Information Technology Project Management Practice Questions - 533 Verified Questions

Page 1


Information Technology Project Management

Practice Questions

Course Introduction

Information Technology Project Management provides students with the fundamental principles, methodologies, tools, and techniques required for managing IT projects effectively. The course covers project life cycles, planning, scheduling, budgeting, resource allocation, risk management, quality assurance, and communication within the context of IT initiatives. Through real-world case studies and practical assignments, students develop skills in using project management software and learn how to lead multidisciplinary teams, balance competing demands, and ensure project success within scope, time, and budget constraints. The course also addresses best practices, ethical considerations, and current trends in IT project management.

Recommended Textbook Project Management in Practice 5th Edition by Jack

Available Study Resources on Quizplus

8 Chapters

533 Verified Questions

533 Flashcards

Source URL: https://quizplus.com/study-set/1630 Page 2

Chapter 1: The World of Project Management

Available Study Resources on Quizplus for this Chatper

70 Verified Questions

70 Flashcards

Source URL: https://quizplus.com/quiz/32366

Sample Questions

Q1) Nonnumeric project selection methods are only suitable if numeric methods are not available.

A)True

B)False

Answer: False

Q2) Negotiating the purchase of a new car would typically be characterized as win-win negotiation.

A)True

B)False

Answer: False

Q3) In project management, superior-subordinate relationships are known and lines of authority are clear.

A)True

B)False

Answer: False

Q4) Briefly explain what a project is.

Answer: Not Answered

Q5) To what extent can the three goals of a project be traded-off for one another?

Answer: Not Answered

To view all questions and flashcards with answers, click on the resource link above. Page 3

Chapter 2: The Manager, the Organization, and the Team

Available Study Resources on Quizplus for this Chatper

68 Verified Questions

68 Flashcards

Source URL: https://quizplus.com/quiz/32367

Sample Questions

Q1) It is common to have more than one boss in a matrix organization.

A)True

B)False Answer: True

Q2) Cross divisional project communication is enhanced when a project is organized in a functional project organization.

A)True

B)False

Answer: False

Q3) It is common practice to select the project manager prior to the project being selected.

A)True

B)False Answer: False

Q4) The project manager is supposed to facilitate the work of the project team and must, therefore, stay aloof from the conflicts arising among project team members.

A)True

B)False Answer: False

To view all questions and flashcards with answers, click on the resource link above. Page 4

Chapter 3: Planning the Project

Available Study Resources on Quizplus for this Chatper

63 Verified Questions

63 Flashcards

Source URL: https://quizplus.com/quiz/32368

Sample Questions

Q1) SDT stands for

A) study, design, test

B) self-directed team

C) significantly delayed task

D) standard design task

E) standard development tool

Answer: B

Q2) Defining resource needs is not necessary on small projects.

A)True

B)False

Answer: False

Q3) Which of the following is used to show linkages between people and tasks?

A) the work breakdown structure

B) the RACI

C) the Project Action Plan

D) the Project Resource Diagram

E) the Concurrent Engineering Chart

Answer: B

Q4) List some of the results of the project launch meeting.

Answer: Not Answered

To view all questions and flashcards with answers, click on the resource link above. Page 5

Chapter 4: Budgeting the Project

Available Study Resources on Quizplus for this Chatper

64 Verified Questions

64 Flashcards

Source URL: https://quizplus.com/quiz/32369

Sample Questions

Q1) The first unit required 6 hours. If the industry uses a 90 percent learning rate, how long should the fourth unit take?

A) 6 hours

B) 4.86 hours

C) 3.75 hours

D) 3.34 hours

E) 2.67 hours

Q2) The first unit requires 10 hours to complete. If the industry uses an 80 percent learning rate, how long should the third unit take?

A) 10 hours

B) 9 hours

C) 8 hours

D) 7.02 hours

E) 6.40 hours

Q3) By very careful planning, a project manager can do away with cost uncertainty.

A)True

B)False

Q4) Define the term learning rate.

Q5) List the steps in performing FMEA.

To view all questions and flashcards with answers, click on the resource link above. Page 6

Chapter 5: Scheduling the Project

Available Study Resources on Quizplus for this Chatper

63 Verified Questions

63 Flashcards

Source URL: https://quizplus.com/quiz/32370

Sample Questions

Q1) What assumptions are made about the probabilities of the optimistic and pessimistic times in the standard formula for calculating the variance of a particular activity? Explain how the formula can be modified to accommodate different assumptions.

Q2) A big advantage of AON networks is that they are easier to draw.

A)True

B)False

Q3) To manage a project successfully, the project manager need only pay close attention to tasks on the critical path.

A)True

B)False

Q4) A Term not used in the discussion of PERT/CPM analysis is

A) Activity

B) Events

C) Critical Path

D) Sensitivity path

E) network s

Q5) Define the term Critical Path.

Q6) What is a merger and what problems do mergers create?

Q7) What is a Gantt chart?

To view all questions and flashcards with answers, click on the resource link above. Page 7

Chapter 6: Allocating Resources to the Project

Available Study Resources on Quizplus for this Chatper

66 Verified Questions

66 Flashcards

Source URL: https://quizplus.com/quiz/32371

Sample Questions

Q1) Pools of like resources from which labor can be added temporarily to projects tend to increase costs for the firm as a whole.

A)True

B)False

Q2) A task has a normal duration of 9 days and a crash duration of 7 days. Its normal cost is $40 and its crash cost is $100. What is the crash cost per day?

A) $140

B) $70

C) $50

D) $40

E) $30

Q3) A limitation associated with traditional approaches to project management is that the dependency between resources and tasks is often ignored.

A)True

B)False

Q4) Briefly overview Goldratt's common chain of events.

Q5) Explain the concept of a safety buffer.

Q6) What is the effect of not reporting the early completion of project activities?

To view all questions and flashcards with answers, click on the resource link above. Page 8

Chapter 7: Monitoring and Controlling the Project

Available Study Resources on Quizplus for this Chatper

72 Verified Questions

72 Flashcards

Source URL: https://quizplus.com/quiz/32372

Sample Questions

Q1) Which of the following is not a distinct type of report?

A) exception

B) special analysis

C) critical incident

D) routine

E) all of the above are distinct types of reports

Q2) Exception reports are primarily intended for unexpected situations.

A)True

B)False

Q3) Monitoring is the direct connection between project planning and control.

A)True

B)False

Q4) Frequent blame is considered a good motivational tool to keep project team members on track.

A)True

B)False

Q5) State the formula for SPI. Explain what SPI means and its relevance to monitoring and controlling a project.

Q6) Explain how an earned value chart can be used to help monitor and control a project.

Page 9

To view all questions and flashcards with answers, click on the resource link above.

Chapter 8: Evaluating and Terminating the Project

Available Study Resources on Quizplus for this Chatper

67 Verified Questions

67 Flashcards

Source URL: https://quizplus.com/quiz/32373

Sample Questions

Q1) Later project audits are typically of less value to the project team and of more interest to general management.

A)True

B)False

Q2) The original criteria for selecting and funding the project are largely irrelevant for project evaluation.

A)True

B)False

Q3) The general audit is usually performed by a person or team with special technical skills.

A)True

B)False

Q4) The formal audit is a special type of project evaluation.

A)True

B)False

Q5) A general audit is usually constrained by time and cost and limited to a brief investigation of project essentials.

A)True

B)False

To view all questions and flashcards with answers, click on the resource link above. Page 10

Turn static files into dynamic content formats.

CreateΒ aΒ flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.