Service Operations Management Final Exam Questions - 1573 Verified Questions

Page 1


Service Operations Management

Final Exam Questions

Course Introduction

Service Operations Management explores the design, operation, and improvement of processes that deliver services in a variety of industries, including healthcare, hospitality, banking, and retail. The course examines service strategy, process analysis, capacity planning, quality management, demand forecasting, and the unique challenges of managing service encounters. Students learn to apply analytical tools and frameworks to improve efficiency, enhance customer satisfaction, and create value in service-based organizations, while also considering the impact of technology and globalization on service operations. Through case studies and practical examples, the course equips participants with the skills to effectively lead and innovate in service environments.

Recommended Textbook Operations and Supply Chain Management 15th Edition by F. Robert Jacobs

Available Study Resources on Quizplus

25 Chapters

1573 Verified Questions

1573 Flashcards

Source URL: https://quizplus.com/study-set/2909 Page 2

Chapter 1: Introduction

Available Study Resources on Quizplus for this Chatper

72 Verified Questions

72 Flashcards

Source URL: https://quizplus.com/quiz/57949

Sample Questions

Q1) Raising senior management awareness of OSCM as a competitive weapon is not an important issue.

A)True

B)False

Answer: False

Q2) All other things remaining the same, if the sales revenue increases, asset turnover ratio will

A)Increase

B)Decrease

C)Stay the same

D)may increase or decrease

E)there is no way to tell for sure

Answer: A

Q3) "Business analytics" involves the analysis of data through a unique combination of linear programming, game theory, and queuing theory to better solve business problems.

A)True

B)False

Answer: False

To view all questions and flashcards with answers, click on the resource link above.

Page 3

Chapter 2: Strategy

Available Study Resources on Quizplus for this Chatper

50 Verified Questions

50 Flashcards

Source URL: https://quizplus.com/quiz/57948

Sample Questions

Q1) In a firm, if the employees attend a training program, then the time to assemble one unit reduces by 10%.Training program will

A)increase the labor productivity only

B)increase the multifactor productivity only

C)increase both labor and multifactor productivity

D)decrease capital productivity

E)have no effect on productivity.

Answer: C

Q2) A firm's business practices toward its labor force pertain mainly to the economic aspect of the triple bottom line concept.

A)True

B)False

Answer: False

Q3) An operations and supply chain strategy must be integrated with the organization's corporate strategy.

A)True

B)False

Answer: True

To view all questions and flashcards with answers, click on the resource link above. Page 4

Chapter 4: Project Management

Available Study Resources on Quizplus for this Chatper

72 Verified Questions

72 Flashcards

Source URL: https://quizplus.com/quiz/57947

Sample Questions

Q1) Using the time-cost CPM model, the crash time is the shortest possible time allowed for each activity in the project.

A)True

B)False

Answer: True

Q2) A company must perform a maintenance project consisting of seven activities.The activities, their predecessors, and their respective time estimates are presented here: Using CPM, what is the latest finish time for the last activity in this project (i.e., the total time to complete the project)?

A)9 days

B)10 days

C)11 days

D)12 days

E)13 days

Answer: C

To view all questions and flashcards with answers, click on the resource link above.

5

Chapter 3: Design of Products and Services

Available Study Resources on Quizplus for this Chatper

53 Verified Questions

53 Flashcards

Source URL: https://quizplus.com/quiz/57946

Sample Questions

Q1) In the generic product development process, phase 2 (system-level design) begins with corporate strategy and incorporates market objectives.

A)True

B)False

Q2) In the generic product development process, collecting customer needs is accomplished during phase 0 (planning).

A)True

B)False

Q3) Which of the following is primarily used to help design products that will connect product attributes with customer desires?

A)Phase 0: Planning

B)House of quality matrix

C)Value analysis/value engineering

D)Concurrent engineering

E)System-level design

Q4) DFMA stands for design for manufacturing and assembly.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above.

Page 6

Chapter 5: Strategic Capacity Management

Available Study Resources on Quizplus for this Chatper

57 Verified Questions

57 Flashcards

Source URL: https://quizplus.com/quiz/57945

Sample Questions

Q1) A production facility develops virtuosity and works best when it focused on a widely varied set of production objectives.

