

Newcastle(UK)

THEPROJECT
Developed for Balfour Beatty Construction Ltd and designed by Red Box Design (UK), the Tyne Bridge Hilton Hotel in Newcastle represents a significantproject in the international hospitality sector, with design solutions focused on comfort and high-quality finishes.
For the building, 257monolithic bathroompods were produced, developed in 3differentlayouts. The pods feature a dual-service configurationwith both bathtub and shower, ensuring high standards of functionality and comfort.
The interiors are completed with elegant VerdeGuatemalamarble finishes, giving the spaces a refined and distinctive character.



Concrete Bathroom Pod with shower and bathtub MODEL1




Concrete Bathroom
Pod with bathtub



MODEL3
Concrete Bathroom
Pod for disabled




MATERIALSANDTECHNOLOGIESFORMODELS1-2
• Base: madein concrete
• Wallsandceiling:in steel profiles and gypsum fiberboard panels Fermacell
• Floorfinishing:gres porcelain tiles 30x10 cm - Italgraniti / Le Gemme
• Wallfinishing:single-fired tiles 20x25cm - Marazzi / Fantasia with a marble strip Verde Guatemala
• Washbasintop:made in Granito Nero Assoluto
• Sanitaryfittings: Twyford / Aria-Galerie; bathtub Baxi Ocean/ Standard
• Taps:Grohe / Euroeplus Due; Groheterm 3000
• Plumbinginstallation:in parallel with manifolds, sheathed and removable crosslinked polyethylene pipes –Uponor
• Electricalinstallation:shaver socket- MK ; loudspeaker - RCF / DS313
• Lightfittings:recessed downlights – Reggiani
• Ventilation:air inlet valve D.100 mm - Halton / URH

MATERIALSANDTECHNOLOGIESFORMODEL3
• Base:madein concrete
• Wallsandceiling:in steel profiles and gypsum fiberboard panels Fermacell
• Floorfinishing:gres porcelain tiles 30x10 cm - Italgraniti / Le Gemme
• Wallfinishing:single-fired tiles 20x25cm – Marazzi; decorative marble strip Verde Guatemala
• Sanitaryfittings:Armitage Shanks/ Ventura; Armitage Shanks/ Portman
• Taps: Grohe / Euroeplus Due; Grohe / Automatic 2000
• Safetyhandles:steel with anti-bacterial coating PBA
• Plumbinginstallation:in parallel with manifolds, sheathed and removable crosslinked polyethylene pipes - Uponor
• Electricalinstallation:shaver socket – MK; altoparlante - RCF / DS313
• Lightfittings:recessed downlights – Reggiani
• Ventilation:air inlet valve D.100 mm - Halton / URH




