Skip to main content

Sample Proposal - Wilson Butler Architects

Page 1

Request for Proposal University of Rochester - New Sloan Performing Arts Center Architectural Programming, Design & CA Services May 11, 2018


TABLE OF CONTENTS 1.

Cover Letter

2.

Project Approach

3.

Firm Overview

4.

Project Team

5.

Project Experience

6.

Fee Proposal


SECTION NO.

ONE

Cover Letter


LET US ENTERTAIN YOU. Through spaces where they can be Amazed. Inspired. Even Enlightened. We partner with our clients to shape uncommon experiences unique to each Community, Patron and Campus.


May 11, 2018 Charles Gantt Director of Planning, Planning and Project Management University of Rochester 271 East River Road Rochester, NY 14627 Re: University of Rochester - New Sloan Performing Arts Center Dear Members of Selection Committee, Wilson Butler Architects (WBA) is pleased to submit for your consideration the following qualifications and fee proposal for the new Sloan Performing Arts Center at the University of Rochester. When we received the thorough but brief RFP, we were pleasantly surprised. In contrast, we are often the recipients of lengthy requests that seem to be more about filling out forms than getting to the true crux of the matter – determining the best, most qualified firm and team to guide you through your challenging project. We are a firm unique in our focused dedication to architecture for the arts. Our projects span a wide range within this specialty area, including new and renovated educational arts facilities dedicated to students of the performing arts, civic performing arts centers, the restoration and expansion of historic theaters and the design of state-of-the-art entertainment venues. With this singular focus, WBA can bring to our clients an unsurpassed wealth of knowledge regarding this complex building type, while successfully leading multiple constituent teams and projects from programming through design and construction/occupancy. We understand the challenges that are at the core of this building type, the concerns of multiple stakeholders often involved, and how to design for the future of the performing arts at the University of Rochester campus. To achieve this goal, the process and subsequent solutions will require extraordinary attention and innovative thinking to clarify and translate the visions of the University of Rochester. It demands a team completely familiar with bringing complex projects to fruition under the constraints of time and budget. Uncovering elegant, functional solutions is what we do. We are enthusiastic at the prospect of working with the University of Rochester and are prepared to begin immediately on your exciting project.

Sincerely excited by this opportunity,

Scott C. Wilson, AIA Director, Wilson Butler Architects scw@wilsonbutler.com

70 Federal St., 5th Floor Boston, MA 02110 P: 617.720.7127 wilsonbutler.com


SECTION NO.

TWO

Project Approach


Jay and Susie Gogue Performing Arts Center at Auburn University


OUR APPROACH “If you build a performing arts center, a lot of people think you build this great spectacular sculptural building and then you put a theater in it. We do it just the opposite. We actually start with the stage, then we design the audience chamber, and then you want to create the intimacy. You’re trying to create the most intimate experience between the performer and the audience. And you want them to feel they’re as close as they can be with no distractions or interruptions.” SCOTT BUTLER, DIRECTOR | WILSON BUTLER ARCHITECTS A TRULY COLLABORATIVE PROCESS Architects and designers frequently throw around certain words - at the top of the list: collaboration. We all have a unique process for involving stakeholders and clients, but often it results in working in a vacuum and coming to a user meeting with ideas of what the designer wants to do and what the designer’s statement is. However, we know this is not about us, it is about you. We think our process stands out as one that indeed takes into account all voices and tools at our disposal. Our process ensures you understand the process and why every design decision and direction was made so that you are fully integrated into the process. First, we facilitate the client meeting. When we say facilitate we mean we let every voice be heard. We apply our knowledge and experience and work together to come to a consensus with unique design solutions. Secondly, we are expert distillers - we flesh out what is most important and develop the driving goals and systems to guide the project. Lastly, we communicate, organize and manage the systems, the relationships, the progress, the process and the people in a consistent, structured yet flexible manner.

OVERALL DESIGN COLLABORATION APPROACH Our design approach allows us to share a common language with both our clients and stakeholders throughout the life of a project. This means we ask a lot of questions. We are committed to a holistic approach and an ongoing dialogue that invites everyone to contribute their perspectives, concerns, and needs. Why? Because we believe a thorough understanding of a project’s optimal usage best guides the many design decisions that follow. We want you to feel immersed in the new spaces. We model, model again, model again and again. It can be hard to interpret a 2-D drawing or rendering, and models have proven to be the best communication tools we have - and they are trusted. We want you to be able to feel what it will be like as you experience the new arts center. It is easy to do so with models; you just have to miniaturize yourself! In the pages of this section, we hope you get some insights into how we think, what issues are important to us, and hopefully are inspired and ready to roll your sleeves up with us. We hope this window into our heads will help convince you that Wilson Butler Architects is the right choice for your project.

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

2


WHAT WE BRING - EXPERIENCE Experience comes in all shapes and sizes: the good, the bad, the ugly and the beautiful. What we bring to the University of Rochester’s, Sloan Performing Arts Center Project is a team that has had all these types of experiences as well as the fact we pride ourselves in learning from them. As a firm that focuses solely on architecture for arts and entertainment, our team has been honored to collaborate with the best of the world’s special consultants in theater, acoustics, landscape and engineering. We know these national and local experts, having successfully delivered multiple projects with them. We know they have an unsurpassed depth of experience and that they bring their lessons learned to each new project. Our relationship with Alec Stoll and Stages Consultants dates back to some of WBA’s earliest and most memorable projects. Stages Consultants is one of the world’s leading theatre planning consultants. We will work hand in hand in program validation and pre/schematic design to refine and confirm program assumptions and begin to adapt a design that is reflective of the mission and vision of the project. Both firms share a common desire - to create memorable experiences. Stages Consultants specialists for stage machinery and rigging will work, consult and coordinate directly with the structural design and engineering team and Stages Consultants’ theater and stage lighting experts will do the same with their counterparts from the electrical systems design and engineering team. Wilson Butler Architects and Threshold Acoustics have been waiting for an ideal opportunity to collaborate and have found it with this project at the University of Rochester. Scott Pfeiffer will provide overall acoustical consultation for the project, working closely with the full design team to ensure great sound design. Scott and his team of specialists will work in collaboration with the structural and mechanical engineering design teams to develop the ideal acoustical noise solution as well as directly with the electrical systems design and engineering team to deliver the optimal Audio/Video/Projection systems.

“They helped us imagine what we could not imagine on our own.” Kelley Shanley, President & CEO | BROWARD CENTER FOR THE PERFORMING ARTS

Our MEP Engineers, M/E Engineering, are local, based in Rochester, and have recently completed the Choral Practice Room at SUNY, Oswego with Wilson Butler Architects. Having worked throughout Central New York for years, they have gained the essential knowledge of the ins and outs of local MEP and fire protection requirements. M/E Engineering will lead all the MEP engineering disciplines. They

Towson University, Center for the Arts, Towson, MD

know the importance of involving specialized experts for Performing Arts Centers, having worked on the University of Rochester, Eastman School of Music. Therefore they are committed to working with the national experts from Stages Consultants and Threshold Acoustics, bringing their engineering expertise and local understanding to the collaboration. Silman Associates is our Structural Engineer - a New York based firm that is focused on providing clients the highest quality structural engineering services possible. After participating in more than 21,000 projects, Silman has earned recognition as one of the leading firms in the country for its innovative spirit in the design of new architectural works and the sensitive modification of existing structures. Erdman Anthony, our Civil Engineer, is an industry leading, multidisciplinary engineering firm dedicated to developing superior infrastructure solutions. In addition to receiving many industry awards, Erdman Anthony has been listed in Engineering News Record as one of the country’s Top 500 engineering firms for 30 consecutive years. For Landscape Architecture we have asked our friends at Environmental Research & Design to join us in this pursuit. A local, awardwinning, woman-owned professional corporation that has been providing public and private clients with multi-disciplinary and integrated site planning, design, engineering, and environmental consulting services for nearly 40 years. In support of Cost Estimating we bring on Vermeulens. Vermeulens combines decades of experience and are professionally recognized for their expertise through national speaking engagements and accredited seminars. Their estimating staff includes professional quantity surveyors, engineers (mechanical, electrical, structural, and civil), interior designers and urban planners. Many of their team members are LEED AP and have worked on hundreds of projects that were either LEED Certified or Net Zero Energy. We will also bring the national team of Jensen Hughes for code consultant. They are recognized amongst regulators, legislators and inspectors for their expertise. As members of the National Fire Protection Association (NFPA), the International Code Council (I-Codes) and other regulatory organizations, Jensen Hughes engineers exceed expectations in the development of code and fire safety requirements. In our opinion….nobody does it better. Kalin Associates, our Specifications Writer out of Boston has provided construction specifications for more than 3,000 projects with a total construction value of over $40 billion.

Broward Center for the Performing Arts, Fort Lauderdale, FL

3

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


PROJECT MANAGEMENT THE RIGHT LEADERSHIP

Our office is a collaborative design studio with an integrated design and project management process. We engage all stakeholders and consultants early in the process through planning workshops and design charrettes. This high-level engagement and collaboration is important for all projects, as project costs are most easily controlled with early identification of process and objectives. From this engagement, we work together to develop an overarching design and management framework, including clear deliverables for each phase. This framework will be both technical - to address the University of Rochester’s current budget, schedule and objectives - as well as creative – to ensure we provide a design that is engaging and exciting. Our project teams grow through the life of a project, with the early design team continuing on with working drawings and ultimately, a member of the documentation team guiding the project through construction. We do not separate our office into design and production teams, as continuity is essential to the successful delivery of our projects and ultimately, our client’s satisfaction. We are committed to achieving the best outcome for your project and bring extensive experience with university administrators and facilities managers. We live and breathe the arts and care deeply about the impact of our work. Because of our commitment to excellence, we have an enduring and respectful relationship with our civic leaders. We have brought a seasoned project manager who has worked on many award-winning projects to lead our team. Paul Vaivoda has led complex, multidisciplinary teams to deliver a variety of projects across markets. His expertise in successful execution will enable our local team to exceed the University Rochester’s expectations. He is supported by a highly collaborative and engaged team ready to support and supplement this level of service.

WHAT PAUL BRINGS TO THE NEW SLOAN PERFORMING ARTS CENTER: As the firm’s Higher Education Practice Leader, Paul oversees the HEP studio and directs several of the office’s most complex performance space venues. With over 30 years of experience, Paul has worked across a number of disciplines, from interiors to architecture and urban design. His projects have received recognition for their innovative designs and achievements in environmental performance. Through his leadership in higher education projects, he has gained a trusted reputation with administrative officials and senior managers. Paul thrives on the complexity of managing project teams and enjoys working with clients and consultants as part of a dynamic multi-disciplinary team. Paul has been heavily involved in our firm’s most recent performance venue, the Jay and Susie Gogue Performing Arts Center at Auburn University. Paul is currently working with Berklee College of Music on a site study review. Client service is our number one priority. Paul will be the primary point of contact for your project and will manage the entire Wilson Butler Architects in-house team and external consultant teams. Paul will work closely with the University of Rochester to monitor budget and schedule, and to think strategically about how to achieve project success.

“On campus, in the audience or onboard: it’s memorable spaces and people that enrich our lives.” PAUL VAIVODA, AIA, SENIOR ASSOCIATE | WILSON BUTLER ARCHITECTS

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

4


SCOPE CONTROL Scope control requires establishing clear scope definition. We will do this as a project team in the internal kickoff and within the scopes outlined in the preliminary study. Project cost parameters and, ideally, a new cost model will be provided by the client’s cost consultant and will inform the decision making process. Finally, project scope must be monitored in terms of project benefit. To do this, we recommend that the project team establish clear, measurable guiding principles and vision at the beginning of the project aiding decisionmaking throughout the duration of the project. Our core team is staffed with project leaders empowered to make and facilitate decisions. We request the same from the client side. Working as an integrated project team, with University of Rochester leadership and stakeholders, allows us to more easily identify when or if a scope is out of line. We will practice the following to help monitor and control project scope: • Regular project status update meetings between our core team, University of Rochester’s project management, and leadership teams to renew project cost, time and owner benefit. • Regular project cost and schedule checks. • Regular internal design team meetings to monitor status of project scope versus project vision and guiding principles. • Clear documentation of budget data, updated costs, and value information.

SCHEDULE CONTROL

FACILITATE EFFECTIVE STAKEHOLDER REVIEW OF DELIVERABLES All stakeholders play an integral role in program validation, design development and design review throughout the process. This allows continuous feedback from University of Rochester leadership and supports an efficient schedule. Our process facilitates continuous, clear and informative presentations with subsequent delivery of comprehensive meeting notes. Stakeholders will be asked to review/clarify comments and expectations and respond in a timely manner. This confirms project design direction throughout the process and enables on-time delivery of project deliverables at each project milestone.

Akron Civic Theate, Akron, OH

5

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


COST CONTROL

QUALITY CONTROL MANAGEMENT

We must vigilantly watch the budget without compromising the project goals. There are several methods with which to approach cost control.

Our Team is known for the quality of its construction documents, resulting in low change order rates on our projects. The heart of the quality control program is the quality of the people we employ. Our strategy is to maintain consistent project design and technical leadership staff for the project from start to finish.

For this project the following recommendations have been discussed within our team: •• Regular cost estimate practices – cost evaluated at the culmination of each design phase •• Parallel cost estimates – two estimating teams cross referencing information and estimates It has been WBA’s experience that the Performing Arts building type is not well suited for typical ‘rules of thumb’ estimating practices; many variables contribute to this. Having a second set of eyes throughout the process is what has contributed to our successes. We typically recommend a parallel cost estimate approach (retained by the owner) where cost is estimated by two estimating teams at our (4) critical thresholds along the design schedule – at the culmination of programming phase, SD Phase, DD Phase, and 50% CD Phase. Parallel estimates provides that second set of eyes. All areas quantities and unit costs are compared and reconciled. This exposes omissions, reveals overly conservative or overly optimistic forecasting and has allowed our clients to have realistic expectations for their project. With these methods, the main objective remains the same: providing a second set of eyes – a checks and balance system that ultimately provides a more accurate cost estimate to the client at the culmination of each phase.

