Engineering Project Management Test Bank
Course Introduction
Engineering Project Management covers the fundamental principles and techniques required to successfully plan, execute, and monitor engineering projects. The course explores methodologies such as traditional Waterfall and Agile approaches, project life cycles, risk assessment, resource allocation, budgeting, and teamwork. Emphasis is placed on the integration of technical and managerial skills to solve complex, real-world engineering problems within constraints of scope, time, and cost. Students will also develop proficiency in using project management tools and software, preparing them for effective leadership and collaboration in multi-disciplinary engineering environments.
Recommended Textbook
Contemporary Project Management 3rd Edition by Timothy Kloppenborg
Available Study Resources on Quizplus
15 Chapters
682 Verified Questions
682 Flashcards
Source URL: https://quizplus.com/study-set/2831

Page 2

Chapter 1: Introduction to Project Management
Available Study Resources on Quizplus for this Chatper
49 Verified Questions
49 Flashcards
Source URL: https://quizplus.com/quiz/56435
Sample Questions
Q1) In an adaptive or change - driven project life cycle:
A) the product or deliverable is well understood.
B) planning precedes all executing.
C) early results lead into planning later work.
D) the waterfall approach is commonly used.
Answer: C
Q2) Generally,project life cycle stages are designed so that the amount of money spent in each of the stages is nearly equivalent.
A)True
B)False
Answer: False
Q3) Some projects are considered successful if they reap business benefits like increased profitability,even if completed late or over budget.
A)True
B)False
Answer: True
To view all questions and flashcards with answers, click on the resource link above. Page 3

Chapter 2: Project Selection and Prioritization
Available Study Resources on Quizplus for this Chatper
52 Verified Questions
52 Flashcards
Source URL: https://quizplus.com/quiz/56436
Sample Questions
Q1) Portfolios deal with all of an organization's projects,while programs deal with:
A) ongoing operations
B) a specific group of related projects
C) resource availability
D) tradeoffs between schedule,scope and quality
Answer: B
Q2) When a client company decides to engage an external contractor to perform project work,it must be prepared to submit a proposal and prepare a bid.
A)True
B)False
Answer: False
Q3) Which of the following statements concerning strategic analysis is true?
A) Strategic analysis focuses exclusively upon external analysis.
B) External analysis focuses on the strengths and weaknesses of the organization.
C) Internal analysis focuses on the threats and opportunities facing the organization.
D) External analysis focuses on the threats and opportunities facing the organization.
Answer: D
To view all questions and flashcards with answers, click on the resource link above. Page 4

Chapter 3: Organizational Capability: Structure,Culture and
Roles
Available Study Resources on Quizplus for this Chatper
50 Verified Questions
50 Flashcards
Source URL: https://quizplus.com/quiz/56437
Sample Questions
Q1) Organizational culture is comprised of the values,social rituals,and symbols that are shared among members of the organization and taught to new members.
A)True
B)False
Answer: True
Q2) Hallmarks of "personal cultures" are skill-based assignments,self-motivated workers,and more deference paid to knowledge than to formal authority.
A)True
B)False
Answer: False
Q3) The decision to kill a project if needed is typically reached jointly through agreement between the project customer and the project contractor.
A)True
B)False
Answer: False
To view all questions and flashcards with answers, click on the resource link above. Page 5

Chapter 4: Chartering Projects
Available Study Resources on Quizplus for this Chatper
39 Verified Questions
39 Flashcards
Source URL: https://quizplus.com/quiz/56438
Sample Questions
Q1) A charter is used to quickly screen potential projects and to eliminate the poor choices.
A)True
B)False
Q2) Which of the following statements accurately describes the responsibilities typically associated with the development of the project charter?
A) the project sponsor typically prepares the detailed first draft of the charter
B) the project manager typically prepares the business case and scope overview
C) the customer typically prepares and signs the charter
D) the project manager and team typically prepare the majority of the rough draft for the project charter
Q3) Which of the following charter elements defines the project purpose and justifies the necessity of the project?
A) scope control plan
B) acceptance criteria
C) business case
D) scope overview
Q4) What are risks,and why is it important to identify them in the project charter?
To view all questions and flashcards with answers, click on the resource link above. Page 6

