Skip to main content

Architecture Portfolio_RayeL_2024

Page 1

PORTFOLI


Raye Liu Intern Architect, Alberta Association of Architects Masters of Architecture (‘22), School of Architecture, Planning and Landscape, University of Calgary

SELECTED WORKS BUILT INSTALLATIONS 1 2 3

2

9-BLOCK Canopy, Digital Fabrication

P6

RE-TIRE Installation, Digital Fabrication

P12

FOLDING LIGHT Object, Parametric Design, Digital Fabrication

P18


CONCEPTUAL DESIGN 4 5

POUNCE Landscape Architecture, Parametric Design

P20

COLLIDE Public, Cultural, Recreational

P30

3


SELECTED WORKS

TECHNICAL DESIGN

6

CAMBIE GARDENS, PARCEL C

7

BASSANO

4

Residential, Retail, Healthcare, Construction Documentation

P38

Residential, Retail, Design Development

P42


SKETCHES AND MODEL MAKING

5


BUILT INSTALLATION

Photo credit: Potographer Neil Zeller

6


9-BLOCK

SAPL was selected as a collaborator to introduce a quick

Built Installation 2020

pilot solution in the nine blocks that surround City Hall.

Team project

The main objective of this project is to improve vibrancy

Initiated and commissioned by the City of Calgary,

Team members and roles:

and sense of safety in this important area in downtown

Team Lead: Assistant Professor Mauricio Soto-Rubio

through a relatively low-cost but impactful design

Lighting design (assembly system) and prototype (3D printing script and form design): Raye Liu

solutions.

LED coding and installation: Shelby Christensen Structure: Ji Song Sun, Jonathan Monfries

Situated on Macleod Trail and 7th Avenue SE, Calgary,

Digital Fabrication Specialist: Guy Gardner Software: Rhino, Grasshopper, Photoshop, Illustrator

the 9 block canopy project consists of an undulating

Tools and Equipment: Robotic arm 3D printing, CNC machine

plywood slat design that contains curvatures to provide a dynamic effect as pedestrians and vehicles pass through the site.

1. GENERAL

7 Ave SE

1.1 DESIGN LIFE: 1.1.1. THE CANOPY STRUCTURE HAS BEEN DESIGN TEMPORARY INSTALLATION. 1.1.2. MEMBERS, MATERIALS, AND CONNECTIONS PROLONGED EXTERIOR EXPOSURE. EXTENSI ONE (1) YEAR DESIGN LIFE IS SUBJECT TO EN

1.2 REFERENCE STANDARDS, CODES, AND ACTS 1.2.1. THE DESIGN AND CONSTRUCTION CONFOR CODE – ALBERTA EDITION 2019, ANY APPLIC HAVING JURISDICTION, AND THE LATEST ED STANDARDS OR PUBLICATIONS REFERENCED a) CAN/CSA-S16 LIMIT STATES DESIGN OF ST b) CAN/CSA G40.20/G40.21 STRUCTURAL QU c) O86 ENGINEERING DESIGN IN WOOD (LIM

1.3 QUALIFICATIONS 1.3.1. ANY ORGANIZATION UNDERTAKING TO WEL CERTIFIED BY THE CANADIAN WELDING BUR

1.4 CONNECTIONS TO EXISTING STRUCTURE 1.4.1. THE CANOPY INSTALLATION IS INTENDED TO THE CONDITION OF THE EXISTING BUILDING 1.4.2. INSPECT THE EXISTING BUILDING AND BECO THE EXISTING CONDITIONS. 1.4.3. BRING TO THE ATTENTION OF THE ENGINEE SHOWN IN THE DOCUMENTS WITH ACTUAL

University of Calgary City Building Design Lab (CBDL)

2. MATERIALS

2.1 STRUCTURAL STEEL PLATE: CONFORM TO CAN/C 2.2 THREADED ROD: CONFORM TO CAN/CSA-G40.20 Fu =450 MPa). NUTS SHALL CONFORM TO ASTMA ASTMF436M. 2.3 PARALLEL STRAND LUMBER (PSL): MANUFACTUR PARALLAM AS MANUFACTURED BY WEYERHAEU 2.4 WOOD SCREWS: CONFORM TO ASTMB18.6.1. SCR STRENGTHS TO CONFORM TO CSA 086. 2.5 NEOPRENE BEARING PAD: MOLDED OR CUT FROM SYNTHETIC RUBBER COMPOUND OF DUROMETE 3. EXECUTION

3.1 FABRICATION 3.1.1. ALL WELDS SHALL CONFORM TO CSA STAN 3.1.2. PROFILING, TAPERS, HOLES, AND THE LIKE IN ACCOMPLISHED BY CNC MACHINING OR OT NO OVERCUTTING.

