00 79
0.950 1789 0.950 1789 40 160.1 14.4 1.00 23
0 No Left
88 No Left 3.7 0.0 2.4
114 No Right
200 No Left
214 No Left 3.7 0.0 2.4
0 No Right
0 No Left
155 No Left 3.7 0.0 2.4
79 No Right
23 No Left 3.7 0.0 2.4
25 No Right
0 No Right
1.75 26
0.99 26 Stop
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
0.99 26 Stop
0.99 14
1.75 14
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 41.2% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2022 Existing.syn
Free
Free
ICU Level of Service A
Synchro 11 Report Page 7
HCM Unsignalized Intersection Capacity Analysis 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h)
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
77 77
11 11 Stop 0% 1.00 11
114 114
200 200
26 26
1 1
5 5
1.00 26
1.00 1
23 23 Stop 0% 1.00 23
20 20
1.00 200
154 154 Free 0% 1.00 154
79 79
1.00 114
188 188 Free 0% 1.00 188
1.00 20
1.00 5
Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS
1.00 77
1.00 79
7 None
None
759
770
154
233
214
820
836
201
759 7.1
770 6.5
154 6.2
233 4.1
214 4.1
820 7.1
836 6.5
201 6.2
3.5 71 268
4.0 96 281
3.3 87 892
2.2 85 1335
2.2 100 1356
3.5 90 220
4.0 92 258
3.3 99 840
EB 1 202 77 114 618 0.33 10.8 16.2 C 16.2 C
NB 1 200 200 0 1335 0.15 4.0 8.2 A 3.9
NB 2 214 0 26 1700 0.13 0.0 0.0
SB 1 155 1 0 1356 0.00 0.0 0.1 A 0.0
Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2022 Existing.syn
6.6 41.2% 15
SB 2 79 0 79 1700 0.05 0.0 0.0
SW 1 23 23 0 220 0.10 2.6 23.2 C 20.6 C
ICU Level of Service
SW 2 25 0 5 299 0.08 2.1 18.1 C
A
Synchro 11 Report Page 8
Lanes, Volumes, Timings 26: Starkey Rd / Range Rd 251 & Ped Crossing
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
270 270 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
234 234 1900 1.00
0 0 1900 1.00
0
0
0
0
0
0
0
1883
0
0
1883
0
0
0 50 23.9 1.7
0
0
0 50 80.1 5.8
0
0
1883 70 173.4 8.9
0
0
1883 70 534.3 27.5
0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
5 0.90 0
5 0.90 0
5 0.90 0
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
300 No Left 3.7 0.0 4.8
0 No Right
0 No Left
260 No Left 3.7 0.0 4.8
0 No Right
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 17.5% Analysis Period (min) 15
PinnacleVillage-1-PM_v0.4 - 2022 Existing.syn
Free
0.90 300
Free
0.90 260
5 0.90 0
Free
ICU Level of Service A
Synchro 11 Report Page 9
HCM Unsignalized Intersection Capacity Analysis 26: Starkey Rd / Range Rd 251 & Ped Crossing
04-01-2025
Intersection Sign configuration not allowed in HCM analysis.
PinnacleVillage-1-PM_v0.4 - 2022 Existing.syn
Synchro 11 Report Page 10
Lanes, Volumes, Timings 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
3 3 1900 0.3 0.0 0 0.0 1.00
6 6 1900 3.7
68 68 1900 0.3 0.0 0
5 5 1900 3.7
24 24 1900 0.3 0.0 0
71 71 1900 0.3 0.0 0
11 11 1900 3.7 0.0 0
1.00 0.876
1.00
1.00 0.951
1.00
8 8 1900 3.7 0.0 0 0.0 0.95
141 141 1900 3.7
1.00
102 102 1900 3.7 105.0 1 0.0 1.00
147 147 1900 3.7
1.00 0.881 0.998 1656 0.998 1656 40 160.1 14.4 1.00 6
68 68 1900 3.7 15.0 1 0.0 1.00
0.95
1650
0
1791
0
0
1650 60 308.8 18.5 1.00 5
0
0.950 1789 0.950 1789
0
0
1.00 24
1.00 102
1791 70 534.3 27.5 1.00 147
1.00 71
1.00 8
0.95 0.990 0.998 3536 0.998 3536 70 477.5 24.6 1.00 141
0 No Left
1.75 26
0 0
1.00 3
0
0.950 1789 0.950 1789
1.00 68
1.00 68
77 No Left 3.7 0.0 2.4
0 No Right
68 No Left
29 No Left 3.7 0.0 2.4
0 No Right
102 No Left
218 No Left 3.7 0.0 2.4
0 No Right
0 No Left
160 No Left 3.7 0.0 2.4
0 No Right
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0
Stop
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 37.0% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2025 Future BG (Adj).syn
Stop
Free
0 0
1.00 11
Free
ICU Level of Service A
Synchro 11 Report Page 1
HCM Unsignalized Intersection Capacity Analysis 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
3 3
6 6 Stop 0% 1.00 6
68 68
68 68
24 24
102 102
8 8
1.00 24
1.00 102
1.00 71
1.00 8
141 141 Free 0% 1.00 141
11 11
1.00 68
147 147 Free 0% 1.00 147
71 71
1.00 68
5 5 Stop 0% 1.00 5
1.00 3
None
None
540
584
76
544
554
182
152
218
540 7.5
584 6.5
76 6.9
544 7.5
554 6.5
182 6.9
152 4.1
218 4.1
3.5 99 385
4.0 98 389
3.3 93 970
3.5 81 365
4.0 99 405
3.3 97 829
2.2 93 1426
2.2 99 1349
EB 1 77 3 68 825 0.09 2.3 9.8 A 9.8 A
WB 1 68 68 0 365 0.19 5.1 17.1 C 15.1 C
WB 2 29 0 24 702 0.04 1.0 10.3 B
NB 1 102 102 0 1426 0.07 1.8 7.7 A 2.5
NB 2 218 0 71 1700 0.13 0.0 0.0
SB 1 78 8 0 1349 0.01 0.1 0.8 A 0.4
SB 2 82 0 11 1700 0.05 0.0 0.0
4.7 37.0% 15
PinnacleVillage-1-PM_v0.4 - 2025 Future BG (Adj).syn
ICU Level of Service
1.00 11
A
Synchro 11 Report Page 2
Lanes, Volumes, Timings 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 0.3 1.00
68 68 1900 3.7 1.00 0.965
22 22 1900 3.7 1.00
5 5 1900 3.7 1.00
72 72 1900 3.7 1.00
0 0 1900 0.3 1.00
25 25 1900 3.7 1.00
7 7 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 0.3 1.00
0
1818
0
0
0
0
0
0
1883
0
0
1818 60 308.8 18.5 1.00 2% 68
0
0
0
0
0
0
0.90 2% 6
1.00 0% 0
0.90 2% 28
0.90 2% 8
1.00 0% 0
1883 40 68.2 6.1 0.90 2% 0
0
0.90 2% 24
0 0 1900 3.7 1.00 0.970 0.963 1759 0.963 1759 40 69.4 6.2 0.90 2% 0
1.00 0% 0
0.996 1876 0.996 1876 60 150.6 9.0 1.00 2% 72
1.00 0% 0
0 No Left
92 No Left 3.7 0.0 2.4
0 No Right
0 No Left
78 No Left 3.7 0.0 2.4
0 No Right
0 No Left
36 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 2.4
0 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0.99 26
0.99
1.75 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 17.9% Analysis Period (min) 15
PinnacleVillage-1-PM_v0.4 - 2025 Future BG (Adj).syn
Free
Stop
Stop
ICU Level of Service A
Synchro 11 Report Page 3
HCM Unsignalized Intersection Capacity Analysis 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min)
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0
68 68 Free 0% 1.00 68
22 22
5 5
0 0
25 25
0 0
1.00 0
0.90 28
0.90 8
1.00 0
0 0 Stop 0% 0.90 0
0 0
0.90 6
0 0 Stop 0% 0.90 0
7 7
0.90 24
72 72 Free 0% 1.00 72
1.00 0
1.00 0
None
None
72
92
164
164
80
172
176
72
72 4.1
92 4.1
164 7.1
164 6.5
80 6.2
172 7.1
176 6.5
72 6.2
2.2 100 1541
2.2 100 1503
3.5 96 798
4.0 100 726
3.3 99 980
3.5 100 787
4.0 100 715
3.3 100 996
EB 1 92 0 24 1541 0.00 0.0 0.0 0.0
WB 1 78 6 0 1503 0.00 0.1 0.6 A 0.6
NB 1 36 28 8 833 0.04 1.0 9.5 A 9.5 A 1.9 17.9% 15
PinnacleVillage-1-PM_v0.4 - 2025 Future BG (Adj).syn
SB 1 0 0 0 1700 0.00 0.0 0.0 A 0.0 A
ICU Level of Service
A
Synchro 11 Report Page 4
Lanes, Volumes, Timings 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
8 8 1900 0.3 0.0 0 0.0 1.00
310 310 1900 3.7
69 69 1900 3.7 130.0 1
386 386 1900 3.7
6 6 1900 0.3 0.0 0
36 36 1900 3.7 10.0 1
2 2 1900 3.7 10.0 1
1.00 0.998
1.00
1.00
1.00 0.850
4 4 1900 0.3 0.0 0 0.0 1.00
4 4 1900 3.7
1.00 0.850
96 96 1900 0.3 0.0 0 0.0 1.00
15 15 1900 3.7
1.00
85 85 1900 3.7 110.0 1 0.0 1.00
1.00
1.00 0.850
1880
0
1880 70 245.1 12.6 1.00 386
0
0 0
1.00 8
0.999 1882 0.999 1882 70 263.2 13.5 1.00 310
1601
0.950 1789 0.950 1789
1.00 69
1.00 85
1601
1.00 6
0.959 1806 0.959 0 1806 70 1595.3 82.0 1.00 1.00 96 15 0
1601
0
1601
0
1.00 36
1.00 4
0.976 1838 0.976 1838 70 138.7 7.1 1.00 4
1601 1601
1.00 2
0 No Left
318 No Left 3.7 0.0 2.4
69 No Right
85 No Left
392 No Left 3.7 0.0 2.4
0 No Right
0 No Left
111 No Left 0.0 0.0 2.4
36 No Right
0 No Left
8 No Left 0.0 0.0 2.4
2 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
1.75 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 60.2% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2025 Future BG (Adj).syn
Free
Stop
Stop
ICU Level of Service B
Synchro 11 Report Page 5
HCM Unsignalized Intersection Capacity Analysis 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
8 8
310 310 Free 0% 1.00 310
69 69
85 85
6 6
96 96
4 4
1.00 6
1.00 96
1.00 36
1.00 4
4 4 Stop 0% 1.00 4
2 2
1.00 85
15 15 Stop 0% 1.00 15
36 36
1.00 69
386 386 Free 0% 1.00 386
1.00 8
1 None
1.00 2
1
None
392
379
885
888
310
910
954
389
392 4.1
379 4.1
885 7.1
888 6.5
310 6.2
910 7.1
954 6.5
389 6.2
2.2 99 1167
2.2 93 1179
3.5 61 246
4.0 94 261
3.3 95 730
3.5 98 218
4.0 98 238
3.3 100 659
EB 1 318 8 0 1167 0.01 0.2 0.3 A 0.2
EB 2 69 0 69 1700 0.04 0.0 0.0
WB 1 85 85 0 1179 0.07 1.8 8.3 A 1.5
4.8 60.2% 15
PinnacleVillage-1-PM_v0.4 - 2025 Future BG (Adj).syn
WB 2 392 0 6 1700 0.23 0.0 0.0
NB 1 147 96 36 312 0.47 18.2 26.4 D 26.4 D
SB 1 10 4 2 285 0.04 0.8 19.2 C 19.2 C
ICU Level of Service
B
Synchro 11 Report Page 6
Lanes, Volumes, Timings 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
94 94 1900 0.3
11 11 1900 3.7 0.0 1 0.0 1.00
121 121 1900 3.7 50.0 1
212 212 1900 3.7 105.0 1 0.0 1.00
232 232 1900 3.7
26 26 1900 0.3 0.0 0
184 184 1900 3.7
92 92 1900 3.7 35.0 1
5 5 1900 0.3
1.00
1.00
1.00 0.850
23 23 1900 3.7 30.0 1 0.0 1.00
20 20 1900 3.7 0.0 1
1.00 0.985
1 1 1900 0.3 0.0 0 0.0 1.00
1.00 0.850
1.00
1855
0
0
1883
1601
1601
0
1855 70 675.7 34.8 1.00 232
0
0
1601
1601
0
1.00 26
1.00 1
1883 70 173.4 8.9 1.00 184
1.00 20
1.00 5
1.00
0 0
1.00 94
0.950 1789 0.950 1789 70 288.3 14.8 1.00 11
1.00 0.850
1601
0.950 1789 0.950 1789
1.00 121
1.00 212
1601
1.00 92
0.950 1789 0.950 1789 40 160.1 14.4 1.00 23
0 No Left
105 No Left 3.7 0.0 2.4
121 No Right
212 No Left
258 No Left 3.7 0.0 2.4
0 No Right
0 No Left
185 No Left 3.7 0.0 2.4
92 No Right
23 No Left 3.7 0.0 2.4
25 No Right
0 No Right
1.75 26
0.99 26 Stop
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
0.99 26 Stop
0.99 14
1.75 14
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 46.0% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2025 Future BG (Adj).syn
Free
Free
ICU Level of Service A
Synchro 11 Report Page 7
HCM Unsignalized Intersection Capacity Analysis 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h)
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
94 94
11 11 Stop 0% 1.00 11
121 121
212 212
26 26
1 1
5 5
1.00 26
1.00 1
23 23 Stop 0% 1.00 23
20 20
1.00 212
184 184 Free 0% 1.00 184
92 92
1.00 121
232 232 Free 0% 1.00 232
1.00 20
1.00 5
Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
1.00 94
1.00 92
7 None
None
857
868
184
276
258
921
947
245
857 7.1
868 6.5
184 6.2
276 4.1
258 4.1
921 7.1
947 6.5
245 6.2
3.5 58 224
4.0 95 242
3.3 86 858
2.2 84 1287
2.2 100 1307
3.5 87 182
4.0 91 218
3.3 99 794
EB 1 226 94 121 487 0.46 18.4 21.1 C 21.1 C
NB 1 212 212 0 1287 0.16 4.5 8.3 A 3.8
NB 2 258 0 26 1700 0.15 0.0 0.0
SB 1 185 1 0 1307 0.00 0.0 0.0 A 0.0
7.5 46.0% 15
PinnacleVillage-1-PM_v0.4 - 2025 Future BG (Adj).syn
SB 2 92 0 92 1700 0.05 0.0 0.0
SW 1 23 23 0 182 0.13 3.2 27.6 D 24.0 C
ICU Level of Service
SW 2 25 0 5 255 0.10 2.5 20.6 C
A
Synchro 11 Report Page 8
Lanes, Volumes, Timings 26: Starkey Rd / Range Rd 251 & Ped Crossing
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
331 331 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
277 277 1900 1.00
0 0 1900 1.00
0
0
0
0
0
0
0
1883
0
0
1883
0
0
0 50 23.9 1.7
0
0
0 50 80.1 5.8
0
0
1883 70 173.4 8.9
0
0
1883 70 534.3 27.5
0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
5 0.90 0
5 0.90 0
5 0.90 0
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
368 No Left 3.7 0.0 4.8
0 No Right
0 No Left
308 No Left 3.7 0.0 4.8
0 No Right
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 20.8% Analysis Period (min) 15
PinnacleVillage-1-PM_v0.4 - 2025 Future BG (Adj).syn
Free
0.90 368
Free
0.90 308
5 0.90 0
Free
ICU Level of Service A
Synchro 11 Report Page 9
HCM Unsignalized Intersection Capacity Analysis 26: Starkey Rd / Range Rd 251 & Ped Crossing
04-01-2025
Intersection Sign configuration not allowed in HCM analysis.
PinnacleVillage-1-PM_v0.4 - 2025 Future BG (Adj).syn
Synchro 11 Report Page 10
Lanes, Volumes, Timings 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
3 3 1900 0.3 0.0 0 0.0 1.00
6 6 1900 3.7
68 68 1900 0.3 0.0 0
5 5 1900 3.7
39 39 1900 0.3 0.0 0
133 133 1900 0.3 0.0 0
11 11 1900 3.7 0.0 0
1.00 0.867
1.00
1.00 0.929
1.00
36 36 1900 3.7 0.0 0 0.0 0.95
141 141 1900 3.7
1.00
102 102 1900 3.7 105.0 1 0.0 1.00
147 147 1900 3.7
1.00 0.881 0.998 1656 0.998 1656 40 160.1 14.4 1.00 6
102 102 1900 3.7 15.0 1 0.0 1.00
0.95
1633
0
1750
0
0
1633 60 308.8 18.5 1.00 5
0
0.950 1789 0.950 1789
0
0
1.00 39
1.00 102
1750 70 534.3 27.5 1.00 147
1.00 133
1.00 36
0.95 0.991 0.991 3514 0.991 3514 70 477.5 24.6 1.00 141
0 No Left
1.75 26
0 0
1.00 3
0
0.950 1789 0.950 1789
1.00 68
1.00 102
77 No Left 3.7 0.0 2.4
0 No Right
102 No Left
44 No Left 3.7 0.0 2.4
0 No Right
102 No Left
280 No Left 3.7 0.0 2.4
0 No Right
0 No Left
188 No Left 3.7 0.0 2.4
0 No Right
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0
Stop
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 43.5% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2025 Future Total (Adj).syn
Stop
Free
0 0
1.00 11
Free
ICU Level of Service A
Synchro 11 Report Page 1
HCM Unsignalized Intersection Capacity Analysis 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
3 3
6 6 Stop 0% 1.00 6
68 68
102 102
39 39
102 102
36 36
1.00 39
1.00 102
1.00 133
1.00 36
141 141 Free 0% 1.00 141
11 11
1.00 102
147 147 Free 0% 1.00 147
133 133
1.00 68
5 5 Stop 0% 1.00 5
1.00 3
None
None
611
702
76
631
642
214
152
280
611 7.5
702 6.5
76 6.9
631 7.5
642 6.5
214 6.9
152 4.1
280 4.1
3.5 99 329
4.0 98 325
3.3 93 970
3.5 67 310
4.0 99 353
3.3 95 792
2.2 93 1426
2.2 97 1280
EB 1 77 3 68 788 0.10 2.5 10.1 B 10.1 B
WB 1 102 102 0 310 0.33 10.6 22.2 C 18.7 C
WB 2 44 0 39 694 0.06 1.5 10.5 B
NB 1 102 102 0 1426 0.07 1.8 7.7 A 2.1
NB 2 280 0 133 1700 0.16 0.0 0.0
SB 1 106 36 0 1280 0.03 0.7 2.8 A 1.6
SB 2 82 0 11 1700 0.05 0.0 0.0
5.8 43.5% 15
PinnacleVillage-1-PM_v0.4 - 2025 Future Total (Adj).syn
ICU Level of Service
1.00 11
A
Synchro 11 Report Page 2
Lanes, Volumes, Timings 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
90 90 1900 0.3 1.00
68 68 1900 3.7 1.00 0.982 0.976 1823 0.976 1823 60 308.8 18.5 1.00 2% 68
22 22 1900 3.7 1.00
5 5 1900 3.7 1.00
72 72 1900 3.7 1.00
0 0 1900 0.3 1.00
25 25 1900 3.7 1.00
7 7 1900 3.7 1.00
0 0 1900 3.7 1.00
3 3 1900 3.7 1.00 0.872
54 54 1900 0.3 1.00
0
0
0
0
0
0
1673
0
0
0
0
0
0
0
0.90 2% 6
1.00 0% 0
0.90 2% 28
0.90 2% 8
1.00 0% 0
1673 40 68.2 6.1 0.90 2% 3
0
0.90 2% 24
9 9 1900 3.7 1.00 0.977 0.970 1785 0.970 1785 40 69.4 6.2 0.90 2% 10
0 No Left
182 No Left 3.7 0.0 2.4
0 No Right
0 No Left
78 No Left 3.7 0.0 2.4
0 No Right
0 No Left
46 No Left 0.0 0.0 4.8
0 No Right
0 No Left
57 No Left 0.0 0.0 2.4
0 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0 0
1.00 0% 90
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 32.2% Analysis Period (min) 15
PinnacleVillage-1-PM_v0.4 - 2025 Future Total (Adj).syn
0.996 1876 0.996 1876 60 150.6 9.0 1.00 2% 72
Free
Stop
1.00 0% 54
Stop
ICU Level of Service A
Synchro 11 Report Page 3
HCM Unsignalized Intersection Capacity Analysis 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min)
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
90 90
68 68 Free 0% 1.00 68
22 22
5 5
0 0
25 25
0 0
1.00 0
0.90 28
0.90 8
1.00 0
3 3 Stop 0% 0.90 3
54 54
0.90 6
9 9 Stop 0% 0.90 10
7 7
0.90 24
72 72 Free 0% 1.00 72
1.00 54
1.00 90
None
None
72
92
400
344
80
357
356
72
72 4.1
92 4.1
400 7.1
344 6.5
80 6.2
357 7.1
356 6.5
72 6.2
2.2 94 1541
2.2 100 1503
3.5 94 503
4.0 98 543
3.3 99 980
3.5 100 561
4.0 99 534
3.3 95 996
EB 1 182 90 24 1541 0.06 1.4 3.9 A 3.9
WB 1 78 6 0 1503 0.00 0.1 0.6 A 0.6
NB 1 46 28 8 559 0.08 2.0 12.0 B 12.0 B 5.0 32.2% 15
PinnacleVillage-1-PM_v0.4 - 2025 Future Total (Adj).syn
SB 1 57 0 54 953 0.06 1.4 9.0 A 9.0 A
ICU Level of Service
A
Synchro 11 Report Page 4
Lanes, Volumes, Timings 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
8 8 1900 0.3 0.0 0 0.0 1.00
310 310 1900 3.7
74 74 1900 3.7 130.0 1
386 386 1900 3.7
6 6 1900 0.3 0.0 0
43 43 1900 3.7 10.0 1
2 2 1900 3.7 10.0 1
1.00 0.998
1.00
1.00
1.00 0.850
4 4 1900 0.3 0.0 0 0.0 1.00
4 4 1900 3.7
1.00 0.850
99 99 1900 0.3 0.0 0 0.0 1.00
15 15 1900 3.7
1.00
97 97 1900 3.7 110.0 1 0.0 1.00
1.00
1.00 0.850
1880
0
1880 70 245.1 12.6 1.00 386
0
0 0
1.00 8
0.999 1882 0.999 1882 70 263.2 13.5 1.00 310
1601
0.950 1789 0.950 1789
1.00 74
1.00 97
1601
1.00 6
0.958 1804 0.958 0 1804 70 1595.3 82.0 1.00 1.00 99 15 0
1601
0
1601
0
1.00 43
1.00 4
0.976 1838 0.976 1838 70 138.7 7.1 1.00 4
1601 1601
1.00 2
0 No Left
318 No Left 3.7 0.0 2.4
74 No Right
97 No Left
392 No Left 3.7 0.0 2.4
0 No Right
0 No Left
114 No Left 0.0 0.0 2.4
43 No Right
0 No Left
8 No Left 0.0 0.0 2.4
2 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
1.75 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 60.4% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2025 Future Total (Adj).syn
Free
Stop
Stop
ICU Level of Service B
Synchro 11 Report Page 5
HCM Unsignalized Intersection Capacity Analysis 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
8 8
310 310 Free 0% 1.00 310
74 74
97 97
6 6
99 99
4 4
1.00 6
1.00 99
1.00 43
1.00 4
4 4 Stop 0% 1.00 4
2 2
1.00 97
15 15 Stop 0% 1.00 15
43 43
1.00 74
386 386 Free 0% 1.00 386
1.00 8
1 None
1.00 2
1
None
392
384
909
912
310
938
983
389
392 4.1
384 4.1
909 7.1
912 6.5
310 6.2
938 7.1
983 6.5
389 6.2
2.2 99 1167
2.2 92 1174
3.5 58 235
4.0 94 249
3.3 94 730
3.5 98 205
4.0 98 227
3.3 100 659
EB 1 318 8 0 1167 0.01 0.2 0.3 A 0.2
EB 2 74 0 74 1700 0.04 0.0 0.0
WB 1 97 97 0 1174 0.08 2.0 8.3 A 1.7
5.3 60.4% 15
PinnacleVillage-1-PM_v0.4 - 2025 Future Total (Adj).syn
WB 2 392 0 6 1700 0.23 0.0 0.0
NB 1 157 99 43 308 0.51 20.7 28.2 D 28.2 D
SB 1 10 4 2 270 0.04 0.9 20.0 C 20.0 C
ICU Level of Service
B
Synchro 11 Report Page 6
Lanes, Volumes, Timings 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
108 108 1900 0.3
11 11 1900 3.7 0.0 1 0.0 1.00
121 121 1900 3.7 50.0 1
212 212 1900 3.7 105.0 1 0.0 1.00
280 280 1900 3.7
35 35 1900 0.3 0.0 0
214 214 1900 3.7
100 100 1900 3.7 35.0 1
5 5 1900 0.3
1.00
1.00
1.00 0.850
26 26 1900 3.7 30.0 1 0.0 1.00
20 20 1900 3.7 0.0 1
1.00 0.983
1 1 1900 0.3 0.0 0 0.0 1.00
1.00 0.850
1.00
1851
0
0
1883
1601
1601
0
1851 70 675.7 34.8 1.00 280
0
0
1601
1601
0
1.00 35
1.00 1
1883 70 173.4 8.9 1.00 214
1.00 20
1.00 5
1.00
0 0
1.00 108
0.950 1789 0.950 1789 70 288.3 14.8 1.00 11
1.00 0.850
1601
0.950 1789 0.950 1789
1.00 121
1.00 212
1601
1.00 100
0.950 1789 0.950 1789 40 160.1 14.4 1.00 26
0 No Left
119 No Left 3.7 0.0 2.4
121 No Right
212 No Left
315 No Left 3.7 0.0 2.4
0 No Right
0 No Left
215 No Left 3.7 0.0 2.4
100 No Right
26 No Left 3.7 0.0 2.4
25 No Right
0 No Right
1.75 26
0.99 26 Stop
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
0.99 26 Stop
0.99 14
1.75 14
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 51.4% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2025 Future Total (Adj).syn
Free
Free
ICU Level of Service A
Synchro 11 Report Page 7
HCM Unsignalized Intersection Capacity Analysis 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h)
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
108 108
11 11 Stop 0% 1.00 11
121 121
212 212
35 35
1 1
5 5
1.00 35
1.00 1
26 26 Stop 0% 1.00 26
20 20
1.00 212
214 214 Free 0% 1.00 214
100 100
1.00 121
280 280 Free 0% 1.00 280
1.00 20
1.00 5
Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
1.00 108
1.00 100
7 None
None
935
955
214
314
315
1004
1038
298
935 7.1
955 6.5
214 6.2
314 4.1
315 4.1
1004 7.1
1038 6.5
298 6.2
3.5 45 196
4.0 95 214
3.3 85 826
2.2 83 1246
2.2 100 1245
3.5 83 157
4.0 90 192
3.3 99 742
EB 1 240 108 121 398 0.60 29.0 28.7 D 28.7 D
NB 1 212 212 0 1246 0.17 4.7 8.5 A 3.4
NB 2 315 0 35 1700 0.19 0.0 0.0
SB 1 215 1 0 1245 0.00 0.0 0.0 A 0.0
8.9 51.4% 15
PinnacleVillage-1-PM_v0.4 - 2025 Future Total (Adj).syn
SB 2 100 0 100 1700 0.06 0.0 0.0
SW 1 26 26 0 157 0.17 4.4 32.3 D 27.8 D
ICU Level of Service
SW 2 25 0 5 225 0.11 2.8 23.0 C
A
Synchro 11 Report Page 8
Lanes, Volumes, Timings 26: Starkey Rd / Range Rd 251 & Ped Crossing
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
331 331 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
393 393 1900 1.00
0 0 1900 1.00
0
0
0
0
0
0
0
1883
0
0
1883
0
0
0 50 23.9 1.7
0
0
0 50 80.1 5.8
0
0
1883 70 173.4 8.9
0
0
1883 70 534.3 27.5
0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
5 0.90 0
5 0.90 0
5 0.90 0
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
368 No Left 3.7 0.0 4.8
0 No Right
0 No Left
437 No Left 3.7 0.0 4.8
0 No Right
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 24.0% Analysis Period (min) 15
PinnacleVillage-1-PM_v0.4 - 2025 Future Total (Adj).syn
Free
0.90 368
Free
0.90 437
5 0.90 0
Free
ICU Level of Service A
Synchro 11 Report Page 9
HCM Unsignalized Intersection Capacity Analysis 26: Starkey Rd / Range Rd 251 & Ped Crossing
04-01-2025
Intersection Sign configuration not allowed in HCM analysis.
