Skip to main content

SP's Land Forces Dec 2010-Jan 2011

Page 1

December 2010-January 2011

SP’s

Volume 7 No 6

AN SP GUIDE

WWW.SPSLANDFORCES.NET

IN THIS ISSUE

R

`100.00 (India-based Buyer Only)

INDIAN ARMY SPECIAL

P U B L I C AT I O N

ROUNDUP

T h e O N LY j o u r n a l i n A s i a d e d i c a t e d t o L a n d F o r c e s

PAGE 4 Indian Army Through the Ages The transformation of Indian military for the future, through technological improvements coupled with innovative operational art will give India a distinct advantage over its potential adversaries.

MINISTRY OF DEFENCE  INDIA

Lt General (Retd) V.K. Kapoor

I

am pleased to learn that SP Guide Publications is bringing out separate special editions on the Indian Air Force, Indian Army and Indian Navy. Our Armed Forces have rendered invaluable contributions  to  the  nation—both  in  times  of   war  and  peace.  We want our Armed Forces to retain the competitive edge and rank among the best in the world. We  remain  committed  to  the  modernisation  of   the Forces. However, modernisation must proceed hand-in-hand with indigenisation. The all-around welfare of  the Jawans,

PAGE 6 Avoid Delays, Act Fast

>> The sluggishness of the Defence Ministry in equipment procurement could have disastrous results in the future. Lt General (Retd) V.K. Kapoor PAGE 10 100 Magnificent Years The Corps of Signals recently celebrated its centenary year.

ex-servicemen and their family members continues to be our primary concern.  I am confident that the special editions will be liked and read widely. Please accept my best wishes for your future endeavours.

A.K. ANTONY

COV E R STO R Y

‘Indian Army is prepared to play its part in the development and security of our country’ PHOTOGRAPH: Abhishek / SP Guide Pubns

Lt General P. Mohapatra PAGE 12 ‘Future wars will be intense, swift, non-linear, network-centric with technology intensive weapon systems’

Interview with Lt General Ajai Chandele, Director General, EME, Indian Army PLUS A Key Enabler in Net-centric Warfare Bid for Best Tech Time for Offensive & Defensive Measures

8 14 16 18 19

Tecknow News in Brief

DO YOU THINK INDO-CHINA RELATIONS HAVE IMPROVED AFTER CHINESE PM’S RECENT VISIT?  Yes  No  Don’t Know

Join the poll & comment

Addressing a gathering comprising course members including officers from friendly foreign countries and civil services at the National Defence College, New Delhi, Chief of Army Staff General V.K. Singh spoke on the subject— ‘Indian Army: Challenges and Vision’ 6/2010

SP’s LAND FORCES

1


Global Patriot Combat-Proven Air and Missile Defence

Protecting today’s world takes a Global Patriot.

Patriot is trusted by 12 nations — forming a global partnership that is addressing today’s challenge of integrated air and missile defence with the most proven solution in the world. Patriot simultaneously defends against multiple threats — including tactical ballistic missiles, cruise missiles, aircraft and UAVs — even in severe electronic countermeasure conditions. Patriot’s performance in combat, and in over 2,500 system tests, translates into an adaptable, cost-effective and reliable line of defence for an alliance of countries that continues to grow. Global Patriot: trusted today to meet the defence needs of tomorrow.

INNOVATION IN ALL DOMAINS Visit www.raytheon.com; Keyword: GlobalPatriot © 2010 Raytheon Company. All rights reserved. “Customer Success Is Our Mission” is a registered trademark of Raytheon Company.


E

D I T O R I A

L

C O V E R S T O R Y << Reports have been appearing in the media regularly and articles have also been appearing in military and security related journals regarding the great drive that has been launched to modernise the armed forces. Reports indicate that the modernisation of the Indian Army includes new helicopters, high technology weapons and new artillery systems, night fighting aids, unmanned vehicles and other advanced systems and munitions. In all a multibillion-dollar induction plan has been drawn by the Indian Army in their long-term integrated perspective plan (LTIPP). The high technology platforms and systems and other assets will enhance the Army’s operational capabilities when integrated with the command, information and decision support system (CIDSS) which is being progressed simultaneously and includes separate projects such as artillery combat command control system (ACCCS), battlefield surveillance system, air defence control and reporting system (ADC&R), battlefield management system (BMS), and future infantry soldier as a system (F-INSAS ). Integrated together with requisite

D

efence of  a nation and development  are  complementary.  If India aspires to be an economic power,  its  military  power  must reflect  that  desire  through  its ability to protect its interests. In this context, the transformation of  the Indian military for the  future,  through  doctrinal,  organisational,  equipment  and  technological  improvements  will  give  India  a  distinct advantage over its potential adversaries. This is vital for preserving India’s sovereignty and furthering its national interests. I  intend  covering  my  talk  under  three broad heads—India’s strategic perspectives; threats and challenges; and the way ahead.

India’s Strategic Perspectives Let  me  first  highlight  certain  perspectives that provide a backdrop to the threats and challenges that confront us.  India’s strategic perspectives have been shaped by geography, history, our own native culture, vision and geopolitical realities. Geographically, a few facts are particularly relevant. First, India is both a continental and maritime  nation  with  a  territory  of   over three  million  sq  km,  a  land  frontier  of 15,000 km, a coastline of  7,500 km, and a population of  1.2 billion, the second largest in the world. Second, its location at the base of  continental Asia and the top of  the Indian Ocean gives it a vantage point in relation to both West, Central, continental and South-East Asia,  and  the  littoral  states  of   the  Indian Ocean from East Africa to Indonesia.  Third,  India’s  peninsular  projection  in the ocean which bears its name, gives it a stake in the security and stability of  these waters. Nehru once said, “I look at India… .on three sides, the sea, and on the fourth, high mountains….History has shown that whatever power controls the Indian Ocean, has in the first instance, India’s sea borne trade at her mercy, and in the second, India’s very independence itself.”  Fourth, India shares borders with a large number  of   neighbours,  most  of   whom  do not share borders amongst themselves. The border problems in the North, West and in the North-east are a colonial legacy which we have to deal with. Fifth, the security situation in our neighbourhood, on our western flank, is of  concern. Even though terrorism poses a serious internal threat, our neighbour has been selective in combating it; fighting some groups, while  sheltering  and  supporting  others  it considers as strategic assets. Till the terrorist infrastructure remains intact and infiltration attempts by terrorists into Jammu & Kashmir continue, our relations will remain strained. Sixth, rapid rise of  our neighbour in the North and North-east as an economic and military  power  together  with  its  new  as-

communications, these systems will provide near real time ‘sensor to shooter’ links to make the Army a network-centric force. Planning seems flawless but when it comes to execution, to take stock of what has been procured out of the big ticket items such as the artillery guns, light observation and reconnaissance helicopters, night fighting aids for armour and infantry, or even efforts towards network-centricity, our pace is so excruciatingly slow that the results achieved are almost negligible. The Ministry of Defence would have us believe that the delays occurring currently are due to several reasons such as insufficient and limited vendor base, non-conformity of the offers to the request for proposal (RFP) conditions, lengthy field trials, complexities in contract negotiations, limited indigenous capability and long lead time for indigenisation, etc. However, these reasons notwithstanding, the fact remains that we as a nation do not seem to have the political will to equip the armed forces suitably. The media is busy unearthing scams, the political parties are busy protecting their power base and their turf, the bu-

sertiveness give rise to apprehensions about her intentions. At the moment, peace prevails along the border and confidence building measures are in place. However, rapid infrastructure development in the adjoining  regions  and  modernisation  of   their armed  forces  has  significantly  enhanced their military capabilities, which we need to take note of. Seventh,  India  is  an  energy  deficient country located close to some of  the most important sources of  oil and natural gas in the Gulf  and Central Asia and adjacent to one  of   the  most  vital  sea-lanes  through which  about  1,00,000  ships  transit  every year. Spill-over effects from other neighbouring countries: Conventional military threats from other neighbours are virtually non-existent.  However,  non-conventional  threats from the neighbourhood could manifest in the form of  spill-over effects along land border or coastal areas. Some of  the concerns relate to the consequences of  the prevailing political instability and porosity of  our borders with Nepal. Cross border movement of Indian insurgent groups and the actions of Bhupalese  refugees  in  the  areas  adjoining Bhutan also remain areas of  concern.  Efforts  by  Sri  Lanka  to  rehabilitate  the war affected people and integrate them into the mainstream have the possibility of  bringing lasting peace with positive outcomes for both the countries.

Threats and Challenges India faces a variety of  military challenges to  national  security.  These  include  the threats  from  traditional  adversaries  and  a variety of  additional challenges that need to be factored in India’s planning process for the future. The additional challenges which impact specifically upon the structure and preparedness of  the Indian Army are:  l Defence  of   our  island  territories  separated by large distances from the mainland. l Security  of   our  offshore  and  on  shore  assets and resources rich areas. l Security  of   a  large  and  unprotected coastline and the national assets and infrastructure along the coastline. l Internal dissent and claims to autonomy by  sub-national  entities,  who  may  be supported from outside.  l Demographic shifts in the North-eastern region  and  other  non-military  threats which may impact upon the military. l The  belief   of   a  single  powerful  neighbour, which views its economic and security interests as more vital than that of the  world  (Damming  of   India’s  water sources). l The proliferation of  weapons of  mass destruction  and  advanced  delivery  platforms such as cruise and ballistic missiles

l l

l

l l

l

reaucracy couldn’t care less and the armed forces do not have the financial powers or the freedom to progress beyond a limit. This is happening at a time when the threats and challenges to the nation are increasing and when we should be preparing the armed forces for a possible two front conflict contingency in the future. After the debacle of 1962 war, our citizens and planners should appreciate that plans on paper, political rhetoric and diplomatic parleys cannot win wars. With this issue, SP’s Land Forces completes seven years. The issue also carries a variety of articles focused on the threats and challenges and modernisation of the Indian Army to prepare for future conflicts.

and UCAVs. Overspill of  ethnic conflicts in the South Asian Region into India. Internal destabilisation of  neighbouring states  compelling  India  to  resort  to “peace enforcement” initiative either individually  or  collectively  as  a  part  of United Nation or other multilateral initiatives. Global  terrorism  perpetrated  by  nonstate actors, which may be aided or supported by other states. Military aid, in internal security, against terrorist activity; narcotics and LWE. Robust economic growth will bestow political  power  and  a  global/regional power  status  in  the  future  which  will mandate autonomy in decision-making and  safeguarding  of   sovereignty  in  a new global order and a new global and regional  security  environment  whose contours  are  currently  hazy  and  will need to be analysed as we move forward in  the  21st  century,  to  ascertain  their impact on our security.  Defence and protection of  Indian Diaspora abroad and India’s energy-related assets located abroad.

Non-Conventional Challenges Ensuring the security of  ‘Global Commons’; namely, outer space, cyber space, the oceans, global  transport  and  communication  networks has assumed significance. Threats to these transcend national boundaries and a collective effort to ensure the free flow of  information  and  economic  opportunities across these ‘commons’ is vital.

Lt General (Retd) V.K. Kapoor

l

l

l

l

l

l

l

and crushing power.  Globalisation  and  interconnectedness will  make  wars  transparent  thus  challenging  the  political  utility  of   using armed forces. Military power is likely to be used selectively,  in  an  integrated  and  synergetic manner and with increasing discrimination in choosing means as well as ends. There will invariably be an international pressure on warring parties due to the fear of  escalation, especially if  the nuclear  armed  states  are  involved,  and hence wars are likely to be short but of high intensity. Two or three generations of  warfare will coexist i.e. high technology as well as low technology components.  The  strategy  of   global  leadership  and  engagement by the United States, based on  the  assumption  that  such  a  role  is natural, will continue for the foreseeable future, though China is building its military  capabilities  at  a  faster  pace  than  anticipated earlier and together with its impressive economic clout will prove to be a formidable challenge in the future. Its assertiveness is already being felt in the region. A  balance  between  the  measures  of   active security building and restraint will have  to  be  maintained  with  a  better awareness of  their respective strengths and weaknesses. Care will have to be taken to work within the limits of  international law including its precepts on the minimum use of  force and proportionality of  response (this is not applicable to hyper/superpowers).

Nature of Future Wars Increasing economic interdependence as a consequence of  globalisation; international opinion, technology and the availability of nuclear weapons have resulted in a major shift in the management of  international security. The nature of  warfare is changing. Future wars, therefore, are likely to be: l Highly uncertain. l Technology will play a pre-dominant role in designing the conduct of  war. l The costs involved and the complexities of  war waging may force nations to join allies/coalitions thus requiring expertise in combined warfare methods.  l The high costs of  waging wars and of  individual  weapon  systems  will  demand total  synergy  between  various  components of  national power and between the various  elements  of   the  armed  forces themselves. l Weaker states will use “asymmetric warfare” to fight more powerful opponents while the more powerful states will use positive asymmetry through C4ISR capabilities to deliver significant lethal and non-lethal effects with precision, speed

The Way Ahead India’s strategic vision is in harmony with our traditional character as a peaceful, responsible nation that has abjured aggression and played a constructive, mainstream role in international relations. We have no extra territorial ambitions and no desire to transplant our ideology on others. It is our considered position that we wish to retain our strategic autonomy and thus need to maintain an independent deterrent capability.

Army Perspective The Indian Army is required to fulfil its roles of   protecting  India’s  integrity  and  sovereignty—across the entire spectrum of  conflict. The present profile of  the Indian Army can essentially be described as: l A large standing Army, which is structured, equipped and trained to undertake operations;  ranging  from  sub-conventional to all out conventional war against a nuclear backdrop at the higher end. l The Indian Army has been involved in Continued on page 15

6/2010

SP’s LAND FORCES

3


>>

M I L I TA R Y H I STO R Y

Indian Army Through the Ages The transformation of the Indian military for the future, through technological improvements coupled with innovative operational art will give India a distinct advantage over its potential adversaries, which is vital for preserving India’s sovereignty and furthering its national interests PHOTOGRAPH: www.army.mil

n LT GENERAL (RETD) V.K. KAPOOR

partition and Punjab migration could have been lessened had Mountbatten been a wiser man and not rushed independence and delayed the announcement of  the boundary award. Out of  about 14 million people involved in migration, it is estimated that more than half  a million died in the violence that erupted on both sides. The strain on the troops of  the old Indian Army with the emotional stress of  communal differences, personal tragedies and daily exposure to heartrending scenes of  murders, rapes  and  other  brutalities,  brought  their discipline to a breaking point, but it survived because of  its leadership. It was the greatest test of  the old Indian Army which it passed with flying colours under the most adverse circumstances.

