Skip to main content

Registered Gas Engineer, September 2021 issue

Page 1

Gas REGISTERED

THE ONLY OFFICIAL INDUSTRY PUBLICATION

Issue 150 September 2021

We’re ready for Gas Safety Week: are you?

What’s the news on hydrogen? The latest developments on how H2 can help to decarbonise Britain

Technical Gas safety on boats and leisure craft

WIN: Five chances to win an ALPHA3 pump from Grundfos


It’s anyone’s game

Fancy winning two places on the trip of a lifetime, just for fitting boilers? Get in the game with the Mystery Trip. The destination is a secret for now, but it’s sure to be an adventure packed with amazing experiences, top-notch food and drink, and brilliant memories. The best thing about Mystery Trip is that it’s a completely level playing field. You get a points target tailored to your business, so you’re competing with people just like you. Every time you fit and register a Glow-worm product, you’ll earn points towards your target. You can follow your progress and see where you stand in our handy Club Energy app too. Register now for your chance to win at www.glow-worm.co.uk/mysterytrip If you're not already a member of Club Energy, remember you'll need to sign up for that too!

Keeping Britain Glowing


For more information, visit www.glow-worm.co.uk/mysterytrip


Wireless measurement with your KANE FGA Temperature - Air Flow - Room CO

Customer Service

0800 059 0800

Email: sales@kane.co.uk

Fax: 01707 393277

www.kane.co.uk

Visit us at Installer Show Ricoh Arena Coventry 28-30 September 2021

Follow us on...

KANE, KANE LINKTM and the KANE logo (registered in the UK and elsewhere) are trademarks of Kane Group Limited, used under licence. All other marks are trademarks of their respective holders. © 2021 Kane International Limited


REGISTERED GAS ENGINEER

In this issue

Issue 150 September 2021

32 Women in industry

With the industry facing a growing skills shortage, what more can be done to encourage women to consider a career in the trades? It’s time to challenge the gender stereotypes

39 Technical

Fan-diluted flue systems and proving air flow

13-19 September 2021

43 Underfloor heating Why zoning matters

06 Gas Safe News

We’re ready for Gas Safety Week, are you? Be on your guard against guaranteed contracts; Gas Safe Register at a Glance: What’s been happening with illegal gas work?

09 News

Illegal gas fitter caused gas escape in care home; eBay to halt sales of patch CO detectors; Difficult winter ahead as Covid-19 impact continues, warns engineering alliance

44 Training

In-person training is back at last – and here’s why you may need it

46 Back to basics

The risks that the build-up of sludge poses to central heating systems and how to prevent it happening

51 Products

The latest new products from around the industry

14 Hydrogen news

• The industry reacts as the governent publishes its long-awaited Hydrogen Strategy • We take an exclusive tour inside the new hydrogen home near Gateshead • All the latest developments and thinking on how hydrogen could help to decarbonise the nation’s heating

24 Technical

20 The good, the bad and the ugly

29 Electrical safety

How can gas engineers achieve safe isolation and why do they need to do so?

as safety on boats G and leisure craft – an overview of the standards and guidance on safety, flues, tightness testing and regulators

Competition Five chances to win a super-efficient ALPHA3 circulator from Grundfos

Win Page 59

www.gassaferegister.co.uk 05


FROM THE EDITOR

Comment

I

’m not a green activist by any means. I’m quite good about recycling as much as I can. I use the car less, eat less meat and walk a lot more than I used to. More of a ‘yes, I see what you mean’ kind of person. And the IPCC’s climate report last month – described by the head of the United Nations as ‘Code Red for Humanity’ – made for uncomfortable and worrying reading. It gives a stark warning of a future where the world is hotter, there are more extreme weather events such as this summer’s devastating floods in Belgium and Germany, and to a lesser extent in the UK, and the searing temperatures and raging fires in Greece, Turkey and Canada. The report says deep cuts in global greenhouse gas emissions could stabilise the world’s rising temperatures. It’s a vivid illustration of why decarbonising the way we produce and use heat and power is necessary. Yes, the UK’s carbon emissions are not as high as those of some other global polluters and we’re definitely going in the right direction – but the emissions from our homes are not a drop in the ocean. And if we want to prevent our oceans rising any more, haven’t we got to do something? Nicki Shearer, editor Gas Safe Register, PO Box 6804, Basingstoke, RG24 4NB. Email: enquiries@gassaferegister.co.uk, register@gassaferegister.co.uk or technical@gassaferegister.co.uk Managing editor: Scott Darroch scott.darroch@gassaferegister.co.uk Editor: Nicki Shearer editorial@registeredgasengineer.co.uk News: Jennie Ward news@registeredgasengineer.co.uk

Technical consultants: Gary Aymes, Carl Banister, David Smith, Jonathan Stirling Production: Mark Turpin Advertising enquiries only: Ian Carter ian@rgemagazine.co.uk Additional print subscriptions £25 per year email: wgardiner@circdata.com, Tel 01635 869 868 The views expressed in this magazine are not necessarily those of Gas Safe Register. The publishers will accept an advertisement or other inserted material only on the condition that the advertiser warrants that such advertisement does not in any way infringe copyright or contravene the provisions of the Trade Descriptions Act. All copy is subject to the approval of the publisher, who reserves the right to refuse, amend, withdraw or otherwise deal with advertisements submitted to it at its absolute discretion and without explanation. All advertisements must comply with the British Code of Advertising Practice. ABC membership approved 19 March, 2009. Calls to phone numbers starting 084 and 087 cost up to 7p per minute plus your service provider’s charge.

CIRCULATION:

Jan-Dec 2020

77,332 06 September 2021

Y

ou’ve probably heard hundreds of excuses from your customers – from “my mate did it and said it was OK” to “I just forgot”. This year, Gas Safety Week will be reminding people not to let excuses get in the way of keeping their loved ones and communities safe, and to make sure that they get their gas appliances safety checked by a registered engineer. The industry’s biggest annual gas safety event will kick off at the Castle Quarter shopping centre in Norwich. Here there will be a special Gas Safety Week video booth where Gas Safe Register will be asking shoppers to confess their real-life excuses – and playing them throughout the week on social media. Community safety will be at the heart of the campaign this year, helping to bring home the importance of staying gas safe

13-19 September 2021 for you, your loved ones and your communities. As always, Gas Safe Register will be working with gas engineers, organisations, MPs, manufacturers and industry stakeholders to use their voices to help spread gas safety messages across the nation. It’s not too late for you to get involved too, in whatever way you want to. When you sign up to support, you’ll receive a digital toolkit packed full of

Gas Safe Register at a glance 2020/21 G

Publisher: Peter McCreary publisher@registeredgasengineer.co.uk

Registered Gas Engineer is written, designed and published by The Team on behalf of Gas Safe Register. 30 Park Street, London, SE1 9EQ

We’re ready for Gas Safety Week: are you?

as Safe Register’s At A Glance report highlights the Register’s work during the past year. The Register was not immune to the impact of the Covid-19 pandemic and, like many other organisations, it faced challenges and had to adapt to a new way of working. Investigations and on-site inspections were focused on work suspected or triaged to be higher risk. You can read the full report at www. GasSafeRegister.co.uk/ media/3117/gas-safeat-a-glance-lr-web.pdf

1,488 reports received

about illegal gas workers

1,984 defects attributed to illegal gas workers


REGISTERED GAS ENGINEER | GAS SAFE REGISTER NEWS

Guaranteed contracts: be on your guard

Press ads will run in national newspapers throughout Gas Safety Week

ideas, images, pre-written articles and social media updates that you can use on your website and social media. It’s a great way to showcase your professionalism to your customers and communities. And if you’re using social

Once again, we’re warning gas engineers to be careful if they’re offered so-called guaranteed contract work. Gas Safe Register has been contacted by gas engineers who, in some instances, have lost thousands of pounds after paying out to secure exclusive gas servicing work in their area that didn’t ever materialise. We’ve been told that this is how these schemes operate: a company contacts you by phone or email, offering you exclusive and substantial guaranteed work in your postcode area. The company, often describing itself as a property maintenance

media to support, don’t forget to use the hashtag #GSW21 to join in with the conversation. Don’t make excuses, join in with Gas Safety Week – help to keep your own communities safe and raise your own business profile too.

Get involved and receive your own toolkit at

www.GasSafetyWeek.co.uk

firm, says it’s giving you a contract to exclusively provide landlords’ gas safety record checks and maintenance of gas appliances in that area. But here’s the catch: you’ll be asked for a fee to secure the ‘exclusive’ contract, often around £2,000. Gas engineers have told us that they don’t ever receive any such work. When they try to contact the company, they can’t get hold of them – and they can’t recoup their money. These companies pop up regularly and change their name frequently. Their addresses are often serviced offices and any phone numbers provided are not in service or go through to virtual assistants only. If you believe you have been the victim of fraud, report it to Action Fraud by calling 0300 123 2040 or go to www.actionfraud. police.uk. Reports of fraud and any other financial crime in Scotland should be reported to Police Scotland via 101. You can report scam text messages by forwarding them to 7726. Remember: if it looks too good to be true, it probably is.

What happens when you report illegal gas work? Reporting illegal gas work when you find it can benefit your business finanacially as well as strengthening your own reputation. When you make a report, a Gas Safe regional investigations officers will aim to visit the property and inspect the gas work within 10 working days. The officer usually spends two to three hours on site and makes a full report of their findings to your customer and HSE (or other bodies, where appropriate) within 10 working days of the site visit. These reports are very detailed and record every gas-related defect on the work, as well as photographs and information about what needs to be done to correct the faults, to provide the evidence that the enforcement agencies need to take enforcement action, including prosecution.

The report may be disclosed to other agencies, if appropriate, such as local authority Environmental Health or Trading Standards. Enforcement The HSE will review the report and decide on the most appropriate enforcement action, in line with its Enforcement Policy. Enforcement action may result in: • a Warning Letter: the first stage of enforcement • a Prohibition Notice: this orders the worker to stop working on gas immediately • Prosecution: this may result in a fine and/or imprisonment of up to six months in the Magistrate’s Court and/or up to two years in the Crown Court or Sheriff Court. Gas Safe Register does not have enforcement powers but it is responsible for investigating and

compiling the evidence of illegal gas work that is then used by enforcement agencies to bring prosecutions. National Investigations Coordinator Ronan Howard says: “We take all reports of unregistered work seriously. Where it has been alleged that specific gas work has been undertaken, we will always endeavour to visit the property, undertake an on-site risk assessment and refer our findings to the enforcing authority for consideration. “Because we are the registration body, not the enforcement agency, we do not make the decision as to whether enforcement action will be taken against an individual or business. “While investigations are ongoing, we are limited in

what information we can provide – but just because we cannot provide sensitive information, this doesn’t mean that action isn’t being taken. “We can only investigate based on the information we receive: if you have concerns, please contact us.” www.GasSafeRegister.co.uk/ reportillegal

www.gassaferegister.co.uk 07


This one’s on us

Free hybrid heat pump training with Daikin. Free boiler for your customer. Not every home is ready to make the change to fully-renewable heating. But now, there’s a solution that means everyone can take advantage of the heat pump revolution. Take your first step into the renewables market with Daikin’s free hybrid* heat pump training. In just one day, you can expand your portfolio and gain the skills to upgrade customers to an eco-friendly hybrid solution, which combines the power of a heat pump with the familiarity of a high efficiency boiler. And what’s more, when they choose a Daikin Altherma hybrid system, you can offer your customers the boiler absolutely free – this one’s on us!

Free training for you. Free boiler for them. Discover your Energy for Change and sign up for your free training today: daikin.co.uk/hybridtraining *Hybrid bi-valent. Terms and Conditions: Free boiler offer available to customers who purchase Daikin outdoor unit [EJHA04AV3], Boiler [D2CND024/28/35A4A] and appropriate accessories to be used as a bi-valent system.


REGISTERED GAS ENGINEER | GAS SAFE REGISTER NEWS

Suspended sentence for illegal gas fitter who caused gas escape in care home A kitchen fitter has been given a suspended prison sentence after a range cooker that he fitted at a care home suffered a substantial gas escape.

Exeter Crown Court heard that on 24 December 2020, Mark Whitham, from Barnstaple, fitted the new gas cooker at the residential care home in North Devon after damaging the existing gas cooker while he was fitting out a new kitchen. Over the next 24 hours, staff at the care home had problems using the cooker and contacted their usual Gas Safe engineer. The engineer found a substantial escape from the gas supply to the cooker and reported the installation under RIDDOR. The HSE investigation found

eBay to halt sales of patch CO detectors eBay will remove all black spot/ patch CO indicators from sale or advertisement, after a request to do so by the All Party Parliamentary Carbon Monoxide Group (APPCOG). APPCOG wrote to the online marketplace recently, requesting it “to take immediate action to prevent any further ads from being listed in the future. This is because these alarms do not work and give a false sense of security to home occupiers.” After receiving the letter, the sale of black spot detectors was urgently reviewed by eBay’s Prohibited and Restricted Items team, in accordance with eBay’s Product Safety Policy. Alasdair McGowan, head of Public Affairs and director of Government Relations at eBay UK, has confirmed that all listings of black spot CO detectors will be removed and that eBay UK will: •U pdate its filters to flag these products if they are listed in future ads, and •C onduct manual sweeps to remove current ads for of black spot and patch CO detectors. Barry Sheerman MP says: “The APPCOG parliamentary

members and myself are delighted to hear that any listings of black spot/patch indicator carbon monoxide detectors will be removed from sale or advertisement in accordance with eBay’s Product Safety Policy. “I would like to express my thanks, and those of APPCOG, to Mr McGowan and the Prohibited and Restricted Items team for taking such swift action on this important consumer safety issue.” Amazon has already taken steps to remove patch CO detectors from its platform. The government plans to expand the requirements for CO alarms so that it will be essential for landlords to install an alarm with an audible or alerting indication in order to keep their tenants safe.

that Mr Whitham was not Gas Safe registered and did not follow the manufacturer’s instructions when he fitted the cooker. Mark Whitham of Fallow Fields, Barnstaple, Devon, pleaded guilty to breaching Regulations 3(1) and 22(1)(a) of the Gas Safety (Installation & Use) Regulations 1998. He was sentenced to six months in prison for each offence, suspended for 12 months. He was also ordered to undertake 120 hours of unpaid work, and pay £2,000 costs. Speaking after the hearing,

HSE inspector Simon Jones said: “Mark Whitham undertook gas work, which he knew he was not registered to do. In this case Mark Whitham’s unregistered gas work put the lives of vulnerable people at real risk from fire and explosion.”

To report illegal gas work please call 0800 408 5577 or go to www.GasSafeRegister. co.uk/reportillegal

BPEC helps Malawi maternity clinic The BPEC Charity has helped fund the installation of a new clean water supply to the Chikwina village maternity clinic in northern Malawi. The clinic now has fresh water from a tap so that staff can clean equipment, wash laundry, prevent infection, and give new mothers and babies clean water for drinking and washing. Previously,

water had to be drawn from a borehole a 15-minute walk away. “BPEC is delighted to have been able to invest in such a worthwhile cause, which is already having a major impact on the Chikwina community,” says Neil Collishaw, CEO at BPEC. “We know that access to clean water can literally save lives and made providing water and sanitation to the Chikwina clinic a priority,” says Dean Buchanan, trustee at international development charity Datum Foundation. “We were delighted to receive a life award grant of £1,500 from the BPEC Charity towards the cost and can’t thank them enough.”