PinnacleVillage-1-PM_v0.4 - 2025 Future Total (Adj).syn
Synchro 11 Report Page 10
Lanes, Volumes, Timings 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
4 4 1900 0.3 0.0 0 0.0 1.00
8 8 1900 3.7
83 83 1900 0.3 0.0 0
6 6 1900 3.7
30 30 1900 0.3 0.0 0
71 71 1900 0.3 0.0 0
11 11 1900 3.7 0.0 0
1.00 0.875
1.00
1.00 0.968
1.00
8 8 1900 3.7 0.0 0 0.0 0.95
220 220 1900 3.7
1.00
102 102 1900 3.7 105.0 1 0.0 1.00
262 262 1900 3.7
1.00 0.882 0.998 1658 0.998 1658 40 160.1 14.4 1.00 8
83 83 1900 3.7 15.0 1 0.0 1.00
0.95
1648
0
1823
0
0
1648 60 308.8 18.5 1.00 6
0
0.950 1789 0.950 1789
0
0
1.00 30
1.00 102
1823 70 534.3 27.5 1.00 262
1.00 71
1.00 8
0.95 0.993 0.998 3546 0.998 3546 70 477.5 24.6 1.00 220
0 No Left
1.75 26
0 0
1.00 4
0
0.950 1789 0.950 1789
1.00 83
1.00 83
95 No Left 3.7 0.0 2.4
0 No Right
83 No Left
36 No Left 3.7 0.0 2.4
0 No Right
102 No Left
333 No Left 3.7 0.0 2.4
0 No Right
0 No Left
239 No Left 3.7 0.0 2.4
0 No Right
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0
Stop
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 46.0% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2035 Future BG (Adj).syn
Stop
Free
0 0
1.00 11
Free
ICU Level of Service A
Synchro 11 Report Page 1
HCM Unsignalized Intersection Capacity Analysis 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
4 4
8 8 Stop 0% 1.00 8
83 83
83 83
30 30
102 102
8 8
1.00 30
1.00 102
1.00 71
1.00 8
220 220 Free 0% 1.00 220
11 11
1.00 83
262 262 Free 0% 1.00 262
71 71
1.00 83
6 6 Stop 0% 1.00 6
1.00 4
None
None
740
778
116
714
748
298
231
333
740 7.5
778 6.5
116 6.9
714 7.5
748 6.5
298 6.9
231 4.1
333 4.1
3.5 99 269
4.0 97 299
3.3 91 915
3.5 69 266
4.0 98 311
3.3 96 699
2.2 92 1334
2.2 99 1223
EB 1 95 4 83 718 0.13 3.5 10.8 B 10.8 B
WB 1 83 83 0 266 0.31 9.8 24.6 C 20.7 C
WB 2 36 0 30 579 0.06 1.5 11.6 B
NB 1 102 102 0 1334 0.08 1.9 7.9 A 1.9
NB 2 333 0 71 1700 0.20 0.0 0.0
SB 1 118 8 0 1223 0.01 0.2 0.6 A 0.3
SB 2 121 0 11 1700 0.07 0.0 0.0
4.9 46.0% 15
PinnacleVillage-1-PM_v0.4 - 2035 Future BG (Adj).syn
ICU Level of Service
1.00 11
A
Synchro 11 Report Page 2
Lanes, Volumes, Timings 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 0.3 1.00
83 83 1900 3.7 1.00 0.964
27 27 1900 3.7 1.00
6 6 1900 3.7 1.00
88 88 1900 3.7 1.00
0 0 1900 0.3 1.00
31 31 1900 3.7 1.00
9 9 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 0.3 1.00
0
1816
0
0
0
0
0
0
1883
0
0
1816 60 308.8 18.5 1.00 2% 83
0
0
0
0
0
0
0.90 2% 7
1.00 0% 0
0.90 2% 34
0.90 2% 10
1.00 0% 0
1883 40 68.2 6.1 0.90 2% 0
0
0.90 2% 30
0 0 1900 3.7 1.00 0.969 0.963 1758 0.963 1758 40 69.4 6.2 0.90 2% 0
1.00 0% 0
0.996 1876 0.996 1876 60 150.6 9.0 1.00 2% 88
1.00 0% 0
0 No Left
113 No Left 3.7 0.0 2.4
0 No Right
0 No Left
95 No Left 3.7 0.0 2.4
0 No Right
0 No Left
44 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 2.4
0 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0.99 26
0.99
1.75 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 19.6% Analysis Period (min) 15
PinnacleVillage-1-PM_v0.4 - 2035 Future BG (Adj).syn
Free
Stop
Stop
ICU Level of Service A
Synchro 11 Report Page 3
HCM Unsignalized Intersection Capacity Analysis 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min)
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0
83 83 Free 0% 1.00 83
27 27
6 6
0 0
31 31
0 0
1.00 0
0.90 34
0.90 10
1.00 0
0 0 Stop 0% 0.90 0
0 0
0.90 7
0 0 Stop 0% 0.90 0
9 9
0.90 30
88 88 Free 0% 1.00 88
1.00 0
1.00 0
None
None
88
113
200
200
98
210
215
88
88 4.1
113 4.1
200 7.1
200 6.5
98 6.2
210 7.1
215 6.5
88 6.2
2.2 100 1520
2.2 100 1476
3.5 96 756
4.0 100 693
3.3 99 958
3.5 100 741
4.0 100 679
3.3 100 976
EB 1 113 0 30 1520 0.00 0.0 0.0 0.0
WB 1 95 7 0 1476 0.00 0.1 0.6 A 0.6
NB 1 44 34 10 794 0.06 1.3 9.8 A 9.8 A 1.9 19.6% 15
PinnacleVillage-1-PM_v0.4 - 2035 Future BG (Adj).syn
SB 1 0 0 0 1700 0.00 0.0 0.0 A 0.0 A
ICU Level of Service
A
Synchro 11 Report Page 4
Lanes, Volumes, Timings 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 0.3 0.0 0 0.0 1.00
378 378 1900 3.7
120 120 1900 3.7 130.0 1
471 471 1900 3.7
8 8 1900 0.3 0.0 0
66 66 1900 3.7 10.0 1
3 3 1900 3.7 10.0 1
1.00 0.997
1.00
1.00
1.00 0.850
5 5 1900 0.3 0.0 0 0.0 1.00
5 5 1900 3.7
1.00 0.850
139 139 1900 0.3 0.0 0 0.0 1.00
18 18 1900 3.7
1.00
139 139 1900 3.7 110.0 1 0.0 1.00
1.00
1.00 0.850
1878
0
1878 70 245.1 12.6 1.00 471
0
0 0
1.00 10
0.999 1882 0.999 1882 70 263.2 13.5 1.00 378
1601
0.950 1789 0.950 1789
1.00 120
1.00 139
1601
1.00 8
0.958 1804 0.958 0 1804 70 1595.3 82.0 1.00 1.00 139 18 0
1601
0
1601
0
1.00 66
1.00 5
0.976 1838 0.976 1838 70 138.7 7.1 1.00 5
1601 1601
1.00 3
0 No Left
388 No Left 3.7 0.0 2.4
120 No Right
139 No Left
479 No Left 3.7 0.0 2.4
0 No Right
0 No Left
157 No Left 0.0 0.0 2.4
66 No Right
0 No Left
10 No Left 0.0 0.0 2.4
3 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
1.75 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 71.0% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2035 Future BG (Adj).syn
Free
Stop
Stop
ICU Level of Service C
Synchro 11 Report Page 5
HCM Unsignalized Intersection Capacity Analysis 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10
378 378 Free 0% 1.00 378
120 120
139 139
8 8
139 139
5 5
1.00 8
1.00 139
1.00 66
1.00 5
5 5 Stop 0% 1.00 5
3 3
1.00 139
18 18 Stop 0% 1.00 18
66 66
1.00 120
471 471 Free 0% 1.00 471
1.00 10
1 None
1.00 3
1
None
479
498
1151
1155
378
1193
1271
475
479 4.1
498 4.1
1151 7.1
1155 6.5
378 6.2
1193 7.1
1271 6.5
475 6.2
2.2 99 1083
2.2 87 1066
3.5 8 152
4.0 89 170
3.3 90 669
3.5 96 121
4.0 97 145
3.3 99 590
EB 1 388 10 0 1083 0.01 0.2 0.3 A 0.2
EB 2 120 0 120 1700 0.07 0.0 0.0
WB 1 139 139 0 1066 0.13 3.4 8.9 A 2.0
24.9 71.0% 15
PinnacleVillage-1-PM_v0.4 - 2035 Future BG (Adj).syn
WB 2 479 0 8 1700 0.28 0.0 0.0
NB 1 223 139 66 202 1.11 80.4 144.1 F 144.1 F
SB 1 13 5 3 173 0.08 1.8 28.9 D 28.9 D
ICU Level of Service
C
Synchro 11 Report Page 6
Lanes, Volumes, Timings 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
137 137 1900 0.3
11 11 1900 3.7 0.0 1 0.0 1.00
147 147 1900 3.7 50.0 1
259 259 1900 3.7 105.0 1 0.0 1.00
343 343 1900 3.7
26 26 1900 0.3 0.0 0
259 259 1900 3.7
125 125 1900 3.7 35.0 1
5 5 1900 0.3
1.00
1.00
1.00 0.850
23 23 1900 3.7 30.0 1 0.0 1.00
20 20 1900 3.7 0.0 1
1.00 0.989
1 1 1900 0.3 0.0 0 0.0 1.00
1.00 0.850
1.00
1863
0
0
1883
1601
1601
0
1863 70 675.7 34.8 1.00 343
0
0
1601
1601
0
1.00 26
1.00 1
1883 70 173.4 8.9 1.00 259
1.00 20
1.00 5
1.00
0 0
1.00 137
0.950 1789 0.950 1789 70 288.3 14.8 1.00 11
1.00 0.850
1601
0.950 1789 0.950 1789
1.00 147
1.00 259
1601
1.00 125
0.950 1789 0.950 1789 40 160.1 14.4 1.00 23
0 No Left
148 No Left 3.7 0.0 2.4
147 No Right
259 No Left
369 No Left 3.7 0.0 2.4
0 No Right
0 No Left
260 No Left 3.7 0.0 2.4
125 No Right
23 No Left 3.7 0.0 2.4
25 No Right
0 No Right
1.75 26
0.99 26 Stop
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
0.99 26 Stop
0.99 14
1.75 14
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 58.2% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2035 Future BG (Adj).syn
Free
Free
ICU Level of Service B
Synchro 11 Report Page 7
HCM Unsignalized Intersection Capacity Analysis 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h)
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
137 137
11 11 Stop 0% 1.00 11
147 147
259 259
26 26
1 1
5 5
1.00 26
1.00 1
23 23 Stop 0% 1.00 23
20 20
1.00 259
259 259 Free 0% 1.00 259
125 125
1.00 147
343 343 Free 0% 1.00 343
1.00 20
1.00 5
Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
1.00 137
1.00 125
7 None
None
1137
1148
259
384
369
1214
1260
356
1137 7.1
1148 6.5
259 6.2
384 4.1
369 4.1
1214 7.1
1260 6.5
356 6.2
3.5 0 131
4.0 93 155
3.3 81 780
2.2 78 1174
2.2 100 1190
3.5 77 101
4.0 85 133
3.3 99 688
EB 1 295 137 147 260 1.14 98.5 139.1 F 139.1 F
NB 1 259 259 0 1174 0.22 6.4 8.9 A 3.7
NB 2 369 0 26 1700 0.22 0.0 0.0
SB 1 260 1 0 1190 0.00 0.0 0.0 A 0.0
33.4 58.2% 15
PinnacleVillage-1-PM_v0.4 - 2035 Future BG (Adj).syn
SB 2 125 0 125 1700 0.07 0.0 0.0
SW 1 23 23 0 101 0.23 6.2 50.8 F 41.0 E
ICU Level of Service
SW 2 25 0 5 158 0.16 4.1 32.0 D
B
Synchro 11 Report Page 8
Lanes, Volumes, Timings 26: Starkey Rd / Range Rd 251 & Ped Crossing
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
485 485 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
385 385 1900 1.00
0 0 1900 1.00
0
0
0
0
0
0
0
1883
0
0
1883
0
0
0 50 23.9 1.7
0
0
0 50 80.1 5.8
0
0
1883 70 173.4 8.9
0
0
1883 70 534.3 27.5
0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
5 0.90 0
5 0.90 0
5 0.90 0
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
539 No Left 3.7 0.0 4.8
0 No Right
0 No Left
428 No Left 3.7 0.0 4.8
0 No Right
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 28.9% Analysis Period (min) 15
PinnacleVillage-1-PM_v0.4 - 2035 Future BG (Adj).syn
Free
0.90 539
Free
0.90 428
5 0.90 0
Free
ICU Level of Service A
Synchro 11 Report Page 9
HCM Unsignalized Intersection Capacity Analysis 26: Starkey Rd / Range Rd 251 & Ped Crossing
04-01-2025
Intersection Sign configuration not allowed in HCM analysis.