T

he early military history of  India is a history of  India’s princely states constantly at war with each other and this motivated their thinking with  the  resultant  lack  of   unity against foreign invaders. Thus the Indian saga of  battles against all invaders including the British is full of  tactical level battles of   personal  bravery  of   kings  and  princes which lacked strategic level thinking and planning. From the lessons of  these wars, it also becomes clear that the military leaders of  India’s princely kingdoms did not understand the importance of  battlefield mobility and the need to evolve new concepts and  to have new weapons synchronised into a new art of  warfare to confront more skillful opponents.   The British era of  the Indian Army lasted for  nearly  200  years.  Major  Stringer Lawrence  was  the  first  army  officer  appointed Commander-in-Chief  of  all the East India  Company’s  forces  in  1752.  He  can thus be deemed as the Father of  the Indian Army. The forces then comprised Europeans recruited from England or locals and Indian auxiliaries. These Indians were armed with their  own  weapons,  wore  their  own  dress and were commanded by their own officers.  The events of  1857 are too well known to be recounted in detail in this brief  focus on the Indian Army. A Royal Commission appointed in July 1858 suggested that the Army in India be composed mainly of  Indian troops with the proportion of  Indians to British being 2:1. By 1863,  the  actual  numbers  were  three, 15,500  Indian  and  38,000  British  troops. The three armies were amalgamated step by step, which was completed by 1895.  With  the  overall  control  of   the  Indian Empire being vested in the Crown, the imperial strategy for the defence of  India envisaged a wide cordon sanitaire to give depth to this jewel in the crown. Afghanistan, Tibet and  Burma  were  the  immediate  buffers while  the  global  dominance  of   the  British Navy  allowed  them  even  further  outposts like  Hong  Kong,  Singapore,  Aden  and Cyprus in the Mediterranean Sea. Pax Britannica was at its zenith and the core was centred in India.

www.spslandforces.net

The Era of the World Wars The final shape and professional restructuring of  the Indian Army was carried out prior to World War I under General Kitchener, the Commander-in-Chief   in  India  from  1902. During this period, due to a clash between him and Viceroy Curzon over the perceived organisational duality of  control of  the military in India, Curzon resigned. This issue has had a significantly negative effect on the higher  defence  control  mechanism  that evolved after independence and which leaves the Service Chiefs outside the governmental decision-making forums. Till date, this aspect remains an Indian weakness.  During World War I, more than one million  Indian  soldiers  served  overseas.  The Army expanded from 2, 39,511 in 1914 to 1,440, 428 personnel by 1919. While there were no commissioned Indian officers in the Army, the Indian Army fought in all major theatres  including  France  Gallipoli, Mesopotamia, Egypt and Palestine. When Poland was attacked by Germany on September 1, 1939, Britain declared war against  Germany  on  September  3,  1939.

4

SP’s LAND FORCES

6/2010

Operation Gulmarg Operation  Gulmarg,  which  was  a  deliberately planned operation by Pakistan, aimed at the annexation of  Jammu and Kashmir (J&K). According to its leader Colonel Akbar Khan  of   Pakistan  Army,  its  planning  was done in August 1947. Indian Army’s operations in J&K and the achievement of  the Indian  Army  under  its  own  officers  despite logistics constraints, daunting terrain and severity of  climate is a proud tribute to its leadership, fighting spirit and patriotic fervour of  all ranks. They undertook a task allotted  to  them  as  a  sacred  mission  to  be fulfilled at whatever the cost.

Indian Army Post-Independence

Indian Army soldiers during a reconnaissance mission training exercise

The  Viceroy  declared  India  at  War  on  the same day. World War II (WW II) had started. Congress  governments  in  power  in  eight provinces  resigned,  as  they  had  not  been consulted. They  declared  that  they  would not  cooperate  with  the  government.  This was not due to love for Nazi Germany, but a matter of  principle. In the beginning of  the WW II, the Indian Army had a strength of 1, 94,373 personnel which was a little more than  the  strength  available  when  WW  I started. The modernisation planned in 1938 was yet to start and the Indian Army was not intended to fight overseas, but only protect India’s borders and nearby areas. However, before the war ended; the Indian Army had expanded to over 2,000,000 men and engaged  in  operations  stretching  from  Hong Kong to Italy. In the re-conquest of  Burma, it provided the bulk of  forces and played important  roles  in  the  campaigns  in  North Africa and Italy. Nearly 6,300 awards were received  by  the  Indian  Army  in  WW  II. Awards  for  gallantry  alone  were  approximately  4,800.  It  included  31  Victoria Crosses,  4  George  Crosses,  252  Distin-

India faces a far greater threat than any other country in the world because of a highly volatile strategic neighbourhood

guished Service Orders, 347 Indian orders of  merit, and 1,311 military crosses.

Independence and Partition While the Indian Army did not fight a war of independence, it contributed to it. Among the factors that led to independence, a major factor was the formation of  India National Army (INA) by the Indian prisoners of  war. Nearly 20,000 officers and men joined the INA. The British were stunned at the defection of  officers. They realised that they could not rely on the Indian Army to put down a movement for Independence. This was reinforced by the mutinies in the Royal Indian Air Force in January 1946 and an even more widespread  one  in  February  1946,  in  the Royal India Navy. It was acknowledged that India could not be held by force of  arms and this was a major factor in the British decision to grant independence.  It was agreed that by August 15, 1947, India  and  Pakistan  should  have  effective forces  mainly  non-Muslims  and  Muslims under their respective control. A large part of  the Army had mixed classes and involved a  major  reorganisation  of   practically  all units. The Navy and the Air Force did not pose  a  serious  problem  due  to  their  small size. An Armed Forces Reconstitution Committee under Field Marshal Auchinleck was set to divide the units and stores in the ratio of  two to one between India and Pakistan, respectively. Muslims from India and nonMuslims from Pakistan could select which dominion they would serve.   The tragedy of  partition is a story which deserves  separate  coverage. The  misery  of

The strength of  the Indian Army in August 1947 was 4,00,000, but the political leadership was keen to reduce the strength to save defence expenditure and hence it was decided to bring down the strength of  the Army to 2,00,000  after  the  J&K  Operations  which would  involve  the  disbandment  of   many units. A new Territorial Army Act was passed in 1948 and the infantry and artillery units with  a  nucleous  of   regular  officers  were raised  in  1949.  Many  other  changes  occurred during the period from 1948 to 1960. The  designation  of   Commander-in-Chief ceased to be in use from 1955 and the three Chiefs (Army, Navy and the Air Force) were made equal and independently responsible for their respective service. Every function of the  defence  services  was  duplicated  in  the Ministry of  Defence where civilian bureaucrats not only ensured financial and administrative control but also gradually took over the decision-making powers of  the defence services.  The  standing  of   the  military reached  an  all  time  low  when  Krishna Menon was the Defence Minister and decisions concerning matters of  major military importance were taken without consultation of  the concerned service.

Nehru’s Bias Nehru’s bias against the military was wellknown in the Services. The clearest example of  this was when Cariappa outlined his plan for the security of  NEFA, after China had  occupied Tibet,  Nehru  flared  up  and thumping the table said, “It is not the business of  the C-in-C to tell the Prime Minister who is going to attack us where. You mind only Kashmir and Pakistan.” Nehru continued  to  appease  the  Chinese  and  the  untimely death of  Sardar Patel took away all opposition to Nehru’s views. The Sino-Indian War of  1962 and the national humiliation was the result of  this policy and the


M I L I TA R Y H I STO R Y

<<

www.amgeneral.com

PHOTOGRAPH: Wikipedia

bias against the military. The military also failed by acquiescing to a policy they knew to be militarily and politically unsound.

Indian Army destroyed over 100 Patton and Sherman Tanks (seen in the pic) of Pakistani Army during the 1965 Indo-Pak War

The Period 1961 to 1971 The period 1961 to 1971 was one of the most traumatic periods of the Indian Army. The  defeat in 1962 shook the foundation of the nation  and  the  armed  forces.  The  Army began  to  introspect  to  overcome  its  weaknesses. The 1965 War helped the Army to redeem  itself,  but  revealed  embarrassing weaknesses in its equipment and its training and even leadership at various levels. These two wars spurred the political leadership to modernise  and  expand the services. As 1970 came to a close, the Indian Army was now ready to face new challenges emerging on the horizon. The  Indo-Pak War in 1971 resulted in creation of a new nation—Bangladesh— and a decisive military victory in which 93,000 prisoners  of  war  were  taken.  While  many books have been written to describe each battle in detail, it is the spirit of the soldiery during this campaign that deserves mention. In the words of Sydney Schanberg of New York Times, who accompanied Indian troops in two sectors, “I don’t like sitting around praising armies.  I  don’t  like  armies  because  armies mean wars—and I don’t like wars. But this [the  Indian]  Army  was  something…They were  great  all  the  way.  There  was  never  a black  mark…I  lived  with  the  officers  and  I walked,  rode  with  the  jawans—and  they were all great … And they were the most perfect gentlemen—I have never seen them do a wrong thing, not even when they just saw how bestial the enemy had been.”

From 1971 to 1998 The period after 1971 War saw the steady

modernisation of the Indian Army with new equipment  for  modern  wars.  The  Experts Committee  under  the  Chairmanship  of  Lt General K.V. Krishna Rao submitted its report in 1976. Some of its major recommen-

If India aspires to be a regional/global economic power, its military power must reflect that desire through its ability to protect its interests

dations started getting implemented in the 1980s. The expansion of mechanised forces was achieved as a result of this report. On April 13, 1984, 34 soldiers of the Indian Army were landed by 17 sorties of helicopters at a point three kilometres short of Bilafond La, a pass on the Soltaro ridge, West of Siachen Glacier. The soldiers occupied the pass. This was the opening move in what is referred to as the Siachen conflict between India and Pakistan, which continues till date. This period also saw the Army operation on the Golden Temple on June 5, 1984, at Amritsar, to clear the complex of militants who had based themselves in the temple. The Operation was code named ‘Blue Star’. By June 7,  1984,  the  Golden  Temple  complex  had been cleared of militants, but it left in its aftermath a wave of anguish and anger among

the Sikh community and the nation faced the assassination  of  the  then  Prime  Minister  Indira Gandhi by her Sikh security guards. The  period  from  July  1987  to  March 1990 saw the Indian Army fight Tamil militants in Sri Lanka with one hand tied behind their back. The Indian Peacekeeping Force (IPKF) moved to Sri Lanka to carry out peacekeeping duties as generally assigned during  UN  operations  and  to  separate  the warring factions’ i.e.  LTTE and Sri Lankan armed forces, but ended up enforcing peace and conducting military operations against LTTE.  What  the  Indian  Army  achieved  is best described in the words of Rajan Wijeratrie, former Minister of State for Defence in Sri Lankan Government. He is reported to have said, “The IPKF had virtually finished them off. They were gasping for breath in the jungles. It was we who provided that oxygen to them.” This summed up what IPKF had achieved before de-induction. During the 1980s, the Indian Army also conducted the operation in Maldives to prevent mercenaries from overthrowing the Government  of   Maldives  and  while  it  did  not involve much fighting, it demonstrated to the world the speed and efficiency with which the Indian armed forces could react. This period (1989 onwards) also saw the start of  the terrorism and insurgency in Kashmir and deployment of  additional troops in J&K.

Kargil War (May-July 1999) Kargil Sector is 168 km along the line of  control (LoC) stretching from Kaobal Gali in the west to Chorbat La in the east. The sector was vast with the line of  control which runs along the  watershed  along  heights  of   4,000  to 5,000 metres high. The frontage and the naContinued on page 15

6/2010

SP’s LAND FORCES

5


>> M O D E R N I S AT I O N

Avoid Delays, Act Fast The sluggishness of the Defence Ministry in equipment procurement could have disastrous results in the future. We need a far greater focus and a firm political will to modernise our military and build the desired military capability for the future. PHOTOGRAPHS: Abhishek / SP Guide Pubns

n LT GENERAL (RETD) V.K. KAPOOR

39-calibre 155mm FH-77B howitzers from Bofors

F

our  conclusions  generally  emerge from any analysis regarding the nature of  future wars—future wars will be highly uncertain, major state-tostate wars among well armed nations will be rare, low intensity conflict and asymmetric wars will proliferate and technology will play a predominant role in designing the conduct of  future wars. Most nations are investing heavily in new and emerging technologies which they feel will confer distinct advantages over the adversary.  India  faces  a  variety  of   military  challenges  to  national  security,  which  include the threats and challenges from traditional adversaries and a multiplicity of  challenges which could be grouped under low intensity conflict operation (LICO). Additionally, there are a large number of  security parameters due to our geography which are factored in to the military planning process in order to derive  the  structural  and  organisational changes and modernisation focus. According  to  Lt  General  (Retd)  Noble Thamburaj,  former  Vice  Chief   of   Army Staff, the modernisation focus of   the Indian Army  in  the  Eleventh  Defence  Plan  is  on “precision fire power, air defence, aviation, future  infantry  soldier  as  a  system  (FINSAS),  infrastructure  development,  network-centricity  and  achieving  battlefield transparency  through  improved  surveillance, night vision and target acquisition… Considering the receding span of  technological  cycle,  right  balance  has  to  be  maintained between the state-of-the-art, current and obsolescent technologies.”  In light of these aspirations, let us examine broadly the progress made so far.

Future Tanks The DRDO has commenced conceptual stage development  of   future  main  battle  tank (FMBT) and future infantry combat vehicle (FICV). This development is expected to be completed  by  about  2025.  T-90S  Russian tanks  have  provided  new  teeth  to  India’s strike formations in the plains and corrected the imbalance that had resulted from Pakistan’s acquisition of  T-80 UD from Ukraine and  the  Al  Khalid  tanks  jointly  developed with China.