Competition winners James Griffiths from Cholsey, Oxfordshire, won a Fusion Astro electric combi boiler in our June competition, courtesy of our friends at the Electric Heating Company. There were five winners in our July competition, with prizes from IMI Hydronic ranging from products from the company’s HVAC portfolio to tickets to Installer Stock 2021, the UK’s only installer festival, which takes place this month. The winners were Steve Morrison from Midlothian, Niall Evans from Gosport, Martin Neate from Bristol, Lui Olandese from Newport, and Brett Williams from Plymouth. Congratulations to all our winners. • Turn to page 59 to enter this month’s competition, with great prizes up for grabs from Grundfos. www.gassaferegister.co.uk 09


REGISTERED GAS ENGINEER | AROUND THE INDUSTRY

‘Difficult winter ahead as Covid impact continues’ Covid-19 continues to cast a dark shadow on the industry and the effects will be felt long into the future, says Actuate UK, the alliance of UK building engineering services. Construction output remains high but is threatened by the twin threats of a skills shortage and long Covid, both of which could have a devastating impact on a volatile industry this winter. Actuate UK is warning the sector to be vigilant and follow good practice guidance to prevent long-lasting impacts on businesses. It adds that

businesses and the government should start planning now to avoid winter disruption. Fiona Hodgson, CEO of Actuate UK member SNIPEF, says: “As the restrictions ease, Actuate UK urges industry to strike a balance when considering the health of its workers and the need to move the economy forward. “This survey gives us grave concern about the long-term effects of Covid on our industry. Building services are the lifeblood of all major construction projects, with heating, lighting, ventilation and digital infrastructure essential

to successful project delivery. “Yet we continue to hear from members there are simply not enough skilled installers to meet current demand. With fewer apprentices being recruited during the pandemic, this has exacerbated the issue and we are deeply concerned this will impact on government targets and future projects.” Andrew Eldred, of Actuate UK and ECA’s director of Skills and Employment, said: “The pandemic has had repercussions for training; the number of new entrants into the workforce has declined. The

difficulties of gaining practical experience, along with reduced numbers starting apprenticeships, have taken their toll.” The spectre of long Covid throws another shadow, with recent figures from the Office for National Statistics (ONS) showing that 385,000 people in the UK have lived with symptoms for a year or more. Andrew adds: “While life may return to ‘the new normal’ for many in the coming weeks and months, for others, the long-term impact of the pandemic will remain a very real barrier to work.”

New head for HHIC

Take three from Testo

Steve Keeton is the new chair of the Heating and Hotwater Industry Council (HHIC). Steve, the director of external affairs and future portfolio at Vaillant Group UK, has had a long career in the industry, working as Vaillant’s UK. R&D director from 2000, then in 2008 as its commercial head of system technologies. He replaces outgoing director Andrew Keating, group service director at BDR Thermea Group. HHIC director Stewart Clements says: “Steve’s work epitomises the long-standing commitment to high standards and future thinking that we champion. “The HHIC is… committed to using our knowledge and

There are three new offers from Testo this autumn on selected flue gas analyser kits, the new 55x digital manifolds and the 868 thermal imaging camera. When you buy a Testo 327, 320B or 300 flue gas analyser kit, you’ll get a free first-year service, saving over £100. Just register on the website before 31 December to claim your free service. You can get a free electric Wiha screwdriver, worth over £65, when you buy a new Testo 550i, 550s or 557s digital manifold. The new digital manifold range is suitable for heat pumps and refrigeration applications, providing fast measurement and easy operation, with wireless measurement.

expertise to define practical solutions for decarbonising heat and hot water in UK homes and businesses.” Steve Keeton says: “These are changing and challenging times for the industry and it is important to have the backing of a strong team to help drive the actions to achieve our targets.”

And there’s £100 off the 868 thermal imaging camera too, which connects to the free Testo Thermography App to create customer reports simply. All offers end on 31 December 2021. www.testo.com/en-UK

‘2 million green jobs by 2030’ says government A Green Jobs Taskforce has declared that every job has the potential to become green as the government sets out its ambition for 2 million skilled green jobs by 2030 and build back greener from the pandemic. The government has welcomed 15 new recommendations from the independent Green Jobs Taskforce. Its Ten Point Plan reckons up to 90,000 highly skilled green jobs will be supported within this Parliament, and up to 250,000 by 2030. This includes supporting 60,000 jobs in offshore wind, 10 September 2021

40,000 new jobs in zero-emission vehicles, and 50,000 jobs in greening the UK’s buildings – all by 2030. The Taskforce’s findings and recommendations on how the government, industry and skills sector can best deliver the green jobs and skills of the future include: • Publishing a detailed Net Zero Strategy and using policy to promote good green jobs, skills and competitive supply chains • Industry, the education sector and the government working together to ensure green

careers advice and pathways into good green jobs •B uilding on the government’s skills reforms to support people to work in the green economy. The report assesses how the jobs market and the skills sector should adapt to support net zero, from training engineers and construction workers who are building offshore wind farms and nuclear plants, to the retrofitters who will make homes more comfortable and energy efficient, and car mechanics servicing electric vehicles and vans.

UK Energy & Climate Change Minister and co-chair of the Green Jobs Taskforce Anne-Marie Trevelyan says: “We need to invest in the UK’s most important asset – its workforce – so that our people have the right skills to deliver a green industrial revolution and thrive in the jobs it will create.” Gillian Keegan, Minister for Apprenticeships and Skills and co-chair of the Green Jobs Taskforce, says: “We are focused on delivering the talent pipeline businesses need for green jobs now and in the future.”


Blue Flame The Navien LCB700 oil boiler range... when only future-proofed will do Reduced running costs, ultra-low NOx emissions and ErP A+ energy efficiency capabilities; these are just some of reasons why we only manufacture blue flame oil boilers. You don’t have to wait for the next generation of oil boilers to arrive. It’s already here. Find the LCB700 at your nearest merchant. LIGHTWEIGHT

•

LOW NOx

•

FUTURE–PROOFED

To find your nearest stockist: info@navienuk.com Discover more about our range: www.navien.co.uk

YEAR

WARRANTY WARRA RA ANTY

0

0 6.

AT +V

r ou t y n m m a fro froerch P e l R R ab m ail est Av ear n

£

0 2 1


REGISTERED GAS ENGINEER | AROUND THE INDUSTRY

New sustainable home centres for Daikin Daikin UK has opened Sustainable Home Centres in East Anglia and Essex, giving homeowners the opportunity to see Daikin’s air source heat pump technology. The centres also put people in touch with a trusted installer in their area. Partnerships have been set up with East Anglia Renewables Centres, a sister company of local air conditioning and air source heat pump provider EOC Services, and with CB Heating in Essex.

For heating engineers, the partnerships mean they will be able to win projects and source products as well as accessing training and resources to help enhance the services they offer, says Daikin – and to ensure the long-term competitiveness of their business as fossil fuels are phased out. Iain Bevan, Daikin UK’s commercial manager, Heating & Renewables, says: “It’s important that homeowners who want to go green can access the best

solution to meet their household’s heating and hot water needs. Being able to explore and discuss heat pump technology in person is vital, as is knowing that it will be installed by a highly trained professional. “Installer training is critical if we’re to meet the target for 19 million heat pumps to be installed nationwide by 2050. To help get us there, industry estimates predict that 17,000 new heat pump installers will be required in the next decade.”

Heating engineers who join Daikin’s Sustainable Home Network can get free, hands-on training at its centres around the UK, helping to develop their heat pump installation and commissioning expertise. Other benefits of joining the network include dedicated technical support, sales-ready leads, business support and special offers. www.daikin.co.uk/en_gb/ installers/support.html

New awards to celebrate young people in LPG

Fill up your toolbox with Vaillant promotion Engineers can earn new tools with every ecoTEC plus boiler pack they buy in Vaillant’s new promotion. Vaillant has teamed up with Wolseley to offer its Advance engineers the chance to earn up to 10 prizes, ranging from Makita Bluetooth radios to a wide variety of power tools. The promotion runs until the end of the year and is based on a prize accumulator, so engineers can claim their prize at any time, or bank their installations to claim an even bigger reward. Once a prize is claimed, the engineer will automatically restart the accumulator from the beginning. With up to 10 restarts, they have the chance to earn one of every available prize. The promotion is available on both the 48kW and 64kW larger-output ecoTEC plus boilers, 12 September 2021

which must be purchased and registered through the Vaillant Advance loyalty scheme. Spencer Clark, commercial director at Vaillant, says: “The cost of kitting out a toolbox can really add up, especially for smaller businesses or engineers who are just starting out. Our latest promotion in partnership with Wolseley is a great way for engineers to expand their toolboxes with some of the best pieces of kit on the market.” Engineers not registered with Vaillant Advance can claim an additional 50 extra credits when they sign up using the code WOLSELEY21, £100 cashback on their first ecoTEC plus installation when registered via Advance, and a number of other bonuses and extended guarantees. www.vaillant.co.uk/ toolgenerator

Young Person in LPG is a new initiative that champions the talent of people aged 30 and under working in the industry. Awards will take place at the Liquid Gas UK Annual Conference in York in November in two categories – Rising Star of the Year, and Apprentice of the Year. Sophia Haywood, director of Public Affairs at Liquid Gas UK, says: “Our industry census demonstrated the importance of skills within the LPG industry; we want to highlight the great work that is being done by talented young people and support them on their journey, across all different types of roles. We want to celebrate and nurture this new and emerging talent, while also promoting the huge opportunities available to people thinking about a career in LPG.” The awards are sponsored by Vaillant and nominations can come from either person or a company, or an individual nominating themselves. www.liquidgasuk.org/news/young-person-in-lpg-2021

Sam wins Worcester Bosch writing competition Nine-year-old Samuel Debenham from Northampton is the winner of Worcester Bosch’s storybook writing competition. His entry, A City Called L8R, was awarded first place because of its creative view of a more sustainable future and will be turned into a real storybook later this year. The story is an optimistic tale about how the world can work towards a greener future together, through a travel forward in time to a world we could have if we protect our planet better. The competition was launched following the release of Worcester Bosch’s own storybook, A Robot Called B4. Director of marketing

Victoria Billings says: “We have been impressed and inspired by the passion shown towards creating a sustainable future, and hope that our commitment to warming lives and protecting our future continues to resonate with children and their families.”


CAN A BUSINESS PARTNER HELP YOU SEE INTO THE FUTURE...

At Vaillant, we support our installers with the tools and knowledge necessary to prepare for the future ahead. Join our Advance loyalty scheme, and you’ll benefit from our industry-leading training, webinars and podcasts. All designed to open new areas of opportunity and help future-proof your business.

Choose a testo Flue Gas Analyser and get your 1st year of service FREE! For a limited time, buy any testo 300, 327 or 320B flue gas analyser kit and get your 1st year of service FREE! •

Flue gas analysers to suit every budget and requirement. Kits from just £450 (RLP)

•

Affordable fixed price servicing

•

Smart, touchscreen and paperless create & send customer reports on-site (testo 300 only)

•

Hurry - Offer only available until 31/12/2021

Install business success. Why wait? Join Advance today for access to our range of business support materials, plus get £100 CASHBACK* when you register your first ecoTEC exclusive or ecoTEC plus boiler. Use code ADVANCE21 to get an additional 50 credits to use in the Advance catalogue! * Terms & conditions apply

vaillant-advance.co.uk

www.testo.com/en-UK/service-promo www.gassaferegister.co.uk 13 1350_Vaillant 2021_BSP_RGE Consecutive Half Pages_290mm x 70mm_V2_REPRO.indd 1

12/08/2021 13:46


REGISTERED GAS ENGINEER | HYDROGEN NEWS

Government kick-starts the UK’s hydrogen future The publication last month of the Hydrogen Strategy recognises the important role that the low-carbon gas could play in heating our homes. Here, we set out the highlights and take the industry’s temperature on what they think of it.

T

he government has fired the starting gun on the race to put hydrogen into 3 million homes by 2030 with the publication of its long-awaited Hydrogen Strategy. The strategy recognises that hydrogen will play a critical role in decarbonising the UK’s heating, as well as in shipping, lorries and trains, suggesting that 20-35 per cent of the UK’s energy consumption by 2050 could be hydrogen-based. Early next year, the government will launch a hydrogen sector development action plan that sets out how it will support companies to secure supply chain opportunities, skills and jobs in hydrogen. And it will consult on how to design a £240 million Net Zero Hydrogen Fund, which aims to support the commercial

deployment of new low-carbon hydrogen production plants across the UK. It will also consult on how to help reduce the cost of producing hydrogen, favouring a model similar to that which established offshore wind production. Other measures set out in the strategy include: • Outlining a twin-track approach to supporting multiple technologies, including ‘green’ electrolytic and ‘blue’ carbon captureenabled hydrogen production, and committing to providing further detail in 2022 on the government’s production strategy • Working with industry to develop a UK standard for low-carbon hydrogen, giving certainty to producers and users that the hydrogen the

‘Strategy signals the UK’s commitment to hydrogen’ The industry reacted broadly positively to the strategy, welcoming the recognition that no single-technology solution will be used to decarbonise the nation’s homes and businesses. Antony Green, hydrogen director at National Grid, said: “The transition to a green economy will require a mix of technologies and hydrogen will play a vital role. This strategy

signals the UK’s commitment to hydrogen and provides the certainty needed to boost consumer and investor confidence and support commercial solutions. “Importantly, unlocking the potential of hydrogen as a clean energy solution requires significant pace and innovation to scale up production, and the guidance from government will be key to triggering the

“The availability of low-cost hydrogen at scale is a key enabler of the deployment of hydrogen for heat.” Jeff House, head of External Affairs, Baxi Heating 14 September 2021

UK produces is consistent with net zero while supporting the deployment of hydrogen across the country • A review to support the development of the necessary network and storage infrastructure • Working with industry to assess the safety, technical feasibility, and cost effectiveness of mixing 20 per cent hydrogen into the existing gas supply, which could reduce emissions by 7 per cent.

But the future role that hydrogen could play decarbonising heat won’t be finally decided until 2026. The government says it’s working with the HSE and Ofgem on hydrogen heating trials, the results of which, along with the results of a wider research and development testing programme, will guide its decision. If these are positive, it says hydrogen could be playing a significant role in heating people’s homes and businesses, powering cars, cookers and boilers by 2035.

“We are optimistic that we will see hydrogenready boilers feature prominently in this autumn’s Heat and Buildings Strategy.” Carl Arntzen, CEO, Worcester Bosch investment and buy-in needed to achieve this.” Mark Wilkins, technologies and training director at Vaillant, said: “Climate change is happening now, so we believe there will be no silver bullet solution and there will be a mix of technologies needed to help reduce emissions. Heat pumps are a tried and tested alternative low-carbon heating solution that is available today. “While we are working with the industry to bring hydrogen solutions for home heating, homeowners, installers and housebuilders should look to start their decarbonisation journey with heat pumps. We are eager to see

more clarity on heat pump funding and hydrogen within the long-awaited Heat and Buildings Strategy in September.” However, the Environmental Audit Committee criticised the fact that funding and the definition of low-carbon hydrogen have still not been ironed out. The committee chairman Philip Dunne MP said: “It is disappointing that only now are the necessary consultations being launched on how to overcome funding issues and how to define low-carbon hydrogen. “These critical issues should have been ironed out in advance of this Strategy.”


...AND PROVIDE THE SUPPORT YOU NEED TODAY

Chemicals Sentinel and Fernox Etc. Text information to Martin on 07821 517 954 Email: Webuyplumbingstock@live.co.uk

When you partner with Vaillant, you not only get access to a range of expertly engineered products. You can also call on a whole network of dedicated service, technical and support teams, and a host of business support tools, including consumer finance, branded marketing materials and product cashbacks and rewards... all designed to help your business thrive.

