Skip to main content

November 2024

Page 1

STRUCTURE NOVEMBER 2024

NCSEA | CASE | SEI

ATLAS TUBE

KEEPS AMERICA

steel:

INVENTION AT THE ARTISE

Flush-frame Vibration performance equal to wide-flange beams at up to a 35% weight savings Smart engineering reduces material costs and improves performance. New Millennium flush-frame connections feature a more efficient design that eliminates beam torsion concerns. Our published set of standard flush-frame connections simplify design and specification. Now, structural engineers can quickly and accurately specify flush-frame connections, streamlining fabrication and erection. Together, let’s build it better.

INSIDE: Invention at The Artise Flush-frame connection designed for efficiency

Download the new Flush-Frame Design Guide

Standardized connections reduce design time

Joist reaction point occurs at beam centerline

newmill.com

32

Structural Thermal Bridging 17 Design for Dissassembly: Stadium 974 36 PG&E's New Headquarters 46

When engineers were designing a steel bridge over a busy railway, Atlas Tube’s Jumbo HSS and Shuriken® bolted connection system were the right choices to support a highly ambitious design.


Turn static files into dynamic content formats.

Create a flipbook
November 2024 by structuremag - Issuu