A)True

B)False

Q2) The capacity focus concept can be put into practice through a mechanism called which of the following?

A)Best operating level (BOL)

B)Plant within a plant (PWP)

C)Total quality management (TQM)

D)Capacity utilization rate (CUR)

E)Zero changeover time (ZXT)

Q3) If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity cushion?

A)25 percent

B)100 units per hour

C)75 percent

D)125 percent

E)133 percent

To view all questions and flashcards with answers, click on the resource link above.

Page 7

Chapter 6: Learning Curves

Available Study Resources on Quizplus for this Chatper

55 Verified Questions

55 Flashcards

Source URL: https://quizplus.com/quiz/57944

Sample Questions

Q1) A company can produce a small lot of products the first time at a cost of $10,000.If their 75 percent learning curve allows them to reduce their costs on each lot, what is the total cost of producing 10 lots?

A)$100,000

B)$93,978

C)$65,432

D)$55,890

E)$49,310

Q2) If a person performing a task has been achieving an 85 percent learning curve and if it took 1 minute to produce the first unit, the total time to produce 1,000 units will be 437.5 minutes.

A)True

B)False

Q3) When plotted on a graph, the learning curve can't be expressed as logarithm.

A)True

B)False

Q4) Learning curves can be applied to individuals and to organizations.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 8

Chapter 7: Manufacturing Processes

Available Study Resources on Quizplus for this Chatper

41 Verified Questions

41 Flashcards

Source URL: https://quizplus.com/quiz/57943

Sample Questions

Q1) A continuous process indicates production of discrete parts moving from workstation to workstation at a controlled rate.

A)True

B)False

Q2) The closer the customer is to the customer order decoupling point, the more quickly the customer receives the product.

A)True

B)False

Q3) A project layout is characterized by a high degree of task ordering.

A)True

B)False

Q4) Which of the following is not a step in developing a manufacturing cell layout?

A)Grouping parts into families that follow a common sequence of steps

B)Identifying dominant flow patterns of parts families as a basis for location of processes

C)Physically grouping machines and processes into cells

D)Disposing of leftover machinery and outsourcing ungrouped processes

E)None of these

To view all questions and flashcards with answers, click on the resource link above. Page 9

Chapter 8: Facility Layout

Available Study Resources on Quizplus for this Chatper

55 Verified Questions

55 Flashcards

Source URL: https://quizplus.com/quiz/57942

Sample Questions

Q1) A workcenter layout is similar to the basic production layout format of job-shop.

A)True

B)False

Q2) In the design of retail service layouts, the term "ambient conditions" could refer to which of the following?

A)Signs

B)Symbols

C)Artifacts

D)Lighting

E)Speed of service

Q3) In assembly-line balancing, the theoretical minimum number of workstations is found by a ratio of the sum of all task times divided by the cycle time.

A)True

B)False

Q4) In designing a production layout a flexible line layout might have the shape of a "U".

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above.

10

Chapter 9: Service Processes

Available Study Resources on Quizplus for this Chatper

61 Verified Questions

61 Flashcards

Source URL: https://quizplus.com/quiz/57941

Sample Questions

Q1) Which of the following is considered a high-contact service operation?

A)On-line brokerage house

B)Internet sales for a department store

C)Physician practice

D)Telephone life insurance sales and service

E)Automobile repair

Q2) In the service-system design matrix, a face-to-face loose specs service encounter is expected to have which of the following?

A)Low sales opportunity

B)Low production efficiency

C)High production efficiency

D)Low degree of customer/server contact

E)None of these

Q3) Which of the following refers to the physical presence of the customer in a service system?

A)Creation of the service

B)Customer contact

C)Intermittent production

D)Continuous production

E)None of these

To view all questions and flashcards with answers, click on the resource link above. Page 11

Chapter 10: Waiting Line Analysis and Simulation

Available Study Resources on Quizplus for this Chatper

70 Verified Questions

70 Flashcards

Source URL: https://quizplus.com/quiz/57940

Sample Questions

Q1) A car wash is an example of a single-channel, multiphase queuing system.

A)True

B)False

Q2) In modeling a simulation, random numbers from 00 to 99 are assigned with the intervals determined from frequency distributions for each behavior occurrence.Assume there are two behaviors, X and Y, out of 50 tallies.On behavior X you record 20 tallies, and on behavior Y you record 30 tallies.Which of the following is a correct random-number interval for behavior X?