A

B

C

D

E

F

3.2 INSTALLATION 3.2.1. ENSURE EXISTING CONCRETE ELEMENTS AT AND DRY PRIOR TO INSTALLATION. 3.2.2. SIDE STEEL PLATES SHALL BE INSTALLED ON CONCRETE COLUMN IN THE FOLLOWING MA a) APPLY NEOPRENE PADS TO COLUMN FAC AND TAB PLATES AND EXISTING CONCRET b) INSTALL SIDE PLATES SO THAT PERPENDI AND NOT IN CONTACT WITH THE NEOPRE c) ALLOW THE SIDE PLATE TO ROTATE ABOU COLUMN UNTIL THE TAB PLATES ARE IN C ‘LOCK’ ONTO THE COLUMN (CANTILEVER/S DOWN WITH THE BACK SIDE OF THE PLATE d) INSTALL THE THREADED RODS, WASHERS TIGHT CONDITION. 3.2.3. INSTALLATION OF THE PSL BEAMS OR PRE-T MAY PROCEED AT THIS POINT. 3.2.4. A DETAILED METHODOLOGY TO PRE-TENSIO ESTABLISHED WITH THE ENGINEER AND THE 100 kN TENSION IS INDUCED IN THE ROD. 3.2.5. AFTER PRE-TENSIONING OF RODS AND FAST COMPLETED AND REVIEWED, THE REMAIND LIGHTS, ELECTRICAL, ETC.) CAN PROCEED.

G

1

1

2

2

3

3

A

B

C

D

E

F

3.3 FULL SCALE LOAD TEST 3.3.1. A FULL SCALE LOAD TEST IS TO BE COMPLET AND CONNECTION. THE INTENT OF THE LOA PRETENSIONING PROCEDURE FOR THE THRE BETWEEN THE STEEL PLATE, NEOPRENE PAD 3.3.2. THE TEST IS TO BE CONDUCTED ON A FULLY INSTALLATION OF SLATS, LIGHTS, ELECTRICA 3.3.3. THE TEST SHALL APPLY LOAD CONCENTRICA FROM THE FACE OF THE EXISTING COLUMN 3.3.4. THE LOAD SHALL BE APPLIED IN A CONTRO (2250 LBS) IS ESTABLISHED. THIS LOAD SHA THE CONNECTION AT THE COLUMN MONITO 3.3.5. APPROPRIATE SAFETY MEASURES (SUCH AS SHALL BE IMPLEMENTED TO PREVENT DAM TO ANY PERSONS. 3.3.6. AFTER THE TEST, INSPECT THE NEW AND EX OR DEFORMATION.

0

G

CITY OF CALGARY BUILDING PERM

For tendering purposes only

Use only for the intended purpose as shown in de It is the contractors responsibility to check all info

This drawing is the property of the School of Arch shall not be used for any purpose or copied or com the written consent of the School of Architecture,

PERMIT DRAWINGS

Macleod Trail SE

Macleod Trail SE

Site Plan Macleod Trail SE

THE CITY OF CALGARY

7

ENTUITIVE

Project


BUILT INSTALLATION

16 lights in total for the whole canopy; the shapes vary depending on the undulation of the near slats, a design approach achieved through algorithm scripted in Grasshopper Section

8 0

250

500

1000 mm


One-way mirror effect during day time Photo credit: Shelby Christensen

Infinity mirror effect at night time Photo credit: Raye Liu

The light fixtures have been 3D printed at the SAPL’s City Building Design Lab using recycled plastic and contain sensors. So during night time, they will illuminate the sidewalk through the “infinity mirror“ and the linear LED strips underneath each layer of “shell“ when the sensors detect pedestrian’s movement below. This ensures people feel safe waiting for the bus at night. During the day when the LED’s are not on, the “infinity mirror“ turns into a one-way mirror, so pedestrians will see their own reflections in the mirrors.

9


BUILT INSTALLATION Nuts

Nuts

Top Cover Top Cover Water-resistant MDF

Outer Shell Outerand ShellHousing Space and Housing for Electronics (Arduino board, transformers etc.)