Install business success. Why wait? Join Vaillant Advance, our installer loyalty programme, and get a £200 CASHBACK* when you install and register your first heat pump. Use code ADVANCE21 to get an additional 50 credits to use in the Advance catalogue! * Terms & conditions apply

vaillant-advance.co.uk

www.gassaferegister.co.uk 15 1350_Vaillant 2021_BSP_RGE Consecutive Half Pages_290mm x 70mm_V2_REPRO.indd 2

12/08/2021 13:46


WiFi Inside

-

-


REGISTERED GAS ENGINEER | HYDROGEN NEWS

First look at the hydrogen home Homes with appliances running on 100 per cent hydrogen are now open for people to see for themselves – and Registered Gas Engineer took an exclusive tour to find out more.

T

he semi-detached houses in Low Thornley, Gateshead, are the first chance for people to see zero-carbon hydrogen appliances in action. The first thing that struck us is that it all looks so, well, normal. Inside the two properties, built by a partnership of Northern Gas Network and Cadent working with the government, are familiar-looking new boilers, hobs, cookers, fires and even a barbecue. Boilers from Baxi and Worcester Bosch are up and running, along with fires, cookers and hobs developed by companies working on the Hy4Heat projects. The showcase homes are intended to last for three years, although they could go on for longer, exhibiting the use of hydrogen appliances in a real-world setting. Baxi and Worcester Bosch have both been working on hydrogen boilers for some time, investing in research and development to create prototypes with support from Hy4Heat, the government’s programme to establish whether if it is possible, safe and convenient to replace natural gas with hydrogen and

prepare for community trials. The 100 per cent hydrogen boiler from Worcester, for example, is fundamentally its Greenstar 8000. The boiler flame is almost invisible and, because no carbon is emitted, is detected via UV. The only changes inside are the burner, which has been adapted for hydogen’s faster flame speed; the gas mixing valve, and the control board plug. And, of course, the only products of combustion are oxygen, water vapour and very low levels of Nox – lower than the amount given off by natural gas boilers currently. In the event that the government gives the green light to running on pure hydrogen, these are the only components that would need to be changed in hydrogen-ready boiler in a process that should take around an hour. Another advantage of hydrogen-ready boilers is the lack of disruption to the rest of the home during conversion. Radiators will work as they always have done, although Martyn Bridges, director of Technical Communication and Product Management at Worcester Bosch, says work is currently under way

reviewing whether joints on 22mm pipework may need to change from compression to soldered fittings. Worcester and Baxi have both created their ‘hydrogen-ready’

boilers as a natural stepping stone to 100 per cent hydrogen. Jeff House, head of external affairs at Baxi, says: “By rolling out hydrogen-ready boilers it is anticipated that we can prepopulate a large proportion of the

UK housing stock, thereby making an eventual future conversion faster, easier and lower cost.” On to the living room then, where a warm glow was coming from the balanced-flue fire. When a hydrogen-powered fire starts up, first there is a purge to disperse the internal build-up of hydrogen before ignition. The HyFires consortium of three manufacturers have also working been on open-chimney and glass-fronted models. Finally, it was time to put the kettle on. Here the flame does look a bit different from the crisp blue flame we’re used to seeing on hobs. As they get going, the sharp flames look distinctly orange – this is because no hydrocarbons are being burned, we’re told, and the flame is very sharp because hydrogen is a light gas and so the PoCs lift vertically. As long as the tea tastes the same, that’s all good with us. n

What’s the difference? Jeff House, head of external affairs at Baxi, says: “While looking the same and sharing many of the same basic components, there are some key internal differences to accommodate hydrogen combustion in boilers. When combusted, pure hydrogen reacts differently from natural gas, with a faster flame speed and different Wobbe index range, therefore requiring some adaptations. There is no carbon element present, so it is not possible to use an ionisation current for flame detection. “As such, there are a number of adaptations to the internal gas-facing components. In addition, the combustion dew point of hydrogen is different from that of natural gas, which means we see more condensate produced – this is dealt with through the usual internal trap and discharge pipe method. “But there are no visible differences to consumers. The boiler looks, performs and operates almost exactly the same as a natural gas boiler.”

www.gassaferegister.co.uk 17


REGISTERED GAS ENGINEER | HYDROGEN NEWS

What’s the latest on hydrogen? Registered Gas Engineer rounds up the latest developments and thinking about how hydrogen could help to decarbonise the nation’s heating.

A

MicroGrid at Spadeadam in Cumbria is helping gas distribution networks understand how to transport up to 100 per cent hydrogen. The MicroGrid was purposebuilt by DNV and led by Northern Gas Networks (NGN) as part of the H21 project. It’s made up of around 1km of pipework of varying pressure tiers and diameters, which will link to three demonstration houses featuring hydrogen boilers. It is being used to carry out

rigorous testing and make recommendations for any operational and maintenance procedures that will need to be updated for a hydrogen gas network. Purging, venting, repairs and maintenance will all be tested to validate the suitability of existing procedures, as well as validating gas flow and pressure modelling software. Pressure and flow within the test network can be monitored remotely, and testing will continue for nine months.

Competence The newly published Hydrogen Competency Framework by Energy & Utility Skills sets out how to ensure that installing and maintaining hydrogen appliances will be completed safely by hydrogen-competent Gas Safe registered engineers. It provides details of the skills and competencies that will be required for gas engineers to work with hydrogen, recognising that although they will need relatively few additional skills, they will need to increase their knowledge and understanding of hydrogen significantly. The required skills, alongside IGEM’s interim Hydrogen Technical Standard, form the basis of the Hydrogen Transition Training Specification – which will enable consistency of training and industry recognition – and the Hydrogen Assessment Module, which will enable a hydrogen competence category to be added to Gas Safe Register.

Looking at the detail Ryan Mallinder, Northern Gas Networks’ H21 project manager, says: “While the H21 project has already established that it is technically possible to repurpose the gas network to transport hydrogen, the MicroGrid starts to look at the more detailed aspects of operating a hydrogen gas network on a day-to-day basis and any changes we need to make

from existing natural gas networks. “As well as furthering our research into operations, the MicroGrid can be used for engineers to learn any new skills and competencies needed for operating a hydrogen gas network. It can also be used by suppliers to develop innovative new solutions and any tooling that may be needed as we move towards 100 per cent hydrogen networks.”

Put consumers first A major new report by Cadent takes a consumer-centric angle on the path to the decarbonisation of the UK’s homes. Its Green Print – Future Heat for Everyone – says the ‘right’ answer to the transition of heating, including the role that hydrogen could play, will need to consider consumers’ wants and needs: • Ensuring they are central to decisions on the future of heat – this means mandating the changes that are needed and then allowing consumers to have their say about how that it delivered • Ending unnecessary ‘format wars’ – work should focus on where different technologies will be deployed and how to help consumers in the transition, rather than arguing about which technology will ‘win’ • Understanding people’s views on their heating and starting to engage with them early • Being upfront with consumers about how much transition will cost them and how it will be paid for. Discussion about decarbonisation so far has ignored consumer behaviour, the report says in its foreword: “When consumers don’t feel confident, they don’t go ahead anyway, they simply don’t purchase. “Decarbonising heat will only succeed if the market is designed for consumers. Significant barriers include cost, disruption, question marks about performance and a lack of clear process. Each needs to be overcome.”

Price promise on H-ready boilers A

hydrogen-ready boiler will cost no more than its natural gas equivalent, major boiler manufacturers have pledged. Baxi, Ideal, Vaillant and Worcester Bosch also say that any hydrogen-ready boiler that was installed initially to run on natural gas will take no more than one hour’s labour to convert it to hydrogen. EUA chief executive Mike Foster says the price promise is a major boost to consumers and the fight against climate 18 September 2021

change. “Consumers want to do their bit to reduce the impact of their homes and help deliver a greener future, but are concerned about the cost of some low-carbon technologies. This price promise from the Big Four ensures that consumers will be able to access an affordable low-carbon heat and hot water solution.” The price promise will force many industry experts to rethink their models, says Mike. “The Committee on Climate Change,

which advises the government, assumed that a hydrogen-ready boiler would cost £100 more than a natural gas boiler. “This is another example of British companies leading the way on net zero. The manufacturers have been very clever in using existing components and technologies to keep the price of hydrogenready boilers down. What’s more, hydrogen-ready boilers will work in the same way as natural gas boilers, with no

changes required to pipework, radiators or the installation of a water tank. “The boiler manufacturers have developed a boiler that works; they support a 2025 mandatory roll-out of the technology and now they’ve found a way to keep costs down. The Big Four boiler companies compete ferociously against each other, but they have come together for the benefit of UK consumers and the good of the planet.”


Thegoodthebad+theugly We want your pictures Registered Gas Engineer wants to see your pictures – whether you’ve come across some horrors or instances of really good work. And there’s a prize for the best one: so go on, get writing and email your stories and pictures to editorial@registeredgasengineer.co.uk or via Twitter @RGEMag

David Roberts was checking the gas supply pipework to an old fire point and found this gas fire isolation valve in situ. He made safe by removing and capping the supply to the fire using an appropriate fitting.

Ralph Gregory’s customer said they had insulated their condensate pipework but their boiler still wasn’t working. Ralph could see why.

The wall to this property had been chased out to accommodate the boiler chimney and plume displacement kit, as found by Garry Coppard, who made safe.

Mark Warner’s customer had to agree that their water heater was beyond repair. Mark isolated the appliance in accordance with IGEM/G/11 and has now replaced it.

20 September 2021

This month winne ’s r

The expansion vessel to this boiler installation, fitted just 12 months previously, was sited in a washing-up bowl on of top a bamboo table. Andrew Turner soon put things right.

Chris Bonner’s photo shows the air intake duct of a boiler chimney completely frozen because of a dripping overflow pipe from the toilet cistern in the flat above. The problem and the cause have both been rectified.


REGISTERED GAS ENGINEER | YOUR PHOTOS

Scott Barnfield was on a routine maintenance inspection when he saw that the chimney had rusted through the air intake duct of the boiler’s chimney, exposing the flueways. Scott made safe.

Derek McGuire was changing a sink and noticed a smell of gas. The hob had been fitted using plumbing pipework. Derek refitted it correctly and re-routed the electrical cables at the recommended safe distance from the gas supply.

Steve Williams found the source of a reported gas escape from this joint under the floorboards: 8mm pipework feeding a gas fire had been pushed into 10mm pipework and soldered. Steve replaced the pipework.

John Vanes and Naim Aziz spotted this plumbing fitting used as an isolation device to a gas fire while they were carrying out a landlord’s gas safety record check. The supply to the fire was disconnected and capped upstream of the gate valve using the correct fittings.

When Doug Forbes unearthed a wasps’ nest inside the boiler, he went beyond the call of duty and removed the nest without any additional costs to his service so that his customer was not ‘stung’.

When Ross Booth was asked to find out why a strange smell was coming from the fire, he soon saw that the chimney had been blocked by a bird.

www.gassaferegister.co.uk 21


REGISTERED GAS ENGINEER | YOUR PHOTOS

Thegoodthebad+theugly Steve Smith’s customer had had a wasp’s nest in their boiler last year and was determined that it wouldn’t happen again. Steve removed the obstruction from the chimney and advised his customer accordingly.

Thank you to PRO-Tech, who found a forest of twigs and debris blocking this gas fire chimney on a service visit. The obstructions were removed and the installation was left working safely.

Photo prize

Water had entered this meter box and frozen at the bottom due to an illfitting lid and leaves blocking the vent holes – leaving the emergency control valve inoperable. Mike Di Bernardo removed the block of ice and rectified the situation.

Stuart Mercer removed the chimney from an old boiler that he was replacing. His photo illustrates the importance of sealing the chimney correctly to the fabric of the building.

Win

There’s a prize for the best photos sent in (in our opinion). Please remember to take pictures at high resolution and email them to editorial@registeredgasengineer.co.uk This month, Anton by Crowcon is giving away a Clip CO personal carbon monoxide alarm – a tough, lightweight, reliable and durable fixed-life, maintenance-free personal CO protection alarm with pocket clip. The Clip has audible, visual and vibrate alarms at 30ppm and 100ppm, plus a sensor range of 0-300ppm. It has a two-year, maintenance-free fixed life PLUS on-screen life duration countdown, self-test and ingress protection to IP66 and IP67. Details of the Clip CO alarm and many more products – as well as fast two-day turnaround on FGA servicing – can be found at www.shop.crowcon.com This month’s winner is Ralph Gregory from Northampton. Congratulations!

22 September 2021


Navien’s NEW loyalty scheme

ts

in o p em ely nk de iat a B r re ed o m im

ue l va in or t s ts ct e B oin se p he t

Gets you straight to the points! Installers can now receive great rewards on every oil and gas boiler registered through the Navien Choice App. From grabbing a snack on the go, through to the latest tech and gadgets, our points always give you the best prizes… Bank them or redeem them, it’s your choice!

www.navienchoice.com

of e e ug oic rds H h a c ew r


Gas safety on boats Gas safety on boats is a specialist but important area for those gas engineers who work within the field. Here, Gas Safe Register Technical Officer David Tickle gives an overview of the standards and outlines the guidance on safety, flues, tightness testing and regulators.

T

he standards that generally apply to leisure craft and narrowboats used on canals and inland waterways in the UK are BS EN ISO 10239:2017(1), which applies to LPG systems on small craft and PD 54823: 2016(2), which covers the design, commissioning and maintenance of LPG systems. The maximum length of a narrowboat in the UK is 70ft (21.95m), and so the scope of the standards applies to leisure craft up 24m long. The principles and guidance can also be applied to a domestic houseboat longer than 24m that is permanently moored or used for partial navigation of a river such as the Thames or Norfolk waterways. Tightness testing New installations: Any new pipework – including any

24 September 2021

additions to an existing installation – is required to be tested initially using air as the test medium at a pressure of three times the normal working pressure. For propane, this would be 111mbar. This is a similar approach to carrying out a strength test in commercial installation testing procedures. Ongoing maintenance: Testing procedures using LPG should be used in the following circumstances: • Whenever work is carried out that may affect gas tightness • If a gas escape is suspected • Before re-establishing an existing gas supply. Bubble testers/gauges: Boats, yachts and any other vessel manufactured after August 2008 must incorporate a simple means of tightness testing into the LPG system before the installation is

used (for example, after the exchange of cylinders). This could be a pressure gauge or a bubble tester. For existing vessels manufactured before August 2008, the installation of a bubble tester is down to the vessel owner’s personal choice. Note: Gas Safe Register inspectors carry out a tightness test on installations in line with the relevant standards using a pressure gauge. Cylinder storage LPG cylinders – whether full or empty – pressure regulation devices and safety devices must be stored in cylinder lockers or housing, and secured to prevent movement that is expected in the course of marine service. The craft and any such storage areas shall be designed

to allow any escaping gas to drain/vent at a low level outside the craft, noting that gas is heavier than air. There should be no potential sources of ignition in a storage compartment or locker and any electrical devices must have ignition protection in accordance with ISO 8846(3). Regulators and OPSO control The regulator to be fitted inside the locker must be suitable for its application and able to deliver the correct pressure for the connected appliances. Boats, yachts and other vessels also require an over-pressure shut-off (OPSO) device to be installed to prevent uncontrolled pressure increase in the low-pressure side of the LPG system. Note: Most leisure craft are used on inland waterways in freshwater


REGISTERED GAS ENGINEER | TECHNICAL

and leisure craft and most existing regulators/ OPSO devices are suitable. However, the engineer should confirm with the regulator or OPSO manufacturer that they are suitable for the environment in which they will be used. Not all devices are suitable for marine use, and salt water can affect their safe operation. Suitability for purpose should also be considered and checked for appliances and flexible pipework. Pipework materials Only solid drawn copper or drawn stainless steel shall be used for rigid pipework supply lines. Jointing methods shall be metallic in construction: they can be brazed, hard-soldered, cutting ring-type fittings, compression fittings or manufacturer-specified fittings, such as pliable corrugated stainless-steel tube fittings.