A)00 to 19

B)01 to 20

C)00 to 39

D)41 to 61

E)45 to 100

Q3) A roller coaster ride in an amusement park employs which type of queuing system line structure?

A)Single channel, single phase

B)Single channel, multiphase

C)Multichannel, single phase

D)Multichannel, multiphase

E)None of these

To view all questions and flashcards with answers, click on the resource link above. Page 12

Chapter 11: Process Design and Analysis

Available Study Resources on Quizplus for this Chatper

53 Verified Questions

53 Flashcards

Source URL: https://quizplus.com/quiz/57939

Sample Questions

Q1) Make-to-stock production processes can easily handle requests for customized product features.

A)True

B)False

Q2) If you want to reduce process flow time, it has been suggested that you can perform activities in the process in parallel.

A)True

B)False

Q3) Make-to-order production processes are well suited for high-volume production of a standardized product.

A)True

B)False

Q4) Pacing in production processes refers to the fixed timing of the movement of items through the process.

A)True

B)False

Q5) McDonald's fast-food restaurants use a make-to-order production process. A)True B)False

To view all questions and flashcards with answers, click on the resource link above. Page 13

Chapter 12: Six Sigma Quality

Available Study Resources on Quizplus for this Chatper

69 Verified Questions

69 Flashcards

Source URL: https://quizplus.com/quiz/57938

Sample Questions

Q1) While business organizations can seek to achieve the Baldrige National Quality Award, universities cannot.

A)True

B)False

Q2) A flowchart as part of a Six-Sigma quality improvement process might be found in which DMAIC category?

A)Define

B)Measure

C)Analyze

D)Improve

E)Control

Q3) Which of the following is a dimension of design quality?

A)Price

B)Features

C)Color

D)Weight

E)Quality at the source

Q4) ISO 9000 is primarily concerned with environmental management.

A)True

B)False

Page 14

To view all questions and flashcards with answers, click on the resource link above.

Chapter 13: Statistical Quality Control

Available Study Resources on Quizplus for this Chatper

63 Verified Questions

63 Flashcards

Source URL: https://quizplus.com/quiz/57937

Sample Questions

Q1) Consider a sampling plan with n=40 and c=1 and given Acceptable quality level (AQL), Lot tolerance percent defective (LTPD), producer's risk ( ) and consumer's risk ( ).Suppose that c is increased to 2, keeping AQL and LTPD unchanged, consumer's risk ( ) will

A)Always decrease

B)Always increase

C)Sometime decrease

D)Stay the same.

E)None of the above.

Q2) You are going to develop an X-bar chart based on range statistics, and you are using a sample size of 12 for your charting purposes.Which of the following is the A<sub>2</sub> factor for the X-bar chart?

A)0.37

B)0.31

C)0.27

D)0.22

E)0.18

Q3) AQL stands for accepting questionable lots in production quality management.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 15

Chapter 14: Lean Supply Chains

Available Study Resources on Quizplus for this Chatper

71 Verified Questions

71 Flashcards

Source URL: https://quizplus.com/quiz/57936

Sample Questions

Q1) JIT production means that we produce the product before it is required so the customer does not wait for the product.

A)True

B)False

Q2) Uniform plant loading is where you schedule production with different amounts of the same product each day of the week to permit variation to meet changing demand requirements.

A)True

B)False

Q3) Uniform plant loading is a process of smoothing the production activity flow to dampen the reaction waves that normally occur in response to schedule variations.

A)True

B)False

Q4) Applying lean concepts in manufacturing balances increases in cost with quality improvement.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 16

Chapter 15: Logistics Distribution, and Transportation

Available Study Resources on Quizplus for this Chatper

55 Verified Questions

55 Flashcards

Source URL: https://quizplus.com/quiz/57935

Sample Questions

Q1) Which of the following is a plant location methodology good for locating a single facility within a set of existing facilities based in distances and volumes of goods shipped?

A)Factor-rating systems

B)Centroid method

C)Decision trees

D)Linear programming

E)Regression analysis

Q2) Facility location analysis considers the competitive imperative of locating near the appropriate labor pool to take advantage of low wage costs and/or skill levels.