LED Strand LED Strand Attached unto the Edge

Electronics Electronics Acrylic Mirror (one-way) Acrylic Mirror

CNC Milled SpacerMDF Spacer LED Strand along the Edge LED Strand

Plexiglas TwoWay Way Mirrow Film (function as Plexiglass withwith Two Mirror Film two-way mirror) PIR Sensor PIR Sensor

The e and tra prog

Inner Shell Inner Shell

LED Strand LED Strand Attached along the Edge

Custom plastic G

Threaded RodsRods

Nuts Nuts Light 14 (Large)

10


Light assembly axo

electronics compartment houses power cord ansformer, and an arduino board that can be grammed through wifi connection to change colors of the LED strips in each lamp

mized robotic arm using granulized recycled c to 3D print the light parts directly through Grasshopper scriptting and Rhino 3D model

11


BUILT INSTALLATION

Rendering submitted for competition

12


"Re-Tire" is a public-space intervention designed and built

RE-TIRE Built installation, exhibited on PARK(ing) Day 2019, Calgary Dimension: 2.4 m (L) x 6 m (W) x 2 m (H) (two parking stalls) Materials: tires, paint, yarns, colored films, two-way mirror films, wood dowel pins, 2"x12" wood planks, metal hardware, LED lights, ivy planters Team project

by a student team of five. It won the exhibition opportunity for PARK(ing) Day (September 20, 2019) in Calgary, Alberta, Canada, after the evaluation of the submissions conducted by the Alberta Association of Landscape Architects (AALA). Our team is one of the only two grant-winners among all the participants of the year. The installation of "Re-Tire" received media coverage before and after the event by the City of

Team members and roles:

Calgary, the Avenue Calgary Magazine, University of Calgary

Team Lead: Raye Liu

and AALA.

Design Assistance: Judy Liu Technical Support: Ji Yong Chyung Graphics: Jason Park Finance and Fundraising: Ryan Spring Software: Rhino, Photoshop, Illustrator Tools and Equipment: CNC machining and power tools during pre-fabrication, hand tools during installation insitu

"Re-Tire" advocates environmental sustainability by upcycling used car tires and curates a space to interact with people of all ages. There is a pathway within the installation for visitors to walk through and enjoy the different visuals each tire has to provide. The whole structure is pre-fabricated off-site, and transported by truck on the installation day. The assemblies are put together sequentially according to how they are numbered.

13


BUILT INSTALLATION

14


The internal pathway within the installation Friends and families appreciating the fun interaction "Re-Tire" creates and taking photos of each other

15


The top and bottom plates are manufactured through CNC using 3D models created in Rhino directly; double plates are bolted together for stability and depth to secure the vertical dowels

16


ASSEMBLY 6

Experiments with weaving through half tires and their shadow effects. Those half tires were design to be installed as the "roof" of the stallation, which was not realized on the installation day

ASSEMBLY 5

ASSEMBLY 4

ASSEMBLY 3

ASSEMBLY 2

ASSEMBLY 1

17


BUILT INSTALLATION

FOLDING LIGHT

Tool: Rhino, Grasshopper Team Project: John Rivera, Raye Liu, Zhengshi Lu, Rajbir Dhaliwal, Eric Sloan Personal Contribution: conceptualization, coding, drafting, physical production G3

RENDERING 2 CLOSE-UP VIEW

RENDERING 1 OVERALL VIEW

Render

1. Points on grid

18

2. Locate points at curves' intersections; add randomized points

3. Merge all points and randomiz on Y-axis within 0 - 100 mm domain range to create depth

G2

Render

4. All points are connected through the Delaunay mesh component in Grasshopper to create a mesh

5. Scale of triangle becomes larger and triangles rotate to maximum 10 degrees in the white zone Scale of triangle becomes smaller and triangles do not rotate in the black zone


1

2

3

5 7

6

8 9 11 10

12

Front Elevation

Side Elevation

The screen is composed of 12 unrolled pieces, colorcoded as above. 1 ' - 5 3/8"

2 1/8"

5 5/8"

3/8"

1 ' - 8 7/8"

4

3"

r e e

4"

1 ' - 4 7/8"

Fold inward

Fold outward

Plan Unrolled Piece No. 1

1/5" thick polysheet Matt white spray paint on both sides

Photos after Installation

Typical detail

19


LANDSCAPE ARCHITECTURE DESIGN

20


POUNCE Academic (2020) Individual project Conceptual Design Project Area: 1,567 m2 Function: Cultural , Recreational Software: Rhino, Grasshopper, Photoshop