Artillery Modernisation Artillery modernisation has been plagued by inordinate delays due to many reasons, but the  most  relevant  factor  is  the  convoluted procurement  process  which  has  been  put into place ostensibly to prevent corruption and  to  ensure  transparency.  The  result  is that  in  doing  so  we  have  tied  ourselves  in knots. Our procedures are not allowing the modernisation process to move forward. It seems that every segment of  the Army and civil machinery asked for its views can stall the  process  by  a  seemingly  innocuous  remark, sometimes just to emphasise their importance  in  the  decision-making  process. Moreover, given the mindsets within the civil and  military  hierarchies  and  the  bureaucratic file pushing that goes on within the MoD, the situation has been made unmanageable. The ultimate sufferer is the Army whose  modernisation  is  stalled  at  a  time when multifarious challenges facing it have started manifesting themselves. There is a real danger that we may have to face a conventional conflict on two fronts, in two different theatres of  war (eastern and western), simultaneously.

www.spslandforces.net

Main Battle Tanks On Army Day 2009, the then Chief  of  Army Staff  General Deepak Kapoor admitted that a large number of  India’s battle tanks are night blind. This reference was obviously pertaining to  the  T-72M1  (Ajaya)  fleet  of   the  Army, which constitutes the majority amounting to approximately  1,800  tanks.  Going  by  the open  sources  information  available,  the Army’s armour profile, in the next five years or so, could comprise approximately 1,700  T-90S, 1,800 upgraded T-72M1 and 250 to 500 Arjuns. The indigenously designed Arjun main battle tank (MBT) had been in the pipeline for over two decades. Though the tank has many good features, it had consistently failed to meet the Army’s GSQR for an MBT and orders had been placed for only 124 tanks to be manufactured. After the recent comparative  trials  of   the  Arjun  with  the T-72M1 and the T-90S, additional orders have been placed for another 124 Arjun Mk II, which is an improvement on the Arjun MBT. In  the  year  2000,  India  signed  a  deal with Russia to acquire 310 T-90S tanks and assemble 1,000 in India. In 2008, the MoD decided  to  acquire  another  347,  T-90S tanks.  The  first  Indian  assembled  T-90S (Bhishma) rolled off  the production line on January 8, 2004. Ultimately we may have up to approximately 1,700 T-90S tanks.  The T-72M1 (Ajeya) tanks are still awaiting modernisation. The upgradation of  some tanks has now commenced at the rate of  200 tanks per year. The upgradation package currently  includes  a  thermal  imaging  standalone night sight (TISAS). An integrated fire

6

SP’s LAND FORCES

6/2010

vehicles for counter-insurgency operations are also being considered.

155mm 52-Calibre, Towed Gun Systems A Tatra mobile launcher with BrahMos supersonic cruise missile

control system has been planned but there seems to be little progress in this direction. New TADIRAN radios have been fitted in all T-72 tanks giving them an effective communication system. Automatic land navigation system (ALNS) and global positioning system (GPS) are being fitted for navigation along with and a laser warning system. Explosive reactive armour (ERA) package is being fitted on  all  Ajeya  tanks  which  will  enhance  protection against armour piercing fin stabi-

lized discarding sabot-tracer (APFSDS) and high  explosive  anti-tank  (HEAT)  rounds.  The  feasibility  of   a  new  power  pack  is  being explored.

Light Tanks The Ministry of  Defence (MoD) issued RFP for  200  light  tanks  and  100  wheeled  armoured  personnel  carriers  (APCs),  including  some  for  the  mountain  sector  in  November 2009. Plans to buy light strike

The  last  major  acquisition  of   towed  gunhowitzers was that of  about 400 pieces of 39-calibre 155mm FH-77B howitzers with a range of  30 km from Bofors of  Sweden in the  mid-1980s. This  gun,  despite  political controversy, proved its mettle in the Kargil conflict. After more than two decades of  neglect,  during  which  many  other  artillery weapons like the 100mm and 122mm field guns of  Russian origin and the indigenously developed  75/24  Indian  mountain  gun joined the long list of  obsolete equipment in service with the Army, tenders were floated and trials were commenced for a 52-calibre 155mm gun to replace all field and medium guns. Four sets of  trials have been done till date and no gun has been inducted.  On July 22, 2010, yet another request for information  (RFI)  for  155mm/52-Calibre Towed Gun System for the artillery was issued and replies were asked for by August 16, 2010. This is consequent to the cancellation  of   the  existing  trials  of   the  two 155mm Howitzers belonging to Singapore Technologies Kinetics (STK) (FH- 2000) and BAE Systems (FH-77 B05 L52), respectively. The MoD spokesman claimed that trials had been  abandoned  due  to  the  “non-appearance” of  STK’s FH-2000 gun. This will result in considerable amount of  delay in the induction of  any new artillery gun because the decision-making process of  choosing a new artillery  gun  itself   may  take  another  two years and the cascading effect will further delay the artillery modernisation plan to the


M O D E R N I S AT I O N << year 2020 as it would take about eight to 10 years to manufacture the chosen weapon indigenously. Artillery is looking for an outright purchase of  400, 155mm Howitzers and another 1,180 howitzers through local manufacture. We are also looking for 120 tracked and 180 wheeled, self-propelled (SP) 155mm guns for the armoured and mechanised formations.

Ultra Light Howitzers The American Defence Security Cooperation Agency  (DSCA)  has  now  notified  the  US Congress of  the Obama administration’s intention to sell 145, M-777, 155mm Howitzers  to  India,  asserting  that  the  sale  will boost ‘interoperability’ between Indian and American soldiers and marines. The mandatory notification follows a request from India for the light-weight towed howitzers. The procurement of  airmobile howitzers fills  a  void  in  the  Army’s  requirement  of heavier calibre artillery for the mountains where the lack of  suitable roads and track system precludes the carriage of  guns to the forward areas so as to reach out deeper in the enemy’s defences. It will enable the Army to carry out quick intra-theatre movements thus substantially improving its flexibility. How  M777  is  a  155mm  39-calibre  towed howitzer that weighs less than 10,000 lbs (4,218  kg).  It  has  laser  inertial  artillery pointing  system  and  a  30  km  range. This government-to-government  deal  is  worth $647 million (`2,910 crore).

and very low radar cross section and are far superior to subsonic cruise missiles like Pakistan’s Babur. Chile, Kuwait, Malaysia and South Africa have shown interest in acquiring this missile.

Current AD Scenario AAD is holding systems with varying timeframes, ranging from the oldest 40mm L70 gun which is more than four decades old to the youngest Tangushka which is about 15 years old. The majority of  the remaining guns and  missiles  are  about  20-30  years  old.  In fact,  the  vintage  of   these  systems  is  much more in their country of  origin. Thus in all respect they are either obsolete or have reached obsolescence. Meanwhile, the air threat has been  becoming  more  critical  with  the  fifth generation fighters looming in the horizon and  unmanned  combat  aerial  vehicles  becoming a reality. Seen in this backdrop, the current AAD picture is rather dismal.  L/70 Gun System: L/70 is the mainstay and has been the work horse of  AAD since 1964. It was to be completely replaced by 2000. However, there is no progress. DRDO’s development effort also kept its replacement at a limb for about two decades. Not many gun  systems  are  currently  available  but  a possible choice is Skyshield of  Rheinmetall Defence which has an effective range of  4 km  and  rate  of   fire  of   1,000  rounds  per minute. It can be matched with any fire control radar and the most redeeming feature is

not succeed and a RFP was issued sometime back, but it seems to have been withdrawn and a fresh RFI has been issued recently. It is very difficult to predict the timeframe of procurement. The possible choices could be Israel’s  Spyder,  Raytheon’s  HAWK  XXI, which is a more advanced and compact version  of   HAWK  PIP-3  upgrade  integrated with a new 3D MPQ-64 sentinel radar. The missiles are upgraded MIM-23K standard with an improved blast-fragmentation warhead  that  creates  a  larger  lethal  zone. Raytheon’s  other  system  is  SLAMRAAM which is the land version of  air-to-air missile which has recently been inducted into the US Defence Forces. Other systems are Russia’s TOR M-1 which has a range of  12 km and Aster15 with a range of  about 30 km which seem to fall in the category of  either  less  or  more  range  than  required. There  are  reports  that  DRDO  is  having  a joint venture with MBDA for Mica missile named Maitre (friendship) under a shortrange SAM (SR-SAM) system programme for replacing QR SAM system. Medium-range SAM (MRSAM) System: Kvadrat is the current system which is more than 35 years old and has the technology of  the early 1960s. An RFP has been issued  but  was  withdrawn  due  to  poor response. DRDO’s Akash has not succeeded in mobile role. So the Indian Air Force has procured limited numbers to replace the ageing Pechoras and the Indian Army is followPHOTOGRAPH: SP Guide Pubns

Rocket Artillery There  has  been  notable  progress  on  the rocket artillery front. A contract for the acquisition of  two regiments of  the 12 tube, 300mm  Smerch  multi-barrel  rocket launcher (MBRL) system with 90 km range was signed with Russia’s Rosoboronexport in early 2006 and the equipment has since been received. This weapon system is a major boost for the long-range firepower capabilities of  the Army.  Extended range (ER) rockets are being introduced for the 122mm Grad MBRL that has been in service for over three decades. The ER rockets  will  enhance  the  weapon  systems’ range from 22 to about 40 km. A contract worth `5,000 crore has also been signed for the  serial  production  of   the  Pinaka  MBRL weapon  system,  another  DRDO  project plagued by delay in time and completed with help from Larsen and Toubro (L&T) and the Tatas. The Pinaka rockets will have an approximate range of  37 km.

Tangushka mounts have been in service for more than a decade

Artillery Command and Control Systems The “Shakti” project for command and control systems for the Artillery, earlier called Artillery combat command and control system (ACCCS), has reached the stage of  maturity and is now being fielded extensively in the plains. Gradually, it will be fielded up to the corps level and the two artillery divisions will be equipped with it.

BrahMos Supersonic Cruise Missile Efforts are also under way to add ballistic as well as cruise missiles to the artillery arsenal. The  BrahMos  supersonic  cruise  missile (Mach 2.8 to 3.0), with a precision strike capability, very high kill energy and range of 290 km, is being inducted into the Army. A ceremonial induction function of  the BlockI version was held in July 2007. Since then, the  Block-II  version  has  successfully  completed trials. It is a versatile missile that can be  launched  from Tatra  mobile  launchers and silos on land, aircraft and ships, and perhaps in future also from submarines. About 50 BrahMos missiles are expected to be produced every year. Efforts are afoot to further increase its strike range. BrahMos Aerospace has  orders  worth  `3,500  crore  from  the Army and the Navy, which has opted for the anti-ship  as  well  as  the  land  attack  cruise missile (LACM) versions. These terrain hugging  missiles  are  virtually  immune  to counter  measures  due  to  their  high  speed

fructify.  Some  current  systems  are Starstreak of  UK, Stinger Block 2 of  US and the Mistral of  France.

Infantry Modernisation The Indian Army is extensively engaged in ongoing  proxy  war  operations  in  Jammu  and Kashmir  and  internal  security  (IS)  and counter-insurgency  operations  (CI)  in  the North-east. Simultaneously, the threat from traditional adversaries demands a high level of  preparedness for conventional conflicts. In 2008,  during  an  interview  with  SPs Land Forces, the Director General Infantry, Lt General Rajender Singh, said, “We have launched major modernisation plans with particular emphasis on improvement in firepower, mobility, surveillance and night fighting capability.  These  will  be  inducted  as  per  the perspective  plans.  Some  of   these  weapons such as multiple grenade launchers (MGLs), automatic  grenade  launchers  (AGLs)  have been inducted while the remainder are in the pipeline. We are also in the process of  individual  soldiers  combat  capabilities  through  future infantry soldier as a system (F-INSAS) programme.”  On July 9, 2009, Lt General Jasbir Singh, the next Director General, Infantry, candidly shared his thoughts on a host of  important issues  affecting  the  Infantry.  He  said,  “With rapid advancements in the field of  science and technology,  the  nature  of   warfare  is  also changing. Future wars are likely to be short, intense and characterised by greater transparency,  increased  accuracy  and  lethality with much higher tempo of  activities. In these times, while the Army needs to maintain conventional deterrence, it should also be prepared  to  face  the  more  probable  threat  of asymmetric war. The technological advancements that would impact future operations of infantry can be categorised as under: (a) Improvement  in  fire  power—both  in quantum and accuracy. (b) Sensors to provide day/night all-weather capability. (c) Information sharing through networking  and  information  management  by  automation. He said that his endeavour was to further enhance the capability of  the Infantry soldier and equip him with adequate lethality, protection and situational awareness to meet the challenges of  both conventional and the next generation of  warfare. He clarified that they were  in  the  process  of   adopting  the  above technologies towards meeting the operational objectives set out for the infantry.

Future Infantry Soldier as a System Project

the advance hit efficiency and destruction (AHEAD)  technology  ammunition  which contains  152  heavy  tungsten  metal,  spin stabilised  sub-projectiles  and  ejected  by  a time fuse. It is claimed to be very effective against  small  targets.  The  same  system  can  replace  ZU-23mm  twin  barrel guns if  found suitable and would reduce the inventory.  Schilka System: It is a highly mobile system for supporting armour formations and is in service since the early 1970s. Its successor was Tangushka, but only one regiment has been procured so far. The result is that the AAD is stuck with limited equipment which does  not  meet  the  current  operational  requirement. One possibility is to take dispensation  for  ‘single  vendor’,  and  procure  more number of  Tangushka mounts which have been in service for more than a decade.  Quick Reaction SAM (QR SAM) System: The current system is OSA-AK which is a highly mobile system for the defence of armour  formations.  This  system  is  more than 20 years old and needs to be replaced. DRDO’s effort to develop Trishul system did

ing suit to buy some for important strategic tasks in static role. Additional procurement appears to be set out through a joint venture of   the  DRDO  and  IAI  of   Israel.  The  contenders could be Russia’s BUK-M1, Aster30, Patriot Advance Capability-3 (PAC-3). The PAC-3 system incorporates many changes to the ground equipment and the missile and is fielded in incremental steps called Configuration 1, 2, and 3. The ultimate PAC-3/Configuration 3 includes upgrades to the radar (now designated AN/MPQ-65) to increase detection in high-clutter environments and to improve discrimination of  closely spaced objects (better decoy recognition). Patriot is the obvious frontrunner as it is war proven; has hit to kill technology; can engage aircraft, helicopters, UAVs, cruise and tactical ballistic  missiles.  It  is  currently  deployed with 10 nations including the US.  Shoulder Fired SAM Systems:  The current system is Igla, which is also in service with the Indian Navy and the Indian Air Force. It was to be replaced with a latest version called Igla-M which had a better ‘approacher  mode’  capability  but  it  did  not

The Army’s F-INSAS project focuses on enhancing  the  lethality  and  survivability  of soldiers. It seeks to transform soldiers into fully networked, mobile warriors with a high degree of  situational awareness and the ability to operate in all-weather conditions in all types of  terrain. The programme envisages equipping infantrymen with light-weight integrated  helmets  with  a  ‘head  up’  display with a built-in communication system and night  vision  goggles,  hand-held  computer display, global positioning system (GPS) and lethal  fire  power,  including  laser-guided weapon systems at appropriate levels.

