Skip to main content

Architecture 2nd year project (SCO)

Page 1

ACADEMIC PORTFOLIO 2021

RAKESH KUMAR NAYAK 11908387 BATCH: 2019 SECTION: A1902


Site Demarcation

Vegetation cover around the building

Main roads around the building for heavy vehicles.

Adjusting roads around the building for cars and other small vehicles..

Travelling range.. its shows the radius of 500m-1km for necessary stuffs....

Good site analysis allows the designer to improve the project, ensuring that the building makes the best use of the resources, such as light, access, views, on the site as possible. It should also allow the designer to anticipate any potential issues which may cause problems to the project


Main entrance gate

(seperate entry for vehicles and pedestrian and a security post nearby for servigilence and ease movement)

Pedestrian area

(covered with greenery and nearby there is water bodies for relaxation)

Seperate parking space

(located nearby building for those who has urgent work in the building and for very short duration)

Service entry

(Entrance only for the vehicles that carries stuffs for the building)

Landscape stairs

(Area which is dedicated to greenery and it will have famous sculptures and literature stuffs of the the state/city itself, which visitors acan enjoy crossing through it)

Vehicular entry

(Entrance way in which service vehicle and public vehicles is allowed, seperate way for pedestrian is also provided for ease movement)


SCO (SHOP CUM OFFICE)


Multi-storey parking plan

Ground floor plan

1st floor plan

2nd floor plan

3rd floor plan


Elevations Sheet

East elevation

North(Front) elevation


Sections Sheet

Section aa’

Section bb’


Turn static files into dynamic content formats.

Create a flipbook
Architecture 2nd year project (SCO) by Rakesh kumar Nayak - Issuu