Skip to main content

April STRUCTURE 2025

Page 1

STRUCTURE APRIL 2025

NCSEA | CASE | SEI

ATLAS TUBE

KEEPS AMERICA

CONCRETE Homestead High School Retrofit Engineering on Display CONCRETE

INSIDE: Champlain Towers Collapse

When engineers were designing a steel bridge over a busy railway, Atlas Tube’s Jumbo HSS and Shuriken® bolted connection system were the right choices to support a highly ambitious design.

32

Specifications and Embodied Carbon 12 Structural Stability Provisions in ASCE 7, IBC 16 Retaining Wall Failure: Lessons Learned 28


Turn static files into dynamic content formats.

Create a flipbook
April STRUCTURE 2025 by structuremag - Issuu