BFSRs and sensors Battlefield surveillance radars (BFSRs) with practical ranges of  up to seven to eight km where  clear  line  of   sight  is  available  have been inducted along with hand-held thermal imaging devices (HHTIs) with ranges up to 2,000 metres for observation at night and stand-alone infrared, seismic and acoustic sensors with varying capabilities. These have enabled  the  infantrymen  to  dominate  the line of  control (LoC) to bring down infiltration  by  terrorists  from  Pakistan  Occupied Kashmir (PoK).  The  newly  acquired  weapons,  which Continued on page 18

6/2010

SP’s LAND FORCES

7


>>

SEMINAR REPORT

A Key Enabler in Net-centric Warfare Inaugurating the two-day Defcom India 2010 in Delhi, Minister of State for Defence M.M. Pallam Raju said that the tactical communication system is under way and that this offers an excellent opportunity for the Indian industry to seek its share of defence production PHOTOGRAPH: Abhishek / SP Guide Pubns

n R. CHANDRAKANTH

T

he  Minister  of   State  for  Defence, M.M.  Pallam  Raju  informed  that the tactical communication system (TCS) is under way and that this offers an excellent opportunity for the Indian industry to seek its share of  defence production. “The government is exploring options to increase private sector participation in the defence sector through joint ventures, consortia, etc,” he said.  Inaugurating the two-day Defcom India 2010 in Delhi, the Minister said that such efforts were directed towards creating indigenous capabilities and achieving self-reliance in the defence sector. Defcom India 2010 has attracted quite a number of  players from the private industry, showcasing their communication capabilities. Defcom India 2010 is jointly organised by the Corps of  Signals and the Confederation of  Indian Industry (CII). Stating that armed forces will remain a demanding customer, both qualitatively and quantitatively, the Minister said that the industry will have to invest substantially in research and development. “The government will facilitate greater private participation in defence production and the defence procurement procedure (DPP) is evolving,” he said.  Talking  about  the  importance  of   communication  in  the  present-day  battlefield, Raju said mission critical programmes cannot be left to chance and that networking of modern weapon systems would be the key. “While the soldier will require smaller and lighter equipment, efforts should be made to integrate  the  existing  legacy  systems.  As cyber security was an area of  concern, the stakeholders had to guard against leakage of information  and  also  of   disabling  of   networks by subversive elements,” he said.  The Chief  of  the Army Staff, General V.K. Singh said that with more technology infusion, the Indian Army would become a better

T

force. The transformation was from a threatbased  structure  to  capability-based  force. With asymmetric warfare the norm now, the shift was from platform-centric to networkcentric warfare and here the networks have to be robust, resilient and secure.“Transformation of  the force takes time and sometimes there is resistance,” he said and added that it is achieved with the least possible disruption to the mindsets that prevail.  The  Signal  Officer-in-Chief,  Lt  General  P. Mohapatra outlined the importance of  the theme “Converged Infostructure for a Transformed Force”. “In a non-linear battlefield, precision  by  information  becomes  crucial from  the  command  centre  to  the  shooter. The Army had embarked upon creating a robust and scalable network and that convergence remained a challenge. Technology is a catalyst as well as inhibitor. Security will be a key factor,” he said.  The Deputy Chief  of  the Army Staff, Lt General V.S. Tonk said that there had to be seamless  connectivity  between  the  Army headquarters  and  the  tactical  battle  area (TBA). The programme was to empower the commanders to act decisively and in quick time. He also spoke on the importance of  interoperability between the forces and intraoperability within each service.

www.spslandforces.net

he private sector has distinct strengths in Information and Communication Technology. Since the armed forces are at the threshold of  an exciting new era of  net-centricity in which they hope to network all sensors, shooters and commanders on converged infostructures, they expect substantial participation by the private sector. While accepting the necessity, we must appreciate that providing connectivity for strategic and tactical networks is a challenge as dispersed forces operate over a large geographical areas with diversities in terrain, weather, local conditions and operational uncertainties. There is also a need to factor in existing and legacy systems which cannot be wished away. The Indian industry will have to create infrastructure, research and development facilities and quality control procedures to become successful system integrators for defence systems. The  government  has  recently  allowed  private  sector participation in the defence industry up to 100 per cent and with foreign direct investment permissible up to 26 per cent both subject to licensing, for manufacture of  all types of  defence equipment within the country. This is expected to add to the investment already made in the public sector. —Minister of State for Defence M.M. Pallam Raju

8

SP’s LAND FORCES

6/2010

T

Ajai Chowdhary, Founder & Chairman of   HCL  Infosystems,  said  that  the  defence communication industry was a multibilliondollar  sector  and  it  required  participation from different sources, primarily the private sector. Many defence communication programmes such as network for spectrum, defence communication network and ASCON Phase-4 are being implemented, coping with the increased demand for reliable communication. The Indian hardware and software sectors had earned a reputation and for the defence sector it could be a viable hub.  During a panel discussion, Major General A.K. Srivastava, Assistant Director General  Tac  C,  said  that  improved  situational awareness,  robust  and  resilient  networks, net-centricity,  supremacy  of   information and empowerment of  the soldier were essential in the changing scenario of  today’s battlefield.  In  the  communication  realm,  the main challenge was interfacing diverse and heterogeneous networks.  The Indian Army had initiated a number of  projects with the aim of  developing network infrastructure and tactical communications applications. Some of  the projects such as Sanjay, Shakti, etc were in various stages of  development. The Army sought from the industry new technologies which integrated

his year the Corps of  Signals is celebrating its centenary. The Corps has a rich heritage of  technological excellence, innovation and communication achievements. Their contribution during operations, internal security and disaster relief  efforts both in India and overseas in the last one hundred years has been noteworthy. During the last 100 years, the Corps has done well to migrate from flags, pigeons and Morse code to networking and information warfare. They are now on the verge of  ushering in a new era in strategic communications with the NFS project, in tactical communications with TCS and also spearhead the strategic defence network with DCN. They have skillfully showcased their communication capabilities, physical fitness and adventurous spirit well by organising various activities at all-India levels during the year. I wish the Corps great success in all their future endeavours. Finally, I wish the Corps of  Signals and CII great success in the conduct of  Defcom India 2010.  —Chief of Army Staff General V.K. Singh

T

with hybrid legacy systems; robust communication; convergence; integration and interoperability; secure and scalable networks; and lifetime support for equipment. Giving  a  perspective  of   the  Indian  Air Force,  Air  Commodore  Hemant  Sharma, Principal  Director,  Signals  (Air)  mentioned how  there  had  been  significant  growth  in bandwidth with induction of  unmanned aerial vehicles (UAVs), radars, airborne warning and  control  systems  (AWACs),  etc.  In  six months,  the  IAF  would  roll  out  the  mobile network (WCDMA) wherein all IAF personnel would be connected through mobile phones. The  IAF  recently  introduced  Air  Force Network (AFNET), indicating the shift from coverage  of   western-eastern  sectors  to  a pan-India approach. The plan is to integrate radars of  civil, Army and Navy through the AFNET. The road ahead, he said, was virtualisation and capacity expansion in terms of bandwidth may be up to 10 gigabytes.  Captain S.K. Chhetri, Director, Naval Systems, said the Navy was posed with challenges on sea, in air and land and called for integration of  platforms for effective intelligence, surveillance, reconnaissance. The Indian ocean was vast and with the curvature of  the earth, it was difficult to track all vessels traversing the  sea  and  there  were  about  1,000  ships passing  every  day  through  the  Malacca straits. There were about 55,000 fishing vessels  only  in  Gujarat  and  Maharashtra. The Navy,  he  said,  had  embarked  upon  a  programme of  identification of  vessels through automatic identification system (AIS). Lt  General  J.P.  Singh,  Deputy  Chief   of Army Staff  (Planning and Systems), summed up stating that the transformation of  the Indian Army to an agile network-centric and knowledge-based force is imminent. Information dominance, achieved through information  infrastructure,  would  help  majorly  in compressing decision-making time, crucial in a command-sensor-shooter hierarchy.

ransformation in the technological domain  requires the ability to acquire battlefield transparency; process information; make decisions; and distribute information over wide areas, at high data rates, on the move, and across all echelons. These capabilities are the enablers of  network-centric warfare. NCW is all about moving from the industrial age model where information is collected at the edges and moved to the centres for decision-making to an information age model where the edge is empowered to make decisions based on command intent and self  synchronisation derived from high quality shared awareness. Falling in the centenary year of  the Corps of  Signals, Defcom India 2010 has a special significance for the Corps. I am glad to declare that we have got a very enthusiastic response from the industry, academia and service officers. Technical papers received from young technically proficient service officers carry many original and novel ideas and will help us to define the user’s communication perspective in a very effective manner. I compliment their effort. —Signal Officer-in-Chief Lt General P. Mohapatra


RF-7800S Secure Personal Radio

Lightweight, Secure, Connected. Warfighters today need to stay in constant communication with their team members and commanders while keeping focused on the mission. The RF-7800S provides full duplex voice, GPS, and high speed data, all in a compact encrypted system.

• Secure voice, data, and position reporting for every team member • Completely automatic and hands-free operation • Seamless voice/data integration with upper-echelon neworks

FFor or more more iinformation, nformation, visit: visit: www.rfcomm.harris.com/SPR www.rfcomm.harris.com/SPR

www.harris.com w w w. h a r r i s . c o m

RFF C R Communications ommunications • G Government overnment C Communications o m m u n i c a t i o n s SSystems ystems • B Broadcast r o a d c a s t Communications Communications


>> C O M M E M O R AT I O N

100 Magnificent Years The Corps of Signals recently celebrated its centenary year. Lt General P. Mohapatra, the Signal Officer-in-Chief at the Army Headquarters and Senior Colonel Commandant of the Corps of Signals, speaks out nostalgically about the sacrifices made by the information warriors. PHOTOGRAPHS: PIB

1

3

www.spslandforces.net

O

n  this  historic  occasion  of   our centenary year, it gives me immense  joy  to  wish  all  combatants, civilian staff, veterans and their families the best of  health, happiness and prosperity. As we relive history, my heart also reaches out to all information warriors,  who  made  the  supreme  sacrifice and  whose  courage  and  indomitable  spirit continues to propel us to greater heights. Ours has been an epic journey, an inspiring  saga  of   enterprise  and  endeavour,  of courage, commitment and accomplishment. From  modest  beginnings,  the  Corps  has grown over the last 100 years into a versatile and vibrant force, matching the best in the world  and  making  its  mark  in  operations, both  in  pre-  as  well  as  post-independence era; its achievements intimately intertwined with those of  the glorious Indian Army. The  fledgling  Signallers,  first  blooded during World War I, repeatedly proved their mettle, in various overseas operations. Battle hardened through the  World War II, the Signallers  were  tested  for  the  first  time, post-independence, in the 1947-48 Jammu and Kashmir (J&K) operations, where communications were set up in record time, in an area devoid of  infrastructure. This very impassioned spirit and innovative zeal has seen the Corps surmount all odds adroitly combining  technology  with  indefatigable human will, to meet the demands of  communications in all operations including the conflict with China, wars with Pakistan, OP Pawan, OP Vijay, OP Parakram and countless other operations, disaster relief  aid to civil authorities and so on. Some invaluable major  pioneering  efforts  have  been  the Army  radio  engineered  network  (AREN) area grid systems, the Army static communication network (ASCON) which provides backbone connectivity to vital areas panIndia,  the  Army  wide  area  network (AWAN), an enterprise wide messaging network and the mobile cellular communications which is of  immense value especially for counter-insurgency/counter-terrorism (CI/CT) operations.  Our  challenges  have  been  inclusive, ranging  from  creating  a  potent  electronic warfare  and  signal  intelligence  capability,

10

SP’s LAND FORCES

6/2010

2

5

4

1. Defence Minister A.K. Antony presenting the first copy of the commemorative brochure to President Pratibha Devisingh Patil on the occasion of inauguration of Corps of Signals Centenary Year, in New Delhi on February 15, 2010. The Minister of State of Defence M.M. Pallam Raju and the Chief of Air Staff Air Chief Marshal P.V. Naik are also seen. 2. President Pratibha Devisingh Patil lighting of the lamp on the occasion of inauguration of Corps of Signals Centenary Year, in New Delhi on February 15, 2010. Defence Minister A.K. Antony and the then Chief of Army Staff General Deepak Kapoor are also seen. 3. Lt. Gen. P. Mohapatra paying homage at Amar Jawan Jyoti on the occasion of the Corps of Signals Centenary Year, in New Delhi on February 14, 2010. 4. Lt. Gen. P. Mohapatra handing over flags to the Centenary Mountaineering Expedition team leader Colonel Vivek Dogra, in New Delhi on September 7, 2010. 5. The Dare Devils of Indian Army performing at 33 Corps HQ Sukhna during the Corps of Signals Centenary Year celebration on May 26 & 27, 2010

which constitutes a national asset to building  up  a  vibrant  cyber  security  establishment, creation of  data centres for the Indian Army and steering mammoth inter-service communication projects. The annals of  history will also record the commendable performance of  our Corps in adventure activities and sports. We have two Arjuna awardees on our rolls. Several of  our players  have  found  a  place  of   honour  in Olympics. The “Daredevils” have several notable  world  records  to  their  credit.  Our mountaineers have been part of  the noteworthy expeditions; the Corps has been a pi-

oneer in micro-light flying while our representation in the scientific mission to Antartica has won wide acclaim. Woven into this splendid tapestry are our Centres of  Excellence, the Military College of  Telecommunication  Engineering  and  Signal  Training Centres, our concern for our brethren which finds reflection in the War Widows Boys Hostel and several benevolent endeavours. Ours is a Corps bristling with dynamism, proud in its being, but never content, forever aspiring to further the objectives of  the Indian Army.  We  owe  our  achievements,  great  and small, to the dedicated Signalmen—an epit-

ome of  diligence and commitment, who have striven consistently and tirelessly for perfection. Our illustrious forbearers have nurtured the  Corps  assiduously  and  with  a  vision— “setting course by the stars, not by the lights of  every passing ship”, giving us our sense of purpose. On this day, reverence of  those who helped shape the destiny of  this Corps is both our  responsibility  and  our  honour.  On  this historic occasion, we rededicate ourselves to the cause of  our great Army and this incredible nation and solemnly pledge to carry forward  the  legacy  bequeathed  to  us.  Teevra Chaukas! Jai Hind!


