Skip to main content

Final Plans

Page 1

CR-1847

CONSTRUCTION PLANS

FEDERAL PROJECT NO.

N/A E-W GATEWAY TIP NO.

N/A

FOR THE

MSD PERMIT NO.

TBD MSD BASE MAP(S)

10F/G,11F/G

CASTLE POINT IMPROVEMENTS

PROJECT LIMITS

survey

engineering project or

any part of the

61 - 64

or intended to be used for

TRAFFIC CONTROL PLANS

or instruments relating to

55 - 60

Reports or other documents

SPECIAL DETAILS

DRIVE

Specifications, Estimates,

5 - 54

other Drawings,

ROADWAY PLANS

responsibility for all

3 - 4

I hereby disclaim any

ITEMIZED QUANTITIES

limited tothis sheet, and

2 authorized by myseal are

SUMMARY OF QUANTITIES

documents intendedto be

COUNTESS

1

I hereby specify thatthe

BARONESS DRIVE

TITLE AND INDEX

DATE

INDEX OF SHEETS

DISCLAIMER OF RESPONSIBILITY

GENERAL LEGEND

DESCRIPTION

ST. LOUIS COUNTY PROJECT NO. CR-1847

DUCHESS

PRINCE DRIVE

EDGEFIELD DRIVE

PRINCESS

CASTLE DRIVE

ROYAL DRIVE

DUKE DRIVE

EARL DRIVE

LORD DRIVE

COUNT DRIVE

DRIVE

BARON DRIVE

MONARCH DRIVE

VISCOUNT DRIVE

DRIVE

DATE

EMPRESS DRIVE

LOCATOR MAP

THE EXISTING SEWER LENGTHS, SIZES, FLOWLINES, DEPTHS OF STRUCTURES AND SEWERS AND LOCATIONS WITH RESPECT TO EXISTING OR PROPOSED EASEMENTS HAVE BEEN MEASURED. THE RESULTS OF THOSE MEASUREMENTS ARE SHOWN ON THIS SET OF FINAL MEASUREMENT PLANS. SINCE THE WYE LOCATIONS HAVE BEEN PLOTTED FROM INFORMATION PROVIDED BY THE SEWER CONTRACTOR OR OTHER SOURCES, I DISCLAIM ANY RESPONSIBILITY FOR THAT SPECIFIC INFORMATION.

SIGNED P.E. DATE IT SHOULD BE UNDERSTOOD THAT THIS SIGNATURE AND SEAL APPLY ONLY TO THE AFOREMENTIONED FINAL MEASUREMENTS

STANDARD SPECIFICATIONS

TRANSPORTATION PUBLIC WORKS

UTILITY NOTE

ST. LOUIS COUNTY, MISSOURI

UNLESS OTHERWISE NOTED, ALL WORK ON THIS

UNDERGROUND FACILITIES, STRUCTURES AND

DEPARTMENT OF TRANSPORTATION & PUBLIC WORKS

PROJECT SHALL BE COVERED BY THE ST. LOUIS COUNTY STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION, AND BY APPLICABLE ST. LOUIS COUNTY STANDARD DRAWINGS.

UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND RECORDS: AND, THEREFORE THEIR LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. IT IS POSSIBLE THERE MAY BE OTHERS, THE

DIVISION OF PROJECT DEVELOPMENT 1050 N. LINDBERGH BLVD ST. LOUIS, MISSOURI 63132

EXISTENCE OF WHICH IS PRESENTLY NOT KNOWN OR SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR EXISTENCE AND EXACT LOCATION AND TO AVOID THERETO.

IMPROVEMENTS

CASTLE POINT

ALL PUBLIC SEWERS ARE LOCATED WITHIN DISIGNATED EXISTING OR PROPOSED EASEMENTS EXCEPT AS FOLLOWS:

M.S.D. P-NUMBER: APPROVED:

DESIGNED BY:

E.A.M.

M.S.D. BASE MAP: Stephanie Leon Streeter, P.E. Director

REVIEW ENGINEER:

DRAWN BY:

E.A.M. CHECKED BY:

APPROVAL DATE:

DATE: SHEET SEQUENCE:

1 OF 64

LICENSE NO. EN-024463

PROFESSIONAL ENGINEER

EDWARD A. (TED) MEDLER

MSD CERTIFICATION

Stephanie Leon Streeter, P.E. Director

LENGTH OF PROJECT

TITLE AND INDEX SHEET

DESIGN CRITERIA

TRANSPORTATION

PROJECT SPECIFIC INFORMATION

PUBLIC WORKS

AD RO RS BE AM CH

Missouri Certificate of Authority: 001578

13523 Barrett Parkway Dr., Suite 250 St. Louis, MO 63021 Phone 314-394-3100

8/14/2023

IF A SEAL IS PRESENT ON THIS SHEET IT HAS BEEN ELECTRONICALLY SEALED AND DATED.

COUNTY PROJECT NO.


Turn static files into dynamic content formats.

Create a flipbook
Final Plans by STLCOGOV - Issuu