Skip to main content

Rail Engineer - Issue 197 | July-August 2022

Page 1

by rail engineers for rail engineers

WELSH

JUL-AUG 2022 – ISSUE 197

RAIL

THE ELIZABETH LINE’S PLATFORM SCREEN DOORS

HS2 is meeting its net-zero targets by investing in green plant and equipment.

The Elizabeth lines PSDs are a marvel, but each represents a potential single point failure.

www.railengineer.co.uk

PLANT & EQUIPMENT

HS2: GOING GREEN

STATIONS & PASSENGER TECHNOLOGIES

Timetable planning is an art that must cater for a variety of factors and stakeholders.

FOCUS FEATURES

TIMETABLING

AT THE HEART OF EVERY RAILWAY

ROLLING STOCK & DEPOTS

transformation


Turn static files into dynamic content formats.

Create a flipbook