Skip to main content

Service Operations Management Exam Bank - 2523 Verified Questions

Page 1


Service Operations Management

Exam Bank

Course Introduction

Service Operations Management explores the strategic and operational aspects of delivering high-quality services across various industries. The course covers key concepts such as service design, process analysis, capacity planning, demand management, quality control, and customer relationship management. Students examine how technology, human resources, and service environments interact to create value for customers while maintaining operational efficiency. Through case studies and analytical tools, participants develop skills to improve service delivery, solve operational challenges, and enhance the overall customer experience in service-centric organizations.

Recommended Textbook operations management 5th edition by r. dan reid

Available Study Resources on Quizplus

20 Chapters

2523 Verified Questions

2523 Flashcards

Source URL: https://quizplus.com/study-set/3712

Page 2

Chapter 1: Introduction to Operations

Available Study Resources on Quizplus for this Chatper

132 Verified Questions

132 Flashcards

Source URL: https://quizplus.com/quiz/73949

Sample Questions

Q1) Which of the following is not true for business process reengineering?

A)It can increase efficiency.

B)It cannot be used to improve quality.

C)It can reduce costs.

D)It involves asking why things are done in a certain way.

E)It involves redesigning processes.

Answer: B

Q2) Today's business must think in terms of:

A)regional trade zones

B)the EPA

C)the U.S.Defense Department

D)the global market place

E)the curved world

Answer: D

Q3) List at least seven different possible inputs to a transformation process.

Answer: workers,managers,buildings,equipment,materials,technology,and information

To view all questions and flashcards with answers, click on the resource link above. Page 3

Chapter 2: Operations Strategy and Competitiveness

Available Study Resources on Quizplus for this Chatper

130 Verified Questions

130 Flashcards

Source URL: https://quizplus.com/quiz/73951

Sample Questions

Q1) Rapid technological change includes the risk of ________________________ . Answer: obsolescence.

Q2) A firm produces 500 units per day using five workers on a five-hour shift.On average,15% of the units produced are defective and must be scrapped.What is the labor productivity for non-defective units?

A)17 units/hour

B)3 units/hour

C)20 units/hour

D)85 units/hour

E)15 units/hour

Answer: A

Q3) Mass produced standard products were the main manufacturing concern until ________________________.

Answer: the 1970s

Q4) A new milling machine can process 2000 jobs in 8 hours.What is the productivity of the machine?

Answer: 250 jobs/hour

Q5) A business strategy is like an explorer's ________________________.

Answer: compass

4

To view all questions and flashcards with answers, click on the resource link above.

Chapter 3: Product Design and Process Selection

Available Study Resources on Quizplus for this Chatper

128 Verified Questions

128 Flashcards

Source URL: https://quizplus.com/quiz/73948

Sample Questions

Q1) Maturity and decline are also referred to as:

A)the early stages

B)the life cycle

C)the later stages

D)design for manufacture stages

E)re-engineering stages

Answer: C

Q2) What is a type of automation system that provides the flexibility of intermittent operations with the efficiency of repetitive operations?

A)CAD

B)AGV

C)AS/RS

D)FMS

E)CAM

Answer: D

Q3) Why are services more complex to design than manufactured goods?

Answer: Services produce intangible products produced with high levels of customer contact.

To view all questions and flashcards with answers, click on the resource link above. Page 5

Chapter 4: E-Commerce and Supply Chain Management

Available Study Resources on Quizplus for this Chatper

138 Verified Questions

138 Flashcards

Source URL: https://quizplus.com/quiz/73953

Sample Questions

Q1) What does EDI stand for?

A)Easy data interchange

B)Electronic door interface

C)Electronic detachable interface

D)Elementary data integration

E)Electronic data interchange

Q2) A recent change in supply chain management has been the:

A)need for faster computers.

B)green supply chain management requirement.

C)requirement for advanced educational degrees.

D)increased government regulation.

E)need for smaller ocean transportation methods.

Q3) Which type of technology provides "point-of-sale information?"