PinnacleVillage-1-PM_v0.4 - 2035 Future BG (Adj).syn
Synchro 11 Report Page 10
Lanes, Volumes, Timings 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
4 4 1900 0.3 0.0 0 0.0 1.00
8 8 1900 3.7
83 83 1900 0.3 0.0 0
6 6 1900 3.7
48 48 1900 0.3 0.0 0
139 139 1900 0.3 0.0 0
11 11 1900 3.7 0.0 0
1.00 0.867
1.00
1.00 0.948
1.00
38 38 1900 3.7 0.0 0 0.0 0.95
220 220 1900 3.7
1.00
102 102 1900 3.7 105.0 1 0.0 1.00
262 262 1900 3.7
1.00 0.882 0.998 1658 0.998 1658 40 160.1 14.4 1.00 8
125 125 1900 3.7 15.0 1 0.0 1.00
0.95
1633
0
1786
0
0
1633 60 308.8 18.5 1.00 6
0
0.950 1789 0.950 1789
0
0
1.00 48
1.00 102
1786 70 534.3 27.5 1.00 262
1.00 139
1.00 38
0.95 0.994 0.993 3532 0.993 3532 70 477.5 24.6 1.00 220
0 No Left
1.75 26
0 0
1.00 4
0
0.950 1789 0.950 1789
1.00 83
1.00 125
95 No Left 3.7 0.0 2.4
0 No Right
125 No Left
54 No Left 3.7 0.0 2.4
0 No Right
102 No Left
401 No Left 3.7 0.0 2.4
0 No Right
0 No Left
269 No Left 3.7 0.0 2.4
0 No Right
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0
Stop
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 53.4% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2035 Future Total (Adj).syn
Stop
Free
0 0
1.00 11
Free
ICU Level of Service A
Synchro 11 Report Page 1
HCM Unsignalized Intersection Capacity Analysis 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
4 4
8 8 Stop 0% 1.00 8
83 83
125 125
48 48
102 102
38 38
1.00 48
1.00 102
1.00 139
1.00 38
220 220 Free 0% 1.00 220
11 11
1.00 125
262 262 Free 0% 1.00 262
139 139
1.00 83
6 6 Stop 0% 1.00 6
1.00 4
None
None
818
906
116
808
842
332
231
401
818 7.5
906 6.5
116 6.9
808 7.5
842 6.5
332 6.9
231 4.1
401 4.1
3.5 98 224
4.0 97 245
3.3 91 915
3.5 44 222
4.0 98 267
3.3 93 664
2.2 92 1334
2.2 97 1154
EB 1 95 4 83 673 0.14 3.7 11.2 B 11.2 B
WB 1 125 125 0 222 0.56 23.5 40.4 E 31.8 D
WB 2 54 0 48 570 0.09 2.4 12.0 B
NB 1 102 102 0 1334 0.08 1.9 7.9 A 1.6
NB 2 401 0 139 1700 0.24 0.0 0.0
SB 1 148 38 0 1154 0.03 0.8 2.3 A 1.3
SB 2 121 0 11 1700 0.07 0.0 0.0
7.6 53.4% 15
PinnacleVillage-1-PM_v0.4 - 2035 Future Total (Adj).syn
ICU Level of Service
1.00 11
A
Synchro 11 Report Page 2
Lanes, Volumes, Timings 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
98 98 1900 0.3 1.00
83 83 1900 3.7 1.00 0.981 0.977 1822 0.977 1822 60 308.8 18.5 1.00 2% 83
27 27 1900 3.7 1.00
6 6 1900 3.7 1.00
88 88 1900 3.7 1.00
0 0 1900 0.3 1.00
31 31 1900 3.7 1.00
9 9 1900 3.7 1.00
0 0 1900 3.7 1.00
4 4 1900 3.7 1.00 0.873
60 60 1900 0.3 1.00
0
0
0
0
0
0
1675
0
0
0
0
0
0
0
0.90 2% 7
1.00 0% 0
0.90 2% 34
0.90 2% 10
1.00 0% 0
1675 40 68.2 6.1 0.90 2% 4
0
0.90 2% 30
9 9 1900 3.7 1.00 0.975 0.969 1779 0.969 1779 40 69.4 6.2 0.90 2% 10
0 No Left
211 No Left 3.7 0.0 2.4
0 No Right
0 No Left
95 No Left 3.7 0.0 2.4
0 No Right
0 No Left
54 No Left 0.0 0.0 4.8
0 No Right
0 No Left
64 No Left 0.0 0.0 2.4
0 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0 0
1.00 0% 98
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 34.2% Analysis Period (min) 15
PinnacleVillage-1-PM_v0.4 - 2035 Future Total (Adj).syn
0.996 1876 0.996 1876 60 150.6 9.0 1.00 2% 88
Free
Stop
1.00 0% 60
Stop
ICU Level of Service A
Synchro 11 Report Page 3
HCM Unsignalized Intersection Capacity Analysis 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min)
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
98 98
83 83 Free 0% 1.00 83
27 27
6 6
0 0
31 31
0 0
1.00 0
0.90 34
0.90 10
1.00 0
4 4 Stop 0% 0.90 4
60 60
0.90 7
9 9 Stop 0% 0.90 10
9 9
0.90 30
88 88 Free 0% 1.00 88
1.00 60
1.00 98
None
None
88
113
458
396
98
411
411
88
88 4.1
113 4.1
458 7.1
396 6.5
98 6.2
411 7.1
411 6.5
88 6.2
2.2 94 1520
2.2 100 1476
3.5 93 453
4.0 98 504
3.3 99 958
3.5 100 512
4.0 99 494
3.3 94 976
EB 1 211 98 30 1520 0.06 1.6 3.8 A 3.8
WB 1 95 7 0 1476 0.00 0.1 0.6 A 0.6
NB 1 54 34 10 513 0.11 2.7 12.8 B 12.8 B 5.0 34.2% 15
PinnacleVillage-1-PM_v0.4 - 2035 Future Total (Adj).syn
SB 1 64 0 60 920 0.07 1.7 9.2 A 9.2 A
ICU Level of Service
A
Synchro 11 Report Page 4
Lanes, Volumes, Timings 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10 1900 0.3 0.0 0 0.0 1.00
378 378 1900 3.7
125 125 1900 3.7 130.0 1
471 471 1900 3.7
8 8 1900 0.3 0.0 0
74 74 1900 3.7 10.0 1
3 3 1900 3.7 10.0 1
1.00 0.997
1.00
1.00
1.00 0.850
5 5 1900 0.3 0.0 0 0.0 1.00
5 5 1900 3.7
1.00 0.850
142 142 1900 0.3 0.0 0 0.0 1.00
18 18 1900 3.7
1.00
152 152 1900 3.7 110.0 1 0.0 1.00
1.00
1.00 0.850
1878
0
1878 70 245.1 12.6 1.00 471
0
0 0
1.00 10
0.999 1882 0.999 1882 70 263.2 13.5 1.00 378
1601
0.950 1789 0.950 1789
1.00 125
1.00 152
1601
1.00 8
0.958 1804 0.958 0 1804 70 1595.3 82.0 1.00 1.00 142 18 0
1601
0
1601
0
1.00 74
1.00 5
0.976 1838 0.976 1838 70 138.7 7.1 1.00 5
1601 1601
1.00 3
0 No Left
388 No Left 3.7 0.0 2.4
125 No Right
152 No Left
479 No Left 3.7 0.0 2.4
0 No Right
0 No Left
160 No Left 0.0 0.0 2.4
74 No Right
0 No Left
10 No Left 0.0 0.0 2.4
3 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
1.75 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 71.2% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2035 Future Total (Adj).syn
Free
Stop
Stop
ICU Level of Service C
Synchro 11 Report Page 5
HCM Unsignalized Intersection Capacity Analysis 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
10 10
378 378 Free 0% 1.00 378
125 125
152 152
8 8
142 142
5 5
1.00 8
1.00 142
1.00 74
1.00 5
5 5 Stop 0% 1.00 5
3 3
1.00 152
18 18 Stop 0% 1.00 18
74 74
1.00 125
471 471 Free 0% 1.00 471
1.00 10
1 None
1.00 3
1
None
479
503
1177
1181
378
1223
1302
475
479 4.1
503 4.1
1177 7.1
1181 6.5
378 6.2
1223 7.1
1302 6.5
475 6.2
2.2 99 1083
2.2 86 1061
3.5 1 144
4.0 89 161
3.3 89 669
3.5 96 113
4.0 96 136
3.3 99 590
EB 1 388 10 0 1083 0.01 0.2 0.3 A 0.2
EB 2 125 0 125 1700 0.07 0.0 0.0
WB 1 152 152 0 1061 0.14 3.8 9.0 A 2.2
31.0 71.2% 15
PinnacleVillage-1-PM_v0.4 - 2035 Future Total (Adj).syn
WB 2 479 0 8 1700 0.28 0.0 0.0
NB 1 234 142 74 196 1.20 91.6 176.1 F 176.1 F
SB 1 13 5 3 162 0.08 2.0 30.6 D 30.6 D
ICU Level of Service
C
Synchro 11 Report Page 6
Lanes, Volumes, Timings 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
152 152 1900 0.3
11 11 1900 3.7 0.0 1 0.0 1.00
147 147 1900 3.7 50.0 1
259 259 1900 3.7 105.0 1 0.0 1.00
396 396 1900 3.7
35 35 1900 0.3 0.0 0
292 292 1900 3.7
134 134 1900 3.7 35.0 1
5 5 1900 0.3
1.00
1.00
1.00 0.850
27 27 1900 3.7 30.0 1 0.0 1.00
20 20 1900 3.7 0.0 1
1.00 0.988
1 1 1900 0.3 0.0 0 0.0 1.00
1.00 0.850
1.00
1861
0
0
1883
1601
1601
0
1861 70 675.7 34.8 1.00 396
0
0
1601
1601
0
1.00 35
1.00 1
1883 70 173.4 8.9 1.00 292
1.00 20
1.00 5
1.00
0 0
1.00 152
0.950 1789 0.950 1789 70 288.3 14.8 1.00 11
1.00 0.850
1601
0.950 1789 0.950 1789
1.00 147
1.00 259
1601
1.00 134
0.950 1789 0.950 1789 40 160.1 14.4 1.00 27
0 No Left
163 No Left 3.7 0.0 2.4
147 No Right
259 No Left
431 No Left 3.7 0.0 2.4
0 No Right
0 No Left
293 No Left 3.7 0.0 2.4
134 No Right
27 No Left 3.7 0.0 2.4
25 No Right
0 No Right
1.75 26
0.99 26 Stop
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
0.99 26 Stop
0.99 14
1.75 14
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 64.1% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2035 Future Total (Adj).syn
Free
Free
ICU Level of Service C
Synchro 11 Report Page 7
HCM Unsignalized Intersection Capacity Analysis 4: Starkey Rd / Range Rd 251 & Bellerose Dr & Pinnacle Way
04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h)
EBL2
EBL
EBR
NBL
NBT
NBR
SBL
SBT
SBR
SWL
SWR
SWR2
152 152
11 11 Stop 0% 1.00 11
147 147
259 259
35 35
1 1
5 5
1.00 35
1.00 1
27 27 Stop 0% 1.00 27
20 20
1.00 259
292 292 Free 0% 1.00 292
134 134
1.00 147
396 396 Free 0% 1.00 396
1.00 20
1.00 5
Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
1.00 152
1.00 134
7 None
None
1223
1243
292
426
431
1304
1360
414
1223 7.1
1243 6.5
292 6.2
426 4.1
431 4.1
1304 7.1
1360 6.5
414 6.2
3.5 0 111
4.0 92 134
3.3 80 747
2.2 77 1133
2.2 100 1129
3.5 68 85
4.0 83 114
3.3 99 639
EB 1 310 152 147 200 1.55 149.2 312.4 F 312.4 F
NB 1 259 259 0 1133 0.23 6.7 9.1 A 3.4
NB 2 431 0 35 1700 0.25 0.0 0.0
SB 1 293 1 0 1129 0.00 0.0 0.0 A 0.0
68.9 64.1% 15
PinnacleVillage-1-PM_v0.4 - 2035 Future Total (Adj).syn
SB 2 134 0 134 1700 0.08 0.0 0.0
SW 1 27 27 0 85 0.32 9.1 65.7 F 51.9 F
ICU Level of Service
SW 2 25 0 5 137 0.18 4.9 37.1 E
C
Synchro 11 Report Page 8
Lanes, Volumes, Timings 26: Starkey Rd / Range Rd 251 & Ped Crossing
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
553 553 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
427 427 1900 1.00
0 0 1900 1.00
0
0
0
0
0
0
0
1883
0
0
1883
0
0
0 50 23.9 1.7
0
0
0 50 80.1 5.8
0
0
1883 70 173.4 8.9
0
0
1883 70 534.3 27.5
0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
5 0.90 0
5 0.90 0
5 0.90 0
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
614 No Left 3.7 0.0 4.8
0 No Right
0 No Left
474 No Left 3.7 0.0 4.8
0 No Right
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 32.4% Analysis Period (min) 15
PinnacleVillage-1-PM_v0.4 - 2035 Future Total (Adj).syn
Free
0.90 614
Free
0.90 474
5 0.90 0
Free
ICU Level of Service A
Synchro 11 Report Page 9
HCM Unsignalized Intersection Capacity Analysis 26: Starkey Rd / Range Rd 251 & Ped Crossing
04-01-2025
Intersection Sign configuration not allowed in HCM analysis.
PinnacleVillage-1-PM_v0.4 - 2035 Future Total (Adj).syn
Synchro 11 Report Page 10
Lanes, Volumes, Timings 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
5 5 1900 0.3 0.0 0 0.0 1.00
9 9 1900 3.7
101 101 1900 0.3 0.0 0
8 8 1900 3.7
36 36 1900 0.3 0.0 0
71 71 1900 0.3 0.0 0
11 11 1900 3.7 0.0 0
1.00 0.877
1.00
1.00 0.970
1.00
8 8 1900 3.7 0.0 0 0.0 0.95
250 250 1900 3.7
1.00
102 102 1900 3.7 105.0 1 0.0 1.00
290 290 1900 3.7
1.00 0.881 0.998 1656 0.998 1656 40 160.1 14.4 1.00 9
101 101 1900 3.7 15.0 1 0.0 1.00
0.95
1652
0
1827
0
0
1652 60 308.8 18.5 1.00 8
0
0.950 1789 0.950 1789
0
0
1.00 36
1.00 102
1827 70 534.3 27.5 1.00 290
1.00 71
1.00 8
0.95 0.994 0.999 3554 0.999 3554 70 477.5 24.6 1.00 250
0 No Left
1.75 26
0 0
1.00 5
0
0.950 1789 0.950 1789
1.00 101
1.00 101
115 No Left 3.7 0.0 2.4
0 No Right
101 No Left
44 No Left 3.7 0.0 2.4
0 No Right
102 No Left
361 No Left 3.7 0.0 2.4
0 No Right
0 No Left
269 No Left 3.7 0.0 2.4
0 No Right
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0
Stop
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 49.3% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2045 Future BG (Adj).syn
Stop
Free
0 0
1.00 11
Free
ICU Level of Service A
Synchro 11 Report Page 1
HCM Unsignalized Intersection Capacity Analysis 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
5 5
9 9 Stop 0% 1.00 9
101 101
101 101
36 36
102 102
8 8
1.00 36
1.00 102
1.00 71
1.00 8
250 250 Free 0% 1.00 250
11 11
1.00 101
290 290 Free 0% 1.00 290
71 71
1.00 101
8 8 Stop 0% 1.00 8
1.00 5
None
None
806
836
130
776
806
326
261
361
806 7.5
836 6.5
130 6.9
776 7.5
806 6.5
326 6.9
261 4.1
361 4.1
3.5 98 237
4.0 97 276
3.3 89 895
3.5 57 233
4.0 97 287
3.3 95 670
2.2 92 1300
2.2 99 1194
EB 1 115 5 101 690 0.17 4.5 11.3 B 11.3 B
WB 1 101 101 0 233 0.43 15.6 31.9 D 25.9 D
WB 2 44 0 36 539 0.08 2.0 12.3 B
NB 1 102 102 0 1300 0.08 1.9 8.0 A 1.8
NB 2 361 0 71 1700 0.21 0.0 0.0
SB 1 133 8 0 1194 0.01 0.2 0.5 A 0.3
SB 2 136 0 11 1700 0.08 0.0 0.0
6.0 49.3% 15
PinnacleVillage-1-PM_v0.4 - 2045 Future BG (Adj).syn
ICU Level of Service
1.00 11
A
Synchro 11 Report Page 2
Lanes, Volumes, Timings 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 0.3 1.00
101 101 1900 3.7 1.00 0.964
33 33 1900 3.7 1.00
8 8 1900 3.7 1.00
107 107 1900 3.7 1.00
0 0 1900 0.3 1.00
38 38 1900 3.7 1.00
11 11 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 3.7 1.00
0 0 1900 0.3 1.00
0
1816
0
0
0
0
0
0
1883
0
0
1816 60 308.8 18.5 1.00 2% 101
0
0
0
0
0
0
0.90 2% 9
1.00 0% 0
0.90 2% 42
0.90 2% 12
1.00 0% 0
1883 40 68.2 6.1 0.90 2% 0
0
0.90 2% 37
0 0 1900 3.7 1.00 0.970 0.963 1759 0.963 1759 40 69.4 6.2 0.90 2% 0
1.00 0% 0
0.996 1876 0.996 1876 60 150.6 9.0 1.00 2% 107
1.00 0% 0
0 No Left
138 No Left 3.7 0.0 2.4
0 No Right
0 No Left
116 No Left 3.7 0.0 2.4
0 No Right
0 No Left
54 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 2.4
0 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0.99 26
0.99
1.75 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 22.2% Analysis Period (min) 15
PinnacleVillage-1-PM_v0.4 - 2045 Future BG (Adj).syn
Free
Stop
Stop
ICU Level of Service A
Synchro 11 Report Page 3
HCM Unsignalized Intersection Capacity Analysis 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min)
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0
101 101 Free 0% 1.00 101
33 33
8 8
0 0
38 38
0 0
1.00 0
0.90 42
0.90 12
1.00 0
0 0 Stop 0% 0.90 0
0 0
0.90 9
0 0 Stop 0% 0.90 0
11 11
0.90 37
107 107 Free 0% 1.00 107
1.00 0
1.00 0
None
None
107
138
244
244
120
256
263
107
107 4.1
138 4.1
244 7.1
244 6.5
120 6.2
256 7.1
263 6.5
107 6.2
2.2 100 1497
2.2 99 1446
3.5 94 706
4.0 100 653
3.3 99 932
3.5 100 688
4.0 100 638
3.3 100 953
EB 1 138 0 37 1497 0.00 0.0 0.0 0.0
WB 1 116 9 0 1446 0.01 0.1 0.6 A 0.6
NB 1 54 42 12 746 0.07 1.8 10.2 B 10.2 B 2.0 22.2% 15
PinnacleVillage-1-PM_v0.4 - 2045 Future BG (Adj).syn
SB 1 0 0 0 1700 0.00 0.0 0.0 A 0.0 A
ICU Level of Service
A
Synchro 11 Report Page 4
Lanes, Volumes, Timings 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
13 13 1900 0.3 0.0 0 0.0 1.00
460 460 1900 3.7
135 135 1900 3.7 130.0 1
574 574 1900 3.7
9 9 1900 0.3 0.0 0
73 73 1900 3.7 10.0 1
3 3 1900 3.7 10.0 1
1.00 0.998
1.00
1.00
1.00 0.850
6 6 1900 0.3 0.0 0 0.0 1.00
6 6 1900 3.7
1.00 0.850
163 163 1900 0.3 0.0 0 0.0 1.00
22 22 1900 3.7
1.00
158 158 1900 3.7 110.0 1 0.0 1.00
1.00
1.00 0.850
1880
0
1880 70 245.1 12.6 1.00 574
0
0 0
1.00 13
0.999 1882 0.999 1882 70 263.2 13.5 1.00 460
1601
0.950 1789 0.950 1789
1.00 135
1.00 158
1601
1.00 9
0.958 1804 0.958 0 1804 70 1595.3 82.0 1.00 1.00 163 22 0
1601
0
1601
0
1.00 73
1.00 6
0.976 1838 0.976 1838 70 138.7 7.1 1.00 6
1601 1601
1.00 3
0 No Left
473 No Left 3.7 0.0 2.4
135 No Right
158 No Left
583 No Left 3.7 0.0 2.4
0 No Right
0 No Left
185 No Left 0.0 0.0 2.4
73 No Right
0 No Left
12 No Left 0.0 0.0 2.4
3 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
1.75 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 82.5% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2045 Future BG (Adj).syn
Free
Stop
Stop
ICU Level of Service E
Synchro 11 Report Page 5
HCM Unsignalized Intersection Capacity Analysis 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
13 13
460 460 Free 0% 1.00 460
135 135
158 158
9 9
163 163
6 6
1.00 9
1.00 163
1.00 73
1.00 6
6 6 Stop 0% 1.00 6
3 3
1.00 158
22 22 Stop 0% 1.00 22
73 73
1.00 135
574 574 Free 0% 1.00 574
1.00 13
1 None
1.00 3
1
None
583
595
1380
1385
460
1428
1516
578
583 4.1
595 4.1
1380 7.1
1385 6.5
460 6.2
1428 7.1
1516 6.5
578 6.2
2.2 99 991
2.2 84 981
3.5 0 100
4.0 81 119
3.3 88 601
3.5 92 74
4.0 94 99
3.3 99 515
EB 1 473 13 0 991 0.01 0.3 0.4 A 0.3
EB 2 135 0 135 1700 0.08 0.0 0.0
WB 1 158 158 0 981 0.16 4.4 9.4 A 2.0
81.0 82.5% 15
PinnacleVillage-1-PM_v0.4 - 2045 Future BG (Adj).syn
WB 2 583 0 9 1700 0.34 0.0 0.0
NB 1 258 163 73 134 1.93 154.3 499.9 F 499.9 F
SB 1 15 6 3 108 0.14 3.5 45.0 E 45.0 E
ICU Level of Service
E
Synchro 11 Report Page 6
Lanes, Volumes, Timings 26: Starkey Rd / Range Rd 251 & Ped Crossing
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
559 559 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
452 452 1900 1.00
0 0 1900 1.00
0
0
0
0
0
0
0
1883
0
0
1883
0
0
0 50 23.9 1.7
0
0
0 50 80.1 5.8
0
0
1883 70 173.4 8.9
0
0
1883 70 534.3 27.5
0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
5 0.90 0
5 0.90 0
5 0.90 0
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
621 No Left 3.7 0.0 4.8
0 No Right
0 No Left
502 No Left 3.7 0.0 4.8
0 No Right
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 32.8% Analysis Period (min) 15
PinnacleVillage-1-PM_v0.4 - 2045 Future BG (Adj).syn
Free
0.90 621
Free
0.90 502
5 0.90 0
Free
ICU Level of Service A
Synchro 11 Report Page 7
HCM Unsignalized Intersection Capacity Analysis 26: Starkey Rd / Range Rd 251 & Ped Crossing
04-01-2025
Intersection Sign configuration not allowed in HCM analysis.
