LocalMatters Forum
Balmain-Baludarri5May2026
SnapSendSolve








![]()
Balmain-Baludarri5May2026
SnapSendSolve








• Capture all the details in a photo
• Can detect requests for the same issue
• Also captures location details from the photo



• Location is found automatically
• Confirm or drag the pin to change


• Search or choose from a category
• Find requests for other organisations


• Add more context (Optional)


• Change or confirm any details
• Send request to Council









Makingtripsto andfromschools saferforeveryone
• Everyday,thousandsofchildren acrosstheInnerWestwalk,ride, scootoraredrivento andfrom school
• Councilhascommencedastudy aimingtoimprovesafetyof everyoneonthesejourneysonhow wecanimprovepedestrianand trafficsafetyaroundeveryprimary andsecondaryschoolintheLGA




LilyfieldRoadCyclewayand angleparking-Update
Proposal:
• Abi-directionalcyclewaybetweenthe BayRunandRozelleParklands
• AngleparkingalongtheRozelle Parkland-anetgainof47on-street parkingspaces.
• Trafficcalmingimprovements

Communityengagement-9March 2026and6April2026-74%supportrate.

PerryLane,Lilyfield–LocalRoad Upgrade
• Budget:$105,000
• ConstructionCommencing:lateMay2026, anticipatedcompletionwithin4weeks
• Worksincludestormwaterdrainage,heavy patchingofsomesectionsofthelaneway andresurfacingtheentirelaneway.
• Improvethestreetscapebyrestoring deterioratedfootpath,roadandkerb& gutterassetsaswellasimprovingsafetyfor pedestriansandmotorists.


• Budget:$130,000
• ConstructionCommencing:lateMay 2026,anticipatedcompletion4weeks.
• Worksincludefootpathreconstruction, kerbandgutterimprovements, reconstructionofspeedhumps, drivewayreconstruction
• Roadresheeting


Budget:$140,000
ConstructionCompleted:27March2026. Constructionofraisedpedestriancrossingto improvepedestrianandmotoristsafetyby betterdefiningsafepedestriancrossingpoints, improvingsightdistances,reducingtraffic speedsandconflictswithtrafficmovementsat thislocation.
Ausgridlightinginstalled


CurtisRoadatMcDonaldStreet andDarlingStreet,Balmain RaisedPedestrianCrossing
Budget:$500,000
ConstructiontoCommence:EarlyJune 2026
Worksincluderaisedpedestrian crossings,continuousfootpath treatments,andaone-waytreatmentin McDonaldStreetto betterdefine pedestriancrossingpointsandaddress driverbehaviour,particularlyduringbusy periods.


• Budget:$270,000
• ConstructionCommenced:7April2026, anticipatedcompletionearlyMay.
• Worksincludeconstructingraised pedestriancrossings.Linemarkingand lighting
• Improvepedestrianandmotoristsafetyby betterdefiningsafepedestriancrossing points,improvingsightdistances,reducing trafficspeedsandconflictswithtraffic movementsatthislocation


Rolloutcompletedin:
• Marrickville
• Newtown
• Enmore
• Sydenham
• StPeters
• Tempe Recentlycompleted:
• StanmoreandPetersham
• DulwichHillsouthandMarrickvillewest

Fullrolloutaimingforcompletionbymid2026.



















• Date:Tuesday12May2026,6pm
• Venue:Haberfield Library