A)Automatic guided vehicles (AGV)

B)Automatic storage and retrieval systems (ASRS)

C)Barcode scanners

D)Flexible manufacturing systems (FMS)

E)Computer aided design/computer aided manufacturing (CAD/CAM)

Q4) Name three

Chapter 5: Total Quality Management

Available Study Resources on Quizplus for this Chatper

142 Verified Questions

142 Flashcards

Source URL: https://quizplus.com/quiz/73955

Sample Questions

Q1) A quality circle is a team of volunteer production employees and their supervisors who meet regularly to solve quality problems.

A)True

B)False

Q2) Employees of the organization who receive goods or services from others in the company are

A)Internal customers

B)Ultimate customers

C)Downstream customers

D)Operators

E)External customers

Q3) What is a schematic diagram of the sequence of steps involved in an operation or process?

A)Checklist

B)Control chart

C)Scatter diagram

D)Flow chart

E)Process chart

Q4) What are the steps involved in Quality Function Deployment?

Q5) What are the common causes of TQM failure?

To view all questions and flashcards with answers, click on the resource link above. Page 7

Chapter 6: Statistical Quality Control

Available Study Resources on Quizplus for this Chatper

132 Verified Questions

132 Flashcards

Source URL: https://quizplus.com/quiz/73956

Sample Questions

Q1) What are the two aspects to implementing the six-sigma concept?

A)numerically controlled machines and inventory management

B)numerically controlled machines and people involvement

C)numerically controlled machines and technical tools

D)technical tools and people involvement

E)inventory management and technical tools

Q2) Define attribute (as a product characteristic).

Q3) Assuming that data exhibit a normal distribution,control limits set at \(\pm\) 3 standard deviations from the mean capture how much common variation?

A)50.00%

B)80.00%

C)95.44%

D)99.74%

E)99.99%

Q4) A process can be considered in a state of control even if one observation is 1.75 standard deviations above the mean.

A)True

B)False

Q5) What is the formula for an x-bar chart's control limits?

To view all questions and flashcards with answers, click on the resource link above. Page 8

Chapter 7: Just-In-Time and Lean Systems

Available Study Resources on Quizplus for this Chatper

137 Verified Questions

137 Flashcards

Source URL: https://quizplus.com/quiz/73957

Sample Questions

Q1) The role of production employees in JIT includes all of the following except

A)Be actively engaged in improving the production process

B)Monitor quality

C)Record data

D)Follow clearly defined and limiting work rules

E)Act on the information they have

Q2) The benefits of long-term relationships with a small number of suppliers include all of the following except

A)Always getting the lowest price

B)Focus on improving process controls

C)Greater accountability

D)Develop stable delivery schedules

E)Eliminate paperwork

Q3) Frank's umbrella corporation is designing a kanban system.They know that they are expected to produce 100 umbrellas per hour.They've also determined that a key external resource takes 30 minutes to deliver the required material once an order has been transmitted.To start with they want to maintain a safety stock of 25 critical parts.Originally they want to start with 3 kanbans.What container size should Frank's umbrella company start with?

Q4) What are the benefits of JIT?

To view all questions and flashcards with answers, click on the resource link above. Page 9

Chapter 8: Forecasting

Available Study Resources on Quizplus for this Chatper

126 Verified Questions

126 Flashcards

Source URL: https://quizplus.com/quiz/73958

Sample Questions

Q1) Multiple regression is a(n)___________ of linear regression.

Q2) Suppose that you are using exponential smoothing with \(\alpha\) = 0.5 and your initial forecast 5 months ago was for 100 units.If the actual demand last month was 0 units,which of the following is definitely true?

A)The forecast for this month should be 0.

B)The model blew up.You can't use exponential smoothing anymore.

C)The forecast for last month was 0.

D)The forecast for this month should be 50.

E)We need more information to determine this month's forecast.

Q3) Suppose that you are interested in trend-adjusted exponential smoothing.Which of the following values of the trend smoothing constant,\(\beta\),would most likely be seen in practice?