The project “Pounce“ is a tensile fabric structure to activate the back alley between buildings sitting along 8 Ave (Stephen Ave) and 9 Ave, Calgary. Considering the currently dominant dining program along 8 Ave, the project intends to let the dining services overflow into the back alley, to serve the nine-tofive office workers and hotel dwellers along 9 Ave within a minimized walk distance. While dining on those elevated platforms, people also have the opportunity to enjoy the landscape along the alley. Another intention is to maximize the landscape influence the current graffiti wall can exert at the south entrance. Functioning as a beacon for fun and vibrancy during both daytime and night, the graffiti wall now works as a backdrop for the semi-outdoor stage. Hopefully, through a re-arrangement of programs and refinement of landscape details, the project will be an attraction point, especially for the younger generation.

21


LANDSCAPE ARCHITECTURE DESIGN

The existing condition: the back alley has three entrances - two at each end and the third is a crossthrough on the ground level under a high-rise, which also expose the graffiti wall when people passby on the main road

22


PO NCE

tensile membrane structu

PO NCE

Site Analysis Zoning tensile membrane structure Program Details INDEX Site Analysis Steel Edge Beams

INDEX

Zoning Program Details

Tensil Fabric

Intention: Intention: • Dining & entertainment • Dining & entertainment • Increase greenery area • Increase greenery area • Night life Elevated Dining Platforms on 2nd Floor

• Night life

Steel Frame Hanging Elevated Platform Dining Graffiti Wall

Island Planter Seat

Entertainment Greenery Graffiti Mural

Dining Dining Entertainment Entertainment Green Spaces Greenery Graffiti Backdrop Graffiti Mural

Proposal: extend the dinning program in the storefronts on Stephen Avenue all the way to the back alley. Use the back alley as an outdoor dining environment. Build a stage using the graffiti wall as the backdrop, creating an amphitheatre for entertainment events. Island planters on the ground level function also as anchors for the tensil membrane structrue that provides a certain degree of protection from the environment.

23


2455

7050

LANDSCAPE ARCHITECTURE DESIGN

Ground Level Floor Plan

3720

17221

Section 24


7571

7571

3720

17221

Short Elevation 25


LANDSCAPE ARCHITECTURE DESIGN 8877 2684

2175

2598

2nd Level Floor Plan

7714

10111

2023 6722

NOISREV TNEDUTS KSEDOTUA NA YB DECUDORP

Inner Clamping Ring Turnbuckle

2344

Plan_2nd Level_Dining 1:200 REV01 Tensile_Green Alley

NOISREV TNEDUTS KSEDOTUA NA YB DECUDORP

Drawing Title Scale Version Project

NOISREV TNEDUTS KSEDOTUA NA YB DECUDORP

12312

Outer Clamping Ring Cage Holding Planters

Detail: Hanging Planter System and Low-Point Ring PRODUCED BY AN AUTODESK STUDENT VERSION

26


2598

2023 6722

10111

3347

7714

2344

3347

12312

g Title

n

Plan_2nd Level_Dining 1:200 REV01 Tensile_Green Alley

27


LANDSCAPE ARCHITECTURE DESIGN

PRODUCED BY AN AUTODESK

Roof Plan

08

Self-tapping Screw Clamping Plate Wrapped Kedar Inside

250

NOISREV TNEDUTS KSEDOTUA NA YB DECUDORP

50 3

PRODUCED BY AN AUTODESK STUDENT VERSION

NOISREV TNEDUTS KSEDOTUA NA YB DECUDORP

Fabric 100

Detail: Rigid Edge PRODUCED BY AN AUTODESK STUDENT VERSION

TODESK STUDENT VERSION

Longitudinal Elevation 28


Sectional Detail: Rigid Edge Beam

PRODUCED BY AN AUTODESK STUDENT VERSION

Kedar

PRODUCED BY AN AUTODESK STUDENT VERSION

PRODUCED BY AN AUTODESK STUDENT VERSION

Edge Beam

Self-tapping Screw

PRODUCED BY AN AUTODESK STUDENT VERSION

Pin Connection

PRODUCED BY AN AUTODESK STUDENT VERSION

Clamping Plate

PRODUCED BY AN AUTODESK STUDENT VERSION

Fabric

PRODUCED BY AN AUTODESK STUDENT VERSION

K STUDENT VERSION

Detail: V-Frame Footing & Connection

PRODUCED BYBY ANAN AUTODESK VERSION PRODUCED AUTODESKSTUDENT STUDENT VERSION

2800

500 1080

5875

PRODUCED BY AN A

29


ARCHITECTURE DESIGN

COLLIDE

Academic (2020) Individual project Conceptual Design Project Area: 6,156 m2 Function: Cultural , Recreational Software: Rhino, Enscape, Photoshop