Chapter 5: Stakeholder Analysis and Communication Planning
Available Study Resources on Quizplus for this Chatper
46 Verified Questions
46 Flashcards
Source URL: https://quizplus.com/quiz/56439
Sample Questions
Q1) In order to be sure a project meeting runs according to plan,the project manager should develop an agenda in advance and deliver it to participants as they arrive at the meeting.
A)True
B)False
Q2) Project management plans generally include all of the following elements EXCEPT:
A) schedules and budgets
B) business case and recommendations
C) risks and quality considerations
D) communications and stakeholders
Q3) Stakeholders include both those who will use the result of a project as well as those who will be affected by the result of a project.
A)True
B)False
Q4) Project managers should purposefully plan and carry out relationship building activities that lead to respect and trust.
A)True
B)False
To view all questions and flashcards with answers, click on the resource link above. Page 7
Chapter 6: Defining Scope and Constructing Work
Breakdown Structures WBS
Available Study Resources on Quizplus for this Chatper
44 Verified Questions
44 Flashcards
Source URL: https://quizplus.com/quiz/56440
Sample Questions
Q1) All of the following conventions are widely adopted when project teams create the second level of the project Work Breakdown Structure (WBS)EXCEPT:
A) The second level may be organized by project phase.
B) The second level may be organized by major design components.
C) The second level may be organized by work function.
D) The second level may be organized by activities and tasks
Q2) Failure to include project management in the Work Breakdown Structure will increase the likelihood that the project will finish late or over budget.
A)True
B)False
Q3) A Work Breakdown Structure must be decomposed at least four levels in order to be effective.
A)True
B)False
Q4) The project scope is the work that must be performed to deliver a product,service or result with the specified features and functions.
A)True
B)False

8
To view all questions and flashcards with answers, click on the resource link above.

Chapter 7: Scheduling Activities
Available Study Resources on Quizplus for this Chatper
56 Verified Questions
56 Flashcards
Source URL: https://quizplus.com/quiz/56441
Sample Questions
Q1) The total number of work periods (not including holidays or other non-work periods)required to complete a schedule activity is known as:
A) effort
B) elapsed time
C) duration
D) resource days
Q2) Except in rare circumstances,project teams should not attempt to decompose work packages into project activities because work packages provide sufficient detail to develop a project schedule.
A)True
B)False
Q3) Which of the following remedies may reduce the likelihood of omissions when developing activity duration estimates?
A) lessons learned
B) resource buffers
C) learning curve
D) staggering project start dates
Q4) Describe "slack" and how you can use slack to your advantage in managing a project.
To view all questions and flashcards with answers, click on the resource link above. Page 9

Chapter 8: Resourcing Projects
Available Study Resources on Quizplus for this Chatper
45 Verified Questions
45 Flashcards
Source URL: https://quizplus.com/quiz/56442
Sample Questions
Q1) While a "RACI" chart may be very useful for assigning activities to core team members and project managers,the sheer number of subject matter experts on many projects renders the RACI chart impractical for large projects.
A)True
B)False
Q2) What methods could a project manager use to resolve resource overloads?
Q3) Consider the project crashing information presented in Figure 8-4.What is the incremental cost to achieve a one-day reduction in the duration of this project in the most cost efficient manner?
A) $ 30
B) $ 35
C) $ 40
D) $ 60
Q4) Consider the project crashing information presented in Figure 8-4.What is the cost to complete this project in the normal time?
A) $ 40
B) $ 120
C) $ 145
D) $ 405
To view all questions and flashcards with answers, click on the resource link above. Page 10

Chapter 9: Budgeting Projects
Available Study Resources on Quizplus for this Chatper
46 Verified Questions
46 Flashcards
Source URL: https://quizplus.com/quiz/56443
Sample Questions
Q1) Discuss how the accuracy of cost estimates becomes more precise during a project.
Q2) Early in a project when very little detail is known about a project,it is impractical to render even a rough estimate of the final project cost.
A)True
B)False
Q3) Decisions related to fixed and variable costs are very sensitive to changes in volume related factors and project scope.
A)True
B)False
Q4) Projects often include indirect costs that are not associated directly with one specific project.Which of the following items are most typically considered to be indirect costs?
A) costs associated with material and purchased parts
B) the cost of labor provided by project team members,consultants and subcontractors
C) executive salaries,utilities and insurance
D) travel cost for the project team
To view all questions and flashcards with answers, click on the resource link above. Page 11
Chapter 10: Project Risk Planning
Available Study Resources on Quizplus for this Chatper
45 Verified Questions
45 Flashcards
Source URL: https://quizplus.com/quiz/56444
Sample Questions
Q1) The primary output of risk identification is the Risk Identification Matrix (RIM).
A)True
B)False
Q2) All of the following are benefits that can be attributed to the effective use of a risk management plan EXCEPT:
A) It enables project managers to eliminate or reduce the impact of some threats.
B) It enables the project manager to identify and eliminate all risks
C) It facilitates communication with various project stakeholders.
D) It enables project managers to capitalize on some opportunities.
Q3) All of the following methods have proven to be useful techniques to help project teams identify the risks that might impact the project EXCEPT:
A) reviewing project documents
B) documenting lessons learned
C) interviewing stakeholders
D) brainstorming among team members and subject matter experts
Q4) Identify five common project risk strategies employed to address threats that your project may face.Give an example of each.
To view all questions and flashcards with answers, click on the resource link above.