A

s  the  DCOAS  (P&S),  my  responsibility  is  principally  related  to  coordinating  the modernisatgfggion, equipping and capability development of the Indian Army, both for immediate and future requirements, through respective directorates.  This  also  includes  updating  of short-term and long-term perspective plans in keeping with the changing security perspective,  equipment  availability,  fiscal  parameters and formulation of  General Staff Policy Statements. SP’s: Despite the changes in the Defence Procurement  Policy  (DPP)  2008,  the  procurement  procedure  of   new  weapon  and other  defence  systems  takes  inordinately long  which,  apart  from  resulting  in  increased costs, may also result in procuring systems which are technologically outdated. What are the measures being taken to overcome this drawbac ime frame for each and every activity involved in procurement, right from the stage of  acceptance of  necessity till the contract is signed.  The entire duration of  the process now ranges from 20 to 34 months. In order to achieve  these  timelines,  preventing  increased costs/cost overruns and achieving technology updatedWhat are the measures being taken to overcome this drawbac ime frame for each and every activity involved in procurement, right from the stage of  acceptance of  necessity till the contract is signed. The  entire  duration  of   the  process  now ranges from 20 to 34 months been put into place for formulation of  explicit and technically achievable.SP’s: Despite the changes in the  Defence  Procurement  Policy  (DPP) 2008, the procurement procedure of  new weapon and other defence systems takes inordinately.  What  are  the  measures  being taken to overcome this drawbac ime frame for each and every activity involved in procurement, right from the stage of  acceptance of  necessity till the contract is signed.  SP’s: Despite the changes in the Defence Procurement  Policy  (DPP)  2008,  the  procurement  procedure  of   new  weapon  and other  defence  systems    takes  inordinately long  which,  apart  from  resulting  in  increased costs,takes inordinately long which, apart from resulting in increased costs, may also result in procuring systems which are technologically  outdated.  What  are  the measures  being  taken  to  overcome  this drawbac right from the stage of  acceptance of  necessity till the contract is signed. n

6/2010

SP’s LAND FORCES

11


>>

INTERVIEW

‘Future wars will be intense, swift, non-linear, network-centric with technology intensive weapon systems’ The professional and institutional ethos of the Electronics and Mechanical Engineering (EME) Corps and the multifaceted support service provided by EME helps Indian Army maintain its operational readiness. In an interview with SP’s Land Forces, Lt General Ajai Chandele, Director General, EME, Indian Army spoke about the engineering support challenges in the service. PHOTOGRAPH: Abhishek / SP Guide Pubns

www.spslandforces.net

SP’s Land Forces (SP’s): The Indian Army is modernising and the state-of-the-art equipment is in various stages of procurement. As an organisation providing engineering support what are the major challenges faced by Electronics and Mechanical Engineering (EME) Corps? Lt General Ajai Chandele (DG): The Indian Army  today  is  in  a  major  modernisation drive to upgrade its weaponry and technological capabilities. Major procurements are under way which include the T-90 and MBT Arjun for the armoured corps, upgrades in night  fighting  capabilities  for  the  mechanised  infantry,  mediumisation  of   the  artillery, induction of  air defence missile and gun systems and the future infantry soldier as a system (FINSAS) for the infantry. Stateof-the-art electronic warfare and communication  systems  are  being  planned,  while simultaneous enabling for network-centric warfare (NCW) is in progress with battlefield surveillance systems and tactical command control communication and intelligence system (TAC C3I) in various stages of  induction. Advanced state-of-the-art helicopters, UAVs, ballistic and cruise missile systems have been inducted into the Army. Ideally the Indian Army aims to maintain a  three  generations  weapon  system  mix  of state-of-the-art technology, current technology and mature technology (in the ratio of 30:40:30). However, due to financial compulsions,  exhaustive  procurement  procedures and  other  related  issues,  the  ratio  today  is 5:25:70. This I feel is the biggest challenge facing the EME—the task of  maintaining a large percentage of  vintage equipment. SP’s: What are the major hurdles in maintaining vintage equipment? DG: Maintaining an equipment profile where more than 60 per cent equipment are living an extended life and in some cases having gone through three to four overhauls is a big challenge.  The  challenge  is  further  compounded by drying up of  foreign sources of supply of  spares as they have graduated to more  advanced  technologies.  While  the modernisation  under  way  will  result  in much improved capabilities for the Indian Army in the future, the equipment management  challenges  of   maintaining  obsolete equipment alongside modern technologies should engage the attention of  the Army.  With  more  and  more  sophistication  in technology and induction of  these advanced systems at each level of  the armed forces organisations, there is a requirement to increase the technical threshold of  the individual soldier and also increase the technical competencies of  the engineering support organisation and echelons within the armed forces. Also, proliferation of  these modern systems poses enormous challenges to the commanders in terms of  operational techniques as well as the way armies are administered and maintained. The current engineering support organisation of  the Army, although suitable for the battles till  date,  needs  to  be  restructured  and strengthened to meet these new challenges of the future.

12

SP’s LAND FORCES

6/2010

needs to be more responsiveness in availability of  spares. OEMs should integrate into the system to ensure that spares are available at rate contracts at their outlets spread all over the country.

SP’s: The ‘womb to tomb system’ of equipment management is followed the world over. How well is this implemented in our Army? DG: This system of  equipment management is  the  established  best  practice  in  armies across the world with strict coordination between all agencies involved with equipment management.  The  system  in  our  Army,  on  the  other hand, has two of  the involved agencies i.e. the Defence Research and Development Organisation (DRDO) and the Directorate General of  Quality Assurance (DGQA) outside the control of  the Integrated Defence Staff which makes them less responsive to service requirements. What is needed is a systems approach that smoothly integrates the functioning of  these agencies to ensure that ambitious  weapon  upgrades  or  new  weapon systems  procurements  do  not  get  riddled with low availability concerns in the future, due  to  inadequate  safeguards  in  the  contracts with the original equipment manufacturers (OEMs) for lack of  provision of  spares and other engineering support essentials. SP’s: There has been a focused drive in the Army to increase the ‘teeth to tail’ ratio. How does this impact the EME? DG: The concept of  the ‘teeth to tail ratio’ has been confused in the Army leading to large manpower cuts in the engineering support organisation, especially at a time when complex state-of-the-art weapon systems are being inducted while mature ageing systems still need to be maintained in the interim. The teeth to tail ratio has been interpreted to mean different things ranging from ‘ratio of bayonet strength to non-bayonet strength in a combat unit’ to ‘ratio of  combat troops to support troops in a force’.  As per the US Marine Corps, the teeth is everything that delivers combat power and the tail includes all the support to maintain its strength such as support staff, from the Pentagon-based  command  structure  right down to the janitorial staff  in the Department of  Defence. In Indian Army, it has been used to determine the relationship between the numbers of  soldiers in combat arms to those in the support services. Let me examine this tooth

to tail ratio in greater detail as defined by the Indian Army. Every armoured squadron or combat team has two vehicle repair teams (AVTs),  one  from  the  LRW  and  the  other from the workshop that operate with it for in situ repairs. These operate ahead of  the essential vehicles column, the B Echelon and the rear parties of  the regiment, but yet get counted towards the tail and not the teeth.  There are some schools of  thought who maintain that war is just a fight between soldiers in combat arms. But this is not the case. It is true that the Army is a fighting machine, but there are three basic needs which needs to be fulfilled if  it is to achieve its full potential in battle—leadership, equipment and training. Wars involve the employment of  a great deal of  modern and sophisticated equipment and the EME plays a major role in assisting the Army’s posture of  operational preparedness and combat effectiveness to win any war. If   combat  arms  are  the  teeth  of   the  Army, then  EME  has  a  vital  function  of   keeping them sharp and it is certainly not the tail. SP’s: What do you feel is the manner in which the engineering support provided by the EME, perceived by the environment? DG: The question is a difficult one to answer as my perspective will always be biased towards the EME, but let me make a fair and frank attempt at this answer. There are concerns in certain quarters of  the Army that the echelon repair system is rigid and there is limited provision of  repair and recovery cover on real time basis during actual combat phase. I think there is a need for seamless integration of  the repair and recovery echelons with the fighting echelons. There is also a feeling that procurement of  non-standardised equipment is leading to vast and unmanageable inventory with poor engineering support and spare part support. Standardisation is the need of  the hour. In addition,  certain  low  population  high-tech equipment could be outsourced for maintenance and repair as it may not be cost-effective to train the personnel on the equipment.  Most users want a single window responsibility  for  engineering  support  as  well  as spares support and that these need to be integrated at Division level and below. There

SP’s: Can you highlight the model of engineering support in other armies of the world? DG: The engineering support being provided by the Corps of  EME will need a constant review with change of  technology and in the future battlefield. The conceptualisation of this  change  will  be  ably  benefited  by analysing the models of  existing armies of developed nations of  the world.  It is seen that the philosophy of  ‘replace forward and repair rearward’ and echelon system  of   engineering  support,  as  is  the backbone of  our repair system, is also prevalent in most of  the armies. Moreover, most armies have dedicated repair support agencies for army outfits maintaining high technology weapons and equipment.  The  primary  focus  of   maintenance  resources  in  the  combat  zone  is  directed  towards  weapon  systems. The  maintenance work is performed as far forward as possible. Testing equipment, recovery equipment and higher mechanic skills have been placed at the  lowest  possible  levels,  so  that  the  equipment can be returned to fully mission capable status.  SP’s: What restructuring can we do to improve our engineering support? DG: The  Army  is  inducting  complex  and state-of-the-art equipment. This essentially needs the maintainer to be integrated with the equipment thus necessitating dedicated and  intimate  engineering  support  at  unit level. We need to diagnose and make replacements in the forward echelons, and repair the echelons in depth due to high cost of  facilities for repair of  this type of  equipment. Another  challenge  is  that  while  the equipment  has  become  complex,  no  additional  manpower  is  available. The  answer lies in outsourcing low technology/civil enduse  equipment  and  enhancing  technical threshold of  the user. We also need to look at the intake level of  our EME mechanics. We need to lay greater emphasis on brain and have intake of  soldier (Technical) on an allIndia merit or better still have a common entrance exam model like the IAF and Indian Navy to get better technically competent intake at least for the technical arms and services. We also need to enrol diploma holders (ITI graduates) directly.  To make our engineering support more responsive, we need to ensure no movement of  equipment behind Corps zone. Responsive and integrated spares and supply chain management is essential. A dedicated communication set up for EME and better mobility for its repair teams is of  utmost importance. (Views expressed and suggestion made in the articles are made by the author in his personal capacity and do not have any official endorsement) To read the complete interview log on to: www.spslandforces.net/interviews


MASTER IN STRATEGY

Design and production of electronic defence systems by ELETTRONICA S.p.A.


>>

T EC H N O LO GY

S I X T H O F A SE R I ES O F S I X A RT I C L ES O N BATT L E F I E L D M A N A G E M E N T SYST E M

Bid for Best Tech The procurements must ensure a level playing field, providing equal competition to all players including the DRDO and PSUs ILLUSTRATION: Anoop Kamath

n LT GENERAL (RETD) P.C. KATOCH

T

hough  India  is  a  democracy,  the  decisions  taken  are  often  not  by consensus.  Net-centricity  in  the Indian  Army  too  has  progressed based on individual understandings, perceptions and decisions. These too have been hampered by the lack of  a netcentric  warfare  (NCW)  philosophy  and  levels of  understanding of  technology by crucial appointments in the decision-making chain. When the Directorate General of Information  Systems  (DGIS)  was  established couple of  years back, the need for a battlefield management system (BMS) for the  fighting  units  was  not  felt  necessary. Net-centricity was planned at Brigade and above levels. Despite knowing that the key to success will lie in attaining higher levels of  net-centricity, harnessing of  information technology for effective command and control  across  the  battalion/regiment  level forces  for  an  accelerated  decision-action cycle and an ability to conduct operations simultaneously  within  an  all  arms  group was  not  planned.  This  understanding dawned at a later stage. To that end, the Indian Army is already late in even commencing the process to acquire a BMS.

Operational Necessity Operational necessity of  the BMS constitutes the vitals for having a faster decision process by commanders at all echelons, better decisions based on reliable operational information provided in real time and the ability to quickly  close  the  sensor  to  shooter  loop. Overall scope of  the system is to integrate, test  and  field  a  BMS  duly  integrated  with other components of  the tactical command, control, communications and information system  (Tac  C3I).  For  such  a  system  to  be customised to meet Indian Army’s specific requirements,  it  will  need  to  be  first  integrated  and  tested  in  a  controlled  environment  in  a  test  bed  laboratory  followed  by validation trials in field conditions. It is only after successful validation of  the system in field  that  the  process  for  equipping  will begin. The concept of  the BMS is to have an ideal system which should be able to integrate the means of  surveillance and engagement  through  an  automated  decision support and command and control system. Exploitation  of   technology  would  aim  at rapid acquisition, processing and transfer of information,  enhanced  situational  awareness, and capacity to react to information and sharpen ability to synchronise and direct fire, thereby establishing and maintaining overwhelming operational tempo. This is very  relevant  at  the  cutting  edge  as  well, where decisive contact battles will be fought.

www.spslandforces.net

Present Status Not only are the bureaucratic processes and the labyrinth of  Defence Procurement Procedure  (DPP)  of   the  Ministry  of   Defence (MoD) time consuming, the Services bureaucracy matches the pace as well. As part of the pursuit for a BMS, a feasibility study for the BMS with members from the private industry, was ordered by Headquarters Integrated Defence Staff  (IDS) and completed in early 2009. Simultaneously, the DGIS drew a Draft Provisional Staff  Qualitative Requirements  (PSQR)  for  the  BMS.  A  PSQR  has more flexibility than the General Staff  Qualitative  Requirements  (GSQR),  the  former being better suited for a project like the BMS

14

SP’s LAND FORCES

6/2010

The acquisition route should be ‘Buy and Make’ with adequate scope for customisation that requires time and induction of  technology.  By  the  time  the  Draft  PSQR  was  approved at the Indian Army level, more than one  year  had  elapsed—  proving  the  oft quoted point that the Services bureaucracy is worse than the bureaucracy at the Ministry  level.  This  led  to  a  second  feasibility study  to  be  ordered  by  HQ  IDS  under  a strange rule that the feasibility study accompanying  the  PSQR  should  have  been  held within  one  year. The  first  feasibility  study was to establish whether the BMS could be acquired indigenously, and it did. Why then the  requirement  of   a  second  study?  It  reminds me of  a lady who after a family planning  operation  applied  for  the  much publicised cash incentive but was told she cannot  get  it  as  she  had  only  one  child whereas the incentive was for women who underwent such operation after two/three children. Well rules are rules and the Services adhere to them strictly.

