Skip to main content

Voghera Prison (IT)

Page 1


VogheraPrison Voghera (IT)

THEPROJECT

The project involved the engineering and supply of 68monolithicbathroompods, custom-designed to meet the highest standards of safety, robustness and functionality required by contemporary detention facilities.

Commissioned by Devi Impianti, the development included threelayouts, with geometric variations designed to optimise internal spaces and adapt to the specific floor plans of the complex.

Particular attention was given to the selection of internal components, designed to ensure highresistanceand protectionagainst damage.

The specification includes stainlesssteel sanitaryfixtures, anti-vandaltapwareand servo-assistedsystems, engineered to ensure long-term durability and controlled water consumption.

The laying of the bathroom pods during the assembly phases
Voghera Prison, Voghera (IT)
MODEL1
Concrete Bathroom Pod with shower

Concrete Bathroom Pod with shower

MODEL2
Voghera Prison, Voghera
Voghera Prison, Voghera (IT)
Concrete Bathroom Pod for disabled MODEL3

MATERIALSANDTECHNOLOGIES

• Structure:base, walls and ceiling made in concrete

• Floorfinishing: slip resistant gres porcelain tiles R11 20 x 20 cm Alba – Cipa Gres / Graniti

• Wallfinishing: gres porcelain tiles 20 x 20 cm Oumi- Cipa Gres / Graniti

• Sanitaryfittings: suspeded in stainless steel 18/10 satin-finished steel– Franke

• Shower:showerhead with anti-rotation device – Franke

• Taps: flush kit with time-controlled regulation and electronically controlled by an external module with piezo-eletric control, on a stainless steel plate with anti vandal fixing

• Plumbinginstallation:in parallel with manifolds; sheathed and removable cross-linked polyethylene pipes – Uponor / Quick& Easy

• Electricalinstallation:equipped with vandal-proof plate and electric components - AVE

• Heatingsystem: cast iron radiator with anti-vandal fixing, without lockshields and valves on the lines - Idealclima / Neoclassic

• Ventilation:white aluminiumwall inlet grid– MP3 with anti vandal fixing and with 45° ventilation fins.

Voghera Prison, Voghera

TECHNICALSPECIFICATIONS,TECHNOLOGIES,TECHNICALDESIGNAND PRODUCTIVECHARACTERISTICS

A full height pod shell, to avoid the creation of a gap between the bathroom ceiling and the upper floor (safety reasons).

Turn static files into dynamic content formats.

Create a flipbook
Voghera Prison (IT) by StercheleGroup® - Issuu