A)0.10

B)0.50

C)0.75

D)0.90

E)1.00

Q4) Time series models are generally more difficult to use than causal models.

A)True

B)False

Page 10

To view all questions and flashcards with answers, click on the resource link above.

Chapter 9: Capacity Planning and Facility Location

Available Study Resources on Quizplus for this Chatper

137 Verified Questions

137 Flashcards

Source URL: https://quizplus.com/quiz/73959

Sample

Questions

Q1) Large facilities can benefit from the concept of _____________________ by creating a plant within a plant (PWP).

A)just-in-time

B)focused factories

C)economies of scale

D)supply chain

E)hierarchical management

Q2) The concept of diseconomies of scale ________________________.

A)states that the average cost of a unit produced is reduced when the amount of output increases

B)is not realistic

C)is not valid for regulated industries

D)states that beyond a certain point the cost of each additional unit made increases E)is an approach for measuring unusable output

Q3) The ratio of actual output rate to capacity is utilization.

A)True

B)False

Q4) How are capacity planning and location analysis similar?

Q5) Discuss why marketing is important in making capacity decisions.

To view all questions and flashcards with answers, click on the resource link above. Page 11

Chapter 10: Facility Layout

Available Study Resources on Quizplus for this Chatper

139 Verified Questions

139 Flashcards

Source URL: https://quizplus.com/quiz/73960

Sample Questions

Q1) What is the shortest distance between two locations using north-south and east-west movements called?

A)Euclidean distance

B)triangulated distance

C)rectilinear distance

D)Socratic distance

E)latitude-longitude (LL)distance

Q2) Which of the following is least like a fixed-position layout?

A)farm

B)shipbuilding

C)bridge construction

D)building construction

E)car wash

Q3) The items listed below are stored in a one-dock warehouse.Which of them should be stored at the very back (furthest away from the dock)?

To view all questions and flashcards with answers, click on the resource link above. Page 12

Chapter 11: Work System Design

Available Study Resources on Quizplus for this Chatper

123 Verified Questions

123 Flashcards

Source URL: https://quizplus.com/quiz/73961

Sample Questions

Q1) Describe why understanding learning curves is important to the organization.

Q2) Output-based incentive systems are based on the assumption that some workers are motivated by money and produce more when pay is linked to performance.

A)True

B)False

Q3) What technique eliminates unnecessary tasks and improves the process for completing tasks?

A)methods analysis

B)job design

C)work measurement

D)task inversion

E)cycle counting

Q4) Which of the following is an advantage of using predetermined time data?

A)You can calculate standard times before the job begins.

B)Very little skill is required.

C)There is universal agreement in assessing the level of difficulty of different work elements.

D)No calculations are required.

E)You do not need to know much about the job.

To view all questions and flashcards with answers, click on the resource link above. Page 13

Chapter 12: Independent Demand Inventory Management

Available Study Resources on Quizplus for this Chatper

137 Verified Questions

137 Flashcards

Source URL: https://quizplus.com/quiz/73962

Sample Questions

Q1) In a periodic review system,if you are basing your time between orders on the EOQ,what should be its length in weeks?

A)EOQ / 52

B)EOQ / average weekly demand

C)average weekly demand / EOQ

D)52 / EOQ

E)(EOQ)(average weekly demand)

Q2) What inventory function protects against supply shortages?

Q3) Hand tools,lubricants,and cleaning supplies are usually examples of what?

A)WIP inventory

B)finished goods inventory

C)raw materials inventory

D)MRO inventory

E)distribution inventory

Q4) Which basic EOQ assumption does the EPQ model relax?

A)Lead time is known and constant.

B)Demand is known and constant.

C)Quantity discounts are not considered.

D)Orders arrive at once.

E)Back orders are not allowed.