PinnacleVillage-1-PM_v0.4 - 2045 Future BG (Adj).syn
Synchro 11 Report Page 8
Lanes, Volumes, Timings 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
5 5 1900 0.3 0.0 0 0.0 1.00
9 9 1900 3.7
101 101 1900 0.3 0.0 0
8 8 1900 3.7
54 54 1900 0.3 0.0 0
139 139 1900 0.3 0.0 0
11 11 1900 3.7 0.0 0
1.00 0.869
1.00
1.00 0.951
1.00
38 38 1900 3.7 0.0 0 0.0 0.95
250 250 1900 3.7
1.00
102 102 1900 3.7 105.0 1 0.0 1.00
290 290 1900 3.7
1.00 0.881 0.998 1656 0.998 1656 40 160.1 14.4 1.00 9
143 143 1900 3.7 15.0 1 0.0 1.00
0.95
1637
0
1791
0
0
1637 60 308.8 18.5 1.00 8
0
0.950 1789 0.950 1789
0
0
1.00 54
1.00 102
1791 70 534.3 27.5 1.00 290
1.00 139
1.00 38
0.95 0.994 0.994 3536 0.994 3536 70 477.5 24.6 1.00 250
0 No Left
1.75 26
0 0
1.00 5
0
0.950 1789 0.950 1789
1.00 101
1.00 143
115 No Left 3.7 0.0 2.4
0 No Right
143 No Left
62 No Left 3.7 0.0 2.4
0 No Right
102 No Left
429 No Left 3.7 0.0 2.4
0 No Right
0 No Left
299 No Left 3.7 0.0 2.4
0 No Right
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0
Stop
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 56.7% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2045 Future Total (Adj).syn
Stop
Free
0 0
1.00 11
Free
ICU Level of Service B
Synchro 11 Report Page 1
HCM Unsignalized Intersection Capacity Analysis 1: Starkey Rd / Range Rd 251 & E Estates Way/Trestle Ridge Rd / Township Rd 544A 04-01-2025
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
5 5
9 9 Stop 0% 1.00 9
101 101
143 143
54 54
102 102
38 38
1.00 54
1.00 102
1.00 139
1.00 38
250 250 Free 0% 1.00 250
11 11
1.00 143
290 290 Free 0% 1.00 290
139 139
1.00 101
8 8 Stop 0% 1.00 8
1.00 5
None
None
884
964
130
870
900
360
261
429
884 7.5
964 6.5
130 6.9
870 7.5
900 6.5
360 6.9
261 4.1
429 4.1
3.5 97 196
4.0 96 226
3.3 89 895
3.5 26 194
4.0 97 246
3.3 92 637
2.2 92 1300
2.2 97 1127
EB 1 115 5 101 645 0.18 4.9 11.8 B 11.8 B
WB 1 143 143 0 194 0.74 36.6 63.0 F 47.8 E
WB 2 62 0 54 529 0.12 3.0 12.7 B
NB 1 102 102 0 1300 0.08 1.9 8.0 A 1.5
NB 2 429 0 139 1700 0.25 0.0 0.0
SB 1 163 38 0 1127 0.03 0.8 2.2 A 1.2
SB 2 136 0 11 1700 0.08 0.0 0.0
10.7 56.7% 15
PinnacleVillage-1-PM_v0.4 - 2045 Future Total (Adj).syn
ICU Level of Service
1.00 11
B
Synchro 11 Report Page 2
Lanes, Volumes, Timings 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Heavy Vehicles (%) Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
98 98 1900 0.3 1.00
101 101 1900 3.7 1.00 0.979 0.980 1822 0.980 1822 60 308.8 18.5 1.00 2% 101
33 33 1900 3.7 1.00
8 8 1900 3.7 1.00
107 107 1900 3.7 1.00
0 0 1900 0.3 1.00
38 38 1900 3.7 1.00
11 11 1900 3.7 1.00
0 0 1900 3.7 1.00
4 4 1900 3.7 1.00 0.873
60 60 1900 0.3 1.00
0
0
0
0
0
0
1675
0
0
0
0
0
0
0
0.90 2% 9
1.00 0% 0
0.90 2% 42
0.90 2% 12
1.00 0% 0
1675 40 68.2 6.1 0.90 2% 4
0
0.90 2% 37
9 9 1900 3.7 1.00 0.975 0.968 1778 0.968 1778 40 69.4 6.2 0.90 2% 10
0 No Left
236 No Left 3.7 0.0 2.4
0 No Right
0 No Left
116 No Left 3.7 0.0 2.4
0 No Right
0 No Left
64 No Left 0.0 0.0 4.8
0 No Right
0 No Left
64 No Left 0.0 0.0 2.4
0 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0.99 26
0.99
0.99 14
0.99 26
0.99
1.75 14
0 0
1.00 0% 98
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 36.0% Analysis Period (min) 15
PinnacleVillage-1-PM_v0.4 - 2045 Future Total (Adj).syn
0.996 1876 0.996 1876 60 150.6 9.0 1.00 2% 107
Free
Stop
1.00 0% 60
Stop
ICU Level of Service A
Synchro 11 Report Page 3
HCM Unsignalized Intersection Capacity Analysis 2: Pinnacle Way/Entrance Road (TBD) & Trestle Ridge Rd / Township Rd 544A
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min)
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
98 98
101 101 Free 0% 1.00 101
33 33
8 8
0 0
38 38
0 0
1.00 0
0.90 42
0.90 12
1.00 0
4 4 Stop 0% 0.90 4
60 60
0.90 9
9 9 Stop 0% 0.90 10
11 11
0.90 37
107 107 Free 0% 1.00 107
1.00 60
1.00 98
None
None
107
138
502
440
120
458
459
107
107 4.1
138 4.1
502 7.1
440 6.5
120 6.2
458 7.1
459 6.5
107 6.2
2.2 93 1497
2.2 99 1446
3.5 90 422
4.0 98 474
3.3 99 932
3.5 100 475
4.0 99 463
3.3 94 953
EB 1 236 98 37 1497 0.07 1.6 3.5 A 3.5
WB 1 116 9 0 1446 0.01 0.1 0.6 A 0.6
NB 1 64 42 12 479 0.13 3.5 13.7 B 13.7 B 4.9 36.0% 15
PinnacleVillage-1-PM_v0.4 - 2045 Future Total (Adj).syn
SB 1 64 0 60 894 0.07 1.8 9.3 A 9.3 A
ICU Level of Service
A
Synchro 11 Report Page 4
Lanes, Volumes, Timings 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Width (m) Storage Length (m) Storage Lanes Taper Length (m) Lane Util. Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
13 13 1900 0.3 0.0 0 0.0 1.00
460 460 1900 3.7
140 140 1900 3.7 130.0 1
574 574 1900 3.7
9 9 1900 0.3 0.0 0
81 81 1900 3.7 10.0 1
3 3 1900 3.7 10.0 1
1.00 0.998
1.00
1.00
1.00 0.850
6 6 1900 0.3 0.0 0 0.0 1.00
6 6 1900 3.7
1.00 0.850
166 166 1900 0.3 0.0 0 0.0 1.00
22 22 1900 3.7
1.00
171 171 1900 3.7 110.0 1 0.0 1.00
1.00
1.00 0.850
1880
0
1880 70 245.1 12.6 1.00 574
0
0 0
1.00 13
0.999 1882 0.999 1882 70 263.2 13.5 1.00 460
1601
0.950 1789 0.950 1789
1.00 140
1.00 171
1601
1.00 9
0.958 1804 0.958 0 1804 70 1595.3 82.0 1.00 1.00 166 22 0
1601
0
1601
0
1.00 81
1.00 6
0.976 1838 0.976 1838 70 138.7 7.1 1.00 6
1601 1601
1.00 3
0 No Left
473 No Left 3.7 0.0 2.4
140 No Right
171 No Left
583 No Left 3.7 0.0 2.4
0 No Right
0 No Left
188 No Left 0.0 0.0 2.4
81 No Right
0 No Left
12 No Left 0.0 0.0 2.4
3 No Right
1.75 26
0.99
0.99 14
0.99 26
0.99
1.75 14
1.75 26
0.99
0.99 14
1.75 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 82.7% Analysis Period (min) 15 Description: New Intersection
PinnacleVillage-1-PM_v0.4 - 2045 Future Total (Adj).syn
Free
Stop
Stop
ICU Level of Service E
Synchro 11 Report Page 5
HCM Unsignalized Intersection Capacity Analysis 3: Starkey Rd / Range Rd 251/Range Rd 250 & Highway 37
Movement Lane Configurations Traffic Volume (veh/h) Future Volume (Veh/h) Sign Control Grade Peak Hour Factor Hourly flow rate (vph) Pedestrians Lane Width (m) Walking Speed (m/s) Percent Blockage Right turn flare (veh) Median type Median storage veh) Upstream signal (m) pX, platoon unblocked vC, conflicting volume vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol tC, single (s) tC, 2 stage (s) tF (s) p0 queue free % cM capacity (veh/h) Direction, Lane # Volume Total Volume Left Volume Right cSH Volume to Capacity Queue Length 95th (m) Control Delay (s) Lane LOS Approach Delay (s) Approach LOS Intersection Summary Average Delay Intersection Capacity Utilization Analysis Period (min) Description: New Intersection
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
13 13
460 460 Free 0% 1.00 460
140 140
171 171
9 9
166 166
6 6
1.00 9
1.00 166
1.00 81
1.00 6
6 6 Stop 0% 1.00 6
3 3
1.00 171
22 22 Stop 0% 1.00 22
81 81
1.00 140
574 574 Free 0% 1.00 574
1.00 13
1 None
1.00 3
1
None
583
600
1406
1411
460
1458
1546
578
583 4.1
600 4.1
1406 7.1
1411 6.5
460 6.2
1458 7.1
1546 6.5
578 6.2
2.2 99 991
2.2 82 977
3.5 0 95
4.0 80 113
3.3 87 601
3.5 91 68
4.0 94 93
3.3 99 515
EB 1 473 13 0 991 0.01 0.3 0.4 A 0.3
EB 2 140 0 140 1700 0.08 0.0 0.0
WB 1 171 171 0 977 0.18 4.8 9.5 A 2.1
94.0 82.7% 15
PinnacleVillage-1-PM_v0.4 - 2045 Future Total (Adj).syn
WB 2 583 0 9 1700 0.34 0.0 0.0
NB 1 269 166 81 129 2.08 167.4 567.3 F 567.3 F
SB 1 15 6 3 101 0.15 3.8 48.3 E 48.3 E
ICU Level of Service
E
Synchro 11 Report Page 6
Lanes, Volumes, Timings 26: Starkey Rd / Range Rd 251 & Ped Crossing
Lane Group Lane Configurations Traffic Volume (vph) Future Volume (vph) Ideal Flow (vphpl) Lane Util. Factor Ped Bike Factor Frt Flt Protected Satd. Flow (prot) Flt Permitted Satd. Flow (perm) Link Speed (k/h) Link Distance (m) Travel Time (s) Confl. Peds. (#/hr) Peak Hour Factor Adj. Flow (vph) Shared Lane Traffic (%) Lane Group Flow (vph) Enter Blocked Intersection Lane Alignment Median Width(m) Link Offset(m) Crosswalk Width(m) Two way Left Turn Lane Headway Factor Turning Speed (k/h) Sign Control
04-01-2025
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
627 627 1900 1.00
0 0 1900 1.00
0 0 1900 1.00
494 494 1900 1.00
0 0 1900 1.00
0
0
0
0
0
0
0
1883
0
0
1883
0
0
0 50 23.9 1.7
0
0
0 50 80.1 5.8
0
0
1883 70 173.4 8.9
0
0
1883 70 534.3 27.5
0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
0.90 0
5 0.90 0
5 0.90 0
5 0.90 0
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
0 No Left 0.0 0.0 4.8
0 No Right
0 No Left
697 No Left 3.7 0.0 4.8
0 No Right
0 No Left
549 No Left 3.7 0.0 4.8
0 No Right
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
0.99 26
0.99
0.99 14
Free
Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 36.3% Analysis Period (min) 15
PinnacleVillage-1-PM_v0.4 - 2045 Future Total (Adj).syn
Free
0.90 697
Free
0.90 549
5 0.90 0
Free
ICU Level of Service A
Synchro 11 Report Page 7
HCM Unsignalized Intersection Capacity Analysis 26: Starkey Rd / Range Rd 251 & Ped Crossing
04-01-2025
Intersection Sign configuration not allowed in HCM analysis.
PinnacleVillage-1-PM_v0.4 - 2045 Future Total (Adj).syn
Synchro 11 Report Page 8
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Appendix C Intersection Analysis - Sidra
49
SITE LAYOUT Site: 101 [Starkey Road and Trestle Ridge Road (Site Folder: Starkey Road and Trestle Ridge Road)] New Site Site Category: (None) Roundabout Layout pictures are schematic functional drawings reflecting input data. They are not design drawings.
SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Created: March 27, 2025 8:33:34 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Trestle Ridge Road - 2035 BG AM (Site Folder: Starkey Road and Trestle Ridge Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
15 0.0
15 0.0
0.214
8.8
LOS A
1.3
9.1
0.11
0.41
0.11
53.7
2
T1 All MCs
283 0.0
283 0.0
0.214
4.1
LOS A
1.3
9.1
0.11
0.41
0.11
54.6
3
R2 All MCs
39 0.0
39 0.0
0.214
3.9
LOS A
1.3
9.1
0.11
0.41
0.11
54.2
337 0.0
337 0.0
0.214
4.3
LOS A
1.3
9.1
0.11
0.41
0.11
54.5
Approach
East: Trestle Ridge Road 4
L2 All MCs
154 0.0
154 0.0
0.153
10.3
LOS B
0.8
5.6
0.46
0.64
0.46
49.9
5
T1 All MCs
3 0.0
3 0.0
0.153
5.6
LOS A
0.8
5.6
0.46
0.64
0.46
50.7
6
R2 All MCs
8 0.0
8 0.0
0.153
5.4
LOS A
0.8
5.6
0.46
0.64
0.46
50.4
165 0.0
165 0.0
0.153
9.9
LOS A
0.8
5.6
0.46
0.64
0.46
49.9
Approach North: Starky Road 7
L2 All MCs
7 0.0
7 0.0
0.249
9.6
LOS A
1.5
10.7
0.40
0.46
0.40
52.5
8
T1 All MCs
292 0.0
292 0.0
0.249
5.0
LOS A
1.5
10.7
0.40
0.46
0.40
53.3
9
R2 All MCs
3 0.0
3 0.0
0.249
4.8
LOS A
1.5
10.7
0.40
0.46
0.40
53.0
302 0.0
302 0.0
0.249
5.1
LOS A
1.5
10.7
0.40
0.46
0.40
53.3
11 0.0
0.181
11.1
LOS B
1.0
7.2
0.58
0.62
0.58
52.2
Approach
West: East Estates Way 10
L2 All MCs
11 0.0
11
T1 All MCs
1 0.0
1 0.0
0.181
6.5
LOS A
1.0
7.2
0.58
0.62
0.58
53.1
12
R2 All MCs
162 0.0
162 0.0
0.181
6.3
LOS A
1.0
7.2
0.58
0.62
0.58
52.8
Approach
174 0.0
174 0.0
0.181
6.6
LOS A
1.0
7.2
0.58
0.62
0.58
52.7
All Vehicles
978 0.0
978 0.0
0.249
5.9
LOS A
1.5
10.7
0.34
0.50
0.34
53.0
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 8:30:17 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Trestle Ridge Road - 2035 Total AM (Site Folder: Starkey Road and Trestle Ridge Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
15 0.0
15 0.0
0.234
8.8
LOS A
1.4
10.0
0.14
0.41
0.14
53.6
2
T1 All MCs
283 0.0
283 0.0
0.234
4.2
LOS A
1.4
10.0
0.14
0.41
0.14
54.5
3
R2 All MCs
60 0.0
60 0.0
0.234
4.0
LOS A
1.4
10.0
0.14
0.41
0.14
54.1
358 0.0
358 0.0
0.234
4.3
LOS A
1.4
10.0
0.14
0.41
0.14
54.4
Approach
East: Trestle Ridge Road 4
L2 All MCs
221 0.0
221 0.0
0.243
10.4
LOS B
1.4
9.7
0.49
0.64
0.49
50.1
5
T1 All MCs
3 0.0
3 0.0
0.243
5.8
LOS A
1.4
9.7
0.49
0.64
0.49
50.9
6
R2 All MCs
38 0.0
38 0.0
0.243
5.6
LOS A
1.4
9.7
0.49
0.64
0.49
50.6
262 0.0
262 0.0
0.243
9.7
LOS A
1.4
9.7
0.49
0.64
0.49
50.2
Approach North: Starky Road 7
L2 All MCs
18 0.0
18 0.0
0.279
10.1
LOS B
1.7
12.2
0.48
0.51
0.48
52.0
8
T1 All MCs
292 0.0
292 0.0
0.279
5.4
LOS A
1.7
12.2
0.48
0.51
0.48
52.9
9
R2 All MCs
3 0.0
3 0.0
0.279
5.2
LOS A
1.7
12.2
0.48
0.51
0.48
52.5
313 0.0
313 0.0
0.279
5.7
LOS A
1.7
12.2
0.48
0.51
0.48
52.8
11 0.0
0.193
11.7
LOS B
1.1
7.9
0.63
0.64
0.63
51.8
Approach
West: East Estates Way 10
L2 All MCs
11 0.0
11
T1 All MCs
1 0.0
1 0.0
0.193
7.1
LOS A
1.1
7.9
0.63
0.64
0.63
52.7
12
R2 All MCs
162 0.0
162 0.0
0.193
6.9
LOS A
1.1
7.9
0.63
0.64
0.63
52.4
Approach
174 0.0
174 0.0
0.193
7.2
LOS A
1.1
7.9
0.63
0.64
0.63
52.3
All Vehicles
1106 0.0 1106 0.0
0.279
6.4
LOS A
1.7
12.2
0.40
0.53
0.40
52.6
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 8:30:42 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Trestle Ridge Road - 2045 BG AM (Site Folder: Starkey Road and Trestle Ridge Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
15 0.0
15 0.0
0.249
8.8
LOS A
1.6
11.4
0.13
0.41
0.13
53.6
2
T1 All MCs
336 0.0
336 0.0
0.249
4.2
LOS A
1.6
11.4
0.13
0.41
0.13
54.5
3
R2 All MCs
39 0.0
39 0.0
0.249
4.0
LOS A
1.6
11.4
0.13
0.41
0.13
54.2
389 0.0
389 0.0
0.249
4.3
LOS A
1.6
11.4
0.13
0.41
0.13
54.5
Approach
East: Trestle Ridge Road 4
L2 All MCs
187 0.0
187 0.0
0.193
10.6
LOS B
1.1
7.4
0.51
0.66
0.51
49.7
5
T1 All MCs
3 0.0
3 0.0
0.193
6.0
LOS A
1.1
7.4
0.51
0.66
0.51
50.5
6
R2 All MCs
9 0.0
9 0.0
0.193
5.8
LOS A
1.1
7.4
0.51
0.66
0.51
50.2
200 0.0
200 0.0
0.193
10.3
LOS B
1.1
7.4
0.51
0.66
0.51
49.8
Approach North: Starky Road 7
L2 All MCs
7 0.0
7 0.0
0.289
9.9
LOS A
1.8
12.9
0.46
0.49
0.46
52.2
8
T1 All MCs
327 0.0
327 0.0
0.289
5.2
LOS A
1.8
12.9
0.46
0.49
0.46
53.1
9
R2 All MCs
3 0.0
3 0.0
0.289
5.0
LOS A
1.8
12.9
0.46
0.49
0.46
52.8
338 0.0
338 0.0
0.289
5.3
LOS A
1.8
12.9
0.46
0.49
0.46
53.1
14 0.0
0.236
11.7
LOS B
1.4
9.9
0.64
0.65
0.64
51.8
Approach
West: East Estates Way 10
L2 All MCs
14 0.0
11
T1 All MCs
2 0.0
2 0.0
0.236
7.1
LOS A
1.4
9.9
0.64
0.65
0.64
52.7
12
R2 All MCs
198 0.0
198 0.0
0.236
6.9
LOS A
1.4
9.9
0.64
0.65
0.64
52.3
Approach
214 0.0
214 0.0
0.236
7.2
LOS A
1.4
9.9
0.64
0.65
0.64
52.3
All Vehicles
1141 0.0 1141 0.0
0.289
6.2
LOS A
1.8
12.9
0.39
0.52
0.39
52.8
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 8:31:26 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Trestle Ridge Road - 2045 Total AM (Site Folder: Starkey Road and Trestle Ridge Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
15 0.0
15 0.0
0.270
8.8
LOS A
1.7
12.1
0.16
0.41
0.16
53.5
2
T1 All MCs
336 0.0
336 0.0
0.270
4.2
LOS A
1.7
12.1
0.16
0.41
0.16
54.4
3
R2 All MCs
60 0.0
60 0.0
0.270
4.0
LOS A
1.7
12.1
0.16
0.41
0.16
54.1
411 0.0
411 0.0
0.270
4.3
LOS A
1.7
12.1
0.16
0.41
0.16
54.3
Approach
East: Trestle Ridge Road 4
L2 All MCs
255 0.0
255 0.0
0.287
10.8
LOS B
1.7
11.9
0.55
0.66
0.55
49.9
5
T1 All MCs
3 0.0
3 0.0
0.287
6.2
LOS A
1.7
11.9
0.55
0.66
0.55
50.7
6
R2 All MCs
39 0.0
39 0.0
0.287
6.0
LOS A
1.7
11.9
0.55
0.66
0.55
50.4
297 0.0
297 0.0
0.287
10.2
LOS B
1.7
11.9
0.55
0.66
0.55
50.0
Approach North: Starky Road 7
L2 All MCs
18 0.0
18 0.0
0.321
10.3
LOS B
2.1
14.7
0.54
0.53
0.54
51.8
8
T1 All MCs
327 0.0
327 0.0
0.321
5.7
LOS A
2.1
14.7
0.54
0.53
0.54
52.7
9
R2 All MCs
3 0.0
3 0.0
0.321
5.5
LOS A
2.1
14.7
0.54
0.53
0.54
52.3
348 0.0
348 0.0
0.321
5.9
LOS A
2.1
14.7
0.54
0.53
0.54
52.6
14 0.0
0.252
12.4
LOS B
1.6
10.9
0.69
0.67
0.69
51.3
Approach
West: East Estates Way 10
L2 All MCs
14 0.0
11
T1 All MCs
2 0.0
2 0.0
0.252
7.7
LOS A
1.6
10.9
0.69
0.67
0.69
52.2
12
R2 All MCs
198 0.0
198 0.0
0.252
7.5
LOS A
1.6
10.9
0.69
0.67
0.69
51.8
Approach
214 0.0
214 0.0
0.252
7.9
LOS A
1.6
10.9
0.69
0.67
0.69
51.8
All Vehicles
1269 0.0 1269 0.0
0.321
6.7
LOS A
2.1
14.7
0.44
0.55
0.44
52.4
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 8:31:47 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Trestle Ridge Road - 2035 BG PM (Site Folder: Starkey Road and Trestle Ridge Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
107 0.0
107 0.0
0.288
8.8
LOS A
1.9
13.1
0.12
0.47
0.12
53.1
2
T1 All MCs
276 0.0
276 0.0
0.288
4.1
LOS A
1.9
13.1
0.12
0.47
0.12
53.9
3
R2 All MCs
75 0.0
75 0.0
0.288
4.0
LOS A
1.9
13.1
0.12
0.47
0.12
53.6
458 0.0
458 0.0
0.288
5.2
LOS A
1.9
13.1
0.12
0.47
0.12
53.7
Approach
East: Trestle Ridge Road 4
L2 All MCs
87 0.0
87 0.0
0.123
10.6
LOS B
0.6
4.5
0.50
0.65
0.50
50.5
5
T1 All MCs
6 0.0
6 0.0
0.123
6.0
LOS A
0.6
4.5
0.50
0.65
0.50
51.3
6
R2 All MCs
32 0.0
32 0.0
0.123
5.8
LOS A
0.6
4.5
0.50
0.65
0.50
51.0
125 0.0
125 0.0
0.123
9.2
LOS A
0.6
4.5
0.50
0.65
0.50
50.7
Approach North: Starky Road 7
L2 All MCs
8 0.0
8 0.0
0.215
9.8
LOS A
1.2
8.5
0.40
0.48
0.40
52.5
8
T1 All MCs
232 0.0
232 0.0
0.215
5.1
LOS A
1.2
8.5
0.40
0.48
0.40
53.3
9
R2 All MCs
12 0.0
12 0.0
0.215
4.9
LOS A
1.2
8.5
0.40
0.48
0.40
53.0
252 0.0
252 0.0
0.215
5.3
LOS A
1.2
8.5
0.40
0.48
0.40
53.3
4 0.0
0.095
10.3
LOS B
0.5
3.5
0.47
0.56
0.47
52.7
Approach
West: East Estates Way 10
L2 All MCs
4 0.0
11
T1 All MCs
8 0.0
8 0.0
0.095
5.6
LOS A
0.5
3.5
0.47
0.56
0.47
53.6
12
R2 All MCs
87 0.0
87 0.0
0.095
5.4
LOS A
0.5
3.5
0.47
0.56
0.47
53.2
Approach
100 0.0
100 0.0
0.095
5.7
LOS A
0.5
3.5
0.47
0.56
0.47
53.2
All Vehicles
935 0.0
935 0.0
0.288
5.8
LOS A
1.9
13.1
0.29
0.51
0.29
53.1
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 8:32:13 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Trestle Ridge Road- 2035 Total PM (Site Folder: Starkey Road and Trestle Ridge Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
107 0.0
107 0.0
0.357
9.0
LOS A
2.5
17.7
0.23
0.46
0.23
52.8
2
T1 All MCs
276 0.0
276 0.0
0.357
4.3
LOS A
2.5
17.7
0.23
0.46
0.23
53.7
3
R2 All MCs
146 0.0
146 0.0
0.357
4.1
LOS A
2.5
17.7