Hoses and hose lines The materials must be suitable for LPG and able to withstand the stresses and exposures of a marine environment. •H oses shall be kept to a minimum practical length and shall not be routed through an engine compartment. •H oses shall have permanently attached end fittings. •T hey shall be a continuous length and not be subjected to tension or kinking under normal use. • Hoses used for an LPG supply line shall have no joints from within the cylinder compartment to the appliance, or accessible isolation valve located near the appliance – except where metallic supply piping is connected to flexible hose connecting a moveable appliance such as a gimballed stove.

Shut-off valves Each LPG system shall be equipped with a manually operated main shut-off valve located in the high-pressure side of the installation. This valve may be the cylinder valve or incorporated in the pressure regulation device. A dual-cylinder installation shall be fitted with a manual or auto changeover device and fitted with non-return valves. These are in addition to the cylinder isolation valves. A shut-off valve shall be installed in the low-pressure supply pipework to each appliance. If there is only one appliance fitted, the cylinder valve may be used for this function if it is located near the appliance. A remotely operable solenoid valve located in the cylinder housing is also

This article is an overview of the relevant gas standards and available information. It is not exhaustive and you can find more information in Technical Bulletin 124: LPG on boats, yachts and other vessels – Update on Standards, gas tightness testing, bubble testers & pressure gauges, regulators and overpressure control. You can read and download all Technical Bulletins by logging into your online account at www.GasSafeRegister. co.uk/sign-in PD 54823 and BS EN ISO 10239 are available as part of Gas Safe Register’s standards subscription facility – you can find out more by logging into your online account.

> www.gassaferegister.co.uk 25


REGISTERED GAS ENGINEER | TECHNICAL

Gas safety on boats and leisure craft continued

Which standards apply?

>

acceptable provided that the valve can be operated from within the vicinity of the appliance. The solenoid can be fitted to the high or low-pressure side of the installation. The solenoid shall be closed automatically in the event of electrical actuating energy failure or loss. Appliances Only appliances suitable and specified for use in a marine environment shall be installed. If the appliances are used or second-hand, they must be in a safe working condition and fit for purpose, and the manufacturer’s installation instructions must be available.

They shall be installed in accordance with the appliance manufacturer’s instructions and fixed to the craft to prevent undue stress on any pipework connecting the appliance. All appliances must be equipped with a flame supervision device and clearly labelled to indicate the type of gas on which is it is designed to operate. Ducts and flues for air intake and combustion product discharge Flue components and ductwork shall be installed in accordance with the appliance manufacturer’s installation instructions. Flues shall be sized and routed

In the hierarchy of standards, BS EN ISO 10239 is the one that is referenced most frequently. The prefix BS EN means it is the UK version, written in English, of a European harmonised standard; while BS EN ISO is an international standard that has been adopted by Europe as a European standard. A company manufacturing a boat or craft to sell abroad would need to comply with this standard as a minimum. When an international standard is written, it must take in the views of an international panel of members from around the world. Sometimes there are compromises and differences from what you might expect to see when compared with other UK gas standards. British boat builders will often refer to PD 54823:2016, which is controlled and maintained by BSI, as well as BS EN ISO 10239. PD 54823:2016 is a guidance document written to complement and reflect the requirements of BS EN ISO 10239. It mirrors the minimum requirements of the international standard and expands on the level of detail about how work should be carried out. to ensure complete discharge of the products of combustion outside the vessel. Areas to be avoided are below canopies or areas that can be obstructed by an accumulation of water. The flue system shall not have any dampers fitted and must not terminate within 500mm of any refuelling point, breather vent from the fuel tank or fuel system, or within 300mm of an opening window, door, port or ventilation grill.

The flue terminal shall be of substantial construction and fitted with a guard. Owner’s manual The leisure craft/boat manufacturer shall provide an owner’s manual and will include with it instructions for use of the LPG system, any relevant instructions for the appliances, safety advice, guidance and safety check requirements. ■

Boat Safety Scheme Being a member of the Boat Safety Scheme permits the engineer to complete work on a leisure craft or boat that does not come under the Gas Safety (Installation & Use Regulations) (GSIUR) 1998, such as a leisure craft or boat that is used for personal use only. If the boat is hired out, used as a time share, shared ownership or a floating business such as cafes or shops, these fall within the scope of GSIUR. This requires that anyone contracted to work on the LPG system on a vessel in scope must be competent in LPG on boats and Gas Safe registered. Because the definition of work covers the removal and replacement of a gas test point

26 September 2021

screw, the scope of GSIUR includes carrying out an LPG tightness test. Therefore, on a leisure craft or boat in scope of GSIUR, examiners who are not Gas Safe registered can only confirm gas tightness using one of the following methods: • Using a bubble leak detector, where fitted and correctly located, or • Observing a tightness test carried out by an LPG boats-qualified Gas Safe engineer. Note: All other types of work, such as adding or replacing an appliance, require the engineer to be Gas Safe registered and competent in LPG on boats.

Bibliography (1) BS EN ISO 10239:2017 – Small craft: Liquified petroleum gas (LPG) Systems (2) PD 54823:2016 – Guidance for the design, commissioning and maintenance of LPG systems in small craft (3) ISO 8846:1990 – Small craft – Electrical devices — Protection against ignition of surrounding flammable gases


Greenstar 4000

The best, reborn. Created from the DNA of the UK’s best-selling Greenstar i With the new Greenstar 4000, we’ve kept everything we know you love and then raised the bar with the ease and speed of installation, commissioning and servicing, along with its increased hot water efficiency and control. All for the same price as the loved boiler it replaces. Welcome to the Greenstar 4000 – it’s the best, reborn.

worcester-bosch.co.uk/4000 *Terms and conditions apply. When installed with any Greenstar System Filter. Excelerate members, who are non-Worcester Accredited Installers, can achieve these guarantee lengths with an additional £150 payment to Bosch Thermotechnology Ltd. via your Excelerate account after the boiler has been registered. Full terms and conditions can be found online via your Excelerate account. †With Greenstar Intelligent Filling System accessory.


MORE FIRST TIME FIXES, LESS COST

GRUNDFOS GO REPLACE, IS THE FASTEST, EASIEST WAY TO REPLACE AN OLD BOILER PUMP

Getting hold of a specific internal circulator pump can add a significant amount of time and cost to boiler repair. Simply download the Grundfos GO REPLACE app to your smartphone or tablet to make choosing a pump replacement quick and efficient. Find your next replacement at www.grundfos.co.uk


REGISTERED GAS ENGINEER | ELECTRICAL SAFETY

Safe isolation: what are the rules? How can gas engineers achieve safe isolation and why do they need to do so? Paul Wilson, UK & Ireland sales manager for Martindale Electric, answers some of your most frequently asked questions.

W

hen it comes to gas safety, you are rightly expected to be more than just competent; you should be experts in your field. But there are plenty of other safety-related issues that you also have to be aware of. One of these is becoming ever more prominent: electrical safety. But just being aware of issues around electrical safety is no longer good enough; you have to have both the knowledge and competence to safely isolate the electrical supply to a gas appliance that uses electricity. What is safe isolation and why is it necessary? Electricity is the cause of approximately 1,000 accidents at work every year – many more incidents inevitably go unreported – and 16 per cent of all workplace fatalities are linked to electricity. With modern gas installations and appliances requiring more electrical connections than ever before – making up to 15 per cent of installation work – gas engineers are at greater risk from electricity. HSE provides clear guidance that live work should never be undertaken where there is the option to work electrically dead, and so establishing an effective electrical safe isolation procedure is critical to keep you safe. The procedure involves de-energising the relevant circuits, isolating them properly before you start any work and, just as importantly, proving that they are electrically dead. The only exceptions allowed are when fault-finding on the installation, in which case appropriate care must be taken at all times. What are the rules regarding safe isolation and how have they changed? For newcomers to the gas industry, safe to touch, safe

isolation and proving that a gas appliance is electrically dead are already part of the training. The important change comes from recognising the increased risk that gas engineers face. It means that all Gas Safe engineers must have the technical knowledge and competence to undertake safe to touch, safe isolation and proving electrically dead procedures before starting work on any gas installation/ appliance that has a connection to a 230V electrical supply. This has been in effect since July 2020 and, by July 2025, all gas engineers will be required to self-validate that they have the knowledge and competence to safely isolate the electrical supply to a gas appliance that uses electricity; it could be as simple as signing a declaration stating this.

How can safe isolation be achieved? Wherever possible and practicable, it is vital that gas engineers should work on dead circuits. Ensuring that you are not exposed to danger when working on or near live electrical systems requires a combination of effective safe isolation procedures and equipment that meets the latest standards, including HSE GS38 guidance notes(1). Failure to use the right equipment can result in a circuit remaining live – and the consequences can be fatal. Take the time to identify the risks and introduce steps to ensure that all equipment is electrically safe before you start work. Proper work planning and using the right tools for the job will help you to avoid incidents.

How can I be sure a circuit is actually dead? Locking off the circuit correctly is an important step in the procedure, but it’s not enough to assume that the circuit is subsequently dead because a particular isolation device has been placed in the OFF position. Although the circuit may be locked off, the neutral conductor can become live if an energised load on another circuit is connected to it. And it’s not uncommon for circuits to be mislabelled, which can be particularly dangerous because it provides no certainty that the correct circuit is actually locked off. Guidance from charity Electrical Safety First states that before carrying out any work on a circuit, engineers should use a dedicated voltage indicator and www.gassaferegister.co.uk 29

>


REGISTERED GAS ENGINEER | ELECTRICAL SAFETY

Safe isolation: what are the rules? (continued) >

proving unit to prove the circuit is indeed dead. While this may sound obvious, we know from experience that there are still far too many instances where engineers might try to use a known live source to test a voltage indicator. The problem is that the known live source may only light some of the LEDs on the tester, whereas a proving unit will ensure that all the LEDs on all ranges are working, eliminating any uncertainty. A further issue is that a known live source may not be conveniently available, increasing the risk that the voltage indicator is not actually proved to be operating correctly. What equipment can I use? You can comply with the standards by using fail-safe voltage indicators and proving devices that have been engineered specifically with safety

“Ensuring you are not exposed to danger requires a combination of effective safe isolation procedures and equipment that meets the latest standards.” in mind and are easy to use. When choosing a voltage detector that complies with GS38, make sure that it is made to BS EN 61243-3. It should be designed without batteries or switches – which could lead to false indication – and the voltage level readings should be clearly visible. It should also be durable as, let’s face it, equipment gets knocked around. Look for a unit that is robust to prevent it getting damaged in a tool case, and that has heavyduty finger guards and doubleinsulated cable. I also recommend choosing a unit dedicated purely to detecting

NEW021 2 FOR rs 5 Yea nty ra ply r a W C’s Ap *T&

voltage; in other words, avoid using multimeters, as recommended by HSG 85. A multimeter measures multiple electrical properties, such as voltage, resistance and current. The problem is that they introduce the potential for human error, making it too easy to select the wrong range. In addition, they rely on battery power; if the batteries are flat, then a false “dead” reading will be given on a live circuit. The position is similar with

non-contact voltage detectors; while these are frequently used to detect live cables, they cannot reliably prove dead or confirm the safe isolation of a circuit. You may want to consider investing in complete safe isolation kits, which bring together all the necessary equipment to prove dead and lock out the circuit being worked on. These kits generally feature a GS38 industry standard voltage indicator, proving unit and locking off devices in a combination carry case, which also helps prevent accidentally leaving any of the equipment behind. ■ www.martindale-electric.co. uk/product-category/safeisolation-voltage-indication

(1) Electrical test equipment for use on low-voltage electrical systems, www.hse.gov.uk/pubns/ books/gs38.htm

The Latest Eco-Friendly

Electric Combi Boiler The Mercury Combi is the ultimate solution for central heating and instantaneous hot water Bare wire system - no limescale on the immersion heaters Instant Hot Water for Washing & Showering Eco friendly with Weather Compensation NTC Temperature control system Large digital screen Quiet operation Compatible with all Volt Free Programmers & WiFi Thermostats

years

Contact us for a quote or more information

www.electric-heatingcompany.co.uk

01698 820533

*Our 5 Year Warranty is offered on Boilers which are registered within 60 Days of purchase, For full Warranty T&C’s please visit our website.

30 September 2021


Total UFH Control Some things in life you can’t control... but your heating shouldn’t be one of them The next generation of UFH controls, Quantum, is easy to set up and intuitive to use. It’s Alexa compatible too, and comes with an industry-leading 5-year guarantee.

0333 800 1750 info@ufh.co.uk ufh.co.uk


It’s time to challenge Most Brits have never had a female tradesperson working in their home. But with the industry facing a growing skills shortage, what more can be done to encourage women to consider a career in the trades? Registered Gas Engineer look at some of the latest initiatives and speaks to women about their own experiences.

S

eventy per cent of Brits have never had a female tradesperson in their home, according to a survey commissioned by Baxi that highlights the lack of female representation in the trades. But even though so few people have used a qualified female tradesperson, 94 per cent of homeowners say they would completely trust them. And just under one-quarter (24 per cent) of women polled said they would feel safer using a female tradesperson. There are no official figures for how many women work as heating engineers, or in other roles within the industry, but estimates suggest the number is very low. The GMB Union estimates that just one in eight construction workers are women1, while Direct Line for Business says there were 33,000 active tradeswomen in 2019 – with 73 per cent of them working as builders.2 But there are signs that times

are changing: Baxi’s research found that 70 per cent of homeowners would actively encourage a female relative to consider a career in engineering. Managing director Karen Boswell says: “Our survey confirms that homeowners are happy to see female plumbers and gas engineers, yet there remains a critical lack of tradeswomen. “With the industry facing its biggest change since the introduction of the gas boiler, this would be an excellent time to improve female representation. We will be doing our bit to employ more women in engineering and management.” Jess Queenan, a Baxi customer support engineer, has been a qualified gas engineer for six years. She says: “I have a career and a wage that I’m proud of. It would be great to see more women getting into it… hopefully we’ll be breaking through some boundaries over the next few years and making [women engineers] the norm.”

“Hopefully we’ll be breaking through some boundaries over the next years and making women engineers the norm,” Jess Queenan, Baxi customer support engineer

Jess’s view is reinforced by independent gas engineer Rachel Griffiths, who says: “There’s not a single obstacle I’ve come across as a woman plumber that I needed help with [or] couldn’t do because of my gender.” The need for good representation Anastasia Bingham-Kirkland works for Baxi Heating as an operations data systems analyst,

and went straight into the industry after gaining her degree in Computer Aided Engineering. She says she wasn’t encouraged to work in engineering at her school, as it was considered a career for boys. But family and

Women are needed to tackle skills shortage A

new initiative that’s working hard to encourage more women into the trades is the national Register of Tradeswomen, set up in March 2021 by Hattie Hasan. Hattie created Stopcocks in 1990 – a national company of women plumbers and heating engineers – and since then, she and her partner Mica May have championed the role that women can play in the trades. Hattie received an MBE in 2020’s New Year Honours for services to women in the heating and plumbing industry. The register is open to women across all the trades, and in time 32 September 2021

they hope to have hundreds of fully vetted tradeswomen of all types, based all over the country. The register has been set up as a community interest company, meaning it’s not-forprofit and all monies raised are fed back in, and initiatives are designed to encourage more women to join the trades.

Spread the word Hattie and Mica are aware of the need to train more tradeswomen – and tradesmen – as the UK battles with a growing skills shortage. The register is looking to set up training courses for women who would be interested in learning a trade. “It’s pre-college level training,” Mica says. “Enough to help teach people how to fix taps and toilets, and to give them some experience with tools and plumbing in general. It’s great experience to help boost their confidence, especially if they are looking to go to college to learn more skills.”