To view all questions and flashcards with answers, click on the resource link above. Page 14

Chapter 13: Aggregate Planning

Available Study Resources on Quizplus for this Chatper

105 Verified Questions

105 Flashcards

Source URL: https://quizplus.com/quiz/73963

Sample Questions

Q1) When you are considering different production planning approaches,the magnitude of change:

A)is not important from an aggregate planning perspective.

B)larger changes need more dramatic measures.

C)drives the point of departure.

D)reduces the point of departure.

E)modifies the duration of change.

Q2) What are the characteristics of undertime?

Q3) The master production schedule is typically stated as:

A)resource requirements

B)sales quotas

C)work-in-process

D)specific finished goods

E)composite products

Q4) Which of the following is not typically contained in the marketing plan?

A)product design

B)target markets

C)new products

D)profit margin

E)competitive focus

To view all questions and flashcards with answers, click on the resource link above. Page 15

Chapter 14: Resource Planning

Available Study Resources on Quizplus for this Chatper

131 Verified Questions

131 Flashcards

Source URL: https://quizplus.com/quiz/73964

Sample Questions

Q1) MRP develops a ____________ that shows future demand,supply and inventories by time period.

A)DSI report

B)snapshot forecast

C)requirements plan

D)material movements schedule

E)time-phased schedule

Q2) What does ERP stand for?

A)educational resources planning

B)end routing procedure

C)enterprise reliability production

D)enterprise resource planning

E)easy resource planning

Q3) For any period the beginning inventory,plus any replenishment order due,less the gross requirement equals planned orders.

A)True

B)False

Q4) Supply chain intelligence enables ______________ along the supply chain.

Q5) For the data provided determine the Inventory Record using a FOQ lot size rule for the screw (H).

Page 16

To view all questions and flashcards with answers, click on the resource link above.

Chapter 15: Scheduling

Available Study Resources on Quizplus for this Chatper

131 Verified Questions

131 Flashcards

Source URL: https://quizplus.com/quiz/73965

Sample Questions

Q1) Which of the following is mostly like to be a policy constraint?

A)strike at the supplier's plant

B)raw material shipping problems

C)decreasing market demand

D)no overtime

E)a regular bottleneck in the product process

Q2) What does makespan measure?

A)WIP inventory

B)due-date performance

C)the amount of time it takes to finish a batch of jobs

D)job tardiness

E)job lateness

Q3) Which of the following is the least effective tactic for managing a bottleneck station?

A)Assign extra workers to the bottleneck station if necessary in order to keep it running.

B)Increase the production rate at the bottleneck station.

C)Inspect items just as soon as they come out of the bottleneck station.

D)Subcontract part of the workload at that station to other companies.

E)Assign your best people to that station to improve efficiency.

To view all questions and flashcards with answers, click on the resource link above.

Chapter 16: Project Management

Available Study Resources on Quizplus for this Chatper

124 Verified Questions

124 Flashcards

Source URL: https://quizplus.com/quiz/73966

Sample Questions

Q1) Which of the following can be calculated for an activity once ES,EF,LS,and LF have been calculated for the activity?

A)expected project duration

B)slack time

C)potential for crashing

D)variance in project duration

E)the relative time position for when the activity will be completed

Q2) An activity in a network diagram has an optimistic time estimate of seven days,a most likely time estimate of 11 days,and a pessimistic time estimate of 19 days.Its variance is _________.

A)2

B)4

C)6

D)12

E)24

Q3) If a delay in an activity will delay completion of the whole project,the activity has slack.

A)True

B)False

Q4) What are the benefits of network planning techniques?

Page 18

To view all questions and flashcards with answers, click on the resource link above.

Chapter 17: Spreadsheet Modeling: an Introduction

Available Study Resources on Quizplus for this Chatper

137 Verified Questions

137 Flashcards

Source URL: https://quizplus.com/quiz/73947

Sample Questions

Q1) One reason for intermediate spreadsheet calculations is management is often interested in more detail than the final results.

A)True

B)False

Q2) You can edit Excel formulas by either double-click the cell,or

Q3) In Excel,which function takes a range of values as its input and returns the smallest value from that range?