This continuity ensures that things do not fall through the cracks. We employ sophisticated protocols for plan reviews and utilize the latest in BIM clash detection programs. Central to our quality control protocols is the “cold team” review. The cold team is made up of architects and engineers who are well versed in Performing Arts Center design but are not directly affiliated with the project. They review the documents near the end of each phase of design for completeness, coordination, and accuracy. We believe that conducting cold team reviews throughout the process, instead of waiting until the end of the construction document phase, produces the best quality contract documents. We have a quality manager assigned early in each project who is responsible for quality control. For the Sloan Performing Arts Center we have committed our Senior Associate, Chris Dynia, known throughout the Northeast architectural community for his thoroughness. Under Chris’ review, every detail will be scrutinized, from construction practice to the more esoteric requirements of performing arts equipment. He or his direct reports will review the overall design approach, technical design, and constructability/scheduling impact.

SAMPLE CONSTRUCTION COST ESTIMATE Only WBA prepares such documents as the “Miscellaneous Metals checklists” attached that assigns all metal pieces of the building to each specification section and to each bidding vendor to avoid all confusion and make sure no pieces fall through the cracks or no overlaps. We are LIST MAKERS! Thalhimers Block - 05-01-18 Ornamental and Misc Metals Scope Division

DMWPV STRUCTURAL COORDINATION VERSION

Latest Revision was on 13 March 2005

Prepared by WBA - SAVED AS 05-01-18 REV Ornamental and Misc Metals Scope Division.xls

Blue are Structural Details already defined Bold Red are details that need to be added to S drawings Italics Red are details requiring Structural input

DRAFT FOR SPEC COORDINATION AND AN series DETAILING CHECKLIST/ Not a Contractual Document

29 29A 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 49A 49B 49C 49D 49E

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

ASP1.06/ AN1.06 New New New New

X

X X

Demountable Platforms

Demountable Platforms

Orchestra Shell and Ceilings

Section 11040

Section 11030

Orchestra Lift

Stage Rigging

SPEC SECTIONS: Division 11

Section 11050

Orchestra Shell and Ceilings

Section 11040

Stage Rigging

Building Specialties

Section 10000

Section 09150

Building Specialties

Section 10000

Section 09150

Div 10

Section 11010

Section 06200

Div 9

Cold Formed Steel framing

Div 6

Division 4:

Div 4

Orchestra Lift

SPEC SECTIONS: Division 11

Section 11010

Cold Formed Steel framing

Finish Carpentry Hardware Item

Section 05770 Aluminum Precast Fabrications or Stone Masonry Section 05850 Interior Exp. Control Section 06200 Finish Carpentry Division 4: Precast Hardware Item or Stone Masonry

Ornamental Bronze incl Plated

Interior Exp. Control

Section 05850

Section 05770

Ornamental Bronze incl Plated

Section 05751

DMWPV STRUCTURAL COORDINATION VERSION

Demountable Platforms

Section 11050

Orchestra Shell and Ceilings

Section 11040

Orchestra Lift

Section 11030

Section 11010

Building Specialties

X X

SPEC SECTIONS: Division 11 Stage Rigging

Div 10

Section 10000

Cold Formed Steel framing

Div 9

Section 09150

Finish Carpentry Hardware Item

Div 6

Section 06200

Div 4 Precast or Stone Masonry

Section 05850

Interior Exp. Control

Section 05740

Aluminum Fabrications

Section 05770

Div 10

Blue are Structural Details already defined Bold Red are details that need to be added to S drawings Italics Red are details requiring Structural input

Division 4:

Ornamental Stainless Steel

Ornamental Steel

Section 05700

Ornamental Bronze incl Plated

Section 05751

Pan Stair

Section 05500

Misc. Metal

Section 05121

Section 05500

Ornamental Stainless Steel

Section 05740

Ornamental Steel

Steel

Pan Stair

Section 05500

Misc. Metal

Section 05500

Structural Steel

Section 05121

Sheet Number

Concrete Embedments

Item Description

ASP1.05/ Steel Grate Cover/Frame on Sump/Room B137A (Note 1) ASP3.10 Ladder # LM-11 down to Lift Pit AN1.05 Cover Plate over Lift Access Ladder (Note 2.) Unistrut Embeds for Lift Guide Rails Revised Pit Lift Guide Rails Revised Pit Lift Utility Guard Rails and sockets in Wagon Storage Room New Pit Lift Utility Guard Rails and Sockets at Orchestra Overhang New Pit Lift Skirt Rails (with plywwod sheathing) and sockets on Pit Lift Platform (audience side) New Pit Lift Rails and sockets on Pit Lift Platform (Stage Side side) (Bid Alternate) New Pit Lift Guard Rails Storage Cart Pit Lift Machinery and Steel Platform including joist at 16" o.c. Weld Plate around Top of Orch Pit Conc Wall 2/S2.03 Revised Steel Seating Chair Wagon New Parapet Rail Steel framing welded to Seating Wagons (Bid Alternate 2 Deduct) Steel Seating Chair Wagon Guide Channels and Storage Rack Removable Infill Platforms New Skirt Closures with plywood panels under Infill Platforms Edge Angles to support Removable Infill Platforms Isolation Joint Covers in Slab(7 locations this plan) Elevator EM-02 Pit Access Ladder # LM-13 Elevator EM-02 Sill Support Angles (3 stops) Elevator EM-02 Hoisting Beam S1.31 Steel Pan Stair and rails No.SM-05 Steel Pan Stair and rails No.SM-08 Steel Pan Stair and rails No SM-09 Steel Pan Stair and rails No.SM-10 Handrails at Concrete Stair No SM-35 both sides Handrails at Concrete Stair No SM-36 both sides Handrails at Concrete Stair No SM-37 both sides Ladder In Return Air Plenum Fall Protection Rail in Return Air Plenum Handrails at Ramp No RM-21 both sides Handrails at Ramp No RM-23A both sides Handrails at Ramp No RM-23B both sides Audio Cable Support Wall Hooks (Quantity tbd) see 4/AN 8.41 Cable Wall Sleeves w/ Caps (Quantity tbd) see 3/AN8.41 Trap Room/ Stage Floor Steel Framing 7 and 8/S3.14

Section 05510

Sheet Number

Section 05700

Section 05510

Concrete Embedments

X 1 AN 1.02/ Steel Grate Cover/Frame on Sump/Room SB217 (Note 1) 2 ASP 1.02 Ladder # LC-15 down to Carpenter Center Lift Pit X** 3 Cover Plate over Lift Access Ladder (Note 2.) X 4 Unistrut Embeds for Lift Guide Rails/ See Note 5 below X 5 Pit Lift Guide Rails Sheet Item Description Sheet Number 6 Pit Lift Machinery and Steel Platform including joists at 16" o.c. Number 7 Weld Plate around Top of Orch Pit Conc Wall 3/S2.03 X 8 Steel Pan Stair and rails No.SS-83 A X* X 1 AN 1.02/ Steel Grate Cover/Frame on Sump/Room SB217 (Note 1) 9 Ornamental Steel Pan StairMisc and rails No SS-84A X* Thalhimers Block - 05-01-18 and Metals Scope Division Latest Revision was on 13 March 2005 2 ASP 1.02 Ladder # LC-15 down to Carpenter Center Lift Pit X** 10 REV Ornamental Checkerplate Cover/Frame on Division.xls Sump/Room SB305 X Prepared by WBA - SAVED AS 05-01-18 and Misc Metals Scope 3 Cover Plate over Lift Access Ladder (Note 2.) X 11 Steel Rebar Loops in floor slab of vault for transformer replacement X 4 Unistrut Embeds for Lift Guide Rails/ See Note 5 below X 12 Steel Rebar Loops in conc wall of vault for transformer replcemt 7/S2.04 X 5 Pit Lift Guide Rails 13 Ladder # LM-26 From SB306 up to B313 X** 6 Pit Lift Machinery and Steel Platform including joists at 16" o.c. 14 Ladder # LM-27 From B313 toAN Sidewalk Hatch X** Document DRAFT7FOR SPEC COORDINATION CHECKLIST/ Not a Contractual Weld Plate around Top of Orch PitAND Conc Wall series DETAILING 3/S2.03 X 8 Steel Pan Stair and rails No.SS-83 A X* SPEC SECTIONS: Division 5 9 Steel Pan Stair and rails No SS-84A X* 10 Checkerplate Cover/Frame on Sump/Room SB305 X 11 Steel Rebar Loops in floor slab of vault for transformer replacement X 12 Steel Rebar Loops in conc wall of vault for transformer replcemt 7/S2.04 X 13 Ladder # LM-26 From SB306 up to B313 X** 14 Ladder # LM-27 From B313 to Sidewalk Hatch X** Item No.

Item No. 20 21 22 23 24 24A 24B 24C 24D 24E 25 26 27 27A 28

SPEC SECTIONS: Division 5

Steel

Sheet Number

Structural Steel

Item Description

Aluminum Fabrications

DRAFT FOR SPEC COORDINATION AND AN series DETAILING CHECKLIST/ Not a Contractual Document Sheet Number

Div 9

Section 11030

Div 6

Blue are Structural Details already defined Bold Red are details that need to be added to S drawings Italics Red are details requiring Structural input

Section 11050

Div 4

DMWPV STRUCTURAL COORDINATION VERSION

Section 05751

Ornamental Stainless Steel

Section 05740

Ornamental Steel

Pan Stair

Section 05700

Section 05500

Misc. Metal

Section 05500

Structural Steel

Section 05121

Concrete Embedments

Section 05510

Item No.

Steel

SPEC SECTIONS: Division 5 Latest Revision was on 13 March 2005

Thalhimers Block - 05-01-18 Ornamental and Misc Metals Scope Division

Prepared by WBA - SAVED AS 05-01-18 REV Ornamental and Misc Metals Scope Division.xls

X**

X X

X X X X X X X

X

X

X

X ( See T-TE 111)

X ( See T-TE 111)

X

None Req/d

X***

X

X

X** X***

X X X X** X X X X X X

X* X* X* X*

Pit Lift Machinery and Steel Platform (See AN 1.02 Above)

X

Pit Lift Utility Guard Rails and Sockets at Orchestra Overhang Pit Lift Skirt Rails (with plywwod sheathing) and sockets on Pit Lift Platform (audience side) Pit Lift Rails and sockets on Pit Lift Platform (Stage Side side) Pit Lift Guard Rails Storage Cart

X X X X

6


PROGRAM VERIFICATION/PRE-SCHEMATIC DESIGN DOING THE LEGWORK

•

Establishing and/or verifying principle project goals and aspirations. “What do we hope to accomplish with the PAC?” University of Rochester, Stakeholders, Faculty, Students, Architectural

Architect Award

•

Defining and solidifying the project schedule, milestones and benchmarks. “When are we going to get there?” University of Rochester, Architectural

•

Conducting in-depth site analysis to identify site opportunities and constraints. “How to site and why?” University of Rochester, Architectural, Engineering, Landscape

$

design team cost estimate

budget reconciliation design team workshop

$ $

construction management design team cost estimate cost estimate

budget reconciliation

$

construction management cost estimate

design team workshop

Architect Award

Establishing/verifying the Preliminary Project Budget and weighing it against the updated program. “Are our visions affordable and how much is available to us?” University of Rochester, Architectural, Cost Consultant

Program Verification & Concept Program Verification & Concept F W F W

JUNE

W W

P $ P

R E V I RE EW V I E W

JULY

7

JULY

field work

P

W FR

workshop field work review

M P

presentation

W

workshop

M

meeting

R

review

Schematic Design

M M

Schematic Design W

W

AUG

$

JUNE

F

AUG

$ $ $ $

presentation meeting

R E V I RE EW V I E PW

Design Development

M

Design Development W

M

P

SEPT SEPT

M

W

OCT

OCT

M

$ $ $ $

$

NOV $

NOV

R E V I RE EW V I E W

Construction Documents Construction Documents

M

=

At the outset, and for the duration of the entire project, employ systems of accurate record keeping and lines of communication. “The go-to person and the proper distribution channels.” Architectural

•

M

=

•

Understanding the faculty, users, and student needs through collaborative and interactive workshops. “Get to know the people and the neighborhood.” University of Rochester, Stakeholders, Faculty, Students, Architectural, Theater Consultant

=

Kick-off meeting to define the specific steps and tasks for the phase relating to project and site definition. “What do we need to do now?” University of Rochester, Architectural, Theater Consultant

•

=

•

Program verification and the revisiting of the past efforts up to this point. “What do we need and have these needs changed?” University of Rochester, Stakeholders, Faculty, Students, Architectural, Theater Consultant

=

In order to solve a problem or challenge, one must first define the challenge and the conditions or influences that can affect or guide solutions. This is one of the most critical periods of the project where a thorough investigation and definition of goals, needs, context, budget, and culture is shared, verified and understood by the entire project team.

•

=

In the following pages we define the primary efforts and activities that we anticipate as part of the project delivery process. It forms the basis of this process and is tied into the proposed project schedule. Following each of the items is a statement in “orange” that cuts to the chase - describing the goal or the outcome of the task. The “blue” text identifies the primary players/teams involved in the effort, as contributors, critics, and coaches.

