Skip to main content

Bolzano New Hospital (IT)

Page 1


BolzanoHospital Bolzano (IT)

THEPROJECT

As part of the constructionof the new hospital complex in Bolzano, commissioned by CZ Hospital and designed by TiemannPetri Koch Architekten, 108prefabricated monolithicbathpods were supplied for the inpatient areas.

The solutionhelped accelerate construction timelines by ensuringhigh quality standards, executive accuracy, and compliance with stringenthealthcare industryrequirements.

The interventionis part of one of the most significant hospital projects in SouthTyrol, characterized by a design approach oriented towards efficiency, patient comfort and sustainability.

Bolzano Hospital, Bolzano (IT)
Concrete Bathroom Pod with shower
MODEL1
Bolzano Hospital, Bolzano (IT)
Concrete Bathroom Pod with shower
Bolzano Hospital, Bolzano (IT)
Concrete Bathroom
Pod with shower
MODEL2
Concrete Bathroom Pod with shower MODEL3
Concrete Bathroom Pod with shower MODEL4
Bolzano Hospital, Bolzano (IT)

MATERIALS ANDTECHNOLOGIES

• Structure: base, walls and ceiling made in concrete

• Floorfinishing: glass mosaic 25 x 25 mm NT-51 EGEO – Reviglass / Natura

• Suspendedceiling: aluminium panels – Prometal

• Wallfinishing: in painted tempered glass sp. 6 mm

• Washbasintop: marble powder bound by polyester resin, Artic white sp. 25 mm – Helopal

• Showerseats: balanced tip up mechanism – Lehen / Evolution

• Sanitaryfittings: Keramag / Renova

• Taps: Grohe / Eurostyle

• Safetygrips: Lehen

• Plumbinginstallation: in series with hotwater recirculation – stainless steel tubing – Geberit

• Electricalinstallation: plates and switches Bush-Jaeger

• Heatingsystem: underfloorheating system with reduced thikness floor – Powerline ; electronic temperature regulator - Jung

• Ventilation: air inlet valve – Lindab / KSU

Bolzano Hospital, Bolzano (IT)

Turn static files into dynamic content formats.

Create a flipbook
Bolzano New Hospital (IT) by StercheleGroup® - Issuu