Initially the training is aimed at teaching a skill to women and survivors of abuse, but Mica hopes they can roll it out on a much larger scale in future. They are currently seeking sponsors to work with them on converting a vehicle into a flexible mobile training centre, travelling around the country to run basic trade training courses. Mica says: “These courses are meant to be a taster, because people are contacting us saying ‘how can I find out if I’m interested in this work when I’ve never had the chance to try?’ This way they can give it a try in a non-threatening environment, to see if it’s something they’d like to pursue further.


REGISTERED GAS ENGINEER | WOMEN IN INDUSTRY

gender stereotypes friends encouraged her to pursue her career. She says: “Companies are taking steps to become more inclusive, and challenge stereotypes. I feel lucky to be pursuing my career at a time when women are becoming more visible, but there are still times when I’m seen as less knowledgeable or competent than my male counterparts, and these perceptions still need to be challenged. “Encouraging women in to get involved starts with good representation. We need to shout about the women who are already in the industry and the fantastic work they do. “This is particularly important for children and young people, who can see from an early age what a real person working in the industry looks like. “It’s important to show the breadth of careers available in the industry, and how there is something to suit all skills, interests and career goals.”

‘Women have a vital role to play’ Northern Gas Networks (NGN) is also encouraging more women to explore a career in the gas industry. The most recent intake for its engineering apprenticeship programme saw a 20 per cent rise in the number of offers being made to female applicants, quadrupling the company’s female engineering workforce. Annie Thompson from Leeds began her career at NGN in an administrative role, but was promoted to operational technician at the NGN gas holder in Leeds after completing a course run by training provider Develop. She says: “I’m on site every day in my hard hat and high-vis, and I make sure that everything is in place for the contractors to do their job safely. I ensure that all the engineering work runs smoothly and to a high standard.” NGN has established a Diversity and Inclusion Strategy within the organisation, and is also a business partner for Solutions

“I make sure that everything is in place for the contractors to do their job safely,” Annie Thompson, NGN

for the Planet; an organisation that brings schools and businesses together to encourage all pupils to study science, technology, engineering and mathematics (STEM), and to think about how science can provide solutions to the challenges of sustainability. Growing influence Viessmann is determined to recruit more women. Its Women’s Influence Network (WIN) aims to positively influence cultural change so that both women and men are perceived more in terms of their specific strengths. Men are welcome to be part of

the network, which has more than 100 active members. Initiatives include networking events, seminars, a mentoring programme, and improvements in childcare provision as well as information on maternity and paternity leave. The Network hopes to work with the Viessmann Foundation to speak to young people in schools about opportunities in the heating industry before gender

“We can’t keep doing the same things to encourage new people into the industry and expecting different results – and what’s being done right now just isn’t working,” Mica May, Register of Tradeswomen

“The industry has known for years that we’re facing a serious skills shortage, and it’s only going to get worse as more people retire. We can’t keep doing the same things to encourage new people into the industry and expecting different results – and what’s being done right now just isn’t working. “We have to try something new to make the industry more aspirational. Culturally we’ve been

taught that any job where you get your hands dirty just isn’t desirable. Schoolchildren are told that they are ‘too good’ to go on the tools, and that has to change. “I think if tradespeople were seen as more diverse that would be a big help. Especially when we in the trade know that the perception of a stereotypical plumber doesn’t fit the reality.” https:// registeroftradeswomen.com www.gassaferegister.co.uk 33

>


REGISTERED GAS ENGINEER | WOMEN IN INDUSTRY

It’s time to challenge gender stereotypes continued

>

stereotypes creep in. Emma-Louise Bennett is a customer relationship coordinator based at Viessmann in Telford. As a WIN member, Emma wants to encourage interest in the industry from as many different people as possible. She says: “The heating industry is currently suffering a severe skills shortage [and] a large section of the Gas Safe Register will be retiring in the next 10 years. It’s essential that the female market is tapped into. Working in heating can be very well paid if you are in the right job and there is no physical reason why a woman can’t be a heating engineer.” A real shift in support for women Melissa Puryer is the Viessmann area business manager for the south-west of England; the face of Viessmann for engineers and merchants in the area. She joined Viessmann as a graduate with a degree in English – the first entrant on a trial graduate recruitment scheme. Melissa says: “There have been times when I’ve gone into a merchant or met with an engineer and got the feeling they were trying to ask particularly technical questions to prove I didn’t know the answer. This has driven me to improve my technical knowledge as I do enjoy proving some of them wrong. “I do think it’s easier now for women to join the industry, and 34 September 2021

“You can see a real shift in support for women as engineers on social media,” Melissa Puryer, Viessmann area business manager I’ve noticed there are more younger people and female apprentices being considered by engineers. You can also see a real shift in support for women as engineers on social media.” But Melissa says the industry needs to do more to raise awareness of the jobs available. “You have to know someone who does the job or you wouldn’t know how to get into it,” she says. “It would be amazing if there had been a session at school where women came in and talked about their jobs and what the opportunities looked like. Although you see plumbers driving around town, not many people know what the job entails.” The industry is changing Sarah Hobbs began her career in 2001 working for a local merchant and is now business development manager (south) for Resideo. “I had always been drawn to more technical hobbies, so finding a job I could really get my teeth into was ideal,” she explains. “There were not many women in construction when I started out, and when I was behind the trade

counter, people tended to head to my male colleagues for answers rather than asking me, but thankfully this is not as prevalent now. “If you are willing to prove the

doubters wrong, you can certainly get there.” Sarah also wasn’t encouraged at school to consider a career in the trades. She says: “There was much more talk about admin roles in the late 1990s when I was starting out, so these were the type of opportunities presented to the girls in my class. I knew that wasn’t what I wanted, but I had to search for other routes myself. “To some extent this is still the case. Even though the job roles are out there, it still doesn’t feature widely on the radar unless a family member or friend is already in the industry and can offer inspiration and advice. “Encouragingly, there has been much more emphasis on engineering and STEM subjects within schools, but that tails off when it comes to plumbing and heating. With the skills gap looming, we need to take the opportunity to break this cycle and present the industry as diverse, attractive and exciting, so that more women and men consider it as a long-term career choice.” ■

1 https://www.gmb.org.uk/news/construction-industry-just-125-women-and-54-bame 2 https://www.directlineforbusiness.co.uk/public-liability-insurance/knowledge-centre/tradesmentips/women-in-trade


TO HELPING YOU DELIVER FULL-SERVICE HEATING SOLUTIONS As more and more homeowners choose air source heat pumps, now is the time to invest in your business and partner with Mitsubishi Electric for success.

■ Multi-award-winning range of air source heat pumps ■ Market-leading ultra quiet sound levels ■ Guaranteed low temperature operation ■ Smart control and remote monitoring with the MELCloud App ■ Expert training, after sales and technical support

MANUFACTURED

IN THE UK

Find out more on why Mitsubishi Electric and Ecodan are the best choice for your business

ecodan.me.uk/upskill Search 'Serious about Sustainability Podcast' for our Ecodan Installer episode

SCAN ME


Supporting off-grid customers and installers to meet the decarbonisation challenge Life after lockdown is certainly looking greener. With the pandemic having sparked a noticeable shift in attitudes towards the environment and the importance of nature, it is no surprise that we are seeing a growing demand for sustainable solutions that can reduce carbon footprint and, in turn, help consumers save money. Inherently, though, making the move to lowcarbon heating for rural, off-grid homes has proven difficult due to the associated complexities and high costs – acting as an obvious deterrent for the customer and installer alike. This, however, is changing with the arrival of BioLPG, a direct, drop-in, hassle-free, sustainable replacement for conventional LPG. Here, Karl Bateman, National Specifier Manager at Calor, advises on the growing opportunity that BioLPG offers installers operating in rural settings.

One unlikely consequence of the Covid crisis is that it has brought the plight of the planet to the fore. With national lockdowns leading more people to spend time outdoors and appreciate the importance of nature, the pandemic has seen the emergence of a more ethical, more eco-conscious consumer. According to a recent report, 81 per cent of us are more concerned about the environment now than a year ago.1 A separate study2 reveals that 65 per cent

sustainable purchases.3 British householders recently admitted they would be willing to pay £3,654 more a year for sustainable items on top of their existing household outgoings.4 On a wider level, the UK government has asserted the importance of a green-focused recovery to the pandemic that tackles the climate change crisis. Sustainability issues will also be high on the agenda ahead of the United Nations COP26 summit. Part of this

“BioLPG, either in standalone boilers or in combination with a heat pump in a hybrid system, has been independently proven to offer the most affordable way to decarbonise around 44 per cent of rural homes currently heated by oil.” of consumers think ‘it is important that climate change is prioritised in the economic recovery after Coronavirus’. Cue the rapid acceleration of green technology uptake. It’s estimated that as many as 60 per cent of consumers are now making more environmentally friendly, 36 September 2021

will centre on the urgent progress needed to reduce carbon emissions from home heating, which contributes a significant 14 per cent to the UK total alone.5 The result is a huge opportunity for installers to offer heating solutions that help their customers to improve their energy

efficiency, reduce their environmental impact and get their homes ready for the future. The rural challenge When it comes to treating the 8 per cent of UK homes that are situated in rural settings and off the gas grid, though, the heat decarbonisation task is traditionally a complex one. This is because the nature of Britain’s rural building stock makes it harder for these properties to transition to lowcarbon heating, compared with those in urban areas. While hydrogen is a possible solution for those on the gas network, it can’t be stored easily or transported off-grid. Heat networks work better in more densely populated areas, and so these are unlikely to play a major role in the countryside. This leaves heat pumps and biomass. Biomass has air quality issues, and woodchip pellets need to be handled manually and delivered frequently. Heat pumps generally require good levels of home insulation to heat effectively. But rural homes are hard to insulate. Lots have solid walls, 78 per cent are detached and 47 per cent were built before 1949, many much earlier. Therefore, the


REGISTERED GAS ENGINEER | ADVERTORIAL

What is BioLPG? It’s a renewable biofuel engineered from a unique blend of waste, residues and sustainably sourced materials that offers exceptional heating performance and can effectively heat even poorly insulated homes and generate instant carbon savings – all while remaining economically feasible. Better still, because it’s a direct, drop-in replacement for conventional LPG, LPG boilers can use it now and in the future. The benefits of this approach are huge. For the homeowner living in a rural, off-grid setting it means they can make sizeable carbon savings with minimal disruption and without a huge outlay. Also, because boilers are unlikely to go away altogether any time soon, there is the assurance of medium to long-term longevity.

It also means that installers who are already LPG trained can help their customers lower their carbon footprint significantly, by replacing their oil boiler with an LPG one, without retraining in other technologies or spending time and money on becoming MCS certified. As we see it here at Calor, this is just the beginning. Drawing on our rich 85-year legacy of providing energy to Britain’s ‘hard to treat’ rural homes, our mission is to help solve the UK’s rural heat decarbonisation challenge. We currently offer our BioLPG as a blend of 40 per cent mixed with 60 per cent conventional LPG, to provide 38 per cent carbon savings compared with heating oil. We aim to supply 100 per cent renewable energy products by 2040.

reality is that an electric heat pump alone may not keep occupants warm enough. What’s more, homeowners may end up with bigger energy bills than expected due to the energy level needed for heat pumps to work effectively and keep them warm. This is why, understandably, some installers have been reluctant to work on low-carbon projects off the grid. A recent survey7 among members of Calor’s Boiler Installer Scheme revealed that 68 per cent were concerned about how the decarbonisation of heat is to be implemented in these homes. Key reasons cited were the huge costs for the homeowner and the worry that off-grid solutions cannot compare with those on the grid. We want to keep boilers It is estimated that the typical upgrade cost for such homes could reach over £30,000 compared with a national average of £9,000.6 And 63 per cent said their customers would prefer to lower their carbon emissions by keeping their existing heating system and boiler, but using a more sustainable fuel they can ‘drop in.’ Fortunately, there is a solution. In the case that standalone heat pumps aren’t suitable, BioLPG fuel, either in standalone boilers or in combination with a heat pump in a hybrid system, has been independently proven to offer the most affordable way to decarbonise around 44 per cent of rural homes currently heated by highly polluting heating oil. Yes, it is a challenging time for the heating market as it embarks on the long journey towards decarbonisation. But it’s also a hugely opportunistic one. By taking advantage of renewable heating sources such as BioLPG, installers can empower rural homeowners to benefit from significant carbon savings off the grid and, in turn, themselves stay competitive as the world returns to an almost normalcy that looks decidedly greener.

We actively support our valued network of Calor installers in helping them to solve their customers’ rural heating requirements. This is not just in terms of innovation, but by providing expert training, technical advice and marketing support. We even offer a market-leading incentive scheme, where we will pay up to £250 per referral. Furthermore, we also carry out the installation of gas storage and external pipework to ensure an easy, seamless service. With such a strong heritage and reputation in supplying gas to families, businesses and communities who live or work off the mains gas grid, being an approved installer with us offers credibility for the customer too.

1 Eco-friendly product sales increase in UK during lockdown, The Independent 2 https://www.bbc.co.uk/news/business-55630144 3 https://www.bbc.co.uk/news/business-55630144 4 Eco-friendly product sales increase in UK during lockdown, The Independent

5 National Statesman 6 Committee on Climate Change 7 Survey conducted among Calor installers in June 2021

www.gassaferegister.co.uk 37


Analyse This!!

Flue Gas Analyser

l Easy to Use & Affordable!! l Domestic or Commercial l FREE View app works with all other TPI affordable Smart Probes to combine reports within Job Management section l Date, Time & GPS Tagged Reports l Create Integrated Gas Safety Records from Recorded Flue Gas Reports

Prices from £315

Easy return & tracking of Annual Service through the TPI Customer Portal at tpieurope.com

with a multitude of kit options available

tpieurope.com | sales@tpieurope.com | call 01293 530196


REGISTERED GAS ENGINEER | TECHNICAL

Fan-diluted flue systems Fan-diluted flue systems may be used to disperse products of combustion in high-rise buildings. Here, Barrie Church looks at some of the questions he receives on proving air flow at the correct rate when flow volumes are variable.

I

n recent weeks, I have received several queries regarding the safety of interlocks on fan-diluted flue (FDF) systems using variablespeed drives (VSDs) on multiple boiler installations. FDF systems are used when it is impossible to get the chimney to high level, for example, in a high-rise apartment block. They dilute the products of combustion to a safe level that does not cause low-level environmental issues. Without the correct suction conditions under all boiler loads and necessary air-flow interlocks, the system can be dangerous because products of combustion will not be drawn away from the boiler chimney/flue. Unstable combustion There are many problems with using VSD control with fan-diluted flue systems. The main issue is that the design must maintain the correct ‘range’ of suction conditions on the primary flue header, just as it is required of a chimney. These conditions must be interlocked with the operation of the appliances. This means that the first thing to do is find out from the appliance manufacturer the end points of these conditions. Too much or too little can lead to unsafe or unstable combustion. Unfortunately, many appliance manufacturers are unable to provide this information and you may need to rely on the experience of the fan-diluted flue designer, or, better still, go to a manufacturer that can provide the information. It’s vital to ensure that there is as much draught control as necessary in the appliance connections, which depends on the space available as well as knowledge of the appliances. Under some wind conditions, the interlocks may prove OK without the fan running, which illustrates that you should always prove that the fan is running.