$ $

DEC

2018 2019 DEC 2018

M

2019

JAN JAN

$ $

FEB FEB

M

R E V I RE EW V I E W

MARCH

M M

MARCH

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


H

PRE-SCHEMATIC DESIGN

FRAMING THE CHALLENGES AND EXPLORING THE OPTIONS This phase, is without question, the most fun and exciting. It’s a time when we all roll up our sleeves and dream of what could be. This is a time for exploration of possibilities – both the short and long term. The design team, together with the University of Rochester, will collaborate to define initial overall approaches to the new Sloan Performing Arts Center. •

Meet with University of Rochester representatives to establish optimum site organization concepts based upon criteria learned in the Program Verification & Understanding Phase. “The Big Picture; how the overall Campus context and the Performing Arts Center work in concert with one another.” University of Rochester, Architectural, Engineering, Landscape

•

Following the determination of the concept, the project team will gather information and preferences through on-site workshops, design “charrettes”, and visioning sessions, using effective and proven methodologies for extracting concerns of stakeholders. “What are your thoughts and ideas? What should the PAC feel and look like?” University of Rochester, Architectural

•

Investigate building specific siting strategies that capitalize upon the campus context and sustainability, while recognizing the importance of safety, circulation, patron/ visitor arrival and building service. “Integration of the Performing Arts Center with the overall context of the campus will go hand in hand.” University of Rochester, Architectural, Engineering, Landscape

•

Use simple physical “tray models” together with program blocks, and scale venue comparisons to study and quickly evaluate options relating to adjacencies and organization – a method that engages participants. “Understanding relationships between spaces and uses.” University of Rochester, Stakeholders, Faculty, Architectural, Theater Consultant, Acoustical

Bidding & Negotiation

M

•

Preparation of the Conceptual Design submission and presentation utilizing hand drawn and computer generated graphics and models to effectively communicate design ideas to ensure that all stakeholders understand the choices, recognize their contribution, and feel vested in the outcomes. ”Clear understanding before progressing to the next steps.” Design Team

•

Preparing of preliminary Conceptual Cost Estimate. “Are early numbers in-line with expectations?” University of Rochester, Architectural, Cost Consultant

Punchlist & Debug

Construction

Award

OCCUPY

M

APRIL

MAY

JUNE

JULY

AUG

JUNE 2019

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

JULY

AUG

SEPT

OCT

2020 8


SCHEMATIC DESIGN

TRANSLATING CONCEPTS INTO MEANINGFUL DESIGN

Building code and accessibility analysis. “A facility that is safe and accessible to all.” Architectural, Code Consultant

•

Converting the initial conceptual designs into architectural expression. Developing the responsive character of the Performing Arts Center through workshop presentations where options are presented and reviewed. “What’s the image the PAC would like to project to the community, the students, the faculty, the performers, and the world?” University of Rochester, Architectural

Architect Award Architect Award

Schematic Design workshop review meetings. “To inform, collaborate, and review.” University of Rochester, Architectural

•

Study and definition of initial engineering systems approaches for performance, efficiency, and economies. “Comfort and Safety. Structural systems, long span, and the water table.” Architectural, Engineering

•

Incorporation and review of preliminary acoustical parameters. “Absorption, reflection, diffusion, reverberation time, and the effect on performance type and frequencies. Exceptional sound with adjustable treatments.” University of Rochester, Architecture, Theater Consultant, Acoustical, Engineering

$

design team cost estimate

budget reconciliation design team workshop

$ $

construction management design team cost estimate cost estimate

budget reconciliation

$

construction management cost estimate

design team workshop

Program Verification & Concept Program Verification & Concept F W F W

JUNE

W W

P $ P

R E V I RE EW V I E W

JULY

Develop options for the palette of the Performing Arts Center’s interior and exterior materials with special consideration to longevity, timelessness, durability, sustainability, tradition, and budget. “Design can be expressed in many creative ways with a broad range of materials.” University of Rochester, Architectural

•

=

Study of performance space concept development as a result of performance types, backstage planning and layout, together with preliminary seating and sightlines analysis. “Function guides design for visitor, performer, technician, and administrator alike.” University of Rochester, Architectural, Theater Consultant Acoustical

•

=

•

Special discussions with users and exploration through role playing of patrons, artists, students, faculty, community members, technicians, administrators, etc. to both enhance the experience and functionality of spaces. “Wearing the many hats and walking in various shoes.” University of Rochester, Architectural, Theater Consultant

9

JULY

field work

P

W FR

workshop field work review

M P

presentation

W

workshop

M

meeting

R

review

Schematic Design

M M

Schematic Design W

W

AUG

$

JUNE

F

AUG

$ $ $ $

Preparation of the Schematic Design submission and presentation in further detail utilizing hand drawn, computer generated graphics and models to effectively communicate design ideas to ensure that all stakeholders understand the choices, recognize their contribution, and feel vested in the outcomes. “Clear understanding before progressing to the next steps.” Design Team

•

Conduct geotechnical and sub-surface investigations to assist in the defining of structural foundation support. “Let’s determine the best and most cost effective way to support the PAC.” University of Rochester

•

Preparing of preliminary Schematic Design cost estimate. Design Team, Cost Consultant

presentation meeting

R E V I RE EW V I E PW

Design Development

M

Design Development W

M

P

SEPT SEPT

M

W

OCT

OCT

M

$ $ $ $

$

NOV $

NOV

R E V I RE EW V I E W

Construction Documents Construction Documents

M

=

•

•

•

M

=

Cost estimating review and settlement. “Are we on track?” University of Rochester, Architectural, Cost Consultant

Study of support and ancillary spaces. “How do these spaces best support and integrate with the Performing Arts Center?” University of Rochester, Architectural, Theater Consultant

=

•

•

=

Where the Pre-Schematic Design phase spoke to grand gestures and concepts, the objective of the Schematic Design Phase is to establish the scope, aesthetic image and quality with respect to the budget and schedule. We aim to create an expression of an integrated design, to rethink the standard approach and to physically capture bold ideas that embody the vision of the new Sloan Performing Arts Center.

$ $

DEC

2018 2019 DEC 2018

M

2019

JAN JAN

$ $

FEB FEB

M

R E V I RE EW V I E W

MARCH

M M

MARCH

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


H

Bidding & Negotiation

M

Award

Punchlist & Debug

Construction

OCCUPY

M

APRIL

MAY

JUNE

JULY

AUG

JUNE 2019

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

JULY

AUG

SEPT

OCT

2020 10


DESIGN DEVELOPMENT

INTEGRATION THROUGH TESTING AND EVALUATION Design Development is the time when the team continues in-depth discussions with the University of Rochester and the specific user groups as we further evaluate and define the design with increased specificity. Design models and drawings are developed and studied increasingly larger scales – often using scale models of key elements and features. During Design Development, we expand the approved Schematic Design concepts to further fix and describe the size and character of the entire project. Here again each discipline involved in the project focuses on the systems, materials, and elements necessary to its successful implementation. Consideration is given to availability of materials, equipment, and labor; construction sequencing and scheduling, including maintaining operations, economic analysis of construction and operations; user safety and maintenance requirements; energy conservation; and life safety.

•

Performance evaluation. “Time to ask the client, “How are we doing?” University of Rochester, Design Team

•

In-depth study of the performance and backstage space configuration with respect to acoustics, performance lighting and audio systems, stage rigging and machinery design, and building systems integration. “The backstage is as important as the House.” Architectural, Theater Consultant, Acoustical, Engineering

•

Schematic Design cost estimate review and settlement. “Are we on still on track? Time to identify any major unknowns.” University of Rochester, Architectural, Cost Consultant

•

•

Preparation of renderings and models to be used to inform and excite the Rochester community, Development Department and Alumni in their fund raising efforts for the Performing Arts Center. “We all can get behind and support this project.” University of Rochester, Stakeholders, Faculty, Students, Architectural

In-depth definition and presentation of interior and exterior materials and systems selection including options. “Natural materials that reinforce concepts and relate to people.” University of Rochester, Architectural, Theater Consultant, Engineering

•

Further definition of specific acoustical treatment and analysis through computer analysis. “Seemingly minor acoustical adjustments can have a big impact upon the listening experience.” Architectural, Theater Consultant, Acoustical, Engineering

construction management design team cost estimate cost estimate

=

budget reconciliation

$

construction management cost estimate

Program Verification & Concept Program Verification & Concept F W F W

JUNE

W W

P $ P

R E V I RE EW V I E W

JULY

11

JULY

W FR

workshop field work review

M P

presentation

W

workshop

M

meeting

R

review

Schematic Design

M M

Schematic Design W

W

AUG

$

JUNE

P

AUG

$ $ $ $

Design Development review meetings with PAC user groups with emphasis on systems and operation functionality. “Users are often the best critics and coaches, and their insights are invaluable.” University of Rochester, Stakeholders, Faculty, Architectural, Theater Consultant, Engineering

•

Preparation of the Design Development submission and presentation utilizing hand drawn, computer generated graphics, large multiple models, together with technical drawings and outline specifications to effectively communicate design ideas and form the basis of the Construction Documents. “Clear understanding before progressing to the next steps.” Design Team

•

Preparation of Design Development cost estimates. Cost Consultant

presentation meeting

R E V I RE EW V I E PW

Design Development

M

Design Development W

M

P

SEPT SEPT

M

W

OCT

OCT

M

$ $ $ $

$

NOV $

NOV

R E V I RE EW V I E W

Construction Documents Construction Documents

M

=

$ $

field work

•

M

=

=

budget reconciliation design team workshop

F

Further definition of mechanical, electrical, plumbing, and fire protection systems including sizing of major equipment and the location distribution paths. “Making room for efficient and economical systems distribution without compromising architectural design – working together.” Architectural, Theater Consultant, Acoustical, Engineering

=

design team cost estimate

=

Architect Award

Further definition of the character of the architectural design experience. “A stair is for a vertical change of levels, this is how we make it an “event” that celebrates movement along its path.” University of Rochester, Architectural

$

design team workshop

Architect Award

•

•

$ $

DEC

2018 2019 DEC 2018

M

2019

JAN JAN

$ $

FEB FEB

M

R E V I RE EW V I E W

MARCH

M M

MARCH

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


H

Bidding & Negotiation

M

Award

Punchlist & Debug

Construction

OCCUPY

M

APRIL

MAY

JUNE

JULY

AUG

JUNE 2019

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

JULY

AUG

SEPT

OCT

2020 12


CONSTRUCTION DOCUMENTATION

COMPLETE, COORDINATED, AND CONSTRUCTIBLE

In-depth QA/QC review of all discipline’s documentation by both the design team and others outside the day-to-day team. “The second pair of eyes is often the sharpest.” Design Team

•

Mid-CD review package submission. “Progress review and the basis of the 50% CD Cost Estimate.” University of Rochester, Architectural, Theater Consultant, Acoustical, Engineering

•

Preparation of Construction Documents Cost Estimate at the midpoint of CD’s. “Probably the most important cost estimate before going out to bid.” Cost Consultant

•

Preparing of comprehensive and coordinated technical specifications that implement wherever possible the naming of multiple manufacturers to facilitate competitive bidding from manufacturers. Design Team

•

Submission of the final CD review set. “I’m ready for my close-up Mr. DeMille.” University of Rochester, Architectural, Theater Consultant, Engineering

design team cost estimate

budget reconciliation design team workshop

$ $

construction management design team cost estimate cost estimate

budget reconciliation

$

construction management cost estimate

Architect Award Architect Award

Program Verification & Concept Program Verification & Concept F W F W

JUNE

W W

P $ P

R E V I RE EW V I E W

JULY

13

JULY

field work

P

W FR

workshop field work review

M P

presentation

W

workshop

M

meeting

R

review

Schematic Design

M M

Schematic Design W

W

AUG

$

JUNE

F

AUG

$ $ $ $

presentation meeting

R E V I RE EW V I E PW

Design Development

M

Design Development W

M

P

SEPT SEPT

M

W

OCT

OCT

M

$ $ $ $

$

NOV $

NOV

R E V I RE EW V I E W

Construction Documents Construction Documents

M

=

$

design team workshop

M

=

Developing the construction details that clearly define the scope and constructability, and remove the contractor’s guesswork, thus reducing the owner’s vulnerability to later change orders. “Minimize items open for interpretation, backed by research and experience.” Design Team

=

•

Conducting of extensive in-depth coordination meetings with all design and engineering design team members. Using 3-D BIM models for coordination, paying particular attention to back-ofhouse features, stage house and venue equipment integration, acoustical issues relating to the HVAC system, coordination of fire protection and lighting systems and equipment clearances and installation tolerances. “These are marathon meetings where the “red-pens” are flying!” Design Team, Cost Consultant

•

=

•

Design Development cost estimate review and settlement. “Are we on still on track? Are there additional efficiencies that can be realized?” University of Rochester, Architectural, Engineering, Cost Consultant

Verification of availability of products, systems, finishes that may have been identified earlier in the process before identifying in the specifications. “Darn, that color’s been discontinued, time to re-evaluate.” Design Team

=

•

•

=

By the time the team has completed Design Development, primary and secondary design decisions have already been made. The Construction Documents delve even deeper into the details where coordination of architectural and engineering disciplines is paramount. Thorough construction documents are perhaps the best protection for the University of Rochester and the project. It ensures the hard work and visions of the earlier design phases are maintained. Although this is the “nuts and bolts” phase of the project design, the involvement of representatives from the University of Rochester remains critically important for review and approval along the way.