Acquisition What acquisition route should we be looking at? Should it be ‘Buy’, ‘Make’ or ‘Buy and Make’ and whom should Project BMS be offloaded to? These are questions on the minds of  people who are affiliated/want to be affiliated  to  the  project,  especially  since  the stakes are pretty lucrative. The shortest route to any system obviously is ‘Buy’, but considering  the  Indian  requirements,  buying  a

BMS off  the shelf  really is not the answer. The longest route is the ‘Make’ procedure, which  not  only  implies  starting  from  the scratch, but is also the longest haul against bureaucratic  procedures.  The  ‘Buy  and Make’ route has been used in the past, very successfully in the artillery command, control and communications system (ACCCS), which has already been fielded in the Indian Army.  While  globally,  the  BMS  caters  for joint service net-centricity from the tri-service apex all the way down, in the case of  Indian  Army  it  implies  only  Battalion/ Regiment and below, down to the individual soldier/weapon platform.  Considering that almost 90 per cent of technology required for the BMS is already available in the market and not only the Indian  Army  but  those  paramilitary  forces (PMF) and police units fighting terrorism/ insurgency also require it, there is a need to accelerate  its  acquisition  and  consider  a ‘Buy and Make’ route over the ‘Make’ only route.  However,  considering  the  current dispensation, the ‘Make’ route is more likely to  be  adopted,  which  may  actually  be worded ‘Make India’. Should this happen, it will actually amount to indirect ‘Buy and Make’, as indicated by past experience. Couple this with the question to whom should Project BMS be off  loaded? Logically, a level

Fielding of the battlefield management system will be an important facet of capability building in the Army

playing  field  should  be  ensured  with  all players including the Defence Research and Development  Organisation  (DRDO)  and public sector undertakings (PSUs). But will this happen? A report in SIPRI asks, “Is the Indian Government willing to put a stop to its  protectionist  policies  that  continue  to favour the Government’s own companies?” Further, critics’ question the offset procedure by saying it is a relatively inflexible approach;  a  system  under  which  suitable private  sector  partners  for  foreign  firms have  to  be  vetted  in  the  first  instance  by state-owned  industries;  and  arguably  the relative  inexperience  of   Indian  firms  in  positioning  themselves  to  benefit  from  offset obligations.  The relevant issue is not whether what SIPRI says is untrue, partially true or true but  that  the  Indian  Army  needs  the  best technology.  This  is  something  the  Indian Army will have to fight for.

Best Technology Bid Situational  awareness  existing  in  the  Indian  Army  is  at  present  on  ad  hoc  basis whereas the requirement is of  an integrated network system. Fielding of  the BMS will be an important facet of  capability building in the Army. Delay in fielding of  the BMS will give an avoidable advantage to our adversaries. We need to get our act together in order  to  prepare  adequately  for  the  21st century challenges. Project BMS needs to be  accelerated.  The  acquisition  route should  be  ‘Buy  and  Make’  with  adequate scope for customisation. The procurements must ensure a level playing field, providing equal competition to all players including the DRDO and PSUs. Additionally, we must graduate  from  the  ‘best  price  bid’  to  the ‘best technology bid.’  (Concluded)


C O V E R S T O R Y / M I L I T A R Y H I S T O R Y << Continued from page 3 sub-conventional operations for the past 50 years, of  which, the last two decades have been intense. This has provided the Army with rich combat experience.  The Indian  Army  possesses  the  requisite  capability  to  be  able  to  effectively  deal with internal conflict situations in coordination  with  civil  agencies  mandated for this purpose. l Equipping a large-standing Army with such varied challenges is a difficult and dynamic process. Our equipment profile thus caters for meeting these challenges. l The Indian Army remains one of  the best organised, structured, equipped and disciplined organisation to react both to natural and man-made disasters. Our record in  this  field  has  been  well  appreciated, both within and outside the country, our concept  being  “First  Responders—Last Resort”. It has the requisite capabilities and  wide  experience  to  fulfill  international  peacekeeping  obligations,  under aegis of  the United Nations.  l The Indian Army soldier is infused with a set of  traditional regimental values. The ethos  of   naam,  namak  and  nishan  i.e. ‘name, honour and dignity’ is ingrained in all soldiers with an unwavering will to succeed. With its diverse multi-religious, multi-lingual and multi-cultural composition, the Indian Army remains a shining example of  ‘unity in diversity’.   Vision for the Army: The vision of  the Indian Army is to ‘be a well motivated, operationally prepared, well-equipped force capable of  meeting the security challenges faced by the nation. It also caters to the transformation process to function in a networked joint services environment to leverage technology and the human resource capital in consonance with the rich values and traditions of  the Indian Army’.  Force Structure Imperatives: Considering  the  diverse  demands  on  the  Indian Army,  we  need  to  possess  the  following  capabilities: (a)  Deterrence: A strong conventional deterrence backed by an appropriate strategic capability, to deter any potential adversary from undertaking inimical activities or initiating hostilities against India. (b)  Conventional War Fighting Capability: To cater to the possibility of  failure of  our deterrence strategy, the Army needs to possess the capability to prosecute decisive  conventional  operations  against  a nuclear backdrop. (c)  Sub-conventional Capability:  The  Army should possess the requisite capability to

be able to effectively deal with internal conflict situations, and function in subconventional environment. (d) Contingent Capability: The Army needs to possess credible capabilities to deploy the land component of  a joint task force, for out  of   area  operations/contingencies should the need arise. (e)  Peacekeeping Capability: The Army has to possess capabilities to fulfill international peacekeeping  obligations,  under  the aegis  of   the  UN,  preferably  in  areas  of our strategic interest. (f)  Humanitarian Assistance and Disaster Relief: The  region  being  prone  to  natural disasters, there is a requirement to create an humanitarian assistance and disaster relief  capability to provide relief  to the affected people.

Areas of Focus Modernisation and Technology Infusion:  Our  defence  capability  planning  is based on upgradation of  our operational capability,  through  modernisation,  force  restructuring  and  technology  absorption. Rapid advances in technology have altered the way wars are fought. In particular, advances in surveillance, night vision, longrange  precision  weapons  and  computer supported networks provide asymmetrical advantages to a technology enabled force. Modernisation of  our Army and infusion of technology is thus our prime focus. We have identified information warfare, surveillance, night fighting, long-range firepower, rotary wing capability, network-centricity and development of  a future infantry soldier as a system (F-INSAS) as our priority areas. Defence Procurement: Modernisation of   armed  forces  wholly  depends  upon  the capital acquisition plan. While there has been a significant increase in the budgetary support over the years; several major modernisation programmes have failed to materialise for one reason or the other. We are taking a host of  in-house measures to optimise internal processes to streamline the acquisition procedures. There is always a dilemma between indigenous production and imports. While we wish to induct the latest technology, it  is  in  our  long-term  national  interest  to achieve self-reliance in the field of  critical defence equipment. To that extent, we are optimising  the  capabilities  of   our  Defence Research  and  Development  Organisation (DRDO) and the private industry with technical support from foreign companies. Concurrently, diversification of  defence sourcing must form another important ingredient in

Continued from page 5 ture of  terrain ensured large gaps between defended areas. The deployment included one infantry battalion at Dras; two infantry battalions, and a BSF battalion covering Kargil and Chorbat La held by Ladakh Scouts. As indications of  Pakistani intrusion came on May 3, 1999, it became clear that armed intruders had occupied heights in the gaps between all defended areas in the sector. It became apparent that India was facing an attempt by Pakistan  to  change  the  LoC  using  its  regular troops. The complacency of  the local army formations in not conducting even routine surveillance in the winter months is clear. The initial reactions were unsatisfactory leading to poorly planned patrols and attacks. While these did fix the enemy, success came their way  only  when  the  whole  act  was  put  together. Air and artillery (155mm Howitzers) was employed with devastating effect to allow the Indian soldier, the infantry man to live up to his reputation of  fortitude under adversity and courage and determination in the attack.

Operation Parakaram Operation  Parakram,  which  means  “valour” was a momentous event which could have unleashed a major war on the subcontinent. It involved a massive build-up Indian Army ordered in the wake of  the December

our forward looking defence planning.  Human Resource Development: While we may get all the technology and resources, the integration of  technology with the systems, upgrading aptitude and threshold level of  the soldiers and leaders and enmeshing them to operate with other Services is another task that needs focused attention. Here we face the same challenges as everybody else. Better job opportunities in the civil street means that we do not always get the best. Continuous commitment of  the Army in internal security tasks, vast variety of  operational roles and shrinking training areas are the other challenges we have to overcome to develop our human resource capital.  Leadership Challenges: The changing face  of   21st  century  conflicts  will  call  for adaptive leaders who are dynamic enough to foresee the diverse range of  challenges, some of   which  are  yet  elusive  and  undefined. These  adaptive  leaders  will  need  to  be  responsive,  decisive  and  highly  motivated. While this will warrant junior commanders to be able to undertake independent actions and operations within the higher commander’s  overall  intent;  the  development  of strategic  culture  and  operational  art amongst our senior leadership is imperative. To train senior leadership to orchestrate and manage change is a key focus area. In low intensity  conflicts,  success  will  have  to  be achieved with restricted and surgical use of combat power, calling for the development of  even higher leadership skills. In today’s transparent  age,  the  Army  cannot  escape media scrutiny and thus the challenges of ‘media glare’ will have to be tackled. Senior officers therefore have a particularly onerous responsibility to lead by example and set the standards by maintaining a high level of personal and professional integrity. Transformation of the Indian Army: Recognising the need to change, the Army has concluded a comprehensive study aimed at enhancing operational effectiveness. We are  also  examining  ways  to  enhance  efficiency of  our headquarters, ensure cost effective  and  responsive  logistic  support, improve financial management and upgrade training standards. I am confident that the implementation of  the recommendations of the study will result in a modern Army that is prepared for the emerging security environment  and  the  complex  and  uncertain challenges of  the 21st century.  Jointmanship: Today, it is an accepted fact  that  no  single  component  of   military power—be it land, maritime or air—can win wars alone. Success in modern war will hinge

on the formulation of  a joint military strategy based on political and military aims. Synergy is an operational imperative. We have to enhance the levels of  jointness to optimise our war-fighting  potential.  A  primary  area  of focus would be to develop as a force capable of  operating in a joint network-centric environment.  The  Army  is  fully  committed  to jointmanship and the ‘purple’ approach. Inter-Agency Coordination:  Armed forces are a potent tool of  comprehensive national power. Towards this end, the National Security Council (NSC) and its associated organs need to develop a focused strategic vision  to  take  a  long-term  view  of   national security. Establishment of  institutionalised mechanisms and processes for greater interagency coordination in handling security issues between various government agencies is an imperative. Such an approach has become absolutely essential to enable coordinated  reactions  to  emerging  threats  and realities that prevail in our immediate neighbourhood. I must admit that our current approach is somewhat compartmentalised and needs comprehensive focus.  Defence Cooperation: Military diplomacy is an effective instrument and a wellorchestrated and calibrated employment of the soft power of  the armed forces needs to be exploited to further the nation’s foreign policy. The positive spin-offs of  such endeavours are numerous; apart from contributing to image projection, they are of  great utility in  improving  the  capability  to  operate  together  and  foster  mutual  understanding. This is also the basis for addressing shared concerns over threats like terrorism, extremism and militancy. Defence cooperation with friendly foreign countries thus remains an area of  priority focus.

Conclusion To conclude, I would emphasise that instabilities on our periphery will have spill over affects on our security. The Indian Army has been the guarantor of  peace and stability for the  nation.  Induction  and  absorption  of technology, development of  adaptable leadership and ability to function effectively in a joint  services,  multi-agency  and  multinational environment is absolutely essential. We need to constantly evolve and transform, assimilating the best knowledge and experiences we gain through our interactions with the civil sector and other foreign militaries.  I can say with confidence that the Indian Army is fully prepared and motivated to play its part in the growth, development and security of  our great country. Jai Hind.

PHOTOGRAPH: Wikipedia

The Way Ahead

Indian soldiers firing the Bofors gun during Kargil war in 1999

13, 2001 terrorist attack on the Parliament House.  This  10-month-long  mobilisation from January to October 2002, along the border with Pakistan generated high levels of  tensions in the relations between the two South  Asian  neighbours  and  raised  the prospects of  a major war. The operation was a major effort in coercive diplomacy by New Delhi, in the wake of  the terrorist attacks on the  Indian  Parliament  on  December  13,

2001,  and  while  the  government  claims that their strategic objectives were met by mere posturing which avoided a war, military analysts are of  the view that gains were not commensurate to the mammoth exercise in coercive diplomacy by India. However,  it  led  to  some  positive  changes  in India’s  military  doctrine  and  it  hastened military  modernisation  together  with  organisational changes.

Indian  Army  as  it  moves  through  the  first quarter of  the 21st century is likely to face three types of  challenges and threats. These include  traditional  threats,  contemporary threats in the form of  terrorism, and insurgencies and contingency threats. In essence, India faces a far greater threat than any other country  in  the  world  because  of   a  highly volatile strategic neighbourhood. Moreover, with  India’s  vibrant  economic  growth,  it would naturally have to assume additional responsibility as a stabilising force in the region. It is encouraging to note that India’s security concerns  have  for  the  first  time  converged with international security concerns which makes  global  community  understand  the need for India to develop and modernise its military capabilities. Defence of  a nation and development are complementary. If  India aspires to be a regional/global economic power, its  military  power  must  reflect  that  desire through its ability to protect its interests. In this context, the transformation of  the Indian military for the future, through technological improvements coupled with innovative operational art will give India a distinct advantage over its potential adversaries, which is vital for preserving India’s sovereignty and furthering its national interests.

