Skip to main content

Industrial Availabilities 2026

Page 1


Q1 2026

Industrial Availabilities

Extraordinary Properties Exceptional Experiences

Rockefeller Group is known for quality in the built environment, with development expertise spanning industrial, multifamily, office and mixed-use projects nationally. The company’s track record extends nearly a century, with roots traced back to the development of Rockefeller Center, a singular development and business address admired worldwide. This rich history has provided the foundation for deep expertise, an influential brand, financial stability through market cycles, and an expectation from all stakeholders for distinctive projects that provide value to partners, clients and communities.

CALIFORNIA Patterson Commerce Center

Perris, CA

259,951 SF

• State-of-the-art distribution center on 14 acres

• Completed in 2024

• Just off the I-215 Freeway

• Access to I-10, I-15 and Route 60

• Located near the Ontario International Airport

• Easy access from the Ports of LA/Long Beach

• Within eight hours of population centers in Nevada, Utah, Arizona and New Mexico

Joe McKay

+1 909 373 2914

jmckay@lee-assoc.com

Michael McKay

+1 909 373 2738 mmckay@lee-assoc.com

Michael Fine +1 909 373 2917 mfine@lee-assoc.com

Sycamore Hills Distribution Center

Riverside, CA

603,100 SF

• Two-building project on 35 acres

• Completed in 2025

• Inland Empire East industrial market

• Just west of the I-215 Freeway on-off ramp

• Near the Ontario International Airport

• Easy access to the Ports of LA/Long Beach

• Within eight hours of population centers in Nevada, Utah, Arizona and New Mexico

Mario Calvillo

+1 951 276 3657 mcalvillo@leeriverside.com

Michael Chavez

+1 909 373 2900 mchavez@lee-assoc.com

Bill Heim

+1 909 373 2901 bheim@lee-assoc.com

Finn Comer

+1 951 276 3618 fcomer@leeriverside.com

Alex Heim

+1 909 373 2701 aheim@lee-assoc.com

Black Diamond Industrial Center

Antioch, CA

441,841 SF

• Premier project on 22.65 acres

• To be completed in 2026

• East Bay submarket of the Bay Area

• Half a mile to Highway 160

• 40.5 miles to the Stockton Metropolitan Airport

• Easy access to the Ports of Oakland and Stockton

Brooks Pedder, SIOR 925 296 7729

brooks.pedder@cbre.com

Tony Binswanger, SIOR 925 296 7728

tony.binswanger@cbre.com

Bo Harkins 925 296 7727 bo.harkins@cbre.com

25 Commerce Park

Thornton, CO

453,550 SF

• Three-building project

• 131,250 SF available for lease

• Completion Q3 2024-Q1 2025

• Access to I-25 and E-470

• Fast-growing labor pool

• Easy connectivity to Metro Denver, Boulder and Northern Colorado

Todd Witty, SIOR

+1 303 725 7189 todd.witty@@cbre.com

303 946 3285 daniel.close@cbre.com

Rockefeller Group Logistics Center

Linthicum Heights, MD

136,495 SF

• W1 industrial park zoning on 35 acres

• 2 oversize drive-in doors

• Additional 1.05 acres of storage/parking

• Less than 2 miles north of I-295

• Three miles to BWI Airport

• 12 miles to the Port of Baltimore

• Within a 200 mile radius of 43 million consumers

Ben Meisels

+1 443 451 2614 ben.meisels@jll.com

Greg Ferraro

+1 443 451 2618 greg.ferraro@jll.com

Rob Maddux

+1 443 931 3353 rob.maddux@jll.com

Cheyenne Industrial Park

Las Vegas, NV

41,190 SF

• High image class A building in North Las Vegas

• Completed in Q4 2024

• Building 1 sold August 2025

• Within a day’s drive of ten major U.S. cities

• Proximate to I-15, as well as U.S. Highways 95 and 93

• Near the Las Vegas Intermodal Yard (rail hubs)

Jason Simon

+1 702 522 5001 jason.simon@jll.com Rob Lujan +1 702 522 5002 rob.lujan@jll.com

Danny Leanos

+1 702 522 5008 danny.leanos@jll.com

Craig Road Logistics Center

Las Vegas, NV

369,198 SF

• Two-building project totaling 369,198 SF

• Completed in Q2 2025

• Within a day’s drive of ten major U.S. cities

• Proximate to I-15, as well as U.S. Highways 95 and 93

• Near the Las Vegas Intermodal Yard (rail hubs)