$ $

DEC

2018 2019 DEC 2018

M

2019

JAN JAN

$ $

FEB FEB

M

R E V I RE EW V I E W

MARCH

M M

MARCH

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


H

Bidding & Negotiation

M

Award

Punchlist & Debug

Construction

OCCUPY

M

APRIL

MAY

JUNE

JULY

AUG

JUNE 2019

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

JULY

AUG

SEPT

OCT

2020 14


BIDDING & PRE/CONSTRUCTION ADMINISTRATION EXPERIENCED AND AVAILABLE PROBLEM SOLVING

•

Review and monitor the contractor’s schedule, progress and adherence to the Construction Documents. University of Rochester, Design Team, Contractor(s)

•

Assist and coordinate the bidding process. “This is the time for “dotted i’s and crossed t’s” to ensure a competitive and fair playing field.” University of Rochester, Design Team

•

Diligent and timely review of submittals and shop drawings. “Let’s make sure the 1st submission is right.” University of Rochester, Design Team, Contractor(s)

•

Assist in the evaluation of bid submissions/contractors; make recommendations. “The locals know the locals.” University of Rochester, Design Team

•

Review Contractor’s Applications for Payment against construction progress. “Another critical place for “dotted i’s and crossed t’s.” Architectural, Engineering

•

Embrace the contractor as an integral member of our team and sharing the common project goals. “We’re all in this together and we all want the same thing; a project that, in the end, we are all proud to have been a part of.” University of Rochester, Design Team

•

Address unexpected field conditions with local presence and onsite availability. Cooperative. “Whoa, what happened here? Don’t worry, we can solve this.” University of Rochester, Design Team, Contractor(s)

•

Continuity of design personnel during construction and on site. “Knowing the reason something was designed a certain way.” University of Rochester, Design Team

•

Punch list review(s). “Hey, you missed a spot.” University of Rochester, Design Team, Contractor(s)

•

Systems commissioning. “It’s one thing to build it right, it’s another to have it operating right.” Architectural, Theater Consultant, Acoustical, Engineering, Contractor(s)

•

Thorough Project Close-out, training and turn over. “Still another critical place for “dotted i’s and crossed t’s.” Design Team, Contractor(s)

$ $

construction management design team cost estimate cost estimate

budget reconciliation

$

construction management cost estimate

Architect Award Architect Award

Program Verification & Concept Program Verification & Concept F W F W

JUNE

W W

P $ P

R E V I RE EW V I E W

JULY

15

JULY

P

W FR

workshop field work review

M P

presentation

W

workshop

M

meeting

R

review

Schematic Design

M M

Schematic Design W

W

AUG

$

JUNE

field work

AUG

$ $ $ $

presentation meeting

R E V I RE EW V I E PW

Design Development

M

Design Development W

M

P

SEPT SEPT

M

W

OCT

OCT

M

$ $ $ $

$

NOV $

NOV

R E V I RE EW V I E W

Construction Documents Construction Documents

M

=

budget reconciliation design team workshop

F

=

design team cost estimate

design team workshop

=

$

=

Construction Kick-off Meeting where ground rules and expectations – from all parties – are defined and agreed to. “Walk the walk and talk the talk.” University of Rochester, Architectural, Theater Consultant, Engineering, Contractor(s)

=

•

M

=

At the completion of the Construction Document Phase, and with the traditional delivery method, it’s is time to bring to the project team its newest member – the Contractor.

$ $

DEC

2018 2019 DEC 2018

M

2019

JAN JAN

$ $

FEB FEB

M

R E V I RE EW V I E W

MARCH

M M

MARCH

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


H

Bidding & Negotiation

M

Punchlist & Debug

Construction

Award

OCCUPY

M

APRIL

MAY

JUNE

JULY

AUG

JUNE 2019

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

JULY

AUG

SEPT

OCT

2020 16


POST OCCUPANCY EVALUATION

MEASURING SUCCESS FOR THE FUTURE Although not specifically identified within the RFP Project Phases, following the premiere performance and the many subsequent events, usually a few times in the first year of operation, the design team and users step back to celebrate the successes and learn from past decisions. With interviews, surveys, and/or questionnaires, the Design Team learns from users their specific experiences with the operation of the PAC. “The “piano test” (where the design team moves a grand piano through the computer model) really paid off!” University of Rochester, Stakeholders, Faculty, Architectural, Theater Consultant, Acoustical, Engineering

•

Performance evaluation. “Time for a “How’d we do?” University of Rochester, Stakeholders, Faculty, Contractor(s)

budget reconciliation

$

design team cost estimate

$

construction management cost estimate

Bidding & Negotiation

hitect ard

Program Verification & Concept

M

F W

W

APRIL

R E V I E W

P

JUNE

P

presentation

W

workshop

M

meeting

R

review

R E V I E W

Schematic Design

M M

MAY

JULY

field work

Award

W

$

17

F

AUG

JUNE

P

Construction

JULY

W

SEPT

OCT

AUG

R OCCUPY E

R E V I E W

Design Development

M

$ $

Punchlist & Debug

=

=

design team workshop

M $ 2019 $

$

2020 NOV

JUNE

V I E W

Construction Documents

M

JULY

=

•

DEC 2018

2019

AUG JAN

M $ $

FEB

Bidd

M

SEPT MARCH

OCT APRIL

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


SECTION NO.

THREE Firm Overview


SMALL STUDIO BIG IDEAS Founded in 1997, Wilson Butler Architects (WBA) is a firm unique in our focused dedication to architecture for the arts. Our projects span a wide range within this specialty area, including new and renovated educational arts facilities dedicated to students of the performing arts, civic performing arts centers, the restoration and expansion of historic theaters and the design of state-of-the-art entertainment venues.

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

18


WE DESIGN PLACES WHERE PEOPLE WANT TO BE. These are spaces to experience life – to be enlightened by the arts, take in a class on animation, relish in great conversation over food and wine, or be reduced to tears of laughter by a wicked performance.

32 12 12 3 5

Professional & Technical Staff

OUR SERVICES

REPRESENTATIVE CLIENTS

Feasibility Studies

Akron Civic Theatre

Programming

Altria Theater

Licensed Architects

Master Planning

Design Staff

Full-Service Architecture Design

Interior Designers Support Staff

Interior Design Construction Administration

Auburn University Berklee College of Music Boch Performing Arts Center Boston Arts Academy Boston Ballet School Boston University, College of Fine Arts Broward Center for the Performing Arts Bushnell Center for the Performing Arts

ABOUT US

Calderwood Pavilion

Our focus on architecture for the arts is the product of our directors’ 35+ year careers designing performance and cultural facilities. With this singular focus, WBA can bring our clients an unsurpassed wealth of knowledge regarding this particularly complex building type, while successfully leading projects from the programming/master planning phases through construction and occupancy. To understand the history of this success, you should know more about WBA’s history prior to its founding. WBA’s founding directors, Scott Wilson and Scott Butler, began their careers working for Benjamin Thompson + Associates, the nationally-recognized and award-winning firm that emphasized buildings are about creating a “setting for an enriched way of life.” Having spent a decade working under Ben’s design influence, they proudly continue that approach as they design facilities which meet each client’s unique requirements, respond to the individual physical context of each site, and celebrate the joy embodied in the arts. Our buildings reflect that creative energy, the character of their distinct surroundings and the unique personality of their users. As a result, our projects are distinctive without a ‘signature style.’ We take great pride in our work and the energy we apply to each challenge. More importantly, our enthusiasm energizes our clients, our consultant partners, and the construction teams. By maintaining an open door policy for our clients and designing in a transparent method, we invite all project participants to be as invested in the design outcome as we are. Employing a staff of 32, our repeat client business is a testimony to our dedication and high level of service.

Celebrity Cruises City of Boston, MA, Strand Theatre City of Herndon, VA, Cultural Arts Center Colonial Theatre Franklin School for the Performing Arts Hartford Stage Company Howard Community College Merrimack Repertory Theatre New England Foundation for the Arts Ogunquit Playhouse Ordway Center for the Performing Arts Richmond CenterStage Royal Caribbean International St. Tammany Parish, Cultural Arts District Towson University, Center for the Arts Virginia Performing Arts Foundation Worcester Business Development Corporation * Blue text indicates the project is highlighted in this submittal

Wilson Butler Architects 70 Federal Street, 5th Floor Boston, MA 02110 www.wilsonbutler.com

Wilson Butler Architects Studio 19

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


SECTION NO.

FOUR

Project Team


Calderwood Pavilion, Boston, MA


WILSON BUTLER ARCHITECTS Design Director

Project Manager

Senior Interior Designer

Scott Wilson, AIA

Paul Vaivoda, AIA, LEED AP BD+C

Rebecca Durante, NCIDQ, IIDA, LEED AP

SUBCONSULTANTS Theater Consultant

Acoustical Consultant

Mechanical Engineer

Electrical Engineering

Plumbing/FP Engineering

Structural Engineer

Alec Stoll, ASTC

Scott Pfeiffer, FASA

Mark Visco, LEED AP, CGD

Brian Danker, P.E., LEED AP

Todd H. Kelsey, P.E., CPD

Michael Auren, P.E. Silman Associates

Stages Consultants, LLC

Threshold Acoustics

M/E Engineering

M/E Engineering

M/E Engineering

Civil Engineering

Landscape Architect

Cost Consultant

Code Consultant

Specifications

Martin D. Willix, P.E. Erdman Anthony

Jo Anne Gagliano, RLA Environmental Design & Research

Craig Chiarelli, LEED AP

Eric Cote, P.E. Jensen Hughes

Mark J. Kalin, FAIA, FCSI, LEED Kalin Associates

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

Vermeulens

20


Scott C. Wilson, AIA

Relevant Project Experience:

Project Role: Co-Design Director

Boston University, College of Fine Arts | Boston, MA

Education: M.A. Architecture University of Illinois, 1976

Berklee College of Music New Performing Arts Venue (Site Study) | Boston, MA

B.S. Architecture University of Illinois, 1974

Calderwood Pavilion | Boston, MA

Professional Registrations: Massachusetts, Illinois, Rhode Island, Virginia, Maine, Florida, Connecticut, Louisiana

Jay and Susie Gogue Performing Arts Center | Auburn, AL Broward Center for the Performing Arts | Fort Lauderdale, FL Richmond CenterStage | Richmond, VA Ogunquit Playhouse | Ogunquit, ME Altria Theater | Richmond, VA Towson University, Center for the Arts | Towson, MD

Scott is a founding partner of Wilson Butler Architects, with a 40-year career focused on the planning and design of award-winning performing arts and entertainment facilities. Clients and users alike respect his ability to lead the architectural planning and design process while connecting all the dots. In WBA’s beginning, Scott, with his partner Scott Butler, developed a unique array of visual tools that allow clients to actively engage in the design process. Scott’s depth of experience includes “out of the box” approaches to stretch existing conditions, coordinate building systems and maximize construction value with thoughtful, smart, creative, often clever and efficient planning and design. With Scott as design leader, no option gets overlooked, no detail forgotten. As champion of the WBA-brand of “hands-on collaboration”, Scott mentors our growing design staff, infusing their state of the art digital skills with a proven design approach that continues to succeed. Scott has wide-ranging experience in urban design, community realm design, and land-use that integrates performing arts and entertainment into all aspects of a campus and/or community plan. Under Scott’s careful guidance, Wilson Butler has also fostered their signature design process, blending traditional methods of conveying design ideas (model building) with the most up to date computer rendering programs. The tools they use and the approach they bring are tailored to meet each client’s unique requirements, respond to the individual physical context of each building site and, in the end, celebrate the joy that is embodied in the arts and entertainment.

Paul Vaivoda, AIA, LEED AP BD+C

Relevant Project Experience:

Project Role: Project Manager

Jay and Susie Gogue Performing Arts Center | Auburn, AL

Education: M.A. Architecture University of Pennsylvania, 1985

SUNY Oswego, Tyler Hall Choral Practice | Oswego, NY

B.A. Environmental Design University of Colorado, 1983

SUNY Institute of Technology, Student Center | Utica, NY*

Professional Registrations: Massachusetts, New York, Pennsylvania

Calderwood Pavilion

Berklee College of Music New Performing Arts Venue (Site Study) | Boston, MA Colgate University, Blackmore Media Center | Hamilton, NY* Colgate University, O’Connor Campus Center | Hamilton, NY* Hobart & William Smith College, Elicott Studio Arts | Geneva, NY* Elmira College, Meier Hall | Elmira, NY* *while employed at QPK Design, Syracuse, NY

Paul has spent the past 30 years designing projects within almost every conceivable market. These sectors include higher education, corporate, hospitality, healthcare, retail, multi-family housing, and the arts. His projects have been honored with numerous design awards on the local, state, and national levels. Paul approaches each new design challenge with fresh enthusiasm producing architecture that is grounded in the translation of the client’s goals and aspirations. The resultant environments are meaningful, functional and exciting. His strengths not only include creative design solutions, but also the ability to lead and coordinate a design team of architects, engineers, and consultants towards timely and budget-conscious project delivery. Paul is a registered architect in Massachusetts, New York, and Pennsylvania, and a LEED accredited professional. In addition, he is a member of the American Institute of Architects, National Council of Architectural Registration Boards, and the Society for College and University Planning (SCUP). Jay and Susie Gogue Performing Arts Center

21

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


Rebecca Durante, NCIDQ, IIDA, LEED AP

Relevant Project Experience:

Project Role: Senior Interior Designer

Altria Theater | Richmond, VA

Education: BFA, Interior Design The New England School of Art and Design Suffolk University, 2007

Merrimack Repertory Theatre | Lowell, MA

Professional Registrations: NCIDQ 26643

Boston University, College of Fine Arts | Boston, MA

Boston Arts Academy | Boston, MA Richmond CenterStage | Richmond, VA St. Tammany Parish Government, Cultural Arts District | Covington, LA Celebrity Edge Theater, Celebrity Cruises | Miami, FL Oasis of the Seas, Royal Caribbean International | Miami, FL TUI Cruises, Mein Schiff Class | Hamburg, Germany

Rebecca will orchestrate the design vision for the interiors of the new Sloan Performing Arts Center project. Rebecca has been with the Wilson Butler Architects since 2006, and has completed the design for award winning interiors, one-of-kind, ground breaking cruise ship experiences and intricately detailed historic theater restorations, including the Altria Theater in Richmond, VA. As the lead interior designer at Wilson Butler, other staff and clients alike rely on Rebecca for her thoughtful, researched design decisions and carefully crafted, holistic environments that both seamlessly respond to the space while wowing the user. Rebecca is adept at composing palettes of inspiration, furniture and materials that inform her comprehensive client presentations. She approaches every project by developing a strong concept that encapsulates client goals, guest experience, project setting, and existing charms to inform every decision, creating a thread of consistency apparent throughout. Her work is notable for sophisticated and fitting compositions of color, texture, and hospitality. Altria Theater

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

22


Stages Consultants, LLC Theater Consultant

300 Raritan Ave, 2nd Floor Highland Park, NJ 08904 p: 732.333.8003 www.stagesconsultants.com

OUR CLIENT-CENTERED APPROACH STARTS WITH THE RECOGNITION THAT THE CLIENT AND THE ARCHITECT ARE EQUALLY ENGAGED CONTRIBUTORS TO THE DESIGN OF THESE SPACES. COMPANY OVERVIEW

SERVICES PROVIDED

REPRESENTATIVE CLIENTS

Stages Consultants is a theatre and acoustics design consultancy founded on the principle that every project, from a major performing arts center to a high school auditorium, deserves the full attention, creative thinking and problem-solving skills of seasoned, experienced experts. Stages Consultants accepts only a small number of projects at a time so that we can offer that kind of attention and deliver the highest quality theatre and acoustical design. Founders and industry veterans Alec Stoll and Damian Doria are experienced principals with established careers in the field. With 15 years of collaboration together, and over 50 years of combined consulting experience, Alec and Damian have the knowledge, creativity, talent and pedigree to take on performing arts projects of any size and scope.

