Introduction to Project Management Final Test Solutions - 1197 Verified Questions

Page 1


Introduction to Project Management

Final Test Solutions

Course Introduction

Introduction to Project Management provides students with a comprehensive overview of the fundamental concepts, techniques, and tools used in managing projects across various industries. This course explores the project life cycle, including initiation, planning, execution, monitoring, and closure, while emphasizing key areas such as scope, time, cost, quality, risk, and stakeholder management. Students will learn about project planning, scheduling, resource allocation, and the critical roles and responsibilities of a project manager. The course also covers contemporary methodologies, such as Agile and Waterfall, and introduces essential software tools for project tracking and collaboration. Through case studies and practical exercises, students will develop critical thinking and problem-solving skills necessary to lead successful projects from conception to completion.

Recommended Textbook

Successful Project Management 6th Edition by Jack Gido

Available Study Resources on Quizplus

13 Chapters

1197 Verified Questions

1197 Flashcards

Source URL: https://quizplus.com/study-set/3621

Page 2

Chapter 1: Project Management Concepts

Available Study Resources on Quizplus for this Chatper

79 Verified Questions

79 Flashcards

Source URL: https://quizplus.com/quiz/71896

Sample Questions

Q1) Which of the following is not an example of a project?

A)Starting-up a restaurant

B)Creating a website for a company

C)Raising money for a disaster relief trip

D)Emptying the recycling everyday

Answer: D

Q2) A plan must be developed that identifies and assesses potential risks, determines the likelihood of occurrence and potential impacts of risks, and delineates responses for dealing with risks

A)risk development

B)risk management

C)risk mitigation

D)risk avoidance

Answer: B

Q3) A work breakdown structure shows the necessary sequence and dependent relationships of the detailed activities for a project.

A)True

B)False

Answer: False

To view all questions and flashcards with answers, click on the resource link above.

Page 3

Chapter 2: Identifying and Selecting Projects

Available Study Resources on Quizplus for this Chatper

70 Verified Questions

70 Flashcards

Source URL: https://quizplus.com/quiz/71897

Sample Questions

Q1) Surveys of stakeholders can be used to gather only quantitative data.

A)True

B)False

Answer: False

Q2) The constraints for a project include the requirement to outsource due to the organization's lack of having expertise with its own staff.

A)True

B)False Answer: True

Q3) The success criteria in the project charter indicate the expected benefits of the project including what the expectations are for project success.

A)True

B)False Answer: True

Q4) The RFP should state what deliverables the customer expects the contractor to provide.

A)True

B)False Answer: True

To view all questions and flashcards with answers, click on the resource link above. Page 4

Chapter 3: Developing Project Proposals

Available Study Resources on Quizplus for this Chatper

112 Verified Questions

112 Flashcards

Source URL: https://quizplus.com/quiz/71898

Sample Questions

Q1) Cost-reimbursement contracts are most appropriate for projects that

A)take less than one year to complete.

B)are with customers that want a single payment date.

C)are well defined and entail little risk.

D)involve risk.

Answer: D

Q2) The customer can terminate the contract according to requirements in the contract.

A)True

B)False

Answer: True

Q3) Indirect costs of doing business are included in proposals where the customer permits the charging of indirect costs.

A)True

B)False

Answer: True

Q4) Local travel is usually not included in the project costs.

A)True

B)False

Answer: True

To view all questions and flashcards with answers, click on the resource link above. Page 5

Chapter 4: Defining Scope, Quality, Responsibility, and Activity Sequence

Available Study Resources on Quizplus for this Chatper

129 Verified Questions

129 Flashcards

Source URL: https://quizplus.com/quiz/71899

Sample Questions

Q1) The lowest-level work item of any one branch is called

A)a work package.

B)a deliverable.

C)an assignment.

D)a product.

Q2) Clear, ambiguous acceptance criteria for all deliverables are important because they are the basis for verifying that the project scope has been completed in accordance with the customer's requirements and expectations.