A)True

B)False

Q3) In facility location decision making, the factor-rating system is based on linear programming.

A)True

B)False

Q4) In a hub-and-spoke system, each warehouse in the system acts as a spoke.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 17

Chapter 16: Global Sourcing and Procurement

Available Study Resources on Quizplus for this Chatper

66 Verified Questions

66 Flashcards

Source URL: https://quizplus.com/quiz/57934

Sample Questions

Q1) Inventory turnover and weeks of supply are mathematically the inverse of one another.

A)True

B)False

Q2) Ownership costs include which of the following costs?

A)Environmental costs

B)Warranty costs

C)Supply chain costs

D)Quality costs

E)Taxes

Q3) Which of the following is not an organizationally driven reason for outsourcing?

A)Improve effectiveness by focusing on what the firm does best.

B)Improve flexibility to meet changing demand for products and services.

C)Increase product and service value by improving response to customer needs.

D)Improve credibility and image by associating with superior providers.

E)All of these are organizationally driven reasons for outsourcing.

Q4) An organizationally driven reason for outsourcing is that it can transform the organization.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 18

Chapter 17: Enterprise Resource Planning Systems

Available Study Resources on Quizplus for this Chatper

45 Verified Questions

45 Flashcards

Source URL: https://quizplus.com/quiz/57933

Sample Questions

Q1) A SAP system can accommodate items that must be maintained in inventory while simultaneously supporting JIT efforts for other items.

A)True

B)False

Q2) Accounts receivable is the amount owed the firm by its suppliers.

A)True

B)False

Q3) In the cash-to-cash cycle calculation, if the cost of goods sold per day increases, but all other data such as average inventory and average payables and receivables remain the same, then the value of cash-to-cash cycle will

A)go down

B)go up

C)stay the same

D)May go up or down, but cannot tell without more information

Q4) Because the scope of ERP packages is very large, it is rarely necessary to add additional software.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 19

Chapter 18: Forecasting

Available Study Resources on Quizplus for this Chatper

90 Verified Questions

90 Flashcards

Source URL: https://quizplus.com/quiz/57932

Sample Questions

Q1) A company has actual unit demand for three consecutive years of 124, 126, and 135.The respective forecasts for the same three years are 120, 120, and 130.Which of the following is the resulting MAD value that can be computed from these data?

A)1

B)3

C)5

D)15

E)123

Q2) As a consultant, you have been thinking about choosing the "right" alpha (smoothing constant) for forecasting using exponential smoothing.Which of the following is most accurate about alpha?

A)If alpha is high, speed of reaction to changes in actually low.

B)If a firm produces standard product with relatively stable demand, alpha should be small.

C)Products experiencing growth should be assigned higher alpha value.

D)Alpha could be more than 1.0, and in this case (1-alpha) will become negative to make up for it.

E)B and C

To view all questions and flashcards with answers, click on the resource link above.

Chapter 19: Sales and Operations Planning

Available Study Resources on Quizplus for this Chatper

61 Verified Questions

61 Flashcards

Source URL: https://quizplus.com/quiz/57931

Sample Questions

Q1) One of the conditions that makes yield management effective is when inventory is easily stored and held for a time when demand is stronger.

A)True

B)False

Q2) Firms facing cyclical demand fluctuations would be wise to introduce complementary products whose cycles are the same as their current products.

A)True

B)False

Q3) The essence of yield management is the ability to manage supply.

A)True

B)False

Q4) In an overview of the major operations planning activities in a typical organization, which of the following activities precedes aggregate sales and operations planning?

A)Process planning

B)Workforce scheduling

C)Master production scheduling

D)Materials requirements planning

E)Order scheduling

To view all questions and flashcards with answers, click on the resource link above. Page 21

Chapter 20: Inventory Management

Available Study Resources on Quizplus for this Chatper

102 Verified Questions

102 Flashcards

Source URL: https://quizplus.com/quiz/57930

Sample Questions

Q1) Shortage costs are precise and easy to measure.

A)True

B)False

Q2) Fixed-time-period inventory models generate order quantities that vary from time period to time period, depending on the usage rate.

A)True

B)False

Q3) One of the drivers of the direct-to-store (direct distribution) approach is the decrease in trucking industry regulation.