Backstage and front of house planning

Capital One Performing Arts Center

Feasibility and existing conditions evaluations

DeSales University

Noise and vibration control of building systems

Dr. Phillips Center for the Performing Arts

Production sound and video systems design

Elisabeth Morrow School

Project visioning

Grant MacEwan University Centre for the Arts

Room acoustics design

Kissimmee Performing Arts Center

Seating layouts and sightlines

Neumann University

Sound isolation

Rider University

Space programming

Riverdale County Day School

Stage dimming and control systems design

Rollins College

Stage equipment design and specification

Sarasota Orchestra

Theatre conceptual design collaboration

State University of New York, Purchase College

Our client-centered approach starts with the recognition that the client and the architect are equally engaged contributors to the design of these spaces. Our goal is to make our client’s dreams come true and to reinforce the architect’s vision as they strive to meet those dreams. We believe in a collaborative approach that allows all ideas to come to the table. We contribute creative solutions, not an agenda. Stages Consultants’ most important function is to inform the architect, the engineers and the client. Only with a complete understanding of the many complicated issues that enter into the design of performance spaces can we work together to address them. We have the depth of knowledge and experience with the idiosyncrasies of this building type to make sure that your project succeeds in every way.

University of British Columbia, Chan Centre University of Cincinnati, College-Conservatory of Music University of Texas at Tyler Wright State University Creative Arts Center Yale Institute of Sacred Music

23

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


Alec Stoll, ASTC

Relevant Project Experience:

Project Role: Lead Theater Consultant

Avenel Arts Village | Avenel, NJ

Education: MFA, Theatre Production Management Brandeis University, 1996

Brock University | St. Catharines, ON

BFA, Technical Theatre Emerson College, 1993

Hudson County High-Tech High School | Secaucus, NJ

Professional Affiliations: American Society of Theatre Consultants RCHP Affordable Housing Corporation

Capital One Performing Arts Center | McLean, VA Grant MacEwan University Centre for the Arts | Edmonton, AB McKinney High School Auditorium | McKinney, TX Riverdale County Day School | Bronx, NY University of Cincinnati, College-Conservatory of Music | Cincinnati, OH Wright State University Creative Arts Center | Dayton, OH

With 15 years of nationwide experience backstage, and a further 20 in theatre consulting, Alec Stoll is internationally respected as a theatre planner and designer. Alec has played integral roles in the programming, planning, design and construction of well over 200 academic, professional and community venues as well as historic renovation and restoration projects. His current projects include the Capital One Performing Arts Center Auditorium in McLean, VA; and the Avenel Arts Village in Avenel, NJ. He is consulting on renovations to the State Theatre of New Jersey; the Capitol Theatre and The Whiting in Flint, MI; among others. Alec is also designing new live music venues in Phoenix, Ann Arbor and Vancouver. Among Alec’s projects under construction are new high school performing arts centers in Appoquiminink, DE; Chatham, NJ; Trenton, NJ; Secaucus, NJ; and McKinney, TX. Recently completed projects include the renovation of five venues at the University of Cincinnati, College Conservatory of Music, and three new venues in Miami Beach for Faena Development. Alec is an alumnus of the Boards of Directors of the American Society of Theatre Consultants, the RCHP Affordable Housing Corporation, and the League of Historic American Theatres.

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

Creative Arts Centre at Wright State University

24


Threshold Acoustics Acoustical Consultant

141 West Jackson Boulevard Suite 2080 Chicago, IL 60604 p: 312.386.1400 www.thresholdacoustics.com

OUR APPROACH EMPHASIZES REINFORCING THE VISUAL REALM WITH THE SUBTLETY, VARIETY, AND EVEN SURPRISE THAT AN AWARENESS OF THE AURAL REALM CAN BRING TO THE BUILT ENVIRONMENT. COMPANY OVERVIEW

SERVICES PROVIDED

REPRESENTATIVE CLIENTS

Threshold Acoustics LLC provides room acoustics and audio/video design consulting services for performance and education facilities, worship spaces, cultural centers, and other places of public assembly. Our collective experience, based on a remarkable diversity of work, has led us to work with clients who seek intentional, well-crafted soundscapes in their buildings.

Acoustical Design

Brown University

Audio-Video Systems Design

Columbia College Chicago

Noise Control Engineering

Duke University

Sound Isolation

Gonzaga University

Our accomplished staff bring together backgrounds in music, theater, mechanical and electrical engineering, physics, live sound, architecture, and architectural acoustics. This rich medley supports our approach to room acoustics, audio/video systems, noise control, and sound isolation as inseparable parts of a whole. We apply our deep knowledge of the subject to every project, taking care to explain the scientific and perceptual basis for our recommendations because doing so frees the design team to explore possibilities with a clear understanding of what is acoustically important and why. Smart decisions, new approaches, and elegant designs can then emerge from the team as a whole. Beyond our core practice, we apply ourselves to design projects that affect people on a daily basis, for example: serving on boards and lecturing in academia; presenting our research to the Acoustical Society of America; and contributing to new Veterans Administration guidelines for healing environments. By working through the AIA and other professional design organizations, we seek to increase awareness of the aural realm’s importance – which extends well beyond cultural events to workplace interactions, social exchanges, and the quality of life overall.

Holland Performing Arts Center Kimmel Center for the Performing Arts National Arts Centre, Ottawa Rice University The Ronald O. Perelman Center for the Performing Arts University of Chicago University of Virginia University of Wisconsin Walton Arts Center Winsor School Wheaton College Conservatory of Music Woodruff Arts Center Writers Theatre

25

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


Scott D. Pfeiffer, FASA

Relevant Project Experience:

Project Role: Acoustical Consultant

Columbia College Chicago, Media Production Center | Chicago, IL

Education: B.S. Physics Moravian College, 1992

Elgin Academy of Arts and Sciences | Elgin, IL

Graduate Studies Technical University of Denmark, 1993

Jones Hall Renewal | Houston, TX

Professional Affiliations: Acoustical Society of America, Fellow

Flea Theater | New York, NY John F. Kennedy Center for the Performing Arts | Washington, DC Millikin University Center for Theatre and Dance | Decatur, IL National Arts Center | Ottawa, Canada Rice University, Music and Performing Arts Center | Houston, TX University of Wisconsin, Eau Claire, Confluence Center | Eau Claire, WI

Scott’s path in architectural acoustics began on the elementary school stage, went on to roles in high school musicals and then recitals as part of his music education at Moravian College. With acoustics as his main interest, he completed a Bachelor of Science in Physics with Honors in Music and then moved on to graduate studies in the Acoustics Laboratory at the Technical University of Denmark. For more than two decades, Scott has participated in virtually every aspect of the acoustical consulting profession, from modeling and measurements to leading the design of complex rooms, audio and video installations, and electronic enhancement systems. Scott has been honored as a Fellow in the Acoustical Society of America for his accomplishments in the design of worship and performing arts spaces as well as his leadership in pursuing great Unanswered Questions, a topic he explored at length in the ASA’s Knudson Distinguished Lecture in 2012. He was keynote speaker at the University of Michigan’s 2013 Saturday Morning Physics conference, lecturing a rapt audience of 1,000 on physics, perception, and uniqueness. He also serves on the Knowles Hearing Center Advisory Board at Northwestern University, the University of Nebraska-Lincoln Durham School Architectural Engineering Industry Advisory Committee, and is a member of the Board of the National Council of Acoustical Consultants. Yes, he is an over-achiever.

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

Earlman College, Visual and Performing Arts Center

26


M/E Engineering

MEP/FP Consultant

150 North Chestnut Street Rochester, NY 14604 p: 585.288.5590 www.meengineering.com

WE ARE COMMITTED TO DESIGNING PROJECTS THAT MAXIMIZE THE VALUE OUR CLIENTS RECEIVE FROM THEIR INVESTMENT. M/E’S PARTNERS ARE INVOLVED IN EVERY PROJECT FROM INCEPTION TO COMPLETION. COMPANY OVERVIEW

SERVICES PROVIDED

REPRESENTATIVE CLIENTS

M/E Engineering, P.C. is a New York State Professional Corporation. Founded in 1991, M/E Engineering, P.C. is a mechanical/electrical consulting engineering firm committed to valuedriven solutions for its clients. Four offices and an expert staff of licensed professional engineers, project designers and technicians serve industrial, commercial, educational, health care, institutional and municipal clients. A commitment to producing designs that result in reliable and efficient systems drives every M/E Engineering project. M/E Engineering has 180 employees, including 38 licensed professional engineers, 57 senior engineers/senior designers, 30 project engineers/project designers and 55 designers/CAD technicians.

Building Information Modeling

Alfred University - Miller Performing Arts Center

Central Plants

Allendale Theatre

Commissiong

Bloomfield Central School District - Performing Arts Center

Computational Fluid Dynamics

Chautauqua Institution - School of Music and Dance

Electrical Engineering

Finger Lakes Community College Performing Arts and Academic Building

Lighting Dynamic

Foothills Performing Arts Center

Mechanical Engineering

Hobart & William Smith Colleges - Performing Arts Center

Sustainability

Ithaca College - James J. Whalen Music Center

M/E Engineering offers services including initial programming, planning and feasibility studies; schematic design and systems life cycle cost analysis; design development and value engineering; engineers’ estimates of probable construction costs; and production of construction drawings and specifications. M/E Engineering also provides construction phase services including bid analysis, construction observation, shop drawing review and systems commissioning. To meet our client’s needs, a Partner or Principal is engaged in the design process from inception to completion.

Kleinhans Music Hall Nazareth College Recital Hall Plattsburgh State University College, Hartman Theater Potsdam State University College - Snell Theater Rochester Auditorium Theatre Rochester City School District Rochester Institute of Technology Auditorium Renovation SUNY, Oswego - Tyler Hall Rehabilitation University of Rochester - Eastman School of Music and Eastman Theatre

27

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


Mark L. Visco, LEED AP, CGD, QCxP

Relevant Project Experience:

Project Role: Mechancial Engineering

Brockport State University, N ew Academic Building | Brockport, NY

Education: Associate of Applied Science Alfred State College, 1988

Cornell University, Barton Hall | Ithaca, NY

Professional Registrations: USGBC-LEED Accredited Professional Certified Quality Comm. Process Provider Certified GeoExchange Designer (CGD)

Rochester Institute of Technology, GIS | Rochester, NY

Monroe Community College, Building 4 - Theater Renovation | Rochester, NY Roberts Wesleyan College, Smith Hall | Rochester, NY Rochester Institute of Technology, MAGIC Spell Studios | Rochester, NY University of Rochester, Gavett Hall Renovations | Rochester, NY University of Rochester, Genesee Hall | Rochester, NY University of Rochester, Sage Art Center | Rochester, NY

Mr. Visco is a Senior Engineer in our HVAC Group. Mark has over twenty years of experience as a Mechanical Designer, Engineer and Project Manager. This experience has included project scheduling, budgeting, estimating and construction administration. As Lead Engineer and Project Manager, Mark has designed central plant heating and cooling systems, geothermal systems, numerous air and water distribution systems and control systems.

Monroe Community College

Brian L. Danker, P.E., LEED AP, BD+C Relevant Project Experience: Project Role: Electrical Engineering

Brockport State University, N ew Academic Building | Brockport, NY

Education: B.S. Electrical Engineering Clarkson University, 1986

Monroe Community College, Building 4 - Theater Renovation | Rochester, NY

Professional Registrations: New York 069743-1

Rochester Institute of Technology, School for American Crafts | Rochester, NY

Roberts Wesleyan College, Smith Hall | Rochester, NY Rochester Institute of Technology, College of Business | Rochester, NY St. John Fisher College, Wilson Academic Addition & Renovation | Rochester, NY University of Rochester, B iomedical Engineering Optics | Rochester, NY University of Rochester, Gavett Hall Renovations | Rochester, NY University of Rochester, River Road Complex Development | Rochester, NY

Brian Danker is a Partner in the company and heads the Electrical Group at our Rochester Office. Brian has experience designing a variety of power, security, lighting, grounding, communications, and fire protection systems for commercial, industrial, municipal and support facilities. He specializes in designing switching stations, clean rooms and multi-building complexes. Brian has successfully led the efforts for eight buildings which received LEED certification and has experience with photovoltaic and wind power design.