A)True

B)False

Q3) A change in responsibility, that is, a different person or organization takes over responsibility for continuing the work, it should define

A)the end of one activity and the start of other activities in the network diagram.

B)predecessor activities in a network diagram.

C)activities in the network diagram that must be completed serially.

D)activities in the network diagram that that must be completed concurrently.

Q4) Describe the quality standards that must be included or referenced in the quality plan.

To view all questions and flashcards with answers, click on the resource link above. Page 6

Chapter 5: Developing the Schedule

Available Study Resources on Quizplus for this Chatper

86 Verified Questions

86 Flashcards

Source URL: https://quizplus.com/quiz/71900

Sample Questions

Q1) Each organization or subcontractor responsible for a group or type of activities should always designate an inexperienced individual to estimate the durations for all the activities for which the organization or subcontractor is responsible.

A)True

B)False

Q2) Earliest start time ES) is the earliest time at which a specific activity can begin

A)calculated on the basis of the project estimated start time and the estimated durations of preceding activities.

B)calculated on the basis of the project estimated finish time and the estimated durations of preceding activities.

C)calculated on the basis of the project estimated start time and the estimated durations of succeeding activities.

D)calculated on the basis of the project estimated start time and the estimated durations of approaching activities.

Q3) Throughout a project, changes may occur that have an impact on the schedule.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above.

Chapter 6: Resource Utilization

Available Study Resources on Quizplus for this Chatper

22 Verified Questions

22 Flashcards

Source URL: https://quizplus.com/quiz/71901

Sample Questions

Q1) Given this project and the requirement that the number of resources working on a task cannot be less than the number assigned to the task, answer the following question.What is the least number of resources that can be assigned to the project if all five tasks occur in parallel?

A)24 workers

B)1.5 workers per day

C)7 workers

D)2 workers

Q2) Resource utilization charts based on each activity's earliest start time are said to be based

A)on availability times.

B)an as-late-as-possible ALAP) schedule.

C)on an as-soon-as-possible ASAP) schedule.

D)on a limited schedule plan.

Q3) If resources are to be considered in planning, it is necessary to

A)when each is taking vacation time or time off.

B)know the name of each resource on the project.

C)list all the projects to which the resources have been assigned.

D)indicate the amounts and types of resources needed to perform each activity.

To view all questions and flashcards with answers, click on the resource link above.

Page 8

Chapter 7: Determining Costs, Budget, and Earned Value

Available Study Resources on Quizplus for this Chatper

69 Verified Questions

69 Flashcards

Source URL: https://quizplus.com/quiz/71902

Sample Questions

Q1) The for the entire project or each work package provides a baseline against which actual cost and work performance can be compared at any time during the project.

A)total budgeted cost TBC)

B)cumulative budgeted cost CBC)

C)cumulative earned value CEV)

D)cumulative actual cost CAC)

Q2) Plot curves on the same graph to reveal any trends toward improving or deteriorating cost performance.

A)AC, TBC, EV

B)actual cost and budgeted cost

C)CBC, CAC, and CEV

D)CBC, PV, and BCWS

Q3) The project cost estimate is allocated to

A)the various work packages in the project work breakdown structure.

B)the resources in the project.

C)the committed costs in the project.

D)the stakeholders.

To view all questions and flashcards with answers, click on the resource link above.

9

Chapter 8: Managing Risk

Available Study Resources on Quizplus for this Chatper

45 Verified Questions

45 Flashcards

Source URL: https://quizplus.com/quiz/71903

Sample Questions

Q1) includes determining which risks may adversely affect the project objective and what the impact of each risk might be if it occurs.

A)Risk modification

B)Risk avoidance

C)Risk identification

D)Risk acceptance

Q2) Risks ____ should be given higher priority because if the risk occurs, it would have a greater impact on the schedule than if it was associated with activities on a path that has a large positive value of total slack.

A)that occur first in the project

B)that affect the most costly activities

C)on the critical path

D)that affect the activities near the end of the project

Q3) Addressing risks proactively will increase the chances of accomplishing the project objective.

A)True

B)False

Q4) Establishing risk categories may help to identify and evaluate risks.List some categories to help identify risks.