6/2010

SP’s LAND FORCES

15


>>

TECHNOLOGY

Time for Offensive & Defensive Measures A holistic assessment of cyber threats is urgently required followed by defining a National Cyber Security Policy leading to a Cyber Security Roadmap, which needs to be implemented in a time bound schedule n LT GENERAL (RETD) P.C. KATOCH

I

nformation age multiplication is a necessity of  modern times. However, such multiplication leads to a host of  vulnerabilities.  Penetration,  theft,  interference,  injecting  viruses,  jamming  of networks,  C4I2SR,  UAV  data,  radio,  microwave, cellular and satellite communications,  interfering  and  jamming  of satellite/missile launches and programmes are all possible today. What are our cyber defences in such environment and what are we doing  to  upgrade  them?  Past  experience shows  that  habitually  we  counter  such threats with the “ostrich approach” and tend to douse curiosity under shrouds of  secrecy. Applauding  the  “Emperor’s  Clothes”  may give short-term pleasure to some, but despite the veil of  secrecy, the writing on the wall is clear—the Emperor is pretty much naked. Even the intercepts of  former President of Pakistan General Pervez Musharraf ’s conversation from Beijing with his men in Islamabad during the Kargil intrusions were obtained through outsourcing and technically not done by our own agencies.

www.spslandforces.net

The Threat Talk of  cyber security and the focus at once goes to hacking, viruses, embedded malware and the like. In 1995, Japan’s Ministry of  Defence and Headquarters of  the three self-defence forces cut off  regular power supply and switched to generators. The reason was advances  in  technological  advances  that  enabled plugging into the electricity supply to extract data from computers five kilometres away. Look at the distance from our North and  South  Blocks  to  the  Embassies  in  the diplomatic enclave astride Shanti Path in New Delhi. Should WikiLeaks then surprise us? Recent news of  cyber attacks on the Commonwealth Games networks and Stuxnet attacks on INSAT 1B, pointing to the source inside China, are perhaps just a tip of  the iceberg.  The damage caused globally by “Ghostnet” and “Stuxnet”, unleashed by China is well researched and documented—Ghostnet penetrating more than 1,200 systems in 103 countries including India and “Stuxnet” infecting some 60,000 computers in Indonesia and 6,000 computers in India. Global reach of   the  expanding  Bot  Armies  of   China  are also well known. The Chinese Government in addition to employing its own hackers manages massive teams of  experts from academia and industry, organising them as Cyber Militias with support and direction of  the People’s Liberation Army (PLA). In Pakistan, the Pakistan Hackers Club (PHC) and the G Force are notorious for hacking and operating under the  ISI.  Little  surprise  if   they  have  been trained by the Chinese. Several cyber warfare (CW) units have been formed in China, hiring best IT graduates and culling manpower from some 25,000 software companies. PLA’s network  warfare  (NW)  Battalions,  electronic warfare (EW) Battalions, intelligence and psychological warfare Battalions have all been networked  into  the  cyber  warfare  conundrum. Web Defacement Groups, spearheaded by PLA, were formed over a decade back and national level cyber defence and offensive exercises rehearsing pre-emptive cyber strikes have  been  held  over  the  years.  Focused  research is being undertaken to take control of

16

SP’s LAND FORCES

6/2010

national networks of  countries like Taiwan, India, Japan and South Korea.  Cyber  attacks  on  critical  infrastructure can simply paralyse a country, bringing it to a  standstill.  Havoc  can  be  wreaked  on  the banking system, stock exchanges, transportation—railways, airways and the like. Its coupling with asymmetric warfare can artificially inflate/crash stock markets, plunging a country into grave economic crisis. In war, a networked  army  can  be  rendered  without information  and  with  non-functional/dysfunctional weapon systems. The enormity of the threat is simply gigantic.

Indian Scene The annual percentage increase of  ‘bot’ infected  computers  in  India  has  already reached alarming proportions. No surprises as almost all computer parts of  our so-called “indigenous computers” are manufactured in China and Indian companies are simply assembling them and certifying that they are free  of   malware,  while  virtually  they  are without means to undertake such checks. This is a happy situation for our adversaries as embedding malware at the manufacturing stage itself  is an easy process. To top it, the modern bot in comparison to the earlier version  is  difficult  to  detect  and  does  not raise suspicion as it does not slow down the speed of  the computer. Indian websites of  the Ministry of  External Affairs, Bhaba Atomic Research Centre, National Informatics Centre, Ministry of  Defence, National Safety Council, Federation of   Indian  Chambers  of   Commerce  and  Industry,  Dalai  Lama’s  office  and  Indian  embassies abroad have been hacked/defaced by  Chinese  web  defacement  groups.  Data from  Defence  Research  and  Development  Organisation, Hindustan Aeronautics Limited, naval dockyards, nuclear installations, military bases, defence HQs, Institute for Defence Studies and Analyses and other think tanks have been stolen by Chinese hackers. Considering the finesse and pattern, cyber attacks in India have Chinese government patronage though China would like us to believe  these  are  courtesy  criminal  gangs based in Sichuan and Guangdong. Recent WikiLeaks exposé that the US has been indulging in cyber espionage should not come as a surprise. Talk  of   cyber  warfare  in  civil  sector  in India and the response you get is that any measures that need to be instituted should be  defence  driven.  This  is  a  defeatist  approach. Actually, we have a Catch-22 situation in place. First, because defence is only one of  the cyber war targets and there is no reason  the  civil  sector  raises  the  issue  as forcefully to protect critical infrastructure. Second, because our MoD is sans an institu-

We need to ensure a fundamental shift from individual entity for overview, control and assessment of cyber security measures

India’s cyber defences are in the nascent state. Our adversaries’ cyber warfare capabilities pose a potent threat to India.

l

l

tionalised strategic thinking mechanism and the bureaucracy has not moved much despite noises on the issue being made by the Services in recent years. Third, because our nine odd major intelligence agencies operating on varied wavelengths and control have not come up with an overall cyber threat assessment, highlighting the extreme urgency for chalking out a National Cyber Security Policy.  Fourth,  there  is  no  hue  and  cry  to shake up the powers to be mainly because of lack  of   public  awareness.  Fifth,  the  media prioritises sensationalism and scams above national security and is apparently engaged in  more  profitable  activities  (remember Radia Tapes) rather than devoting time for ‘mundane’ issues like cyber security.    Currently, the National Talent Research Organisation  (NTRO)  is  the  focal  point  for cyber defence. However, this organisation is inadequately organised, staffed and equipped to deal with such gigantic responsibility in addition to its other tasks, especially when the country is importing almost 90 per cent of computers,  telecommunication  equipment and critical software without requisite testing facilities in place to undertake cyber checks. Though the NTRO is pushing for indigenisation, it has little effect due to lack of  government  focus  on  the  issue.  Besides  the  much publicised establishment of  Computer Emergency Response Team (CERT) at the national Services levels, they have a restricted role and do  not  constitute  ‘information  assurance’ which is the need of  the hour.

l

l

l

l

Requirement Absolute  cyber  security  undoubtedly  is  a myth.  However,  complacency  can  put  us back by many years if  we are subjected to sustained  cyber  warfare—that  our  adversaries are vigorously preparing for. We need to holistically assess the cyber threat, appreciate what our comfort levels are   and find means to upgrade them.  The following issues merit urgent attention at the national level: l A holistic strategic appraisal is required to define the cyber threats we are likely to face in future. The initial appraisal could cover a period up to 2020, which should then  be  reviewed  annually/biannually. This exercise needs to be undertaken at the national level by a suitable committee comprising  nominated  representatives from the military, intelligence agencies, agencies/organisations charged with critical infrastructure, research and development organisations, IITs, private industry and academia. Such appraisal should be undertaken in a time bound schedule. l Based on the above appraisal a National Cyber Security Policy (NCSP) should be speedily formulated.  l The NCSP should lead to the Cyber Security Roadmap 2020. This should include

l

l

the  organisations  that  are  required  at various levels to deal with future cyber threats and the measures that need to be adopted, research and development and fiscal  back  up  that  will  be  required  including prioritisation.  As part of  the national cyber security set up,  establishment  of   a  National  Cyber Command and a Tri-Service Cyber Command should be considered. Concurrently, a holistic appraisal should be  undertaken  to  establish  our  short-, medium- and long-term requirements of hardware,  software  and  security  solutions.  Based  on  this,  the  government should enunciate a policy for their indigenisation. This will require issue of  a specific government directive nominating a group  of   industries  responsible  for  the same coupled with the DRDO, IITs, etc.   For  developing  security  solutions,  the policy should take into account COTS solutions (including their possible customisation) and development by specifically chosen and nominated indigenous private  industry  having  administered  an oath  of   secrecy  akin  to  a  government  organisation. There should be reason for mistrust as these Indian nationals under oath would be no different from personnel of  CAIR. Action needs to be initiated for establishing  adequate  facilities  for  undertaking cyber checks of  all hardware and software, commencing critical networks.  Facilities  need  to  be  established  for speedy certification of  security solutions, to accelerate net-centricity at all levels  simultaneously. Defensive measures can hardly cope with the requirements of  cyber warfare. We must adopt a parallel defensive and offensive approach. Offensive cyber capabilities must be developed as a deterrent. We also need to develop the national will to establish credibility of  such deterrent which may require its selective demonstration against a rogue adversary.    A  National  Cyber  Security  Awareness Programme  needs  to  be  launched  to  educate the masses on the issue. Cyber security  requires  a  national  effort  in which all citizens need to be involved.  Finally,  the  government  needs  to  be  as transparent as possible on the issue, as national security permits.

Cyber Deterrent As any developing nation, India’s cyber defences  are  in  the  nascent  state.  Our  adversaries’ cyber warfare capabilities pose a potent threat to India. Much needs to be done, which will require a national effort. We need to ensure a fundamental shift from individual entity for overview, control and assessment of cyber  security  measures.  A  holistic  assessment of  cyber threats is urgently required followed by defining a National Cyber Security Policy leading to a Cyber Security Roadmap, which  needs  to  be  implemented  in  a  time bound  schedule.  A  simultaneous  defensive and offensive approach is required, latter as a “cyber  deterrent”,  ensuring  its  credibility. Much  ground  needs  to  be  covered  and  we need to act fast.   (The views expressed in this article are the personal views of the writer.)


PHOTOGRAPH: US Army

T E C K N O W

Fight Smart XM25 ‘individual airburst weapon system’ is fitted with a chip that receives a radio signal from the gun sight which uses a laser range finder to determine the exact distance of the obstruction

T

he US Army is all set to use the XM25, a futuristic rifle capable of  firing radio-controlled smart bullets, for the first time in Afghanistan. The XM25 has a range of  2,300 feet and has been designed to fire 25mm grenades, which can be set to explode right in mid-air after having travelled a particular distance. The XM25 ‘individual airburst weapon system’ developed by Heckler & Koch, is an effective airburst grenade launcher rifle derived from the XM29 OICW.  The XM25 rifle has been developed with the aim to address all the existing capability gaps when it comes to defeating the defilade targets. The system has extra features to increase its potential battlefield deployment, an attraction for armies across the world. This system offers improved fea-

tures that can increase the soldiers’ efficiency when engaged in combat. It has an increased ability to hit every type of  point target at a distance of  almost 500 metres.  The XM25 has 25mm munitions including the highly effective high explosive air-burst (HEAB), door breaching, armour piercing and anti-personnel munitions together with two types of  munitions that are not lethal—the agent and blunt dispersing airburst. The weapon was initially designed to provide the soldiers fighting in Iraq and Afghanistan increased ability to set the necessary fuse of  every round in

order to have it explode over the chosen target. After placing the aim point of  the XM25 on the target, the soldier will be able to activate the additional laser range finder in order for the weapon to evaluate and calculate the necessary range to that particular target. The weapon will convert this to the necessary time of  flight requested by the fuse setting. The XM25 has been designed to enable the soldier to utilise the existing XM116 integral fire control system. This highly effective system includes night and day channels thus increasing the battlefield adaptability of

the weapon. The system includes a ballistic computer, a laser rangefinder, a compass, a fuse setter and an internal display. XM25 ‘ weapon weighs just 12 pounds and is thus easy to use for soldiers who can carry it for longer distances without getting tired. The weapon will weigh as much as the traditional M16 with the common M203 grenade launcher attached to it. XM25 is a semi-automatic weapon that can be used to fire the airbursting round from almost 600-700 metres. The accuracy of  the weapon was already proven by the initial tests and the manufacturers estimate a constant increase in the effectiveness of  the weapon.  The latest versions of  XM25 ‘individual airburst weapon system’ have a wide range of  smart military equipment that can be used in order to increase its effectiveness in battlefield deployment. This equipment can include the laser range finder, the thermal optic and even the highly effective infra-red and fire-control system. This system can be used in order to wirelessly transmit the accurate distance between the target and the rifle right into the round’s fuse just before firing. This rifle control can increase the efficiency of  the troops because they will be able to evaluate the real time conditions and targets without being prone to making mistakes and exposing themselves to unnecessary risks.

Continued from page 7 complement these surveillance and observation  devices,  include  84  mm  rocket launchers, including some disposable ones, anti-  material  rifles  (AMRs),  under-barrel grenade  launchers  (UBGLs),  new  generation carbines, bullet proof vehicles, and accurate sniper rifles. However, the numbers acquired  and  the  ammunition  stocks  are still  inadequate  and  need  to  be  made  up more rapidly. The INSAS 5.56mm assault rifles have now been in service for over 10 years  and  also  needs  replacement.  New 5.56mm  assault  rifles  of  bull-pup  design with an integrated laser range finder and grenade launcher are under development. Efforts  are  also  being  made  to  provide  infantry platoons and sections with integrated GPS-based navigation system, secure lightweight  walkie-talkie  radio  sets  and  better protective gear with a helmet that incorporates a built-in head-up display.

curately destroy critical targets quickly as well as to minimise collateral damage. During the Gulf War I in 1991, PGMs formed less than 10 per cent of the total high explosive dropped over Iraq and were rather inaccurate. The “collateral” destruction of an air  raid  shelter  harbouring  women  and children has been too well documented to bear  recounting.  The  coalition  forces  did not  destroy  a  single  Iraqi  Scud  missile launcher. In Kosovo, PGMs accounted for about 30 per cent of the ordnance dropped and the accuracies had improved considerably by 1999.  In the post-9/11 retribution

control,  communication  and  information (TacC3I)  system  is  under  development. Under  this  mother  system,  various  other systems such as command information decision  support  system  (CIDSS),  artillery combat  command  and  control  system (ACCCS),  battlefield  surveillance  system (BSS), air defence control and reporting system (ADC&R), and battlefield management system (BMS) are being developed. Efforts are  also  under  way  to  finalise  a  networkcentric  warfare  (NCW)  philosophy.  A  triservice  defence  communication  network (DCN) is in the stage of advanced planning. PHOTOGRAPH: US Navy

Mechanised Infantry The  mechanised  infantry  is  now  equipped with  BMP-1  and  BMP-2  ICV  Sarath.    The  variants  include  81mm  carrier  mortar tracked vehicle (CMTV), a command post, an ambulance,  armoured  dozer  and  engineer and reconnaissance vehicles. Reconnaissance and  support  battalions  (mechanised)  need better  surveillance  radars,  fire-and-forget ATGMs and effective night fighting capability.

www.spslandforces.net

UAVs for Infantry Battalions

Micro UAVs like Elbit’s Skylark, among others, will improve the surveillance capability in conventional conflict and asymmetric conflict situations

The  Army’s  infantry  battalions  also  need mini or micro UAVs like Elbit’s Skylark or Rafael’s Skylite, among others, to improve their surveillance capability in conventional conflict and asymmetric conflict situations. These UAVs could have a range of about 10 to 15 km, be light-weight (less than 10 kg), hand-launched, carry a single payload, for example a daylight video camera or infra-red camera for night operations, and should be inexpensive  enough  to  be  dispensable.  A mini ground control station should be authorised at battalion headquarter (HQ) for planning and control. Ideally, these should be indigenously designed and developed and locally manufactured.

inflicted on the Taliban militia and its AlQaeda supporters in Afghanistan, the share of PGMs rose to nearly 60 per cent. During Gulf War II in Iraq, the ratio of PGMs went up  to  nearly  70  per  cent.  The  Indian  Artillery  does  not  have  PGMs  in  quantities large enough to matter. Only limited quantities of the Russian Krasnopol PGM have been imported for the Bofors 155mm howitzer. Among others, the Bofors Bonus PGM is a suitable candidate, subject to successful trials in the deserts and the mountains.