30


Journey of the Bird Sanctuary

Journey of the Linear and Circular Architecture

The site is the breath-taking Inglewood Bird Sanctuary situated along the Bow River in Calgary, Alberta. The curated bird-watching journey is a loop that starts and ends at the existing parking lot. To correspond with the curated linear journey, the architecture naturally is designed as a “loop within a loop“. By the time of this design exercise, it was in the middle of the heated discussion about mental health issues that are brought about by COVID situation. Thus this project is also a review about how architecture can contribute to the mental health of the users. Based on the belief that a multi-modal program is beneficial to activate the different areas of the human brain, Collide is a recreational project that incorporated all different modalities and supra-modalities - as a collision of programs through various spatial heights and elevations, visual connections and adjacency to biophilia.

31


ARCHITECTURE DESIGN

14 +6 M

13 -1.5 M

N

10

9

11

8

LOGISTICAL ACCESS POINT (BOH)

12 -1.5 M

7 6

5 4

3

32

2

-1.5 M

1

ENTER +-0

1. CAFE 2. BOOKSTORE 3. COUNSELLING 4. BREAKOUT ROOMS 5. PERFORMANCE ART 6. EXHIBITION 7. ART EDUCATION / MAKERS’ SPACE 8. ART & DESIGN STUDIO 9. MUSIC STUDIO 10. MIND-BODY WORKOUT 11. BOXING 12. SUNKEN GARDEN 13. ROCK CLIMBING 14. MEDITATION / PRAYER ROOMS

FOCAL AREA


Rock Climbing Space

33


ARCHITECTURE DESIGN

Meditation Room on the Second Level

34


TRAIL & PUBLIC ENTRANCE

MEDITATION SPACE

BOH ENTRANCE FROM 9 AVE

+6 M GROUND -1.5 M

THEATRE

OPEN CAFE & CASUAL SEATING NEAR EXIT

KICK BOXING STUDIO

PERFORMANCE ART STUDIO

OPEN STAGE

ROCK CLIMBING

ENTRANCE TO THE BUILDING

ART EDUCATION CLASSROOM

COUNSELLING CENTRE MEETING ROOM

COUNSELLOR OFFICE

ENTRANCE TO GARDEN

35


ARCHITECTURE DESIGN

Outdoor Landscape and the Visual Connection with the Indoor 36


37


TECHNICAL DESIGN

ALUMINUM CLADDING WHITE FINISH 100 MM RIGID INSULATION WATER / VAPOUR BARRIER TO WRAP AROUND EXT. GRADE DRYWALL EXT. GRADE DRYWALL HAT CHANNEL SCREWED ONTO HSS HSS - SEE STRUCTURAL DWGS

SLOPE DOWN TO GUTTER 3%

GUTTER BEYOND

SLOPE DOWN TO PIPE 2% MIN. 100 MM STEEL STUD 150 MM STEEL STUD 150 MM RIGID INSULATION PIPE TO RAINWATER LEADER

38

A

A

OPEN TO PLANTER BELOW


CAMBIE GARDEN PARCEL C Role: Coordinate engineering disciplines during Design Development phase; Produce construction documents set, including envelop detailing; Assist in the communication and clarification with the City during permitting process Attend and write meeting minutes during consultant meetings Location: Vancouver, BC Construction documentation phase (2023- present) Project Type: New Construction Gross Floor Area: 369,148 SF No. of Stories: 28 Budget: CAD$60,000,000 Occupancy: Residential, Office, Healthcare Software: Revit

LEVEL 02

LEVEL 01

39


TECHNICAL DESIGN

INTERIOR LEVEL 02 38 MM RIGID INSULATION GLASS SPANDREL PANEL 150 MM RIGID INSULATION 150 MM STEEL STUD

EXTERIOR

PREFABRICATED METAL FLASHING EXT. GRADE DRYWALL WATER / VAPOUR BARRIER TO WRAP AROUND EXT. GRADE DRYWALL ALUMINUM CLADDING WHITE FINISH 100 MM RIGID INSULATION

TRANSLUCENT TEMPERED GLASS PANE

HSS - SEE STRUCTURAL DWGS

SLPOE DOWN TO GUTTER - 3%

GUTTER BEYOND SLOPE DOWN TO PIPE 2% MIN.