University of Rochester, Rush Rhees Library UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

28


Todd H. Kelsey, P.E., CPD

Relevant Project Experience:

Project Role: Plumbing/Fire Protection

Cornell University, College of Agriculture & Life Sciences | Ithaca, NY

Education: B.S. Industrial Engineering Technology SUNY Institute of Technology, 1994

Cornell University, Martha Van Rensselaer | Ithaca, NY

Professional Registrations: New York, P.E. 088822 New York, CPD 27010

Rochester Institute of Technology, MAGIC Spell Studios | Rochester, NY

Cornell University, Riley Robb Hall | Ithaca, NY Empire State College, Suffolk Regional Center | Saratoga Springs, NY Syracuse University, Dineen College of Law | Syracuse, NY University of Rochester, Fauver Residence Hall | Rochester, NY University of Rochester, Gavett Hall Renovations | Rochester, NY University of Rochester, Goergen Cooling Tower Study | Rochester, NY

Todd has 20+ years of experience in the design of plumbing systems and has worked on various projects for governmental, educational, healthcare and commercial clients including design/build projects.

University of Rochester, Fauver Residence Hall

29

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


Silman Associates

Structural Engineering

32 Old Slip, 10th Floor New York, NY 10005 p: 212.620.7970 www.silman.com

WE HAVE SERVED AS STRUCTURAL ENGINEERING CONSULTANT ON MORE THAN 23,000 PROJECTS AND IS NOTED FOR ITS COLLABORATIVE SPIRIT IN THE DESIGN OF NEW ARCHITECTURAL WORKS. COMPANY OVERVIEW

SERVICES PROVIDED

REPRESENTATIVE CLIENTS

This has been the vision of Silman since its inception in 1966. The firm fosters an approach centered on constant collaboration among owners, architects, and consultants to provide the highest quality structural engineering services possible. The firm has served as structural engineering consultant on more than 23,000 projects and is noted for its collaborative spirit in the design of new architectural works and on some of the largest and most noteworthy renovations and additions in this country. With offices in New York City, Washington, DC, and Boston, Silman presently numbers 160, of whom more than 50 have professional registration and more than 20 are LEED accredited.

Adaptive Reuse

Aaron Davis Hall, CUNY, The City College of New York

Building Envelopes

Boston Symphony Hall

Historic Preservation

Brooklyn Academy of Music

New Construction

Center for the Arts, University of Maine

Renovation

Duke Theater, Antony & Cleopatra Pool

Structural Investigation

Hays Theater, Molloy College

Sustainable Engineering

Jamaica Performing Arts Center,

Work in the field of education is one of the pillars on which Silman was founded and on which it continues to thrive. The firm’s higher education experience includes renovations as well as new construction for academic, residential, performing arts, and athletic buildings, along with libraries, laboratories, and student centers. The firm’s higher education clients include Cornell, New York University, Boston University, Harvard, Brown, Yale, among many others. The firm promotes sustainable and environmentally responsible design and has long advocated sustainable methodologies in engineering. In 1975 Silman served as a consultant for a US Department of Energy study that investigated methods for reducing not only operating energy consumption, but also embodied energy. As part of its emphasis on green design, Silman revised its standard specifications so that the default is sustainable and introduced high performance metrics into all of its designs.

John F. Kennedy Center for the Performing Arts Memorial Hall & the Wish Theatre, Bowdoin College Peabody Conservatory of Music, Johns Hopkins University Performing Arts Center, York College Perry & Marty Granoff Center for the Arts, Brown University Queens College Amphitheatre Roschel Center for the Performing Arts, Franklin & Marshall College Theatre for a New Audience at Polonsky Shakespeare Center Yale School of Art & New Theater, Yale University

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

30


Michael Auren, P.E.

Relevant Project Experience:

Project Role: Structural Engineering

Holy Cross Performing Arts Center | Worcester, MA

Education: M.S. Structural Engineering Rensselaer Polytechnic Institute, 1995

McNay Art Museum, Jane & Arthur Stieren Center for Exhibitions | San Antonio, TX

B.S. Civil Engineering Rensselaer Polytechnic Institute, 1994

Indianapolis Museum of Art | Indianapolis, IN

Professional Registrations: Massachusetts 52861 New York 77406 Connecticut 32831

Judy and Arthur Zankel Hall. Carnegie Hall

American Airlines Theatre | New York, NY Harvard Art Museums | Cambridge, MA Massachusetts Institute of Technology, Building E52 | Cambridge, MA Bryn Mawr College Park Science Building | Bryn Mawr, PA Forest Park Middle School | Springfield, MA

Mike Auren has been with Silman since 1998. He was named a Principal with the firm in 2017 and founded the Boston office in 2007. Mike has worked on projects ranging from historic preservation to new construction to renovation. Current and recent work includes the renovation and expansion of the Harvard Art Museums, the new Harlem Hospital in New York City, and the new entry pavilion and renovations to the historic Brooklyn Museum in Brooklyn, NY.

31

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


Erdman Anthony Civil Engineering

145 Culver Road, Suite 200 Rochester, NY 14620 p: 585.427.8888 www.erdmananthony.com

ERDMAN, ANTHONY AND ASSOCIATES, INC. PROVIDES INFRASTRUCTURE ENGINEERING AND SUPPORT SERVICES TO PRIVATE INDUSTRY AND GOVERNMENT CLIENTS PRIMARILY IN THE EASTERN UNITED STATES. COMPANY OVERVIEW

SERVICES PROVIDED

REPRESENTATIVE CLIENTS

Erdman Anthony is a 100% Employee Owned corporation which has been providing infrastructure engineering to our clients since 1954. Our 250 professionals work from seven office locations running from Maine to Florida because we believe that proximity boosts productivity. In addition to receiving many industry awards, Erdman Anthony has been listed in Engineering News Record as one of the country’s Top 500 engineering firms for 30 consecutive years. Company-wide core values of commitment to employees, respect, integrity, and customer focus have helped to maintain our ISO 9001 certification since 2000.

Civil Engineering

Buffalo State College

Site Planning/Land Development

City of Rochester

Stormwater Management

Colonial Village Housing Development

Water Distribution Systems

Cornell University

Sanitary Sewer Collection Systems

Fort Drum Army Base

As a multi-disciplinary firm, Erdman Anthony has five primary business lines: Civil and Site Design; Facilities Engineering and Design; Transportation Engineering; Geospatial Services; and Construction Inspection. Our staff has experience and intimate knowledge of the related processes that add to the success of your projects. Our work has included projects for clients engaged in the industrial, commercial, utility, and telecommunications market segments, as well as institutional clients, and government clients at the federal, state, and local levels. Erdman Anthony provides its clients with comprehensive infrastructure and support services for both government and private sector clients.

Hobart and William Smith Colleges Hudson Valley Community College Millersville University Monroe County Rochester Institute of Technology St. Lucie County SUNY Geneseo SUNY Oneonta The Plains at Parish Homestead Housing Community University of Buffalo University of Rochester

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

32


Martin Willix

Relevant Project Experience:

Project Role: Civil Engineering

University of Rochester, Wilmot Cancer Center | Rochester, NY

Education: B.S. Civil Engineering Rochester Institute of Technology, 1994

Rochester Institute of Technology, Global Village | Rochester, NY

Professional Registrations: New York Pennsylvania

Rochester Institute of Technology, IT Collaboratory | Rochester, NY

Rochester Institute of Technology, University Services Center | Rochester, NY Rochester Institute of Technology, NCC Quad Design | Rochester, NY Rochester Institute of Technology, Kate Gleason College of Engineering | Rochester, NY Cornell University, Alterations to 626 University Avenue | Ithaca, NY Plains at Parish Homestead | Oneonta NY ORTC | Fort Drum NY

Martin Willix is a registered professional engineer with 24 years of experience. His project management and design experience are diverse and encompasses site development, roadway design, lift stations and utility infrastructure including water, sewage, gas, stormwater, and Telecommunication & Data. Mr. Willix is committed to providing high-quality, responsive services. He is an effective team leader, with a proven track record of completing projects on time and under budget.

Rochester Institute of Technology, Global Village

33

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


Environmental Design & Research Landscape Architecture

274 North Goodman Street, Suite B260 Rochester, NY 14607 p: 585.271.0040 www.edrdpc.com

AT ENVIRONMENTAL DESIGN & RESEARCH, LANDSCAPE ARCHITECTURE IS THE ART AND SCIENCE OF ANALYSIS, PLANNING, DESIGN, MANAGEMENT, PRESERVATION AND REHABILITATION OF THE LAND. COMPANY OVERVIEW

SERVICES PROVIDED

REPRESENTATIVE CLIENTS

EDR is a local, award-winning, woman-owned professional corporation that has been providing public and private clients with multi-disciplinary and integrated site planning, design, engineering, and environmental consulting services for nearly 40 years.

Community Planning & Engagement

Albany State University

Construction Administration

Alfred University

Cultural Resources Management

Binghamton State University

Founded in 1979, EDR employs a full-time staff of 85, headquartered in Rochester, Syracuse, and Albany, NY,. Their mission is to make places better for people and for the environment by perpetually striving for balance – the balance between their client’s needs and the community’s satisfaction, the balance between immediate results and long-term viability, and the balance between respect for the natural environmental and delivering the most relevant impact on people’s lives. Their method for achieving this is a “resource-based” approach that considers the needs of their client, the community, and the environment to create realistic and long-lasting solutions.

Ecological Resources Management

Buffalo State University

Environmental Regulatory Compliance

City of Rochester

GIS Mapping & Analysis

Cornell University

Historic Preservation Planning

Hamilton Colleges

Landscape Architecture Design

Houghton College

Site & Land Use Master Planning

Le Moyne College

Site/Civil Engineering Design

Nazareth College

Visualization & Graphic Design

Oswego State University

Water/Wastewater Engineering Design

Rochester Institute of Technology

EDR and their clients have been honored to receive more than 30 national, regional, and local awards and recognitions for projects planned and designed by EDR. They also have a long history of sustainable landscape design and “green” engineering practices. As a member of the U.S. Green Building Council and with LEED™ Accredited Professionals on staff, EDR provides expertise in integrating principles of sustainability. A 61,000 SF new academic building at SUNY Brockport, completed in 2016, and a 40,000 SF new science center at Le Moyne College, completed in 2014, achieved LEED™ Gold Ratings.

St. Lawrence University SUNY - The State University of New York Syracuse University University of Rochester

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

34


Jo Anne Chiarenza-Gagliano, RLA

Relevant Project Experience:

Project Role: Landscape Architecture

University of Rochester, H utchison Hall Addition | Rochester, NY

Education: B.S. Landscape Architecture Cornell University, 1988

SUNY College at Potsdam, Crane School of Music | Potsdam, NY

AAS Horticulture & Landscape Planning Morrisville State College, 1985

Professional Registrations: New York 001474

Le Moyne College, C oyne Science Center | Syracuse, NY Rochester Institute of Technology, Gene Polisseni Center | Rochester, NY Le Moyne College, Le Moyne Plaza | Syracuse, NY Syracuse University, Schine Student Center | Syracuse, NY Albany State University, Alumni Quadrangle | Albany, NY SUNY College at Oneonta, Physical Science Building | Oneonta, NY SUNY College at Brockport, New Academic Building | Brockport, NY

Jo Anne Chiarenza-Gagliano is the President of EDR, a woman-owned business enterprise, founded in 1979. Jo Anne is a recipient of the American Society for Landscape Architects Distinguished Professional Award. She is also a Registered Landscape Architect and an award-winning designer, with more than 35 years of professional experience. As a Senior Landscape Architect, her responsibilities include master-planning, conceptual design, design development, horticulture and sustainable landscapes management, site/civil engineering, and visual impact assessment. As a Principal-in-Charge, she is contractually responsible for project management and quality control/quality assurance, and provides technical guidance to the production team, as needed. She also coordinates an in-house consulting team of environmental regulatory compliance specialists, ecological and cultural resources management professionals, site/civil and water/wastewater engineers, geographic information systems analysts, graphic designers. and visualization specialists, as needed, to enhance and substantiate the firm’s resource-based approach to project delivery. Her professional portfolio of project experience includes: higher education facilities; inns, spas, resorts, clubs, vineyards, and event centers; campus signage and wayfinding, waterfront developments, corporate campuses, luxury estates, parks and recreation facilities, historic and cultural landscapes, native planting / landscape restoration and more. SUNY Potsdam, New Performing Arts Center

35

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


Vermeulens

Cost Estimating

140 Broadway, 46th Floor New York, NY 10005 p: 212.208.1414 www.vermeulens.com

SINCE OUR INCEPTION IN 1972 AND IN PARTNERSHIP SINCE 1961, VERMEULENS HAS BEEN A LEADER AND AN INNOVATOR IN OUR SPECIALTY OF PRE-CONSTRUCTION COST CONTROL. COMPANY OVERVIEW

SERVICES PROVIDED

REPRESENTATIVE CLIENTS

We developed the elemental estimating systems, line item estimate computer reports, and computer graphic take-off processes that have become standard throughout the industry. We estimate over 150 new/renovation projects every year, which translates into $10 billion worth of construction. Extensive bid and reconciliation data enable us to benchmark institutional buildings at appropriate current levels. This provides owners and architects with detailed and accurate costing reports based on information from our comprehensive database, knowledgeable staff, and developed processes. These realistic project budgets from the outset help minimize the loss of program and scope, and costly re-design that can minimize unexpected costs and outcomes.