A)INF

B)SMALL

C)LITTLE

D)MIN

E)LOW

Q4) What are the most common useful numerical formats?

A)date,currency,and percentage

B)date,time,and custom

C)time,custom,and number

D)number,custom,and percentage

E)number,currency,and percentage

Q5) What is the advantage of using a Stacked Column chart?

To view all questions and flashcards with answers, click on the resource link above. Page 19

Q6) The sample standard deviation is found by using the Excel ___________ function.

Chapter 18: Introduction to Optimization

Available Study Resources on Quizplus for this Chatper

108 Verified Questions

108 Flashcards

Source URL: https://quizplus.com/quiz/73950

Sample Questions

Q1) If a firm is using a linear program to determine production amounts of its chairs and tables,which of the following constraints must be in the model?

A)non-negativity

B)labor hours

C)machine hours

D)profit maximization

E)wood availability

Q2) After running a Linear Program in Excel Solver,what message do you hope to see in the "Solver Results" box?

Q3) Three reports are available when Solver has successfully found an optimal solution.These are _______.

A)Answer Report,Sensitivity Report,and Limits Report

B)Answer Report,Sensitivity Report,and Constraints Report

C)Answer Report,Limits Report,and Constraints Report

D)Solution Report,Sensitivity Report,and Limits Report

E)Solution Report,Sensitivity Report,and Constraints Report

Q4) A formulation is a formal,____________ statement of a constrained optimization problem

Q5) A constraint in Excel Solver consists of what three pieces of information?

To view all questions and flashcards with answers, click on the resource link above. Page 20

Chapter 19: Waiting Line Models

Available Study Resources on Quizplus for this Chatper

129 Verified Questions

129 Flashcards

Source URL: https://quizplus.com/quiz/73952

Sample Questions

Q1) Consider a single-line,single-server waiting line system.Suppose that customers arrive according to a Poisson distribution at an average rate of 50 per hour,and the average (exponentially distributed)service time is 45 seconds per customer.What is the probability that 4 customers are in the system?

Q2) Changing from a multi-line model to a single-line model is most appropriate when the company is concerned about fairness for its customers.

A)True

B)False

Q3) Consider a single-line,single-server waiting line system.Suppose that customers arrive according to a Poisson distribution at an average rate of 50 per hour,and the average (exponentially distributed)service time is 45 seconds per customer.What is the probability that \(\le\) 2 customers are in the system?

Q4) There are many variations of the mathematical models for designing waiting lines. A)True

B)False

Q5) List examples of dedicating specific servers for specific transactions.

Q6) In a single-line,multi-server,single phase model,customers form a ________ line.

To view all questions and flashcards with answers, click on the resource link above.

Page 21

Chapter 20: Master Scheduling and Rough-Cut Capacity Planning

Available Study Resources on Quizplus for this Chatper

57 Verified Questions

57 Flashcards

Source URL: https://quizplus.com/quiz/73954

Sample Questions

Q1) What term refers to proven capacity calculated from actual performance data?

A)manifested capacity

B)established capacity

C)demonstrated capacity

D)confirmed capacity

E)affirmed capacity

Q2) What is the formula for calculating the ATP quantity in the action bucket?

A)MPS shipment - customer orders before next replenishment

B)beginning inventory + MPS shipment - (the greater of this period's forecast or the actual customer orders promised for delivery this period)

C)beginning inventory + MPS shipment - forecasted demand

D)beginning inventory + MPS shipment - customer orders before next replenishment

E)beginning inventory + MPS shipment - customer orders this period

Q3) Beginning Inventory + MPS Shipment - maximum of (forecast and customer orders)is called ________________________.

Q4) Describe what CPOPF is.

Q5) The MPS is said to be ________________________ between final assembly and cumulative manufacturing lead times.

Q6) Discuss the Master scheduler responsibility.

To view all questions and flashcards with answers, click on the resource link above. Page 22

Turn static files into dynamic content formats.

Create a flipbook