A typical fan-diluted flue system with external variable-speed drive

IGEM/UP/10 – Installation of flued gas appliances in industrial and commercial premises – refers to using a no-volt interlock on the three-phase motor starter. The inlet air system can be blocked by all manner of things, from crisp packets to snow and leaves – and even sheets of hardboard. The fact that the suction conditions have been met does not always mean that there is a flow. Paddle flow switches can be unreliable and, at very low boiler demand, might not be good enough to ensure safety. Differential pressure switches 3across attenuators or inlet grilles or fans could be applied. But even with the correct interlocks in place, nothing beats good regular maintenance to ensure safety. A detailed analysis must be performed on the necessary interlocks and failure modes

to guarantee safety under all boiler operating conditions. A differential pressure switch 3monitoring negative pressure on the inlet side of the fan is best policy, with the motor speed inverter monitoring motor operation as well.

inlet damper is not usually of a balancing type and is generally left fully open. In most cases, it would be better if this inlet damper is installed between the boilers and the fan so that it can be used for balancing the system against the fan duty.

All FDF systems require 3proper commissioning and

Some designers have used 6the FDF system to extract air

maintenance by those who understand the design of the system. Adding fixed balancing dampers in various parts of the ductwork is essential, with all dampers having at least 25 per cent cutaway openings and rigidly locked into position.

from the boiler room via a motorised damper and room stat. This is potentially very dangerous because the suction in the boiler room will increase as the boiler load increases. It could affect the air flow into the burner and, depending upon the types of balancing dampers that are fitted, affect the flue gas passage to the exhaust grille. IGEM/UP/10 advises against fan extract systems unless there are inlet fans to balance the extract. In my view, it’s

It is recommended that 3dampers are incorporated in each boiler connection, which are usually of the lockable quadrant type. However, the

www.gassaferegister.co.uk 39

>


REGISTERED GAS ENGINEER | TECHNICAL

Condensing systems operating with fan-diluted flues can cause serious environmental and safety problems

>

best to have separate systems, even if both are VSD-controlled. Where dilution air is extracted from the plant room, the ventilation must be increased substantially if it is by natural means, such as louvres, because it has to be based on at least 2.0m/sec jet (1.0m/sec face) velocity. Where the ventilation is mechanical, the supply must be interlocked and able to provide enough to cover both the dilution air requirement and combustion air. Condensate The last point that I would like to make relates to condensate. The design information in the standards relates to noncondensing boilers: however, the

air flow and temperature conditions for the design need to be dramatically changed for condensing boiler systems, whose waste gases can be like a fog when used with FDFs. Vertical plumes have caused numerous 999 calls and horizontal plumes across highways have the potential to cause serious accidents. The plume may not be a problem if the outlet is in an inconspicuous location, but it can be mitigated by entraining more dilution air so that the flue gas becomes unsaturated. However, this can increase the size and cost of the system substantially. Other issues •C orrosion issues with the use of the proper grade of stainless steel for system

longevity are often overlooked on grounds of cost. • The handling and removal of the condensate is also a big problem, and this may get worse as the concentration of hydrogen in natural gas increases. • Large damp stains on exterior walls by grilles are not acceptable – choose a better type of drip-free joint. • Condensate and dust will collect on the linings of the duct system and especially on the fan assemblies. This means that maintenance access is even more important than with non-condensing systems.

motor to around half speed as a minimum, as the differential pressure switch will be at the point of dropping out in this scenario, so this does limit the scope for variation. • Where different speed set points are configured to match selected boiler loads, it may be necessary to include multiple differential pressure switches, each monitoring the different boiler load configurations. However, this depends on the BMS and its flexibility. Barrie Church is past chairman of IGEM/UP/10* and consultant to Global Energy Associates. Thanks also to AI Flues for its assistance with this article.

Speed control • As a rough guide, it is only possible to reduce the fan

*IGEM/UP/10 – Installation of flued gas appliances in industrial and commercial premises

Stay up to date with your app In these fast-moving times, your Registered Gas Engineer app can help you stay up to date with all the latest news, wherever you are. We’ve made important updates to your FREE app. So please make sure you choose ‘Update’ at your app store to unlock some great new features.

40 September 2021

Stay up to date – choose Latest News Feeds to see the latest news from Gas Safe Register and around the industry PLUS the newest products and jobs. Simply tap on the headline and the full article opens in simple, readable text.

Find the latest technical articles, news and features, Technical Bulletins, Industry Standard Updates and Safety Alerts. Choose e-Journal replica to download and read 12 full magazine editions on your mobile device.

*Available to Gas Safe registered engineers only. You’ll need to log in with your Gas Safe registration number for verification the first time you use the app.


LOW CARBON HEATING

The LG Therma V operates on Fluorinated Greenhouse Gas (R32)

AHEAD OF THE EXPECTED The shift to low carbon heating systems is closer than you think. There is no time like the present to start readying your business for the change. Discover how LG’s innovative Therma V, air-to-water, all-in-one, Monobloc Heat Pump can help you be prepared. www.lg.com/uk/monobloc

Remotely control from your mobile

Renewable technology

Comfortable home

Lower bills

Reduce carbon emissions


REGISTERED GAS ENGINEER | UNDERFLOOR HEATING

Why zoning matters Changes in the way we live and work have highlighted the importance of advanced controls that enable customers to zone their heating systems, writes Chris Ingram, founder of Continal Underfloor Heating.

M

any household budgets are tighter than ever due to the impact of the pandemic, and homeowners are always looking for ways to make their money go a little further. Utility bills are rising, with the price cap for default domestic energy deals raised to cover rises in the wholesale costs of gas and oil. Around 80 per cent of the energy used in a property goes towards providing heating and hot water, so it’s an easy place to start when trying to reduce household bills. Switching energy supplier is one way, but upgrading heating control systems to make sure their heating is as efficient as possible is often the quickest and most cost-effective way to improve efficiency and so bring down costs. For years now, manufacturers have been pushing the importance of advanced controls, and yet 15 per cent of homes with gas central heating still do not have a basic thermostat1 – let alone sophisticated modern controls.

“It will become mandatory for each room in new-build properties to have its own temperature controls.” Revisions to Building Regulation Part L, due out later this year, are designed to encourage more properties to improve their heating controls. From April 2022, it will be mandatory in England and Wales for each room in new-build properties to have its own temperature controls. Existing homes that do not have this level of control will need to have them fitted when their boiler or heat source is replaced. For underfloor heating (UFH) systems, that means fitting a thermostat in each room. This will

monitor the temperature in that room, or area, sending data back to the wiring centre to ensure that each part of the property will maintain the desired temperature. Get into the zone Fitting individual room temperature control as part of the UFH system also gives homeowners the opportunity to go a step further and introduce specific heating zones, and this can boost heating system efficiencies significantly. A multi-zone system divides the property’s heating into specific areas based on their usage and requirements, for example: kitchen, office, bedroom, and lounge. Separate heating programmes are then created for each area, each controlled by its own thermostat, to ensure that the room is only heated when it is likely to be in use. For example, zoning a system means you can set the heating to come on in the kitchen, bedroom and bathroom first thing in the morning while the household gets ready for the day, leaving the living and office areas set at a lower temperature. Then, from 9am when children are at school and adults are either out at work or in their home office, the heating in those areas can be switched off,

or the temperature reduced, while the working area is kept warm. Having multiple zones gives complete flexibility and control over the heating, so that no heat energy should ever be wasted on an unoccupied room. With more people working flexibly in the future, flexible heating systems will ensure that they don’t pay any more than they have to for the comfort and warmth that a modern UFH system brings. Design for life Creating a zoned UFH system comes down to the design. A zoned system uses a wiring centre and actuators to provide independent control of each zone, with separate pipe runs going to each room, all connected to a central manifold. A room thermostat is then fitted in each area to monitor the temperature,

sending data back to the wiring centre and telling it when it needs to open the actuator and fire up the boiler to send heat to that specific zone. Making sure this type of system works efficiently means choosing the right controls, and working with a manufacturer who can design a system for you that maximises efficiency at every stage. Every UFH system should be carefully designed and built to meet the users’ needs. That means talking with customers right at the start to learn how they live and how they want to be able to use the system, then assessing what zones they will need. Always choose a supplier that can offer advice on the right questions to ask, and one that will provide detailed CAD and installation plans to make fitting the system simple. ■ www.ufh.co.uk

Quantum of controls Continal’s Quant digital thermostats can be installed in every room of the home, with both wired and wireless options. Digital thermostats can be app-controlled and operated remotely through a smartphone or tablet, as well as manual dial thermostats for those who prefer an offline interface.

1 https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/ file/539570/Energy_report.pdf

www.gassaferegister.co.uk 43


REGISTERED GAS ENGINEER | TRAINING

Training is back – and here’s why you need it As lockdown restrictions ease, manufacturers can provide face-to-face, hands-on training once again. Navien’s national training manager Sean Keleher looks at why it’s so important to keep your product knowledge and skills up to date.

W

ith new boilers and accessories constantly being brought out, training remains vital for heating engineers in both the oil and gas sectors. Covid-19 restrictions meant that training centres around the country experienced heavy restrictions or had to close temporarily, but as essential workers, heating engineers were able to carry on servicing and repairing boilers nationwide. Training didn’t stop altogether, though, and many companies created alternatives to physical courses, including videos, eLearning, online questionnaires and Zoom sessions. But now there is light at the end of the tunnel, and manufacturers are re-opening their training centres and inviting gas engineers back for vital, hands-on, face-to-face sessions. In an increasingly competitive market, heating engineers need

generation. For new learners, they can provide colleges and educational establishments with the most advanced boilers on the market, to ensure students are up to date with the latest in heating technology. Heating technicians need to be properly trained for the work they carry out, giving them confidence in their skills and product knowledge, while offering their customers added peace of mind in terms of safety, costs and efficiency. Attending a manufacturer’s training day is an excellent way to learn all the essential information under the guidance of a dedicated technical expert. A manufacturer-led training course also ensures that engineers can demonstrate that they have the levels of competency required when fitting a specific product. Training courses should include comprehensive technical

“Manufacturers are re-opening their training centres and inviting gas engineers back for vital, hands-on, face-to-face sessions.” to have the essential knowledge, skills and experience to fit the latest systems safely and effectively. After all, as gas and oil boilers (particularly Blue Flame models) continue to advance, legislation changes and customers become more informed, heating engineers need to ensure they are up to speed with all the latest developments – as well as the introduction of any new products. With energy efficiency high on the industry agenda, manufacturers need to ensure there is adequate training in place to educate both existing heating engineers and the next 44 September 2021

explanations and hands-on, practical tuition on the products. This enables attendees to obtain valuable experience with live gas, oil and water connections, as well as familiarising themselves with the latest controls and relevant legislation. It can be challenging to take time off work and attend a training course, but doing so offers long-term benefits. Industry-recognised training schemes include hands-on advice and learning, helping add to and enhance installers’ expertise and skills. All appropriate accessories should also be explored in

depth – including flues, pumps, condensate traps and control systems. When looking at the controls available, it is important to consider the technical aspects, such as wiring and connectivity, as well as functionality. Furthermore, as heating installers are now dealing with consumers who have grown more tech savvy, aspects such as smart controls, diagnostics and zoning are all key elements that can require detailed explanation. Training and certification are the best ways to convey trust to your customers: the more trained gas engineers the heating

industry has, the better its reputation will be, while simultaneously eliminating fraudsters carrying out substandard or even illegal work. As the industry emerges from lockdown restrictions – and with the heating season nearly upon us – there is no better time to get re-acquainted with the latest legislative and technological developments. Not only will it refresh your product knowledge, but it can help grow your business by ensuring you are working safely and fulfilling your customer’s expectations. ■

A standard day’s training at Navien usually includes a detailed overview of its gas and Blue Flame oil boilers, covering key aspects including installation, servicing and commissioning, as well as parameters, settings and fault analysis. For oil boilers, this includes adjusting the oil pump and measuring combustion at the commissioning stage, along with how to clean and maintain the heat exchanger. These are certainly the key areas we cover when conducting sessions on our LCB700 Blue Flame oil boilers. Plus, attendees go home with a free training giveaway pack worth £300. training@navienuk.com


STAY PROTECTED. FIT A CARBON MONOXIDE ALARM For professional quality, service and innovation, the Aico Carbon Monoxide Alarm range has you covered.

BSI KITEMARKED AS STANDARD

COMPATIBLE

Follow us on www.aico.co.uk | 01691 664100 | enquiries@aico.co.uk

Half page ad_CO_131mm x 186mm.indd 1

16/08/2021 11:18:58

GEBERIT MAPRESS GAS

DESIGNED FOR SPEED. BUILT FOR BUSINESS. RESULT. Gas applications require a safe connection for such volatile media, and fittings and pipes must comply with specific requirements for gas. Geberit Mapress Copper Gas and Stainless Steel Gas have all the necessary approvals for natural gases, liquefied gases and several technical gases, ensuring a safe and certified installation. geberit.co.uk/mapress

www.gassaferegister.co.uk 45


REGISTERED GAS ENGINEER | BACK TO BASICS

Sludge: seeing is believing Sludge or magnetite in heating system water is a major cause of heating breakdowns. But water quality isn’t usually seen or considered by the homeowner. Tom Hood, Adey’s UK and Ireland sales director, looks at the risks that the build-up of sludge poses, how to prevent it happening, and the importance of showing your customers why it needs to be treated.

M

ost gas engineers know what sludge is and how it forms from corrosion inside radiators, pipes, and soldered joints. The older the system, the more likely it is to have some heating sludge build-up. But that doesn’t mean that newly heating systems are immune. Corrosion can start to affect boilers and radiators from day one. Indeed, leaving old water in a system unaddressed is like putting old oil in a new car. According to independent

falters, gives up and requires remedial attention. While an automatic air vent costs less to replace, a PCB, heat exchanger or fan can cost substantially more. Filter it out Rust and dirt build-up can be slowed and filters can collect magnetite particles from the system water. A magnetic filter attracts magnetite of all particle sizes, catching and collecting them as the water moves around

“The tell-tale signs of sludge include cold spots in radiators, kettling noises, lukewarm water in taps, leaks, loss in boiler pressure or the boiler simply turning itself off.” research, 15 per cent of new boilers breakdown every year, and sludge is the cause of 60 per cent of these failures.1 Sludge build-up can also affect the system’s energy efficiency as it struggles to transfer heat, radiators and pipes are blocked, and the flow of water is restricted. This means the billpayer has higher energy bills than they would have if the heating system’s water was cleaner. In fact, Band A boilers can shift to Band E in terms of efficiency because of the damage caused by sludge. The tell-tale signs of sludge can become apparent before the boiler breaks down. They include cold spots in radiators, kettling noises, having to turn the thermostat up, lukewarm water from taps, leaks, loss in boiler pressure, or the boiler simply turning itself off. Once sludge starts to build up, various parts of the boiler become affected: the main heat exchanger, the plate heat exchanger, expansion vessel, pump, gas valve, automatic air vent, the fan, and even the PCB. Their performance is compromised until it invariably 46 September 2021

the magnet, so that they can be removed as part of annual servicing and maintenance routines. Smart filters can monitor the build-up of sludge and alert heating engineers to a sludge problem before it causes a breakdown. Adding such prevention measures can reduce annual energy bills by up to £802 a year by keeping the boiler working as efficiently as possible. Filtering out sludge prevents it from damaging the heating system, preventing potential expensive and stressful breakdowns and prolonging the boiler’s lifespan by up to seven years. Making the invisible visible Best practice when it comes to water testing should be worked into every install, every service, and every repair, whether the system is new or not. While customers are often very aware that a boiler breakdown will be inconvenient, disruptive and costly, many aren’t aware how preventative maintenance can help to prevent it. On-site, laboratory-style water testing can help them understand the

importance of boiler system water quality and ongoing preventative treatment options. On-site testing of the system’s water quality, including inhibitors, corrosion and pH levels, can open the door to discuss remedial actions, such as system flushing or replenishing inhibitor levels. This type of measure is also recommended as part of Benchmark best practice when it comes to the preparation, commissioning, and maintenance of domestic heating systems. Going for the flush Whether you are installing a new boiler or servicing an older model, if you find sludge is present in the system, it is best

practice to remove it. Flushing can remove virtually all the magnetite through a cleaning process, without the need to remove radiators, giving a faster and more effective clean. As most homeowners’ first point of call for maintaining and repairing their heating systems, heating engineers are not only there to eliminate sludge when it becomes problematic. While cleaning and powerflushing will stop dirty debris from doing further damage, fitting a magnetic filter to keep freshly cleansed water clean is also vital, keeping customers safe from the dangers of sludge and costly repairs. ■ www.adey.com

1 Independent research by Delta EE 2 Tests carried out by KIWA Gastec based on gas prices in July 2019


We’re looking for gas engineers to join the AO family.