Benchmarking

East Tennessee State University

Continuous Estimating

Emory University

Cost Models

Francis Marion University Center for Performing Arts

Options Analysis

Hobart and William Smith Colleges Performing Arts

Parallel Estimating

Jay and Susie Gogue Performing Arts Center

Pre-Construction Cost Control

Maryville College Civic Arts Center

Procurement Strategies

Radford University Fine Arts Center

Program Analysis

University of Delaware

Program Estimating

University of Iowa

Risk Analysis

University of Michigan

Target Value Models

University of South Florida

Value Optimization

University of Virginia

We specialize in pre-construction services, which includes programming through construction documents cost estimates, reconciliation of scope to budget, value engineering, and bid review. Our areas of concentration include but are not limited to higher education, healthcare, science + technology, cultural and entertainment. Our team members work in architectural, structural, mechanical, and electrical divisions. We pride ourselves on having one third of our estimating staff as mechanical and electrical engineers, which means, we understand completely how these systems work and how much they cost. This team approach enables us to provide continuity, a working knowledge of all projects, and to make it our policy to be responsive to your needs, while providing an estimating service that is Beyond Estimation.

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

University of Virginia Virginia Performing Arts Center Foundation Virginia Tech Center for the Arts Western Illinois University Center for Performing Arts

36


Craig Chiarelli, LEED AP

Relevant Project Experience:

Project Role: Cost Estimating

East Tennessee State University Fine Arts Classroom Building | Johnson, TN

Education: B.S. Electrical Engineering University of Western Ontario, 1999

Emory University Donna & Marvin Schwartz Center for Performing Arts | Atlanta, GA

Professional Affiliations: U.S. Green Building Council, LEED AP

Virginia Tech Center for the Arts | Blacksburg, VA

Western Illinois University Center for Performing Arts | Macomb, IL University of Delaware Roselle Center for the Arts | Newark, DE Radford University Fine Arts Center | Radford, VA Jay and Susie Gogue Performing Arts Center | Auburn, AL Francis Marion University Center for Performing Arts | Florence, SC Hobart and William Smith Colleges Performing Arts | Geneva, NY

Craig Chiarelli has been with Vermeulens since 1999. Craig is an Associate Principal and Director of Estimating for the firm, coordinating estimating operations. Craig is an experienced Mechanical/Electrical Estimator. As Project Leader, he is responsible for the overall scope of work for the project including all versions of the estimate from draft to final estimate at each of the design stages. Craig’s roles on the project are overview, review and reconciliation, value engineering meetings, and client support. Craig co-authored a White Paper with James Vermeulen and Tsoi Kobus & Associates called The Cost of LEED, A Report on Cost Expectations to Meet LEED 2009 for New Construction and Major Renovations (NC v2009), and Published by Building Green LLC.

Francis Marion University Center for the Performing Arts

37

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


Jensen Hughes Code Consultant

1661 Worcester Road, Suite 501 Framingham, MA 01701 p: 508.620.8900 www.jensenhughes.com

WE ARE A COMPANY OF ENGINEERS, CONSULTANTS, AND SCIENTISTS FOCUSED ON EVALUATING RISKS AND DILIGENTLY DEVELOPING THE BEST, MOST COST-EFFECTIVE PROTECTION AND SAFETY SOLUTIONS. COMPANY OVERVIEW

SERVICES PROVIDED

REPRESENTATIVE CLIENTS

JENSEN HUGHES ENGINEERING, P.C., offers a broad range of safety, security, and risk assessment and mitigation services to protect people, property and the environment. We provide expert consulting, design, construction support, forensic engineering and investigation, research and development, software solutions, and training throughout the world, across every industry. Our experts work diligently to provide a data-driven, forward‑thinking approach to risk prevention and mitigation. Whether solving a code compliance challenge or security master planning, every project begins with a rigorous, in-depth analysis and understanding of the client’s needs and desired outcomes, followed by developing a set of recommendations aligned with established industry and regulatory standards, and then facilitating the implementation of optimal solutions. Our firm is the global leader in safety, security, and risk-based engineering and consulting services. We are engineers, scientists, and consultants committed to helping our clients evaluate, address, and mitigate risk.

Code Consulting

Altria Theater

Construction Administration and Commissioning

Boston Conservatory

Electrical System Design and Analysis

Boston University (BU), School of Theatre

Fire Protection and Life Safety Design and Analysis

Cutler Majestic Theatre, Emerson College

Fire Research, Development and Testing

Dr. Phillips Center for the Performing Arts

Forensic Engineering and Litigation Support

Hamilton College, Theater and Art Gallery

Hazard Analysis and Risk Management

Jay and Susie Gogue Performing Arts Center

Live and Online Training

John F. Kennedy Center for the Performing Arts

Security Design and Consulting

Kansas City Metropolitan Performing Arts Center

Sustainability and Pollution protection

Madison Square Garden

We provide fire safety code consulting for the construction, renovation, and evaluation of assembly occupancies including convention centers, conference facilities, exhibition halls, ballrooms, auditoriums, lecture halls, theatres, religious facilities, and performing arts facilities. From fire systems design to facility management, having an effective facility program should be an essential part of your strategy. Our professionals are experienced in providing optimal solutions for top-of-the-line assembly occupancies, while meeting the challenges of aesthetics, function, safety, and cost-effectiveness.

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

New York Lincoln Center Paramount Center, Emerson College SUNY, Oswego Campus, Tyler Hall Renovations The Kimmel Center for the Performing Arts Xfinity Theatre

38


Eric Cote, P.E.

Relevant Project Experience:

Project Role: Technical Lead/Code

Altria Theater | Richmond, VA

Education: B.S. Fire Protection Engineering University of Maryland, 1987

Boston Convention & Exhibition Center | Boston, MA

Professional Registrations: New York Massachusetts Virginia

Huntington Theater Renovations & Additions | Boston, MA

Colonial Theatre | Boston, MA Dedham Community Theatre | Dedham, MA Jay and Susie Gogue Performing Arts Center | Auburn, AL New Brunswick Cultural Center | New Brunswick, NJ Parker Playhouse Renovations | Ft. Lauderdale, FL St. Tammany Parish, Cultural Arts District | Covington, LA

Eric Cote, PE, is a Senior Technical Advisor with over 28 years of experience. He has been dedicated to the analysis of building code requirements and their intent relative to the fire-safe design of all structure types. He specializes in fire and life safety master planning, accessibility code analysis and plan review, and complex code issue analysis and equivalency development. Project experience includes large mixed-use developments; research and instructional laboratories; educational facilities; residential and institutional multi-tenanted housing; and fire and code analyses for unique structure types.

Jay and Susie Gogue Performing Arts Center

39

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


Kalin Associates

Specifications Consultant

1121 Washington St. Newton, MA 02465 p: 617.964.5477 www.kalinassociates.com

KALIN ASSOCIATES PROVIDES ARCHITECTURAL SPECIFICATION WRITING SERVICES FOR ARCHITECTS, CORPORATIONS AND BUILDING PRODUCT MANUFACTURERS. COMPANY OVERVIEW

SERVICES PROVIDED

REPRESENTATIVE CLIENTS

Since 1984, Kalin Associates has provided construction specifications for more than 3,000 projects with a total construction value of over $40 billion. Our services range from preparing specifications for private, public bid, and LEED projects, to master specifications for design offices and corporate owners, guide specifications for building product manufacturers, and specification management and education.

BIMspec—Integrating BIM and specs

AvalonBay Communities, the Ahold Companies

Lectures and spec training

Brigham and Women’s Hospital

Master specs for companies and agencies

Cape Cod Community College

Specs for international projects

Commonwealth of Massachusetts (DCAMM)

Spec writing for LEED projects

Dubai Apartment Tower

Mark is the author of the original GreenSpec Database of Sustainable Products (1996), and has written chapters for both Green Building, RS Means and Construction Specifications (Wiley & Sons). He has authored numerous publications on specifications, product selection, and greespecs, presenting on these topics in over 100 sessions at both regional and national conventions. He has taught Architectural Specifications at the Graduate School of Design at Harvard University and is currently Chair of the Masterformat Maintenance Task Team of the Construction Specifications Institute. Long active in the American Institute of Architects, he has been Chairman of the AIA Masterspec Review Committee, the AIA Specifications and Building Technology Professional Interest Area and the AIA Library and Archives Committee. We seek to work with architects and designers who are focused on design and who can appreciate the value of specifications in their design process.

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

Fitaihi Medical Center Fresenius Medical Care Massachusetts Bay Transit Authority (MBTA) Massachusetts Maritime Academy MIT Lincoln Lab Nextel Communications United Parcel Service University of Massachusetts at Amherst Wellesley College

40


Mark J. Kalin FAIA, FCSI, LEED

Relevant Project Experience:

Project Role: Specifications

Boston University, Black Box Theater | Boston, MA

Education: B.S. Architecture The Ohio State University, 1975

Cambridge School of Weston | Weston, MA

B.A. English University of Rochester, 1970

Professional Affiliations: Construction Specifications Institute AIA Masterspec Review Committee AIA Library and Archives Committee

Cambridge School of Weston

Claire T. Carney Library | North Dartmouth, MA Colonial Theater Renovation | Boston, MA Colonial Theater Renovation | Laconia, NH Music Center at Indian Hill | Groton, MA R. W. Kern Center, Hampshire College | Amherst, MA Salem State University, Black Box Theater | Salem, MA The Lofts at Washington University | St. Louis, MO

Mark Kalin (FAIA, FCSI, LEED) is a highly experience specification writer, author, speaker, registered architect, and the President of Kalin Associates. Mark is a CSI certified construction specifier, USGBC LEED accredited professional, and one of only 27 individuals advanced to fellowship in both the American Institute of Architects and the Construction Specifications Institute. Mark has been involved in over 4,000 specification projects since 1984, including 250 LEED projects. He is the author of the original GreenSpec Database of Sustainable Products (1996), and has written chapters for both Green Building, RS Means and Construction Specifications (Wiley & Sons). Mark has authored numerous publications on specifications, product selection, and greespecs, presenting on these topics in over 100 sessions at both regional and national conventions. He has taught Architectural Specifications at the Graduate School of Design at Harvard University and is currently Chair of the Masterformat Maintenance Task Team of the Construction Specifications Institute. Long active in the American Institute of Architects, he has been Chairman of the AIA Masterspec Review Committee, the AIA Specifications and Building Technology Professional Interest Area and the AIA Library and Archives Committee.

41

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


SECTION NO.

FIVE

Project Experience


Civic Performing Arts Centers

Historic Renovations

State-of-the-Art Entertainment Venues

Educational Arts Facilities

Cultural Arts Districts


JAY AND SUSIE GOGUE PERFORMING ARTS CENTER AUBURN, AL SIZE: 80,000 SF COMPLETION DATE: est. 2019 CONSTRUCTION COST: est. $50M The performing arts center is organized around two primary venues: a 1,200-seat multi-purpose performance hall, and a 250-seat flexible venue. These two venues are linked with a transparent multi-story lobby oriented towards the art museum and major campus entry roadway, inviting all to join in the celebration of the arts. The 1,200-seat multi-purpose hall has been designed with natural, variable acoustics, orchestra pit/lift, and an adjustable proscenium, with a stage (and stagehouse) to accommodate a full range of performers: from a small ensemble or dance troupe, to a full symphony orchestra and chorus, to touring Broadway shows. The second venue is intended to serve a variety of needs from rehearsal space, to banqueting/event space (working in concert with the lobby and outdoor “porch”) and, of course, performance space. It will not only facilitate the technical needs of a multi-media experimental theatre, but also has the additional feature of operable “hanger-type” doors that allow for performers to play to an outdoor “lawn” with a capacity of over 2,500 concert goers. The project is designed to achieve LEED Silver Certification.

CLIENT REFERENCE: Jim Carroll, Former University Architect Auburn University e. jimcarroll@ucdavis.edu | p. 530.754.1073

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

42


61

ES 2 1 4 PA R K I N G S PA C

FUTURE DUNCAN EXTENSION

45

60

48

GREENWAY

JULE COLLINS SMITH MUSUEM OF FINE ART

TH EP OR CH

VA LE T

SO

UT H

CO LLE G

ES

TR

EET

19 P AR

KING

S PA

DROP - OFF

CES

WOODFIELD DRIVE

THE LA WN

KIM

BE

POND

98 PARKING S

E PAC

RLY

DR

IVE

S

1” = 40’ - 0” April 27, 2017

+

43

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

44


CALDERWOOD PAVILION BOSTON, MA

SIZE: 38,000 SF COMPLETION DATE: 2004 CONSTRUCTION COST: $8.2M The Calderwood Pavilion is the anchor tenant in a ninestory mixed-use building on Tremont Street. The larger facility includes restaurant, retail and residential spaces. The facility is connected to the historic Cyclorama building, home of the Boston Center for the Arts (BCA), and is jointly operated by the Huntington Theatre Company (HTC) and the BCA. The new 38,000 SF complex has a three-story interior space that includes generous rehearsal rooms, box office, public lobbies, and back of house functions. This is the HTC’s second performance venue and the additional space allows them to expand both creatively and physically. The theatres are given distinct identities within: The Roberts Studio is designed with an unexpected red leather upholstered wall to represent the more experimental productions it houses; while the Wimberly is outfitted with more traditional wood paneling. Blue accents reference the soft blue lining that

covers the wooden interior of a musical case.

