Systems Engineering Test Preparation - 373 Verified Questions

Page 1


Systems Engineering Test Preparation

Course

Introduction

Systems Engineering is an interdisciplinary field focused on the design, integration, and management of complex systems throughout their life cycles. This course covers fundamental principles, methodologies, and tools used to define customer needs, develop requirements, and create system architecture while addressing technical, organizational, and operational factors. Emphasis is placed on life cycle thinking, systems modeling, risk analysis, trade-off studies, verification and validation, and project management. Students will gain practical skills in applying systems engineering processes to real-world projects, enabling them to effectively collaborate across disciplines to deliver robust, efficient, and sustainable solutions to complex engineering challenges.

Recommended Textbook

Project Management in Practice 4th Edition by Samuel J. Mantel Jr

Available Study Resources on Quizplus

8 Chapters

373 Verified Questions

373 Flashcards

Source URL: https://quizplus.com/study-set/1698 Page 2

Chapter 1: The World of Project Management

Available Study Resources on Quizplus for this Chatper

52 Verified Questions

52 Flashcards

Source URL: https://quizplus.com/quiz/33651

Sample Questions

Q1) Achieving both strategic and routine goals are growing in importance in project management.

A)True

B)False

Answer: True

Q2) Many recent developments in project management are being driven by changes in the nature of the American workforce.

A)True

B)False

Answer: False

Q3) In project management,it is often necessary to trade-off one objective for another.

A)True

B)False Answer: True

Q4) When using financial methods for selecting projects,the payback period is the simplest and best method to use.

A)True

B)False Answer: False

To view all questions and flashcards with answers, click on the resource link above. Page 3

Chapter 2: The Manager, the Organization, and the Team

Available Study Resources on Quizplus for this Chatper

45 Verified Questions

45 Flashcards

Source URL: https://quizplus.com/quiz/33652

Sample Questions

Q1) It is common practice to select the project manager prior to the project being selected.

A)True

B)False

Answer: False

Q2) Functional project organizations have higher personnel costs than pure project organizations.

A)True

B)False Answer: False

Q3) Morale of the project team is a key responsibility of the project manager. A)True

B)False Answer: True

Q4) Project team conflict stifles team creativity.

A)True

B)False

Answer: False

To view all questions and flashcards with answers, click on the resource link above.

Page 4

Chapter 3: Planning the Project

Available Study Resources on Quizplus for this Chatper

48 Verified Questions

48 Flashcards

Source URL: https://quizplus.com/quiz/33653

Sample Questions

Q1) Entries above the diagonal in the Design Structure Matrix indicate

A) tasks that need to be shortened

B) tasks that have no resources assigned to them

C) tasks that are on the critical path

D) potential rework situations

E) tasks with no predecessors

Answer: D

Q2) The salary requirements of human resources are a required element in the project plan.

A)True

B)False

Answer: False

Q3) According to the text,the use of sticky-notes can be particularly useful for constructing a(n)

A) RACI matrix

B) Work Breakdown Structure

C) Gantt chart

D) Design Structure Matrix

E) Aggregate Project Portfolio

Answer: E

To view all questions and flashcards with answers, click on the resource link above. Page 5

Chapter 4: Budgeting the Project

Available Study Resources on Quizplus for this Chatper

46 Verified Questions

46 Flashcards

Source URL: https://quizplus.com/quiz/33654

Sample Questions

Q1) The project budget acts as a project control.

A)True

B)False

Q2) A requirement of top-down budgeting is:

A) involvement of the project team

B) estimating the detailed level of the project's tasks

C) applying the learning curve to labor time estimates

D) all of the above

E) none of the above

Q3) A task is expected to take 20 hours of labor at $25 per hour.The required material cost is $500 and the organization charges 30% of direct labor for overhead.The total task cost is:

A) $500

B) $1,150

C) $1,250

D) $1,300

E) $1,500

Q4) A budget is a plan for allocating resources to project activities.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 6

Chapter 5: Scheduling the Project

Available Study Resources on Quizplus for this Chatper

46 Verified Questions

46 Flashcards

Source URL: https://quizplus.com/quiz/33655

Sample Questions

Q1) Standard Pert/CPM networks can be use to resolve probabilistic concerns

A)True

B)False

Q2) It is easiest to see lead and lag time in a project task on a PERT/CPM networks.

A)True

B)False

Q3) When it was originally developed,PERT used certain (deterministic)methods to estimate activity duration.

A)True

B)False

Q4) PERT was originally used for what type of project?

A) construction

B) R & D

C) military

D) computer software development

E) advertising

Q5) A project schedule is a project action plan converted into a timetable.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 7

Chapter 6: Allocating Resources to the Project

Available Study Resources on Quizplus for this Chatper

46 Verified Questions

46 Flashcards

Source URL: https://quizplus.com/quiz/33656

Sample Questions

Q1) For resources that are consumed when used,the problem is which project gets to use the resource first and which must wait.

A)True

B)False

Q2) According to research,the best overall priority rule is A) as soon as possible

B) as late as possible

C) shortest task duration first

D) minimum slack first

E) most critical successor

Q3) The amount of resources a project can use depends in part on the timing of the allocation.

A)True

B)False

Q4) Good PM are able to estimate project task times with absolute certainty

A)True

B)False

Q5) All tasks can be crashed to some extent.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 8

Chapter 7: Monitoring and Controlling the Project

Available Study Resources on Quizplus for this Chatper

45 Verified Questions

45 Flashcards

Source URL: https://quizplus.com/quiz/33657

Sample Questions

Q1) The most common source of changes to a project based on the natural tendency of the client and project team members to improve the project's output is called

A) scope creep

B) projectitis

C) multitasking

D) dynamic scoping

E) unfreezing

Q2) In general,it is preferable to have periodic reports.

A)True

B)False

Q3) Statistical quality control techniques can be helpful for determining what size variances are significant.

A)True

B)False

Q4) According to the text,there is no satisfactory way to measure accurately the percent of completion of most tasks.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above.

Page 9

Chapter 8: Evaluating and Terminating the Project

Available Study Resources on Quizplus for this Chatper

45 Verified Questions

45 Flashcards

Source URL: https://quizplus.com/quiz/33658

Sample Questions

Q1) Early project audits usually focus on the project's budget and schedule.

A)True

B)False

Q2) The formal audit is a special type of project evaluation.

A)True

B)False

Q3) The project final report is a history of the project.

A)True

B)False

Q4) Which of the following is concerned with appraising a project relative to its initial or revised plan?

A) project evaluation

B) project termination

C) project monitoring

D) project control

E) project planning

Q5) Project termination should be treated as a mechanistic process.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 10

Turn static files into dynamic content formats.

Create a flipbook