Installers

The front line of our Customer Service Add another tool to your belt You’ll install all sorts of domestic appliances – we’ll even train you to be electrically competent. Support for success All the right gear, a supportive technical team and in-house progression to help build your career. Great work-life balance Enjoy flexible shift patterns and the opportunity to work freelance on your days off. Apply now at ao-jobs.com


REGISTERED GAS ENGINEER | UNDERFLOOR HEATING

Warm floors without the disruption Overfloor systems can bring underfloor heating to a home with minimal disruption, writes Chris Ingram, founder of Continal Underfloor Heating.

O

verfloor systems are a relative newcomer to the underfloor heating (UFH) industry. Unlike more traditional systems that are laid beneath the floor of the property before being buried under a liquid screed, overfloor systems are laid on top of an existing subfloor. They can then be covered with carpet, vinyl, wood floors or tiles, bringing the luxury and efficiency of UFH to properties – without the disruption of having to rip up the existing floor. This flexibility has made them extremely popular with installers, and there are many different products available – but they don’t all offer the same benefits, and you need to make sure that the system provides the promised amount of heat or risk disappointing your customers. Overfloor systems typically consist of a high-strength

insulated substrate board inset with grooves where the UFH pipes sit. The substrate is laid on top of the base floor and, once the pipes have been set into the grooves, the floor covering is laid on top. Overfloor boards based on an extruded polystyrene-insulated substrate won’t provide the same heat output as a screed system, typically providing 60W/m2 compared with 100W/m2 of heat from a screed system. But the reaction times are still fast because the heat is sent directly up into the floor covering rather than first having to navigate through a solid screed. Overfloor systems use thin heating pipes to keep build-up heights to a minimum. But because the systems are designed to be as narrow as possible, it’s important to check the compressive strength of the board to make sure it can take

the weight of the floor being laid over it. This is especially true if you’re planning to tile over the UFH system because the heavy weight of the tiles can compress the board and cause it to shift, risking the tile grout cracking. Some manufacturers require their systems to be laid using special primers and adhesives to prevent this, but these products can be expensive. Alternatively a layer of plywood could be added on top to stabilise the floor, though this will reduce heating efficiencies and increase the floor build-up height.

underneath the pipe, not the thickness of the board itself, as this is where the heat will originate from. Depending on the heat loss of the building, you may need additional insulation beneath the UFH board to get the efficiencies you’re looking for. ■

Insulation is king It’s vital to check that the overfloor system you choose includes enough insulation to make sure that the heat is not lost into the ground. Because the pipes are set into the board, check the thickness of the board

Continal runs regular online training courses and webinars for engineers who want to learn more about the different types of UFH. www.ufh.co.uk/training

Did your Power flush fail? Try

POWDER FLUSH!

We succeed, where others fail!

Our Patented technology can clean out hard sludge build-up in any size pipe! • We can clean microbore, one pipe and plastic pipe systems. • We offer zero risk “No fix No fee deals” If we can’t fix it, you don’t pay anything • Earn £100 Commissions for completed client referrals • We can fix blocked systems and blocked heat exchangers. • No need to replace or re-run pipes. WWW.POWDERFLUSH.CO.UK 48 September 2021


BES RGE H131xW186mm ad 21 NEW.pdf

1

16/07/2021

09:46

OVER 15,000 PRODUCTS LOW PRICES QUALITY PRODUCTS FREE NEXT DAY DELIVERY*

Plumbing, heating and gas supplies...

FAST!

NEW

CATALOGUE OUT NOW!

100s

of PRICE REDUCTIONS

Order online

bes.co.uk or call free

0800 80 10 90

test 4 less The UK's Premier Online Test Equipment Specialists

CALIBRATION & INSTRUMENT SUPPLIER Anton Sprint Pro Testo 327-1 from £359 from £373.50 TPI DC710 from £238

WE COLLECT WE CALIBRATE

GREAT SERVICE GREAT DEALS

WE DELIVER

Collection & Delivery £4.95 Fixed Prices From £85.00 Fast Turnaround

Book and Pay Online

www.test4less.co.uk

PREFER TO CALL? GET IN TOUCH ON:

01782 567 099 All prices correct at time of print. Prices exclude VAT

www.gassaferegister.co.uk 49


#POWERINGWATER

HOT WATER SORTED. STUART PULSE HEATING & HOT WATER CIRCULATORS Electronically controlled high-efficiency circulators for heating, air conditioning, cooling and sanitary water. Stuart Pulse Circulators offer five different control modes plus an automatic operation function an EEI rating from just 0.20 and are ErP compliant.

STUART-TURNER.CO.UK Technical Datasheets available at stuart-turner.co.uk | 21


REGISTERED GAS ENGINEER | PRODUCTS

Productnews Fast heating and cooling with LG’s Monobloc R32 Therma V

BoilerMag adds compact system filter

The new LG R32 Monobloc Therma V heat pump unit makes it possible to incorporate standard boilers and/or solar panels into heating and cooling, for an innovative and economical heating and hot water system. The Monobloc version of the air-to-water heat pump is now available in 5kW to 16kW 1Ø and 12kW to 16kW 3Ø. It comes with a wide operating range of 10Hz-135Hz, water temperatures up to 65°C without an electric

The BoilerMagXC is the company’s latest domestic magnetic system filter, designed to fit inline into a compact space. Heating system water passes its magnetic core twice on a single pass, thanks to dual-flow technology, allowing for the length of the extraction chamber to be minimised while retaining high levels of iron oxide extraction. The BoilerMagXC can be fitted on vertical or horizontal pipework and is serviced in minutes by simply removing the core cover and rinsing. National sales manager Craig Worth says: “It’s the ideal filter for those looking for highperformance protection in restricted spaces, at an attractive price.” www.boilermag.com

heater, and has an energy label rating of A+++. The new unit is quieter than previous models and new features include a new scroll type compressor. The unit has excellent performance at low ambient temperatures – 100 per cent at -7°C. LG units offer quicker response times for the provision of heating and cooling, by sensing not only the temperature but also pressure – a pressure control sensor provides a faster and more accurate response, says LG. The addition of pressure control means the Therma V Monobloc takes less time to reach the desired temperatures, with up to 30 per cent quicker response in cooling and 44 per cent quicker response in heating. www.lg.com/uk/heating-awhp

Glow-worm’s new Compact is small but mighty Glow-worm says its new Compact boiler is one of the smallest on the market, with a casing size of 626mm x 400mm, making it suitable where space is at a premium, including kitchen cupboards and caravan retrofit projects. The combi is available in 24kW and 28kW in a bundle that comes with a flue and system filter. Its stainless-steel heat exchanger provides protection against corrosion for older systems, helping to increase the lifespan of the boiler. Features include: • Touchscreen interface for ease of installation • Built-in bracket for faster fitting • External eBUS socket to simplify connectivity between the boiler and controls • Lowest flow operation • Increased volume for expansion vessel to suit a variety of system sizes, protecting water in heating systems from excess pressure • Additional accessories, including 25mm spacing frame to allow for upward piping, which can still be fitted within a cupboard. The Glow-worm Compact is available in natural gas and LPG

and starts at £499. It’s fully compatible with the company’s range of controls and has a five-year guarantee. Spencer Clark, commercial director for UK & Ireland, says: “The new Glow-worm Compact really packs a punch when it comes to performance, but its size means that it can be easily placed out of sight within the home, for example within a kitchen cupboard. “We’re offering training sessions that cover both the product and its applications, as well as expert advice when it comes to installation.” www.glow-worm.co.uk/trade/ compact

App integration with Viega slimline press tool Viega’s Pressgun Picco 6 Plus makes press connection installation simple, even in the most confined or awkward spaces, says the company. The new inline configuration has been designed to operate as a natural extension of the arm. At just 1.6kg, it is 700g lighter than the previous generation Pressgun Picco and can be used comfortably with one hand. Its 180° rotating head means connections can be pressed at any angle. It delivers a 24kN pressing force and is compatible with metallic Viega press connectors from 12mm to 35 mm, Megapress thick-walled steel tube connectors from 3/8 to 3/4 inch and plastic and multilayer composite pipe systems from 12mm to 40mm. It can also connect to a smartphone or other connected device via Bluetooth and provides additional functionality through

the Viega Tool Services app. Users can see full tool information and the current status at any time, including battery level and the total number of pressings since the last service. The Viega Tool Services app also allows the pressing mode to be changed, with the choice of Viega AutoCycle, the default setting, which presses the connectors in one action, and Viega SmartCycle, which presses the connection in two stages to allow inspection before to completing the pressing. Managing director Scott James says: “The ergonomic, slimline configuration makes it ideal for a wide range of applications, but it is especially suitable for installers working on residential and light commercial projects, where the size and flexibility are important advantages.” www.viega.co.uk

> www.gassaferegister.co.uk 51


Productnews > Hot water heating units are

hydrogen-ready

Rinnai’s Sensei N Series continuous-flow hot water heaters are now ready to use with the proposed initial supply of hydrogen blends in the existing gas infrastructure. The Sensei N Series can be powered by a blend of up to 30 per cent hydrogen, and Rinnai UK is developing units that will be able to operate on 100 per cent hydrogen. The appliance is described as suitable for use with natural gas out of the box, but can be

converted and re-commissioned in the field to operate safely and efficiently solely using a hydrogen supply. All Rinnai units are guaranteed to provide limitless volumes of temperature-accurate hot water, provided fuel and water connections are constant. The Rinnai Sensei N Series range offers a compact, enhanced combustion design that allows for easier installation, with strong operational performance and ease of serviceability. The unit comes with a stainless-steel heat exchanger for an extended working life. There are four models in the range, which are all low NOx and use Rinnai’s patented advanced technology with a 13:1 turn-down ratio and extremely quiet operation. www.rinnaiuk.com

Knipex launches pliers wrench sets Knipex has introduced two new pliers wrench sets – medium and large sizes – all stored in a hardwearing polyester fabric tool roll with a hook-and-loop fastener. The Knipex pliers wrenches are a plier and wrench in a single tool, replacing the need to keep a whole set of metric and imperial spanners. Users can adjust the jaw size quickly with the push of a button, with no unintentional shift of the gripping jaws and no slipping of the joint. The tools mean that tradespeople can grip, hold, press and bend workpieces easily, while the smooth jaws mean damage-free installation of plated fittings – even when working directly on chrome. Three sets provide different-sized tools with slim, plastic-coated handles. The medium set has three tools in 125mm, 180mm and 250mm lengths, and the large set contains tools in lengths of 150mm, 250mm and 300mm. The extra-large set contains five piers wrenches in 125mm, 150mm, 180mm, 250mm and 300mm lengths. www.knipex.com

Keep up to date with your app In these fast-moving times your Registered Gas Engineer app can help you stay up to date with all the latest news, wherever you are. We’ve made important updates to your FREE app. So please make sure you choose ‘Update’ at your app store to unlock some great new features. Stay up to date – choose Latest News Feeds to see the latest news from Gas Safe Register and around the industry PLUS the newest products and jobs.

Simply tap on the headline and the full article opens in simple, readable text

52 September 2021

*Available to Gas Safe registered engineers only. You’ll need to log in with your Gas Safe registration number for verification the first time you use the app.

Find the latest technical articles, news and features, Technical Bulletins, Industry Standard Updates and Safety Alerts.

Choose e-Journal replica to download and read 12 full magazine editions on your mobile device.


INSTALL

MORE BOILERS A R E A IN YOUR

JOIN US NOW FREE BUSINESS WEB PAGE THE BEST QUALIFIED LEADS IN THE UK PAY AS YOU GO FOR THE JOBS YOU WANT NO CONTRACTS/SUBSCRIPTIONS FREE ACCESS TO CUSTOMER FINANCE TOOL

Make the Most of The Big Boiler Switch ON! GET THE BEST

JOIN US

IT’S FREE

GET NEW THEBOILER BEST LEADS NEW IN THE BOILER BUSINESS LEADS IN THE BUSINESS OK

visit www.boilerguide.co.uk/gassafe

SCAN THE CODE TO JOIN US


RECRUITMENT

Are You a Top Heating Engineer? Ready to earn over £100k p.a.? If you’re a fully qualified, time-served, Gas Safe registered heating engineer, we’d like to hear from you!

1979 - 2019 1979 - 2019

Top Jobs

• • • •

Own Gas Safe registration, with Gas Flue Analyser Full UK manual driving licence Domestic and commercial qualifications welcome Competence across major brands in boiler diagnostics, servicing, installations, maintenance & repairs • Qualified installers of vented and unvented cylinders • Able to work in London and the surronding areas

Top Money

www.pimlicoplumbers.com

Top Company 0207 793 2228

recruitments@pimlicoplumbers.com

NATIONWIDE

Learn from a company that has over 100 years experience.

Online Learning Courses Sign up now for a FREE of charge course

Register online Receive your login details Login and view all the current courses available Book your place at a time to suit Visit www.viessmanninstallerportal.co.uk to register Viessmann Academy | Tel: 01952 675032 | Email: academy-uk@viessmann.com

54 September 2021

124583_Sept 2021 pages 54-58.indd 54

13/08/2021 17:39


LONDON AND SOUTH EAST

FO

R

O

The Leading Training Company

s at course NORTHOLT

Friendly Helpful Staff FREE On-site parking FREE Lunch, tea, coffee and biscuits Comfortable Stress Free Environment Air Conditioned Finance Available

LUTON

Boiler Breakdown and Fault Finding

BU PE SI N NE SS

BASILDON

SITTINGBOURNE We offer the following courses: GAS ACS PLUMBING & HEATING ELECTRICAL OFTEC OIL RENEWABLES HEALTH & SAFETY REFRIGERATION

or call our Customer Service Team on:

PLUS Parts Replacement and Service Course Learn how to repair ALL types of combi/system boilers PLUS way, PLUS MUST know

NEW

• Parts Replacement and Service Day – get hands-on experience removing and replacing boiler parts • Parts and Service days – max 3 people • Both courses can also be booked 1 on 1 to suit you • Company discounts available

WOODYS TRAINING Special offers on the day, FREE tea & coffee all day. FREE parking. LOOK ON WEBSITE FOR DISCOUNT CODES

www.boiler-training.co.uk

Online shop at www.boiler-training.co.uk/shop Give us a call and we will help you:

0345 845 7222

Tel: 01375 841804 Mob: 07958 783 681 Email: info@boiler-training.co.uk

For our latest prices and SPECIAL OFFERS visit www.logic4training.co.uk

Woodys Training, Unit 62c Thames Industrial Park, Princess Margret Road, East Tilbury, Essex RM18 8RH

the co origi urs na e l

NATIONWIDE

LONDON AND SOUTH EAST

Training Services

A friendly and professional service for all your Electrical and Gas Training and Assessment requirements.

