P R O P O S E D
I N D U S T R I A L
&
B U S I N E SS
E S TAT E
PROPOSED NEW
110 Sippy Creek Road & 23 Parkyn Road
TANAWHA, QLD
INDUSTRIAL & BUSINESS ESTATE
SUNSHINE COAST
·
4556
DA REFERENCE
R E C O N F I G U R AT I O N
LODGED
A SS E SS I N G AU T H O R I T Y
USE TYPE
MCU25/0166
RAL25/0046
April 2025
Sunshine Coast Council
Industry & Business — MCU
69
2
1,200m²
11ha
T O TA L L O T S PROPOSED
D E L I V E RY S TA G E S
MINIMUM LOT SIZE
T O TA L S TA N D A R D LOT AREA
A development application is before Sunshine Coast Council seeking approval for
PROJECT
SNAPSHOT
a 69-lot industrial and business estate at Tanawha. The site, currently a caravan park, offers exceptional connectivity to Sippy Creek Road, Parkyn Road and the Bruce Highway — positioned to meet strong demand for industrial land
Total Lots
69 Lots
Stage 1
33 Lots
Stage 2
35 Lots
on the Sunshine Coast. P R O P O S E D R E C O N F I G U R AT I O N P L A N — R E V A , 1 3 / 0 5 / 2 0 2 5
Total Lot Area
11.03 ha
Balance Lot 100
25.45 ha
Internal Roads
25m Wide
LOT
S TA G E 1 — 3 3 LO T S
ZONED INDUSTRY & BUSINESS Reconfiguration from existing caravan park into a dedicated industrial and business precinct
S TA G E 2 — 3 5 LO T S
SIZE
SUMMARY
DESCRIPTION
RANGE
Minimum lot size
1,200m²
Maximum lot size
4,362m²
Typical Stage 1
1,320–1,500m²
Typical Stage 2
1,200–1,481m²
Corner / landmark
Up to 4,362m²
LO C AT I O N
PRIME CONNECTIVITY Direct access to Sippy Creek Road & Parkyn Road with close proximity to the Bruce Highway
Bruce Hwy ~5 min Caloundra CBD ~12 min SC Airport ~18 min Maroochydore ~20 min
FLEXIBLE LOT SIZES
BAL29 COMPLIANT
1,200m² minimum up to 4,362m² — suitable for diverse industrial and business operators
27m building setback with 20m bushfire buffer — 10m turf and 10m fire access driveway
DEVELOPMENT APPLICATION CURRENTLY BEFORE SUNSHINE COAST COUNCIL DA REF: MCU25/0166 | RAL REF: RAL25/0046
M AT E R I A L C H A N G E O F U S E — I N D U S T RY & B U S I N E S S
This brochure is for information purposes only. All areas, lot sizes and staging are indicative and subject to local authority approval and final survey. Prepared May 2025.