0.23
0.46
0.23
53.3
529 0.0
529 0.0
0.357
5.2
LOS A
2.5
17.7
0.23
0.46
0.23
53.4
Approach
East: Trestle Ridge Road 4
L2 All MCs
132 0.0
132 0.0
0.186
10.8
LOS B
1.0
7.3
0.54
0.65
0.54
50.5
5
T1 All MCs
6 0.0
6 0.0
0.186
6.1
LOS A
1.0
7.3
0.54
0.65
0.54
51.3
6
R2 All MCs
51 0.0
51 0.0
0.186
5.9
LOS A
1.0
7.3
0.54
0.65
0.54
50.9
188 0.0
188 0.0
0.186
9.3
LOS A
1.0
7.3
0.54
0.65
0.54
50.6
Approach North: Starky Road 7
L2 All MCs
40 0.0
40 0.0
0.252
10.1
LOS B
1.5
10.4
0.46
0.52
0.46
52.0
8
T1 All MCs
232 0.0
232 0.0
0.252
5.4
LOS A
1.5
10.4
0.46
0.52
0.46
52.8
9
R2 All MCs
12 0.0
12 0.0
0.252
5.2
LOS A
1.5
10.4
0.46
0.52
0.46
52.5
283 0.0
283 0.0
0.252
6.1
LOS A
1.5
10.4
0.46
0.52
0.46
52.7
4 0.0
0.101
10.7
LOS B
0.5
3.8
0.53
0.59
0.53
52.5
Approach
West: East Estates Way 10
L2 All MCs
4 0.0
11
T1 All MCs
8 0.0
8 0.0
0.101
6.1
LOS A
0.5
3.8
0.53
0.59
0.53
53.4
12
R2 All MCs
87 0.0
87 0.0
0.101
5.9
LOS A
0.5
3.8
0.53
0.59
0.53
53.0
Approach
100 0.0
100 0.0
0.101
6.1
LOS A
0.5
3.8
0.53
0.59
0.53
53.0
All Vehicles
1101 0.0 1101 0.0
0.357
6.2
LOS A
2.5
17.7
0.37
0.52
0.37
52.7
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 8:32:43 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Trestle Ridge Road - 2045 BG PM (Site Folder: Starkey Road and Trestle Ridge Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
107 0.0
107 0.0
0.308
8.8
LOS A
2.1
14.5
0.13
0.46
0.13
53.1
2
T1 All MCs
305 0.0
305 0.0
0.308
4.2
LOS A
2.1
14.5
0.13
0.46
0.13
53.9
3
R2 All MCs
75 0.0
75 0.0
0.308
4.0
LOS A
2.1
14.5
0.13
0.46
0.13
53.6
487 0.0
487 0.0
0.308
5.1
LOS A
2.1
14.5
0.13
0.46
0.13
53.7
Approach
East: Trestle Ridge Road 4
L2 All MCs
106 0.0
106 0.0
0.153
10.9
LOS B
0.8
5.8
0.53
0.66
0.53
50.4
5
T1 All MCs
8 0.0
8 0.0
0.153
6.2
LOS A
0.8
5.8
0.53
0.66
0.53
51.2
6
R2 All MCs
38 0.0
38 0.0
0.153
6.1
LOS A
0.8
5.8
0.53
0.66
0.53
50.9
153 0.0
153 0.0
0.153
9.4
LOS A
0.8
5.8
0.53
0.66
0.53
50.6
Approach North: Starky Road 7
L2 All MCs
8 0.0
8 0.0
0.246
9.9
LOS A
1.4
10.1
0.44
0.49
0.44
52.3
8
T1 All MCs
263 0.0
263 0.0
0.246
5.3
LOS A
1.4
10.1
0.44
0.49
0.44
53.2
9
R2 All MCs
12 0.0
12 0.0
0.246
5.1
LOS A
1.4
10.1
0.44
0.49
0.44
52.8
283 0.0
283 0.0
0.246
5.4
LOS A
1.4
10.1
0.44
0.49
0.44
53.1
5 0.0
0.119
10.6
LOS B
0.7
4.6
0.52
0.58
0.52
52.5
Approach
West: East Estates Way 10
L2 All MCs
5 0.0
11
T1 All MCs
9 0.0
9 0.0
0.119
5.9
LOS A
0.7
4.6
0.52
0.58
0.52
53.4
12
R2 All MCs
106 0.0
106 0.0
0.119
5.8
LOS A
0.7
4.6
0.52
0.58
0.52
53.1
Approach
121 0.0
121 0.0
0.119
6.0
LOS A
0.7
4.6
0.52
0.58
0.52
53.1
All Vehicles
1044 0.0 1044 0.0
0.308
5.9
LOS A
2.1
14.5
0.32
0.51
0.32
53.0
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 8:33:06 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Trestle Ridge Road - 2045 Total PM (Site Folder: Starkey Road and Trestle Ridge Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
107 0.0
107 0.0
0.378
9.0
LOS A
2.7
19.1
0.24
0.46
0.24
52.8
2
T1 All MCs
305 0.0
305 0.0
0.378
4.4
LOS A
2.7
19.1
0.24
0.46
0.24
53.7
3
R2 All MCs
146 0.0
146 0.0
0.378
4.2
LOS A
2.7
19.1
0.24
0.46
0.24
53.3
559 0.0
559 0.0
0.378
5.2
LOS A
2.7
19.1
0.24
0.46
0.24
53.4
Approach
East: Trestle Ridge Road 4
L2 All MCs
151 0.0
151 0.0
0.218
11.0
LOS B
1.3
8.8
0.57
0.66
0.57
50.3
5
T1 All MCs
8 0.0
8 0.0
0.218
6.4
LOS A
1.3
8.8
0.57
0.66
0.57
51.1
6
R2 All MCs
57 0.0
57 0.0
0.218
6.2
LOS A
1.3
8.8
0.57
0.66
0.57
50.8
216 0.0
216 0.0
0.218
9.6
LOS A
1.3
8.8
0.57
0.66
0.57
50.5
Approach North: Starky Road 7
L2 All MCs
40 0.0
40 0.0
0.180
10.1
LOS B
1.0
7.1
0.46
0.54
0.46
51.8
8
T1 All MCs
146 0.0
146 0.0
0.180
5.4
LOS A
1.0
7.1
0.46
0.54
0.46
52.7
9
R2 All MCs
12 0.0
12 0.0
0.180
5.3
LOS A
1.0
7.1
0.46
0.54
0.46
52.3
198 0.0
198 0.0
0.180
6.4
LOS A
1.0
7.1
0.46
0.54
0.46
52.5
5 0.0
0.115
10.3
LOS B
0.6
4.3
0.48
0.56
0.48
52.6
Approach
West: East Estates Way 10
L2 All MCs
5 0.0
11
T1 All MCs
9 0.0
9 0.0
0.115
5.7
LOS A
0.6
4.3
0.48
0.56
0.48
53.5
12
R2 All MCs
106 0.0
106 0.0
0.115
5.5
LOS A
0.6
4.3
0.48
0.56
0.48
53.2
Approach
121 0.0
121 0.0
0.115
5.8
LOS A
0.6
4.3
0.48
0.56
0.48
53.2
All Vehicles
1094 0.0 1094 0.0
0.378
6.3
LOS A
2.7
19.1
0.37
0.53
0.37
52.6
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 8:33:30 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
SITE LAYOUT Site: 101 [Starkey Road and Bellerose Dr/Pinnacle Way (Site Folder: Starky Road and Bellerose Dr/Pinnacle Way)] New Site Site Category: (None) Roundabout Layout pictures are schematic functional drawings reflecting input data. They are not design drawings.
SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Created: March 27, 2025 8:23:35 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Bellerose Dr/Pinnacle Way - 2035 BG AM (Site Folder: Starky Road and Bellerose Dr/Pinnacle Way)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
143 0.0
143 0.0
0.320
9.3
LOS A
2.3
16.0
0.38
0.51
0.38
51.8
2
T1 All MCs
252 0.0
252 0.0
0.320
4.7
LOS A
2.3
16.0
0.38
0.51
0.38
52.7
3
R2 All MCs
Approach
23 0.0
23 0.0
0.320
4.5
LOS A
2.3
16.0
0.38
0.51
0.38
52.3
418 0.0
418 0.0
0.320
6.3
LOS A
2.3
16.0
0.38
0.51
0.38
52.3
East: Pinnacle Way 4
L2 All MCs
41 0.0
41 0.0
0.068
11.1
LOS B
0.4
2.6
0.57
0.66
0.57
50.2
5
T1 All MCs
18 0.0
18 0.0
0.068
6.5
LOS A
0.4
2.6
0.57
0.66
0.57
51.0
6
R2 All MCs
4 0.0
4 0.0
0.068
6.3
LOS A
0.4
2.6
0.57
0.66
0.57
50.7
63 0.0
63 0.0
0.068
9.5
LOS A
0.4
2.6
0.57
0.66
0.57
50.5
Approach North: Starky Road 7
L2 All MCs
1 0.0
1 0.0
0.496
10.1
LOS B
3.8
26.5
0.53
0.51
0.53
52.2
8
T1 All MCs
455 0.0
455 0.0
0.496
5.5
LOS A
3.8
26.5
0.53
0.51
0.53
53.0
9
R2 All MCs
151 0.0
151 0.0
0.496
5.3
LOS A
3.8
26.5
0.53
0.51
0.53
52.7
606 0.0
606 0.0
0.496
5.5
LOS A
3.8
26.5
0.53
0.51
0.53
52.9
96 0.0
96 0.0
0.360
11.9
LOS B
2.4
17.0
0.70
0.68
0.70
50.9
Approach West: Bellerose Drive 10
L2 All MCs
11
T1 All MCs
21 0.0
21 0.0
0.360
7.2
LOS A
2.4
17.0
0.70
0.68
0.70
51.8
12
R2 All MCs
207 0.0
207 0.0
0.360
7.1
LOS A
2.4
17.0
0.70
0.68
0.70
51.4
Approach
324 0.0
324 0.0
0.360
8.5
LOS A
2.4
17.0
0.70
0.68
0.70
51.3
All Vehicles
1412 0.0 1412 0.0
0.496
6.6
LOS A
3.8
26.5
0.52
0.55
0.52
52.3
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 6:36:46 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Bellerose Dr/Pinnacle Way - 2035 Total AM (Site Folder: Starky Road and Bellerose Dr/Pinnacle Way)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
143 0.0
143 0.0
0.338
9.4
LOS A
2.5
17.3
0.39
0.50
0.39
51.8
2
T1 All MCs
268 0.0
268 0.0
0.338
4.7
LOS A
2.5
17.3
0.39
0.50
0.39
52.6
3
R2 All MCs
Approach
26 0.0
26 0.0
0.338
4.6
LOS A
2.5
17.3
0.39
0.50
0.39
52.3
438 0.0
438 0.0
0.338
6.2
LOS A
2.5
17.3
0.39
0.50
0.39
52.3
East: Pinnacle Way 4
L2 All MCs
47 0.0
47 0.0
0.077
11.3
LOS B
0.4
2.9
0.58
0.67
0.58
50.1
5
T1 All MCs
18 0.0
18 0.0
0.077
6.6
LOS A
0.4
2.9
0.58
0.67
0.58
50.9
6
R2 All MCs
4 0.0
4 0.0
0.077
6.5
LOS A
0.4
2.9
0.58
0.67
0.58
50.5
69 0.0
69 0.0
0.077
9.8
LOS A
0.4
2.9
0.58
0.67
0.58
50.3
Approach North: Starky Road 7
L2 All MCs
1 0.0
1 0.0
0.552
10.3
LOS B
4.5
31.5
0.57
0.52
0.57
52.0
8
T1 All MCs
507 0.0
507 0.0
0.552
5.7
LOS A
4.5
31.5
0.57
0.52
0.57
52.8
9
R2 All MCs
165 0.0
165 0.0
0.552
5.5
LOS A
4.5
31.5
0.57
0.52
0.57
52.5
674 0.0
674 0.0
0.552
5.6
LOS A
4.5
31.5
0.57
0.52
0.57
52.7
100 0.0
100 0.0
0.388
12.4
LOS B
2.7
18.8
0.75
0.70
0.75
50.6
Approach West: Bellerose Drive 10
L2 All MCs
11
T1 All MCs
21 0.0
21 0.0
0.388
7.7
LOS A
2.7
18.8
0.75
0.70
0.75
51.4
12
R2 All MCs
207 0.0
207 0.0
0.388
7.6
LOS A
2.7
18.8
0.75
0.70
0.75
51.0
Approach
328 0.0
328 0.0
0.388
9.0
LOS A
2.7
18.8
0.75
0.70
0.75
50.9
All Vehicles
1509 0.0 1509 0.0
0.552
6.7
LOS A
4.5
31.5
0.56
0.56
0.56
52.1
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 6:57:37 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Bellerose Dr/Pinnacle Way - 2045 BG AM (Site Folder: Starky Road and Bellerose Dr/Pinnacle Way)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
175 0.0
175 0.0
0.389
9.5
LOS A
3.0
21.3
0.44
0.52
0.44
51.6
2
T1 All MCs
300 0.0
300 0.0
0.389
4.9
LOS A
3.0
21.3
0.44
0.52
0.44
52.4
3
R2 All MCs
Approach
23 0.0
23 0.0
0.389
4.7
LOS A
3.0
21.3
0.44
0.52
0.44
52.1
498 0.0
498 0.0
0.389
6.5
LOS A
3.0
21.3
0.44
0.52
0.44
52.1
East: Pinnacle Way 4
L2 All MCs
41 0.0
41 0.0
0.075
11.8
LOS B
0.4
3.0
0.63
0.69
0.63
49.9
5
T1 All MCs
18 0.0
18 0.0
0.075
7.1
LOS A
0.4
3.0
0.63
0.69
0.63
50.6
6
R2 All MCs
4 0.0
4 0.0
0.075
7.0
LOS A
0.4
3.0
0.63
0.69
0.63
50.3
63 0.0
63 0.0
0.075
10.1
LOS B
0.4
3.0
0.63
0.69
0.63
50.1
Approach North: Starky Road 7
L2 All MCs
1 0.0
1 0.0
0.600
10.6
LOS B
5.2
36.3
0.64
0.55
0.64
51.7
8
T1 All MCs
535 0.0
535 0.0
0.600
6.0
LOS A
5.2
36.3
0.64
0.55
0.64
52.6
9
R2 All MCs
177 0.0
177 0.0
0.600
5.8
LOS A
5.2
36.3
0.64
0.55
0.64
52.2
713 0.0
713 0.0
0.600
5.9
LOS A
5.2
36.3
0.64
0.55
0.64
52.5
114 0.0
114 0.0
0.472
13.3
LOS B
3.7
25.9
0.81
0.74
0.86
50.0
Approach West: Bellerose Drive 10
L2 All MCs
11
T1 All MCs
21 0.0
21 0.0
0.472
8.6
LOS A
3.7
25.9
0.81
0.74
0.86
50.8
12
R2 All MCs
253 0.0
253 0.0
0.472
8.5
LOS A
3.7
25.9
0.81
0.74
0.86
50.5
Approach
387 0.0
387 0.0
0.472
9.9
LOS A
3.7
25.9
0.81
0.74
0.86
50.3
All Vehicles
1661 0.0 1661 0.0
0.600
7.2
LOS A
5.2
36.3
0.62
0.59
0.63
51.8
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 7:18:11 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Bellerose Dr/Pinnacle Way - 2045 Total AM (Site Folder: Starky Road and Bellerose Dr/Pinnacle Way)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
175 0.0
175 0.0
0.407
9.5
LOS A
3.3
22.9
0.46
0.52
0.46
51.5
2
T1 All MCs
317 0.0
317 0.0
0.407
4.9
LOS A
3.3
22.9
0.46
0.52
0.46
52.4
3
R2 All MCs
Approach
26 0.0
26 0.0
0.407
4.7
LOS A
3.3
22.9
0.46
0.52
0.46
52.0
518 0.0
518 0.0
0.407
6.5
LOS A
3.3
22.9
0.46
0.52
0.46
52.1
East: Pinnacle Way 4
L2 All MCs
47 0.0
47 0.0
0.084
12.0
LOS B
0.5
3.4
0.65
0.70
0.65
49.7
5
T1 All MCs
18 0.0
18 0.0
0.084
7.3
LOS A
0.5
3.4
0.65
0.70
0.65
50.4
6
R2 All MCs
4 0.0
4 0.0
0.084
7.1
LOS A
0.5
3.4
0.65
0.70
0.65
50.1
69 0.0
69 0.0
0.084
10.5
LOS B
0.5
3.4
0.65
0.70
0.65
49.9
Approach North: Starky Road 7
L2 All MCs
1 0.0
1 0.0
0.658
11.2
LOS B
6.5
45.7
0.70
0.59
0.72
51.5
8
T1 All MCs
587 0.0
587 0.0
0.658
6.5
LOS A
6.5
45.7
0.70
0.59
0.72
52.3
9
R2 All MCs
192 0.0
192 0.0
0.658
6.3
LOS A
6.5
45.7
0.70
0.59
0.72
52.0
780 0.0
780 0.0
0.658
6.5
LOS A
6.5
45.7
0.70
0.59
0.72
52.2
118 0.0
118 0.0
0.511
14.5
LOS B
4.4
30.7
0.87
0.79
0.98
49.1
Approach West: Bellerose Drive 10
L2 All MCs
11
T1 All MCs
21 0.0
21 0.0
0.511
9.9
LOS A
4.4
30.7
0.87
0.79
0.98
49.9
12
R2 All MCs
253 0.0
253 0.0
0.511
9.7
LOS A
4.4
30.7
0.87
0.79
0.98
49.6
Approach
392 0.0
392 0.0
0.511
11.2
LOS B
4.4
30.7
0.87
0.79
0.98
49.5
All Vehicles
1759 0.0 1759 0.0
0.658
7.7
LOS A
6.5
45.7
0.66
0.62
0.70
51.5
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 7:27:12 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Bellerose Dr/Pinnacle Way - 2035 BG PM (Site Folder: Starky Road and Bellerose Dr/Pinnacle Way)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
273 0.0
273 0.0
0.518
9.8
LOS A
4.4
30.9
0.51
0.54
0.51
51.2
2
T1 All MCs
361 0.0
361 0.0
0.518
5.2
LOS A
4.4
30.9
0.51
0.54
0.51
52.0
3
R2 All MCs
Approach
27 0.0
27 0.0
0.518
5.0
LOS A
4.4
30.9
0.51
0.54
0.51
51.7
661 0.0
661 0.0
0.518
7.1
LOS A
4.4
30.9
0.51
0.54
0.51
51.6
East: Pinnacle Way 4
L2 All MCs
24 0.0
24 0.0
0.072
13.3
LOS B
0.4
3.1
0.74
0.72
0.74
49.4
5
T1 All MCs
21 0.0
21 0.0
0.072
8.7
LOS A
0.4
3.1
0.74
0.72
0.74
50.2
6
R2 All MCs
5 0.0
5 0.0
0.072
8.5
LOS A
0.4
3.1
0.74
0.72
0.74
49.9
51 0.0
51 0.0
0.072
10.9
LOS B
0.4
3.1
0.74
0.72
0.74
49.8
Approach North: Starky Road 7
L2 All MCs
1 0.0
1 0.0
0.386
10.7
LOS B
2.6
18.3
0.59
0.57
0.59
51.9
8
T1 All MCs
273 0.0
273 0.0
0.386
6.1
LOS A
2.6
18.3
0.59
0.57
0.59
52.8
9
R2 All MCs
132 0.0
132 0.0
0.386
5.9
LOS A
2.6
18.3
0.59
0.57
0.59
52.4
405 0.0
405 0.0
0.386
6.1
LOS A
2.6
18.3
0.59
0.57
0.59
52.7
144 0.0
144 0.0
0.295
10.4
LOS B
1.9
13.2
0.55
0.61
0.55
51.2
Approach West: Bellerose Drive 10
L2 All MCs
11
T1 All MCs
12 0.0
12 0.0
0.295
5.8
LOS A
1.9
13.2
0.55
0.61
0.55
52.0
12
R2 All MCs
155 0.0
155 0.0
0.295
5.6
LOS A
1.9
13.2
0.55
0.61
0.55
51.7
Approach
311 0.0
311 0.0
0.295
7.9
LOS A
1.9
13.2
0.55
0.61
0.55
51.5
All Vehicles
1427 0.0 1427 0.0
0.518
7.1
LOS A
4.4
30.9
0.55
0.57
0.55
51.8
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 7:58:31 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Bellerose Dr/Pinnacle Way - 2035 Total PM (Site Folder: Starky Road and Bellerose Dr/Pinnacle Way)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
273 0.0
273 0.0
0.579
10.0
LOS B
5.3
37.4
0.58
0.55
0.58
51.0
2
T1 All MCs
417 0.0
417 0.0
0.579
5.4
LOS A
5.3
37.4
0.58
0.55
0.58
51.9
3
R2 All MCs
Approach
37 0.0
37 0.0
0.579
5.2
LOS A
5.3
37.4
0.58
0.55
0.58
51.5
726 0.0
726 0.0
0.579
7.1
LOS A
5.3
37.4
0.58
0.55
0.58
51.5
East: Pinnacle Way 4
L2 All MCs
28 0.0
28 0.0
0.087
14.2
LOS B
0.5
3.8
0.79
0.75
0.79
48.8
5
T1 All MCs
21 0.0
21 0.0
0.087
9.5
LOS A
0.5
3.8
0.79
0.75
0.79
49.5
6
R2 All MCs
5 0.0
5 0.0
0.087
9.3
LOS A
0.5
3.8
0.79
0.75
0.79
49.2
55 0.0
55 0.0
0.087
11.9
LOS B
0.5
3.8
0.79
0.75
0.79
49.1
Approach North: Starky Road 7
L2 All MCs
1 0.0
1 0.0
0.430
10.8
LOS B
3.1
21.4
0.63
0.58
0.63
51.8
8
T1 All MCs
307 0.0
307 0.0
0.430
6.2
LOS A
3.1
21.4
0.63
0.58
0.63
52.7
9
R2 All MCs
141 0.0
141 0.0
0.430
6.0
LOS A
3.1
21.4
0.63
0.58
0.63
52.3
449 0.0
449 0.0
0.430
6.2
LOS A
3.1
21.4
0.63
0.58
0.63
52.6
160 0.0
160 0.0
0.321
10.7
LOS B
2.1
14.8
0.59
0.63
0.59
51.0
Approach West: Bellerose Drive 10
L2 All MCs
11
T1 All MCs
12 0.0
12 0.0
0.321
6.1
LOS A
2.1
14.8
0.59
0.63
0.59
51.8
12
R2 All MCs
155 0.0
155 0.0
0.321
5.9
LOS A
2.1
14.8
0.59
0.63
0.59
51.5
Approach
326 0.0
326 0.0
0.321
8.3
LOS A
2.1
14.8
0.59
0.63
0.59
51.2
All Vehicles
1557 0.0 1557 0.0
0.579
7.3
LOS A
5.3
37.4
0.60
0.58
0.60
51.7
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 8:03:57 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Bellerose Dr/Pinnacle Way - 2045 BG PM (Site Folder: Starky Road and Bellerose Dr/Pinnacle Way)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
332 0.0
332 0.0
0.622
10.2
LOS B
6.1
42.7
0.63
0.57
0.63
50.8
2
T1 All MCs
417 0.0
417 0.0
0.622
5.6
LOS A
6.1
42.7
0.63
0.57
0.63
51.6
3
R2 All MCs
Approach
27 0.0
27 0.0
0.622
5.4
LOS A
6.1
42.7
0.63
0.57
0.63
51.2
776 0.0
776 0.0
0.622
7.5
LOS A
6.1
42.7
0.63
0.57
0.63
51.2
East: Pinnacle Way 4
L2 All MCs
24 0.0
24 0.0
0.088
15.0
LOS B
0.6
4.0
0.83
0.76
0.83
48.4
5
T1 All MCs
21 0.0
21 0.0
0.088
10.3
LOS B
0.6
4.0
0.83
0.76
0.83
49.1
6
R2 All MCs
5 0.0
5 0.0
0.088
10.1
LOS B
0.6
4.0
0.83
0.76
0.83
48.8
51 0.0
51 0.0
0.088
12.5
LOS B
0.6
4.0
0.83
0.76
0.83
48.7
Approach North: Starky Road 7
L2 All MCs
1 0.0
1 0.0
0.482
11.4
LOS B
3.6
25.1
0.70
0.62
0.70
51.5
8
T1 All MCs
319 0.0
319 0.0
0.482
6.7
LOS A
3.6
25.1
0.70
0.62
0.70
52.4
9
R2 All MCs
156 0.0
156 0.0
0.482
6.5
LOS A
3.6
25.1
0.70
0.62
0.70
52.0
476 0.0
476 0.0
0.482
6.7
LOS A
3.6
25.1
0.70
0.62
0.70
52.3
166 0.0
166 0.0
0.366
10.9
LOS B
2.5
17.7
0.63
0.64
0.63
51.0
Approach West: Bellerose Drive 10
L2 All MCs
11
T1 All MCs
12 0.0
12 0.0
0.366
6.2
LOS A
2.5
17.7
0.63
0.64
0.63
51.8
12
R2 All MCs
189 0.0
189 0.0
0.366
6.0
LOS A
2.5
17.7
0.63
0.64
0.63
51.5
Approach
367 0.0
367 0.0
0.366
8.2
LOS A
2.5
17.7
0.63
0.64
0.63
51.3
All Vehicles
1669 0.0 1669 0.0
0.622
7.6
LOS A
6.1
42.7
0.66
0.60
0.66
51.4
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 8:10:31 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Bellerose Dr/Pinnacle Way - 2045 Total PM (Site Folder: Starky Road and Bellerose Dr/Pinnacle Way)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
South: Starky Road 1
L2 All MCs
332 0.0
332 0.0
0.686
10.5
LOS B
7.4
51.5
0.72
0.59
0.72
50.6
2
T1 All MCs
473 0.0
473 0.0
0.686
5.9
LOS A
7.4
51.5
0.72
0.59
0.72
51.4
3
R2 All MCs
Approach
37 0.0
37 0.0
0.686
5.7
LOS A
7.4
51.5
0.72
0.59
0.72
51.0
841 0.0
841 0.0
0.686
7.7
LOS A
7.4
51.5
0.72
0.59
0.72
51.0
East: Pinnacle Way 4
L2 All MCs
28 0.0
28 0.0
0.107
16.1
LOS B
0.7
5.1
0.88
0.78
0.88
47.6
5
T1 All MCs
21 0.0
21 0.0
0.107
11.5
LOS B
0.7
5.1
0.88
0.78
0.88
48.3
6
R2 All MCs
5 0.0
5 0.0
0.107
11.3
LOS B
0.7
5.1
0.88
0.78
0.88
48.0
55 0.0
55 0.0
0.107
13.8
LOS B
0.7
5.1
0.88
0.78
0.88
47.9
Approach North: Starky Road 7
L2 All MCs
1 0.0
1 0.0
0.531
11.8
LOS B
4.4
30.6
0.74
0.65
0.77
51.4
8
T1 All MCs
354 0.0
354 0.0
0.531
7.2
LOS A
4.4
30.6
0.74
0.65
0.77
52.2
9
R2 All MCs
165 0.0
165 0.0
0.531
7.0
LOS A
4.4
30.6
0.74
0.65
0.77
51.8
520 0.0
520 0.0
0.531
7.1
LOS A
4.4
30.6
0.74
0.65
0.77
52.1
182 0.0
182 0.0
0.397
11.2
LOS B
2.8
19.7
0.67
0.66
0.67
50.8
Approach West: Bellerose Drive 10
L2 All MCs
11
T1 All MCs
12 0.0
12 0.0
0.397
6.5
LOS A
2.8
19.7
0.67
0.66
0.67
51.6
12
R2 All MCs
189 0.0
189 0.0
0.397
6.4
LOS A
2.8
19.7
0.67
0.66
0.67
51.3
Approach
383 0.0
383 0.0
0.397
8.6
LOS A
2.8
19.7
0.67
0.66
0.67
51.0
All Vehicles
1799 0.0 1799 0.0
0.686
7.9
LOS A
7.4
51.5
0.72
0.62
0.73
51.2
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 8:15:52 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
SITE LAYOUT Site: 101 [Starkey Road and Sturgeon Road (Site Folder: Starky Road and Sturgeon Road)] New Site Site Category: (None) Roundabout Layout pictures are schematic functional drawings reflecting input data. They are not design drawings.
SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Created: March 27, 2025 8:18:45 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Sturgeon Road - 2025 BG AM (Site Folder: Starky Road and Sturgeon Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
East: Sturgeon Road 5
T1 All MCs
184 2.0
184 2.0
0.280
5.4
LOS A
1.8
12.9
0.49
0.51
0.49
53.2
6
R2 All MCs
128 2.0
128 2.0
0.280
5.2
LOS A
1.8
12.9
0.49
0.51
0.49
52.9
313 2.0
313 2.0
0.280
5.3
LOS A
1.8
12.9
0.49
0.51
0.49
53.1
Approach North: Starky Road 7
L2 All MCs
344 2.0
344 2.0
0.520
10.1
LOS B
4.3
32.2
0.56
0.59
0.56
50.6
9
R2 All MCs
261 20.0
261 20.0
0.520
5.7
LOS A
4.3
32.2
0.56
0.59
0.56
50.6
605 9.8
605 9.8
0.520
8.2
LOS A
4.3
32.2
0.56
0.59
0.56
50.6
Approach West: Sturgeon Road 10
L2 All MCs
223 2.0
223 2.0
0.380
11.0
LOS B
2.6
18.6
0.63
0.64
0.63
50.2
11
T1 All MCs
157 2.0
157 2.0
0.380
6.3
LOS A
2.6
18.6
0.63
0.64
0.63
51.1
Approach
380 2.0
380 2.0
0.380
9.1
LOS A
2.6
18.6
0.63
0.64
0.63
50.6
All Vehicles
1298 5.6 1298 5.6
0.520
7.8
LOS A
4.3
32.2
0.56
0.59
0.56
51.2
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 6:21:27 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Sturgeon Road - 2025 Total AM (Site Folder: Starky Road and Sturgeon Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
East: Sturgeon Road 5
T1 All MCs
184 2.0
184 2.0
0.293
5.4
LOS A
1.9
13.8
0.50
0.52
0.50
53.2
6
R2 All MCs
141 2.0
141 2.0
0.293
5.2
LOS A
1.9
13.8
0.50
0.52
0.50
52.8
325 2.0
325 2.0
0.293
5.3
LOS A
1.9
13.8
0.50
0.52
0.50
53.0
Approach North: Starky Road 7
L2 All MCs
382 2.0
382 2.0
0.539
10.1
LOS B
4.6
32.6
0.56
0.59
0.56
50.7
9
R2 All MCs
277 2.0
277 2.0
0.539
5.3
LOS A
4.6
32.6
0.56
0.59
0.56
51.2
659 2.0
659 2.0
0.539
8.1
LOS A
4.6
32.6
0.56
0.59
0.56
50.9
Approach West: Sturgeon Road 10
L2 All MCs
228 2.0
228 2.0
0.398
11.3
LOS B
2.8
19.7
0.66
0.66
0.66
50.1
11
T1 All MCs
157 2.0
157 2.0
0.398
6.6
LOS A
2.8
19.7
0.66
0.66
0.66
50.9
Approach
385 2.0
385 2.0
0.398
9.4
LOS A
2.8
19.7
0.66
0.66
0.66
50.4
All Vehicles
1369 2.0 1369 2.0
0.539
7.8
LOS A
4.6
32.6
0.58
0.59
0.58
51.2
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 6:24:04 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Sturgeon Road - 2035 BG AM (Site Folder: Starky Road and Sturgeon Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
East: Sturgeon Road 5
T1 All MCs
224 2.0
224 2.0
0.374
5.9
LOS A
2.7
19.2
0.60
0.56
0.60
52.8
6
R2 All MCs
167 2.0
167 2.0
0.374
5.7
LOS A
2.7
19.2
0.60
0.56
0.60
52.5
392 2.0
392 2.0
0.374
5.8
LOS A
2.7
19.2
0.60
0.56
0.60
52.7
Approach North: Starky Road 7
L2 All MCs
453 2.0
453 2.0
0.710
11.8
LOS B
8.5
64.2
0.78
0.66
0.84
49.9
9
R2 All MCs
342 20.0
342 20.0
0.710
7.6
LOS A
8.5
64.2
0.78
0.66
0.84
49.9
795 9.7
795 9.7
0.710
10.0
LOS A
8.5
64.2
0.78
0.66
0.84
49.9
12.8
LOS B
4.6
32.7
0.80
0.73
0.87
49.2
Approach West: Sturgeon Road 10
L2 All MCs
279 2.0
279 2.0
0.532
11
T1 All MCs
191 2.0
191 2.0
0.532
8.2
LOS A
4.6
32.7
0.80
0.73
0.87
50.0
Approach
469 2.0
469 2.0
0.532
10.9
LOS B
4.6
32.7
0.80
0.73
0.87
49.6
All Vehicles
1656 5.7 1656 5.7
0.710
9.3
LOS A
8.5
64.2
0.74
0.66
0.79
50.4
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 6:34:35 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Sturgeon Road - 2035 Total AM (Site Folder: Starky Road and Sturgeon Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
East: Sturgeon Road 5
T1 All MCs
224 2.0
224 2.0
0.391
5.9
LOS A
2.9
20.4
0.62
0.56
0.62
52.8
6
R2 All MCs
181 2.0
181 2.0
0.391
5.8
LOS A
2.9
20.4
0.62
0.56
0.62
52.4
405 2.0
405 2.0
0.391
5.9
LOS A
2.9
20.4
0.62
0.56
0.62
52.6
Approach North: Starky Road 7
L2 All MCs
493 2.0
493 2.0
0.726
11.9
LOS B
9.0
64.2
0.79
0.66
0.84
50.1
9
R2 All MCs
360 2.0
360 2.0
0.726
7.0
LOS A
9.0
64.2
0.79
0.66
0.84
50.5
853 2.0
853 2.0
0.726
9.8
LOS A
9.0
64.2
0.79
0.66
0.84
50.3
13.7
LOS B
5.2
36.8
0.84
0.77
0.95
48.8
Approach West: Sturgeon Road 10
L2 All MCs
285 2.0
285 2.0
0.561
11
T1 All MCs
191 2.0
191 2.0
0.561
9.0
LOS A
5.2
36.8
0.84
0.77
0.95
49.6
Approach
476 2.0
476 2.0
0.561
11.8
LOS B
5.2
36.8
0.84
0.77
0.95
49.1
All Vehicles
1734 2.0 1734 2.0
0.726
9.4
LOS A
9.0
64.2
0.76
0.67
0.82
50.5
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 6:50:36 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Sturgeon Road - 2045 BG AM (Site Folder: Starky Road and Sturgeon Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
East: Sturgeon Road 5
T1 All MCs
274 2.0
274 2.0
0.487
6.5
LOS A
3.9
28.0
0.73
0.61
0.73
52.3
6
R2 All MCs
200 2.0
200 2.0
0.487
6.3
LOS A
3.9
28.0
0.73
0.61
0.73
52.0
474 2.0
474 2.0
0.487
6.4
LOS A
3.9
28.0
0.73
0.61
0.73
52.2
Approach North: Starky Road 7
L2 All MCs
541 2.0
541 2.0
0.900
19.9
LOS B
21.3
161.4
1.00
1.01
1.46
44.9
9
R2 All MCs
409 20.0
409 20.0
0.900
16.0
LOS B
21.3
161.4
1.00
1.01
1.46
44.9
951 9.8
951 9.8
0.900
18.2
LOS B
21.3
161.4
1.00
1.01
1.46
44.9
Approach West: Sturgeon Road 10
L2 All MCs
337 2.0
337 2.0
0.737
18.2
LOS B
9.5
68.0
1.00
0.93
1.36
46.1
11
T1 All MCs
233 2.0
233 2.0
0.737
13.6
LOS B
9.5
68.0
1.00
0.93
1.36
46.8
Approach
569 2.0
569 2.0
0.737
16.3
LOS B
9.5
68.0
1.00
0.93
1.36
46.4
All Vehicles
1994 5.7 1994 5.7
0.900
14.9
LOS B
21.3
161.4
0.94
0.89
1.26
46.9
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 7:04:12 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Sturgeon Road - 2045 Total AM (Site Folder: Starky Road and Sturgeon Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
East: Sturgeon Road 5
T1 All MCs
274 2.0
274 2.0
0.505
6.6
LOS A
4.1
29.4
0.74
0.62
0.74
52.3
6
R2 All MCs
214 2.0
214 2.0
0.505
6.4
LOS A
4.1
29.4
0.74
0.62
0.74
51.9
487 2.0
487 2.0
0.505
6.5
LOS A
4.1
29.4
0.74
0.62
0.74
52.1
Approach North: Starky Road 7
L2 All MCs
581 2.0
581 2.0
0.908
20.0
LOS C
22.5
159.9
1.00
1.02
1.46
45.1
9
R2 All MCs
427 2.0
427 2.0
0.908
15.2
LOS B
22.5
159.9
1.00
1.02
1.46
45.5
1008 2.0 1008 2.0
0.908
18.0
LOS B
22.5
159.9
1.00
1.02
1.46
45.3
Approach West: Sturgeon Road 10
L2 All MCs
343 2.0
343 2.0
0.782
20.9
LOS C
11.1
79.3
1.00
1.03
1.49
44.6
11
T1 All MCs
233 2.0
233 2.0
0.782
16.3
LOS B
11.1
79.3
1.00
1.03
1.49
45.3
Approach
576 2.0
576 2.0
0.782
19.0
LOS B
11.1
79.3
1.00
1.03
1.49
44.9
All Vehicles
2072 2.0 2072 2.0
0.908
15.6
LOS B
22.5
159.9
0.94
0.93
1.30
46.6
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 7:21:27 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Sturgeon Road - 2025 BG PM (Site Folder: Starky Road and Sturgeon Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
East: Sturgeon Road 5
T1 All MCs
102 2.0
102 2.0
0.304
6.0
LOS A
2.0
13.9
0.56
0.57
0.56
53.2
6
R2 All MCs
212 2.0
212 2.0
0.304
5.8
LOS A
2.0
13.9
0.56
0.57
0.56
52.8
314 2.0
314 2.0
0.304
5.8
LOS A
2.0
13.9
0.56
0.57
0.56
52.9
Approach North: Starky Road 7
L2 All MCs
239 2.0
239 2.0
0.290
9.3
LOS A
1.9
14.5
0.34
0.56
0.34
51.0
9
R2 All MCs
129 20.0
129 20.0
0.290
4.7
LOS A
1.9
14.5
0.34
0.56
0.34
51.0
368 8.3
368 8.3
0.290
7.7
LOS A
1.9
14.5
0.34
0.56
0.34
51.0
Approach West: Sturgeon Road 10
L2 All MCs
308 2.0
308 2.0
0.417
10.3
LOS B
2.9
20.6
0.54
0.61
0.54
50.4
11
T1 All MCs
166 2.0
166 2.0
0.417
5.7
LOS A
2.9
20.6
0.54
0.61
0.54
51.3
Approach
475 2.0
475 2.0
0.417
8.7
LOS A
2.9
20.6
0.54
0.61
0.54
50.7
All Vehicles
1157 4.0 1157 4.0
0.417
7.6
LOS A
2.9
20.6
0.48
0.58
0.48
51.4
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 6:31:19 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Sturgeon Road - 2025 Total PM (Site Folder: Starky Road and Sturgeon Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
East: Sturgeon Road 5
T1 All MCs
102 2.0
102 2.0
0.350
6.2
LOS A
2.4
16.8
0.60
0.58
0.60
53.1
6
R2 All MCs
253 2.0
253 2.0
0.350
6.0
LOS A
2.4
16.8
0.60
0.58
0.60
52.7
355 2.0
355 2.0
0.350
6.0
LOS A
2.4
16.8
0.60
0.58
0.60
52.8
Approach North: Starky Road 7
L2 All MCs
263 2.0
263 2.0
0.316
9.3
LOS A
2.2
16.4
0.35
0.56
0.35
50.9
9
R2 All MCs
140 20.0
140 20.0
0.316
4.8
LOS A
2.2
16.4
0.35
0.56
0.35
50.9
403 8.3
403 8.3
0.316
7.7
LOS A
2.2
16.4
0.35
0.56
0.35
50.9
Approach West: Sturgeon Road 10
L2 All MCs
327 2.0
327 2.0
0.444
10.5
LOS B
3.2
22.5
0.57
0.62
0.57
50.3
11
T1 All MCs
166 2.0
166 2.0
0.444
5.9
LOS A
3.2
22.5
0.57
0.62
0.57
51.1
Approach
494 2.0
494 2.0
0.444
9.0
LOS A
3.2
22.5
0.57
0.62
0.57
50.6
All Vehicles
1252 4.0 1252 4.0
0.444
7.7
LOS A
3.2
22.5
0.51
0.59
0.51
51.3
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 6:29:23 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Sturgeon Road - 2035 BG PM (Site Folder: Starky Road and Sturgeon Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
East: Sturgeon Road 5
T1 All MCs
124 2.0
124 2.0
0.448
6.9
LOS A
3.3
23.5
0.72
0.64
0.72
52.6
6
R2 All MCs
294 2.0
294 2.0
0.448
6.7
LOS A
3.3
23.5
0.72
0.64
0.72
52.3
418 2.0
418 2.0
0.448
6.8
LOS A
3.3
23.5
0.72
0.64
0.72
52.4
Approach North: Starky Road 7
L2 All MCs
313 2.0
313 2.0
0.391
9.5
LOS A
3.0
22.4
0.42
0.56
0.42
50.7
9
R2 All MCs
173 20.0
173 20.0
0.391
5.0
LOS A
3.0
22.4
0.42
0.56
0.42
50.7
485 8.4
485 8.4
0.391
7.9
LOS A
3.0
22.4
0.42
0.56
0.42
50.7
Approach West: Sturgeon Road 10
L2 All MCs
403 2.0
403 2.0
0.571
11.5
LOS B
4.9
34.6
0.70
0.67
0.72
49.8
11
T1 All MCs
203 2.0
203 2.0
0.571
6.9
LOS A
4.9
34.6
0.70
0.67
0.72
50.6
Approach
606 2.0
606 2.0
0.571
9.9
LOS A
4.9
34.6
0.70
0.67
0.72
50.0
All Vehicles
1509 4.1 1509 4.1
0.571
8.4
LOS A
4.9
34.6
0.62
0.63
0.63
50.9
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 7:56:34 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Sturgeon Road - 2035 Total PM (Site Folder: Starky Road and Sturgeon Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
East: Sturgeon Road 5
T1 All MCs
124 2.0
124 2.0
0.508
7.5
LOS A
4.1
29.5
0.77
0.68
0.80
52.3
6
R2 All MCs
339 2.0
339 2.0
0.508
7.4
LOS A
4.1
29.5
0.77
0.68
0.80
51.9
463 2.0
463 2.0
0.508
7.4
LOS A
4.1
29.5
0.77
0.68
0.80
52.0
Approach North: Starky Road 7
L2 All MCs
339 2.0
339 2.0
0.421
9.5
LOS A
3.4
25.3
0.44
0.56
0.44
50.7
9
R2 All MCs
185 20.0
185 20.0
0.421
5.0
LOS A
3.4
25.3
0.44
0.56
0.44
50.7
524 8.4
524 8.4
0.421
7.9
LOS A
3.4
25.3
0.44
0.56
0.44
50.7
12.3
LOS B
5.7
40.4
0.75
0.70
0.81
49.4
Approach West: Sturgeon Road 10
L2 All MCs
423 2.0
423 2.0
0.605
11
T1 All MCs
203 2.0
203 2.0
0.605
7.6
LOS A
5.7
40.4
0.75
0.70
0.81
50.1
Approach
626 2.0
626 2.0
0.605
10.8
LOS B
5.7
40.4
0.75
0.70
0.81
49.6
All Vehicles
1614 4.1 1614 4.1
0.605
8.9
LOS A
5.7
40.4
0.65
0.65
0.69
50.6
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 8:09:08 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Sturgeon Road - 2045 BG PM (Site Folder: Starky Road and Sturgeon Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
East: Sturgeon Road 5
T1 All MCs
151 2.0
151 2.0
0.586
9.3
LOS A
5.7
40.5
0.86
0.77
0.99
51.2
6
R2 All MCs
345 2.0
345 2.0
0.586
9.1
LOS A
5.7
40.5
0.86
0.77
0.99
50.9
496 2.0
496 2.0
0.586
9.1
LOS A
5.7
40.5
0.86
0.77
0.99
51.0
Approach North: Starky Road 7
L2 All MCs
373 2.0
373 2.0
0.481
9.8
LOS A
4.1
31.0
0.53
0.57
0.53
50.5
9
R2 All MCs
205 20.0
205 20.0
0.481
5.3
LOS A
4.1
31.0
0.53
0.57
0.53
50.5
578 8.4
578 8.4
0.481
8.2
LOS A
4.1
31.0
0.53
0.57
0.53
50.5
Approach West: Sturgeon Road 10
L2 All MCs
482 2.0
482 2.0
0.728
14.9
LOS B
9.3
66.2
0.88
0.81
1.09
47.9
11
T1 All MCs
247 2.0
247 2.0
0.728
10.2
LOS B
9.3
66.2
0.88
0.81
1.09
48.7
Approach
729 2.0
729 2.0
0.728
13.3
LOS B
9.3
66.2
0.88
0.81
1.09
48.2
All Vehicles
1803 4.0 1803 4.0
0.728
10.5
LOS B
9.3
66.2
0.76
0.72
0.88
49.6
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 8:07:15 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
MOVEMENT SUMMARY Site: 101 [Starkey Road and Sturgeon Road - 2045 Total PM (Site Folder: Starky Road and Sturgeon Road)] Output produced by SIDRA INTERSECTION Version: 9.1.3.210 New Site Site Category: (None) Roundabout Vehicle Movement Performance Mov ID
Turn Mov Class
Demand Arrival Flows Flows [ Total HV ] [ Total HV ] veh/h % veh/h %
Deg. Satn
Aver. Level of Delay Service
v/c
sec
95% Back Of Queue [ Veh. Dist ] veh m
Prop. Que
Eff. Stop Rate
Aver. No. of Cycles
Aver. Speed km/h
East: Sturgeon Road 5
T1 All MCs
151 2.0
151 2.0
0.662
10.9
LOS B
7.4
52.6
0.93
0.84
1.15
50.1
6
R2 All MCs
391 2.0
391 2.0
0.662
10.7
LOS B
7.4
52.6
0.93
0.84
1.15
49.7
541 2.0
541 2.0
0.662
10.8
LOS B
7.4
52.6
0.93
0.84
1.15
49.8
Approach North: Starky Road 7
L2 All MCs
399 2.0
399 2.0
0.496
9.8
LOS A
4.4
31.6
0.54
0.57
0.54
50.6
9
R2 All MCs
218 2.0
218 2.0
0.496
5.0
LOS A
4.4
31.6
0.54
0.57
0.54
51.1
617 2.0
617 2.0
0.496
8.1
LOS A
4.4
31.6
0.54
0.57
0.54
50.7
16.5
LOS B
11.0
78.0
0.93
0.88
1.24
46.9
Approach West: Sturgeon Road 10
L2 All MCs
502 2.0
502 2.0
0.769
11
T1 All MCs
247 2.0
247 2.0
0.769
11.8
LOS B
11.0
78.0
0.93
0.88
1.24
47.7
Approach
749 2.0
749 2.0
0.769
14.9
LOS B
11.0
78.0
0.93
0.88
1.24
47.2
All Vehicles
1907 2.0 1907 2.0
0.769
11.5
LOS B
11.0
78.0
0.80
0.77
0.99
49.0
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Parameter Settings dialog (Options tab). Roundabout LOS Method: SIDRA Roundabout LOS. Vehicle movement LOS values are based on average delay per movement. Intersection and Approach LOS values are based on average delay for all vehicle movements. Roundabout Capacity Model: SIDRA Standard. Delay Model: SIDRA Standard (Control Delay: Geometric Delay is included). Queue Model: SIDRA queue estimation methods are used for Back of Queue and Queue at Start of Gap. Gap-Acceptance Capacity Formula: SIDRA Standard (Akçelik M3D). HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation. Arrival Flows used in performance calculations are adjusted to include any Initial Queued Demand and Upstream Capacity Constraint effects. SIDRA INTERSECTION 9.1 | Copyright © 2000-2023 Akcelik and Associates Pty Ltd | sidrasolutions.com Organisation: ARCADIS - IBI GROUP | Licence: PLUS / 1PC | Processed: March 27, 2025 8:14:29 PM Project: C:\Users\lorinczs3312\ARCADIS\133341 Pinnacle Village - Internal Documents\6.0_Technical\6.23_Traffic\04_DesignAnalysis_2024-06-05\Sidra 2024-11-20\2025-03\Pinnacle Village_v.02.sip9
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Appendix D Intersection Treatment Warrants
50
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Trestle Ridge Rd / E Estates
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 5,750 1,920 102 320 160 5 760
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 31.9% 4.9% 1.52% 2.2% 7.0
th
Use Detailed Method RT Lane warranted base storage requirement - standard storage length + additional truck storage = total additional storage required Type IV
Additonal Storage Not Requied
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: NB Period: PM Peak
Year of Analysis: 2025 (Background) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Trestle Ridge Rd / E Estates
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 3,140 1,920 8 160 320 1 60
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 5.0% 12.5% 1.52% 0.2% 0.3
th
Use Detailed Method Type II
Direction: SB Period: PM Peak
Year of Analysis: 2025 (Background) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additonal Storage Not Requied
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
-
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Trestle Ridge Rd / E Estates
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 8,270 2,150 102 435 239 5 760
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 23.4% 4.9% 1.52% 4.0% 17.5
th
Use Detailed Method RT Lane warranted base storage requirement - standard storage length + additional truck storage = total additional storage required Type IV
Additonal Storage Not Requied
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: NB Period: PM Peak
Year of Analysis: 2035 (Background) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Trestle Ridge Rd / E Estates
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 5,050 2,150 8 239 435 1 60
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 3.3% 12.5% 1.52% 0.3% 0.8
th
Use Detailed Method Type II
Direction: SB Period: PM Peak
Year of Analysis: 2035 (Background) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additonal Storage Not Requied
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
-
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Trestle Ridge Rd / E Estates
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 9,610 2,420 102 463 269 5 760
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 22.0% 4.9% 1.52% 4.7% 21.6
th
Use Detailed Method RT Lane warranted base storage requirement 25 m - standard storage length 20 m + additional truck storage 0m = total additional storage required 5m Type IV
Additional Storage Required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: NB Period: PM Peak
Year of Analysis: 2045 (Background) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Trestle Ridge Rd / E Estates
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 5,660 2,420 8 269 463 1 60
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 3.0% 12.5% 1.52% 0.4% 1.1
th
Use Detailed Method Type II
Direction: SB Period: PM Peak
Year of Analysis: 2045 (Background) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additonal Storage Not Requied
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
-
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Trestle Ridge Rd / E Estates
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 6,760 3,370 102 382 188 5 1,253
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 26.7% 4.9% 1.52% 3.0% 11.4
th
Use Detailed Method RT Lane warranted base storage requirement - standard storage length + additional truck storage = total additional storage required Type IV