To view all questions and flashcards with answers, click on the resource link above. Page 10

Chapter 9: Closing the Project

Available Study Resources on Quizplus for this Chatper

42 Verified Questions

42 Flashcards

Source URL: https://quizplus.com/quiz/71904

Sample Questions

Q1) The project team should wait until the end of the project to capture and document lessons learned.

A)True

B)False

Q2) The process of closing the project involves various actions, including

A)identifying which resources to use for the project.

B)collecting and making final payments.

C)adding in extra work if the project hasn't spent all the funds.

D)replenishing office supplies that may not have been used on the project.

Q3) Projects also can be terminated by the sponsor or customer due to a project return on investment increase.

A)True

B)False

Q4) Projects also can be terminated by the sponsor or customer for financial situations.

A)True

B)False

Q5) What type of knowledge base system should be established by the project organization?

To view all questions and flashcards with answers, click on the resource link above. Page 11

Chapter 10: The Project Manager

Available Study Resources on Quizplus for this Chatper

129 Verified Questions

129 Flashcards

Source URL: https://quizplus.com/quiz/71905

Sample Questions

Q1) In informal conversations, the project manager should use open-ended questions and do a lot of listening.

A)True

B)False

Q2) Good project managers spend more time talking than listening.

A)True

B)False

Q3) The project manager has primary responsibility for in planning, organizing, and controlling the work effort to accomplish the project objective.

A)doing the paperwork

B)making all the decisions

C)providing leadership

D)impeding

Q4) The project manager should never provide coaching.

A)True

B)False

Q5) Get a mentor to develop the skills necessary to be an effective project manager.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 12

Chapter 11: The Project Team

Available Study Resources on Quizplus for this Chatper

225 Verified Questions

225 Flashcards

Source URL: https://quizplus.com/quiz/71906

Sample Questions

Q1) To help you effectively manage your time, at the end of each week, identify several two to five) goals that you wanted to accomplish the past week.

A)True

B)False

Q2) In the stage of team development, members frequently collaborate and willingly help each other.

A)forming

B)norming

C)storming

D)performing

Q3) Team building is the responsibility of

A)both the project manager and the project team.

B)the project manager.

C)the project team.

D)the organization's management.

Q4) Team members can also do things to support valuing diversity and the contributions of all team members.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 13

Chapter 12: Project Communication and Documentation

Available Study Resources on Quizplus for this Chatper

124 Verified Questions

124 Flashcards

Source URL: https://quizplus.com/quiz/71907

Sample Questions

Q1) If everything is not covered then the meeting should overrun the scheduled meeting time.

A)True

B)False

Q2) Possible elements of a include documents, author or originator or person responsible for creating the documents, required date or frequency for document completion and distribution, recipients for documents in distribution list, actions required, and comments related to each document.

A)project document plan

B)project communication plan

C)project revision plan

D)project performance plan

Q3) The project manager should dominate rather than facilitate the meeting.

A)True

B)False

Q4) Throughout a project, various project documents will be revised to incorporate changes.

A)True

B)False

Q5) List the most common types of project meetings.

Page 14

To view all questions and flashcards with answers, click on the resource link above.

Chapter 13: Project Management Organizational Structures

Available Study Resources on Quizplus for this Chatper

65 Verified Questions

65 Flashcards

Source URL: https://quizplus.com/quiz/71908

Sample Questions

Q1) reduces duplication and overlap of activities.

A)An autonomous project organizational structure

B)A functional organizational structure

C)A matrix organizational structure

D)A project management office

Q2) A disadvantage of a matrix organizational structure is that a company that uses a matrix organization structure must establish operating guidelines to assure a the balance of power between project managers and functional managers favors one or the other.

A)True

B)False

Q3) provides the benefits associated with specialization and functional excellence.

A)An autonomous project organizational structure

B)A functional organizational structure

C)A matrix organizational structure

D)A project management office

Q4) A disadvantage of an autonomous project organizational structure is that individuals are dedicated to working on one project.

A)True

B)False