Skip to main content

Pavia Prison (IT)

Page 1


PaviaPrison
Pavia (IT)

Theproject

The new PaviaPrison, delivered for ICG Srl,is a project requiring high standards of safety, durability and construction reliability.

As part of the project, in addition to the prefabricatedstructuralsystem, Sterchele Group supplied 100HighSecurityMonolithicBathroomPods, developed in 4differentlayouts to suit the various building configurations.

The pods were specifically engineered to meet the requirements of correctional facilities, incorporating dedicated geometries, stainless steel sanitary ware and anti-vandal service systems.

The prefabricated approach ensured controlled quality, construction precision and production consistency, delivering high standards of safety and long-term durability.

The layingofthe bathroompodis inserted duringthe assemblyphases

Concrete Bathroom

Pod with shower

Pavia Prison,Pavia (IT)

Concrete Bathroom

Pod with shower

MODEL2
Pavia Prison,Pavia (IT)

Concrete Bathroom

Pod for disabled MODEL3

Pavia Prison,Pavia (IT)

Materialsandtechnologies

• Structure:base, walls and ceiling made in concrete

• Floorfinishing: slip resistant gres porcelain tiles R11 20 x 20 cm Alba –Cipa Gres / Graniti

• Wallfinishing: gres porcelain tiles 20 x 20 cm Oumi- Cipa Gres / Graniti

• Sanitaryfittings: suspended in stainless steel 18/10 satin-finished steel – Franke

• Shower:showerhead with anti-rotation device – Franke

• Taps: flush kit with time-controlled regulation and electronically controlled by an external module with piezo-eletric control, on a stainless steel plate with anti vandal fixing

• Plumbinginstallation:in parallel with manifolds; sheathed and removable cross-linked polyethylene pipes – Uponor / Quick& Easy

• Electricalinstallation:equipped with vandal-proof plate and electric components - AVE

• Heatingsystem: cast iron radiator with anti-vandal fixing, without lockshieldsand valves on the lines - Idealclima / Neoclassic

• Ventilation:white aluminiumwall inlet grid– MP3 with anti vandal fixing and with 45° ventilation fins.

Pavia Prison,Pavia (IT)

Technicalspecifications,technologies,technical designandproductivecharacteristics

A full height pod shell, to avoid the creation of a gap between the bathroom ceiling and the upper floor (safety reasons).

Pavia Prison,Pavia (IT)

Turn static files into dynamic content formats.

Create a flipbook
Pavia Prison (IT) by StercheleGroup® - Issuu