Additonal Storage Not Requied
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: NB Period: PM Peak
Year of Analysis: 2025 (Total) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Trestle Ridge Rd / E Estates
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 3,570 3,370 36 188 382 1 60
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 19.1% 2.8% 1.52% 0.9% 1.7
th
Use Detailed Method Type III
Direction: SB Period: PM Peak
Year of Analysis: 2025 (total) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additonal Storage Not Requied
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
-
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Trestle Ridge Rd / E Estates
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 9,390 3,750 102 503 269 1 1,308
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 20.3% 1.0% 1.52% 5.2% 26.0
th
Use Detailed Method RT Lane warranted base storage requirement 25 m - standard storage length 20 m + additional truck storage 0m = total additional storage required 5m Type IV
Additional Storage Required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: NB Period: PM Peak
Year of Analysis: 2035 (total) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Trestle Ridge Rd / E Estates
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 5,530 3,750 38 269 503 2 60
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 14.1% 5.3% 1.52% 1.9% 5.0
th
Use Detailed Method Type IV
Direction: SB Period: PM Peak
Year of Analysis: 2035 (total) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additonal Storage Not Requied
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
-
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Trestle Ridge Rd / E Estates
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 10,370 4,020 102 531 299 5 1,308
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 19.2% 4.9% 1.52% 5.9% 31.5
th
Use Detailed Method RT Lane warranted base storage requirement 25 m - standard storage length 20 m + additional truck storage 0m = total additional storage required 5m Type IV
Additional Storage Required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: NB Period: PM Peak
Year of Analysis: 2045 (Total) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Trestle Ridge Rd / E Estates
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 6,140 4,020 38 299 531 2 60
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 12.7% 5.3% 1.52% 2.2% 6.7
th
Use Detailed Method Type IV
Direction: SB Period: PM Peak
Year of Analysis: 2045 (total) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additonal Storage Not Requied
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
-
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Trestle Ridge Road Minor Rd: Pinnacle Way / Village
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 70 1,920 600 7 101 48 -
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 6.9% 0.0% 1.83% 0.0% 0.0
th
Use Detailed Method Type II
Direction: WB Period: AM Peak
Year of Analysis: 2025 (Background) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additonal Storage Not Requied
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
-
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Trestle Ridge Road Minor Rd: Pinnacle Way / Village
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 70 2,150 730 9 124 58 -
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 7.3% 0.0% 1.83% 0.1% 0.1
th
Use Detailed Method Type II
Direction: WB Period: AM Peak
Year of Analysis: 2035 (Background) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additonal Storage Not Requied
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
-
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Trestle Ridge Road Minor Rd: Pinnacle Way / Village
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 70 2,420 890 11 151 71 -
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 7.3% 0.0% 1.83% 0.1% 0.2
th
Use Detailed Method Type II
Direction: WB Period: AM Peak
Year of Analysis: 2045 (Background) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additonal Storage Not Requied
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
-
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Trestle Ridge Road Minor Rd: Pinnacle Way / Village
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 70 3,370 1,560 90 180 77 244
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 50.0% 0.0% 1.83% 0.6% 1.2
th
Use Detailed Method Type II
Direction: EB Period: PM Peak
Year of Analysis: 2025 (Total) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additonal Storage Not Requied
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
-
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Trestle Ridge Road Minor Rd: Pinnacle Way / Village
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 70 3,370 1,560 7 101 180 -
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 6.9% 0.0% 1.83% 0.1% 0.1
th
Use Detailed Method Type II
Direction: WB Period: AM Peak
Year of Analysis: 2025 (Total) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additonal Storage Not Requied
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
-
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Trestle Ridge Road Minor Rd: Pinnacle Way / Village
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 50 3,750 1,730 98 208 94 298
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 47.1% 0.0% 2.45% 0.9% 1.9
th
Use Detailed Method Type II
Direction: EB Period: PM Peak
Year of Analysis: 2035 Total Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additonal Storage Not Requied
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
-
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Trestle Ridge Road Minor Rd: Pinnacle Way / Village
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 70 3,750 1,730 9 122 88 -
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 7.4% 0.0% 1.83% 0.1% 0.1
th
Use Detailed Method Type II
Direction: WB Period: AM Peak
Year of Analysis: 2035 (Total) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additonal Storage Not Requied
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
-
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Trestle Ridge Road Minor Rd: Pinnacle Way / Village
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 50 4,020 1,730 98 232 115 1 363
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 42.2% 1.0% 2.45% 1.2% 2.7
th
Use Detailed Method RT Lane warranted base storage requirement - standard storage length + additional truck storage = total additional storage required Type III
Additonal Storage Not Requied
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: EB Period: PM Peak
Year of Analysis: 2045 (Total) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Trestle Ridge Road Minor Rd: Pinnacle Way / Village
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 70 4,020 1,728 11 151 101 -
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 7.3% 0.0% 1.83% 0.1% 0.2
th
Use Detailed Method Type II
Direction: WB Period: AM Peak
Year of Analysis: 2045 (Total) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additonal Storage Not Requied
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
-
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Bellerose Dr / Pinnacle Way
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 7,500 5,000 212 470 277 10 260
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 45.1% 4.7% 1.52% 7.1% 33.1
th
Use Detailed Method Type IV
Direction: NB Period: PM Peak
Year of Analysis: 2025 (Background) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additional Storage Required
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
25 m 20 m 0m 5m
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Bellerose Dr / Pinnacle Way
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 7,500 5,000 1 277 470 854
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 0.4% 0.0% 1.52% 0.1% 0.2
th
Use Detailed Method RT Lane warranted base storage requirement - standard storage length + additional truck storage = total additional storage required Type II
Additonal Storage Not Requied
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: SB Period: PM Peak
Year of Analysis: 2025 (Background) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Bellerose Dr / Pinnacle Way
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 8,400 5,220 212 527 315 5 328
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 40.2% 2.4% 1.52% 9.4% 49.5
th
Use Detailed Method Type IV
Direction: NB Period: PM Peak
Year of Analysis: 2025 (Total) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additional Storage Required
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
30 m 20 m 0m 10 m
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Range Rd 251 / Starkey Rd Minor Rd: Bellerose Dr / Pinnacle Way
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 8,400 5,220 1 315 527 963
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 0.3% 0.0% 1.52% 0.1% 0.2
th
Use Detailed Method RT Lane warranted base storage requirement - standard storage length + additional truck storage = total additional storage required Type II
Additonal Storage Not Requied
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: SB Period: PM Peak
Year of Analysis: 2025 (Total) Date of Analysis: 28-Mar-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Highway 37 Minor Rd: Range Rd 251 / Starkey Rd
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 7,850 2,870 8 387 474 904
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 2.1% 0.0% 1.52% 0.6% 2.3
th
Use Detailed Method RT Lane warranted base storage requirement - standard storage length + additional truck storage = total additional storage required Type III
Additonal Storage Not Requied
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: EB Period: PM Peak
Year of Analysis: 2025 (BG) Date of Analysis: 01-Apr-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Highway 37 Minor Rd: Range Rd 251 / Starkey Rd
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 7,030 2,870 85 477 387 2 42
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 17.8% 2.4% 1.52% 5.5% 26.2
th
Use Detailed Method Type IV
Direction: WB Period: PM Peak
Year of Analysis: 2025 (BG) Date of Analysis: 01-Apr-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additional Storage Required
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
25 m 20 m 0m 5m
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Highway 37 Minor Rd: Range Rd 251 / Starkey Rd
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 10,110 4,590 10 508 618 1,373
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 2.0% 0.0% 1.52% 1.4% 6.9
th
Use Detailed Method RT Lane warranted base storage requirement - standard storage length + additional truck storage = total additional storage required Type III
Additonal Storage Not Requied
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: EB Period: PM Peak
Year of Analysis: 2035 (BG) Date of Analysis: 01-Apr-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Highway 37 Minor Rd: Range Rd 251 / Starkey Rd
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 9,110 4,590 139 618 508 3 52
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 22.5% 2.2% 1.52% 14.3% 88.3
th
Use Detailed Method Type IV
Direction: WB Period: PM Peak
Year of Analysis: 2035 (BG) Date of Analysis: 01-Apr-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additional Storage Required
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
40 m 20 m 0m 20 m
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Highway 37 Minor Rd: Range Rd 251 / Starkey Rd
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 12,150 5,250 13 608 741 1,588
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 2.1% 0.0% 1.52% 2.7% 16.5
th
Use Detailed Method RT Lane warranted base storage requirement - standard storage length + additional truck storage = total additional storage required Type IV
Additonal Storage Not Requied
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: EB Period: PM Peak
Year of Analysis: 2045 (BG) Date of Analysis: 01-Apr-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Highway 37 Minor Rd: Range Rd 251 / Starkey Rd
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 10,940 5,250 158 741 608 3 63
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 21.3% 1.9% 1.52% 24.5% 181.2
th
Use Detailed Method Type IV
Direction: WB Period: PM Peak
Year of Analysis: 2045 (BG) Date of Analysis: 01-Apr-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additional Storage Required
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
55 m 20 m 0m 35 m
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Highway 37 Minor Rd: Range Rd 251 / Starkey Rd
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 7,920 3,140 8 392 489 943
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 2.0% 0.0% 1.52% 0.6% 2.5
th
Use Detailed Method RT Lane warranted base storage requirement - standard storage length + additional truck storage = total additional storage required Type III
Additonal Storage Not Requied
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: EB Period: PM Peak
Year of Analysis: 2025 (Total) Date of Analysis: 01-Apr-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Highway 37 Minor Rd: Range Rd 251 / Starkey Rd
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 7,220 3,140 97 489 392 2 42
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 19.8% 2.1% 1.52% 6.3% 31.0
th
Use Detailed Method Type IV
Direction: WB Period: PM Peak
Year of Analysis: 2025 (Total) Date of Analysis: 01-Apr-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additional Storage Required
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
25 m 20 m 0m 5m
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Highway 37 Minor Rd: Range Rd 251 / Starkey Rd
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 10,200 4,880 10 513 631 1,416
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 1.9% 0.0% 1.52% 1.4% 7.2
th
Use Detailed Method RT Lane warranted base storage requirement - standard storage length + additional truck storage = total additional storage required Type III
Additonal Storage Not Requied
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: EB Period: PM Peak
Year of Analysis: 2035 (Total) Date of Analysis: 01-Apr-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Highway 37 Minor Rd: Range Rd 251 / Starkey Rd
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 9,320 4,880 152 775 513 3 52
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 19.6% 2.0% 1.52% 20.6% 159.3
th
Use Detailed Method Type IV
Direction: WB Period: PM Peak
Year of Analysis: 2035 (Total) Date of Analysis: 01-Apr-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additional Storage Required
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
50 m 20 m 0m 30 m
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Highway 37 Minor Rd: Range Rd 251 / Starkey Rd
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 12,230 5,540 13 613 754 1,631
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 2.1% 0.0% 1.52% 2.8% 17.2
th
Use Detailed Method RT Lane warranted base storage requirement - standard storage length + additional truck storage = total additional storage required Type IV
Additonal Storage Not Requied
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
Direction: EB Period: PM Peak
Year of Analysis: 2045 (Total) Date of Analysis: 01-Apr-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
Main Rd: Highway 37 Minor Rd: Range Rd 251 / Starkey Rd
INPUT 85 percentile speed, km/h: Main Road A.A.D.T. Minor (intersecting) Road A.A.D.T Left turn volume (VLT), veh/h: Advancing volume (Vadv), veh/h: Opposing volume (Vopp), veh/h: Left turn truck volume, trucks/h: Right turn volume (VRT), veh/day:
Value 80 11,140 5,540 171 754 613 3 63
OUTPUT Percent left-turns in advancing volume: Percent trucks in left turn volume: Probability of conflict threshold: Calculated probability of conflicting arrival: Calculated conflicts per hour, veh/h:
Value 22.7% 1.8% 1.52% 26.8% 201.7
th
Use Detailed Method Type IV
Direction: WB Period: PM Peak
Year of Analysis: 2045 (Total) Date of Analysis: 01-Apr-2025 Type IV Warranted
Detailed Method Chart
Type III Warranted
1000
900
800
Opposing Volume (Vopp), veh/h
Intersection Analysis Rural Two-Lane Undivided Highways
700
600
500
400
300
Additional Storage Required
base storage requirement - standard storage length + additional truck storage = total additional storage required
CALIBRATION CONSTANTS Variable Average time for making left-turn, s: Critical headway (gap), s: Average time to clear, s:
Classification: Protected A
#
65 m 20 m 0m 45 m
200
100
Value 3.0 5.0 1.9
0 0
100
200
300
400
500
600
700
Advancing Volume (Vadv), veh/h
800
900
1000
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Appendix E Signal Warrant Calculation
51
AT - Traffic Signal Warrant Analysis Main Street (name)
Range Rd 251/Starkey Rd
Direction (EW or NS)
NS
Road Authority:
Side Street (name)
E Estates Way / Trestle Ridge Rd
Direction (EW or NS)
EW
City:
Quadrant / Int #
1
2045 Total
Comments
CHECK SHEET
for Warrant Calculation Results, please hit 'Page Down'
Analysis Date:
2025 Mar 28, Fri
Count Date:
2022 Oct 05, Wed
Other input NS EW
Speed (Km/h) 70 60
Truck % 4.0% 3.0%
Bus Rt (y/n) n n
# of Thru Lanes
UpStream Signal (m)
Excl RT
Th & RT
Th+RT+LT
Through
Th & LT
Excl LT