Precision Guided Munitions (PGMs)

TAC C3I

PGMs are increasingly gaining currency as weapons of choice in conflict on land, to ac-

According  to  Lt  General  (Retd)  Prakash  Katoch,  former  DG  IS,  tactical  command,

However, little progress has been made towards  addressing  inter-service  interoperability  challenges  in  the  communications field. An RFP for the DCN system is expected to be issued in 2010. Cyber security and offensive cyber warfare are other areas that do not appear to have received the attention that they deserve. With China moving rapidly  towards  creating  “one  million  laptop warriors”, neglecting this field could prove to be very costly in the long term.

Army Aviation

18

SP’s LAND FORCES

6/2010

Modernisation of Army aviation is also not making much headway. The aviation fleet continues to be based on vintage Chetak and

Cheetah helicopters. The long-pending acquisition of 197 light helicopters has been mired in controversy. The only addition has been that of small numbers of Dhruv light utility helicopters for logistics duties. Upgradation of India’s attack helicopter capabilities  is  also  pending,  though  a  tender  has been issued for 24 attack helicopters for two squadrons of the IAF. Medium and heavy lift capability also must be enhanced for effective troop transportation and logistics support in the mountains and in the plains.

Comprehensive planning Modernisation  and  capability  building  involves  a  comprehensive  planning  process which considers a large number of factors. Broadly speaking, it is based on threat perception,  technological  changes  and  available  resources.  India’s  modernisation  process  is primarily driven by the government and the armed forces has been streamlined over the years  with  preparation  of  a  long-term  integration  perspective  plan  (LTIPP).  The five-year perspective plans and yearly action plans flow from the LTIPP. The equipment procurement and manufacturing are derived from these plans and the induction is done by strictly  following  the  defence  procurement procedure (DPP).  The delays occurring currently are due to several reasons such as insufficient and limited vendor base, non-conformity of the offers to the request for proposal (RFP) conditions, field trials, complexities in contract negotiations, limited indigenous capability and long lead time for indigenisation, etc. Further, the market for state-of-the-art defence  equipment  and  platforms  being  circumscribed  by  denial  regimes,  limited availability of required type of material, complexities in construction and manufacturing involving integration of large number of systems,  assemblies  and  sub-assemblies  also cause delays. The procurement procedure itself needs to be reviewed in light of the above reasoning. The lethargy of the Defence Ministry in equipment procurement could have disastrous results in the future, bearing in mind that our adversaries are preparing at a rapid pace. We need a far greater focus and a firm political will to modernise our military and build the desired military capability for the future.


News in Brief JAPAN SHOULD IMPROVE DEFENCE CAPABILITY “Japan should improve its defence capability in the south-west where it shares a maritime border with China,” said Japan’s Vice Defence Minister Jun Azumi. The country has traditionally allocated its heavy defence capability to the north to respond to potential threats from  former  Soviet  Union.  However,  Japan now seems to be shifting its focus to the South West. Japan is likely to boost its capability on land,  sea  and  in  the  air  in  the  future. The country is updating its National Defence Programme guideline for release by the end of this year.

tract  signed  in  February  and  will  continue through the second quarter of  2011. The US Army  will  conduct  additional  verification testing prior to the capabilities’ Initial Operational Test and Evaluation in 2011 and will be deployed to Afghanistan in 2012.

INDIAN ARMY TO GET ADDITIONAL AKASH MISSILES

BOEING DELIVERS MODERNISATION CAPABILITIES TO US ARMY

Boeing has begun delivering brigade combat team  modernisation  (BCTM)  Increment  1 hardware to the US Army. The hardware includes network integration kit-equipped mine resistant  ambush  protected  vehicles  and Humvees,  unattended  ground  sensors  and unmanned  ground  vehicles.  BCTM  increment 1 capabilities will provide soldiers with enhanced intelligence, surveillance and reconnaissance capabilities, as well as increased survivability and lethality. The deliveries are part of  the low-rate initial production con-

Bharat Electronics (BEL) in India is expecting contracts worth `100 billion ($2.2 bn) from the Indian Army and Indian Air Force to produce several squadrons of  the Akash missile system in the next few months. BEL military radar business unit General Manager P.C. Jain said that the Indian Army was eyeing two regiments  of   the  surface-to-air  area  defence guided missile system. Each squadron of  the missile system consists of  48 missiles, surveillance radar, tracking radar and a flight control centre. The missile system has a range of 25 km and can reach an altitude of  18 km and is capable of  engaging four targets simultaneously. The Indian Army is in the process of  finalising the configuration of  the system to meet its requirements.

GD AWARDED SAUDI ARABIA TANK CONTRACT

31 January-3 February  Soldier Technology US Marriott Gateway, Arlington, Virginia, USA www.soldiertechnologyus.com

7-10 February  International Armoured Vehicles ExCeL Centre, London, UK www.internationalarmouredvehicles.com 9-13 February Aero India 2011 Air Force Station Yelahanka,  Bengaluru, India www.aeroindia.in 15-16 February  DWT-Unmanned Vehicles III Bonn/Germany www.dwt-sgw.de 20-24 February  IDEX 2011 Abu Dhabi National Exhibition Centre, UAE www.idexuae.ae/ 14-17 March Soldier Modernisation Asia Amara Sanctuary Resort Sentosa,  Singapore www.iqpc.com/Event.aspx?id=344996

Editor Lt General (Retd) V.K. Kapoor

INDIAN ARMY TO GET TWO NEW RIFLES The  Defence  Research  and  Development  Organisation (DRDO) in India is developing two indigenous Future-INSAS rifles for the  Indian  Army.  Indian  small  arms  system (INSAS) is a family of  infantry arms consisting of  an assault rifle, a light machine gun and a carbine. Army soldiers will use the new weapon, which can be operated effectively in urban or jungle environments, instead of  the standard INSAS rifle. The DRDO is also developing a modern submachine carbine with a 5.56mm/30mm calibre, incorporating a pistol and a rifle design so that it can be fired with  one  hand.  Armament  Research  and  Development Establishment director Anil M. Dattar said the new rifle is designed to provide night  vision  through  integrated  thermal  imaging sensors. The rifle and carbine of  the future infantry soldier project will be completed in three phases, with the first phase  expected to be completed in three years.

THALES, NEXTER AND SAGEM TO SUPPORT SCORPION PROGRAMME The  French  Defence  Procurement  Agency (DGA) has awarded a two-year contract to a consortium of  Thales, Nexter and Sagem to handle the architecture phase of  the Scorpion programme for the French army. The €21million (`126 crore) contract will create a dedicated company, Mars, which will ensure the capability and programme coherence of  current and future equipment for combat units. Mars is a vehicle through which the consortium will provide the French land forces with a range of  skills, expertise in combat equipment, and a detailed understanding of  current and future operational needs. Scorpion is a project that unites several programmes to modernise the French Army’s eight combined arms brigades.

DEVELOPMENT OF INDIAN FMBT

>> SHOW CALENDAR

1-3 February  Soldier Modernisation India 2011 Venue to be confirmed, New Delhi, India www.soldiermodindia.com

Publisher and Editor-in-Chief Jayant Baranwal

GD Land Systems has been awarded a contract to convert 15 of  Saudi Arabia’s M1A1 tanks into the M1A2S model. The contract is an  addition  to  a  $58  million  (`261  crore) contract originally awarded in 2008 to design, develop, convert, implement and test a hybrid  configuration  of   the  M1A1,  M1A2 and  M1A2  system  enhancement  package tank variants. The M1A2S vehicles will possess defined capabilities that increase lethality while limiting obsolescence. Work will be carried out at the company’s Joint Systems Manufacturing Centre in Lima, Ohio, US, with an estimated date for completion by March 31, 2012. The US Army TACOM lifecycle management command awarded the $19 million (`86 crore) contract on behalf  of  the Royal Saudi Land Forces.

RUSSIA TEST FIRES INTERCONTINENTAL BALLISTIC MISSILE Russia has successfully test-fired the RS 12M Topol intercontinental ballistic missile from Kapustin Yar landfill in Russia’s Astrakhan region, according to the country’s Defence Ministry. The RS-12M Topol is a single-warhead intercontinental ballistic missile with a maximum range of  10,000 km (6,125 miles) which can carry a nuclear warhead with a yield of  550kt, according to RIA Novosti. Russia’s  strategic  missile  forces  (SMF)  commander  Lt  General  Sergei  Karakayev  said SMF will be rearmed with multiple-warhead RS-24 missiles instead of  the RS-12M TopolM missile systems.

Preliminary  Staff   Qualitative  Requirement (PSQR) of  future main battle tank (FMBT) has been  formulated  by  the  Army.  Feasibility study on FMBT is being carried out by the Defence Research and Development Organisation. FMBT is likely to be developed by the year 2020. This information was given by Defence Minister A.K. Antony in a written reply in the Indian Parliament.

>> APPOINTMENTS

Assistant Group Editor R. Chandrakanth Senior Technical Group Editor Lt General (Retd) Naresh Chand Contributing Editor Air Marshal (Retd) V.K. Bhatia Sr. Copy Editor & Correspondent Sucheta Das Mohapatra Assistant Correspondent Abhay Singh Thapa Assistant Photo Editor Abhishek Singh Contributors India General (Retd) V.P. Malik, Lt General (Retd) Vijay Oberoi, Lt General (Retd) R.S. Nagra, Lt General (Retd) S.R.R. Aiyengar, Air Marshal (Retd) Vinod Patney, Major General (Retd) Ashok Mehta, Major General (Retd) G.K. Nischol, Brigadier (Retd) Gurmeet Kanwal, Brigadier (Retd) S. Mishra, Rohit Sharma Chairman & Managing Director Jayant Baranwal Administration & Coordination Bharti Sharma, Survi Massey Senior Art Director Anoop Kamath Design Vimlesh Kumar Yadav, Sonu Singh Bisht Sales & Marketing Director Sales & Marketing: Neetu Dhulia Head Vertical Sales: Rajeev Chugh SP’s Website Sr. Web Developer: Shailendra P. Ashish Web Developer: Ugrashen Vishwakarma Published bimonthly by Jayant Baranwal on behalf of SP Guide Publications Pvt Ltd. All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, photocopying, recording, electronic, or otherwise without the prior written permission of the publishers. Printed in India by Kala Jyothi Process Pvt Ltd © SP Guide Publications, 2010 Annual Subscription Inland: `600 • Overseas: US$180 Email: subscribe@spguidepublications.com Letters to Editor editor@spslandforces.net For Advertising Details, Contact: guidepub@vsnl.com neetu@spguidepublications.com rajeev.chugh@spguidepublications.com SP GUIDE PUBLICATIONS PVT LTD POSTAL ADDRESS Post Box No 2525, New Delhi 110 005, India Corporate Office A 133 Arjun Nagar, Opp Defence Colony, New Delhi 110 003, India Tel: +91(11) 24644693, 24644763, 24620130 Fax: +91 (11) 24647093 Regd Office Fax: +91 (11) 23622942 Email: guidepub@vsnl.com

Lt General A.S. Lamba

Vice  Admiral  D.K.  Joshi  has  been  appointed  Chief   of   Integrated  Staff   to COSC, Indian Army. Similarly, Lt General Chetinder Singh as Quarter Master General, Lt General M.C. Badhani as Engineerin-Chief, Lt General I.J. Singh as Director General Electronics and Mechanical Engineers, Lt General D.S. Sidhu as Director General  Mechanised  Forces,  Lt  General  Jitender  Singh  as  Director  General  of Rashtriya Rifles, Lt General A.S. Lamba Vice Chief  of  the Army Staff, Lt General D.S. Thakur as Director General Military Intelligence and Lt General N.B. Singh has been appointed as Director General (IS), Indian Army.

Representative Offices BENGALURU, INDIA Air Marshal (Retd) B.K. Pandey 534, Jal Vayu Vihar, Kammanhalli Main Rd, Bangalore 560043, India. Tel: +91 (80) 23682534 MOSCOW, RUSSIA LAGUK Co., Ltd, Yuri Laskin Krasnokholmskaya, Nab., 11/15, app. 132, Moscow 115172, Russia. Tel: +7 (495) 911 2762, Fax: +7 (495) 912 1260 www.spguidepublications.com www.spslandforces.net RNI Number: DELENG/2008/25818

6/2010

SP’s LAND FORCES

19


SHOCK-PROOF. VIBRATION-PROOF. AND A ND EVEN EVEN FUTURE-PROOF. Over 115,000 DRS systems have been fielded for Blue Force Tracking and FBCB2. And thanks to a powerful Dual Core processor and flexible architecture, today’s JV-5 is ready Battle Command-Platform and ffor or ffuture uture applications. applications. From From the the JJoint oint B attle C ommand - Platform ((JBC-P) JBC-P) a nd beyond. beyond. Which Which means U.S. joint forces will see returns on this hardware investment for years to come.

Capability C apability For For T Today. oday. And And T Tomorrow. omorrow. T That’s hat’s G Go oT To. o. JointForceSystems.com


Turn static files into dynamic content formats.

Create a flipbook
SP's Land Forces Dec 2010-Jan 2011 by SP Guide Publications Pvt Ltd - Issuu