A)True

B)False

Q4) The standard fixed-time-period model assumes that inventory is never counted but determined by EOQ measures.

A)True

B)False

Q5) Inventory is defined as the stock of any item or resource used in an organization.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 22

Chapter 21: Material Requirements Planning

Available Study Resources on Quizplus for this Chatper

83 Verified Questions

83 Flashcards

Source URL: https://quizplus.com/quiz/57929

Sample Questions

Q1) The time-phased plan specifying how many and when the firm plans to build each end item is called the master production schedule (MPS).

A)True

B)False

Q2) The MRP program performs its analysis from the bottom up of the product structure trees, imploding requirements level by level.

A)True

B)False

Q3) The least unit cost method of lot-sizing adds ordering, stockout, and inventory carrying costs for each trial lot size and divides by the number of units in each lot size, picking the lot size with the lowest unit cost.

A)True

B)False

Q4) A modular bill of materials is the term for an item that can be produced and stocked as a subassembly.

A)True B)False

To view all questions and flashcards with answers, click on the resource link above. Page 23

Chapter 22: Workcenter Scheduling

Available Study Resources on Quizplus for this Chatper

61 Verified Questions

61 Flashcards

Source URL: https://quizplus.com/quiz/181532

Sample Questions

Q1) Assume you are sequencing jobs using Johnson's rule.A particular job requires 3 hours to assemble and then is followed by 2 hours in the painting department.Which of the following is where you would schedule this job?

A)As early as possible in the unfilled job sequence.

B)As late as possible in the unfilled job sequence.

C)The schedule would depend on the due date.

D)Does not matter.

E)Johnson's rule does not apply.

Q2) In infinite loading, no consideration is given directly to whether there is sufficient capacity at the resources required to complete the work, nor is the actual sequence of the work as done by each resource in the work center considered.

A)True

B)False

Q3) A backward schedule tells when an order must be started in order to be done by a specific date.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above.

24

Chapter 23: Theory of Constraints

Available Study Resources on Quizplus for this Chatper

55 Verified Questions

55 Flashcards

Source URL: https://quizplus.com/quiz/181533

Sample Questions

Q1) JIT requires work-in-process when used with kanban so there is inventory to pull.When compared to synchronous manufacturing, this is viewed as a negative aspect of JIT.

A)True

B)False

Q2) According to the theory of constraints, a bottleneck is any resource whose capacity is greater than the demand placed on it.

A)True

B)False

Q3) Statistical fluctuation refers to the normal variation about a mean or average.

A)True

B)False

Q4) Larger transfer batches give shorter lead times and lower inventories, and there is more material handling than smaller transfer batches.

A)True

B)False

Q5) Buffer inventory in front of a bottleneck is called a time buffer. A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 25

Chapter 24: Health Care

Available Study Resources on Quizplus for this Chatper

60 Verified Questions

60 Flashcards

Source URL: https://quizplus.com/quiz/57926

Sample Questions

Q1) Which of the following is an essential resource that flows through a hospital supply chain?

A)Doctors and nurses

B)Information

C)Medicine

D)Patients

E)X-rays

Q2) Nursing stations designed today are only circular in shape.

A)True

B)False

Q3) The founders of the Mayo Clinic are credited with the innovation of integrated medical care in their rural medical practice in the late 1800s.

A)True

B)False

Q4) Health care operations management may be defined as the recruitment, organization, and scheduling of the professionals that deliver health care services.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 26

Chapter 25: Operations Consulting

Available Study Resources on Quizplus for this Chatper

53 Verified Questions

53 Flashcards

Source URL: https://quizplus.com/quiz/181492

Sample Questions

Q1) Which of the following is not considered an operations consulting tool kit category?

A)Problem definition

B)Data gathering

C)Cost impact and payoff analysis

D)Optimizing operations output

E)Implementation

Q2) Which of the following is the stage in the operations consulting process that immediately follows "sales and proposal development"?

A)Design, develop, and test alternative solutions

B)Develop systematic performance measures

C)Present final report

D)Assure client satisfaction

E)Analyze problem

Q3) Companies typically seek out operations consultants when they are faced with major investment decisions or when they believe that they are not getting maximum effectiveness from their productive capacity.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above.