Range Rd 251/Starkey Rd NB 1 1 Range Rd 251/Starkey Rd SB 1 E Estates Way / Trestle Ridge Rd WB 1 E Estates Way / Trestle Ridge Rd EB 1 Are the E Estates Way / Trestle Ridge Rd WB right turns significantly impeded by through movements? (y/n) Are the E Estates Way / Trestle Ridge Rd EB right turns significantly impeded by through movements? (y/n)
1 1
1
Demographics Elem. School/Mobility Challenged Senior's Complex Pathway to School Metro Area Population Central Business District
n n
NB
(y/n) (y/n) (y/n) (#) (y/n)
WB
EB
Ped1
Ped2
Ped3
Ped4
NS
NS
EW
EW
Th
RT
LT
Th
RT
LT
Th
RT
LT
Th
RT
W Side
E Side
N Side
S Side
11
247
44
13
241
2
188
2
29
10
2
146
0
0
0
0
14
319
57
17
311
3
242
3
37
13
2
188
0
0
0
0
50
141
68
19
122
5
70
4
26
2
4
49
0
0
0
0
54
155
74
20
134
6
76
4
29
3
5
54
0
0
0
0
81
231
111
30
199
9
114
E Estates Way / Trestle Ridge Rd
SB
LT
43
4
7
80
0
0
0
0
6
102
290
139
38
250
11
143
8
54
5
9
101
0
0
0
0
Total (6-hour peak)
312
1,383
493
138
1,256
36
833
28
217
37
29
618
0
0
0
0
Average (6-hour peak)
52
230
82
23
209
6
139
5
36
6
5
103
0
0
0
0
NB
LT 139
EB
>
W = [Cbt(Xv-v) / K1 + (F (Xv-p) L) / K2] x Ci
Range Rd 251/Starkey Rd
WB
v Traffic Signal Warrant Spreadsheet - v3H © 2007 Transportation Association of Canada
52
LT
5
103
0
TH
RT
Ped4
6
114
RT
TH
451
EB
209
230
6
TH
RT
LT
238
82
0
Veh
Ped
RESET SHEET
365
NB
Range Rd 251/Starkey Rd
63
SB
23
78
NOT Warranted
273
LT
78
W=
110
TH
RT 36
5
Ped3 0
180
WB
Average 6-hour Peak Turning Movements
<-- North
n n n 20,495 n
Median (m) 0.0
Set Peak Hours
Traffic Input
press 'Set Peak Hours' Button to set the peak hour periods
(yyyy-mm-dd)
Date Entry Format:
Lane Configuration
Range Rd 251/Starkey Rd E Estates Way / Trestle Ridge Rd
AT Sturgeon County
SB
>
AT - Traffic Signal Warrant Analysis E Estates Way / Trestle Ridge Rd Pinnacle Way / Pinnacle Side Street (name) Village
Main Street (name)
3
Quadrant / Int #
Direction (EW or NS)
EW
Road Authority:
Direction (EW or NS)
NS
City:
2045 Total
Comments
CHECK SHEET
for Warrant Calculation Results, please hit 'Page Down'
Analysis Date:
2025 Mar 28, Fri
Count Date:
2022 Sep 29, Thu (yyyy-mm-dd)
E Estates Way / Trestle Ridge Rd WB 1 E Estates Way / Trestle Ridge Rd EB 1 Pinnacle Way / Pinnacle Village NB 1 Pinnacle Way / Pinnacle Village SB 1 Are the Pinnacle Way / Pinnacle Village NB right turns significantly impeded by through movements? (y/n) Are the Pinnacle Way / Pinnacle Village SB right turns significantly impeded by through movements? (y/n) Speed (Km/h) 70 40
Other input EW NS
Truck % 3.0% 0.0%
Bus Rt (y/n) n n
# of Thru Lanes
UpStream Signal (m)
Excl RT
Th & RT
Th+RT+LT
Through
Excl LT
Th & LT
Date Entry Format:
Lane Configuration
E Estates Way / Trestle Ridge Rd Pinnacle Way / Pinnacle Village
AT Sturgeon County
1 1
Demographics Elem. School/Mobility Challenged Senior's Complex Pathway to School Metro Area Population Central Business District
n n
NB
SB
WB
EB
Ped1
Ped2
Ped3
Ped4
NS
NS
EW
EW S Side
RT
LT
Th
RT
LT
Th
RT
LT
Th
RT
W Side
E Side
N Side
2
6
0
5
71
8
108
0
23
42
13
0
0
0
0
50
3
8
0
6
92
11
140
0
30
54
17
0
0
0
0
18
4
5
0
2
28
4
50
0
46
48
16
0
0
0
0
18
4
5
0
2
29
4
51
0
47
48
16
0
0
0
0
34
8
10
0
4
54
7
96
0
88
91
30
0
0
0
0
38
9
11
0
4
60
8
107
0
98
101
33
0
0
0
0
Total (6-hour peak)
197
31
45
0
22
333
42
552
0
332
383
124
0
0
0
0
Average (6-hour peak)
33
5
8
0
4
56
7
92
0
55
64
21
0
0
0
0
WB
60
LT
E Estates Way / Trestle Ridge Rd
SB
v Traffic Signal Warrant Spreadsheet - v3H © 2007 Transportation Association of Canada
TH
7
LT
5
8
0
TH
RT
Ped2
21
45
RT
92
71
NB
64
RT
33
TH
0
LT
140
0
Veh
Ped
RESET SHEET
99
WB
E Estates Way / Trestle Ridge Rd
32
EB
55
12
Not Warranted - Vs<75
180
LT
12
W=
0
TH
RT 56
4
Ped1 0
59
<
W = [Cbt(Xv-v) / K1 + (F (Xv-p) L) / K2] x Ci
NB
SB
Average 6-hour Peak Turning Movements
North -->
Th
39
Pinnacle Way / Pinnacle Village
LT
press 'Set Peak Hours' Button to set the peak hour periods
n n n 20,495 n
Median (m) 0.0
Set Peak Hours
Traffic Input
(y/n) (y/n) (y/n) (#) (y/n)
EB
>
AT - Traffic Signal Warrant Analysis Range Rd 251/Starkey Rd
Direction (EW or NS)
NS
Road Authority:
Side Street (name) Bellerose Dr / Pinnacle Way
Direction (EW or NS)
EW
City:
2
Quadrant / Int #
2045 Background
Comments
CHECK SHEET
for Warrant Calculation Results, please hit 'Page Down'
Range Rd 251/Starkey Rd NB 1 1 Range Rd 251/Starkey Rd SB 1 Bellerose Dr / Pinnacle Way WB 1 Bellerose Dr / Pinnacle Way EB 1 Are the Bellerose Dr / Pinnacle Way WB right turns significantly impeded by through movements? (y/n) Are the Bellerose Dr / Pinnacle Way EB right turns significantly impeded by through movements? (y/n) Other input NS EW
Speed (Km/h) 70 70
Truck % 4.0% 3.0%
Bus Rt (y/n) n n
Analysis Date:
2025 Mar 28, Fri
Count Date:
2022 Oct 04, Tue (yyyy-mm-dd)
# of Thru Lanes
UpStream Signal (m)
Excl RT
Th & RT
Th+RT+LT
Through
Excl LT
Lane Configuration
Range Rd 251/Starkey Rd Bellerose Dr / Pinnacle Way
AT Sturgeon County
Date Entry Format:
Th & LT
Main Street (name)
1 1
1
Demographics Elem. School/Mobility Challenged Senior's Complex Pathway to School Metro Area Population Central Business District
1 n n
NB
SB
WB
EB
Ped1
Ped2
Ped3
Ped4
NS
NS
EW
EW
Th
RT
LT
Th
RT
LT
Th
RT
LT
Th
RT
W Side
E Side
N Side
S Side
220
17
1
392
130
30
13
3
83
15
185
0
0
0
0
166
285
22
1
508
168
39
17
4
108
20
240
0
0
0
0
148
186
12
0
143
70
11
9
2
74
5
85
0
0
0
0
150
188
12
0
144
70
11
10
2
75
5
86
0
0
0
0
283
355
23
1
272
133
21
18
4
142
10
161
0
0
0
0
315
396
26
1
303
148
23
20
5
158
11
180
0
0
0
0
Total (6-hour peak)
1,190
1,631
113
4
1,762
719
135
87
21
640
67
937
0
0
0
0
Average (6-hour peak)
198
272
19
1
294
120
22
14
3
107
11
156
0
0
0
0
TH
LT
14
22
>
Range Rd 251/Starkey Rd
WB
v Traffic Signal Warrant Spreadsheet - v3H © 2007 Transportation Association of Canada
198
LT
11
156
0
TH
RT
Ped4
120
274
RT
TH
472
EB
294
272
107
TH
RT
LT
414
19
0
Veh
Ped
RESET SHEET
489
NB
Range Rd 251/Starkey Rd
333
SB
1
144
Warranted
382
LT
144
W=
31
RT
40 NB
3
Ped3 0
<-- North
W = [Cbt(Xv-v) / K1 + (F (Xv-p) L) / K2] x Ci
EB
WB
Average 6-hour Peak Turning Movements
Bellerose Dr / Pinnacle Way
LT 128 press 'Set Peak Hours' Button to set the peak hour periods
n n n 20,495 n
Median (m) 0.0
Set Peak Hours
Traffic Input
(y/n) (y/n) (y/n) (#) (y/n)
SB
>
AT - Traffic Signal Warrant Analysis Range Rd 251/Starkey Rd
Direction (EW or NS)
NS
Road Authority:
Side Street (name) Bellerose Dr / Pinnacle Way
Direction (EW or NS)
EW
City:
2
Quadrant / Int #
2045 Total
Comments
CHECK SHEET
for Warrant Calculation Results, please hit 'Page Down'
Range Rd 251/Starkey Rd NB 1 1 Range Rd 251/Starkey Rd SB 1 Bellerose Dr / Pinnacle Way WB 1 Bellerose Dr / Pinnacle Way EB 1 Are the Bellerose Dr / Pinnacle Way WB right turns significantly impeded by through movements? (y/n) Are the Bellerose Dr / Pinnacle Way EB right turns significantly impeded by through movements? (y/n) Other input NS EW
Speed (Km/h) 70 70
Truck % 4.0% 3.0%
Bus Rt (y/n) n n
Analysis Date:
2025 Mar 28, Fri
Count Date:
2022 Oct 04, Tue (yyyy-mm-dd)
# of Thru Lanes
UpStream Signal (m)
Excl RT
Th & RT
Th+RT+LT
Through
Excl LT
Lane Configuration
Range Rd 251/Starkey Rd Bellerose Dr / Pinnacle Way
AT Sturgeon County
Date Entry Format:
Th & LT
Main Street (name)
1 1
1
Demographics Elem. School/Mobility Challenged Senior's Complex Pathway to School Metro Area Population Central Business District
1 n n
NB
SB
WB
EB
Ped1
Ped2
Ped3
Ped4
NS
NS
EW
EW
Th
RT
LT
Th
RT
LT
Th
RT
LT
Th
RT
W Side
E Side
N Side
S Side
232
19
1
431
141
35
13
3
86
15
185
0
0
0
0
166
301
25
1
558
182
45
17
4
112
20
240
0
0
0
0
148
211
16
0
158
74
13
9
2
81
5
85
0
0
0
0
150
214
17
0
160
75
13
10
2
82
5
86
0
0
0
0
283
403
31
1
301
141
24
18
4
155
10
161
0
0
0
0
315
449
35
1
336
157
27
20
5
173
11
180
0
0
0
0
Total (6-hour peak)
1,190
1,810
143
4
1,944
769
157
87
21
690
67
937
0
0
0
0
Average (6-hour peak)
198
302
24
1
324
128
26
14
3
115
11
156
0
0
0
0
TH
LT
14
26
>
Range Rd 251/Starkey Rd
WB
v Traffic Signal Warrant Spreadsheet - v3H © 2007 Transportation Association of Canada
198
LT
11
156
0
TH
RT
Ped4
128
282
RT
TH
506
EB
324
302
115
TH
RT
LT
453
24
0
Veh
Ped
RESET SHEET
524
NB
Range Rd 251/Starkey Rd
341
SB
1
164
Warranted
420
LT
164
W=
36
RT
44 NB
3
Ped3 0
<-- North
W = [Cbt(Xv-v) / K1 + (F (Xv-p) L) / K2] x Ci
EB
WB
Average 6-hour Peak Turning Movements
Bellerose Dr / Pinnacle Way
LT 128 press 'Set Peak Hours' Button to set the peak hour periods
n n n 20,495 n
Median (m) 0.0
Set Peak Hours
Traffic Input
(y/n) (y/n) (y/n) (#) (y/n)
SB
>
AT - Traffic Signal Warrant Analysis AT
Main Street (name)
Hwy 37
Direction (EW or NS)
EW
Road Authority:
Side Street (name)
Range Rd 251/Starkey Rd
Direction (EW or NS)
NS
City:
Sturgeon County
Quadrant / Int #
4
Analysis Date:
2025 Apr 02, Wed
Count Date:
2022 Oct 04, Tue
2045 Background
Comments
CHECK SHEET
for Warrant Calculation Results, please hit 'Page Down'
Hwy 37 WB 1 1 Hwy 37 EB 1 Range Rd 251/Starkey Rd NB 1 Range Rd 251/Starkey Rd SB 1 Are the Range Rd 251/Starkey Rd NB right turns significantly impeded by through movements? (y/n) Are the Range Rd 251/Starkey Rd SB right turns significantly impeded by through movements? (y/n) Speed (Km/h) 70 70
Other input EW NS
Truck % 2.0% 2.0%
Bus Rt (y/n) n n
# of Thru Lanes
UpStream Signal (m)
Excl RT
Th & RT
Th+RT+LT
Through
Th & LT
Excl LT
Lane Configuration
Hwy 37 Range Rd 251/Starkey Rd
1 1
1 1 1 n n
Demographics Elem. School/Mobility Challenged Senior's Complex Pathway to School Metro Area Population Central Business District
NB
(y/n) (y/n) (y/n) (#) (y/n)
SB
WB
EB
Ped1
Ped2
Ped3
Ped4
NS
NS
EW
EW S Side
LT
Th
RT
LT
Th
RT
LT
Th
RT
LT
Th
RT
W Side
E Side
N Side
191
10
97
6
27
19
29
306
2
4
445
129
0
0
0
0
247
13
126
8
35
25
38
396
3
5
576
167
0
0
0
0
77
10
34
3
3
1
74
270
4
6
216
63
0
0
0
0
78
10
35
3
3
1
75
273
4
6
219
64
0
0
0
0
146
20
65
5
5
3
142
515
8
12
413
121
0
0
0
0
73
6
6
3
158
574
9
13
460
135
0
0
0
0
85
430
31
79
52
516
2,334
31
46
2,328
679
0
0
0
0
Average (6-hour peak)
150
14
72
5
13
9
86
389
5
8
388
113
0
0
0
0
27
LT
Hwy 37
SB
v Traffic Signal Warrant Spreadsheet - v3H © 2007 Transportation Association of Canada
86
LT
14
72
0
TH
RT
Ped2
113
236
RT
TH
465
NB
388
389
150
TH
RT
LT
509
5
0
Veh
Ped
RESET SHEET
480
WB
Hwy 37
212
EB
8
142
Warranted
548
LT
142
W=
5
TH 13
27 RT 9
Ped1 0 WB
W = [Cbt(Xv-v) / K1 + (F (Xv-p) L) / K2] x Ci
NB
SB
Average 6-hour Peak Turning Movements
North -->
22
901
Range Rd 251/Starkey Rd
163 Total (6-hour peak)
<
n n n 20,495 n
Median (m) 0.0
Set Peak Hours
Traffic Input
press 'Set Peak Hours' Button to set the peak hour periods
(yyyy-mm-dd)
Date Entry Format:
EB
>
AT - Traffic Signal Warrant Analysis AT
Main Street (name)
Hwy 37
Direction (EW or NS)
EW
Road Authority:
Side Street (name)
Range Rd 251/Starkey Rd
Direction (EW or NS)
NS
City:
Sturgeon County
Quadrant / Int #
4
Analysis Date:
2025 Apr 02, Wed
Count Date:
2022 Oct 04, Tue
2045 Total
Comments
CHECK SHEET
for Warrant Calculation Results, please hit 'Page Down'
Hwy 37 WB 1 1 Hwy 37 EB 1 Range Rd 251/Starkey Rd NB 1 Range Rd 251/Starkey Rd SB 1 Are the Range Rd 251/Starkey Rd NB right turns significantly impeded by through movements? (y/n) Are the Range Rd 251/Starkey Rd SB right turns significantly impeded by through movements? (y/n) Speed (Km/h) 70 70
Other input EW NS
Truck % 2.0% 2.0%
Bus Rt (y/n) n n
# of Thru Lanes
UpStream Signal (m)
Excl RT
Th & RT
Th+RT+LT
Through
Th & LT
Excl LT
Lane Configuration
Hwy 37 Range Rd 251/Starkey Rd
1 1
1 1 1 n n
Demographics Elem. School/Mobility Challenged Senior's Complex Pathway to School Metro Area Population Central Business District
NB
(y/n) (y/n) (y/n) (#) (y/n)
SB
WB
EB
Ped1
Ped2
Ped3
Ped4
NS
NS
EW
EW
LT
Th
RT
LT
Th
RT
LT
Th
RT
LT
Th
RT
W Side
E Side
N Side
S Side
195
10
107
6
27
19
32
306
2
4
445
130
0
0
0
0
252
13
138
8
35
25
42
396
3
5
576
169
0
0
0
0
78
10
38
3
3
1
80
270
4
6
216
66
0
0
0
0
79
10
39
3
3
1
81
273
4
6
219
67
0
0
0
0
149
20
73
5
5
3
153
515
8
12
413
126
0
0
0
0
81
6
6
3
171
574
9
13
460
140
0
0
0
0
85
475
31
79
52
560
2,334
31
46
2,328
698
0
0
0
0
Average (6-hour peak)
153
14
79
5
13
9
93
389
5
8
388
116
0
0
0
0
27
LT
Hwy 37
SB
v Traffic Signal Warrant Spreadsheet - v3H © 2007 Transportation Association of Canada
93
LT
14
79
0
TH
RT
Ped2
116
246
RT
TH
472
NB
388
389
153
TH
RT
LT
512
5
0
Veh
Ped
RESET SHEET
487
WB
Hwy 37
223
EB
8
148
Warranted
551
LT
148
W=
5
TH 13
27 RT 9
Ped1 0 WB
W = [Cbt(Xv-v) / K1 + (F (Xv-p) L) / K2] x Ci
NB
SB
Average 6-hour Peak Turning Movements
North -->
22
918
Range Rd 251/Starkey Rd
166 Total (6-hour peak)
<
n n n 20,495 n
Median (m) 0.0
Set Peak Hours
Traffic Input
press 'Set Peak Hours' Button to set the peak hour periods
(yyyy-mm-dd)
Date Entry Format:
EB
>
ARCADIS GROUP DRAFT REPORT PINNACLE VILLAGE OUTLINE PLAN Prepared for Pinnacle Investments Inc.
Appendix F Illumination Warrant
52
Main Road Name: Trestle Ridge Road (Township Rd 544A) Minor Road Name: Pinnacle Way City of Edmonton, AB Warrant Undertaken by Mladen Pecanac Company name: Arcadis Date: 2024-06-06
Item No.
Rating Factor 'R'
Classification Factor 0
1
2
3
Weight Subcategory (If Applicable)
Weight 'W'
Enter 'R' Here
Score 'R' x 'W'
Raised and Operating Speed Less than 70 km/h on at Least One Channelized Approach or
15
0
0
4
Geometric Factors (G)
1
Channelization
None
Right and/or Left Turn Lanes on Minor Approach Only
Right Turn Lane(s) Only on Major Leg(s)
Left Turn Lane(s) on Major Leg(s)
Left and Right Turn Lanes on All Legs
Raised and Operating Speed Less than 70 km/h or More on at Least One Channelized Approach or Pained Only
2
Approach Sight Distance on the Most Constrained Approach (Relative to Recommended Minimum Intersection Sight Distance)
100 % or More
75% to 99%
50% to 74%
25% to 49%
<25%
Tangent
>1800 m
1150 to 1800 m
750 to 1150 m
< 750 m
Tangent
>1400 m
950 to 1400 m
600 to 950 m
<600 m
Tangent
>950 m
550 to 950 m
340 to 550 m
<340 m
Tangent
>575 m
320 to 575 m
190 to 320 m
<190 m
80 or 100 Degree Angle
-
70 or 110 Degree Angle
20
0
5
0
10
0
0
5
0
0
<70 or> 110 Degree or Offest Intersection
5
0
0
>7.0% or Exceeds Maximum Gradient for Type and Speed of Road
3
0
0
3
2
6
Subtotal Geometric Factors
6
Only One 'R' Value is To Be Entered for These Three Rows!
Horizontal Curvature (Radius) at or Immediately Before Intersection on Any Leg for Posted Speed Limit of: 3
110 km/hr: 90 or 100 km/hr: 70 or 80 km/hr: 60 km/hr:
4
Angle of lntersection or Offset Intersection
90 Degree Angle
5
Downhill Approach Grades at or Immediately Before Intersection on Any Leg
<3.0%
6
Number of legs
-
3.1 to 3.9% and Meets 4.0 to 4.9% and Meets 5.0 to 7.0% and Design Guidelines for Design Guidelines for Meets Design Type and Speed of Type and Speed of Guidelines for Type Road Road and Speed of Road 3
4
5
6 or More
G
Operational Factors (O) If the Intersection is Signalized, Illumination is Warranted If the Intersection is NOT Signalized, Points Should Be Calculated on the Basis of Either the AADT Factor or the Signalization Warrant Factor Either AADT (2-way) (See Note 1):
On Major Road and
<1000
1000 to 2000
2000 to 3000
3000 to 5000
>5000
10
On Minor Road
<500
500 to 1000
1000 to 1500
1500 to 2000
>2000
20
0
Intersection Not Signalized and Volume-Based Signal Warrant is Less than 20% Satisfied
Intersection Not Signalized and Volume-Based Warrant is 20% to 40% Satisfied
Intersection Not Signalized and VolumeBased Warrant is 40% to 60% Satisfied
Intersection Not Signalized and Volume-Based Warrant is 60% to 80% Satisfied
Intersection Not Signalized and Volume-Based Warrant is over 80% Satisfied
30
0
7
or
Signalization Warrant (See Note 1)
3
8
Regular Nighttime Hourly Pedestrian Volume (See Note 2)
No Pedestrian
Up to 10
10 to 30
30 to 50
Over 50
10
1
10
9
Intersecting Roadway Classifications
No Primary Road Involved
Primary/Rural Major, Primary/Rural Minor, or Primary/Designated Community Access
Primary/Secondary
Primary/Primary
Intersection Includes Divided Highway
5
1
5
10
Operating Speed or Posted Speed limit on Major Road (See Note 3)
50 km/h or Less
60 km/h
70 km/h
80 km/h
90 km/h or Over
5
1
5
11
Operating Speed or Posted Speed limit on Minor Road (See Note 3)
50 km/h or Less
60 km/h
70 km/h
80 km/h
91 km/h or Over
5
0
Subtotal Operational Factors
12
Environmental Factors (E) Lighted Development Within 150 m Radius of Intersection
-
In One Quadrant
In Two Quadrant
In Three Quadrants
In Four Quadrants
5
5
2
Subtotal Environmental Factors
Only One 'R' Value is To Be Entered for These Two Rows!
30
0 50
O
10 10
E
Collision Factors (A)
1 or 2 Collisions
13
Average Annual Nighttime Collision Frequency (See Note 4) or Rate over Last Three Year (Only Collisions Potentially Attributable to Inadequate Lighting)
0 Collisions per Year
1 Collisions per Year
-
15
1
15 Only One 'R' Value is To Be Entered for These Two Rows
3 or More Collisions Per Year OR At Least 1.5 Collisions Per Million Entering Vehicles Per Year and an Average Ratio of All Nightto-Day Collisions of at Least 1.5 3 or More Collisions Per Year or Rate ≥ 1.5 Collisions/MEV
30
0
Subtotal Collisions Factors
15
A
81
D
G + O + E + A = Total Warranting Points Warranting Condition. Difference ± Notes: 1. If the intersection is not signalized, the user could choose EITHER the AADT factor OR the signalization factor. The points from either factor, but not both factors, may be used for the warrant point calculations. 2. The number of certain types of The number of child pedestrians (ages 12 und under) should be multiplied by two, and the number of senior pedestrians (age 65 and over) should be multiplied by 1.5. 3. 85th percentile nighttime speed should be used, if available. Otherwise, the posted speed may be used 4. Reported collisions, rounded to the nearest whole number