Jason Simon

+1 702 522 5001 jason.simon@jll.com

Rob Lujan +1 702 522 5002 rob.lujan@jll.com

Danny Leanos +1 702 522 5008 danny.leanos@jll.com

Nellis Logistics Center

Las Vegas, NV

134,114 SF

• North Las Vegas distribution facility on six acres

• Completed in 2024

• Proximity to I-15, and U.S. Highways 95 and 93

• Within a day’s drive of ten major U.S. cities

• Proximate to I-15, as well as U.S. Highways 95 and 93

• Near the Las Vegas Intermodal Yard (rail hubs)

Jason Simon

+1 702 522 5001 jason.simon@jll.com

Rob Lujan +1 702 522 5002 rob.lujan@jll.com

Danny Leanos +1 702 522 5008 danny.leanos@jll.com

Main Street Logistics Center

Spotswood, NJ

654,640 SF

• Central New Jersey distribution facility

• Immediate access to NJ Turnpike (Exit 9)

• 35.7 million people reachable within 3 hours

• 59-acre property

• 30-year PILOT and active rail line

• 4,000A / 277V

Mark Petrella

+1 732 621 6317 marc.petrella@kbcadvisors.com

Michael Kimmel

+1 410 241 1815 michael.kimmel@kbcadvisors.com

Jason Goldman

+1 201 280 5360 jason.goldman@kbcadvisors.com

Andrew Siemsen

+1 201 306 5019 andrew.siemsen@kbcadvisors.com

Rockefeller Group Logistics Center at Carneys Point

Carneys Point, NJ

1.1 MSF

• Two-building project

• Less than four miles from NJ TPKE Exit 1

• Three miles from I-295 Exits 2B and 4

• Easy access to four East Coast ports: (New York & New Jersey, Philadelphia, Wilmington and Baltimore)

Thomas F. Monahan

+1 201 712 5610 thomas.monahan@cbre.com

Brian Golden +1 201 712 5607 brian.golden@cbre.com

Larry Schiffenhaus +1 201 712 5809 larry.schiffenhaus@cbre.com

Drew Green +1 610 251 5183 andrew.green@cbre.com

Crossways Logistics Center

Woodbury, NY

145,200 SF

• Completed in 2023

• 104,544 SF available for lease

• Excellent highway connectivity

• 23 and 25 miles from LaGuardia & JFK Airports

• 45 miles from Port Newark/Elizabeth

• Central location bridging Long Island and NYC

• 9-acre property

• 41,000-sf lease completed with Rivian in 2024

Frank Frizalone, SIOR +1 631 425 1242 frank.frizalone@cushwake.com

John Giannuzzi

+1 631 425 1228 john.giannuzzi@cushwake.com

Thomas DeLuca +1 631 425 1237 thomas.deluca@cushwake.com

Mindy Lissner, SIOR +1 732 261 6319 mindy.lissner@cushwake.com

Nicholas Gallipoli +1 631 425 1217 nicholas.gallipoli@cushwake.com

William Waxman, SIOR +1 201 394 9989 bill.waxman@cushwake.com

Rockefeller Group Logistics Park 55 Paradise Lane Bay

Shore, NY

172,622 SF

• Last-mile premier distribution facility

• 66,406 SF available for lease

• Underserved market

• Completion in 2023

• Six minutes to I-495 (Long Island Expressway)

Facts

Frank Frizalone, SIOR

+1 631 425 1242 frank.frizalone@cushwake.com

John Giannuzzi

+1 631 425 1228 john.giannuzzi@cushwake.com

Thomas DeLuca +1 631 425 1237 thomas.deluca@cushwake.com

Austin Fitzpatrick

+1 631 546 5865 austin.fitzpatrickr@cushwake.com

Nicholas Gallipoli +1 631 425 1217 nicholas.gallipoli@cushwake.com

David Frattaroli

+1 516 859 6396 david.frattaroli@cushwake.com

Rockefeller Group Logistics Center on the Boulevard

Philadelphia, PA

656,904 SF

• Two-building distribution park

• Completion in Q4 2025

• 15 miles from the Port of Philadelphia

• Two miles to I-276

• Four miles to I-95

• 14 miles to the NJ Turnpike

• Population of 2.2 million within 30 minutes

Andrew Green

+1 610 251 5183 andrew.green@cbre.com

Michael Mullen

+1 215 561 8927 michael.mullen@cbre.com

Paul Touhey

+1 610 251 5126 paul.touhey@cbre.com

Silver Spring Logistics Park

Mechanicsburg, PA

2.01 MSF

• Three-building distribution park

• 120 miles from the Port of Philadelphia

• Immediate highway access to I-81, I-76 Route 11 and Route 15

• 175 miles to the Port of Newark/Elizabeth

• 206,000+ labor force (30-minute drive)