12

Chapter 11: Project Quality Planning and Project Kick-Off
Available Study Resources on Quizplus for this Chatper
45 Verified Questions
45 Flashcards
Source URL: https://quizplus.com/quiz/56445
Sample Questions
Q1) The goal of empowered performance is to improve performance results each and every period.
A)True
B)False
Q2) The project manager is responsible for selecting appropriate quality standards for the project.Typically,these standards apply to all of the following EXCEPT:
A) team selection criteria
B) documentation created during the project
C) deliverables created by the project
D) materials and related inputs used by the project
Q3) A high level view of processes and stakeholders,that starts with suppliers and ends with customers,is sometimes referred to as a "Plan-Do-Check-Act" (PDCA)model.
A)True B)False
Q4) Project quality is defined as the degree to which a set of inherent characteristics fulfills requirements.
A)True
B)False
To view all questions and flashcards with answers, click on the resource link above. Page 13

Chapter 12: Project Supply Chain Management
Available Study Resources on Quizplus for this Chatper
45 Verified Questions
45 Flashcards
Source URL: https://quizplus.com/quiz/56446
Sample Questions
Q1) Supply chains use a combination of modes of transportation including: air,rail,water,pipeline and truck.
A)True
B)False
Q2) Project managers must frequently decide whether to obtain needed products and services from internal sources or from external sources.This decision is often referred to as the "make or buy" decision.Briefly identify and explain at least three reasons that support the decision to "make" the products and at least three reasons that support the decision to "buy" the products.
Q3) Project partnerships can be advantageous to both the client and the vendor,in terms of improved project execution,flexibility,and reduced bid administration.
A)True
B)False
Q4) Effective project partnerships generally require shared responsibilities,shared resources,shared information,shared rights and shared risks between suppliers and customers.
A)True
B)False
To view all questions and flashcards with answers, click on the resource link above. Page 14

Chapter 13: Leading and Managing Project Teams
Available Study Resources on Quizplus for this Chatper
46 Verified Questions
46 Flashcards
Source URL: https://quizplus.com/quiz/56447
Sample Questions
Q1) All of the following are among the activities a project manager should undertake to develop a highly effective team EXCEPT:
A) assess sponsor capability
B) assess project team capability
C) establish team ground rules
D) assess individual member capability
Q2) All project teams progress uniformly through five stages of team development.
A)True
B)False
Q3) The value of engaging a subject matter expert early in a project should be balanced against the potentially significant cost of paying for his or her expertise.
A)True
B)False
Q4) Great team synergy can make a team's capability better than the individual members' capabilities.
A)True
B)False
Q5) Identify and describe five characteristics of a high-performing project team.
To view all questions and flashcards with answers, click on the resource link above. Page 15
Chapter 14: Determining Project Progress and Results
Available Study Resources on Quizplus for this Chatper
44 Verified Questions
44 Flashcards
Source URL: https://quizplus.com/quiz/56448
Sample Questions
Q1) Consider the project performance report presented in figure 14.1.As a project manager,these results should lead you to...
A) take actions to understand and remedy the schedule performance on the active avionics work packages.
B) take actions to understand and resolve budgetary overruns on the active communications work packages.
C) take actions to understand and remedy the schedule performance on the active training work packages.
D) notify the project owner that you will not require all of the funding currently budgeted for this project.
Q2) Your most recent project performance report indicates that your cumulative Schedule Performance Index (SPI)is .85 and your cumulative Cost Performance Index (CPI)is .90.What conclusions can you draw from these performance indices? What actions might you take to address project performance based on these results?
Q3) Earned Value (EV)is the authorized budget assigned to the scheduled work.
A)True
B)False
To view all questions and flashcards with answers, click on the resource link above.

Page 16

Chapter 15: Finishing the Project
Available Study Resources on Quizplus for this Chatper
30 Verified Questions
30 Flashcards
Source URL: https://quizplus.com/quiz/56449
Sample Questions
Q1) Any of the following attributes can serve as a useful factor for coding lessons learned EXCEPT:
A) type of project
B) stage in project life cycle
C) issue it concerns
D) lessons learned owner
Q2) More organizations effectively collect lessons learned than effectively disseminate and use them.
A)True
B)False
Q3) On some projects,some deliverables remain incomplete at project close-out.Activities that are not complete should be itemized,and responsibility for each should be clearly identified.
A)True
B)False
Q4) Identify two actions a project manager can take to avoid terminating a project early.If these actions aren't effective,how should the project manager approach an early termination?
Q5) What is "validate scope" and why is it important to the project?
To view all questions and flashcards with answers, click on the resource link above. Page 17