A new events venue was designed within the performance facility to address the lack of event space in the neighborhood and to provide additional amenities for the mixed-use development. Machado and Silvetti Associates and ADD Inc. designed the building’s exterior, and the mixed-use project condominium component.

CLIENT REFERENCE: Peter Dubois, Artistic Director Huntington Theatre Company e. pdubois@huntingtontheatre.org | p. 617.266.7900

45

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

46


TOWSON UNIVERSITY CENTER FOR THE ARTS TOWSON, MD

SIZE: 300,000 SF COMPLETION DATE: 2006 CONSTRUCTION COST: $42M Wilson Butler Architects, in a joint venture with Design Collective Inc., of Baltimore, brought the previously disparate visual and performing arts communities of Towson together in a 300,000 SF arts center that highlights the distinct individuality of each department. The facility provides a public “frontage” space in a unified collectie village via an interior “street for the arts.” The eight venue arts center includes the renovation and spatial reorganization of the original 165,000 SF CFA building built in the early 1970’s, and a seamless addition of 135,000 SF. The AIA and IIDA-award-winning Center now includes a new recital hall, recording studio, dance theater and new “black box” studio theater, and an expanded program of studios, classrooms, rehearsal halls, galleries and administrative space for all departments. Classrooms, rehearsal halls, and studios, along with administrative offices, create a home for the performing arts students at Towson. Spaces support the artistic and musical soul in the growth of their art. Gathering nodes and neighborhoods mesh seamlessly with the more formal performance spaces to create opportunities for conversation or an impromptu jam session. Students both learn and play in the Center for the Arts, fostering both their creative spirit and their thirst for knowledge.

CLIENT REFERENCE: David Mayhew, Director, University Architecture Towson University e. dmayhew@towson.edu | p. 410.704.4459

47

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

48


HOWARD COMMUNITY COLLEGE VISUAL AND PERFORMING ARTS CENTER TOWSON, MD

SIZE: 42,400 SF COMPLETION DATE: 2006 CONSTRUCTION COST: $21.4M The rural campus of Howard Community College, a rich intellectual, cultural and economic asset in Howard County, is attended by 43% of county residents. The Performing Arts Wing addition to the Arts & Humanities Instructional Building was the latest in a string of projects Howard Community College had undertaken to improve the quality of their facilities in response to the College’s 2000 Master Plan. Wilson Butler Architects was responsible for the design of the project’s three performance spaces, many of which are shared with community groups to enhance their operational use time and to further bond the community and the college. They include the 2,320 SF Dance Rehearsal Studio, the 2,570 SF, 118 seat Recital Hall, and the 3,200 SF, 108-116 seat, Studio Theatre. The 3,800 SF Black Box will serve as a flexible, experimental space with state-of-the-art lighting and sound systems for theatrical learning for both performers and production crews. The 2,400 SF Multimedia Hall serves vocal and instrumental practice performances for an audience of 100, while educating students through a highly technical, multimedia approach to music instruction. Instruction also takes place within the Dance Rehearsal Studio.

CLIENT REFERENCE: Valerie Lash, Dean of the Arts & Humanities Howard Community College e. vlash@howardcc.edu | p. 443.518.4959

49

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

50


BROWARD CENTER FOR THE PERFORMING ARTS FORT LAUDERDALE, FL

SIZE: 220,000 SF COMPLETION DATE: 2014 CONSTRUCTION COST: $40.5M In 2009, WBA was selected to develop the design for the $40 million renovation of the 220,000 GSF Broward Center for Performing Arts (BCPA), originally designed by the firm’s partners, Scott Wilson and Scott Butler in 1986 - 1987 (completed 1991), while working with Benjamin Thompson Associates. The project was executed in 3 main phases and the facility remained open during the entire construction period. Phase I focused on the renovation of the 2,700 seat Au-Rene Theater and the creation of the new Club Level, an all-inclusive patron experience modeled after those offered in sports arenas, a first in the performing arts industry. Phase II continued with new and improved patron experiences; the new Intermezzo Lounge, Peck Courtyard, renewed lobbies and vastly improved restrooms. Phase III concluded the main project with the grand opening of the new Huizenga Events Pavilion which was sited along the New River and the addition of the Rose Miniaci Arts Education Center. During the summer of 2015, BCPA opted to finish what they started and renovate the 590 seat Amaturo Theater as the final chapter in the ambitious project.

CLIENT REFERENCE: Kelley Shanley, President & CEO Broward Center for the Performing Arts e. kshanley@browardcenter.org | p. 954.522.5334

51

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

52


53

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

54


THE BUSHNELL CENTER FOR THE PERFORMING ARTS HARTFORD, CT

SIZE: 91,000 SF COMPLETION DATE: 2001 | 2006 CONSTRUCTION COST: $34M Wilson Butler Architects guided the project into becoming a leading player in Connecticut’s cultural life with the design of the 91,000 SF Maxwell M. and Ruth R. Belding Theater addition and the restoration of the 1930 historic gem Mortensen Hall. The multi-purpose 907-seat addition dramatically expands the Bushnell’s ability to present cultural and educational programming. Designed for theatre, ballet, opera and symphony, it includes a ceiling mural, created by the Wilson Butler team along with Boston based artist James Piatt, AIA. The performance hall also houses offices and educational facilities for the Bushnell’s youth programs. Mortensen Hall, the original 2800-seat performance venue, is listed on the National Register of Historic Places and is a vital part of Hartford’s Elm Street Historic District. Its restoration, completed by Wilson Butler Architects in 2006, brings its faded glory back to vibrant life. The transformation of the Bushnell into a full Performance Center also includes generous new lobbies with patron amenities for both theaters, as well as the 200-seat Autorino Great Hall for cabaret performances and functions, with a new box office, café, and gift shop.

CLIENT REFERENCE: Ronna Reynolds, Executive Vice President Bushnell Center for the Performing Arts e. ronna_reynolds@bushnell.org | p. 860.987.6000

55

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

56


BOSTON UNIVERSITY HARRIS MUSIC AND TEACHING CENTER BOSTON, MA

SIZE: N/A COMPLETION DATE: 2009 CONSTRUCTION COST: $11.4M Wilson Butler Architects partnered with Boston University’s College of Fine Arts (CFA) in 2001 to conduct a comprehensive program inventory and building evaluation. The end result was the multi-phased 2004 Master Plan which addressed immediate needs as well as laying the foundation for the future vision of the CFA. In 2009, we completed renovations to the Harris Music and Teaching Center at 855 Commonwealth Avenue, along with a new printmaking studio and classrooms at 808 Commonwealth Avenue. The teaching center replaced the existing music practice rooms located in the basement of the College of Fine Arts. The project required full demolition of the existing facility which suffered from poor air quality and unacceptable acoustic separation. The renovation provided 119 Wenger modular practice rooms, some of which were equipped with Wenger’s Virtual Acoustics Environment technology which acoustically simulates various performance venue types and enables musicians to better prepare for performances.In addition to the practice rooms, additional rehearsal spaces were provided for percussion as well as labs for ethnomusicology, piano and music technology and a student lounge.

CLIENT REFERENCE: Amy Barrett, Asst. Provost, Academic Space Planning Boston University, College of Fine Arts e. abarrett@bu.edu | p. 617.353.2230

57

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

58


59

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


SECTION NO.

SIX

Fee Proposal


Klanghaus Concert Hall


FEE PROPOSAL The following Professional Fees are based upon the University of Rochester’s Sloan

Design Staff Hourly Rates

Performing Arts Center Request for Proposals dated 27 April 2018, and subsequent provided material (Owner’s Project Submission Requirements – Exhibit B, and Supplement to Project Requirement Letter, received 1 May 2018), including requested comments appearing later in this section. Our professional fees are a direct function of effort and the criteria set forth by our clients. With that understanding, we are always willing to have substantive discussions with our clients in order to negotiate fees that are fair and equitable to all parties. Wilson Butler proposes a total professional fee for Basis Services in the amount of 1,495,000.00 (One Million Four Hundred and Ninety-Five Thousand Dollars). In the interest of transparency, the below chart breaks down the Wilson Butler Design Team’s professional fees by individual Consultant and Phase. It has been Wilson Butler’s experience that, due to the complexity of the performing arts building type, reimbursable expenses are typically in the range of 6-8% of the total fee. Given the current Sloan Performing Arts Center program, we are comfortable with a 6% of the total fee or $89,700.00 (Eighty-Nine Thousand Seven Hundred Dollars) allowance to be established for Reimbursable Expenses.

Project Phase

Wilson Butler Architectural

Director

$250

Principal

$200

Senior Architect

$180

Project Architect

$150

Project Manager

$120

Senior Interior Designer

$120

Designer II

$100

Designer I

$90

Intern/Office Support

$60

Stages Consultants Threshold Acoustics Theater

Acoustics & A/V

ME Engineers

Vermeulens

MEP/FP

EDR

Cost

SIlman Engineers

Landscape

Structural

Erdman Anthony Civil

Jensen Hughes Code

Kalin Associates Specifications

Phase Total

Programming & Pre-Schematic

$54,100

$9,800

$13,500

$0

$15,600

$0

$5,000

$0

$2,500

$0

$100,500

Schematic Design

$85,000

$9,800

$18,600

$24,000

$23,600

$6,975

$10,000

$4,800

$5,000

$1,000

$188,775

Design Development

$154,500

$15,400

$18,100

$75,000

$14,000

$16,190

$20,000

$12,000

$7,500

$5,000

$337,690

Construction Documents

$270,400

$17,500

$25,700

$105,000

$6,000

$14,840

$40,000

$7,200

$10,000

$4,000

$500,640

$31,000

$3,500

$3,600

$4,000

$0

$2,550

$5,000

$0

$0

$0

$49,650

$177,565

$14,000

$45,000

$38,000

$0

$13,480

$20,000

$4,700

$5,000

$0

$317,745

$772,565

$70,000

$124,500

$246,000

$59,200

$54,035

$100,000

$28,700

$30,000

$10,000

$1,495,000

Bidding & Negotiation Construction Administration

TOTAL

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

60


ASSUMPTIONS & EXCLUSIONS The following represent assumptions made by the Design Team and items that are excluded from the scope of services. Should these services be required or desired by the University of Rochester, the services shall be treated as Additional Services. • •

• • • • • • • • •

No services are included for the testing, documentation, or abatement of hazardous materials are included. The University of Rochester shall provide a complete topographic site survey including all utilities, invert elevations, neighboring structures, trees, roads, walks, etc. Additionally, an applicable site Geotechnical Report shall be provided or a Geotechnical Engineer retained by the University of Rochester for the preparation of said report. All required subsurface investigation shall be included as part of the Geotechnical Engineer’s scope of services Available as-built drawings for existing structures All existing systems (water, sanitary, electric, cogen hot water and chilled water) have sufficient capacity for the additional loading of this project and there is adequate water pressure so as to not require a fire pump. No Life Cycle Cost Analysis for systems alternatives No design of telephone, data, communications, or security systems other than empty raceway. No seismic design for systems or supports. The project will be constructed with a single prime contract and issued for bid as a single package. Above fees do not include FF&E, except that equipment that falls within the scope of the Theatre and A/V Consultants. No U.S. Green Building Council LEED Project Certification. No New York State Energy Research and Development Authority (NYSERDA) studies, anticipated incentives and application process.

COMMENTS ON EXHIBIT B – OWNER’S PROJECT SUBMISSION REQUIREMENTS 1.16 – It is assumed that the Catering Kitchen is intended for warming and plating only and no food prep will be conducted requiring DOH approval. 5.6 – It is assumed that Project Meetings can be attended in-person or remotely utilizing web-based teleconferencing. 5.7 – Wilson Butler has proven to successfully administer and conduct construction progress observation/review on projects utilizing a number of differing techniques, including: representation by the most appropriate Design Team member to the construction work at hand, live web-based cameras, extensive photo documentation services (Multivista), etc. We feel that instead of a predetermined weekly on-site construction progress observation/review – when there may be nothing to review - it is more important to utilize review time when it is most needed and at appropriate levels of construction. In some cases this may necessitate multiple days on site to review critical conditions later in construction. 5.14 - Record Drawings shall be the input of the Contractor‘s supplied Certified “As-Built” information into original documents. Wilson Butler Architects and their Consultants cannot verify or certify “as-built” conditions.

COMMENTS ON SUPPLEMENT TO PROJECT REQUIREMENTS LETTER (OWNER CONSULTANT AGREEMENT) 1.2.2 – The Owner acknowledges that the Consultant is relying upon the accuracy, competence, and completeness of any services or documentation provided by the Owner to the Consultant. 2.4.1.3 – The Consultant shall investigate and determine the nature and scope of only those existing University standards and practices directly applicable to the Project, and may, but is not required to, make recommendations as desirable to their revision. 2.6.22 – “Owner shall have the right to reasonably disapprove…” 2.6.23 – Mutually agreed timeframe to be determined. 8.4.1 – All undisputed payments due the Consultant from the Owner shall be paid per 10.3.1. 8.5.2 – This provision shall be mutual. 9.1.1 - In the first sentence strike “…defend…”, “…any and all…”, “…attorney’s…”, and “…caused by or resulting from…” 11.5.2 – Incomplete 2nd sentence? 14.2 – “…benefit of the Owner and Consultant…” 14.4.c – Strike “duly organized, validly existing and”

61

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL


70 Federal Street, Fifth Floor Boston, MA 02110 www.wilsonbutler.com

UNIVERSITY OF ROCHESTER, SLOAN PERFORMING ARTS CENTER - REQUEST FOR PROPOSAL

77


Turn static files into dynamic content formats.

Create a flipbook
Sample Proposal - Wilson Butler Architects by Steven Caruso - Issuu