Bart D. Anderson

+1 717 540 2706 bart.anderson@cbre.com

Michael Hess +1 717 540 2705 michael.hess@cbre.com Michael Pietropola +1 717 540 2713 michael.pietropola@cbre.com

Duncan Logistics Center

Duncan, SC

827,180 SF

• Three-building project

• Up to 685,220 SF available for lease

• Immediate access to I-85

• Seven miles to I-26

• Seven miles to Inland Port Greer

• Within four hours of Ports of Charleston and Savannah

Campbell Lewis, SIOR +1 864 527 6041 campbell.lewis@cbre.com

Marcus Cornelius, SIOR +1 864 527 6081 marcus.cornelius@cbre.com

Spartanburg 221

Spartanburg, SC

1.02 MSF

• Premier distribution facility on 89 acres

• Completed in Q4 2024

• Located off highway 221

• One mile from the I-85 Exit 78 interchange

• Strong transportation network, population growth

Campbell Lewis, SIOR

+1 864 527 6041 campbell.lewis@cbre.com

Marcus Cornelius, SIOR +1 864 527 6081 marcus.cornelius@cbre.com

McKinney Commerce Center

McKinney, TX

319,347 SF

• Three-building project

• 281,087 SF available for lease

• Divisible to 14,442 SF

• Easy on-off access to I-75

• Monument signage for all three buildings visible from I-75

• Quick access to DFW International Airport, the Dallas-Fort Worth Metroplex, and major industrial corridors serving

Dock Doors Car Parking Truck Court

Occupancy

Brett Lewis

+1 972 934 4018 blewis@lee.associates.com

Taylor Stell +1 214 558 1969 tstell@lee.associates.com

Valley View Logistics Park

Irving, TX

788,270 SF

• Four-building project in the Dallas submarket

• Within three miles of DFW International Airport

• Located between Dallas and Fort Worth

• Access to dense warehouse labor pool

• Project visible from Valley View Lane, a key connector to U.S. Route 183

• Each building includes insulated dock doors, warehouse LED lighting and significant power

• Divisible to 32,000 SF

SF 32’-36’ 2,905-3,040 SF 25-56

Range: 121-301

Range: 18-53 Q4 2026

Nathan Lawrence +1 214 402 6016 nathan.lawrence@kbcadvisors.com

Will Carney +1 817 437 5708 will.carney@kbcadvisors.com

Krista Raymond +1 972 971 2785 krista.raymond@kbcadvisors.com

Whit Maddox +1 214 240 0014 whit.maddox@kbcadvisors.com

Port 460 Logistics Center

Suffolk, VA

2.4 MSF (Phase One)

• Phase one is a five-building project on 260 acres

• Scheduled for completion from Q4 2025-Q3 2027

• Directly on US-460 with access to I-85 and I-95

• Closest development of scale to the Port of Virginia

• Reach 75% of the U.S. population in two days

Todd Hughes

+1 443 451 2608 todd.hughes@jll.com

Greg Christofferson

+1 757 965 3009 gregg.christofferson@jll.com

Facts

Aggregate Building Size

Clear Height

Dock Doors

Car Parking

Trailer Parking

Occupancy

Kris Kennedy

+1 757 348 6098 kris.kennedy@jll.com

2.4 MSF

40’ (4 of 5)

Range: 54-168

Range: 177-438

Range: 140-417

Q1 2026

Northsound Logistics

Arlington, WA

186,873 SF

• Located on 9.29-acre parcel

• Scheduled for completion in Q4 2026

• Accessible to Seattle and Bellevue as well as Pierce and Snohomish Counties

• Located less than two miles from the Interstate 5 Freeway

• 2.7

Matt Hagen

425 283 5782

matt.hagen@kidder.com

Matt Henn

425 450 1108

matt.henn@kidder.com

Recent Completions

Over the past five years Rockefeller Group has completed 10 million square feet of industrial property in eight states spanning the Northeast, Southeast and Western U.S., and today has a $2.8 billion industrial development pipeline totaling more than 16 million square feet.