We offer short courses in the following

Electrical Part P full scope 17th Edition Pat Testing

Basic electrical safety Essential electrics

Brand-New Approved Training & Assessment Centre in Hemel Hempstead

ACS for Natural Gas and LPG All Domestic elements All Industrial/Commercial elements Commercial Catering Elements Mobile Catering Commercial Laundry Commercial Meters Emergency Service Providers Flue Gas Analyser

(Initial and Re Assessment) (Initial and Re Assessment) (Initial and Re Assessment) (Initial and Re Assessment) (Initial and Re Assessment) (Initial and Re Assessment) (Initial and Re Assessment) (Initial and Re Assessment)

Other Courses Unvented Hot Water Systems Water Regulations Energy efficiency Plumbing to Gas Engineering

New Entrant Basic Gas Utilization Course For Domestic or Industrial / Commercial Training Needs Analysis Bespoke Training and Assessment courses for Managers/Landlords/Agents

Legionella Water Hygiene Oil Basic Pipe Skills Basic Understanding of Central Heating Systems

ACS Gas Initial Training & Re-Assessments CCN1 - Core Domestic Gas Safety CENWAT - Central Heating & Water Heaters

A wide-rage of Plumbing, Electrical & Construction Courses also available! Unvented Hot Water Systems Course Water Regulations Course

CKR1 - Gas Cookers

City & Guilds 18th Edition for Electricians

HTR1 - Gas Fires & Space Heaters

CITB SMSTS/SSSTS

MET1 - Domestic Gas Meters CPA1 - Flue Gas Analyser

City & Guilds NVQ’s

1 Day Gas Safety Awareness For further information on any of our courses please

Fax 01322 Phone 01322 524 792 Email paul.chambers@egtrainingservices.co.uk

310 223

EG Training Services Ltd - 3 Mulberry Court - Bourne Industrial Park Bourne Road - Crayford - DA1 4BF

Book Your Course Online Today at www.cdc.org.uk/training Serving London & Hertfordshire for over 10 years. cdc.org.uk

020 8191 9090

info@cdc.org.uk

* Training is not a pre-requisite for assessment. CDC Group ® is a registered trading brand of Construction Development Centre Ltd, registration office at 6 Chancerygate Business Centre, Whiteleaf Road, Hemel Hempstead HP3 9HD.

www.gassaferegister.co.uk 55

124583_Sept 2021 pages 54-58.indd 55

13/08/2021 17:39


LONDON AND SOUTH EAST

RECRUITMENT Robeys Ltd, Goods Road, Belper, Derbyshire DE56 1UU info@robeys.co.uk

EXPERIENCED GAS INSTALLER / GAS SERVICE ENGINEER

If you are a Gas Installer / Gas Service Engineer and have the following skills and attributes, then we would like to talk to you. You would be required to be GAS Safe registered and a HETAS qualification would be a bonus. Experience in gas servicing and appliance installation is required although additional on-going training will be given to the successful person. A current clean driving licence is essential. Applicants should be self-motivated and organized with a mature responsible attitude and be able to produce high standards of work especially when under pressure. We would expect you to work well individually or as part of a team and have a pleasant customer friendly nature. You will need to be conscientious, clean and tidy and prepared to travel when required.

TECHNICAL ADVISOR

Robeys are the leading supplier and distributor of quality wood burning stoves, fireboxes, contemporary gas fires and lifestyle products. Due to continued expansion and progression within Robeys a Technical Advisor role has now become available. Are you from a customer facing background with experience of offering support or advice to customers, looking to take on a technical role and help continue our business growth? Our Technical Advisors provide exceptional customer service, display efficient multitasking abilities, are detail-oriented and equipped with technical knowledge and key computer competencies. You will need excellent customer interaction, problem-solving and MS Office skills to meet service delivery and technical demands. Bringing real world experience and value through project capability would enhance your application. In this varied office-based role, you will be required to deal with technical queries from customers, dealers, and installers as well as liaising with esteemed manufacturers to influence production, quality assurance and development. Your main roles in the Technical Department will be to provide high quality support, advice and signposting to other internal and external resources plus help diagnose appliance problems, source correct replacement parts as required and make sure the product is back functioning as quickly as possible. There are other key administrative and business tasks which will be assigned under the supervision of respective managers. You will have authentic experience of consistently high levels of customer service, ideally managing technical or product issues, with excellent attention to detail and be self-motivated with the ability to work alone and as part of a team. The Job • Provide technical advice, expertise and troubleshooting support to dealers, architects, installers, clients, and in-house staff. • Liaise with appliance manufacturers and product suppliers. • Liaise with technical specialists, approval bodies and service providers. • Perform analysis and mentoring activities, document, and report on findings. • Coordinate technical spares stocks, despatch and returns. • Undertake technical writing and publish guidance documents for installers and servicing engineers. • Keep abreast of regulatory and guidance changes, then effectively communicate and manage key elements. • Comply with regulations and work practices plus industry or site-specific work rules. • Conduct administrative audit and technical reviews with recommendations for change proposals. • Carry out other administrative duties to include maintaining accurate records and interpreting data. • Hours of work are 8am to 5pm Monday to Friday (8 hour paid shift). The benefits for both roles • Company pension • Employee discount • On-site parking • Private medical insurance option

Experience Customer Service, Administration and Technical Advice: 3 years (Preferred though assessed on application and interview) The ideal candidate will positively evidence the following skills: • Interpersonal • Teamwork • Communication • Problem-Solving • Leadership • Work Ethic • Integrity • Adaptability You will need to have a pleasant customer friendly mannerism and be a good communicator, preferably with experience in dealing with technical matters within the gas and/or solid fuel industry. Good attention to detail and flexible approach to tasks is essential, as is being a competent computer user. Experience in Health & Safety matters and asset certification is desirable but not essential, however you will need to exhibit good sense and judgement to be a competent H&S representative for the company.

Covid-19 considerations We have COVID19 Health & Safety procedures in place observed by all employees and contacts.

The application Robeys can offer the successful applicant long term employment with a full-time contract and good salary with both pension and health cover if required. If representing Robeys and closely working with brands such as Rais, Piazzetta, Ortal and Brunner appeals to you please contact Mark Robey by forwarding your CV alongside a personal letter to the below address, which explains why you think you may be a good fit for these roles. We are offering long term employment, excellent salary + benefits package (subject to qualifications and experience held), work wear, and a company vehicle will be provided where applicable. If you have the necessary skills to fulfil the vacancy, please apply in writing only giving full details and CV to

Robeys Ltd, Goods Road, Belper, Derbyshire DE56 1UU or email info@robeys.co.uk

56 September 2021

124583_Sept 2021 pages 54-58.indd 56

13/08/2021 17:39


EQUIPMENT

01384 573408

www.trustapart.com

• FROM ALPHA TO ZILMET IN STOCK • INSTALLATION PARTS • SERVICE PARTS • SPARE PARTS • RARE & OBSOLETE PARTS • UNVENTED CYLINDER PARTS • ONLINE & TRADE COUNTER • PARTBOX COLLECTION POINT Unit 26, Enterprise Trading Estate, Brierley Hill, DY5 1TX

H2OK Spares Merchant

hello@trustapart.com

LONDON

BTAAC offer a full range of Domestic and Commercial Gas training and re-assessments in a well-equipped training facility at very competitive prices. · All ACS Domestic Gas – core + appliances ·All ACS Commercial Gas including CMDDA1,BMP1,LPG · Unvented Hot Water & Water Regs

Free on site parking www.londongastc.co.uk email: info@londongastc.co.uk call our booking team

· Essential Electrics & Heating Controls · Highly knowledgeable trainers with years of experience

For more information and to book your course contact us on:- Email: sarah.bygraves@bromleytraining.co.uk Telephone: 0208 315 5678

Water Regulations

Bromley Training & Assessment Centre (BTAAC) Unit 4 Ashgrove Industrial Estate Ashgrove Road, Bromley Kent, BR1 4JW

www.gassaferegister.co.uk 57

124583_Sept 2021 pages 54-58.indd 57

20/08/2021 12:10


LONDON AND SOUTH EAST

Sheffield’s Premier Gas Training Provider Training & Assessment Specialists • Domestic gas & appliances • Commercial gas • Commercial catering • ACS re-assessments • New entrants to gas (GGFO) • Unvented hot water

• Water regulations • LPG changeover • Legionella • 18th Edition Wiring Regulations • Electrical Testing and Inspection

020 8394 3280 gascentre @ nescot.ac.uk

✔ FREE PA R K I N G ✔ COMPETITIVE PRICES ✔ N O V. A .T. ✔ F R I E N D LY S TA F F

Quality Training in a Modern Relaxed Stress Free Environment • ACS Domestic Natural Gas & LPG • ACS Industrial / Commercial Gas / ESP • Catering ͬ >ĂƵŶĚƌLJ

• K&d Kŝů • Unvented Hot water • Legionella/Water Regs • Part L • Essential Electrics

Call now to Reserve your place at prices not to be missed

Office: 0114 327 9698 Craig: 0778 680 0064 info@gastraininguk.com www.gastraininguk.com

Reigate Road, Ewell, Epsom, KT17 3DS www.nescot.ac.uk

EQUIPMENT PURCHASED

WE BUY ANY ACS, NG, LPG Domestic, Commercial, Industrial Safe Electrical Isolation Un-vented Hot Water & Water Regs

BOILER AND HEATING PARTS Cash waiting for job lots of new boiler and heating parts Genuine parts in good condition and manufacturer’s original packaging

• Excess Stock • Retirement Sale • Closing Down Sale • Slow Moving Parts • Pristine Van Stock

Text or WhatsApp on 07958 665075 joblotboilerparts.co.uk MIDLANDS

RECRUITMENT

Primary Assessments

EXTENDED HOURS AND SAFETY DUE TO COVID-19

DomesCc Gas Commercial Gas LPG

Unvented Hot Water Water Regs Legionella

OFTEC Oil

For all enquiries please contact our team: 0115 9201144 ptas44@aol.com

0208 500 0510

www.heatforhomes.com

Offering training and assessments in:

No3ngham, NG5 6BB

www.primaryassessments.co.uk

We are currently looking Gas Safe Registered engineers with a sound knowledge of domestic heating systems. You must be good with Boiler installations, breakdowns and servicing but also be prepared to do a bit of plumbing if the situation arises. We are a small but fast growing company covering Essex, Kent and Greater London. We take great pride in our customer service and need you to have good communication skills. We provide a company van, fuel card and workwear. If you wish to use your own van we can adjust your salary accordingly. The hours are Monday to Friday 8am to 5pm with plenty of overtime opportunities. Hours: 40 per week Holiday: 20 Days Per Year Job Types: Full-time, Permanent Salary: £42,000.00-£49,000.00 per year

David Brook 07958112977 david@heatforhomes.com

SOUTH WEST

ADVERTISE YOUR TRAINING COURSES, SERVICES OR RECRUITMENT REQUIREMENTS TO 78,000 GAS SAFE

Introductory Gas Training Courses (Commercial, Domestic & LPG) ACS Domestic Core & Appliances and CPA ACS Non-Domestic Core & Appliances ACS Commercial Catering, Mobile Catering & Appliances Swimming Pool Boilers ACS LPG Core & Appliances (incl Boats, RPH, LAV, PD, Caravans) LPG Generators OFTEC Oil Assessment & Training (OFT 50, 101, 102, 201, 105e, 600a) & Solid Fuel Un-vented & Vented Domestic Hot Water, Legionella and Water Regulations Gas Supervisor Courses and courses designed for your specific needs EAL Electrical Courses and Electrical Part P Fire Alarm BS5839 and Security Lighting BS 5266 Energy Efficiency and Renewable Energy Courses (Solar, Photovoltaic) BESA F Gas Courses

SOUTH WEST PENINSULAR TRAINING LTD Westover Trading Estate Langport, Somerset TA10 9RB Tel: 01458 253493 Fax: 01458 253445 Email:info@swptraining.co.uk www.swptraining.co.uk

REGISTERED BUSINESSES, AND REACH MORE THAN 131,000 GAS ENGINEERS.

PLEASE TELEPHONE BEV: 0203 137 8582 OR EMAIL: classified@rgemagazine.co.uk

58 September 2021

124583_Sept 2021 pages 54-58.indd 58

13/08/2021 17:39


REGISTERED GAS ENGINEER | COMPETITION

Competition Win with Grundfos We’ve teamed up with our friends at Grundfos to give five readers the chance to win an high-efficiency ALPHA3 circulator.

D

id you know Europe has more than 130 million domestic circulators in operation and about 40 per cent of them are inefficient? The good news is that you can play a major role in reducing the world’s energy consumption – without much effort.

Old pumps are inefficient and costly to run Pumps that are more than 10 years old are usually far less efficient than current models. In fact, replacing an old circulator can save up to 75 per cent on energy consumption. Imagine if all circulators were high efficiency like the Grundfos ALPHA3 or UPM3 GO Balance – the electricity savings would equal the energy consumption of 4 million European citizens. You can make a big difference in making this happen and have a positive impact on your customers’ energy bill and Europe’s environment. Be perfectly in balance With the ALPHA3 high-efficiency canned rotor circulator pump, it has never been quicker or easier for you to operate a pump in domestic heating systems. The ALPHA3 is fully controlled via a smart device using the integrated Bluetooth communication. From the moment the circulator is installed and connected, all pump operation, including set-up wizard, is available in the GO Remote app. Pump set-up and monitoring are simpler than TERMS AND CONDITIONS

By entering this prize draw, you agree to these terms and conditions: • Registered Gas Engineer and Grundfos do not accept responsibility for lost, delayed, corrupted or invalid entries. • Five winners will be chosen at random from all correct answers submitted in accordance with these terms and conditions. • The winners will be notified by email. The judges’ decision is final and no correspondence will be entered into. • The prize cannot be substituted or upgraded.

5

cha to wnces in

To be in with the chance of winning a Grundfos ALPHA3 pump, please answer the following question correctly: Which two apps are compatible with the Grundfos ALPHA3? a) GO Remote and GO Replace b) GO Balance and GO Remote c) GO Replace and GO Balance

ever, and you get smarter and more optimal operation. The ALPHA3 also comes with built-in functionality to perform easy flow-based hydronic balancing with the Grundfos GO Balance app. In addition, you can balance an entire heating system through the GO Balance app, with real-time calculations of the flow required in your radiator and underfloor heating systems. A step-by-step guide takes you through the whole process of hydronic balancing all the home’s radiators and underfloor heating zones. Discover the ALPHA3 and download GO Balance at: www.grundfos.co.uk/ALPHA3

• The prize is non-transferable and there is no cash alternative. • Registered Gas Engineer and Grundfos may disqualify you from winning if they have reasonable grounds to suspect that you are in breach of these terms and conditions or your participation is fraudulent or otherwise unlawful. • This draw is not open to employees of Grundfos, Gas Safe Register or Registered Gas Engineer or their direct family members or agents. • Registered Gas Engineer and Grundfos do not accept any responsibility for any network

Send your answer, plus your name, address and registration number to competition@registeredgasengineer. co.uk Five winners will be drawn at random from all correct entries received by the closing date of Thursday 30 September 2021.

Last month’s winners Arun Koshal from North Harrow, Steve Creamer from Waterlooville, Krzysztof Regula from Ilkeston, Roger Jezusek from Sheffield and Simon Ballam from Poole won last month’s competition. They will all receive a Digistat from Drayton. Congratulations!

connection, technical failure or other problem in any telephone line, network, system, provider or otherwise which results in any entry not being properly recorded or received. •O ne entry per person. •Y our entry details will be provided to Grundfos, which may use them for marketing purposes. By entering this competition, you agree that you may receive communications from them. If you do not wish to be contacted, please add NO COMMUNICATIONS in your email entry.

www.gassaferegister.co.uk 59


Scan to find your local stockist: www.esteembathrooms.com


Turn static files into dynamic content formats.

Create a flipbook
Registered Gas Engineer, September 2021 issue by Registered Gas Engineer - Issuu