HSS SECTION - STR. DWGS

150 MM STEEL STUD

MEMBRANE LINED 150 MM X 150 MM STEEL GUTTER

PIPE TO RAINWATER LEADER

40

B

B

OPEN TO PLANTER BELOW


LEVEL 02

LEVEL 01

41


TECHNICAL DESIGN

42


BASSANO Role: Explore design options during Design Development phase, e.g. planter and parapet wall conditions, and building canopy design; Material research; Building Code and by-laws research; Coordinate with engineering disciplines; produce drawing set for Building Permit application, e.g. stair and core drawings, and window schedules; Attend and write meeting minutes during consultant meetings Location: Burnaby, BC Design Development phase (2023), Construction Documentation phase () Project Type: New Construction Gross Floor Area: 326,250 SF No. of Stories: 43 Budget: CAD$48,500,000 Occupancy: Residential, Retail, Office Software: Revit

Bassano is a mix-used high rise. On the third level in the podium, there is this luxurious residential unit that has a vast terrace, and the task was to explore different options of the height of the planter v.s. the parapet wall, considering various factors, such as to continue the luxurious design style for the tenant, aesthetics, privacy, cost, and structural design.

43


TECHNICAL DESIGN

5% SLOPE DOWN

TERRACE

METAL FLASHING ON PEEL AND STICK MEMB. ON TREATED PLYWOOD

TERRACE

EXTEND R MEMB. UP

MEMBRAN TERMINAT

TOP OF PL EXTEND ROOFING MEMB. UP THE UPSTAND

10% MIN.

SEE LAND BUILDUP

MEMBRANE TERMINATION BAR TOP OF PLANTER WALL 10% MIN.

SEE LANDSCAPE BUILDUP GUMLIP FLASHING TO PROTECT LEADING EDGE OF ROOF MEMBRANE AND DRAINAGE MAT TYP.

PAVERS

PAVERS 2% SLOPE

OVERFLOW SCUPPER IN WALL PAVERS

16" CONC. SLAB (SEE STR.)

2%

CONC. WALL (SEE STR.)

EXIT BELOW

Option 1 Higher parapet wall because of the required 3’ 6” nonclimbable height starting from the soil surface

44

OVERFLOW SCUPPER IN WALL PAVERS

16" CO (SEE S

EXIT

Tall (3’ 6”) planter; sight line m or branches of plants; low


ROOFING P THE UPSTAND

NE TION BAR

TERRACE

5% SLOPE DOWN

LANTER WALL

DSCAPE

METAL FLASHING ON PEEL AND STICK MEMB. ON TREATED PLYWOOD GUMLIP FLASHING TO PROTECT LEADING EDGE OF ROOF MEMBRANE AND DRAINAGE MAT TYP.

5% SLOPE DOWN

METAL FLASHING ON PEEL AND STICK MEMB. ON TREATED PLYWOOD

EXTEND ROOFING MEMB. UP THE UPSTAND MEMBRANE TERMINATION BAR TOP OF PLANTER WALL 10% MIN.

SEE LANDSCAPE BUILDUP

GUMLIP FLASHING TO PROTECT LEADING EDGE OF ROOF MEMBRANE AND DRAINAGE MAT TYP.

PAVERS SLOPE

ONC. SLAB STR.)

CONC. WALL (SEE STR.)

OVERFLOW SCUPPER IN WALL PAVERS

16" CONC. SLAB (SEE STR.)

2% SLOPE TO PLANTER DRAIN

16" CONC. SLAB (SEE STR.)

CONC. WALL (SEE STR.)

T BELOW

Option 2 may only land on trunck wer parapet allows visual connection

EXIT BELOW Option 3 direct interaction with the planting area; special drainage and structural design requried for the inset planter; low parapet wall allows for visual connection 45


SKETCHES

46


47


48


49


Turn static files into dynamic content formats.

Create a flipbook
Architecture Portfolio_RayeL_2024 by Raye Liu - Issuu