BRASELTON, GA I 427,655 SF I SOLD: 2025

CENTER

RIVERSIDE, CA I 289,556 SF | SOLD: 2022

STATELINE 77

CHARLOTTE, NC I 1.0 MSF | SOLD: 2023

I 147,000 SF | SOLD: 2024

EASTAMPTON, NJ I 345,600 SF | SOLD: 2023

INDUSTRIAL CENTER SAN DIEGO, CA I 202,760 SF | SOLD: 2023

HERITAGE
VAL VERDE LOGISTICS
ROCKEFELLER GROUP EASTAMPTON
BRASELTON II
CONSTITUTION LOGISTICS CENTER PISCATAWAY, NJ

MIDDLESEX LOGISTICS CENTER

MIDDLESEX, NJ I 400,000 SF | SOLD: 2021 HARVILL LOGISTICS CENTER PERRIS, CA I 334,000 SF | SOLD: 2021

AIRWAY INDUSTRIAL PARK OTAY MESA, CA I 136,000 SF | SOLD: 2021 ROCKEFELLER GROUP LOGISTICS PARK LEHIGH VALLEY, PA I 1.3 MSF | SOLD: 2021

145 & 158 CANDLEWOOD ROAD BAY SHORE, NY I 560,719 SF I SOLD: 2024 800 WILLOWBROOK ROAD HANOVER, PA I 454,000 SF | SOLD: 2022 10 EDISON

FONTANA SANTA ANA INDUSTRIAL CENTER FONTANA, CA I 297,000 SF | SOLD: 2021

NJ I 900,000 SF | SOLD: 2020

40 years of experience developing industrial properties for the world’s leading businesses and logistics firms.
Industrial Development

Rockefeller Group has been engaged in large-scale industrial property development for more than 40 years, beginning with the partnership to develop the 1.7-million-square-foot International Trade Center in New Jersey. Since inception, the company has developed more than 28 million square feet of class-A industrial real estate for many of the world’s leading businesses and logistics firms.

Rockefeller Group has extensive experience obtaining entitlements for industrial development projects nationwide. The company has completed build-to-suit projects for Fortune 500 clients, who emphasize the value of a strong track record, financial stability through market cycles, as well as projects delievered on schedule and within established budgets. Seven U.S. regional offices house the local development, design & construction and leasing teams, providing market-level expertise

to bolster the company’s national footprint. Each regional development team has existing relationships in the local markets, and is experienced in all aspects of development. The company plans its projects for the most efficient access from ports and inland distribution hubs to the nation’s major population centers. In addition, the company advises businesses and property owners on trade and logistics matters related to Foreign Trade Zones through its FTZ Services subsidiary.

A 400,000 square foot warehouse and distribution facility, completed in 2021 in Middlesex, N.J.
Companies involved in international trade may benefit from Rockefeller Group’s 40 years of Foreign Trade Zone expertise.

Navigating FTZs

The financial advantages of operating in an FTZ can drive significant savings, especially in a changing tariff and trade environment. FTZs can help businesses preserve cash flow and offset costs associated with relocation. Rockefeller Group has four decades of experience assisting businesses through the process of FTZ designation or activation. Most Rockefeller Group projects are considered “FTZ enabled,” or sites located in the service area of an existing FTZ project under the sponsorship of an existing grantee. FTZ-enabled sites allow for a simplified and faster FTZ designation application process without any fees payable to the U.S. Foreign-Trade Zones Board. More information can be found at ftz.rockefellergroup.com.

1271 Avenue of the Americas

New York, NY 10020 rockefellergroup.com

Development Team

NATIONAL & FTZ SERVICES

Brandi Hanback 410 897 4858 bhanback@rockefellergroup.com

NATIONAL DEVELOPMENT

Katie Lenss 202 864 3605 klenss@rockefellergroup.com

MID-ATLANTIC

Hilary Allard Goldfarb 202 864 3601 hgoldfarb@rockefellergroup.com

NORTH CENTRAL

Mark Shearer 973 448 3594 mshearer@rockefellergroup.com

NORTHEAST

Meg Brod 212 282 2034 mbrod@rockefellergroup.com

ROCKY MOUNTAINS

Jay Despard 719 256 0798 jdespard@rockefellergroup.com

SOUTHEAST

John Petricola 770 884 1322 jpetricola@rockefellergroup.com

SOUTHWEST

Phillip Croker 346 615 0131 pcroker@rockefellergroup.com

WEST

James Camp 949 468 1806 jcamp@rockefellergroup.com

FOREIGN TRADE ZONES

Rebecca Williams 973 448 3598 rwilliams@rockefellergroup.com

Turn static files into dynamic content formats.

Create a flipbook